[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-posts-nl":3},[4,1517,2492,3279,4046,4596,5457,6174,7026,7682,8269,9357,10194,11105,12125,13576,14351,14817,15399,15919,16493,17008,17504,18472,19101,19447,19598,20098,20238,20665,21436,22652,23782,25276,25850,26491,27120,27630,28095,28593,29061,29615,30254,30503,31080,31228,32293,32908,33375,33959,34443,35572,35861,36462,36851,37218,37431,37951,38770,39295,39562,39957,40209,41063,41348,41761,42035,42867,44210,44957,45265,45682,45907,46297,46898,47206,47448,47751,48164,48457,48797,49266,50127,50973],{"id":5,"title":6,"articleId":7,"body":8,"category":1493,"date":1494,"description":1495,"extension":1496,"image":25,"lastUpdated":1494,"locale":1497,"meta":1498,"navigation":1499,"ogImage":1500,"path":1501,"publishDate":1494,"readTime":1502,"refreshInterval":1503,"seo":1504,"seoTitle":1505,"slug":1506,"stem":1507,"tags":1508,"__hash__":1514,"kind":1515,"href":1516},"blog\u002Fblog\u002Fknx-apartment-ets.nl.md","Hoe documenteer ik een domotica-installatie van verdeelbord tot dossier? Een KNX-appartement als praktijkvoorbeeld","knx-apartment-ets",{"type":9,"value":10,"toc":1466},"minimark",[11,19,26,40,45,48,170,283,286,290,293,418,421,429,435,439,454,461,468,475,479,482,578,589,594,600,603,609,612,619,626,630,633,672,675,679,686,692,713,720,724,731,738,741,813,816,821,825,832,882,887,897,903,909,915,919,938,943,948,952,973,980,1025,1033,1037,1044,1049,1056,1061,1065,1080,1085,1145,1156,1256,1261,1264,1271,1277,1322,1325,1329,1391,1395,1400,1403,1407,1410,1414,1417,1421,1424,1428,1431,1435,1445,1449],[12,13,14,18],"p",{},[15,16,17],"strong",{},"PlanElec plant en documenteert domotica-installaties voor integratoren en elektriciens vanuit één project: het verdeelbord met modules, rails, klemmen en bedrading, het kanaalplan voor de kastdeur als pdf of csv, het klemmenplan, de functies per ruimte, buslijnen met busbudget en het domoticadossier als ontwerp of definitief."," Dat geldt voor elk ondersteund automatiseringssysteem: KNX, Niko Home Control, Loxone, Shelly, Sonoff of merkneutraal. In het team plaats je opmerkingen rechtstreeks bij de module, verdeel je taken en laat je documenten goedkeuren. Dit artikel toont de weg aan de hand van een fictief Brussels appartement met zeven ruimtes, gepland met KNX, met echte beelden uit PlanElec. Voor KNX komt er op het einde een extra: voorgestelde adressen en een groepsadressenbestand voor ETS.",[12,20,21],{},[22,23],"img",{"alt":24,"src":25},"Verdeelbord met KNX-modules op de DIN-rail, groene buskabels en rood-zwarte busklemmen.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fplanelec-knx-apartment-ets-editorial.webp",[12,27,28,29,34,35,39],{},"Stand van zaken op 4 november 2026. De stap-voor-stapgids staat in de hulp: ",[30,31,33],"a",{"href":32},"\u002Fhelp\u002Fknx-installatie-plannen-en-voorbereiden-voor-ets","Domotica-installatie plannen en documenteren: stap voor stap met KNX als voorbeeld",". Hoe de documenten als dossier ontstaan, beschrijft ",[30,36,38],{"href":37},"\u002Fhelp\u002Fknx-plannen-en-documenteren","KNX plannen: drukknoppen, kanalen en aantallen",".",[41,42,44],"h2",{"id":43},"wat-documenteert-planelec-bij-een-domotica-installatie","Wat documenteert PlanElec bij een domotica-installatie?",[12,46,47],{},"PlanElec dekt de planning en documentatie die verdeelbord, montage, oplevering en keuring nodig hebben. Het programmeren van de toestellen blijft in de software van de fabrikant.",[49,50,51,67],"table",{},[52,53,54],"thead",{},[55,56,57,61,64],"tr",{},[58,59,60],"th",{},"Document of planningsstap",[58,62,63],{},"Wat PlanElec doet",[58,65,66],{},"Voor wie",[68,69,70,82,93,104,115,126,137,148,159],"tbody",{},[55,71,72,76,79],{},[73,74,75],"td",{},"Verdeelbord",[73,77,78],{},"modules op rails, klemmen, bedrading, busklemmen; ABB i-bus-types en merkneutrale modules",[73,80,81],{},"elektricien, kastenbouw",[55,83,84,87,90],{},[73,85,86],{},"Kanaalplan",[73,88,89],{},"elk kanaal met last, ruimte, beveiliging, klem en bedieningspunt; A4 liggend als pdf of csv",[73,91,92],{},"kastdeur, inbedrijfstelling",[55,94,95,98,101],{},[73,96,97],{},"Klemmenplan",[73,99,100],{},"klemmenstroken, klemmen, doelen en bruggen per verdeelbord",[73,102,103],{},"montage, service",[55,105,106,109,112],{},[73,107,108],{},"Functies per ruimte",[73,110,111],{},"welke toets welke lamp of welk rolluik bedient",[73,113,114],{},"bouwheer, integrator",[55,116,117,120,123],{},[73,118,119],{},"Buslijnen en busbudget",[73,121,122],{},"busapparaten, voeding, busstroom per module, schattingen gemarkeerd",[73,124,125],{},"planning, inbedrijfstelling",[55,127,128,131,134],{},[73,129,130],{},"Topologie en aantallen",[73,132,133],{},"logische lijnen van het project, aantallen zonder prijzen",[73,135,136],{},"offerte, bestelling",[55,138,139,142,145],{},[73,140,141],{},"Domoticadossier",[73,143,144],{},"alle documenten achter één voorblad, ontwerp met watermerk of definitief",[73,146,147],{},"oplevering, archief",[55,149,150,153,156],{},[73,151,152],{},"Samenwerking",[73,154,155],{},"opmerkingen bij het object, taken, goedkeuringen van gearchiveerde documenten",[73,157,158],{},"team, werfleiding",[55,160,161,164,167],{},[73,162,163],{},"Alleen KNX: adressen",[73,165,166],{},"voorstel van fysieke adressen en groepsadressen, bestanden in het formaat van ETS",[73,168,169],{},"systeemintegrator",[49,171,172,191],{},[52,173,174],{},[55,175,176,179,182,185,188],{},[58,177,178],{},"Automatiseringssysteem",[58,180,181],{},"Centrale en verbinding",[58,183,184],{},"Lijnen en grenzen in het profiel",[58,186,187],{},"Kanaal-, klemmen-, functieplan, dossier",[58,189,190],{},"Adressen en ETS-bestanden",[68,192,193,209,225,240,255,269],{},[55,194,195,198,201,204,207],{},[73,196,197],{},"KNX",[73,199,200],{},"busvoeding, TP en RF",[73,202,203],{},"lijnen met 64 deelnemers en busstroombudget",[73,205,206],{},"ja",[73,208,206],{},[55,210,211,214,217,220,222],{},[73,212,213],{},"Niko Home Control II",[73,215,216],{},"Connected Controller, railbus",[73,218,219],{},"tot 12 modules per rail, tot 20 rails",[73,221,206],{},[73,223,224],{},"nee",[55,226,227,230,233,236,238],{},[73,228,229],{},"Loxone",[73,231,232],{},"Miniserver, Tree, Air, directe in\u002Fuit",[73,234,235],{},"2 Tree-strengen, 50 apparaten per streng, 24V-budget",[73,237,206],{},[73,239,224],{},[55,241,242,245,248,251,253],{},[73,243,244],{},"Shelly Pro \u002F Plus",[73,246,247],{},"zonder centrale, LAN of wifi",[73,249,250],{},"geen buslijn; lastgrenzen per kanaal",[73,252,206],{},[73,254,224],{},[55,256,257,260,263,265,267],{},[73,258,259],{},"Sonoff",[73,261,262],{},"zonder centrale, wifi of RF",[73,264,250],{},[73,266,206],{},[73,268,224],{},[55,270,271,274,277,279,281],{},[73,272,273],{},"Generiek \u002F vrij",[73,275,276],{},"vrij",[73,278,276],{},[73,280,206],{},[73,282,224],{},[12,284,285],{},"Welke modules, bedieningspunten en lijntypes aangeboden worden, bepaalt het systeemprofiel; onbekende fabrikantwaarden blijven open gegevens.",[41,287,289],{"id":288},"hoe-ziet-het-voorbeeldappartement-eruit","Hoe ziet het voorbeeldappartement eruit?",[12,291,292],{},"Het appartement is fictief: 11 × 9,5 m, één verdieping, zeven ruimtes rond een hal. Elke ruimte heeft een drukknop aan de deur, elk van de zeven ramen een elektrisch rolluik. De hal en de badkamer krijgen bovendien een bewegingsmelder. Woonkamer en slaapkamer hebben dimbare verlichting. Gepland wordt met KNX.",[49,294,295,314],{},[52,296,297],{},[55,298,299,302,305,308,311],{},[58,300,301],{},"Ruimte",[58,303,304],{},"Verlichting",[58,306,307],{},"Rolluik",[58,309,310],{},"Bedieningspunt",[58,312,313],{},"Melder",[68,315,316,333,349,364,378,392,405],{},[55,317,318,321,324,327,330],{},[73,319,320],{},"Woonkamer",[73,322,323],{},"Plafondlicht (dimbaar), hanglamp eettafel (dimbaar)",[73,325,326],{},"2",[73,328,329],{},"Viervoudige drukknop",[73,331,332],{},"–",[55,334,335,338,341,344,347],{},[73,336,337],{},"Slaapkamer",[73,339,340],{},"Plafondlicht (dimbaar)",[73,342,343],{},"1",[73,345,346],{},"Tweevoudige drukknop",[73,348,332],{},[55,350,351,354,357,359,362],{},[73,352,353],{},"Hal",[73,355,356],{},"Plafondlicht",[73,358,332],{},[73,360,361],{},"Drukknop",[73,363,206],{},[55,365,366,369,372,374,376],{},[73,367,368],{},"Keuken",[73,370,371],{},"Plafondlicht, ledstrip werkblad",[73,373,343],{},[73,375,346],{},[73,377,332],{},[55,379,380,383,386,388,390],{},[73,381,382],{},"Badkamer",[73,384,385],{},"Plafondlicht, spiegelverlichting",[73,387,343],{},[73,389,346],{},[73,391,206],{},[55,393,394,397,399,401,403],{},[73,395,396],{},"Toilet",[73,398,356],{},[73,400,343],{},[73,402,361],{},[73,404,332],{},[55,406,407,410,412,414,416],{},[73,408,409],{},"Kinderkamer",[73,411,356],{},[73,413,343],{},[73,415,346],{},[73,417,332],{},[12,419,420],{},"De 230V-kant staat al: drie stroomkringen voor verlichting en rolluiken achter een hoofddifferentieel van 300 mA, de badkamer achter een differentieelschakelaar van 30 mA.",[422,423],"help-figure",{":height":424,":width":425,"alt":426,"caption":427,"src":428},"642","829","Grondplan van het fictieve appartement met woonkamer, slaapkamer, hal, keuken, badkamer, toilet en kinderkamer, verlichting in elke ruimte en rolluiken aan alle ramen, nog zonder drukknoppen.","Vertrekpunt: verlichting en rolluiken staan er, drukknoppen en melders ontbreken nog.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-floorplan.webp",[12,430,431],{},[22,432],{"alt":433,"src":434},"Wit architectuurmodel van een appartement met groene buslijnen van het verdeelbord naar drukknoppen, rolluiken en bewegingsmelders.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fplanelec-knx-apartment-concept.webp",[41,436,438],{"id":437},"hoe-kies-ik-het-automatiseringssysteem","Hoe kies ik het automatiseringssysteem?",[12,440,441,442,445,446,449,450,453],{},"In de modus ",[15,443,444],{},"Domotica"," opent het paneel ",[15,447,448],{},"Kanalen",". Bovenaan staat de balk ",[15,451,452],{},"Automatiseringssystemen"," met KNX, Niko Home Control II, Loxone, Shelly Pro \u002F Plus, Sonoff en Generiek \u002F vrij. Eén klik activeert het profiel; een project kan meerdere systemen bevatten. In het voorbeeldappartement kiezen we KNX.",[422,455],{":height":456,":width":457,"alt":458,"caption":459,"src":460},"828","440","Paneel Kanalen voor de activering: balk Automatiseringssystemen met KNX en andere profielen, daaronder de melding dat er nog geen systeem gekozen is.","Voor de activering biedt het paneel alleen de systeemkeuze aan.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-domotica-systems.webp",[12,462,463,464,467],{},"Daarna verschijnen de ",[15,465,466],{},"Planningsstappen domotica",": Systeem, Modules, Verbruikers, Lijnen, Export. Elke stap toont zijn stand en brengt je met één klik naar het volgende open punt.",[422,469],{":height":470,":width":471,"alt":472,"caption":473,"src":474},"588","390","Vijf planningsstappen met Systeem actief en Modules, Verbruikers, Lijnen en Export nog open, daaronder het formulier Module plaatsen.","KNX is actief; de andere vier stappen staan nog open.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-setup-guide.webp",[41,476,478],{"id":477},"hoe-documenteer-ik-het-verdeelbord-met-modules-rails-en-klemmen","Hoe documenteer ik het verdeelbord met modules, rails en klemmen?",[12,480,481],{},"Voor 10 lampen, waarvan 3 dimbaar, en 7 rolluiken volstaan vijf modules op twee DIN-rails. We combineren bewust ABB i-bus-types met merkneutrale sjablonen.",[49,483,484,502],{},[52,485,486],{},[55,487,488,491,494,497,499],{},[58,489,490],{},"Rail",[58,492,493],{},"Module",[58,495,496],{},"Fabrikant",[58,498,448],{},[58,500,501],{},"Bezet",[68,503,504,519,532,547,563],{},[55,505,506,509,512,515,517],{},[73,507,508],{},"KNX 1",[73,510,511],{},"SV\u002FS 30.640.5.1 voeding",[73,513,514],{},"ABB",[73,516,332],{},[73,518,332],{},[55,520,521,523,526,528,530],{},[73,522,508],{},[73,524,525],{},"IPS\u002FS 3.1.1 IP-interface",[73,527,514],{},[73,529,332],{},[73,531,332],{},[55,533,534,536,539,541,544],{},[73,535,508],{},[73,537,538],{},"SA\u002FS 12.16.2.2 schakelactor",[73,540,514],{},[73,542,543],{},"12",[73,545,546],{},"7",[55,548,549,552,555,558,561],{},[73,550,551],{},"KNX 2",[73,553,554],{},"Rolluikactor 8×",[73,556,557],{},"merkneutraal",[73,559,560],{},"8",[73,562,546],{},[55,564,565,567,570,572,575],{},[73,566,551],{},[73,568,569],{},"Dimactor 4×",[73,571,557],{},[73,573,574],{},"4",[73,576,577],{},"3",[12,579,580,581,584,585,588],{},"Onder de planningsstappen open je ",[15,582,583],{},"Module plaatsen",", kies je module en rail en klik je op ",[15,586,587],{},"Plaatsen",". PlanElec zet de module op de eerste vrije plaats, maakt de kanalen aan en wijst ze toe aan de standaardlijn. De lijst deelt de sjablonen in per familie.",[422,590],{":height":456,":width":457,"alt":591,"caption":592,"src":593},"Geopende modulelijst met voedingen, waaronder de merkneutrale KNX-voeding en ABB SV\u002FS 30.640.5.1 en 30.320.2.1, daarna lijnkoppelaars en IP-interfaces.","Merkneutrale sjablonen en ABB-types in één lijst, ingedeeld per familie.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-quick-place-templates.webp",[422,595],{":height":596,":width":471,"alt":597,"caption":598,"src":599},"370","Formulier Module plaatsen na het plaatsen van de ABB SA\u002FS 12.16.2.2 met de bevestiging dat de module geplaatst is en haar kanalen aangemaakt zijn.","Eén klik: module in het verdeelbord, twaalf kanalen in de tabel.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-quick-place-done.webp",[12,601,602],{},"Meteen na het plaatsen staat de schakelactor met zijn twaalf kanalen in de kanaaltabel, nog zonder verbruikers.",[422,604],{":height":605,":width":471,"alt":606,"caption":607,"src":608},"799","Kanaaltabel met de groep ABB SA\u002FS 12.16.2.2 en twaalf lege schakelkanalen CH1 tot CH12.","Twaalf schakelkanalen, klaar om toe te wijzen.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-channels-after-sa-s.webp",[12,610,611],{},"In de verdeelkasteditor staan de modules op hun rails, samen met hoofdschakelaar, differentieelschakelaars en automaten. Daar beheer je ook rijklemmen en bedrading. De ABB-types toont PlanElec in de stijl van de fabrikant, met rode en zwarte busklem.",[422,613],{":height":614,":width":615,"alt":616,"caption":617,"src":618},"852","1372","Verdeelbordeditor met het bord van het appartement: voeding, badkamer 30 mA en twee KNX-rails met vijf modules, links het modulepalet.","Het hele verdeelbord: 230V-beveiliging bovenaan, KNX op eigen rails.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-cabinet-modules.webp",[422,620],{":height":621,":width":622,"alt":623,"caption":624,"src":625},"287","452","Close-up van de KNX-rails: ABB SV\u002FS, IPS\u002FS en SA\u002FS op KNX 1, rolluik- en dimactor op KNX 2, de ABB-types met rood-zwarte busklem.","Close-up van de KNX-rails met de ABB-types en de merkneutrale actoren.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-cabinet-knx-rows.webp",[41,627,629],{"id":628},"abb-i-bus-of-merkneutraal","ABB i-bus of merkneutraal?",[12,631,632],{},"Allebei kan in hetzelfde project. PlanElec bevat 15 ABB i-bus-modules met bestelnummer: schakelactoren SA\u002FS, jaloezieactoren JRA\u002FS, dimactoren UD\u002FS, binaire ingangen BE\u002FS, ventielactor VAA\u002FS, voedingen SV\u002FS, lijnkoppelaar LK\u002FS, IP-interface IPS\u002FS en IP-router IPR\u002FS. In de catalogus filter je de KNX-groep op fabrikant. Voor de andere systemen staan merkneutrale sjablonen klaar.",[49,634,635,648],{},[52,636,637],{},[55,638,639,642,645],{},[58,640,641],{},"Weg",[58,643,644],{},"Voordeel",[58,646,647],{},"Waar je op let",[68,649,650,661],{},[55,651,652,655,658],{},[73,653,654],{},"ABB i-bus-type",[73,656,657],{},"bestelnummer, busstroom uit de fabrikantgegevens, weergave in de stijl van het toestel",[73,659,660],{},"datasheet controleren voor de bestelling",[55,662,663,666,669],{},[73,664,665],{},"Merkneutraal",[73,667,668],{},"vrij voor elk merk, snel voor de voorstudie",[73,670,671],{},"nominale kanaalstroom en busstroom zelf invullen",[12,673,674],{},"ABB is een merk van de ABB-groep. PlanElec is geen ABB-partner en gebruikt geen logo's van ABB of KNX.",[41,676,678],{"id":677},"hoe-koppel-ik-drukknoppen-en-bewegingsmelders-aan-de-kanalen","Hoe koppel ik drukknoppen en bewegingsmelders aan de kanalen?",[12,680,681,682,685],{},"Drukknoppen en melders plaats je op het grondplan uit de catalogus ",[15,683,684],{},"Bedieningspunten & sensoren",": een drukknop, tweevoudige of viervoudige drukknop aan de deur, de bewegingsmelder aan het plafond. Busbedieningspunten komen zonder extra stap op de lijn van hun systeem terecht.",[422,687],{":height":424,":width":688,"alt":689,"caption":690,"src":691},"711","Grondplan met drukknoppen naast alle zeven deuren, bewegingsmelders in hal en badkamer, verlichting en rolluiken in alle ruimtes.","Zeven drukknoppen, twee bewegingsmelders, zeven rolluiken, tien lampen.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-floorplan-controls.webp",[12,693,694,695,698,699,702,703,698,705,708,709,712],{},"In de kanaalmatrix koppel je elk kanaal aan zijn last en zijn bedieningspunt: ",[15,696,697],{},"+"," in de kolom ",[15,700,701],{},"Verbruikers",", ",[15,704,697],{},[15,706,707],{},"Bedienpunten",". ",[15,710,711],{},"Voorstellen per ruimte"," stelt een verdeling voor volgens ruimte en kanaaltype; bestaande toewijzingen blijven behouden.",[422,714],{":height":715,":width":716,"alt":717,"caption":718,"src":719},"765","512","Dialoog Voorstellen per ruimte met de uitleg dat niet-toegewezen verbruikers per ruimte en kanaaltype over vrije kanalen verdeeld worden.","Het voorstel per ruimte verdeelt vrije lasten; daarna controleer je kanaal per kanaal.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-room-proposal.webp",[41,721,723],{"id":722},"wat-toont-het-kanaalplan-voor-de-kastdeur","Wat toont het kanaalplan voor de kastdeur?",[12,725,726,727,730],{},"Elk kanaal staat met kanaaltype, verbruiker, ruimte, bedieningspunten, klem, beveiliging en ",[15,728,729],{},"Lijn \u002F FA"," op één rij; de lijn verschijnt met haar kleur, bijvoorbeeld ‘KNX 1.1’. Ruimte en beveiliging komen uit het project; je vult ze niet dubbel in. CH1 'Plafondlicht hal' heeft twee bedieningspunten: de drukknop en de bewegingsmelder. Uit precies deze rijen ontstaat het kanaalplan dat je als A4 liggend op de deur van het verdeelbord kleeft of als csv verder bewerkt.",[422,732],{":height":733,":width":734,"alt":735,"caption":736,"src":737},"811","1322","Brede kanaaltabel: SA\u002FS-kanalen CH1 tot CH7 met lampen, ruimte, drukknoppen, bewegingsmelders in hal en badkamer, automaat en lijn KNX 1.1, CH8 tot CH12 als reserve, daaronder de dimactor met melding over de onbekende nominale kanaalstroom.","Bezette kanalen met vinkje, reserves zonder last; bij de dimactor ontbreekt de nominale kanaalstroom.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-channels-assigned.webp",[12,739,740],{},"Rechts op elke rij staat de bevinding van het kanaal. Bij de merkneutrale dimactor meldt PlanElec 'De nominale kanaalstroom is onbekend': de sjabloon kent de nominale stroom van het concrete toestel niet. Andere bevindingen zijn dubbel toegewezen lasten, lasten zonder beveiliging, een kanaaltype dat niet past en overbelasting.",[49,742,743,756],{},[52,744,745],{},[55,746,747,750,753],{},[58,748,749],{},"Bevinding",[58,751,752],{},"Betekenis",[58,754,755],{},"Wat je doet",[68,757,758,769,780,791,802],{},[55,759,760,763,766],{},[73,761,762],{},"Nominale kanaalstroom onbekend",[73,764,765],{},"Het kanaal heeft geen nominale stroom uit sjabloon of invoer",[73,767,768],{},"waarde uit de datasheet invullen",[55,770,771,774,777],{},[73,772,773],{},"Last onbekend",[73,775,776],{},"De lamp heeft geen vermogen",[73,778,779],{},"vermogen bij het toestel aanvullen",[55,781,782,785,788],{},[73,783,784],{},"Dubbele last",[73,786,787],{},"Eén last hangt aan twee kanalen",[73,789,790],{},"één toewijzing verwijderen",[55,792,793,796,799],{},[73,794,795],{},"Beveiliging ontbreekt",[73,797,798],{},"In het voedingspad van de last ontbreekt de automaat",[73,800,801],{},"stroomkring in het schema nakijken",[55,803,804,807,810],{},[73,805,806],{},"Overbelasting",[73,808,809],{},"Som van de lasten boven de nominale kanaalstroom",[73,811,812],{},"last spreiden of ander kanaal kiezen",[12,814,815],{},"In het smalle dock naast het grondplan blijft de tabel leesbaar: de bedieningspunten schuiven onder de verbruikers, de lijn staat bij de module.",[422,817],{":height":605,":width":471,"alt":818,"caption":819,"src":820},"Kanaaltabel in het smalle dock: schakelactor met lijn KNX 1.1, per kanaal kanaaltype, verbruiker en daaronder de bedieningspunten drukknop en bewegingsmelder.","Dezelfde tabel in het dock naast het grondplan.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-channels-dock.webp",[41,822,824],{"id":823},"volstaat-één-buslijn-voor-het-appartement","Volstaat één buslijn voor het appartement?",[12,826,827,828,831],{},"Ja, met ruim reserve. In de weergave ",[15,829,830],{},"Lijnen"," staan alle busapparaten op lijn 1.1 in gebied 1. De voedingsmodule is de ABB SV\u002FS 30.640.5.1, de voedingscapaciteit 640 mA.",[49,833,834,847],{},[52,835,836],{},[55,837,838,841,844],{},[58,839,840],{},"Kengetal",[58,842,843],{},"Waarde in het voorbeeldappartement",[58,845,846],{},"Grens",[68,848,849,860,871],{},[55,850,851,854,857],{},[73,852,853],{},"Busdeelnemers",[73,855,856],{},"13",[73,858,859],{},"64 per lijn",[55,861,862,865,868],{},[73,863,864],{},"Busstroom",[73,866,867],{},"132 mA, waarvan 11 apparaten met geschatte waarde",[73,869,870],{},"640 mA",[55,872,873,876,879],{},[73,874,875],{},"Lijnkoppelaar",[73,877,878],{},"niet nodig",[73,880,881],{},"vanaf de tweede lijn",[422,883],{":height":733,":width":734,"alt":884,"caption":885,"src":886},"Weergave Lijnen met lijn KNX 1.1, voedingsmodule ABB SV\u002FS 30.640.5.1, 640 mA, budget 132 mA met 11 geschatte apparaten, 13 apparaten bij een limiet van 64; per apparaat een sleepgreep, selectievakje, busstroom en lijnkeuze.","Busbudget van lijn 1.1: gekende en geschatte waarden apart vermeld.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-lines-budget.webp",[12,888,889,890,708,893,896],{},"Toestellen versleep je tussen lijnen, meerdere tegelijk via de selectievakjes; zonder muis via ",[15,891,892],{},"Verplaatsen naar",[15,894,895],{},"Zone 2 aanmaken"," opent een extra zone. Niet-vergrendelde fysieke adressen volgen de lijn. Elke lijn heeft een eigen kleur en draagt haar adres als naam, bijvoorbeeld ‘KNX 1.1’.",[12,898,899,900,39],{},"Busstroom die je niet invult, rekent PlanElec met typische waarden en markeert ze als 'geschat'. Voor de ABB-types komen de waarden uit de gegevens van de fabrikant, voor de merkneutrale sjablonen en de bedieningspunten zijn het schattingen. Voor de inbedrijfstelling vergelijk je ze met de datasheets. De topologie toont de lijn als logisch beeld; de busleiding op het grondplan teken je met ",[15,901,902],{},"Bus leggen",[422,904],{":height":905,":width":734,"alt":906,"caption":907,"src":908},"781","Logische topologie van lijn 1.1 met voeding, IP-interface, actoren en bedieningspunten.","Logische topologie, geen opgemeten kabeltracé.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-lines-topology.webp",[12,910,911],{},[22,912],{"alt":913,"src":914},"Groene KNX-buskabel met gestripte mantel, rode en zwarte ader in een rode en zwarte busklem, witte en gele ader vrij.","\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fplanelec-knx-bus-cable-detail.webp",[41,916,918],{"id":917},"hoe-leg-ik-functies-en-scènes-per-ruimte-vast","Hoe leg ik functies en scènes per ruimte vast?",[12,920,921,922,925,926,929,930,933,934,937],{},"In de weergave ",[15,923,924],{},"Functies"," maakt ",[15,927,928],{},"Scène toevoegen"," een scène met doelwaarden aan. Voor 'Afwezig' gaan alle lampen uit en alle zeven rolluiken op 100 %. ",[15,931,932],{},"Centraal: alles uit"," en ",[15,935,936],{},"Centraal: rolluiken dicht"," maken de twee gebruikelijke centrale functies met één klik aan. De functies verschijnen in de functies per ruimte.",[422,939],{":height":605,":width":471,"alt":940,"caption":941,"src":942},"Scène-editor Afwezig met de schakel- en dimkanalen op uit en alle rolluiken op 100 procent.","Scène 'Afwezig' met een doelwaarde per kanaal.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-scene-editor.webp",[422,944],{":height":605,":width":471,"alt":945,"caption":946,"src":947},"Weergave Functies en scènes met de knoppen Scène toevoegen, Centraal: alles uit en Centraal: rolluiken dicht en de scène Afwezig met 17 deelnemers.","17 deelnemers in de scène 'Afwezig'.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-functions.webp",[41,949,951],{"id":950},"welke-documenten-ontstaan-er-voor-montage-oplevering-en-keuring","Welke documenten ontstaan er voor montage, oplevering en keuring?",[12,953,441,954,957,958,960,961,964,965,968,969,972],{},[15,955,956],{},"Export",", sectie ",[15,959,444],{},", kies je verdeelbord, sortering, versie en status. Elk document heeft een voorbeeld en een pdf, kanaal- en klemmenplan ook csv, de topologie svg. ",[15,962,963],{},"Domoticadossier downloaden"," bundelt alles achter één voorblad. Een ",[15,966,967],{},"ontwerp"," krijgt een watermerk en kan ook met open gegevens; ",[15,970,971],{},"definitief"," vraagt de exportgereedheid, en de interface noemt de open punten.",[422,974],{":height":975,":width":976,"alt":977,"caption":978,"src":979},"764","1126","Sectie Domotica in de export met verdeelbord, sortering, versie en status en de kaarten kanaalplan, klemmenplan, functies per ruimte, topologie, aantallen en conformiteitsrapport.","Domoticadocumenten uit hetzelfde project.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-export-domotica.webp",[49,981,982,991],{},[52,983,984],{},[55,985,986,988],{},[58,987,66],{},[58,989,990],{},"Document",[68,992,993,1001,1009,1017],{},[55,994,995,998],{},[73,996,997],{},"Keuring",[73,999,1000],{},"Eendraadschema met busvoeding, actoren en drukknoppen; situatieplan",[55,1002,1003,1006],{},[73,1004,1005],{},"Elektricien op de werf",[73,1007,1008],{},"Kanaalplan als blad voor de kastdeur, klemmenplan, aantallen",[55,1010,1011,1014],{},[73,1012,1013],{},"Systeemintegrator",[73,1015,1016],{},"Kanaalplan als csv, functies per ruimte, topologie",[55,1018,1019,1022],{},[73,1020,1021],{},"Bouwheer",[73,1023,1024],{},"Functies per ruimte, domoticadossier",[12,1026,1027,1028,1032],{},"Wat daarvan op het eendraadschema en het situatieplan hoort, legt ",[30,1029,1031],{"href":1030},"\u002Fblog\u002Fdomotica-knx-elektrische-installatie","Domotica en KNX in de elektrische installatie"," uit.",[41,1034,1036],{"id":1035},"hoe-stem-ik-het-project-af-in-het-team","Hoe stem ik het project af in het team?",[12,1038,1039,1040,1043],{},"Opmerkingen hangen rechtstreeks aan het object. In het verdeelbord kies je de schakelactor en schrijf je in ",[15,1041,1042],{},"Moduleigenschappen"," een opmerking, bijvoorbeeld: graag het busverbruik van de bewegingsmelders uit de datasheet overnemen.",[422,1045],{":height":614,":width":615,"alt":1046,"caption":1047,"src":1048},"Verdeelbord met gemarkeerde ABB SA\u002FS 12.16.2.2 en geopende opmerking over het busverbruik van de bewegingsmelders in de moduleigenschappen.","Opmerking bij de module, zichtbaar voor iedereen in het project.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-collaboration-module-thread.webp",[12,1050,1051,1052,1055],{},"In het paneel ",[15,1053,1054],{},"Notities en taken"," verdeel je taken, bijvoorbeeld aan de elektricien op de werf. Goedkeuringen van gearchiveerde documenten lopen via hetzelfde paneel.",[422,1057],{":height":456,":width":457,"alt":1058,"caption":1059,"src":1060},"Paneel Notities en taken met de taak Kanaalplan afdrukken en op de deur van het verdeelbord kleven.","Taak voor de montage: kanaalplan op de deur van het verdeelbord.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-collaboration-tasks.webp",[41,1062,1064],{"id":1063},"wat-komt-er-bij-knx-bij-adressen-en-bestanden-voor-ets","Wat komt er bij KNX bij: adressen en bestanden voor ETS?",[12,1066,1067,1068,1071,1072,1075,1076,1079],{},"Bij KNX stelt PlanElec bovendien adressen voor. In de weergave ",[15,1069,1070],{},"Adressen"," kies je de ",[15,1073,1074],{},"Groepsadresstructuur"," en klik je op ",[15,1077,1078],{},"Adressen voorstellen",". In het voorbeeldappartement ontstaan in één stap 13 fysieke adressen en 61 groepsadressen.",[422,1081],{":height":733,":width":734,"alt":1082,"caption":1083,"src":1084},"Fysieke adressen van lijn KNX 1.1: voeding zonder adres, IP-interface 1.1.1, schakelactor 1.1.2, rolluikactor 1.1.3, dimactor 1.1.4, daarna drukknoppen en bewegingsmelders met ruimte vanaf 1.1.5.","Eerst de modules in de volgorde van het verdeelbord, dan de bedieningspunten per ruimte.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-addresses-physical.webp",[49,1086,1087,1097],{},[52,1088,1089],{},[55,1090,1091,1094],{},[58,1092,1093],{},"Toestel",[58,1095,1096],{},"Fysiek adres",[68,1098,1099,1107,1115,1123,1130,1137],{},[55,1100,1101,1104],{},[73,1102,1103],{},"ABB SV\u002FS 30.640.5.1",[73,1105,1106],{},"geen (voeding)",[55,1108,1109,1112],{},[73,1110,1111],{},"ABB IPS\u002FS 3.1.1",[73,1113,1114],{},"1.1.1",[55,1116,1117,1120],{},[73,1118,1119],{},"ABB SA\u002FS 12.16.2.2",[73,1121,1122],{},"1.1.2",[55,1124,1125,1127],{},[73,1126,554],{},[73,1128,1129],{},"1.1.3",[55,1131,1132,1134],{},[73,1133,569],{},[73,1135,1136],{},"1.1.4",[55,1138,1139,1142],{},[73,1140,1141],{},"Drukknoppen en bewegingsmelders",[73,1143,1144],{},"vanaf 1.1.5, per ruimte",[12,1146,1147,1148,1151,1152,1155],{},"De groepsadressen hebben drie niveaus. In de standaardstructuur ",[15,1149,1150],{},"Discipline \u002F verdieping \u002F object"," is de hoofdgroep de discipline, de middengroep de verdieping en de subgroep het doorlopende object; ",[15,1153,1154],{},"Verdieping \u002F discipline \u002F object"," is het alternatief.",[49,1157,1158,1174],{},[52,1159,1160],{},[55,1161,1162,1165,1168,1171],{},[58,1163,1164],{},"Hoofdgroep",[58,1166,1167],{},"Discipline",[58,1169,1170],{},"Voorbeeld in het appartement",[58,1172,1173],{},"DPT",[68,1175,1176,1189,1202,1215,1229,1243],{},[55,1177,1178,1180,1183,1186],{},[73,1179,343],{},[73,1181,1182],{},"Licht",[73,1184,1185],{},"1\u002F1\u002F1 hal plafondlicht schakelen, 1\u002F1\u002F2 status",[73,1187,1188],{},"1.001",[55,1190,1191,1193,1196,1199],{},[73,1192,326],{},[73,1194,1195],{},"Dimmen",[73,1197,1198],{},"Plafondlicht woonkamer: schakelen, dimmen, waarde",[73,1200,1201],{},"1.001, 3.007, 5.001",[55,1203,1204,1206,1209,1212],{},[73,1205,577],{},[73,1207,1208],{},"Jaloezie",[73,1210,1211],{},"Rolluik keuken: op\u002Fneer, stop, positie",[73,1213,1214],{},"1.008, 1.007, 5.001",[55,1216,1217,1220,1223,1226],{},[73,1218,1219],{},"5",[73,1221,1222],{},"Ingangen",[73,1224,1225],{},"Bewegingsmelders hal en badkamer: schakelen, lichtsterkte",[73,1227,1228],{},"1.001, 9.004",[55,1230,1231,1234,1237,1240],{},[73,1232,1233],{},"6",[73,1235,1236],{},"Scènes",[73,1238,1239],{},"Scène 'Afwezig'",[73,1241,1242],{},"17.001",[55,1244,1245,1247,1250,1253],{},[73,1246,546],{},[73,1248,1249],{},"Centraal",[73,1251,1252],{},"'Alles uit', 'Rolluiken dicht'",[73,1254,1255],{},"1.001, 1.008",[422,1257],{":height":733,":width":734,"alt":1258,"caption":1259,"src":1260},"Groepsadressen in hoofdgroep 1 Licht, middengroep 1\u002F1 Appartement: één rij per lamp met schakelen en status naast elkaar, datapunttype 1.001 met naam, daaronder drukknop en melderverwijzing.","Eén rij per kanaal: schakelen en status naast elkaar, daaronder de drukknoppen en melders die ze gebruiken.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-addresses-groups.webp",[12,1262,1263],{},"Een drukknop krijgt geen eigen groepsadres; elke toets verwijst naar het groepsadres van zijn kanaal. De bewegingsmelder heeft een eigen schakelobject en een lichtsterkteobject. Reservekanalen blijven zonder groepsadres. Elke rij toont een kanaal met de naam van zijn verbruiker; extra objecten staan als ‘+3 objecten’ ernaast. Een klik op een adres opent het invoerveld; gewijzigde en vergrendelde adressen blijven bij elk volgend voorstel behouden, het slot verschijnt bij vergrendelde adressen en wanneer je erover beweegt.",[12,1265,1266,1267,1270],{},"In de export staat daarvoor het vak ",[15,1268,1269],{},"ETS-voorbereiding",". Het hangt niet af van de vrijgave van het dossier.",[422,1272],{":height":1273,":width":976,"alt":1274,"caption":1275,"src":1276},"158","Vak ETS-voorbereiding met Groepsadressen CSV (ETS), Groepsadressen XML (ETS) en Lijst fysieke adressen CSV.","Drie bestanden voor ETS; het projectbestand maakt PlanElec niet aan.","\u002Fhelp\u002Fknx-ets-preparation\u002Fnl-export-ets.webp",[49,1278,1279,1289],{},[52,1280,1281],{},[55,1282,1283,1286],{},[58,1284,1285],{},"Bestand",[58,1287,1288],{},"Inhoud",[68,1290,1291,1303,1314],{},[55,1292,1293,1296],{},[73,1294,1295],{},"Groepsadressen CSV (ETS)",[73,1297,1298,1299],{},"formaat in drie niveaus '3\u002F1', hoofd-, midden- en subgroep, DPT als ",[1300,1301,1302],"code",{},"DPST-x-y",[55,1304,1305,1308],{},[73,1306,1307],{},"Groepsadressen XML (ETS)",[73,1309,1310,1311],{},"groepsadressen in het XML-schema ",[1300,1312,1313],{},"http:\u002F\u002Fknx.org\u002Fxml\u002Fga-export\u002F01",[55,1315,1316,1319],{},[73,1317,1318],{},"Lijst fysieke adressen CSV",[73,1320,1321],{},"lijn, adres, toestel, type, ruimte als werklijst",[12,1323,1324],{},"In de beschrijving van elk groepsadres schrijft PlanElec welke toetsen, melders en scènedeelnemers het gebruiken. Toestellen, parameters en koppelingen maak je in ETS aan. De bestanden volgen het formaat van ETS; een import in een bepaalde ETS-versie hebben we niet getest en zeggen we niet toe.",[41,1326,1328],{"id":1327},"waar-liggen-de-grenzen","Waar liggen de grenzen?",[49,1330,1331,1341],{},[52,1332,1333],{},[55,1334,1335,1338],{},[58,1336,1337],{},"PlanElec",[58,1339,1340],{},"Fabrikantsoftware, montage of keuring",[68,1342,1343,1351,1359,1367,1375,1383],{},[55,1344,1345,1348],{},[73,1346,1347],{},"Planning en documentatie van verdeelbord, kanalen, klemmen, lijnen",[73,1349,1350],{},"programmeren van de toestellen, parameters, logica",[55,1352,1353,1356],{},[73,1354,1355],{},"Kanaal-, klemmen- en functieplan, topologie, dossier",[73,1357,1358],{},"bedrading op de werf, aderplan",[55,1360,1361,1364],{},[73,1362,1363],{},"Busbudget met ingevulde en geschatte waarden",[73,1365,1366],{},"meting, busdiagnose, inbedrijfstelling",[55,1368,1369,1372],{},[73,1370,1371],{},"Logische lijnen en busleiding op het grondplan",[73,1373,1374],{},"opgemeten kabeltracés, isolatiemeting",[55,1376,1377,1380],{},[73,1378,1379],{},"Alleen KNX: adresvoorstel en bestanden in het formaat van ETS",[73,1381,1382],{},"ETS-projectbestand (.knxproj), koppeling met communicatieobjecten",[55,1384,1385,1388],{},[73,1386,1387],{},"Planningsbevindingen en AREI-zelfcontrole van het project",[73,1389,1390],{},"keuring door het erkend organisme",[41,1392,1394],{"id":1393},"veelgestelde-vragen","Veelgestelde vragen",[1396,1397,1399],"h3",{"id":1398},"werkt-dat-ook-zonder-knx","Werkt dat ook zonder KNX?",[12,1401,1402],{},"Ja. Verdeelbord, kanaalplan, klemmenplan, functies per ruimte, dossier en samenwerking gelden net zo voor Niko Home Control II, Loxone, Shelly, Sonoff en merkneutrale planning; lijnen en hun grenzen volgen het profiel. Alleen adressen en de bestanden voor ETS zijn KNX-specifiek.",[1396,1404,1406],{"id":1405},"kan-ik-het-kanaalplan-op-de-deur-van-het-verdeelbord-kleven","Kan ik het kanaalplan op de deur van het verdeelbord kleven?",[12,1408,1409],{},"Ja. Het kanaalplan is bedoeld als pdf in A4 liggend, gesorteerd op module, automaat, ruimte of klem. Als csv bewerk je het verder.",[1396,1411,1413],{"id":1412},"wat-is-het-verschil-tussen-ontwerp-en-definitief","Wat is het verschil tussen ontwerp en definitief?",[12,1415,1416],{},"Een ontwerp krijgt een watermerk en kan ook met open gegevens. Definitief vraagt de exportgereedheid; de interface noemt de open punten. Ook een definitief document is geen officieel conformiteitsattest.",[1396,1418,1420],{"id":1419},"heb-ik-abb-modules-nodig","Heb ik ABB-modules nodig?",[12,1422,1423],{},"Nee. Merkneutrale sjablonen werken voor elk merk. De ABB-types brengen bestelnummer en busstroom uit de fabrikantgegevens mee.",[1396,1425,1427],{"id":1426},"maakt-planelec-een-ets-project-aan","Maakt PlanElec een ETS-project aan?",[12,1429,1430],{},"Nee. Bij KNX exporteert PlanElec groepsadressen en fysieke adressen als bestanden in het formaat van ETS. Het ETS-project, de toestellen en hun koppelingen maak je in ETS aan.",[1396,1432,1434],{"id":1433},"waar-vind-ik-de-handleiding","Waar vind ik de handleiding?",[12,1436,1437,1438,1440,1441,1444],{},"In de hulp onder ",[30,1439,33],{"href":32},". In de Studio toont de ",[15,1442,1443],{},"Domotica-rondleiding"," in het Leercentrum dezelfde weg in ongeveer drie minuten.",[41,1446,1448],{"id":1447},"verwante-artikels","Verwante artikels",[1450,1451,1452,1458,1462],"ul",{},[1453,1454,1455],"li",{},[30,1456,1457],{"href":1030},"Domotica en KNX in de elektrische installatie: wat hoort er op het plan en op het eendraadschema?",[1453,1459,1460],{},[30,1461,38],{"href":37},[1453,1463,1464],{},[30,1465,33],{"href":32},{"title":1467,"searchDepth":1468,"depth":1468,"links":1469},"",2,[1470,1471,1472,1473,1474,1475,1476,1477,1478,1479,1480,1481,1482,1483,1492],{"id":43,"depth":1468,"text":44},{"id":288,"depth":1468,"text":289},{"id":437,"depth":1468,"text":438},{"id":477,"depth":1468,"text":478},{"id":628,"depth":1468,"text":629},{"id":677,"depth":1468,"text":678},{"id":722,"depth":1468,"text":723},{"id":823,"depth":1468,"text":824},{"id":917,"depth":1468,"text":918},{"id":950,"depth":1468,"text":951},{"id":1035,"depth":1468,"text":1036},{"id":1063,"depth":1468,"text":1064},{"id":1327,"depth":1468,"text":1328},{"id":1393,"depth":1468,"text":1394,"children":1484},[1485,1487,1488,1489,1490,1491],{"id":1398,"depth":1486,"text":1399},3,{"id":1405,"depth":1486,"text":1406},{"id":1412,"depth":1486,"text":1413},{"id":1419,"depth":1486,"text":1420},{"id":1426,"depth":1486,"text":1427},{"id":1433,"depth":1486,"text":1434},{"id":1447,"depth":1468,"text":1448},"guide","2026-11-04","Verdeelbord met modules en klemmen, kanaalplan voor de kastdeur, klemmenplan, functies per ruimte, buslijnen met busbudget en dossier als ontwerp of definitief – voor KNX, Niko Home Control, Loxone, Shelly, Sonoff of merkneutraal. Aan de hand van een fictief Brussels KNX-appartement, met alle grenzen.","md","nl",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-11-04\u002Fshare\u002Fplanelec-knx-apartment-ets-editorial.jpg","\u002Fblog\u002Fknx-apartment-ets.nl","16 min",6,{"title":6,"description":1495},"Domotica documenteren: verdeelbord, kanaalplan, dossier","knx-plannen-appartement-ets-voorbereiding","blog\u002Fknx-apartment-ets.nl",[444,1509,1013,75,86,97,197,1510,229,1511,1512,1513],"Gebouwautomatisering","Niko Home Control","Shelly","ABB i-bus","België","Om8JdS6IpBkaiACIay2hOcWrKcUBb0p59q_X7q0dGRg","blog","\u002Fblog\u002Fknx-plannen-appartement-ets-voorbereiding",{"id":1518,"title":33,"body":1519,"category":2475,"description":2476,"extension":1496,"guideId":2477,"image":2478,"locale":1497,"meta":2479,"navigation":1499,"order":2480,"path":2481,"publishedAt":1494,"readTime":2482,"seo":2483,"seoTitle":2484,"slug":2485,"stem":2486,"tags":2487,"updatedAt":1494,"__hash__":2490,"kind":2491,"href":32,"date":1494},"help\u002Fhelp\u002Fknx-ets-preparation.nl.md",{"type":9,"value":1520,"toc":2459},[1521,1527,1536,1540,1594,1599,1601,1645,1649,1667,1672,1674,1705,1709,1712,1716,1729,1734,1738,1762,1766,1769,1774,1778,1805,1826,1831,1835,1838,1843,1847,1893,1897,1902,1907,1911,1942,1946,1949,1954,1958,1984,2040,2057,2061,2066,2070,2083,2087,2092,2096,2120,2124,2177,2180,2259,2263,2270,2275,2279,2303,2307,2346,2349,2354,2358,2417,2421,2431,2435],[12,1522,1523,1526],{},[15,1524,1525],{},"In de modus Domotica plan en documenteer je een gebouwautomatisering vanuit hetzelfde project als grondplan en eendraadschema: automatiseringssysteem kiezen, modules in het verdeelbord zetten, verlichting en rolluiken aan de kanalen toewijzen, drukknoppen en bewegingsmelders koppelen, lijnen nakijken."," Daaruit ontstaan het kanaalplan voor de kastdeur als pdf of csv, het klemmenplan, de functies per ruimte, topologie en aantallen, apart of als domoticadossier in ontwerp of definitief. Dat geldt voor KNX, Niko Home Control II, Loxone, Shelly, Sonoff en merkneutrale planning. Het programmeren van de toestellen blijft in de software van de fabrikant.",[12,1528,1529,1530,1533,1534,39],{},"De gids volgt een KNX-voorbeeld: een fictief Belgisch appartement met zeven ruimtes, een drukknop in elke ruimte, een rolluik aan elk raam en bewegingsmelders in de hal en de badkamer. Voor KNX komen er op het einde twee secties bij: voorgestelde adressen en bestanden voor ETS. Het hele verhaal vertelt de blog ",[30,1531,1532],{"href":1516},"Domotica-installatie documenteren met een KNX-appartement als voorbeeld",". Status, versie en datahash van de documenten beschrijft ",[30,1535,38],{"href":37},[41,1537,1539],{"id":1538},"wat-heb-ik-nodig-voor-ik-begin","Wat heb ik nodig voor ik begin?",[49,1541,1542,1552],{},[52,1543,1544],{},[55,1545,1546,1549],{},[58,1547,1548],{},"Voorwaarde",[58,1550,1551],{},"Waarvoor",[68,1553,1554,1562,1570,1578,1586],{},[55,1555,1556,1559],{},[73,1557,1558],{},"Grondplan met ruimtes",[73,1560,1561],{},"Ruimtes plaatsen bedieningspunten en groepsadressen op de juiste verdieping",[55,1563,1564,1567],{},[73,1565,1566],{},"Verlichting en rolluiken geplaatst",[73,1568,1569],{},"Dat zijn de verbruikers die je aan de actorkanalen toewijst",[55,1571,1572,1575],{},[73,1573,1574],{},"Stroomkringen met beveiliging",[73,1576,1577],{},"Elke geschakelde last heeft haar automaat in het schema nodig",[55,1579,1580,1583],{},[73,1581,1582],{},"Verdeelbord met vrije DIN-rail",[73,1584,1585],{},"Daar plaatst PlanElec de automatiseringsmodules",[55,1587,1588,1591],{},[73,1589,1590],{},"Projectrol met bewerkingsrecht",[73,1592,1593],{},"Wie enkel mag lezen, ziet de planning maar wijzigt niets",[12,1595,1596],{},[30,1597],{"id":1598},"activate",[41,1600,438],{"id":437},[1602,1603,1604,1612,1632],"ol",{},[1453,1605,1606,1607,1609,1610,39],{},"Kies links in de modusbalk ",[15,1608,444],{},". Rechts opent het paneel ",[15,1611,448],{},[1453,1613,1614,1615,1617,1618,702,1620,702,1622,702,1624,702,1626,1628,1629,1631],{},"Klik in de balk ",[15,1616,452],{}," op je systeem: ",[15,1619,197],{},[15,1621,213],{},[15,1623,229],{},[15,1625,244],{},[15,1627,259],{}," of ",[15,1630,273],{},". PlanElec biedt daarna de modules, bedieningspunten en lijntypes van dat systeem aan. In het voorbeeld is dat KNX.",[1453,1633,1634,1635,1637,1638,1641,1642,39],{},"Je herkent het resultaat aan de ",[15,1636,466],{},": stap 1 ",[15,1639,1640],{},"Systeem"," staat op ",[15,1643,1644],{},"Actief",[422,1646],{":height":470,":width":471,"alt":1647,"caption":1648,"src":474},"Planningsstappen domotica: Systeem actief, Modules, Verbruikers, Lijnen en Export nog open; daaronder het formulier Module plaatsen met Module en Rail.","De vijf planningsstappen tonen de stand; meteen daaronder plaats je de eerste module.",[12,1650,1651,1652,702,1654,702,1657,702,1659,933,1661,1663,1664,1666],{},"De vijf planningsstappen zijn ",[15,1653,1640],{},[15,1655,1656],{},"Modules",[15,1658,701],{},[15,1660,830],{},[15,1662,956],{},". Elke stap toont zijn stand, bijvoorbeeld 'Kanalen: 12' of 'Toegewezen: 17 van 17', en brengt je met één klik naar wat nog openstaat. Je kunt het systeem ook kiezen in de projectgegevens onder ",[15,1665,1509],{},"; het effect is hetzelfde. Een project kan meerdere systemen bevatten.",[12,1668,1669],{},[30,1670],{"id":1671},"modules",[41,1673,478],{"id":477},[1602,1675,1676,1681,1687,1694],{},[1453,1677,1678,1679,39],{},"Open onder de planningsstappen ",[15,1680,583],{},[1453,1682,1683,1684,1686],{},"Kies onder ",[15,1685,493],{}," de sjabloon. De lijst toont de modules van het gekozen systeem, ingedeeld per toestelfamilie; bij KNX bijvoorbeeld voeding, lijnkoppelaar, IP-interface, schakel-, jaloezie-, dim- en verwarmingsactoren en binaire ingangen, merkneutraal en als ABB i-bus-types met bestelnummer.",[1453,1688,1683,1689,1691,1692,39],{},[15,1690,490],{}," de DIN-rail in het verdeelbord en klik op ",[15,1693,587],{},[1453,1695,1696,1697,1700,1701,1704],{},"PlanElec zet de module op de eerste vrije plaats, maakt haar kanalen aan en wijst voeding, busapparaten en bedieningspunten toe aan de lijn van het systeem, bij KNX de standaardlijn ",[15,1698,1699],{},"1.1",". De melding '… geplaatst, kanalen aangemaakt.' bevestigt de stap; ",[15,1702,1703],{},"Nog een module plaatsen"," opent het formulier opnieuw.",[422,1706],{":height":456,":width":457,"alt":1707,"caption":1708,"src":593},"Geopende modulelijst in Module plaatsen: KNX-voeding, ABB SV\u002FS 30.640.5.1, ABB SV\u002FS 30.320.2.1, lijnkoppelaars en IP-interfaces, gegroepeerd per familie.","Merkneutrale sjablonen en ABB i-bus-types staan in dezelfde lijst, gegroepeerd per familie.",[12,1710,1711],{},"In het voorbeeldappartement staan op de rail 'KNX 1' een ABB SV\u002FS 30.640.5.1 (voeding 640 mA), een ABB IPS\u002FS 3.1.1 (IP-interface) en een ABB SA\u002FS 12.16.2.2 (12-voudige schakelactor), op 'KNX 2' een merkneutrale rolluikactor 8× en een dimactor 4×. De ABB-types toont het verdeelbord in de stijl van de fabrikant, met rode en zwarte busklem.",[422,1713],{":height":621,":width":622,"alt":1714,"caption":1715,"src":625},"Verdeelbord met twee KNX-rails: voeding, IP-interface en 12-voudige schakelactor op KNX 1, rolluik- en dimactor op KNX 2, de ABB-types met rood-zwarte busklem.","De geplaatste modules in het verdeelbord, de ABB-types met rode en zwarte busklem.",[12,1717,1718,1719,1722,1723,1725,1726,1728],{},"In de verdeelkasteditor (paneel ",[15,1720,1721],{},"Verdeelkast",") staan de automatiseringsmodules samen met hoofdschakelaar, differentieelschakelaars en automaten. Daar beheer je rijklemmen en bedrading. De klemmen van de automatiseringskanalen met klemmenstroken, doelen en bruggen beheer je in het paneel ",[15,1724,448],{}," onder ",[15,1727,97],{},". Bestelnummers en busstroom van de ABB-types komen uit de gegevens van de fabrikant. Controleer ze voor de bestelling op de concrete datasheet. ABB is een merk van de ABB-groep; PlanElec is geen ABB-partner.",[12,1730,1731],{},[30,1732],{"id":1733},"controls",[41,1735,1737],{"id":1736},"hoe-plan-ik-drukknoppen-en-bewegingsmelders","Hoe plan ik drukknoppen en bewegingsmelders?",[1602,1739,1740,1743,1759],{},[1453,1741,1742],{},"Sluit het paneel zodat het grondplan vrij is, en open de catalogus.",[1453,1744,1745,1746,1748,1749,702,1751,702,1753,1628,1755,1758],{},"Kies in ",[15,1747,684],{}," een ",[15,1750,361],{},[15,1752,346],{},[15,1754,329],{},[15,1756,1757],{},"Bewegingsmelder"," en klik op de muur of het plafond in de ruimte.",[1453,1760,1761],{},"Het grondplan toont het symbool in de ruimte. Busbedieningspunten komen zonder extra stap op lijn 1.1 terecht.",[422,1763],{":height":424,":width":688,"alt":1764,"caption":1765,"src":691},"Grondplan van het appartement met zeven ruimtes: drukknoppen naast elke deur, bewegingsmelders in hal en badkamer, rolluiken aan alle ramen en verlichting in elke ruimte.","Een drukknop in elke ruimte, bewegingsmelders in hal en badkamer, rolluiken aan alle zeven ramen.",[12,1767,1768],{},"Bewegings- en aanwezigheidsmelders krijgen later bij het adresvoorstel twee eigen objecten: een schakelobject (DPT 1.001), gekoppeld aan het schakel-groepsadres van het lichtkanaal, en een lichtsterkteobject (DPT 9.004). Een drukknop krijgt geen eigen groepsadres; zijn toetsen verwijzen naar de groepsadressen van de kanalen die ze bedienen.",[12,1770,1771],{},[30,1772],{"id":1773},"channels",[41,1775,1777],{"id":1776},"hoe-wijs-ik-verbruikers-en-drukknoppen-aan-de-kanalen-toe","Hoe wijs ik verbruikers en drukknoppen aan de kanalen toe?",[12,1779,1780,1781,1783,1784,1787,1788,702,1791,702,1793,702,1795,702,1797,702,1800,933,1803,39],{},"Kies in het paneel ",[15,1782,448],{}," de weergave ",[15,1785,1786],{},"Kanaalmatrix",". De kanaaltabel toont per module een groep met verdeelbord, rail, plaats, type en lijn, en daaronder elk kanaal met ",[15,1789,1790],{},"Kanaaltype",[15,1792,701],{},[15,1794,301],{},[15,1796,707],{},[15,1798,1799],{},"Klem",[15,1801,1802],{},"Beveiliging",[15,1804,729],{},[1602,1806,1807,1816,1823],{},[1453,1808,1809,1810,1812,1813,1815],{},"Klik in de kolom ",[15,1811,701],{}," op ",[15,1814,697],{}," en kies de lamp of het rolluik. PlanElec biedt de lasten aan die bij het kanaaltype passen.",[1453,1817,1809,1818,1812,1820,1822],{},[15,1819,707],{},[15,1821,697],{}," en kies drukknop of bewegingsmelder.",[1453,1824,1825],{},"Herhaal dat voor elk kanaal. Ruimte en beveiliging komen uit het project; je vult ze niet dubbel in.",[12,1827,1828,1830],{},[15,1829,711],{}," verdeelt niet-toegewezen verbruikers per ruimte en kanaaltype over vrije kanalen. Bestaande toewijzingen blijven behouden. Controleer het voorstel daarna kanaal per kanaal.",[422,1832],{":height":733,":width":734,"alt":1833,"caption":1834,"src":737},"Kanaaltabel van de ABB SA\u002FS 12.16.2.2: CH1 tot CH7 met plafondlichten, ledstrip en spiegelverlichting, drukknoppen en bewegingsmelders, ruimte, automaat en lijn KNX 1.1; CH8 tot CH12 als reserve; daaronder de dimactor met melding over de onbekende nominale kanaalstroom.","Zeven toegewezen schakelkanalen, vijf reserves; bij de dimactor meldt PlanElec de ontbrekende nominale kanaalstroom.",[12,1836,1837],{},"Rechts op elke rij staat de bevinding van het kanaal. Een vinkje betekent: geen open planningsgegevens. Een uitroepteken zegt wat ontbreekt, in het voorbeeld 'De nominale kanaalstroom is onbekend; controleer het apparaat en vul de waarde in.' bij de merkneutrale dimactor. Andere bevindingen zijn bijvoorbeeld een dubbel toegewezen last, een last zonder beveiliging, een kanaaltype dat niet past of overbelasting. Het zijn planningscontroles; de AREI-zelfcontrole van het project staat daar los van.",[12,1839,1840],{},[30,1841],{"id":1842},"lines",[41,1844,1846],{"id":1845},"hoe-controleer-ik-lijnen-en-busbudget","Hoe controleer ik lijnen en busbudget?",[1602,1848,1849,1855,1869,1880,1887],{},[1453,1850,1780,1851,1783,1853,39],{},[15,1852,448],{},[15,1854,830],{},[1453,1856,1857,1858,1861,1862,1865,1866,1868],{},"Klik op ",[15,1859,1860],{},"Niet-toegewezen apparaten vooraf toewijzen"," als er nog busapparaten zonder lijn zijn. ",[15,1863,1864],{},"KNX-lijn toevoegen"," maakt een extra lijn aan, ",[15,1867,895],{}," een extra zone. Elke lijn heeft een eigen kleur en draagt haar adres als naam, bijvoorbeeld ‘KNX 1.1’.",[1453,1870,1871,1872,1875,1876,1879],{},"Kies op de lijnkaart de ",[15,1873,1874],{},"Voedingsmodule"," en de ",[15,1877,1878],{},"Voedingscapaciteit (mA)",", bijvoorbeeld 640 mA.",[1453,1881,1882,1883,1886],{},"Vul onder ",[15,1884,1885],{},"Busstroom (mA)"," de waarde uit de datasheet in waar je die kent.",[1453,1888,1889,1890,1892],{},"Versleep toestellen tussen lijnen, meerdere tegelijk via de selectievakjes; zonder muis via ",[15,1891,892],{},". Niet-vergrendelde fysieke adressen volgen de lijn.",[422,1894],{":height":733,":width":734,"alt":1895,"caption":1896,"src":886},"Weergave Lijnen met de lijn KNX 1.1 in gebied 1, met sleepgrepen en selectievakjes per apparaat, voedingsmodule ABB SV\u002FS 30.640.5.1, voedingscapaciteit 640 mA, busbudget 132 mA van 640 mA met 11 geschatte apparaten, 13 apparaten bij een limiet van 64.","Lijn 1.1: 132 mA van 640 mA, waarvan elf apparaten met geschatte busstroom; 13 van 64 deelnemers.",[12,1898,1899,1900,39],{},"Het budget zet de busstroom af tegen de voeding en het aantal apparaten tegen de limiet van 64 deelnemers per lijn. Waarden die je niet invult, rekent PlanElec met typische waarden en markeert ze als 'geschat'. Voor de inbedrijfstelling vergelijk je ze met de datasheets. Een lijn is een logische planning, geen opgemeten kabeltracé; de busleiding op het grondplan teken je met ",[15,1901,902],{},[12,1903,1904],{},[30,1905],{"id":1906},"functions",[41,1908,1910],{"id":1909},"hoe-maak-ik-functies-scènes-en-centrale-functies-aan","Hoe maak ik functies, scènes en centrale functies aan?",[1602,1912,1913,1919,1924,1939],{},[1453,1914,1780,1915,1783,1917,39],{},[15,1916,448],{},[15,1918,924],{},[1453,1920,1921,1923],{},[15,1922,928],{}," opent de scène-editor. Geef een naam in, bijvoorbeeld 'Afwezig', kies de kanalen en hun doelwaarde: aan of uit bij schakelen, procent bij dimmen en bij rolluiken.",[1453,1925,1926,933,1928,1930,1931,1934,1935,1938],{},[15,1927,932],{},[15,1929,936],{}," maken de gebruikelijke centrale functies met één klik aan. ",[15,1932,1933],{},"Functie vanuit kanaal"," met ",[15,1936,1937],{},"Aanmaken"," maakt van één kanaal een functie.",[1453,1940,1941],{},"De functies verschijnen in de functies per ruimte. Bij KNX krijgen scènes en centrale functies bij het adresvoorstel een eigen groepsadres (zie verder).",[422,1943],{":height":605,":width":471,"alt":1944,"caption":1945,"src":942},"Scène-editor met de naam Afwezig: alle schakel- en dimkanalen op uit, alle zeven rolluiken op 100 procent.","Scène 'Afwezig': licht uit, alle rolluiken dicht.",[422,1947],{":height":605,":width":471,"alt":945,"caption":1948,"src":947},"De scène 'Afwezig' met 17 deelnemers; de centrale functies volgen in dezelfde lijst.",[12,1950,1951],{},[30,1952],{"id":1953},"documents",[41,1955,1957],{"id":1956},"welke-documenten-ontstaan-er-voor-kastdeur-montage-en-oplevering","Welke documenten ontstaan er voor kastdeur, montage en oplevering?",[1602,1959,1960,1967,1970],{},[1453,1961,1606,1962,1964,1965,39],{},[15,1963,956],{}," en scrol naar de sectie ",[15,1966,444],{},[1453,1968,1969],{},"Kies verdeelbord, sortering (module, automaat, ruimte of klem), versie en status.",[1453,1971,1972,1973,1976,1977,1980,1981,1983],{},"Elk document heeft een ",[15,1974,1975],{},"voorbeeld"," en een ",[15,1978,1979],{},"pdf","; kanaal- en klemmenplan krijg je ook als csv, de topologie als svg. ",[15,1982,963],{}," bundelt alles achter één voorblad.",[49,1985,1986,1994],{},[52,1987,1988],{},[55,1989,1990,1992],{},[58,1991,990],{},[58,1993,1288],{},[68,1995,1996,2003,2009,2016,2024,2032],{},[55,1997,1998,2000],{},[73,1999,86],{},[73,2001,2002],{},"verdeelbord, module, kanaal, verbruiker, ruimte, beveiliging, klem, bedieningspunt; A4 liggend voor de kastdeur",[55,2004,2005,2007],{},[73,2006,97],{},[73,2008,100],{},[55,2010,2011,2013],{},[73,2012,108],{},[73,2014,2015],{},"toetsen en de lasten die ze bedienen; scènes en centrale functies",[55,2017,2018,2021],{},[73,2019,2020],{},"Topologiediagram",[73,2022,2023],{},"logische lijnen van het project, ook als svg",[55,2025,2026,2029],{},[73,2027,2028],{},"Aantallen domotica",[73,2030,2031],{},"modules, voedingen, bedieningspunten en signaalkabels als aantal, zonder prijzen",[55,2033,2034,2037],{},[73,2035,2036],{},"Conformiteitsrapport met domotica",[73,2038,2039],{},"zelfcontrolerapport met bevindingen en controlegrenzen",[12,2041,2042,2043,2045,2046,2049,2050,2053,2054,39],{},"Een ",[15,2044,967],{}," krijgt een watermerk en kan ook met open gegevens. ",[15,2047,2048],{},"Definitief"," vraagt de exportgereedheid; de interface noemt de open punten en biedt ",[15,2051,2052],{},"Volgend open punt behandelen"," aan. Status, versie en datahash beschrijft ",[30,2055,38],{"href":2056},"\u002Fhelp\u002Fknx-plannen-en-documenteren#export",[422,2058],{":height":975,":width":976,"alt":2059,"caption":2060,"src":979},"Sectie Domotica in de export met keuze van verdeelbord, sortering, versie en status en de kaarten van de domoticadocumenten.","Domoticadocumenten in de export: verdeelbord, sortering, versie en ontwerp of definitief.",[12,2062,2063],{},[30,2064],{"id":2065},"team",[41,2067,2069],{"id":2068},"hoe-stem-ik-open-punten-af-in-het-team","Hoe stem ik open punten af in het team?",[12,2071,2072,2073,2075,2076,2078,2079,2082],{},"Kies in het verdeelbord een module en open in ",[15,2074,1042],{}," het tekstballonnetje naast de modulenaam. Daar schrijf je een opmerking rechtstreeks bij de module, bijvoorbeeld over een busstroom die nog uit de datasheet moet komen. In het paneel ",[15,2077,1054],{}," maak je onder ",[15,2080,2081],{},"Taken"," een taak aan en wijs je ze toe. Goedkeuringen van gearchiveerde documenten lopen via hetzelfde paneel.",[422,2084],{":height":614,":width":615,"alt":2085,"caption":2086,"src":1048},"Verdeelbord met gemarkeerde ABB SA\u002FS 12.16.2.2 en geopende opmerking in de moduleigenschappen: graag het busverbruik van de bewegingsmelders uit de datasheet overnemen.","Opmerking rechtstreeks bij de schakelactor; het getal bij het symbool toont hoeveel reacties er zijn.",[12,2088,2089],{},[30,2090],{"id":2091},"addresses",[41,2093,2095],{"id":2094},"alleen-knx-hoe-stelt-planelec-fysieke-adressen-en-groepsadressen-voor","Alleen KNX: hoe stelt PlanElec fysieke adressen en groepsadressen voor?",[1602,2097,2098,2104,2115],{},[1453,2099,1780,2100,1783,2102,39],{},[15,2101,448],{},[15,2103,1070],{},[1453,2105,2106,2107,2109,2110,2112,2113,39],{},"Kies de ",[15,2108,1074],{},": ",[15,2111,1150],{}," (standaard) of ",[15,2114,1154],{},[1453,2116,1857,2117,2119],{},[15,2118,1078],{},". De regel eronder geeft het resultaat, in het voorbeeld '13 fysieke adressen en 61 groepsadressen voorgesteld.' Het voorstel is één stap die je ongedaan kunt maken.",[422,2121],{":height":733,":width":734,"alt":2122,"caption":2123,"src":1084},"KNX-adressen: structuur Discipline \u002F verdieping \u002F object, knop Adressen voorstellen, daaronder lijn 1.1 met voeding zonder adres, IP-interface 1.1.1, schakelactor 1.1.2, rolluikactor 1.1.3, dimactor 1.1.4 en drukknoppen en bewegingsmelders vanaf 1.1.5 met ruimte.","Fysieke adressen van lijn 1.1: eerst de modules in de volgorde van het verdeelbord, dan de bedieningspunten per ruimte.",[49,2125,2126,2136],{},[52,2127,2128],{},[55,2129,2130,2133],{},[58,2131,2132],{},"Regel",[58,2134,2135],{},"Voorstel",[68,2137,2138,2145,2153,2161,2169],{},[55,2139,2140,2142],{},[73,2141,875],{},[73,2143,2144],{},"x.y.0",[55,2146,2147,2150],{},[73,2148,2149],{},"Voeding",[73,2151,2152],{},"geen fysiek adres",[55,2154,2155,2158],{},[73,2156,2157],{},"Actoren en interfaces",[73,2159,2160],{},"vanaf x.y.1 in de volgorde van het verdeelbord (verdeelbord, rail, plaats)",[55,2162,2163,2166],{},[73,2164,2165],{},"Busbedieningspunten",[73,2167,2168],{},"daarna per ruimte",[55,2170,2171,2174],{},[73,2172,2173],{},"Apparaten zonder lijn",[73,2175,2176],{},"geen adres; de samenvatting telt ze, de controle meldt ze",[12,2178,2179],{},"De groepsadressen hebben drie niveaus: hoofdgroep, middengroep, subgroep. In de standaardstructuur is de hoofdgroep de discipline, de middengroep de verdieping (0 zonder verdieping) en de subgroep het doorlopende object.",[49,2181,2182,2193],{},[52,2183,2184],{},[55,2185,2186,2188,2190],{},[58,2187,1164],{},[58,2189,1167],{},[58,2191,2192],{},"Objecten en datapunttype (DPT)",[68,2194,2195,2204,2213,2222,2232,2241,2250],{},[55,2196,2197,2199,2201],{},[73,2198,343],{},[73,2200,1182],{},[73,2202,2203],{},"Schakelen 1.001, status 1.001",[55,2205,2206,2208,2210],{},[73,2207,326],{},[73,2209,1195],{},[73,2211,2212],{},"Schakelen 1.001, dimmen 3.007, helderheidswaarde 5.001, status 1.001 en 5.001",[55,2214,2215,2217,2219],{},[73,2216,577],{},[73,2218,1208],{},[73,2220,2221],{},"Op\u002Fneer 1.008, stop\u002Flamel 1.007, positie 5.001, status positie 5.001",[55,2223,2224,2226,2229],{},[73,2225,574],{},[73,2227,2228],{},"Verwarming",[73,2230,2231],{},"Gewenste en werkelijke waarde 9.001, stuurwaarde 5.001, bedrijfsmodus 20.102",[55,2233,2234,2236,2238],{},[73,2235,1219],{},[73,2237,1222],{},[73,2239,2240],{},"Schakelobject 1.001; lichtsterkte van de melders 9.004",[55,2242,2243,2245,2247],{},[73,2244,1233],{},[73,2246,1236],{},[73,2248,2249],{},"Scène 17.001",[55,2251,2252,2254,2256],{},[73,2253,546],{},[73,2255,1249],{},[73,2257,2258],{},"Schakelen 1.001 of op\u002Fneer 1.008",[422,2260],{":height":733,":width":734,"alt":2261,"caption":2262,"src":1260},"Groepsadressen in hoofdgroep 1 Licht, middengroep 1\u002F1 Appartement: rij Plafondlicht hal met schakelen 1\u002F1\u002F1 en status 1\u002F1\u002F2 naast elkaar, datapunttype 1.001 met naam, daaronder drukknop en verwijzing naar 5\u002F1\u002F1.","Hoofdgroep Licht: één rij per kanaal, schakelen en status naast elkaar, daaronder drukknop en melderkoppeling.",[12,2264,2265,2266,2269],{},"Groepsadressen ontstaan alleen voor kanalen met minstens één last; een reservekanaal blijft zonder adres. Elke rij toont een kanaal met de naam van zijn verbruiker; schakelen en status staan naast elkaar, telkens met datapunttype en naam, extra objecten als ‘+3 objecten’. Een klik op een adres opent het invoerveld. Een gewijzigd adres vergrendelt PlanElec automatisch; met het slot (",[15,2267,2268],{},"Adres vergrendelen","), dat verschijnt wanneer je erover beweegt, vergrendel je het uitdrukkelijk. Vergrendelde adressen blijven bij elk volgend voorstel behouden en hun nummer wordt niet opnieuw uitgedeeld. Dubbele of ongeldige adressen meldt de controle als conflict.",[12,2271,2272],{},[30,2273],{"id":2274},"ets",[41,2276,2278],{"id":2277},"alleen-knx-hoe-download-ik-de-adressen-als-bestanden-voor-ets","Alleen KNX: hoe download ik de adressen als bestanden voor ETS?",[1602,2280,2281,2287,2300],{},[1453,2282,1606,2283,1964,2285,39],{},[15,2284,956],{},[15,2286,444],{},[1453,2288,2289,2290,2292,2293,702,2295,1628,2297,2299],{},"In het vak ",[15,2291,1269],{}," download je ",[15,2294,1295],{},[15,2296,1307],{},[15,2298,1318],{},". Zonder adresvoorstel vraagt het vak om eerst adressen voor te stellen.",[1453,2301,2302],{},"De bestanden volgen het formaat van ETS voor groepsadressen. Toestellen, parameters en de koppeling van de communicatieobjecten maak je in ETS aan; controleer daar elk overgenomen adres.",[422,2304],{":height":1273,":width":976,"alt":2305,"caption":2306,"src":1276},"Vak ETS-voorbereiding in de export met de knoppen Groepsadressen CSV (ETS), Groepsadressen XML (ETS) en Lijst fysieke adressen CSV.","De drie bestanden in het vak ETS-voorbereiding; een ETS-project maakt PlanElec niet aan.",[49,2308,2309,2317],{},[52,2310,2311],{},[55,2312,2313,2315],{},[58,2314,1285],{},[58,2316,1288],{},[68,2318,2319,2329,2339],{},[55,2320,2321,2323],{},[73,2322,1295],{},[73,2324,2325,2326,2328],{},"Formaat '3\u002F1': hoofd-, midden- en subgroep, adres, beschrijving, DPT als ",[1300,2327,1302],{},"; komma, UTF-8 met BOM",[55,2330,2331,2333],{},[73,2332,1307],{},[73,2334,2335,2336,2338],{},"Groepsadressenexport volgens het XML-schema ",[1300,2337,1313],{}," met bereiknamen",[55,2340,2341,2343],{},[73,2342,1318],{},[73,2344,2345],{},"Lijn, fysiek adres, toestel, type en ruimte als werklijst",[12,2347,2348],{},"Groepsadressen dragen geen koppeling met communicatieobjecten. Daarom staat in de beschrijving van elk groepsadres welke toetsen, melders of scènedeelnemers het gebruiken; de koppeling zelf maak je in ETS. Een import in een bepaalde ETS-versie hebben we niet getest en zeggen we niet toe. De exports hangen niet af van de vrijgave van het dossier: je kunt ze al in het ontwerp downloaden.",[12,2350,2351],{},[30,2352],{"id":2353},"limits",[41,2355,2357],{"id":2356},"wat-doet-planelec-niet","Wat doet PlanElec niet?",[49,2359,2360,2370],{},[52,2361,2362],{},[55,2363,2364,2367],{},[58,2365,2366],{},"PlanElec doet",[58,2368,2369],{},"Blijft in de fabrikantsoftware of op de werf",[68,2371,2372,2380,2388,2395,2402,2409],{},[55,2373,2374,2377],{},[73,2375,2376],{},"Verdeelbord, kanalen, klemmen en lijnen plannen en documenteren",[73,2378,2379],{},"programmeren van de toestellen, parameters en logica",[55,2381,2382,2385],{},[73,2383,2384],{},"Kanaal-, klemmen- en functieplan, topologie, aantallen, dossier",[73,2386,2387],{},"bedrading op de werf, aderplan, bestelling",[55,2389,2390,2392],{},[73,2391,1363],{},[73,2393,2394],{},"meting van de busstroom, busdiagnose, inbedrijfstelling",[55,2396,2397,2399],{},[73,2398,1371],{},[73,2400,2401],{},"opmeting van de kabeltracés, isolatiemeting",[55,2403,2404,2406],{},[73,2405,1379],{},[73,2407,2408],{},"ETS-project (.knxproj), productdatabanken, communicatieobjecten",[55,2410,2411,2414],{},[73,2412,2413],{},"Planningsbevindingen en AREI-zelfcontrole",[73,2415,2416],{},"keuring van de installatie door het erkend organisme",[41,2418,2420],{"id":2419},"kan-ik-het-verloop-in-de-studio-laten-zien","Kan ik het verloop in de Studio laten zien?",[12,2422,2423,2424,2427,2428,2430],{},"Ja. Start in het ",[15,2425,2426],{},"Leercentrum"," de ",[15,2429,1443],{},". Die toont in ongeveer drie minuten systeem, planningsstappen, module plaatsen, kanaaltabel, lijnen, functies en de documenten in de export, voor KNX ook adressen en ETS-voorbereiding, zonder je project te wijzigen. Stappen waarvan het doel nog ontbreekt in het project, slaat de rondleiding over.",[41,2432,2434],{"id":2433},"verwante-gidsen","Verwante gidsen",[1450,2436,2437,2441,2447,2453],{},[1453,2438,2439],{},[30,2440,38],{"href":37},[1453,2442,2443],{},[30,2444,2446],{"href":2445},"\u002Fhelp\u002Fschakelketens-stroomkringen-en-kabelroutes","Schakelketens, stroomkringen en kabelroutes bewerken",[1453,2448,2449],{},[30,2450,2452],{"href":2451},"\u002Fhelp\u002Fdocumenten-exporteren","Documenten exporteren en een installatiedossier samenstellen",[1453,2454,2455],{},[30,2456,2458],{"href":2457},"\u002Fhelp\u002Fwat-controleert-de-zelfcontrole","Wat controleert de AREI-zelfcontrole van PlanElec?",{"title":1467,"searchDepth":1468,"depth":1468,"links":2460},[2461,2462,2463,2464,2465,2466,2467,2468,2469,2470,2471,2472,2473,2474],{"id":1538,"depth":1468,"text":1539},{"id":437,"depth":1468,"text":438},{"id":477,"depth":1468,"text":478},{"id":1736,"depth":1468,"text":1737},{"id":1776,"depth":1468,"text":1777},{"id":1845,"depth":1468,"text":1846},{"id":1909,"depth":1468,"text":1910},{"id":1956,"depth":1468,"text":1957},{"id":2068,"depth":1468,"text":2069},{"id":2094,"depth":1468,"text":2095},{"id":2277,"depth":1468,"text":2278},{"id":2356,"depth":1468,"text":2357},{"id":2419,"depth":1468,"text":2420},{"id":2433,"depth":1468,"text":2434},"automation","Stap voor stap van het automatiseringssysteem tot het dossier: modules in het verdeelbord, drukknoppen en bewegingsmelders aan de kanalen, kanaalplan voor de kastdeur, klemmenplan, functies per ruimte, lijnen met busbudget, ontwerp of definitief en teamwerk – voor KNX, Niko Home Control, Loxone, Shelly, Sonoff of merkneutraal. Voor KNX ook adressen en bestanden voor ETS.","knx-ets-preparation","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fknx-ets-preparation.webp",{},20,"\u002Fhelp\u002Fknx-ets-preparation.nl","13 min",{"title":33,"description":2476},"Domotica plannen en documenteren, stap voor stap","knx-installatie-plannen-en-voorbereiden-voor-ets","help\u002Fknx-ets-preparation.nl",[444,75,86,97,2488,197,1510,229,1511,2489],"Buslijn","ETS","eU1pzNcobBuDwh4e4l6-t7FMbqiUTGbN9Pz-ru_5iiM","help",{"id":2493,"title":2494,"articleId":2495,"body":2496,"category":1493,"date":3255,"description":3256,"extension":1496,"image":3257,"lastUpdated":3258,"locale":1497,"meta":3259,"navigation":1499,"ogImage":3260,"path":3261,"publishDate":3255,"readTime":3262,"refreshInterval":3263,"seo":3264,"seoTitle":3265,"slug":3266,"stem":3267,"tags":3268,"__hash__":3277,"kind":1515,"href":3278},"blog\u002Fblog\u002Ftrikker-archief-verhuizen.nl.md","Trikker-archief verhuizen naar PlanElec Pro: batchimport van .trik-bestanden","trikker-archive-migration",{"type":9,"value":2497,"toc":3231},[2498,2515,2521,2525,2535,2541,2545,2577,2580,2636,2643,2647,2789,2793,2796,2816,2819,2823,2829,2866,2870,2873,2899,2907,2911,2920,2929,2933,2936,2946,2950,2953,2957,2963,3048,3070,3074,3080,3097,3104,3106,3110,3113,3117,3120,3124,3127,3131,3137,3144,3147,3151,3157,3161,3164,3168,3175,3223],[12,2499,2500,2507,2508,2510,2511,39],{},[15,2501,2502,2503,2506],{},"Nieuw in PlanElec Pro (sinds 30\u002F10\u002F2026): je verhuist een volledig archief Trikker-bestanden (",[1300,2504,2505],{},".trik",") in één keer."," Je sleept bestanden, een map of een ZIP-archief met maximaal 500 bestanden naar de importpagina. Elk bestand wordt een eigen project, het originele ",[1300,2509,2505],{},"-bestand blijft aan het project gekoppeld en je ziet vooraf welke bestanden opmerkingen hebben. De import staat open voor elk aangemeld PlanElec-account, ook met \"Pro uitproberen\". Dit artikel laat zien hoe het werkt en, even belangrijk, wat er vandaag wel en niet wordt overgenomen. De bediening in detail staat in de handleiding: ",[30,2512,2514],{"href":2513},"\u002Fhelp\u002Ftrikker-projecten-importeren","Trikker-projecten importeren",[12,2516,2517,2520],{},[15,2518,2519],{},"Geschreven door het PlanElec-team. Wij maken PlanElec Sketch en Pro."," Trikker is een merk van zijn eigenaar; we gebruiken de naam alleen om naar het product te verwijzen. Elke uitspraak over Trikker hieronder komt van de openbare pagina's van Trikker, op het einde gelinkt met de datum van onze controle. De uitspraken over PlanElec beschrijven de stand van 30\u002F10\u002F2026; de importpagina in Pro is bepalend.",[41,2522,2524],{"id":2523},"voor-wie-is-de-batchimport-bedoeld","Voor wie is de batchimport bedoeld?",[12,2526,2527,2528,2534],{},"Voor installatiebedrijven en elektriciens die met Trikker hebben gewerkt en hun eerdere werk ook in PlanElec Pro willen hebben. Volgens de handleiding van Trikker is een Trikker-project een bestand dat je bewaart waar je wil, op je eigen computer (",[30,2529,2533],{"href":2530,"rel":2531},"https:\u002F\u002Fwww.trikker.be\u002Fhandleiding\u002Fv2.0-beta",[2532],"nofollow","handleiding 2.0-beta, sectie 16.2","). Na jaren werk zijn dat meestal honderden bestanden in mappen per klant, jaar of werf, soms verspreid over meerdere computers.",[12,2536,2537,2538,2540],{},"Voor één enkel bestand heb je geen archiefrun nodig: de ingang ",[15,2539,2514],{}," neemt één bestand net zo goed aan als vijfhonderd. De batchimport loont wanneer een heel archief in één keer in je account moet, elk klantdossier als project, zonder dezelfde stappen honderd keer te herhalen. Het is geen oordeel over de kwaliteit van je oude bestanden en geen aanbeveling om Trikker niet meer te gebruiken.",[41,2542,2544],{"id":2543},"wat-heb-je-nodig-voor-je-start","Wat heb je nodig voor je start?",[1450,2546,2547,2553,2571],{},[1453,2548,2549,2552],{},[15,2550,2551],{},"Een aangemeld PlanElec-account."," Een Pro-abonnement is niet nodig; de import staat ook open met \"Pro uitproberen\". Zonder account blijft PlanElec Sketch de weg voor één bestand (zie hieronder).",[1453,2554,2555,2561,2562,2565,2566,2570],{},[15,2556,2557,2558,2560],{},"Je ",[1300,2559,2505],{},"-bestanden op je computer",", in een map of in een ZIP-archief. Trikker maakt automatische back-ups als ",[1300,2563,2564],{},".trikback","-bestanden, standaard elke 5 minuten in een map \"Trikker Backups\" in je map Documenten (",[30,2567,2569],{"href":2530,"rel":2568},[2532],"handleiding 2.0-beta, sectie 14.1","). Die back-ups zijn je projectbestanden niet. Laat ze buiten de selectie, anders belanden oudere versies van hetzelfde project in je lijst.",[1453,2572,2573,2576],{},[15,2574,2575],{},"Een browser."," Die leest de selectie en laadt de bestanden op. De omzetting loopt daarna op de server.",[12,2578,2579],{},"Dit zijn de grenzen van één run:",[49,2581,2582,2591],{},[52,2583,2584],{},[55,2585,2586,2588],{},[58,2587,846],{},[58,2589,2590],{},"Waarde",[68,2592,2593,2601,2609,2620,2628],{},[55,2594,2595,2598],{},[73,2596,2597],{},"Bestanden per run",[73,2599,2600],{},"tot 500",[55,2602,2603,2606],{},[73,2604,2605],{},"ZIP-archief",[73,2607,2608],{},"tot 200 MB",[55,2610,2611,2617],{},[73,2612,2613,2614,2616],{},"Eén uitgepakt ",[1300,2615,2505],{},"-bestand",[73,2618,2619],{},"tot 5 MB",[55,2621,2622,2625],{},[73,2623,2624],{},"Alle uitgepakte bestanden samen",[73,2626,2627],{},"tot 500 MB",[55,2629,2630,2633],{},[73,2631,2632],{},"Gelijktijdige runs",[73,2634,2635],{},"één per account",[12,2637,2638,2639,2642],{},"Verborgen bestanden en mappen zoals ",[1300,2640,2641],{},"__MACOSX"," in een ZIP worden genegeerd. Is je archief groter, splits het dan op en importeer in meerdere runs. Omdat identieke bestanden worden herkend (zie hieronder), is een overlap geen probleem.",[41,2644,2646],{"id":2645},"hoe-verloopt-de-import-stap-voor-stap","Hoe verloopt de import stap voor stap?",[1602,2648,2649,2666,2683,2706,2720,2730,2740,2746,2764],{},[1453,2650,2651,2654,2655,2657,2658,2661,2662,2665],{},[15,2652,2653],{},"Open de import."," Kies ",[15,2656,2514],{}," in het logomenu van een project (badge ",[15,2659,2660],{},"Nieuw","), in de projectlijst naast ",[15,2663,2664],{},"Nieuw project"," of in het opdrachtenpalet.",[1453,2667,2668,2671,2672,2675,2676,1628,2679,2682],{},[15,2669,2670],{},"Kies je bestanden."," Sleep bestanden, een map of een ZIP naar ",[15,2673,2674],{},"Bestanden, map of ZIP hierheen slepen",", of gebruik ",[15,2677,2678],{},"Bestanden kiezen",[15,2680,2681],{},"Map kiezen",". Submappen worden gelezen; het mappad van elk bestand wordt bijgehouden.",[1453,2684,2685,2688,2689,2692,2693,702,2696,702,2699,1628,2702,2705],{},[15,2686,2687],{},"Controleer de voorvertoning."," De lijst toont ",[15,2690,2691],{},"50 bestanden gecontroleerd"," en per bestand de status ",[15,2694,2695],{},"Klaar",[15,2697,2698],{},"met opmerkingen",[15,2700,2701],{},"Duplicaat",[15,2703,2704],{},"Fout",". Er is nog niets aangemaakt. Bij bestanden met opmerkingen zie je wat niet wordt overgenomen of aangepast.",[1453,2707,2708,2711,2712,2715,2716,2719],{},[15,2709,2710],{},"Kies de bestemming."," Onder ",[15,2713,2714],{},"Aanmaken in"," kies je ",[15,2717,2718],{},"Mijn projecten"," of een organisatie waartoe je behoort.",[1453,2721,2722,2725,2726,2729],{},[15,2723,2724],{},"Beslis over de toestemming."," ",[15,2727,2728],{},"Bestanden gebruiken om de import te verbeteren"," is vrijwillig en standaard uit (zie \"Mislukte bestanden\").",[1453,2731,2732,2735,2736,2739],{},[15,2733,2734],{},"Start."," De knop heet ",[15,2737,2738],{},"48 projecten aanmaken",". Duplicaten en fouten worden overgeslagen.",[1453,2741,2742,2745],{},[15,2743,2744],{},"Laat de bestanden opladen, daarna mag je het venster sluiten."," Zodra \"Alle bestanden zijn opgeladen. Je mag dit venster sluiten: we sturen je een e-mail zodra alles klaar is.\" verschijnt, werkt de server zelfstandig verder.",[1453,2747,2748,2751,2752,2755,2756,2759,2760,2763],{},[15,2749,2750],{},"Volg de voortgang of wacht op de e-mail."," De pagina ",[15,2753,2754],{},"Je Trikker-projecten worden aangemaakt"," toont de voortgang en de geschatte resterende tijd en, onder ",[15,2757,2758],{},"Tot nu toe herkend",", tellers zoals stroomkringen, beveiligingen, stopcontacten, lichtpunten en verdeelborden. ",[15,2761,2762],{},"Rest annuleren"," stopt de run; voltooide projecten blijven.",[1453,2765,2766,2769,2770,2773,2774,2777,2778,2781,2782,2785,2786,39],{},[15,2767,2768],{},"Lees het rapport."," Het heet ",[15,2771,2772],{},"48 projecten aangemaakt"," en scheidt projecten zonder opmerkingen, met opmerkingen, overgeslagen duplicaten en niet-geïmporteerde bestanden. ",[15,2775,2776],{},"Projecten bekijken"," opent de projectlijst, ",[15,2779,2780],{},"Rapport als CSV"," downloadt de tabel, ",[15,2783,2784],{},"Meer bestanden importeren"," start een nieuwe run. Bij precies één project is er ",[15,2787,2788],{},"Project openen",[41,2790,2792],{"id":2791},"wat-toont-het-rapport-per-bestand","Wat toont het rapport per bestand?",[12,2794,2795],{},"Het rapport beantwoordt drie vragen:",[1450,2797,2798,2804,2810],{},[1453,2799,2800,2803],{},[15,2801,2802],{},"Wat is overgenomen?"," Aantallen van wat PlanElec heeft gevonden: verdeelborden, stroomkringen, toestellen.",[1453,2805,2806,2809],{},[15,2807,2808],{},"Wat is niet overgenomen?"," Gegroepeerd per thema: de tekening zelf, het situatieplan, opmaak en nummering, documentgegevens en afdrukinstellingen.",[1453,2811,2812,2815],{},[15,2813,2814],{},"Wat is aangepast?"," Waarden die PlanElec niet kent, zoals sommige kabeltypes of doorsneden, worden vervangen en de betrokken kabels gemarkeerd voor nazicht. Combinaties worden anders weergegeven: een automaat met een 30 mA-differentieelschakelaar erachter wordt bijvoorbeeld één gecombineerd toestel.",[12,2817,2818],{},"Het rapport bevat codes en aantallen, geen oordeel of het schema juist is. Het zegt je waar je moet kijken; het kijken blijft jouw taak.",[41,2820,2822],{"id":2821},"wat-wordt-vandaag-overgenomen","Wat wordt vandaag overgenomen?",[12,2824,2825,2826,2828],{},"De batchimport gebruikt dezelfde omzetting als de ",[1300,2827,2505],{},"-import in PlanElec Sketch en zet het resultaat om in een Pro-project. Hij leest bestanden uit Trikker 2.0 en uit oudere versies zoals Trikker 1.5. Vandaag neemt hij over:",[1450,2830,2831,2837,2843,2848,2854,2860],{},[1453,2832,2833,2836],{},[15,2834,2835],{},"Het eendraadschema"," met zijn beveiligingsketen: voeding, verdeelborden en onderverdelers, hoofdschakelaar, beveiligingen. Waar Pro een combinatie anders weergeeft, zegt het rapport het.",[1453,2838,2839,2842],{},[15,2840,2841],{},"Stroomkringen"," met hun beveiliging en kabels.",[1453,2844,2845,2847],{},[15,2846,701],{}," zoals stopcontacten, verlichting, toestellen of een laadpunt, telkens verbonden met hun stroomkring.",[1453,2849,2850,2853],{},[15,2851,2852],{},"Gegevens over klant, adres van de installatie, installateur en erkend organisme",", voor zover het bestand ze bevat.",[1453,2855,2856,2859],{},[15,2857,2858],{},"Notities",", die terechtkomen in de notities op het voorblad van het project, voor zover ze in 500 tekens passen.",[1453,2861,2862,2865],{},[15,2863,2864],{},"Het situatieplan"," in het grondplan: per pagina een verdieping met naam, muren met hun dikte, ruimtes met naam, deuren met draairichting, ramen, garagepoorten en trappen; de geplaatste toestellen zijn gekoppeld aan hun kring.",[41,2867,2869],{"id":2868},"wat-wordt-vandaag-niet-overgenomen","Wat wordt vandaag niet overgenomen?",[12,2871,2872],{},"Lees deze sectie voor je een archief verhuist.",[1450,2874,2875,2881,2887,2893],{},[1453,2876,2877,2880],{},[15,2878,2879],{},"Delen van het situatieplan,"," zoals leidingen, symbolen zonder tegenhanger in Pro en afbeeldingen van geïmporteerde grondplannen. Het rapport vermeldt ze.",[1453,2882,2883,2886],{},[15,2884,2885],{},"De voedingskabel naar de meter."," Je vult hem in Pro aan bij de aansluiting.",[1453,2888,2889,2892],{},[15,2890,2891],{},"Opmaakdetails."," Vaste kringletters als zodanig (de letters staan in de kringnaam, maar Pro nummert zelf), handmatige pagina-einden en de weergave van onderverdelers.",[1453,2894,2895,2898],{},[15,2896,2897],{},"Documentgegevens en afdrukopties."," Het logo (Pro drukt het logo uit je profiel af), telefoon en e-mail van het organisme, datum en revisie, de documenttaal en de afdrukopties.",[12,2900,2901,2902,2906],{},"Heb je een grondplan alleen als PDF, scan of afbeelding, dan leest de grondplanherkenning in Pro het. Ze stelt muren, ruimtes, deuren en ramen voor en vraagt je de schaal te bevestigen voor er iets wordt overgenomen; zie ",[30,2903,2905],{"href":2904},"\u002Fnl\u002Fblog\u002Fgrondplan-herkennen-verdeelkast-foto-ai","AI-grondplanherkenning",". Beschouw alles wat niet onder \"Wat wordt vandaag overgenomen?\" staat als niet overgenomen. Het rapport van elk bestand is bepalend.",[41,2908,2910],{"id":2909},"hoe-herkent-planelec-duplicaten-en-wat-gebeurt-er-met-het-origineel","Hoe herkent PlanElec duplicaten, en wat gebeurt er met het origineel?",[12,2912,2913,2916,2917,2919],{},[15,2914,2915],{},"Duplicaten."," PlanElec vergelijkt bestanden op inhoud (een SHA-256-vingerafdruk), niet op naam. Een kopie in een andere map, een bestand dat tweemaal in je ZIP zit of een bestand uit een eerdere run geldt als duplicaat en wordt overgeslagen. De vergelijking gebeurt binnen de gekozen bestemming, dus in ",[15,2918,2718],{}," of in de organisatie.",[12,2921,2922,2925,2926,2928],{},[15,2923,2924],{},"Het origineel blijft gekoppeld."," Het ",[1300,2927,2505],{},"-bestand wordt als projectbestand bewaard bij de projectstukken van het project. Je bestanden op je computer worden alleen gelezen, nooit gewijzigd of verwijderd. Het origineel blijft dus beschikbaar als je het met het rapport wilt vergelijken of later opnieuw wilt importeren.",[41,2930,2932],{"id":2931},"mislukte-bestanden-wat-gebeurt-ermee","Mislukte bestanden: wat gebeurt ermee?",[12,2934,2935],{},"Sommige bestanden laten zich niet omzetten: beschadigde bestanden, bestanden die geen Trikker-bestanden zijn of inhoud die de omzetter niet kan lezen. Ze krijgen in het rapport de status Fout met een redencode, en er wordt geen project voor aangemaakt.",[12,2937,2938,2939,2941,2942,2945],{},"Met de toestemming ",[15,2940,2728],{}," (standaard uit) of met een klik op ",[15,2943,2944],{},"Ter analyse versturen"," mag PlanElec een bestand dat niet goed werd geïmporteerd analyseren om de import te verbeteren; het origineel blijft dan tot 12 maanden bewaard. Zonder een van beide wist PlanElec het origineel van een mislukt bestand na 30 dagen. De analyse verandert vandaag het resultaat voor je eigen bestand niet. De gebruiksstatistieken van de import bevatten aantallen en codes, geen bestandsnamen.",[41,2947,2949],{"id":2948},"hoe-lang-duurt-het","Hoe lang duurt het?",[12,2951,2952],{},"Dat hangt af van het aantal en de grootte van de bestanden. De importpagina toont een geschatte resterende tijd. Wat telt: zodra de bestanden zijn opgeladen, hoef je niet te wachten. PlanElec zet ze op de achtergrond om, maakt de projecten aan en stuurt een e-mail naar je account zodra alles klaar is. De e-mail bevat alleen cijfers en een link naar het rapport, geen bestandsnamen en geen klantnamen. Dit is de duur van het technische proces en geen uitspraak over hoeveel tijd de verhuis je bespaart: het nakijken van de geïmporteerde schema's duurt zolang het duurt.",[41,2954,2956],{"id":2955},"sketch-of-pro-welke-voor-welke-taak","Sketch of Pro: welke voor welke taak?",[12,2958,2959,2960,2962],{},"PlanElec Sketch en PlanElec Pro lezen allebei ",[1300,2961,2505],{},"-bestanden, maar voor verschillende taken:",[49,2964,2965,2978],{},[52,2966,2967],{},[55,2968,2969,2972,2975],{},[58,2970,2971],{},"Vraag",[58,2973,2974],{},"PlanElec Sketch",[58,2976,2977],{},"Trikker-projecten importeren in Pro",[68,2979,2980,2991,3002,3013,3024,3035],{},[55,2981,2982,2985,2988],{},[73,2983,2984],{},"Hoeveel bestanden tegelijk?",[73,2986,2987],{},"Eén bestand",[73,2989,2990],{},"Eén bestand, veel bestanden, een map of een ZIP, tot 500",[55,2992,2993,2996,2999],{},[73,2994,2995],{},"Account",[73,2997,2998],{},"Niet nodig",[73,3000,3001],{},"Aangemeld PlanElec-account, ook \"Pro uitproberen\"",[55,3003,3004,3007,3010],{},[73,3005,3006],{},"Resultaat",[73,3008,3009],{},"Een bewerkbare tekening in de browser",[73,3011,3012],{},"Een project per bestand in je account",[55,3014,3015,3018,3021],{},[73,3016,3017],{},"Rapport",[73,3019,3020],{},"Importrapport voor het bestand",[73,3022,3023],{},"Rapport over de run, CSV, e-mail bij afronding",[55,3025,3026,3029,3032],{},[73,3027,3028],{},"Originele bestand",[73,3030,3031],{},"Blijft bij jou",[73,3033,3034],{},"Bewaard als projectbestand",[55,3036,3037,3042,3045],{},[73,3038,3039,3040],{},"Situatieplan uit de ",[1300,3041,2505],{},[73,3043,3044],{},"Komt in de tekening",[73,3046,3047],{},"Komt in het grondplan van het project",[12,3049,3050,3051,3056,3057,3060,3061,3065,3066,39],{},"Zonder account, of als je eerst wilt zien wat een typisch bestand wordt, open je het in ",[30,3052,3055],{"href":3053,"rel":3054},"https:\u002F\u002Fsketch.planelec.be\u002Fnl\u002F",[2532],"Sketch",". Dat is gratis en je ziet hetzelfde soort importrapport. Na het openen wijst Sketch op de archiefverhuis (\"Je hele Trikker-archief overzetten?\", knop ",[15,3058,3059],{},"Naar PlanElec Pro","). Meer over Sketch staat in ",[30,3062,3064],{"href":3063},"\u002Fnl\u002Fblog\u002Fplanelec-sketch-gratis-eendraadschema-tekenen","PlanElec Sketch: gratis eendraadschema tekenen",". De vergelijking van alle drie de tools, met bronnen, staat in ",[30,3067,3069],{"href":3068},"\u002Fnl\u002Fblog\u002Ftrikker-sketch-pro-vergelijking","Trikker, PlanElec Sketch of PlanElec Pro",[41,3071,3073],{"id":3072},"na-de-import-wat-je-nog-moet-nakijken","Na de import: wat je nog moet nakijken",[12,3075,3076,3077,3079],{},"Een project dat uit een ",[1300,3078,2505],{},"-bestand is ontstaan, is een vertrekpunt en geen goedgekeurd document.",[1602,3081,3082,3085,3088,3091,3094],{},[1453,3083,3084],{},"Open enkele projecten van verschillende soort (een woning, een appartement, een uitbreiding) en vergelijk het eendraadschema met de afgedrukte versie van het origineel.",[1453,3086,3087],{},"Lees de opmerkingen en de lijst \"niet overgenomen\" van die bestanden.",[1453,3089,3090],{},"Controleer de stroomkringen, de nominale waarden van de beveiligingen en de kabels die voor nazicht zijn gemarkeerd.",[1453,3092,3093],{},"Vul aan wat niet wordt overgenomen: logo, afdrukopties en de voedingskabel. Vergelijk het grondplan met het situatieplan van het origineel.",[1453,3095,3096],{},"Laat de AREI\u002FRGIE-zelfcontrole in Pro lopen op projecten waarmee je verderwerkt. Ze dekt de ondersteunde regels en toont openstaande punten. Ze is geen attest. De inhoud van elk plan blijft jouw verantwoordelijkheid en de keuring doet het erkend organisme.",[12,3098,3099,3100,39],{},"We garanderen niet dat een geïmporteerd schema aan het AREI\u002FRGIE voldoet, en de import vervangt je eigen controle niet. Voor de achtergrond van de twee documenten zie ",[30,3101,3103],{"href":3102},"\u002Fnl\u002Fblog\u002Feendraadschema-vs-situatieschema","eendraadschema of situatieplan",[41,3105,1394],{"id":1393},[1396,3107,3109],{"id":3108},"heb-ik-een-pro-abonnement-nodig","Heb ik een Pro-abonnement nodig?",[12,3111,3112],{},"Nee. Je hebt een aangemeld PlanElec-account nodig; de import staat ook open met \"Pro uitproberen\".",[1396,3114,3116],{"id":3115},"moet-trikker-geïnstalleerd-zijn-of-draaien","Moet Trikker geïnstalleerd zijn of draaien?",[12,3118,3119],{},"Nee. De omzetting leest de inhoud van de bestanden. Je hebt alleen de bestanden zelf nodig.",[1396,3121,3123],{"id":3122},"worden-mijn-originele-bestanden-gewijzigd-of-verwijderd","Worden mijn originele bestanden gewijzigd of verwijderd?",[12,3125,3126],{},"Nee. Ze worden alleen gelezen.",[1396,3128,3130],{"id":3129},"kan-ik-zo-een-trikker-pdf-importeren","Kan ik zo een Trikker-PDF importeren?",[12,3132,3133,3134,3136],{},"Nee. De import leest ",[1300,3135,2505],{},"-bestanden. Een PDF van een grondplan laat je lezen door de grondplanherkenning, zoals hierboven beschreven.",[1396,3138,3140,3141,3143],{"id":3139},"wat-gebeurt-er-met-het-situatieplan-in-mijn-trik-bestanden","Wat gebeurt er met het situatieplan in mijn ",[1300,3142,2505],{},"-bestanden?",[12,3145,3146],{},"Het komt in het grondplan van het project: verdiepingen, muren, ruimtes, deuren, ramen, garagepoorten en trappen, de geplaatste toestellen gekoppeld aan hun kring. Wat daarvan niet wordt overgenomen, vermeldt het rapport.",[1396,3148,3150],{"id":3149},"kan-ik-het-eerst-met-één-bestand-proberen","Kan ik het eerst met één bestand proberen?",[12,3152,3153,3154,3156],{},"Ja: met ",[15,3155,2514],{}," en één enkel bestand, of zonder account in PlanElec Sketch. Beide gebruiken dezelfde omzetting.",[1396,3158,3160],{"id":3159},"ik-heb-meer-dan-500-bestanden","Ik heb meer dan 500 bestanden.",[12,3162,3163],{},"Importeer het archief in meerdere runs. Bestanden die al eerder werden geïmporteerd, worden als duplicaat overgeslagen.",[41,3165,3167],{"id":3166},"bronnen-en-datum","Bronnen en datum",[12,3169,3170,3171,3174],{},"De uitspraken over Trikker werden gecontroleerd op ",[15,3172,3173],{},"29\u002F10\u002F2026",". De pagina's van Trikker tonen geen publicatiedatum, de datum is dus de datum van onze controle.",[49,3176,3177,3190],{},[52,3178,3179],{},[55,3180,3181,3184,3187],{},[58,3182,3183],{},"Nr.",[58,3185,3186],{},"Uitspraak over Trikker",[58,3188,3189],{},"Bron",[68,3191,3192,3208],{},[55,3193,3194,3196,3202],{},[73,3195,343],{},[73,3197,3198,3199,3201],{},"Een Trikker-project is een ",[1300,3200,2505],{},"-bestand dat je bewaart waar je wil, op je eigen computer (sectie 16.2)",[73,3203,3204],{},[30,3205,3207],{"href":2530,"rel":3206},[2532],"Trikker-handleiding 2.0-beta",[55,3209,3210,3212,3218],{},[73,3211,326],{},[73,3213,3214,3215,3217],{},"Automatische back-ups zijn ",[1300,3216,2564],{},"-bestanden, standaard elke 5 minuten in de map \"Trikker Backups\" in de map Documenten (secties 4.2 en 14.1)",[73,3219,3220],{},[30,3221,3207],{"href":2530,"rel":3222},[2532],[12,3224,3225,3226,3230],{},"Functies veranderen. Is iets hier verouderd, ",[30,3227,3229],{"href":3228},"mailto:info@planelec.be","schrijf ons"," dan en we corrigeren het.",{"title":1467,"searchDepth":1468,"depth":1468,"links":3232},[3233,3234,3235,3236,3237,3238,3239,3240,3241,3242,3243,3244,3254],{"id":2523,"depth":1468,"text":2524},{"id":2543,"depth":1468,"text":2544},{"id":2645,"depth":1468,"text":2646},{"id":2791,"depth":1468,"text":2792},{"id":2821,"depth":1468,"text":2822},{"id":2868,"depth":1468,"text":2869},{"id":2909,"depth":1468,"text":2910},{"id":2931,"depth":1468,"text":2932},{"id":2948,"depth":1468,"text":2949},{"id":2955,"depth":1468,"text":2956},{"id":3072,"depth":1468,"text":3073},{"id":1393,"depth":1468,"text":1394,"children":3245},[3246,3247,3248,3249,3250,3252,3253],{"id":3108,"depth":1486,"text":3109},{"id":3115,"depth":1486,"text":3116},{"id":3122,"depth":1486,"text":3123},{"id":3129,"depth":1486,"text":3130},{"id":3139,"depth":1486,"text":3251},"Wat gebeurt er met het situatieplan in mijn .trik-bestanden?",{"id":3149,"depth":1486,"text":3150},{"id":3159,"depth":1486,"text":3160},{"id":3166,"depth":1468,"text":3167},"2026-10-30","Nieuw in PlanElec Pro: verhuis een volledig archief Trikker-bestanden (.trik) in één keer. Bestanden, map of ZIP, één project per bestand, één rapport, het origineel blijft gekoppeld. Met wat wel en niet wordt overgenomen.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-vs-trikker-editorial.webp","2026-11-01",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-vs-trikker-editorial.jpg","\u002Fblog\u002Ftrikker-archief-verhuizen.nl","8 min",1,{"title":2494,"description":3256},"Trikker-archief naar PlanElec Pro: batchimport","trikker-archief-verhuizen","blog\u002Ftrikker-archief-verhuizen.nl",[3269,3270,3271,2505,3272,3273,3274,3275,3276],"Trikker","Trikker-archief","batchimport","PlanElec Pro","eendraadschema","situatieplan","AREI","RGIE","iK5-nPY_9K5ZVQvLlEQOeN6HJFP9folV-3C1RR9JamU","\u002Fblog\u002Ftrikker-archief-verhuizen",{"id":3280,"title":3281,"body":3282,"category":4028,"description":4029,"extension":1496,"guideId":4030,"image":4031,"locale":1497,"meta":4032,"navigation":1499,"order":4033,"path":4034,"publishedAt":3255,"readTime":4035,"seo":4036,"seoTitle":4037,"slug":4038,"stem":4039,"tags":4040,"updatedAt":3258,"__hash__":4045,"kind":2491,"href":2513,"date":3255},"help\u002Fhelp\u002Ftrikker-import.nl.md","Hoe importeer ik mijn Trikker-projecten in PlanElec?",{"type":9,"value":3283,"toc":4008},[3284,3293,3298,3302,3385,3397,3402,3406,3429,3433,3437,3486,3491,3496,3498,3588,3594,3598,3660,3665,3669,3672,3731,3734,3739,3743,3853,3856,3861,3865,3871,3876,3880,3933,3936,3941,3945,3958,3960,3962,3965,3969,3972,3976,3986,3990,3993,3997,4000],[12,3285,3198,3286,3288,3289,3292],{},[1300,3287,2505],{},"-bestand. ",[15,3290,3291],{},"Je importeert het in PlanElec Pro met de ingang \"Trikker-projecten importeren\": één bestand net zo goed als meerdere bestanden, een map of een ZIP-archief met maximaal 500 bestanden."," Elk bestand wordt een eigen project, het origineel blijft als bestand bij het project. Het eendraadschema, de verdeelborden, stroomkringen en toestellen komen mee; het situatieplan blijft achter. Je hebt een aangemeld PlanElec-account nodig; een Pro-abonnement is niet nodig, \"Pro uitproberen\" volstaat. Zonder account open je één bestand in PlanElec Sketch.",[12,3294,3295],{},[30,3296],{"id":3297},"ways",[41,3299,3301],{"id":3300},"welke-weg-past-bij-mijn-gegevens","Welke weg past bij mijn gegevens?",[49,3303,3304,3316],{},[52,3305,3306],{},[55,3307,3308,3311,3314],{},[58,3309,3310],{},"Je hebt …",[58,3312,3313],{},"Jouw weg",[58,3315,2995],{},[68,3317,3318,3334,3351,3367],{},[55,3319,3320,3326,3331],{},[73,3321,3322,3323,3325],{},"een archief met veel ",[1300,3324,2505],{},"-bestanden, een map of een ZIP",[73,3327,3328,3330],{},[15,3329,2514],{}," in PlanElec Pro (hoofdweg, zie hieronder)",[73,3332,3333],{},"PlanElec-account",[55,3335,3336,3341,3349],{},[73,3337,3338,3339,2616],{},"één enkel ",[1300,3340,2505],{},[73,3342,3343,3344,3346,3347],{},"dezelfde weg: ",[15,3345,2514],{},"; bij precies één project biedt het rapport ",[15,3348,2788],{},[73,3350,3333],{},[55,3352,3353,3358,3364],{},[73,3354,3338,3355,3357],{},[1300,3356,2505],{},"-bestand en geen account",[73,3359,3360,3361],{},"PlanElec Sketch: bestand openen, schema nakijken en eventueel ",[15,3362,3363],{},"Overnemen in Pro",[73,3365,3366],{},"geen voor Sketch",[55,3368,3369,3372,3383],{},[73,3370,3371],{},"een grondplan als PDF, scan, afbeelding of DXF",[73,3373,3374,3375,933,3379],{},"importeren of laten herkennen, zie ",[30,3376,3378],{"href":3377},"\u002Fhelp\u002Fgrondplan-importeren-en-kalibreren","Grondplan importeren en kalibreren",[30,3380,3382],{"href":3381},"\u002Fhelp\u002Fgrondplan-herkennen-met-ai","Grondplan herkennen met AI",[73,3384,3333],{},[12,3386,3387,3388,3390,3391,3393,3394,3396],{},"Onze aanbeveling: importeer ",[1300,3389,2505],{},"-bestanden met ",[15,3392,2514],{},". Dat is de ene importweg in Pro; ze maakt projecten aan in je account en bewaart het origineel. Het situatieplan van het ",[1300,3395,2505],{},"-bestand komt mee in de grondplan: verdiepingen, muren, ruimtes, deuren, ramen, garagepoorten, trappen en geplaatste toestellen.",[12,3398,3399],{},[30,3400],{"id":3401},"requirements",[41,3403,3405],{"id":3404},"wat-heb-je-nodig-voor-de-import","Wat heb je nodig voor de import?",[1450,3407,3408,3413,3424],{},[1453,3409,3410,3412],{},[15,3411,2551],{}," De import staat open voor elk aangemeld account, ook met \"Pro uitproberen\".",[1453,3414,3415,3420,3421,3423],{},[15,3416,2557,3417,3419],{},[1300,3418,2505],{},"-bestanden"," op de computer waarop je werkt. De automatische back-ups van Trikker (",[1300,3422,2564],{},") zijn geen projectbestanden; laat ze weg.",[1453,3425,3426,3428],{},[15,3427,2575],{}," Die leest je selectie, pakt een ZIP uit en laadt elk bestand op. Alles daarna loopt op de server.",[12,3430,3431],{},[30,3432],{"id":2353},[41,3434,3436],{"id":3435},"welke-grenzen-gelden-er","Welke grenzen gelden er?",[49,3438,3439,3447],{},[52,3440,3441],{},[55,3442,3443,3445],{},[58,3444,846],{},[58,3446,2590],{},[68,3448,3449,3459,3465,3473,3479],{},[55,3450,3451,3454],{},[73,3452,3453],{},"Bestanden per keer",[73,3455,3456,3457,3419],{},"tot 500 ",[1300,3458,2505],{},[55,3460,3461,3463],{},[73,3462,2605],{},[73,3464,2608],{},[55,3466,3467,3471],{},[73,3468,2613,3469,2616],{},[1300,3470,2505],{},[73,3472,2619],{},[55,3474,3475,3477],{},[73,3476,2624],{},[73,3478,2627],{},[55,3480,3481,3483],{},[73,3482,2632],{},[73,3484,3485],{},"één per account; een tweede start pas als de eerste is afgerond of geannuleerd",[12,3487,2638,3488,3490],{},[1300,3489,2641],{}," en een ZIP in een ZIP worden overgeslagen. Is je archief groter, splits het dan op en importeer in meerdere runs. Duplicaten worden herkend, een overlap is dus geen probleem.",[12,3492,3493],{},[30,3494],{"id":3495},"steps",[41,3497,2646],{"id":2645},[1602,3499,3500,3513,3523,3534,3544,3551,3557,3563,3576,3582],{},[1453,3501,3502,3504,3505,3507,3508,2661,3510,3512],{},[15,3503,2653],{}," Je vindt ",[15,3506,2514],{}," op drie plaatsen: in het logomenu van een project (met de badge ",[15,3509,2660],{},[15,3511,2664],{}," en in het opdrachtenpalet. Alle drie openen dezelfde pagina.",[1453,3514,3515,2671,3517,2675,3519,1628,3521,2682],{},[15,3516,2670],{},[15,3518,2674],{},[15,3520,2678],{},[15,3522,2681],{},[1453,3524,3525,2688,3527,3529,3530,3533],{},[15,3526,2687],{},[15,3528,2691],{}," en per bestand een status (tabel hieronder). Er is nog niets aangemaakt. Open de details van een bestand met opmerkingen om te lezen wat niet wordt overgenomen. Met ",[15,3531,3532],{},"Selectie wissen"," begin je opnieuw.",[1453,3535,3536,2711,3538,3540,3541,3543],{},[15,3537,2710],{},[15,3539,2714],{}," vind je ",[15,3542,2718],{}," en de organisaties waartoe je behoort.",[1453,3545,3546,2725,3548,3550],{},[15,3547,2724],{},[15,3549,2728],{}," is vrijwillig en standaard uit (zie privacy hieronder).",[1453,3552,3553,2735,3555,2739],{},[15,3554,2734],{},[15,3556,2738],{},[1453,3558,3559,3562],{},[15,3560,3561],{},"Wacht tot de bestanden zijn opgeladen."," Dan verschijnt de melding \"Alle bestanden zijn opgeladen. Je mag dit venster sluiten: we sturen je een e-mail zodra alles klaar is.\" Tot dan blijft het venster open.",[1453,3564,3565,2751,3568,3570,3571,3573,3574,2763],{},[15,3566,3567],{},"Volg de voortgang of sluit het venster.",[15,3569,2754],{}," toont de stand, de geschatte resterende tijd en onder ",[15,3572,2758],{}," tellers zoals stroomkringen, beveiligingen, stopcontacten, lichtpunten en verdeelborden. Projecten die al klaar zijn, staan meteen in je projectoverzicht. ",[15,3575,2762],{},[1453,3577,3578,3581],{},[15,3579,3580],{},"Lees de e-mail."," Zodra elk bestand een eindstatus heeft, stuurt PlanElec precies één e-mail naar je account, in de taal van de run, met cijfers en een link naar het rapport. Bestands- en klantnamen staan er niet in.",[1453,3583,3584,3587],{},[15,3585,3586],{},"Open het rapport."," Zie de volgende sectie.",[12,3589,3590,3591,3593],{},"Succescriterium: het rapport heet ",[15,3592,2772],{}," en de projecten staan in de gekozen projectlijst.",[1396,3595,3597],{"id":3596},"welke-statussen-toont-de-voorvertoning","Welke statussen toont de voorvertoning?",[49,3599,3600,3612],{},[52,3601,3602],{},[55,3603,3604,3607,3609],{},[58,3605,3606],{},"Status",[58,3608,752],{},[58,3610,3611],{},"Wat gebeurt er bij de start",[68,3613,3614,3626,3637,3649],{},[55,3615,3616,3620,3623],{},[73,3617,3618],{},[15,3619,2695],{},[73,3621,3622],{},"Het bestand is leesbaar.",[73,3624,3625],{},"Er wordt een project aangemaakt.",[55,3627,3628,3632,3635],{},[73,3629,3630],{},[15,3631,2698],{},[73,3633,3634],{},"Het bestand is leesbaar, maar onderdelen worden aangepast of niet overgenomen. De details noemen ze.",[73,3636,3625],{},[55,3638,3639,3643,3646],{},[73,3640,3641],{},[15,3642,2701],{},[73,3644,3645],{},"Hetzelfde bestand (zelfde inhoud, niet noodzakelijk dezelfde naam) werd al geïmporteerd in de gekozen bestemming of staat tweemaal in de run.",[73,3647,3648],{},"Wordt overgeslagen.",[55,3650,3651,3655,3658],{},[73,3652,3653],{},[15,3654,2704],{},[73,3656,3657],{},"Het bestand is geen leesbaar Trikker-bestand.",[73,3659,3648],{},[12,3661,3662],{},[30,3663],{"id":3664},"report",[41,3666,3668],{"id":3667},"wat-toont-het-rapport","Wat toont het rapport?",[12,3670,3671],{},"Het rapport opent via de link in de e-mail of, als je terugkomt, op dezelfde pagina. Het noemt het aantal aangemaakte projecten, opgesplitst in zonder opmerkingen, met opmerkingen, overgeslagen duplicaten en niet-geïmporteerde bestanden.",[49,3673,3674,3684],{},[52,3675,3676],{},[55,3677,3678,3681],{},[58,3679,3680],{},"Knop",[58,3682,3683],{},"Werking",[68,3685,3686,3695,3704,3713,3722],{},[55,3687,3688,3692],{},[73,3689,3690],{},[15,3691,2776],{},[73,3693,3694],{},"opent de projectlijst met de nieuwe projecten",[55,3696,3697,3701],{},[73,3698,3699],{},[15,3700,2788],{},[73,3702,3703],{},"verschijnt als precies één project is aangemaakt en opent het",[55,3705,3706,3710],{},[73,3707,3708],{},[15,3709,2780],{},[73,3711,3712],{},"downloadt een tabel met bestandsnaam, map, status, projectpad, aantal opmerkingen en foutcode",[55,3714,3715,3719],{},[73,3716,3717],{},[15,3718,2784],{},[73,3720,3721],{},"start een nieuwe run",[55,3723,3724,3728],{},[73,3725,3726],{},[15,3727,2944],{},[73,3729,3730],{},"staat bij een niet-geïmporteerd bestand en geeft het vrij voor analyse (zie privacy)",[12,3732,3733],{},"Het rapport bevat codes en cijfers. Het zegt je waar je moet kijken en bevestigt niet dat een schema klopt.",[12,3735,3736],{},[30,3737],{"id":3738},"scope",[41,3740,3742],{"id":3741},"wat-wordt-overgenomen-en-wat-niet","Wat wordt overgenomen en wat niet?",[49,3744,3745,3758],{},[52,3746,3747],{},[55,3748,3749,3752,3755],{},[58,3750,3751],{},"Onderdeel",[58,3753,3754],{},"Overgenomen",[58,3756,3757],{},"Niet overgenomen",[68,3759,3760,3771,3781,3792,3803,3812,3822,3832,3843],{},[55,3761,3762,3765,3768],{},[73,3763,3764],{},"Eendraadschema",[73,3766,3767],{},"voeding, verdeelborden en onderverdelers, hoofdschakelaar, beveiligingen, stroomkringen met beveiliging en kabels, verbruikers",[73,3769,3770],{},"toestellen zonder eigen kringbeveiliging en enkele opstellingen die Pro niet kan tekenen; het rapport noemt ze",[55,3772,3773,3776,3779],{},[73,3774,3775],{},"Combinaties",[73,3777,3778],{},"aangepast in Pro, bv. een automaat met een 30 mA-schakelaar erachter wordt één gecombineerd toestel",[73,3780,332],{},[55,3782,3783,3786,3789],{},[73,3784,3785],{},"Waarden",[73,3787,3788],{},"bekende kabeltypes, doorsneden en nominale waarden",[73,3790,3791],{},"onbekende waarden worden vervangen en de kabels gemarkeerd voor nazicht",[55,3793,3794,3797,3800],{},[73,3795,3796],{},"Projectgegevens",[73,3798,3799],{},"klant met telefoon en gsm, adres van de installatie, installateur, erkend organisme (naam, adres)",[73,3801,3802],{},"telefoon en e-mail van het organisme, datum en revisie, documenttaal",[55,3804,3805,3807,3810],{},[73,3806,2858],{},[73,3808,3809],{},"als notities in het eendraadschema, bij het symbool of vrij op het blad, met kleur en grootte; bij het exporteren te verbergen",[73,3811,332],{},[55,3813,3814,3817,3819],{},[73,3815,3816],{},"Opmaak",[73,3818,332],{},[73,3820,3821],{},"vaste kringletters (de letter blijft in de kringnaam), handmatige pagina-einden, weergave van onderverdelers",[55,3823,3824,3827,3830],{},[73,3825,3826],{},"Voedingskabel",[73,3828,3829],{},"de voedingskabel vóór de meter of hoofdschakelaar met kabeltype, doorsnede, aders, lengte en aderkleuren; elke onderverdeling met eigen voedingskabel en ingang (zonder kabel in het bestand legt Pro er een aan met standaardwaarden, het rapport meldt het)",[73,3831,332],{},[55,3833,3834,3837,3840],{},[73,3835,3836],{},"Situatieplan",[73,3838,3839],{},"per pagina een verdieping met naam, muren met dikte, ruimtes met naam, deuren met draairichting, ramen, garagepoorten, rechte trappen, vrije teksten (met regeleinden) en rechthoeken, geplaatste toestellen (gekoppeld aan hun kring); ruimtetype uit de naam van de ruimte (bv. ‘Salle de bain’ → badkamer, ‘Keuken’ → keuken; bij onduidelijke namen leeg, het rapport noemt het aantal om na te kijken); volgorde van de verdiepingen uit duidelijke namen (kelder, gelijkvloers, verdiepingen, zolder), anders in de volgorde van de pagina's",[73,3841,3842],{},"leidingen, symbolen zonder tegenhanger in Pro, afbeeldingen van geïmporteerde grondplannen",[55,3844,3845,3848,3850],{},[73,3846,3847],{},"Afdruk",[73,3849,332],{},[73,3851,3852],{},"logo (Pro drukt het logo uit je profiel af), afdrukopties",[12,3854,3855],{},"Beschouw alles wat niet in de kolom \"Overgenomen\" staat als niet overgenomen; het rapport van het betreffende bestand is bepalend.",[12,3857,3858],{},[30,3859],{"id":3860},"duplicates",[41,3862,3864],{"id":3863},"hoe-herkent-planelec-duplicaten","Hoe herkent PlanElec duplicaten?",[12,3866,3867,3868,3870],{},"PlanElec vergelijkt de inhoud van de bestanden via een vingerafdruk (SHA-256), niet de naam. Een hernoemde kopie, een bestand dat tweemaal in de ZIP zit en een bestand uit een eerdere run zijn duplicaten. De vergelijking gebeurt binnen de gekozen bestemming, dus ",[15,3869,2718],{}," of de organisatie, en alleen met projecten die niet gearchiveerd zijn en die je mag zien.",[12,3872,3873],{},[30,3874],{"id":3875},"privacy",[41,3877,3879],{"id":3878},"wat-gebeurt-er-met-mijn-originelen","Wat gebeurt er met mijn originelen?",[49,3881,3882,3891],{},[52,3883,3884],{},[55,3885,3886,3888],{},[58,3887,1285],{},[58,3889,3890],{},"Bewaring",[68,3892,3893,3905,3915,3925],{},[55,3894,3895,3898],{},[73,3896,3897],{},"Aangemaakt project",[73,3899,3900,3901,3904],{},"Het origineel staat als projectbestand bij de ",[15,3902,3903],{},"Projectstukken"," van het project en blijft zolang het project bestaat. De kopie die voor de verwerking diende, wordt gewist.",[55,3906,3907,3912],{},[73,3908,3909,3910],{},"Niet-geïmporteerd bestand, toestemming uit en geen klik op ",[15,3911,2944],{},[73,3913,3914],{},"Het origineel wordt na 30 dagen gewist.",[55,3916,3917,3922],{},[73,3918,3919,3920],{},"Niet-geïmporteerd bestand, met toestemming of na ",[15,3921,2944],{},[73,3923,3924],{},"Het origineel blijft tot 12 maanden bewaard voor analyse, zodat de import voor zulke bestanden beter wordt. Het resultaat voor je eigen bestand verandert niet.",[55,3926,3927,3930],{},[73,3928,3929],{},"Duplicaat of geannuleerd bestand",[73,3931,3932],{},"Wordt niet bewaard; resten wist PlanElec na een dag.",[12,3934,3935],{},"De lijst met bestanden van een run (namen, mappen) wist PlanElec 12 maanden na afronding. Je bestanden op je computer worden alleen gelezen, nooit gewijzigd. De gebruiksstatistieken van de import bevatten cijfers en codes, geen bestandsnamen.",[12,3937,3938],{},[30,3939],{"id":3940},"sketch",[41,3942,3944],{"id":3943},"hoe-open-ik-één-bestand-in-sketch-en-neem-ik-het-over-in-pro","Hoe open ik één bestand in Sketch en neem ik het over in Pro?",[12,3946,3947,3948,3951,3952,3954,3955,3957],{},"PlanElec Sketch is de weg zonder account. Open het bestand via ",[15,3949,3950],{},"Document → Openen"," of vanaf de startpagina (\"Trikker-bestand (.trik) openen\"), lees het importrapport en werk verder aan het eendraadschema. Daarna toont Sketch de tip \"Je hele Trikker-archief overzetten?\" met de knop ",[15,3953,3059],{},". Wil je in Pro verder plannen, kies dan ",[15,3956,3363],{},". Het situatieplan gaat mee: verdiepingen, muren, ruimtes, openingen, trappen, teksten, rechthoeken en geplaatste toestellen staan daarna op de grondplan in Pro. Sketch opent bestanden tot 8 MB.",[41,3959,1394],{"id":1393},[1396,3961,3109],{"id":3108},[12,3963,3964],{},"Nee. De import staat open voor elk aangemeld account, ook met \"Pro uitproberen\". Welke Pro-functies je daarna in het project gebruikt, hangt af van je tarief.",[1396,3966,3968],{"id":3967},"moet-trikker-geïnstalleerd-zijn","Moet Trikker geïnstalleerd zijn?",[12,3970,3971],{},"Nee. De import leest de inhoud van de bestanden.",[1396,3973,3975],{"id":3974},"kan-ik-een-trikker-pdf-importeren","Kan ik een Trikker-PDF importeren?",[12,3977,3978,3979,3981,3982,3985],{},"Niet met ",[15,3980,2514],{},". Een PDF met het grondplan laat je lezen door de ",[30,3983,3984],{"href":3381},"grondplanherkenning"," of leg je als sjabloon onder je tekening.",[1396,3987,3989],{"id":3988},"wat-als-ik-een-run-onderbreek","Wat als ik een run onderbreek?",[12,3991,3992],{},"Staat het opladen langer dan 30 minuten stil, dan sluit PlanElec de run af. Bestanden die niet aankwamen, staan in het rapport als niet geïmporteerd. Start ze daarna opnieuw; al aangemaakte projecten worden als duplicaat overgeslagen.",[1396,3994,3996],{"id":3995},"is-een-geïmporteerd-project-gecontroleerd","Is een geïmporteerd project gecontroleerd?",[12,3998,3999],{},"Nee. Het is een vertrekpunt. Vergelijk enkele projecten met het origineel, lees de opmerkingen en laat de zelfcontrole in Pro lopen. Die toont openstaande punten en is geen attest; de keuring doet het erkend organisme.",[12,4001,4002,4003,4007],{},"Meer over de achtergrond en over het verhuizen van een heel archief staat in het blogartikel ",[30,4004,4006],{"href":4005},"\u002Fnl\u002Fblog\u002Ftrikker-archief-verhuizen","Trikker-archief verhuizen naar PlanElec Pro",". Trikker is een merk van zijn eigenaar; PlanElec gebruikt de naam alleen om naar het product te verwijzen.",{"title":1467,"searchDepth":1468,"depth":1468,"links":4009},[4010,4011,4012,4013,4016,4017,4018,4019,4020,4021],{"id":3300,"depth":1468,"text":3301},{"id":3404,"depth":1468,"text":3405},{"id":3435,"depth":1468,"text":3436},{"id":2645,"depth":1468,"text":2646,"children":4014},[4015],{"id":3596,"depth":1486,"text":3597},{"id":3667,"depth":1468,"text":3668},{"id":3741,"depth":1468,"text":3742},{"id":3863,"depth":1468,"text":3864},{"id":3878,"depth":1468,"text":3879},{"id":3943,"depth":1468,"text":3944},{"id":1393,"depth":1468,"text":1394,"children":4022},[4023,4024,4025,4026,4027],{"id":3108,"depth":1486,"text":3109},{"id":3967,"depth":1486,"text":3968},{"id":3974,"depth":1486,"text":3975},{"id":3988,"depth":1486,"text":3989},{"id":3995,"depth":1486,"text":3996},"getting_started","Importeer Trikker-bestanden (.trik) in PlanElec Pro, één voor één of als archief: ingang, bestanden of ZIP kiezen, voorvertoning, bestemming, voortgang met e-mail, rapport. Met de grenzen, wat wel en niet wordt overgenomen en Sketch en grondplanimport als alternatief.","trikker-import","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ftrikker-import.webp",{},19,"\u002Fhelp\u002Ftrikker-import.nl","9 min",{"title":3281,"description":4029},null,"trikker-projecten-importeren","help\u002Ftrikker-import.nl",[3269,2505,4041,3271,4042,4043,4044],"import","archief","ZIP","verhuis","ECmTcm67pnH-YE0kPh_d9Jp5_aYKKXkdsi09Ae-o2EA",{"id":4047,"title":4048,"articleId":4049,"body":4050,"category":1493,"date":4576,"description":4577,"extension":1496,"image":4578,"lastUpdated":4579,"locale":1497,"meta":4580,"navigation":1499,"ogImage":4581,"path":4582,"publishDate":4576,"readTime":3262,"refreshInterval":1486,"seo":4583,"seoTitle":4584,"slug":4585,"stem":4586,"tags":4587,"__hash__":4594,"kind":1515,"href":4595},"blog\u002Fblog\u002Fai-assistent-verbinden-mcp.nl.md","Hoe verbind je Claude of ChatGPT via MCP met PlanElec Pro?","planelec-pro-mcp-ai-assistants",{"type":9,"value":4051,"toc":4551},[4052,4062,4066,4069,4073,4076,4080,4083,4152,4159,4163,4181,4190,4194,4213,4224,4228,4231,4235,4255,4259,4276,4280,4297,4301,4366,4373,4377,4380,4383,4387,4404,4408,4484,4490,4494,4497,4499,4503,4509,4513,4520,4524,4527,4531,4534,4538,4541,4545],[12,4053,4054,4057,4058,4061],{},[15,4055,4056],{},"Met PlanElec Pro koppel je je eigen AI-assistent, bijvoorbeeld Claude of ChatGPT, via MCP (Model Context Protocol) aan je projecten."," Je voegt PlanElec toe als eigen verbinding met de server-URL ",[1300,4059,4060],{},"https:\u002F\u002Fplanelec.be\u002Fmcp",", meldt je met OAuth aan bij PlanElec en controleert de gevraagde rechten. Daarna kan je assistent je projecten vinden, de opgeslagen planningsstand lezen en, met schrijfrechten, projecten aanmaken en ondersteunde wijzigingen uitvoeren. De verbinding is alleen beschikbaar met een actieve PlanElec Pro. Je projectrollen blijven gelden en je kunt de toegang op elk moment intrekken.",[4063,4064],"copy-field",{"test-id":4065,"value":4060},"blog-mcp-endpoint",[12,4067,4068],{},"PlanElec is niet verbonden met OpenAI of Anthropic. Claude en ChatGPT zijn merken van hun respectieve eigenaars.",[41,4070,4072],{"id":4071},"wat-is-mcp-in-twee-zinnen","Wat is MCP, in twee zinnen?",[12,4074,4075],{},"MCP is een open standaard waarmee een AI-assistent via een beveiligde verbinding bepaalde tools van een andere toepassing kan aanroepen. Voor PlanElec betekent dat: je kopieert geen projectgegevens meer in een chat, je assistent haalt ze zelf op, met de rechten die jij hebt gegeven.",[41,4077,4079],{"id":4078},"wat-kan-je-assistent-vandaag-met-planelec-doen","Wat kan je assistent vandaag met PlanElec doen?",[12,4081,4082],{},"De omvang volgt de tools die echt zijn vrijgegeven. Het doel is de volledige PlanElec-app vanuit het gesprek aansturen, maar dat is nog niet beschikbaar. Dit vermeldt de integratiepagina vandaag:",[49,4084,4085,4098],{},[52,4086,4087],{},[55,4088,4089,4092,4095],{},[58,4090,4091],{},"Domein",[58,4093,4094],{},"Wat je assistent kan doen",[58,4096,4097],{},"Schrijfrechten nodig",[68,4099,4100,4111,4121,4132,4142],{},[55,4101,4102,4105,4108],{},[73,4103,4104],{},"Projecten lezen",[73,4106,4107],{},"Projecten oplijsten waartoe je toegang hebt, hun gegevens lezen en stroomkringen, verdeelborden, kabels en installatie-instellingen samenvatten",[73,4109,4110],{},"Nee",[55,4112,4113,4116,4119],{},[73,4114,4115],{},"Planningstools",[73,4117,4118],{},"Een omvormer toetsen aan de Synergrid C10\u002F26-lijst, technische fiches raadplegen, spanningsval of ledstrips berekenen, PlanElec-handleidingen zoeken",[73,4120,4110],{},[55,4122,4123,4126,4129],{},[73,4124,4125],{},"Projecten beheren",[73,4127,4128],{},"Projecten aanmaken, naam, beschrijving en notities wijzigen, projecten archiveren en herstellen (niet definitief verwijderen)",[73,4130,4131],{},"Ja",[55,4133,4134,4137,4140],{},[73,4135,4136],{},"Planning bewerken",[73,4138,4139],{},"Ondersteunde planningsacties op verdiepingen, ruimtes, toestellen, stroomkringen en kabels; laat je assistent vóór een wijziging de beschikbare acties tonen",[73,4141,4131],{},[55,4143,4144,4147,4150],{},[73,4145,4146],{},"Exportgereedheid",[73,4148,4149],{},"Nagaan welke gegevens het opgeslagen plan voor een export nog mist en een beveiligde downloadlink ophalen voor documenten die al bestaan",[73,4151,4110],{},[12,4153,4154,4155,39],{},"Nog niet beschikbaar zijn onder meer het genereren van een nieuwe pdf via de assistent, PV-dak- en stringindeling, KNX-automatisering en het aansturen van een geopende studiosessie. Die stappen doe je nog in de PlanElec-studio. De actuele lijst staat op de ",[30,4156,4158],{"href":4157},"\u002Fintegrations\u002Fai-assistants","integratiepagina",[41,4160,4162],{"id":4161},"hoe-stel-je-het-in-bij-claude","Hoe stel je het in bij Claude?",[1602,4164,4165,4172,4178],{},[1453,4166,4167,4168,4171],{},"Open ",[15,4169,4170],{},"Aanpassen → Connectors"," en voeg een eigen connector toe. Bij Team- en Enterprise-abonnementen moet eerst een eigenaar of beheerder de connector voor de organisatie toestaan.",[1453,4173,4174,4175,4177],{},"Noem hem PlanElec en vul de server-URL ",[1300,4176,4060],{}," in. Gebruik OAuth en volg de PlanElec-aanmelding.",[1453,4179,4180],{},"Controleer de gevraagde rechten en keur ze goed. Activeer PlanElec in een gesprek en vraag om je projecten op te lijsten.",[12,4182,4183,4184,4189],{},"Anthropic beschrijft eigen connectors in het ",[30,4185,4188],{"href":4186,"rel":4187},"https:\u002F\u002Fsupport.claude.com\u002Fen\u002Farticles\u002F11175166-get-started-with-custom-connectors-using-remote-mcp",[2532],"helpartikel over remote MCP",". Menu's en beschikbaarheid per abonnement bepaalt Anthropic en kunnen wijzigen.",[41,4191,4193],{"id":4192},"hoe-stel-je-het-in-bij-chatgpt","Hoe stel je het in bij ChatGPT?",[1602,4195,4196,4199,4206],{},[1453,4197,4198],{},"Open ChatGPT Plugins op het web, kies het plusteken en “Eigen MCP-server toevoegen”. Je account of werkruimte moet eigen verbindingen toestaan.",[1453,4200,4201,4202,4205],{},"Noem de verbinding PlanElec, vul onder ",[15,4203,4204],{},"Verbinding"," de server-URL in en kies OAuth. Meld je aan bij PlanElec en controleer de gevraagde rechten.",[1453,4207,4208,4209,4212],{},"Maak de plugin aan, controleer de gevonden tools en selecteer PlanElec in een gesprek met ",[1300,4210,4211],{},"@",". Laat eerst je projecten oplijsten.",[12,4214,4215,4216,4221,4222,39],{},"OpenAI beschrijft de stappen in de ",[30,4217,4220],{"href":4218,"rel":4219},"https:\u002F\u002Fdevelopers.openai.com\u002Fplugins\u002Fdeploy\u002Fconnect-chatgpt",[2532],"handleiding om een eigen MCP-server te verbinden",". Welke abonnementen en rollen eigen servers mogen toevoegen, hangt af van OpenAI en de instellingen van je werkruimte. Wijkt je scherm af, volg dan de actuele instructies van de aanbieder. Meer details staan op de ",[30,4223,4158],{"href":4157},[41,4225,4227],{"id":4226},"welke-voorbeeldvragen-passen-bij-installateurs-studiebureaus-en-architecten","Welke voorbeeldvragen passen bij installateurs, studiebureaus en architecten?",[12,4229,4230],{},"De drie scenario's hieronder zijn voorbeelden, geen klantreferenties. De projectnamen zijn verzonnen. Pas de formulering aan je eigen projecten aan en controleer het resultaat altijd in het project.",[1396,4232,4234],{"id":4233},"installateur-projectstand-voor-de-werfbespreking","Installateur: projectstand voor de werfbespreking",[1450,4236,4237,4243,4249],{},[1453,4238,4239,4242],{},[15,4240,4241],{},"Uitgangssituatie:"," Voor je volgende bezoek wil je weten welke stroomkringen en verdeelborden vastliggen en wat je laatst noteerde.",[1453,4244,4245,4248],{},[15,4246,4247],{},"Voorbeeldvraag:"," “Lees mijn PlanElec-project ‘Woningrenovatie’ en het planningsoverzicht. Vat de stroomkringen, verdeelborden, installatie-instellingen en bestaande projectnotities samen voor de werfbespreking. Scheid opgeslagen gegevens van bijkomende vragen en duid ontbrekende gegevens aan.”",[1453,4250,4251,4254],{},[15,4252,4253],{},"Resultaat dat je kunt nagaan:"," Een basis voor het gesprek met de vastgelegde projectstand, je bestaande notities en vragen voor het bezoek. Vergelijk ze met het project en vul op de werf opgehelderde punten daarna aan in de studio. Leesrechten volstaan.",[1396,4256,4258],{"id":4257},"studiebureau-twee-varianten-vergelijken-voor-de-overdracht","Studiebureau: twee varianten vergelijken voor de overdracht",[1450,4260,4261,4266,4271],{},[1453,4262,4263,4265],{},[15,4264,4241],{}," De oorspronkelijke planning en een variant staan in twee afzonderlijke PlanElec-projecten.",[1453,4267,4268,4270],{},[15,4269,4247],{}," “Vergelijk de planningsoverzichten van mijn projecten ‘Kantoor – basisplanning’ en ‘Kantoor – variant’. Zet stroomkringen, verdeelborden en installatie-instellingen naast elkaar in een tabel. Duid ontbrekende of ingekorte gegevens aan en formuleer vragen voor de overdracht.”",[1453,4272,4273,4275],{},[15,4274,4253],{}," Een vergelijkingstabel en concrete vragen voor het overleg. Die gaan alleen over de overzichten die de tools teruggeven. Ruimtelijke verschillen en de technische dimensionering controleer je in de projecten zelf.",[1396,4277,4279],{"id":4278},"architect-afgesproken-eisen-vastleggen","Architect: afgesproken eisen vastleggen",[1450,4281,4282,4287,4292],{},[1453,4283,4284,4286],{},[15,4285,4241],{}," Na een overleg moeten drie afgesproken punten in het gezamenlijke planningsproject komen.",[1453,4288,4289,4291],{},[15,4290,4247],{}," “Lees de notities van mijn project ‘Woning – afstemming’. Voeg deze afspraken toe: werkplek in de logeerkamer, buitenverlichting aan het terras, reserve voor een laadpunt. Behoud de bestaande inhoud en toon mij een voorstel van maximaal 500 tekens. Sla het pas op na mijn bevestiging.”",[1453,4293,4294,4296],{},[15,4295,4253],{}," Je controleert het voorstel en keurt het uitdrukkelijk goed. Daarna staan de punten in de projectnotities, die je in PlanElec terugziet. Dit voorbeeld vraagt schrijfrechten.",[41,4298,4300],{"id":4299},"hoe-zit-het-met-rechten-en-gegevensbescherming","Hoe zit het met rechten en gegevensbescherming?",[49,4302,4303,4312],{},[52,4304,4305],{},[55,4306,4307,4309],{},[58,4308,2971],{},[58,4310,4311],{},"Antwoord",[68,4313,4314,4322,4330,4338,4346,4358],{},[55,4315,4316,4319],{},[73,4317,4318],{},"Wie kan de verbinding gebruiken?",[73,4320,4321],{},"Gebruikers met een actieve PlanElec Pro. Sketch, Sketch met AI-extra en een proefperiode omvatten dit niet.",[55,4323,4324,4327],{},[73,4325,4326],{},"Welke rechten gelden?",[73,4328,4329],{},"Je projectrollen blijven gelden. Wijzigingen vragen bovendien schrijfrechten in de OAuth-toestemming. Elke actie wordt opnieuw op de server gecontroleerd.",[55,4331,4332,4335],{},[73,4333,4334],{},"Wat ziet de assistent?",[73,4336,4337],{},"De resultaten van de tools die hij aanroept, zoals projectnamen, beschrijvingen, notities en planningsoverzichten. Het toestemmingsscherm vermeldt ook adressen en contactgegevens als je die rechten geeft.",[55,4339,4340,4343],{},[73,4341,4342],{},"Wie verwerkt de gegevens?",[73,4344,4345],{},"Na de toolaanroep verwerkt je AI-aanbieder de gegevens volgens zijn eigen voorwaarden en privacy-instellingen. Lees het toestemmingsscherm aandachtig.",[55,4347,4348,4351],{},[73,4349,4350],{},"Hoe trek je de toegang in?",[73,4352,4353,4354,4357],{},"In PlanElec onder ",[15,4355,4356],{},"Mijn profiel → Verbonden apps"," en in Claude of ChatGPT door de verbinding te verwijderen. Intrekken stopt toekomstige toegang; gegevens in eerdere gesprekken worden niet verwijderd.",[55,4359,4360,4363],{},[73,4361,4362],{},"Gebruikt het mijn PlanElec-AI-tegoed?",[73,4364,4365],{},"Nee. De gesprekken lopen via je eigen AI-abonnement; de limieten daarvan gelden apart.",[12,4367,4368,4369,39],{},"AI-antwoorden zijn geen goedkeuring van de installatie. PlanElec ondersteunt planning en zelfcontrole; het erkende organisme voert de officiële keuring uit. Over de assistent in de studio zelf lees je meer in ",[30,4370,4372],{"href":4371},"\u002Fblog\u002Fai-assistent-elektrische-planning","AI-assistent voor elektrische planning",[41,4374,4376],{"id":4375},"wat-doe-je-het-eerst-na-het-verbinden","Wat doe je het eerst na het verbinden?",[12,4378,4379],{},"Begin met opdrachten die alleen lezen, want die wijzigen niets en tonen je wat je assistent echt ziet. Vraag om je PlanElec-projecten op te lijsten en laat daarna één project met naam samenvatten. Vraag ook welke PlanElec-tools in je verbinding beschikbaar zijn: die lijst hangt af van de rechten die je gaf, je abonnement en wat je AI-aanbieder ondersteunt. Pas wanneer de antwoorden met je project overeenkomen, sta je wijzigingen toe.",[12,4381,4382],{},"Schrijfrechten zijn een aparte stap. Ze staan op het toestemmingsscherm en een verbinding zonder die rechten blijft alleen-lezen. Laat je assistent vóór de eerste wijziging de beschikbare acties tonen en een voorstel van wat hij wil opslaan. PlanElec controleert elke actie opnieuw op de server en je projectrol bepaalt nog steeds of je dat project mag bewerken.",[1396,4384,4386],{"id":4385},"hoe-formuleer-je-een-goede-opdracht","Hoe formuleer je een goede opdracht?",[1450,4388,4389,4392,4395,4398,4401],{},[1453,4390,4391],{},"Noem het project exact zoals het in PlanElec heet, zodat de assistent niet moet kiezen tussen gelijkaardige projecten.",[1453,4393,4394],{},"Geef één taak per opdracht, bijvoorbeeld lezen, vergelijken of notities toevoegen, en controleer het resultaat voor de volgende stap.",[1453,4396,4397],{},"Vraag de assistent opgeslagen gegevens van bijkomende vragen te scheiden en ontbrekende gegevens aan te duiden, zoals in de scenario's hierboven.",[1453,4399,4400],{},"Vraag bij wijzigingen eerst een voorstel en laat de assistent pas opslaan na jouw bevestiging.",[1453,4402,4403],{},"Controleer het antwoord in het project zelf. De assistent werkt met de opgeslagen projectstand, niet met het browsertabblad dat je open hebt.",[1396,4405,4407],{"id":4406},"wat-zijn-typische-problemen-bij-de-installatie","Wat zijn typische problemen bij de installatie?",[49,4409,4410,4423],{},[52,4411,4412],{},[55,4413,4414,4417,4420],{},[58,4415,4416],{},"Symptoom",[58,4418,4419],{},"Waarschijnlijke oorzaak",[58,4421,4422],{},"Wat doe je",[68,4424,4425,4436,4451,4462,4473],{},[55,4426,4427,4430,4433],{},[73,4428,4429],{},"De aanmelding werd afgebroken of de verbinding mislukt",[73,4431,4432],{},"OAuth werd niet afgerond",[73,4434,4435],{},"Start de verbinding opnieuw en rond de PlanElec-aanmelding en het toestemmingsscherm af",[55,4437,4438,4441,4444],{},[73,4439,4440],{},"Het toestemmingsscherm geeft de verbinding niet vrij",[73,4442,4443],{},"Geen actieve PlanElec Pro",[73,4445,4446,4447],{},"Activeer eerst Pro; Sketch en een proefperiode omvatten geen MCP. Zie de ",[30,4448,4450],{"href":4449},"\u002Fpricing","prijzenpagina",[55,4452,4453,4456,4459],{},[73,4454,4455],{},"Geen optie om een eigen verbinding toe te voegen",[73,4457,4458],{},"Je account of werkruimte laat dat niet toe",[73,4460,4461],{},"Vraag de beheerder van de werkruimte of volg de actuele instructies van je aanbieder",[55,4463,4464,4467,4470],{},[73,4465,4466],{},"Geen schrijftool zichtbaar",[73,4468,4469],{},"Schrijfrechten, abonnement of ondersteuning door de aanbieder ontbreken",[73,4471,4472],{},"Vraag de assistent naar zijn PlanElec-tools, verbind opnieuw en controleer het toestemmingsscherm",[55,4474,4475,4478,4481],{},[73,4476,4477],{},"De verbinding vraagt een nieuwe goedkeuring",[73,4479,4480],{},"De tekst van de rechten is gewijzigd sinds je laatste goedkeuring",[73,4482,4483],{},"Verbind opnieuw en controleer de huidige rechten",[12,4485,4486,4487,4489],{},"Blijft het probleem bestaan, dan verwijst de ",[30,4488,4158],{"href":4157}," naar hulp bij het verbinden.",[41,4491,4493],{"id":4492},"wat-komt-er-nog","Wat komt er nog?",[12,4495,4496],{},"Het doel is dat Pro-gebruikers de volledige PlanElec-app via hun eigen assistent kunnen aansturen, van projectaanmaak tot de voorbereiding van de documentatie. Die uitbreiding is in ontwikkeling en de lijst hierboven is de huidige stand. Nieuwe mogelijkheden beschrijven we hier pas wanneer ze zijn vrijgegeven.",[41,4498,1394],{"id":1393},[1396,4500,4502],{"id":4501},"wat-kost-de-verbinding","Wat kost de verbinding?",[12,4504,4505,4506,4508],{},"MCP maakt deel uit van PlanElec Pro en vraagt een actief Pro-account; de actuele abonnementen staan op de ",[30,4507,4450],{"href":4449},". Je Claude- of ChatGPT-abonnement is apart en wordt door je aanbieder gefactureerd.",[1396,4510,4512],{"id":4511},"werkt-het-met-sketch","Werkt het met Sketch?",[12,4514,4515,4516,39],{},"Nee. MCP-toegang vereist PlanElec Pro. Meer over het product staat op de ",[30,4517,4519],{"href":4518},"\u002Fproducten\u002Fpro","PlanElec Pro-pagina",[1396,4521,4523],{"id":4522},"kan-de-assistent-mijn-elektrische-installatie-tekenen","Kan de assistent mijn elektrische installatie tekenen?",[12,4525,4526],{},"Voor ondersteunde planningsacties wel: hij kan het opgeslagen project lezen en gecontroleerde wijzigingen aanbrengen aan verdiepingen, ruimtes, toestellen, stroomkringen en kabels. Volledige app-bediening is het doel maar nog niet beschikbaar. Sommige stappen, zoals een nieuwe pdf genereren, blijven in de studio.",[1396,4528,4530],{"id":4529},"waarom-zie-ik-geen-schrijftool","Waarom zie ik geen schrijftool?",[12,4532,4533],{},"De getoonde tools hangen af van de rechten die je gaf, je abonnement en de acties die je AI-aanbieder ondersteunt. Laat de assistent zijn PlanElec-tools tonen. Zijn rechten gewijzigd, verbind dan opnieuw en controleer het nieuwe toestemmingsscherm.",[1396,4535,4537],{"id":4536},"moet-ik-een-server-installeren","Moet ik een server installeren?",[12,4539,4540],{},"Nee. PlanElec beheert de remote MCP-server. Je vult alleen de URL in bij je assistent.",[1396,4542,4544],{"id":4543},"worden-wijzigingen-aan-het-arei-getoetst","Worden wijzigingen aan het AREI getoetst?",[12,4546,4547,4548,4550],{},"Planningswijzigingen lopen via de eigen opdrachten en controles van PlanElec op de server. De zelfcontrole toont bevindingen; wat ze controleert staat in ",[30,4549,2458],{"href":2457},". Ze vervangt de officiële keuring niet.",{"title":1467,"searchDepth":1468,"depth":1468,"links":4552},[4553,4554,4555,4556,4557,4562,4563,4567,4568],{"id":4071,"depth":1468,"text":4072},{"id":4078,"depth":1468,"text":4079},{"id":4161,"depth":1468,"text":4162},{"id":4192,"depth":1468,"text":4193},{"id":4226,"depth":1468,"text":4227,"children":4558},[4559,4560,4561],{"id":4233,"depth":1486,"text":4234},{"id":4257,"depth":1486,"text":4258},{"id":4278,"depth":1486,"text":4279},{"id":4299,"depth":1468,"text":4300},{"id":4375,"depth":1468,"text":4376,"children":4564},[4565,4566],{"id":4385,"depth":1486,"text":4386},{"id":4406,"depth":1486,"text":4407},{"id":4492,"depth":1468,"text":4493},{"id":1393,"depth":1468,"text":1394,"children":4569},[4570,4571,4572,4573,4574,4575],{"id":4501,"depth":1486,"text":4502},{"id":4511,"depth":1486,"text":4512},{"id":4522,"depth":1486,"text":4523},{"id":4529,"depth":1486,"text":4530},{"id":4536,"depth":1486,"text":4537},{"id":4543,"depth":1486,"text":4544},"2026-10-27","PlanElec Pro koppelt via MCP aan je eigen Claude of ChatGPT. Wat vandaag werkt, installatie in beide assistenten, drie voorbeeldvragen voor installateurs, studiebureaus en architecten, rechten en grenzen.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-ai-assistant-editorial.webp","2026-10-29",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-ai-assistant-editorial.jpg","\u002Fblog\u002Fai-assistent-verbinden-mcp.nl",{"title":4048,"description":4577},"Claude of ChatGPT met PlanElec Pro verbinden (MCP)","ai-assistent-verbinden-mcp","blog\u002Fai-assistent-verbinden-mcp.nl",[4588,4589,4590,4591,4592,3272,4593],"AI","AI-assistent","MCP","Claude","ChatGPT","gegevensbescherming","GB8dMn7YggXROIJ2uwr1uE7lxPQkIHIyCCYy3idnasU","\u002Fblog\u002Fai-assistent-verbinden-mcp",{"id":4597,"title":4598,"articleId":4599,"body":4600,"category":5442,"date":5443,"description":5444,"extension":1496,"image":5445,"lastUpdated":3258,"locale":1497,"meta":5446,"navigation":1499,"ogImage":5447,"path":5448,"publishDate":5443,"readTime":3262,"refreshInterval":3263,"seo":5449,"seoTitle":3064,"slug":5450,"stem":5451,"tags":5452,"__hash__":5455,"kind":1515,"href":5456},"blog\u002Fblog\u002Fplanelec-sketch-gratis-eendraadschema-tekenen.nl.md","Maak kennis met PlanElec Sketch: gratis een eendraadschema tekenen in je browser","introducing-planelec-sketch",{"type":9,"value":4601,"toc":5422},[4602,4616,4622,4626,4629,4655,4658,4662,4665,4672,4676,4735,4758,4762,4765,4855,4858,4862,4871,4878,4882,4894,5158,5161,5167,5171,5174,5198,5201,5205,5269,5273,5285,5292,5294,5298,5301,5305,5308,5312,5318,5322,5325,5329,5332,5336,5339,5341,5347,5416],[12,4603,4604,4607,4608,4610,4611,39],{},[15,4605,4606],{},"PlanElec Sketch is een gratis webapp voor de twee plannen die het AREI vraagt: het eendraadschema en het situatieplan."," Je tekent in je browser, zonder account en zonder limiet op kringen, symbolen, pagina's of projecten. Sketch opent Trikker-bestanden (",[1300,4609,2505],{},"), maakt de pdf op je eigen toestel en geeft de tekening met één klik door aan PlanElec Pro als je meer nodig hebt. ",[30,4612,4615],{"href":4613,"rel":4614},"https:\u002F\u002Fsketch.planelec.be\u002Fnl\u002Ftekenen",[2532],"Begin te tekenen in Sketch",[12,4617,4618,4621],{},[15,4619,4620],{},"Stand van 16 oktober 2026. Geschreven door het PlanElec-team."," Wij maken Sketch en Pro. Elke uitspraak over Trikker hieronder komt uit de openbare bronnen van Trikker; je vindt ze onderaan, met de datum waarop we ze nagekeken hebben. Trikker is een merk van zijn eigenaar. We gebruiken de naam enkel om naar het product te verwijzen.",[41,4623,4625],{"id":4624},"wat-is-planelec-sketch","Wat is PlanElec Sketch?",[12,4627,4628],{},"Sketch is een tekentool, geen planningspakket. Het maakt precies twee documenten, en dat snel:",[1450,4630,4631,4637,4643,4649],{},[1453,4632,4633,4636],{},[15,4634,4635],{},"Eendraadschema."," Je kiest een symbool of een kant-en-klare kring en klikt op een blauw aansluitpunt. Opmaak, lijnen, kringletters (A, B, …) en volgnummers (A1, A2, …) volgen automatisch. Plaatsen waar een symbool niet mag staan, zoals een stopcontact rechtstreeks op de rail, worden niet aangeboden.",[1453,4638,4639,4642],{},[15,4640,4641],{},"Situatieplan."," Je importeert een grondplan als afbeelding of pdf-pagina, stelt de schaal in met twee punten en een echte lengte, tekent muren, deuren en ramen en sleept de toestellen uit het schema op het plan. Elk toestel draagt zijn volgnummer, en Sketch vinkt de kringen af die volledig geplaatst zijn.",[1453,4644,4645,4648],{},[15,4646,4647],{},"Materiaallijst en lijst van kringen"," uit het schema, naar keuze mee afgedrukt in de pdf.",[1453,4650,4651,4654],{},[15,4652,4653],{},"Pdf"," in A4 liggend met kader en titelblok: adres van de installatie, klant, EAN, installateur met ondernemingsnummer en logo, erkend organisme, datum en bladnummer.",[12,4656,4657],{},"Sketch is er voor installateurs die snel een schema willen, voor studiebureaus die een plan nodig hebben zonder volledig project, en voor eigenaars die de plannen voor de keuring van hun eigen installatie voorbereiden.",[41,4659,4661],{"id":4660},"wat-kost-sketch-en-waar-staat-mijn-tekening","Wat kost Sketch en waar staat mijn tekening?",[12,4663,4664],{},"Sketch is gratis. Geen account, geen proefperiode, geen limiet op kringen, symbolen, pagina's of projecten. De pdf draagt geen watermerk; in het titelblok staat de regel ‘Getekend met PlanElec Sketch’.",[12,4666,4667,4668,4671],{},"Je tekening blijft op je toestel. Sketch bewaart ze automatisch in je browser; je kunt ze ook als ",[1300,4669,4670],{},".planelec.json","-bestand opslaan en later weer openen. Afbeeldingen van geïmporteerde grondplannen worden bij het opslaan in het bestand ingesloten. De pdf ontstaat in je browser, niet op een server. Ook een Trikker-bestand wordt in je browser gelezen. Om Sketch te verbeteren bewaart PlanElec ingelezen bestanden (Trikker-bestanden, grondplanafbeeldingen, geopende tekeningen) 90 dagen versleuteld; met het vinkje bij het openen kun je dat weigeren.",[41,4673,4675],{"id":4674},"hoe-begin-ik","Hoe begin ik?",[1602,4677,4678,4687,4706,4721],{},[1453,4679,4167,4680,4683,4684],{},[30,4681,3055],{"href":4613,"rel":4682},[2532],". Het startvenster vraagt ",[15,4685,4686],{},"Wat wilt u tekenen?",[1453,4688,4689,4690,702,4693,702,4696,702,4699,1628,4702,4705],{},"Kies een beginpunt: ",[15,4691,4692],{},"Woning",[15,4694,4695],{},"Appartement",[15,4697,4698],{},"Laadpaal toevoegen",[15,4700,4701],{},"Lege tekening",[15,4703,4704],{},"Trikker-bestand openen",". De voorbeelden zijn typische installaties; pas kringen en waarden aan de werkelijke situatie aan.",[1453,4707,4708,4709,4711,4712,4714,4715,2427,4717,4720],{},"Teken in het deel ",[15,4710,3764],{},", plaats de toestellen onder ",[15,4713,3836],{}," en vul onder ",[15,4716,990],{},[15,4718,4719],{},"Documentgegevens"," voor het titelblok in.",[1453,4722,1683,4723,4726,4727,4730,4731,4734],{},[15,4724,4725],{},"Afdrukken"," de inhoud en klik op ",[15,4728,4729],{},"Pdf maken",". Je kiest er ook de taal van het document en drukt de ",[15,4732,4733],{},"Materiaallijst"," en de lijst van kringen mee af.",[12,4736,4737,4738,702,4743,702,4748,702,4753,39],{},"Eerst het resultaat zien? Deze voorbeeld-pdf's komen uit Sketch, met fictieve gegevens: ",[30,4739,4742],{"href":4740,"rel":4741},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Feendraadschema-voorbeeld.pdf",[2532],"Nederlands",[30,4744,4747],{"href":4745,"rel":4746},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Fschema-unifilaire-exemple.pdf",[2532],"Français",[30,4749,4752],{"href":4750,"rel":4751},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Feindrahtschema-beispiel.pdf",[2532],"Deutsch",[30,4754,4757],{"href":4755,"rel":4756},"https:\u002F\u002Fsketch.planelec.be\u002Fsamples\u002Fsingle-line-diagram-example.pdf",[2532],"English",[41,4759,4761],{"id":4760},"welke-arei-eisen-dekt-de-pdf-van-sketch","Welke AREI-eisen dekt de pdf van Sketch?",[12,4763,4764],{},"Onderafdeling 3.1.2.1 a van het AREI vraagt eendraadschema's en situatieplannen voor elke nieuwe huishoudelijke installatie en voor elke belangrijke wijziging of uitbreiding. Deze tabel toont waar Sketch de gegevens plaatst die die onderafdeling vraagt.",[49,4766,4767,4777],{},[52,4768,4769],{},[55,4770,4771,4774],{},[58,4772,4773],{},"AREI onderafdeling 3.1.2.1 a vraagt",[58,4775,4776],{},"In Sketch",[68,4778,4779,4792,4806,4817,4825,4833,4843],{},[55,4780,4781,4784],{},[73,4782,4783],{},"Eendraadschema's en situatieplannen",[73,4785,4786,4787,933,4789,4791],{},"De delen ",[15,4788,3764],{},[15,4790,3836],{},", samen in één pdf",[55,4793,4794,4797],{},[73,4795,4796],{},"Naam, hoedanigheid en btw-nummer van de verantwoordelijke van de uitvoering op beide plannen",[73,4798,4799,4800,1725,4803,4805],{},"Installateur, adres en ",[15,4801,4802],{},"Ondernemingsnummer",[15,4804,4719],{},", afgedrukt in het titelblok",[55,4807,4808,4811],{},[73,4809,4810],{},"Adres van de installatie op beide plannen",[73,4812,4813,4816],{},[15,4814,4815],{},"Adres van de installatie"," in het titelblok",[55,4818,4819,4822],{},[73,4820,4821],{},"Elke kring een hoofdletter; punten genummerd in volgorde vanaf de overstroombeveiliging",[73,4823,4824],{},"Kringletters en volgnummers worden automatisch toegekend; een vaste letter is mogelijk",[55,4826,4827,4830],{},[73,4828,4829],{},"Op het situatieplan draagt elk punt de kringletter en het nummer uit het eendraadschema",[73,4831,4832],{},"Toestellen uit het schema behouden hun benaming (A1, B2, …)",[55,4834,4835,4838],{},[73,4836,4837],{},"Symbolen uit tabel 2.23; andere duidelijk herkenbare symbolen als ze in de legende staan",[73,4839,4840],{},[15,4841,4842],{},"Legende afdrukken (symbolen buiten AREI-tabel 2.23)",[55,4844,4845,4848],{},[73,4846,4847],{},"Na een conforme keuring ondertekenen en dateren de verantwoordelijke en het erkend organisme de plannen",[73,4849,4850,4851,4854],{},"Gebeurt op de afgedrukte plannen bij de keuring; Sketch drukt het gekozen ",[15,4852,4853],{},"Erkend organisme"," af",[12,4856,4857],{},"Sketch toetst je installatie niet aan het AREI. Het levert je de plannen; voor de inhoud ben je zelf verantwoordelijk, en de keuring doet het erkend organisme. De symbolen van Sketch volgen de gangbare IEC 60617\u002FAREI-tekenwijze; kijk op een echt project na of de symbolen die je nodig hebt erbij zitten.",[41,4859,4861],{"id":4860},"kan-ik-mijn-trikker-bestanden-in-sketch-openen","Kan ik mijn Trikker-bestanden in Sketch openen?",[12,4863,4864,4865,4867,4868,4870],{},"Ja. Kies ",[15,4866,4704],{}," in het startvenster of open het ",[1300,4869,2505],{},"-bestand in Sketch. Sketch leest bestanden uit Trikker 2.0 en uit oudere versies zoals Trikker 1.5, en maakt van het eendraadschema een bewerkbare tekening: voeding, beveiligingstoestellen, kabels, onderverdeelborden, kringen en verbruikers.",[12,4872,4873,4874,4877],{},"Er verdwijnt niets stilletjes. Elementen zonder Sketch-symbool, of op een plaats die Sketch niet toelaat, blijven als notitie op het schema staan. Verwante symbolen worden benaderd, ontbrekende waarden krijgen een standaardwaarde, en het importverslag toont elke afwijking met haar plaats in het Trikker-bestand. ",[15,4875,4876],{},"Ook het situatieplan komt mee:"," verdiepingen met naam, muren met hun dikte, ruimtes met naam, deuren met draairichting, ramen, garagepoorten, trappen, vrije teksten en rechthoeken. Kijk het geïmporteerde schema altijd na.",[41,4879,4881],{"id":4880},"sketch-pro-en-trikker-naast-elkaar","Sketch, Pro en Trikker naast elkaar",[12,4883,4884,4885,4888,4889,4893],{},"Het beknopte overzicht. De uitgebreide vergelijking met alle bronnen staat in ",[30,4886,3069],{"href":4887},"\u002Fblog\u002Ftrikker-sketch-pro-vergelijking","; de blik vanuit Pro in ",[30,4890,4892],{"href":4891},"\u002Fblog\u002Ftrikker-alternatief","Trikker-alternatief",". Cijfers in de Trikker-kolom verwijzen naar de bronnenlijst onderaan.",[49,4895,4896,4909],{},[52,4897,4898],{},[55,4899,4900,4903,4905,4907],{},[58,4901,4902],{},"Criterium",[58,4904,2974],{},[58,4906,3272],{},[58,4908,3269],{},[68,4910,4911,4924,4936,4950,4964,4977,4989,5003,5018,5031,5043,5055,5067,5079,5092,5105,5118,5131,5145],{},[55,4912,4913,4916,4919,4921],{},[73,4914,4915],{},"Platform en installatie",[73,4917,4918],{},"Browser, niets te installeren",[73,4920,4918],{},[73,4922,4923],{},"Desktopprogramma voor Windows 10 en 11; macOS-bèta sinds 30\u002F09\u002F2026; webversie aangekondigd (1)",[55,4925,4926,4928,4930,4933],{},[73,4927,2995],{},[73,4929,2998],{},[73,4931,4932],{},"Nodig",[73,4934,4935],{},"Licentie per computer (2)",[55,4937,4938,4941,4944,4947],{},[73,4939,4940],{},"Prijs",[73,4942,4943],{},"Gratis",[73,4945,4946],{},"Early access: € 0. Vanaf de start van de formules: Pro uitproberen € 0, eenmalig gebruik € 12, Pro € 24 per maand excl. btw met drie plaatsen om te bewerken (+€ 5 per extra plaats). Prijsgarantie: de prijs blijft zolang het abonnement zonder onderbreking loopt; startdatum nog niet vastgelegd",[73,4948,4949],{},"€ 45 per maand of € 360 per jaar excl. btw, per computer (2)",[55,4951,4952,4955,4958,4961],{},[73,4953,4954],{},"Limieten",[73,4956,4957],{},"Geen op kringen, symbolen, pagina's of projecten",[73,4959,4960],{},"Plannen zonder grens",[73,4962,4963],{},"Demo: max. 5 kringen, 1 planpagina, watermerk (2)",[55,4965,4966,4968,4971,4974],{},[73,4967,3764],{},[73,4969,4970],{},"Ja, automatische opmaak en kringletters",[73,4972,4973],{},"Ja, afgeleid uit het projectmodel",[73,4975,4976],{},"Ja (3)",[55,4978,4979,4981,4984,4987],{},[73,4980,3836],{},[73,4982,4983],{},"Ja, op een geïmporteerd grondplan, met muren, deuren, ramen",[73,4985,4986],{},"Ja, toestellen op hun echte plaats in het grondplan",[73,4988,4976],{},[55,4990,4991,4994,4997,5000],{},[73,4992,4993],{},"Grondplan als onderlaag",[73,4995,4996],{},"Afbeelding of pdf-pagina",[73,4998,4999],{},"Afbeelding, pdf en DXF, meerdere verdiepingen",[73,5001,5002],{},"Afbeeldingen, pdf, DWG en DXF (3)",[55,5004,5005,5010,5013,5015],{},[73,5006,5007,5009],{},[1300,5008,2505],{},"-bestanden openen",[73,5011,5012],{},"Ja, eendraadschema en situatieplan met importverslag",[73,5014,4110],{},[73,5016,5017],{},"Eigen formaat",[55,5019,5020,5023,5025,5028],{},[73,5021,5022],{},"AI-grondplanherkenning (pdf, scan, afbeelding)",[73,5024,4110],{},[73,5026,5027],{},"Ja: muren, ruimtes, deuren, ramen, ondersteunde toestelsymbolen, schaal",[73,5029,5030],{},"Niet beschreven",[55,5032,5033,5036,5038,5041],{},[73,5034,5035],{},"AI-herkenning van het verdeelbord uit foto's",[73,5037,4110],{},[73,5039,5040],{},"Ja: zichtbare DIN-modules als voorstel voor een leeg bord",[73,5042,5030],{},[55,5044,5045,5048,5050,5052],{},[73,5046,5047],{},"Bestaand eendraadschema inlezen (pdf, foto)",[73,5049,4110],{},[73,5051,4110],{},[73,5053,5054],{},"Schemalezer: aparte AI-webtool, bèta, voor licentiehouders; leest schema en situatieplan in naar Trikker (4)",[55,5056,5057,5059,5061,5064],{},[73,5058,4589],{},[73,5060,4110],{},[73,5062,5063],{},"Ja, opdrachten in je eigen woorden in het hele project",[73,5065,5066],{},"Niet beschreven in het programma (1)(3)",[55,5068,5069,5072,5074,5077],{},[73,5070,5071],{},"Verdeelbordplanning",[73,5073,4110],{},[73,5075,5076],{},"Ja, met pdf",[73,5078,5030],{},[55,5080,5081,5084,5086,5089],{},[73,5082,5083],{},"PV",[73,5085,4110],{},[73,5087,5088],{},"Ja, strings, MPPT's en DC-zijde",[73,5090,5091],{},"Symbolen voor PV, omvormer, batterij (3)",[55,5093,5094,5097,5099,5102],{},[73,5095,5096],{},"AREI-zelfcontrole",[73,5098,4110],{},[73,5100,5101],{},"Ja, voor de ondersteunde regels",[73,5103,5104],{},"In de Schemalezer, op het ingelezen schema (4)",[55,5106,5107,5109,5112,5115],{},[73,5108,4653],{},[73,5110,5111],{},"Gemaakt in je browser",[73,5113,5114],{},"Eendraadschema, situatieplan, verdeelbord, zelfcontroleverslag, dossier",[73,5116,5117],{},"Gemaakt op de servers van de fabrikant (3)",[55,5119,5120,5122,5125,5128],{},[73,5121,4733],{},[73,5123,5124],{},"Ja, uit het schema",[73,5126,5127],{},"Gedetailleerde, merkonafhankelijke lijst (pilot)",[73,5129,5130],{},"Ja, export naar Excel (3)",[55,5132,5133,5136,5139,5142],{},[73,5134,5135],{},"Samenwerken",[73,5137,5138],{},"Nee; de tekening blijft op je toestel",[73,5140,5141],{},"Organisaties, uitnodigingen, projectrollen",[73,5143,5144],{},"Lokale bestanden, geen cloud (3)",[55,5146,5147,5150,5153,5155],{},[73,5148,5149],{},"Talen",[73,5151,5152],{},"NL, FR, DE, EN",[73,5154,5152],{},[73,5156,5157],{},"NL, FR, EN, DE, PL, RO (3)",[12,5159,5160],{},"\"Niet beschreven\" betekent dat we het noch in de handleiding noch op de website gevonden hebben; het bewijst niet dat de functie ontbreekt.",[12,5162,5163,5166],{},[15,5164,5165],{},"Wat we niet gemeten hebben."," Een benchmark met de stopwatch, bijvoorbeeld de tijd tot het eerste symbool, hangt af van hardware, verbinding en ervaring. We hebben geen reproduceerbare meting, dus publiceren we er geen. De cijfers in de tabel (installatie, account, prijs, limieten, platformen) zijn de meetbare.",[41,5168,5170],{"id":5169},"ai-import-en-schemalezer-wat-bestaat-er-vandaag","AI-import en schemalezer: wat bestaat er vandaag?",[12,5172,5173],{},"\"AI-import\" kan drie dingen betekenen, en de programma's verschillen op elk punt:",[1450,5175,5176,5186,5192],{},[1453,5177,5178,5181,5182,39],{},[15,5179,5180],{},"Grondplan uit een pdf of scan:"," PlanElec Pro herkent muren, ruimtes, deuren, ramen, ondersteunde toestelsymbolen en de schaal, ook uit een pdf-export van Trikker. Je kijkt het voorstel na voor je het overneemt. ",[30,5183,5185],{"href":5184},"\u002Fblog\u002Fgrondplan-herkennen-verdeelkast-foto-ai","Zo werkt de grondplanherkenning",[1453,5187,5188,5191],{},[15,5189,5190],{},"Verdeelbord uit foto's:"," Pro stelt de zichtbare DIN-modules voor in een leeg bord. Bedrading en elektrische verbindingen haalt het niet uit een foto.",[1453,5193,5194,5197],{},[15,5195,5196],{},"Een bestaand eendraadschema inlezen:"," Trikker biedt dat met de Schemalezer, een aparte AI-webtool in bèta voor licentiehouders. Die zet een pdf, afbeelding, foto of handgetekend schema om naar een Trikker-bestand (4). Sketch en Pro lezen vandaag geen eendraadschema uit een pdf of foto in.",[12,5199,5200],{},"Sketch zelf bevat geen AI. Zijn import is het Trikker-bestand: gestructureerde gegevens, gelezen in je browser.",[41,5202,5204],{"id":5203},"wanneer-volstaat-sketch-en-wanneer-heb-je-pro-nodig","Wanneer volstaat Sketch, en wanneer heb je Pro nodig?",[49,5206,5207,5217],{},[52,5208,5209],{},[55,5210,5211,5214],{},[58,5212,5213],{},"Jouw situatie",[58,5215,5216],{},"Programma",[68,5218,5219,5226,5233,5240,5248,5255,5262],{},[55,5220,5221,5224],{},[73,5222,5223],{},"Snel een eendraadschema en situatieplan tekenen en als pdf afdrukken",[73,5225,3055],{},[55,5227,5228,5231],{},[73,5229,5230],{},"Een Trikker-schema verder bewerken in de browser",[73,5232,3055],{},[55,5234,5235,5238],{},[73,5236,5237],{},"Geen account, geen installatie, geen kosten",[73,5239,3055],{},[55,5241,5242,5245],{},[73,5243,5244],{},"Een grondplan als pdf of scan omzetten naar een bewerkbaar grondplan",[73,5246,5247],{},"Pro",[55,5249,5250,5253],{},[73,5251,5252],{},"Verdeelbord, PV of domotica plannen",[73,5254,5247],{},[55,5256,5257,5260],{},[73,5258,5259],{},"De installatie toetsen aan de ondersteunde AREI-regels",[73,5261,5247],{},[55,5263,5264,5267],{},[73,5265,5266],{},"In team werken of een volledig dossier met voorblad en archieflink afleveren",[73,5268,5247],{},[41,5270,5272],{"id":5271},"hoe-neem-ik-een-sketch-tekening-mee-naar-pro","Hoe neem ik een Sketch-tekening mee naar Pro?",[12,5274,5275,5276,5278,5279,1812,5282,5284],{},"Open in Sketch het deel ",[15,5277,990],{},". Klik onder ",[15,5280,5281],{},"Verder in PlanElec Pro",[15,5283,3363],{},". Pro opent zijn importpagina en neemt eendraadschema, borden en onderverdeelborden, kringen, kabels en projectgegevens over. Daar meld je je aan of maak je een account; de tekening wordt pas geüpload wanneer je het project aanmaakt. Waarden die in Pro niet precies zo bestaan, zoals sommige kabeltypes, worden aangepast, en de betrokken kabels worden gemarkeerd om na te kijken.",[12,5286,5287,5288,5291],{},"Het situatieplan komt in het grondplan van Pro: verdiepingen, muren, ruimtes, deuren, ramen, garagepoorten, trappen en de geplaatste toestellen met hun kring. Vrije notities, de voedingskabel naar de meter en afbeeldingen van geïmporteerde grondplannen gaan niet mee. Is een tekening te groot voor de rechtstreekse overdracht, bewaar ze dan als bestand en gebruik in Pro ",[15,5289,5290],{},"Sketch-bestand importeren",". Projecten gaan van Sketch naar Pro, niet terug.",[41,5293,1394],{"id":1393},[1396,5295,5297],{"id":5296},"is-planelec-sketch-echt-gratis","Is PlanElec Sketch echt gratis?",[12,5299,5300],{},"Ja. Geen account en geen limiet op kringen, symbolen, pagina's of projecten. De pdf draagt geen watermerk; in het titelblok staat de regel ‘Getekend met PlanElec Sketch’.",[1396,5302,5304],{"id":5303},"moet-ik-iets-installeren","Moet ik iets installeren?",[12,5306,5307],{},"Nee. Sketch draait in de browser. Trikker is een desktopprogramma; Pro draait ook in de browser, maar vraagt een account.",[1396,5309,5311],{"id":5310},"is-sketch-een-trikker-alternatief","Is Sketch een Trikker-alternatief?",[12,5313,5314,5315,5317],{},"Om eendraadschema en situatieplan te tekenen wel: Sketch is gratis, draait in de browser en opent ",[1300,5316,2505],{},"-bestanden. Trikker biedt aan de tekenkant meer, zoals DWG-onderlagen, zes talen en de Schemalezer. Heb je grondplanherkenning, verdeelbord, PV of een zelfcontrole nodig, kijk dan naar Pro.",[1396,5319,5321],{"id":5320},"heeft-sketch-ai","Heeft Sketch AI?",[12,5323,5324],{},"Nee. AI-grondplanherkenning, herkenning van verdeelbordfoto's en de assistent horen bij PlanElec Pro.",[1396,5326,5328],{"id":5327},"kan-sketch-een-papieren-eendraadschema-inlezen","Kan Sketch een papieren eendraadschema inlezen?",[12,5330,5331],{},"Nee. Sketch leest Trikker-bestanden. Een bestaand schema uit een foto of pdf inlezen kan vandaag niet in Sketch en niet in Pro.",[1396,5333,5335],{"id":5334},"volstaat-een-pdf-uit-sketch-voor-de-keuring","Volstaat een pdf uit Sketch voor de keuring?",[12,5337,5338],{},"De pdf bevat het eendraadschema, het situatieplan en het titelblok met de gegevens uit onderafdeling 3.1.2.1 a. Voor de inhoud blijf je zelf verantwoordelijk; het erkend organisme voert de keuring uit en ondertekent de plannen.",[41,5340,3167],{"id":3166},[12,5342,5343,5344,39],{},"De uitspraken over Trikker zijn nagekeken op ",[15,5345,5346],{},"16 oktober 2026",[49,5348,5349,5359],{},[52,5350,5351],{},[55,5352,5353,5355,5357],{},[58,5354,3183],{},[58,5356,3186],{},[58,5358,3189],{},[68,5360,5361,5375,5389,5402],{},[55,5362,5363,5365,5368],{},[73,5364,343],{},[73,5366,5367],{},"Windows 10 en 11; macOS-bèta sinds 30\u002F09\u002F2026; webversie voor Android en iPad aangekondigd; geen AI op de startpagina",[73,5369,5370],{},[30,5371,5374],{"href":5372,"rel":5373},"https:\u002F\u002Fwww.trikker.be\u002F",[2532],"trikker.be",[55,5376,5377,5379,5382],{},[73,5378,326],{},[73,5380,5381],{},"€ 45 per maand of € 360 per jaar excl. btw; één computer per licentie; demo met 5 kringen, 1 planpagina, watermerk",[73,5383,5384],{},[30,5385,5388],{"href":5386,"rel":5387},"https:\u002F\u002Fwww.trikker.be\u002Fpricing",[2532],"trikker.be\u002Fpricing",[55,5390,5391,5393,5396],{},[73,5392,577],{},[73,5394,5395],{},"Zes talen; offline tekenen; pdf op de servers van Trikker; lokale bestanden zonder cloud; import van afbeelding, pdf, DWG\u002FDXF; materiaallijst naar Excel",[73,5397,5398],{},[30,5399,5401],{"href":2530,"rel":5400},[2532],"Handleiding Trikker 2.0-bèta",[55,5403,5404,5406,5409],{},[73,5405,574],{},[73,5407,5408],{},"Schemalezer: AI, bèta, licentiehouders, pdf, afbeelding, foto of handgetekend schema naar een Trikker-bestand, AREI-toets van het ingelezen schema",[73,5410,5411],{},[30,5412,5415],{"href":5413,"rel":5414},"https:\u002F\u002Fwww.trikker.be\u002Fen\u002Fblog\u002Fnieuws-2\u002Fnieuw-in-beta-de-schemalezer-zet-schema-en-situatieplan-in-minuten-om-naar-trikker-30",[2532],"Trikker-nieuws, 13\u002F10\u002F2026",[12,5417,5418,5419,5421],{},"De uitspraken over Sketch en Pro volgen het product op dezelfde datum. Functies en prijzen veranderen. Is iets verouderd, ",[30,5420,3229],{"href":3228}," en we passen het aan.",{"title":1467,"searchDepth":1468,"depth":1468,"links":5423},[5424,5425,5426,5427,5428,5429,5430,5431,5432,5433,5441],{"id":4624,"depth":1468,"text":4625},{"id":4660,"depth":1468,"text":4661},{"id":4674,"depth":1468,"text":4675},{"id":4760,"depth":1468,"text":4761},{"id":4860,"depth":1468,"text":4861},{"id":4880,"depth":1468,"text":4881},{"id":5169,"depth":1468,"text":5170},{"id":5203,"depth":1468,"text":5204},{"id":5271,"depth":1468,"text":5272},{"id":1393,"depth":1468,"text":1394,"children":5434},[5435,5436,5437,5438,5439,5440],{"id":5296,"depth":1486,"text":5297},{"id":5303,"depth":1486,"text":5304},{"id":5310,"depth":1486,"text":5311},{"id":5320,"depth":1486,"text":5321},{"id":5327,"depth":1486,"text":5328},{"id":5334,"depth":1486,"text":5335},{"id":3166,"depth":1468,"text":3167},"news","2026-10-23","PlanElec Sketch is een gratis browsertool voor eendraadschema en situatieplan volgens het AREI: zonder account, zonder limieten, opent Trikker-bestanden, pdf uit je browser. Met een matrix tegenover PlanElec Pro en Trikker.","\u002Fimages\u002Fblog\u002Fintroducing-planelec-sketch\u002Fhero.webp",{},"\u002Fimages\u002Fblog\u002Fintroducing-planelec-sketch\u002Fshare\u002Fhero.jpg","\u002Fblog\u002Fplanelec-sketch-gratis-eendraadschema-tekenen.nl",{"title":4598,"description":5444},"planelec-sketch-gratis-eendraadschema-tekenen","blog\u002Fplanelec-sketch-gratis-eendraadschema-tekenen.nl",[2974,3273,3274,5453,5454,3275],"gratis eendraadschema tekenen","Trikker alternatief","LCbtJEOLMKbOBk6wmI-MFgfvowZF0nZAAZpQO5Ahv6k","\u002Fblog\u002Fplanelec-sketch-gratis-eendraadschema-tekenen",{"id":5458,"title":5459,"articleId":5460,"body":5461,"category":6162,"date":6163,"description":6164,"extension":1496,"image":3257,"lastUpdated":3258,"locale":1497,"meta":6165,"navigation":1499,"ogImage":3260,"path":6166,"publishDate":6163,"readTime":4035,"refreshInterval":3263,"seo":6167,"seoTitle":6168,"slug":6169,"stem":6170,"tags":6171,"__hash__":6173,"kind":1515,"href":4887},"blog\u002Fblog\u002Ftrikker-sketch-pro-vergelijking.nl.md","Trikker, PlanElec Sketch of PlanElec Pro: welk programma voor eendraadschema en situatieplan in België?","trikker-vs-sketch-vs-pro",{"type":9,"value":5462,"toc":6147},[5463,5469,5475,5479,5556,5560,5754,5757,5761,5764,5808,5812,5815,5846,5849,5853,5856,5898,5902,5952,5967,5971,6105,6108,6113,6115,6117,6120,6124,6133,6137,6140,6144],[12,5464,5465,5468],{},[15,5466,5467],{},"Trikker is het gevestigde desktopprogramma voor eendraadschema en situatieplan, PlanElec Sketch is een gratis tekentool in de browser en PlanElec Pro plant de hele installatie in één project."," Wil je enkel tekenen en een pdf exporteren, dan lukt dat met Trikker en met Sketch. Heb je daarnaast een project op basis van het grondplan, een verdeelbord, PV of een AI-assistent nodig, kijk dan naar Pro. Deze vergelijking toont waar elk programma staat, met een bron bij elke uitspraak over Trikker.",[12,5470,5471,5474],{},[15,5472,5473],{},"Vergelijking per 26 oktober 2026, voor het eerst gecontroleerd op 14 oktober 2026. Geschreven door het PlanElec-team."," Wij maken twee van de drie programma's. Daarom komt elke uitspraak over Trikker uit de openbare bronnen van Trikker of uit onze eigen test met de Trikker 2.0-demo, en noemen we ook wat Trikker beter doet. Trikker is een merk van zijn eigenaar. We gebruiken de naam enkel om naar het product te verwijzen.",[41,5476,5478],{"id":5477},"welk-programma-past-bij-welke-taak","Welk programma past bij welke taak?",[49,5480,5481,5490],{},[52,5482,5483],{},[55,5484,5485,5487],{},[58,5486,5213],{},[58,5488,5489],{},"Beste keuze",[68,5491,5492,5499,5506,5517,5525,5533,5540,5548],{},[55,5493,5494,5497],{},[73,5495,5496],{},"Je werkt offline op een Windows-pc of Mac, tekent dagelijks en kent Trikker",[73,5498,3269],{},[55,5500,5501,5504],{},[73,5502,5503],{},"Je tekent af en toe een schema en wil geen installatie, geen account en geen kosten",[73,5505,2974],{},[55,5507,5508,5511],{},[73,5509,5510],{},"Je hebt Trikker-bestanden en wil het eendraadschema in de browser verderzetten",[73,5512,5513,5514,5516],{},"PlanElec Sketch (opent ",[1300,5515,2505],{},"-bestanden)",[55,5518,5519,5522],{},[73,5520,5521],{},"Je wil je Trikker-bestanden, één voor één of als heel archief, als projecten in je account",[73,5523,5524],{},"PlanElec Pro (Trikker-projecten importeren)",[55,5526,5527,5530],{},[73,5528,5529],{},"Je werkt met Trikker en hebt een oud schema enkel op papier, als scan of als pdf, of wil de installatie ter plaatse beschrijven of dicteren",[73,5531,5532],{},"Trikker (Schemalezer, bèta, voor licentiehouders)",[55,5534,5535,5538],{},[73,5536,5537],{},"Je wil grondplan, stroomkringen, verdeelbord, documenten en zelfcontrole in één project, alleen of in team",[73,5539,3272],{},[55,5541,5542,5545],{},[73,5543,5544],{},"Je hebt een grondplan als pdf of scan en wil er een bewerkbaar plan van maken",[73,5546,5547],{},"PlanElec Pro (grondplanherkenning)",[55,5549,5550,5553],{},[73,5551,5552],{},"Je geeft les of opleiding",[73,5554,5555],{},"Trikker (gratis onderwijslicentie); Sketch is gratis voor iedereen",[41,5557,5559],{"id":5558},"de-drie-programmas-naast-elkaar","De drie programma's naast elkaar",[49,5561,5562,5574],{},[52,5563,5564],{},[55,5565,5566,5568,5570,5572],{},[58,5567,4902],{},[58,5569,3269],{},[58,5571,2974],{},[58,5573,3272],{},[68,5575,5576,5589,5602,5616,5629,5642,5655,5681,5692,5704,5716,5729,5741],{},[55,5577,5578,5581,5584,5587],{},[73,5579,5580],{},"Platform",[73,5582,5583],{},"Desktopprogramma voor Windows; macOS in de 2.0-bèta sinds 30\u002F09\u002F2026",[73,5585,5586],{},"Browser",[73,5588,5586],{},[55,5590,5591,5594,5597,5600],{},[73,5592,5593],{},"Account nodig",[73,5595,5596],{},"Geen account; licentiecode per computer, demo zonder account; voor de Schemalezer aanmelden met het licentie-e-mailadres",[73,5598,5599],{},"Nee; optioneel een gratis account voor de cloud",[73,5601,4131],{},[55,5603,5604,5607,5610,5613],{},[73,5605,5606],{},"Prijs en grenzen",[73,5608,5609],{},"Abonnement, € 45 per maand of € 360 per jaar excl. btw, per computer. Demo: max. 5 stroomkringen, 1 planpagina, watermerk",[73,5611,5612],{},"Gratis. Geen limiet op stroomkringen, symbolen, pagina's of projecten; de pdf draagt geen watermerk",[73,5614,5615],{},"Early Access tot en met 01\u002F11\u002F2026: € 0. Vanaf 2 november 2026: Pro uitproberen € 0, € 12 per pand (eenmalig) of € 24 per maand; eindprijzen zonder btw (vrijstellingsregeling kleine ondernemingen); de prijs blijft zolang het abonnement zonder onderbreking loopt",[55,5617,5618,5620,5623,5626],{},[73,5619,3764],{},[73,5621,5622],{},"Ja; automatische lay-out, kringletters, kabel- en beveiligingseigenschappen",[73,5624,5625],{},"Ja; automatische lay-out, kringletters, kant-en-klare stroomkringen",[73,5627,5628],{},"Ja; afgeleid uit het projectmodel (stroomkringen, verdeelbord, kabels)",[55,5630,5631,5633,5636,5639],{},[73,5632,3836],{},[73,5634,5635],{},"Ja; muren, deuren, ramen, maatlijnen, meerdere pagina's",[73,5637,5638],{},"Ja; grondplan als afbeelding of pdf, schaal, muren, deuren, ramen; meerdere verdiepingen",[73,5640,5641],{},"Ja; grondplaneditor, toestellen op de echte positie",[55,5643,5644,5646,5649,5652],{},[73,5645,4653],{},[73,5647,5648],{},"Tabblad Afdrukken; volgens de handleiding maakt de server van de fabrikant de pdf en moet je toestemming geven om het dossier te verzenden",[73,5650,5651],{},"In de browser gemaakt, het pdf-bestand wordt niet geüpload; A4 of A3, liggend of staand, met titelblok; gratis en zonder watermerk; met account een QR-code ter controle",[73,5653,5654],{},"Eendraadschema, situatieplan, zelfcontrolerapport, verdeelbord, dossier",[55,5656,5657,5660,5666,5672],{},[73,5658,5659],{},"Bestandsimport",[73,5661,5662,5663,5665],{},"Opent eigen ",[1300,5664,2505],{},"-bestanden; afbeeldingen, pdf en DWG als achtergrond",[73,5667,5668,5669,5671],{},"Opent Trikker-",[1300,5670,2505],{},"-bestanden met situatieplan en rapport",[73,5673,5674,5675,5677,5678,5680],{},"Importeert ",[1300,5676,2505],{},"-bestanden één voor één of als archief (tot 500, elk als project, met situatieplan); schema ook via Sketch met ",[15,5679,3363],{},"; Trikker-pdf's en scans via grondplanherkenning",[55,5682,5683,5685,5688,5690],{},[73,5684,5149],{},[73,5686,5687],{},"NL, FR, EN, DE, PL, RO (handleiding 2.0)",[73,5689,5152],{},[73,5691,5152],{},[55,5693,5694,5696,5699,5702],{},[73,5695,152],{},[73,5697,5698],{},"Lokale bestanden, geen cloudsynchronisatie (handleiding)",[73,5700,5701],{},"Geen teamwerk; zonder account blijft de tekening in de browser, met een gratis account staat ze in de cloud en is ze op elk toestel beschikbaar",[73,5703,5141],{},[55,5705,5706,5708,5711,5713],{},[73,5707,75],{},[73,5709,5710],{},"Deel van het eendraadschema; fysieke kastplanning niet beschreven in de handleiding",[73,5712,4110],{},[73,5714,5715],{},"Verdeelbordplanning in de editor, met pdf",[55,5717,5718,5721,5724,5726],{},[73,5719,5720],{},"PV en domotica",[73,5722,5723],{},"Symbolen voor PV, omvormer, batterij, laadpaal en domotica; export van de achtergrond naar Niko Home Control",[73,5725,4110],{},[73,5727,5728],{},"PV-planning; KNX-documentatie in pilootstatus",[55,5730,5731,5733,5736,5738],{},[73,5732,4588],{},[73,5734,5735],{},"Schemalezer: apart webtool op basis van AI, bèta, voor licentiehouders; leest eendraadschema en situatieplan (pdf, png, jpg, ook scan, foto of handschets) in tot een Trikker-schema; maakt sinds een update van een getypte of gedicteerde beschrijving (NL, FR, EN) een eendraadschema, de punten plaats je zelf op het plan",[73,5737,4110],{},[73,5739,5740],{},"Assistent voor planningsopdrachten, herkenning van grondplan en foto van het verdeelbord",[55,5742,5743,5745,5748,5751],{},[73,5744,4733],{},[73,5746,5747],{},"Ja; Excel-export",[73,5749,5750],{},"Ja; eenvoudige lijst uit het schema",[73,5752,5753],{},"Gedetailleerde, merkonafhankelijke lijst (pilootstatus)",[12,5755,5756],{},"De bronnen voor de Trikker-kolom staan onderaan. \"Niet beschreven\" betekent nooit \"bestaat niet\": we vermelden enkel wat we konden controleren.",[41,5758,5760],{"id":5759},"wat-trikker-goed-doet","Wat Trikker goed doet",[12,5762,5763],{},"Trikker is een volwassen programma en dat merk je.",[1450,5765,5766,5772,5778,5784,5790,5796,5802],{},[1453,5767,5768,5771],{},[15,5769,5770],{},"Gevestigd."," Het zit in de Belgische opleidingen: Syntra Midden-Vlaanderen geeft een cursus Trikker en Trikker biedt een gratis onderwijslicentie.",[1453,5773,5774,5777],{},[15,5775,5776],{},"Offline desktop."," Tekenen, bewaren en exporteren werken zonder internet (handleiding). Licentiecontrole en pdf-uitvoer hebben internet nodig. Je bestanden blijven op je computer; de handleiding zegt dat uitdrukkelijk.",[1453,5779,5780,5783],{},[15,5781,5782],{},"Rijpe eendraadschemalogica."," In onze eigen test met de demo ordent het schema zich zelf wanneer je op een aansluitpunt klikt. Kabeltype, aantal geleiders, plaatsing (ondergronds, in wand, op wand, luchtleiding), fase en kortsluitstroom hebben eigen velden. Een nieuw document start met een toevoerleiding, een hoofddifferentieel en een verdeelbord.",[1453,5785,5786,5789],{},[15,5787,5788],{},"Brede symbolenbibliotheek."," Elf categorieën, van stopcontacten, schakelaars en verlichting over bel en alarm tot domotica, energie en aandrijvingen.",[1453,5791,5792,5795],{},[15,5793,5794],{},"Situatieplan met muren en achtergrond."," Tekenen met raster en magnetisme, kaders A4 en A3, import van afbeeldingen, pdf en DWG met laagkeuze.",[1453,5797,5798,5801],{},[15,5799,5800],{},"Zes talen"," in versie 2.0, ook Pools en Roemeens.",[1453,5803,5804,5807],{},[15,5805,5806],{},"Oude schema's inlezen (bèta)."," De Schemalezer maakt van een eendraadschema en een situatieplan, ook als scan, foto of handschets, een Trikker-schema; de symbolen komen op het plan, gekoppeld aan hun kring. Hij is beschikbaar voor klanten met een actieve licentie, en het resultaat moet je nakijken. Sinds een update beschrijf je de installatie ter plaatse ook getypt of gedicteerd, in het Nederlands, Frans of Engels; daaruit ontstaat een eendraadschema volgens het AREI, onzekere kringen verschijnen bij de punten ter controle, en de punten plaats je zelf op het plan.",[41,5809,5811],{"id":5810},"wat-planelec-sketch-doet-en-wat-niet","Wat PlanElec Sketch doet, en wat niet",[12,5813,5814],{},"Sketch is een gratis webapp voor precies twee documenten: het eendraadschema en het situatieplan.",[1450,5816,5817,5820,5823,5826,5829,5838],{},[1453,5818,5819],{},"Je kiest een symbool of een kant-en-klare stroomkring en klikt op een blauw aansluitpunt. Lay-out, lijnen en kringletters volgen vanzelf. Plaatsen waar een symbool niet kan aansluiten, worden niet aangeboden.",[1453,5821,5822],{},"Het situatieplan werkt op een geïmporteerd grondplan (afbeelding of pdf). Je stelt de schaal in met twee punten, sleept de toestellen uit het schema naar het plan en ziet welke stroomkringen volledig geplaatst zijn. Het plan heeft meerdere verdiepingen; in de pdf krijgt elke verdieping eigen bladen.",[1453,5824,5825],{},"De pdf wordt in je browser gemaakt; het pdf-bestand wordt niet geüpload. Je kiest A4 of A3, liggend of staand. Hij heeft een titelblok met installatie, klant, EAN, installateur en erkend organisme. De pdf draagt geen watermerk; in het titelblok staat de regel „Getekend met PlanElec Sketch”.",[1453,5827,5828],{},"Geen account nodig, geen limiet. Je tekening wordt automatisch in je browser bewaard; je kan ze ook als bestand opslaan. Met een gratis PlanElec-account bewaart Sketch de tekening automatisch in de cloud, zodat ze op elk toestel klaarstaat. De pdf van een opgeslagen, ongewijzigde tekening draagt dan een QR-code waarmee je versie en herkomst kunt controleren.",[1453,5830,5831,5834,5835,5837],{},[15,5832,5833],{},"Trikker-bestanden openen:"," Sketch opent een ",[1300,5836,2505],{},"-bestand, laat je verdergaan met het eendraadschema en vermeldt in een rapport alles wat niet kon worden overgenomen. Het situatieplan komt mee: verdiepingen, muren met hun dikte, ruimtes, deuren, ramen, garagepoorten, trappen, vrije teksten en rechthoeken. Controleer het resultaat altijd.",[1453,5839,5840,1934,5843,5845],{},[15,5841,5842],{},"Verder in Pro:",[15,5844,3363],{}," zet je de tekening voort als PlanElec Pro-project. Eendraadschema, verdeelborden, stroomkringen, kabels en projectgegevens gaan mee, het situatieplan niet; de overnamepagina toont vooraf alles wat niet wordt overgenomen. Van Pro terug naar Sketch kan niet.",[12,5847,5848],{},"Sketch doet geen verdeelbordplanning, PV, domotica, AI, teamwerk of AREI-zelfcontrole. Sketch is ook jong. De symbolenset is kleiner dan die van een gevestigd programma, dus controleer op een echt project of de symbolen die je nodig hebt erbij zitten.",[41,5850,5852],{"id":5851},"wat-planelec-pro-doet-en-waar-de-grenzen-liggen","Wat PlanElec Pro doet, en waar de grenzen liggen",[12,5854,5855],{},"Pro vertrekt van de installatie, niet van de tekening. Grondplan, toestellen, stroomkringen en verdeelbord vormen één project. Eendraadschema, situatieplan en lijsten worden daaruit afgeleid.",[1450,5857,5858,5864,5870,5876,5882],{},[1453,5859,5860,5863],{},[15,5861,5862],{},"Documenten:"," eendraadschema, situatieplan, verdeelbord, zelfcontrolerapport en een selecteerbaar dossier als pdf.",[1453,5865,5866,5869],{},[15,5867,5868],{},"AI:"," de PlanElec-assistent voert opdrachten in gewone taal uit in het project. Grondplanherkenning leest pdf, PNG, JPEG of WebP, ook een Trikker-pdf-export, in tot een voorstel met muren, ruimtes, deuren en ramen. Daarvoor is een bevestigde schaal nodig. Herkenning van een foto van het verdeelbord stelt de zichtbare DIN-modules voor.",[1453,5871,5872,5875],{},[15,5873,5874],{},"Zelfcontrole:"," een AREI-zelfcontrole voor de ondersteunde regels. Ze toont open punten. Ze is geen attest; de officiële beoordeling doet het erkend organisme.",[1453,5877,5878,5881],{},[15,5879,5880],{},"Teamwerk:"," organisaties, uitnodigingen en projectrollen.",[1453,5883,5884,5887,5888,5890,5891,5893,5894,5897],{},[15,5885,5886],{},"Grenzen:"," Pro vraagt een account. Zonder verbinding bewerk je een vooraf geopend project als pilot verder; export en AI-functies hebben internet nodig. Pro importeert ",[1300,5889,2505],{},"-bestanden met situatieplan via ",[15,5892,2514],{},"; wat niet wordt overgenomen, staat in het importrapport, zie ",[30,5895,5896],{"href":4005},"Trikker-archief verhuizen",". De gedetailleerde materiaallijst en de KNX-documentatie hebben pilootstatus.",[41,5899,5901],{"id":5900},"overstappen-vanaf-trikker","Overstappen vanaf Trikker",[1602,5903,5904,5915,5930,5939],{},[1453,5905,5906,5909,5910,5912,5913,39],{},[15,5907,5908],{},"Je wil de bestanden als projecten in je account:"," importeer ze in Pro met ",[15,5911,2514],{},", één voor één of als archief; stappen en grenzen staan in ",[30,5914,5896],{"href":4005},[1453,5916,5917,5920,5921,5923,5924,5927,5928,39],{},[15,5918,5919],{},"Je tekent verder:"," open het ",[1300,5922,2505],{},"-bestand in ",[30,5925,2974],{"href":3053,"rel":5926},[2532],". Controleer het rapport en het schema. Wil je in Pro verder plannen, kies daar dan ",[15,5929,3363],{},[1453,5931,5932,5935,5936,5938],{},[15,5933,5934],{},"Je hebt het plan alleen als pdf:"," laat het door Pro herkennen. Het situatieplan van een ",[1300,5937,2505],{},"-bestand nemen Sketch en Pro rechtstreeks over.",[1453,5940,5941,5944,5945,5947,5948,39],{},[15,5942,5943],{},"Je wil eerst vergelijken:"," de volledige vergelijking vanuit het standpunt van Pro staat in ",[30,5946,4892],{"href":4891},". Wat de Trikker 2.0-bèta brengt, lees je in ",[30,5949,5951],{"href":5950},"\u002Fblog\u002Ftrikker-2-0-mac","Trikker 2.0 voor Mac",[12,5953,5954,5955,5959,5960,5964,5965,39],{},"Het verschil tussen de twee documenten vind je in ",[30,5956,5958],{"href":5957},"\u002Fblog\u002Feendraadschema-vs-situatieschema","eendraadschema vs situatieschema",". Sketch staat op ",[30,5961,5963],{"href":3053,"rel":5962},[2532],"sketch.planelec.be","; de tarieven van Pro vind je op de ",[30,5966,4450],{"href":4449},[41,5968,5970],{"id":5969},"hoe-we-deze-vergelijking-hebben-gecontroleerd","Hoe we deze vergelijking hebben gecontroleerd",[49,5972,5973,5984],{},[52,5974,5975],{},[55,5976,5977,5979,5981],{},[58,5978,3186],{},[58,5980,3189],{},[58,5982,5983],{},"Datum",[68,5985,5986,5999,6014,6027,6047,6061,6078,6091],{},[55,5987,5988,5991,5996],{},[73,5989,5990],{},"Abonnement € 45\u002Fmaand of € 360\u002Fjaar excl. btw; één computer per licentiecode; demo met max. 5 stroomkringen, 1 planpagina, watermerk; gratis onderwijslicentie",[73,5992,5993],{},[30,5994,5388],{"href":5386,"rel":5995},[2532],[73,5997,5998],{},"14\u002F10\u002F2026, 26\u002F10\u002F2026",[55,6000,6001,6004,6011],{},[73,6002,6003],{},"Trikker 2.0 als bèta voor Windows en macOS sinds 30\u002F09\u002F2026; pdf rechtstreeks aangemaakt",[73,6005,6006],{},[30,6007,6010],{"href":6008,"rel":6009},"https:\u002F\u002Fwww.trikker.be\u002Fen\u002Fblog\u002Fnieuws-2\u002Ftrikker-2-0-in-beta-een-nieuwe-basis-nu-ook-op-macos-14",[2532],"Trikker-nieuws, 30\u002F09\u002F2026",[73,6012,6013],{},"14\u002F10\u002F2026",[55,6015,6016,6019,6024],{},[73,6017,6018],{},"Schemalezer: op basis van AI, bèta, voor licentiehouders, met aparte AREI-controle; leest eendraadschema en situatieplan uit pdf, png of jpg, ook scan, foto of handschets; resultaat moet worden nagekeken",[73,6020,6021],{},[30,6022,5415],{"href":5413,"rel":6023},[2532],[73,6025,6026],{},"14\u002F10\u002F2026, 19\u002F10\u002F2026",[55,6028,6029,6032,6044],{},[73,6030,6031],{},"Schemalezer: installatie getypt of gedicteerd beschrijven (NL, FR, EN), daaruit een eendraadschema volgens het AREI; onzekere kringen als punten ter controle; punten zonder plan, zelf te plaatsen; aanmelden met het licentie-e-mailadres",[73,6033,6034,933,6039],{},[30,6035,6038],{"href":6036,"rel":6037},"https:\u002F\u002Fwww.trikker.be\u002Fblog\u002Fnieuws-2\u002Fbeschrijf-de-installatie-op-de-werf-trikker-maakt-er-meteen-een-schema-van-33",[2532],"Trikker-nieuws",[30,6040,6043],{"href":6041,"rel":6042},"https:\u002F\u002Fwww.trikker.be\u002Fblog\u002Fnieuws-2\u002Fnieuw-in-beta-de-schemalezer-zet-schema-en-situatieplan-in-minuten-om-naar-trikker-30",[2532],"aankondiging Schemalezer",[73,6045,6046],{},"26\u002F10\u002F2026",[55,6048,6049,6052,6059],{},[73,6050,6051],{},"Pdf van de plannen op de servers van Trikker, bevestiging vóór het afdrukken; gebruiksanalyse en AI-training met de plannen als twee optionele toestemmingen",[73,6053,6054,6058],{},[30,6055,6057],{"href":2530,"rel":6056},[2532],"Online handleiding Trikker 2.0-bèta",", privacyinformatie",[73,6060,6046],{},[55,6062,6063,6066,6076],{},[73,6064,6065],{},"Zes talen, offline werken, lokale bestanden zonder cloudsynchronisatie, pdf via de server van de fabrikant, import van DWG\u002Fpdf, materiaallijst met Excel, export naar Niko Home Control",[73,6067,6068,933,6071],{},[30,6069,6057],{"href":2530,"rel":6070},[2532],[30,6072,6075],{"href":6073,"rel":6074},"https:\u002F\u002Fwww.trikker.be\u002Fmedia\u002FHandleiding_Trikker.pdf",[2532],"pdf-handleiding V1.5.78",[73,6077,6013],{},[55,6079,6080,6086,6089],{},[73,6081,6082,6083,6085],{},"Demolimiet van 5 stroomkringen, ",[1300,6084,2505],{},"-opbouw, symboolcategorieën, de melding dat een bestand voor het afdrukken wordt geüpload",[73,6087,6088],{},"Eigen test met Trikker 2.0.0 (demo), projecten T01 tot T05",[73,6090,6013],{},[55,6092,6093,6096,6103],{},[73,6094,6095],{},"Cursus Trikker bij Syntra",[73,6097,6098],{},[30,6099,6102],{"href":6100,"rel":6101},"https:\u002F\u002Fsyntra-mvl.be\u002Fnl\u002Fopleidingen\u002Fbouw-en-energie\u002Felektriciteit-en-onderhoudstechnieken\u002Ftrikker",[2532],"Syntra Midden-Vlaanderen",[73,6104,6013],{},[12,6106,6107],{},"Over het afdrukken verschillen de bronnen van Trikker in formulering. De online handleiding zegt dat de pdf op de servers van de fabrikant wordt gemaakt en dat je toestemming moet geven om het dossier daarheen te sturen. De aankondiging van 2.0 zegt dat afdrukken rechtstreeks pdf's maakt. In onze demotest meldde een bericht dat het bestand voor het afdrukken naar de fabrikant wordt geüpload; in de demo hebben we geen pdf aangemaakt. De privacyinformatie in de handleiding van de 2.0-bèta (gecontroleerd op 26\u002F10\u002F2026) beschrijft de weg via de servers: vóór het afdrukken bevestig je dat de pdf daar wordt gemaakt. Gebruiksanalyse en het trainen van toekomstige AI-modellen met je plannen zijn twee aparte, optionele toestemmingen. Is privacy voor jou belangrijk, controleer dan hoe de definitieve versie het aanpakt.",[12,6109,6110,6111,5421],{},"De uitspraken over PlanElec volgen onze productbeschrijving van 26 oktober 2026. Prijzen en functies veranderen. Is iets verouderd, ",[30,6112,3229],{"href":3228},[41,6114,1394],{"id":1393},[1396,6116,5297],{"id":5296},[12,6118,6119],{},"Ja. Geen account nodig, geen limiet op stroomkringen, symbolen, pagina's of projecten. Zonder account blijft je tekening in je browser tot je ze zelf opslaat of exporteert; met een gratis account bewaart Sketch ze in de cloud. De pdf draagt geen watermerk; in het titelblok staat de regel „Getekend met PlanElec Sketch”.",[1396,6121,6123],{"id":6122},"kan-ik-mijn-trikker-bestand-in-sketch-openen","Kan ik mijn Trikker-bestand in Sketch openen?",[12,6125,6126,6127,6129,6130,6132],{},"Ja. Sketch opent ",[1300,6128,2505],{},"-bestanden en somt op wat niet kon worden overgenomen. Het situatieplan van het bestand komt mee. Met ",[15,6131,3363],{}," zet je het schema daarna voort in PlanElec Pro.",[1396,6134,6136],{"id":6135},"heeft-trikker-een-gratis-versie","Heeft Trikker een gratis versie?",[12,6138,6139],{},"Trikker heeft een demo zonder account, beperkt tot 5 stroomkringen en 1 planpagina en met een watermerk, en een gratis onderwijslicentie. De volledige versie is een abonnement.",[1396,6141,6143],{"id":6142},"volstaat-een-sketch-schema-voor-de-keuring","Volstaat een Sketch-schema voor de keuring?",[12,6145,6146],{},"Sketch geeft je een pdf met titelblok voor het erkend organisme; de pdf draagt geen watermerk. Je blijft verantwoordelijk voor de inhoud van je plannen; de keuring doet het erkend organisme.",{"title":1467,"searchDepth":1468,"depth":1468,"links":6148},[6149,6150,6151,6152,6153,6154,6155,6156],{"id":5477,"depth":1468,"text":5478},{"id":5558,"depth":1468,"text":5559},{"id":5759,"depth":1468,"text":5760},{"id":5810,"depth":1468,"text":5811},{"id":5851,"depth":1468,"text":5852},{"id":5900,"depth":1468,"text":5901},{"id":5969,"depth":1468,"text":5970},{"id":1393,"depth":1468,"text":1394,"children":6157},[6158,6159,6160,6161],{"id":5296,"depth":1486,"text":5297},{"id":6122,"depth":1486,"text":6123},{"id":6135,"depth":1486,"text":6136},{"id":6142,"depth":1486,"text":6143},"comparison","2026-10-21","Eerlijke vergelijking van Trikker, PlanElec Sketch en PlanElec Pro voor eendraadschema en situatieplan in België: platform, prijs, pdf, bestandsimport, AI, met bronnen en datum.",{},"\u002Fblog\u002Ftrikker-sketch-pro-vergelijking.nl",{"title":5459,"description":6164},"Trikker vs PlanElec Sketch vs Pro: vergelijking","trikker-sketch-pro-vergelijking","blog\u002Ftrikker-sketch-pro-vergelijking.nl",[3269,2974,1337,3273,3274,5453,3275,6172],"vergelijking","dt6sJ9xxXb81okO5r84nQP3IJCmpDe2aDQ6PMEriPe0",{"id":6175,"title":6176,"articleId":6177,"body":6178,"category":6162,"date":7010,"description":7011,"extension":1496,"image":6191,"lastUpdated":7012,"locale":1497,"meta":7013,"navigation":1499,"ogImage":7014,"path":7015,"publishDate":7010,"readTime":7016,"refreshInterval":1486,"seo":7017,"seoTitle":4037,"slug":7018,"stem":7019,"tags":7020,"__hash__":7024,"kind":1515,"href":7025},"blog\u002Fblog\u002Famperio-alternatief.nl.md","Amperio of PlanElec: welke software kies je in 2026?","planelec-vs-amperio",{"type":9,"value":6179,"toc":6991},[6180,6186,6192,6280,6284,6287,6301,6307,6367,6370,6374,6549,6566,6570,6608,6612,6674,6678,6681,6782,6797,6803,6807,6810,6883,6887,6891,6894,6898,6904,6908,6913,6917,6923,6927,6930,6934,6937,6941,6944,6948,6975,6979],[12,6181,6182,6185],{},[15,6183,6184],{},"Kies Amperio als je werfopvolging met taken, voor\u002Fna-foto’s en spraaknotities in dezelfde app als je schema wilt en op de werf vooral raadpleegt en noteert. Kies PlanElec als je de hele installatie – grondplan, stroomkringen, verdeelkast, eendraadschema en situatieplan – in één projectmodel plant, in het Nederlands, Frans, Duits of Engels dicteert en elke wijziging van de AI-assistent meteen door een openbaar gedocumenteerde AREI-zelfcontrole wilt laten nakijken."," Beide zijn Belgische webapps zonder installatie, met spraakinvoer en een pdf-dossier voor de keuring. Het verschil zit in de nadruk: Amperio legt die op het werfbezoek, PlanElec op het samenhangende ontwerp tot en met de verdeelkast.",[12,6187,6188],{},[22,6189],{"alt":6190,"src":6191},"Elektroplanning met digitale toestellen.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-vs-amperio-editorial.webp",[12,6193,6194,6197,6198,702,6203,702,6208,702,6212,702,6217,933,6222,6227,6228,6231,6232,6237,6238,6243,6244,702,6249,1875,6254,6259,6260,6265,6266,6271,6272,6275,6276,6279],{},[15,6195,6196],{},"Wie publiceert deze vergelijking?"," Deze pagina is van PlanElec, een van de twee vergeleken aanbieders. Stand: 2 november 2026. Elke uitspraak over Amperio komt van de openbare website van Amperio (amperio.be, uitgegeven door ONEIRIC SRL), geraadpleegd op 12 oktober 2026: ",[30,6199,6202],{"href":6200,"rel":6201},"https:\u002F\u002Famperio.be\u002Fnl",[2532],"startpagina",[30,6204,6207],{"href":6205,"rel":6206},"https:\u002F\u002Famperio.be\u002Fnl\u002Fprijzen",[2532],"prijzen",[30,6209,3273],{"href":6210,"rel":6211},"https:\u002F\u002Famperio.be\u002Fnl\u002Feendraadschema",[2532],[30,6213,6216],{"href":6214,"rel":6215},"https:\u002F\u002Famperio.be\u002Fnl\u002Fsituatieschema",[2532],"situatieschema",[30,6218,6221],{"href":6219,"rel":6220},"https:\u002F\u002Famperio.be\u002Fnl\u002Fwerfopvolging",[2532],"werfopvolging",[30,6223,6226],{"href":6224,"rel":6225},"https:\u002F\u002Famperio.be\u002Fnl\u002Famperio-in-het-kort",[2532],"Amperio in het kort",". Op 19 oktober 2026 hebben we de ",[30,6229,6202],{"href":6200,"rel":6230},[2532],", de ",[30,6233,6236],{"href":6234,"rel":6235},"https:\u002F\u002Famperio.be\u002Fllms.txt",[2532],"llms.txt"," en de Franstalige pagina’s over ",[30,6239,6242],{"href":6240,"rel":6241},"https:\u002F\u002Famperio.be\u002Fcontroles-rgie",[2532],"AREI-controles",", het ",[30,6245,6248],{"href":6246,"rel":6247},"https:\u002F\u002Famperio.be\u002Fdossier-electrique-pdf",[2532],"pdf-dossier",[30,6250,6253],{"href":6251,"rel":6252},"https:\u002F\u002Famperio.be\u002Fschema-unifilaire-photovoltaique",[2532],"zonnepanelen, batterij en laadpaal",[30,6255,6258],{"href":6256,"rel":6257},"https:\u002F\u002Famperio.be\u002Fguide-rgie",[2532],"AREI-gids"," opnieuw nagekeken en etiketten, aantal controles, zonnepanelen, gids en dossiertalen aangevuld. Op 26 oktober 2026 hebben we de llms.txt, de startpagina, de Franstalige pagina’s over ",[30,6261,6264],{"href":6262,"rel":6263},"https:\u002F\u002Famperio.be\u002Fetiquettes-tableau-electrique",[2532],"verdeelbord en etiketten"," en het ",[30,6267,6270],{"href":6268,"rel":6269},"https:\u002F\u002Famperio.be\u002Fdossier-electrique-rgie",[2532],"elektrisch dossier"," en de gidsen op de blog van Amperio van 20 en 21 oktober 2026 nagekeken en de bordweergave, etiketten, fotoherkenning van verdeelborden en de inhoud van het dossier aangevuld. Op 2 november 2026 hebben we de startpagina, de prijspagina en de llms.txt opnieuw nagekeken en het eenmalige aanbod Particulier en de grenzen van de gratis proefperiode aangevuld. Wat die pagina’s niet noemen, staat hieronder als „niet vermeld”; dat betekent niet dat de functie ontbreekt. Gegevens over PlanElec komen uit de gedocumenteerde productomvang, de ",[30,6273,6274],{"href":4449},"prijspagina"," en de handleidingen in de hulp. Zie je een fout of is er intussen iets veranderd? Schrijf naar ",[30,6277,6278],{"href":3228},"info@planelec.be","; we verbeteren de regel en passen de datum aan.",[41,6281,6283],{"id":6282},"in-het-kort","In het kort",[12,6285,6286],{},"Amperio en PlanElec lossen hetzelfde probleem op – eendraadschema en situatieplan voor de keuring – maar vertrekken vanuit een andere werkplek. Amperio is gebouwd rond het werfbezoek: kamer per kamer dicteren, taken en foto’s bijhouden en het schema op de gsm raadplegen. PlanElec is gebouwd rond één projectmodel waarin grondplan, toestellen, stroomkringen en verdeelkast samenhangen; tekenen, de AI-assistent en dicteren zijn drie invoerwegen naar datzelfde model.",[1450,6288,6289,6295],{},[1453,6290,6291,6294],{},[15,6292,6293],{},"Kies Amperio als"," je werfopvolging (taken, voor\u002Fna-foto’s, spraaknotities, werven per klant) in dezelfde app als het schema wilt, of een bestaand eendraadschema uit een foto of pdf wilt laten overnemen.",[1453,6296,6297,6300],{},[15,6298,6299],{},"Kies PlanElec als"," je de verdeelkast in een editor op DIN-rails plant, in het Duits of Engels werkt, het grondplan uit een pdf of scan wilt laten herkennen of precies wilt weten welke AREI-regels de software toetst.",[12,6302,6303,6306],{},[15,6304,6305],{},"Kosten over 12 maanden",", volgens de prijspagina’s van beide aanbieders op 2 november 2026; Amperio Pro exclusief btw, Amperio Particulier inclusief btw, PlanElec eindprijzen zonder btw (vrijstellingsregeling kleine ondernemingen):",[49,6308,6309,6321],{},[52,6310,6311],{},[55,6312,6313,6316,6318],{},[58,6314,6315],{},"Formule",[58,6317,1337],{},[58,6319,6320],{},"Amperio",[68,6322,6323,6334,6345,6356],{},[55,6324,6325,6328,6331],{},[73,6326,6327],{},"Zonder kosten",[73,6329,6330],{},"Pro uitproberen: € 0, zonder einddatum, zonder project- of kringgrens; exports met afgeschermde gegevens",[73,6332,6333],{},"Gratis: 1 werf, 7 dagen, zonder kredietkaart; daarna raadpleegbaar, pdf alleen met proefwatermerk",[55,6335,6336,6339,6342],{},[73,6337,6338],{},"Eenmalig, één object",[73,6340,6341],{},"Eenmalig gebruik: € 12 per pand; 12 maanden bewerkbaar, daarna export zonder afscherming",[73,6343,6344],{},"Particulier: € 29 voor 1 werf (eigen installatie); 6 maanden bewerkbaar, daarna raadplegen en exporteren",[55,6346,6347,6350,6353],{},[73,6348,6349],{},"Pro, jaarlijks betaald",[73,6351,6352],{},"€ 240, 3 bewerkplaatsen; de prijs blijft zolang het abonnement loopt",[73,6354,6355],{},"€ 374,40 aan lanceringstarief",[55,6357,6358,6361,6364],{},[73,6359,6360],{},"Pro, maandelijks × 12",[73,6362,6363],{},"€ 288 (12 × € 24)",[73,6365,6366],{},"€ 468 (12 × € 39)",[12,6368,6369],{},"De betalende formules van PlanElec lopen sinds 2 november 2026. Wie zich vóór 2 november heeft geregistreerd, gebruikt Pro tot en met 1 december 2026 gratis; daarna loopt het account zonder boeking verder als Pro uitproberen aan € 0. Bij Amperio blijft het lanceringstarief van € 39 per maand (in plaats van € 79) volgens Amperio behouden zolang je geabonneerd blijft.",[41,6371,6373],{"id":6372},"amperio-en-planelec-per-criterium","Amperio en PlanElec per criterium",[49,6375,6376,6386],{},[52,6377,6378],{},[55,6379,6380,6382,6384],{},[58,6381,4902],{},[58,6383,1337],{},[58,6385,6320],{},[68,6387,6388,6398,6409,6420,6431,6442,6453,6464,6474,6485,6495,6506,6517,6528,6539],{},[55,6389,6390,6392,6395],{},[73,6391,5580],{},[73,6393,6394],{},"Browser zonder installatie; best op laptop of desktop, op tablet en gsm past de werkruimte zich aan",[73,6396,6397],{},"Browser zonder installatie op computer, tablet en telefoon",[55,6399,6400,6403,6406],{},[73,6401,6402],{},"Talen van de interface",[73,6404,6405],{},"Nederlands, Frans, Duits, Engels",[73,6407,6408],{},"Frans, Nederlands, Engels",[55,6410,6411,6414,6417],{},[73,6412,6413],{},"Gebruikers in Pro",[73,6415,6416],{},"3 bewerkplaatsen inbegrepen, elke extra plaats € 5\u002Fmaand; leestoegang gratis en onbeperkt",[73,6418,6419],{},"Collega’s sluiten aan met een uitnodigingscode, zonder individuele betaling; aantal per abonnement niet vermeld",[55,6421,6422,6425,6428],{},[73,6423,6424],{},"Schema en plan",[73,6426,6427],{},"Eén projectmodel; eendraadschema en situatieplan komen uit grondplan, kringen en verdeelkast",[73,6429,6430],{},"Een element bestaat één keer; plan en schema worden samen bijgewerkt",[55,6432,6433,6436,6439],{},[73,6434,6435],{},"Grondplan",[73,6437,6438],{},"Tekenen; pdf, DXF of afbeelding als onderlegger; meerdere verdiepingen; 3D-weergave",[73,6440,6441],{},"Kamers getekend of gedicteerd met afmetingen; één plan per niveau, dak inbegrepen",[55,6443,6444,6447,6450],{},[73,6445,6446],{},"Bestaand werk overnemen",[73,6448,6449],{},"Grondplan herkennen uit pdf, scan of afbeelding (ook Trikker-pdf); DIN-modules uit kastfoto’s; geen schema-import",[73,6451,6452],{},"Schema of plan uit pdf of foto; verliesstroomschakelaars, automaten en kringen worden opnieuw opgebouwd; volgens de gidsen van Amperio ook bestaande verdeelborden met AI uit foto’s",[55,6454,6455,6458,6461],{},[73,6456,6457],{},"Invoer met spraak",[73,6459,6460],{},"Dicteren in de AI-assistent, NL\u002FFR\u002FDE\u002FEN; herkende tekst nalezen vóór het verzenden",[73,6462,6463],{},"Dicteren kamer per kamer voor schema, plan en taken",[55,6465,6466,6468,6471],{},[73,6467,4589],{},[73,6469,6470],{},"Meer dan 100 planningsopdrachten in het hele project; risicovolle acties pas na bevestiging",[73,6472,6473],{},"Past het schema aan met één zin, je bevestigt; AREI-gids beantwoordt getypte of ingesproken vragen uit Boek 1 met geciteerde passages",[55,6475,6476,6479,6482],{},[73,6477,6478],{},"AREI-controle",[73,6480,6481],{},"56 gepubliceerde controles, waarvan 29 met AREI-artikel; na elke wijziging van de assistent",[73,6483,6484],{},"Meer dan 40 controles uit Boek 1 per kring tijdens het invoeren, met artikel en voorgestelde correctie",[55,6486,6487,6489,6492],{},[73,6488,1721],{},[73,6490,6491],{},"Kasteditor met DIN-rails, kast-PDF, herkenning uit kastfoto’s",[73,6493,6494],{},"Het verdeelbord bouwt zich op vanuit het schema, in 3D of plat; etiketten op ware grootte op A4, deurlegende en stroken voor labelprinters",[55,6496,6497,6500,6503],{},[73,6498,6499],{},"Zonnepanelen en domotica",[73,6501,6502],{},"PV-strings per MPPT met DC-beveiliging; KNX-documentatie als pilot",[73,6504,6505],{},"Panelen, omvormer, batterij, laadpaal en DC-tak met controles volgens hoofdstuk 7.112 en een eigen dossierpagina; domoticabus, actoren en deelnemers in schema, plan en dossier",[55,6507,6508,6511,6514],{},[73,6509,6510],{},"Werfopvolging",[73,6512,6513],{},"Niet inbegrepen: geen taken, geen voor\u002Fna-foto’s",[73,6515,6516],{},"Taken (ook gedicteerd), foto’s voor\u002Fna, spraaknotities, werven per klant",[55,6518,6519,6522,6525],{},[73,6520,6521],{},"Offline",[73,6523,6524],{},"Pilot: geopende projecten verder bewerken in grondplan, schema en verdeelkast; export, uploads en AI online",[73,6526,6527],{},"Laatste werven raadplegen; taken, foto’s en spraakmemo’s zonder netwerk; schema en plan bewerken vraagt netwerk",[55,6529,6530,6533,6536],{},[73,6531,6532],{},"Documenten",[73,6534,6535],{},"Eendraadschema, situatieplan, kast-PDF, zelfcontrolerapport; dossier met voorblad, inhoudsopgave en versie-archief",[73,6537,6538],{},"Elektrisch dossier als één pdf: installatiefiche, eendraadschema, plannen met titelblok, legende en handtekeningen, genummerd en met versies; in het Frans, Nederlands of Engels",[55,6540,6541,6543,6546],{},[73,6542,5135],{},[73,6544,6545],{},"Organisaties, uitnodiging per e-mail, projectrollen, live synchronisatie",[73,6547,6548],{},"Organisatie met uitnodigingscode, gedeelde werven, taken en foto’s",[12,6550,6551,6552,702,6554,702,6557,702,6561,6565],{},"Bronnen PlanElec: ",[30,6553,6274],{"href":4449},[30,6555,6556],{"href":2457},"Wat controleert de zelfcontrole?",[30,6558,6560],{"href":6559},"\u002Fhelp\u002Fstudio-activiteit-assistent","Activiteit en assistent in de studio",[30,6562,6564],{"href":6563},"\u002Fhelp\u002Fplanelec-offline-gebruiken","PlanElec offline gebruiken",". Bronnen Amperio: de pagina’s in de inleiding, geraadpleegd op 12, 19 en 26 oktober en op 2 november 2026.",[41,6567,6569],{"id":6568},"waar-is-amperio-sterker","Waar is Amperio sterker?",[1450,6571,6572,6578,6584,6590,6596,6602],{},[1453,6573,6574,6577],{},[15,6575,6576],{},"Werfopvolging in dezelfde app."," Taken dicteer of typ je, met deeltaken, foto’s en spraaknotities; voor- en nafoto’s blijven per werf gekoppeld en werven staan per klant. PlanElec heeft geen taken en geen voor\u002Fna-foto’s; daarvoor gebruik je naast PlanElec een ander hulpmiddel.",[1453,6579,6580,6583],{},[15,6581,6582],{},"Raadplegen en noteren zonder netwerk."," Volgens Amperio blijven de laatst geopende werven offline raadpleegbaar, schema en plan inbegrepen, en maak je zonder netwerk taken, foto’s en spraakmemo’s die later synchroniseren. Foto’s en notities zonder verbinding biedt PlanElec niet.",[1453,6585,6586,6589],{},[15,6587,6588],{},"Een bestaand eendraadschema overnemen."," Amperio bouwt verliesstroomschakelaars, automaten en kringen opnieuw op uit een foto of pdf van een schema. PlanElec herkent grondplannen en kastfoto’s, geen eendraadschema’s; het schema plan je in PlanElec opnieuw.",[1453,6591,6592,6595],{},[15,6593,6594],{},"Bordweergave en etiketten."," Amperio bouwt het verdeelbord op vanuit het schema, in 3D of plat, en drukt de etiketten op ware grootte af op A4, met een deurlegende en stroken voor labelprinters. Een etikettenblad biedt PlanElec niet.",[1453,6597,6598,6601],{},[15,6599,6600],{},"De gsm als werkinstrument."," Amperio zet de telefoon uitdrukkelijk in voor taken, foto’s en het raadplegen van het schema bij de klant. PlanElec werkt ook op gsm, maar plannen doe je het best op een groter scherm.",[1453,6603,6604,6607],{},[15,6605,6606],{},"Studenten."," Amperio geeft studenten op aanvraag gratis toegang met een schooladres.",[41,6609,6611],{"id":6610},"waar-is-planelec-sterker","Waar is PlanElec sterker?",[1450,6613,6614,6620,6629,6638,6648,6656,6662,6668],{},[1453,6615,6616,6619],{},[15,6617,6618],{},"Vier talen, ook Duits."," Interface, dictaat en documenten bestaan in het Nederlands, Frans, Duits en Engels. Voor installateurs in Oost-België en voor Duitstalige opdrachtgevers maakt dat het verschil.",[1453,6621,6622,6625,6626,6628],{},[15,6623,6624],{},"Een zelfcontrole die je kunt nalezen."," PlanElec kent 56 controles; 29 verwijzen naar een concreet AREI-artikel, de 27 andere zijn als praktijkregel of plausibiliteitscontrole aangeduid. Welke regels getoetst worden en wat bewust niet, staat openbaar in ",[30,6627,6556],{"href":2457},". Regelstand: AREI Boek 1, versie 07, van toepassing sinds 1 november 2026; de rapporten vermelden de versie die op de datum van het rapport geldt.",[1453,6630,6631,6634,6635,39],{},[15,6632,6633],{},"Een assistent in het hele project."," De PlanElec-assistent voert meer dan 100 planningsopdrachten uit: grondplan, ruimtes, toestellen, stroomkringen, schakelketens, kabels, verdeelkast, domotica\u002FKNX, PV-strings en lichtsturing. Na elke wijziging kijkt de zelfcontrole het volledige project na, elke wijziging draai je in één stap terug en risicovolle acties voert hij pas uit na ",[15,6636,6637],{},"Bevestigen en uitvoeren",[1453,6639,6640,6643,6644,39],{},[15,6641,6642],{},"De verdeelkast hoort erbij."," Beveiligingen plaats je op DIN-rails, de kast exporteer je als pdf en kastfoto’s worden een controleerbaar voorstel van DIN-modules. ",[30,6645,6647],{"href":6646},"\u002Fhelp\u002Fverdeelkast-herkennen-van-foto","Verdeelkast herkennen van foto",[1453,6649,6650,6653,6654,39],{},[15,6651,6652],{},"Grondplan uit pdf of scan."," Muren, ruimtes met oppervlakte, deuren, ramen, ondersteunde toestelsymbolen en schaal komen uit een pdf, scan of afbeelding, ook uit een Trikker-pdf. Zonder bevestigde schaal blokkeert de overname. ",[30,6655,3382],{"href":3381},[1453,6657,6658,6661],{},[15,6659,6660],{},"Schema en plan offline bewerken (pilot)."," Een geopend project bewerk je zonder verbinding verder in grondplan, eendraadschema en verdeelkast; bij het opnieuw verbinden synchroniseert PlanElec en botsende wijzigingen beslis je zelf.",[1453,6663,6664,6667],{},[15,6665,6666],{},"Dossier met versies."," Je bundelt documenten met voorblad, inhoudsopgave, paginanummers en je logo. Versies komen in een privéarchief met een intrekbare QR-link die herkomst en bestandsintegriteit aantoont.",[1453,6669,6670,6673],{},[15,6671,6672],{},"Drie bewerkplaatsen in Pro."," Pro bevat drie plaatsen om te bewerken, leestoegang is gratis en onbeperkt.",[41,6675,6677],{"id":6676},"dicteren-in-amperio-en-planelec-wat-is-het-verschil","Dicteren in Amperio en PlanElec: wat is het verschil?",[12,6679,6680],{},"Beide programma’s laten je de installatie inspreken in plaats van tikken. Bij Amperio staat de stem centraal: je beschrijft al wandelend de kamer, één zin maakt een kamer aan of voegt een verliesstroomschakelaar toe, en de AI stelt de wijziging voor die jij bevestigt. In PlanElec dicteer je in de AI-assistent van de studio, en die opdracht werkt in het volledige projectmodel.",[49,6682,6683,6694],{},[52,6684,6685],{},[55,6686,6687,6690,6692],{},[58,6688,6689],{},"Kenmerk",[58,6691,1337],{},[58,6693,6320],{},[68,6695,6696,6707,6717,6728,6739,6750,6761,6772],{},[55,6697,6698,6701,6704],{},[73,6699,6700],{},"Waar je dicteert",[73,6702,6703],{},"In de AI-assistent; de opdracht werkt in grondplan, kringen, kabels en verdeelkast",[73,6705,6706],{},"In schema, plan en taken",[55,6708,6709,6711,6714],{},[73,6710,5149],{},[73,6712,6713],{},"NL, FR, DE en EN, in de taal van de interface; herkenning met Belgische vaktermen",[73,6715,6716],{},"Taal van het dictaat niet apart vermeld; interface FR, NL en EN",[55,6718,6719,6722,6725],{},[73,6720,6721],{},"Vóór de wijziging",[73,6723,6724],{},"Herkende tekst verschijnt in het invoerveld; je verbetert hem en verzendt zelf",[73,6726,6727],{},"„De AI stelt voor, u beslist”; je bevestigt de aanpassing",[55,6729,6730,6733,6736],{},[73,6731,6732],{},"Na de wijziging",[73,6734,6735],{},"AREI-zelfcontrole van het hele project, één stap ongedaan maken, vermelding in de projectgeschiedenis",[73,6737,6738],{},"AREI-controles tijdens het invoeren, met geciteerde regel",[55,6740,6741,6744,6747],{},[73,6742,6743],{},"Plan en schema",[73,6745,6746],{},"Grondplan, kringen en eendraadschema komen uit hetzelfde model",[73,6748,6749],{},"Plan en schema worden samen bijgewerkt",[55,6751,6752,6755,6758],{},[73,6753,6754],{},"Exacte plaatsing",[73,6756,6757],{},"Ruimte, muur, hoogte en afstand in één zin; posities worden berekend",[73,6759,6760],{},"Niet vermeld",[55,6762,6763,6766,6769],{},[73,6764,6765],{},"Zonder netwerk",[73,6767,6768],{},"Dicteren vraagt een verbinding",[73,6770,6771],{},"Spraakmemo’s offline; schema en plan bewerken vraagt netwerk",[55,6773,6774,6777,6780],{},[73,6775,6776],{},"Opnameduur",[73,6778,6779],{},"Maximaal 2 minuten per opname",[73,6781,6760],{},[12,6783,6784,6785,6788,6789,6792,6793,6796],{},"Zo ziet dat in PlanElec uit: je kiest ",[15,6786,6787],{},"Dicteren"," in de invoerbalk van de assistent en zegt bijvoorbeeld „Gang, noordmuur: drie stopcontacten, 30 cm boven de afgewerkte vloer, de eerste op 45 cm van de linkerhoek”. Na ",[15,6790,6791],{},"Opname gebruiken"," staat de herkende tekst in het invoerveld; een verkeerd verstaan woord verbeter je voor je verzendt, want gedicteerde tekst gaat nooit automatisch weg. De assistent berekent de posities op de muur en plaatst de stopcontacten. Vraag je hem ook om ze op een nieuwe stopcontactkring te zetten, dan staat die kring meteen in het eendraadschema, want grondplan en schema delen één model. Daarna kijkt de zelfcontrole het hele project na en meldt nieuwe bevindingen; met ",[15,6794,6795],{},"Ongedaan maken"," op de actiekaart draai je de stap terug.",[12,6798,6799,6800],{},"Voor Oost-België telt vooral de taal: je dicteert in het Duits, de herkenning kent vaktermen als Eindrahtschema of Fehlerstromschalter, en het dossier maak je in het Duits. De omzetting verbruikt het AI-tegoed; PlanElec bewaart opname en herkende tekst niet, alleen de opdracht die je verzendt. ",[30,6801,6802],{"href":6559},"Hoe dicteer ik een opdracht?",[41,6804,6806],{"id":6805},"hoe-stap-je-over-van-amperio-naar-planelec","Hoe stap je over van Amperio naar PlanElec?",[12,6808,6809],{},"Een rechtstreekse import van Amperio-projecten bestaat niet. Het grondplan en de verdeelkast neem je wel over; stroomkringen en schema plan je in PlanElec opnieuw.",[1602,6811,6812,6818,6832,6849,6863,6874],{},[1453,6813,6814,6817],{},[15,6815,6816],{},"Lopende werven afwerken."," Werk lopende dossiers af in Amperio en bewaar per werf het pdf-dossier. Amperio vermeldt dat je gegevens bij opzegging exporteerbaar blijven.",[1453,6819,6820,6823,6824,6827,6828,6831],{},[15,6821,6822],{},"Planningsaanpak kiezen."," Bij een nieuw project kies je ",[15,6825,6826],{},"Plannen vanuit de plattegrond"," (aanbevolen) of ",[15,6829,6830],{},"Eerst het eendraadschema tekenen"," als je gewoon bent vanuit het schema te werken. Je wisselt later in de projectinstellingen zonder gegevens te verliezen.",[1453,6833,6834,6837,6838,6840,6841,6844,6845,6848],{},[15,6835,6836],{},"Grondplan laten herkennen."," Zet het situatieschema of het architectenplan als pdf of afbeelding bij ",[15,6839,3903],{}," en start ",[15,6842,6843],{},"Plattegrond herkennen",". Controleer schaal, ruimtes en oppervlaktes en neem het resultaat met ",[15,6846,6847],{},"Overnemen"," over in een lege verdieping. Herkende symbolen zijn stopcontact, dubbel stopcontact, spatwaterdicht stopcontact, schakelaar en lichtpunt; wat PlanElec niet eenduidig toewijst, wordt gemarkeerd en niet overgenomen.",[1453,6850,6851,6854,6855,6858,6859,6862],{},[15,6852,6853],{},"Verdeelkast van foto."," Open in de kasteditor ",[15,6856,6857],{},"Kastfoto’s",", laad je foto’s op en start ",[15,6860,6861],{},"Modules herkennen",". Het gecontroleerde voorstel importeer je in een lege verdeelkast; bedrading toont een foto niet.",[1453,6864,6865,6868,6869,6873],{},[15,6866,6867],{},"Kringen en schema plannen."," Dicteer per ruimte in de assistent of laat de ",[30,6870,6872],{"href":6871},"\u002Fhelp\u002Fautomatische-planning","automatische planning"," schakelketens, kringtoewijzing, kabels en fasen voorstellen. Houd de Amperio-pdf ernaast als referentie.",[1453,6875,6876,6879,6880,39],{},[15,6877,6878],{},"Zelfcontrole lezen en exporteren."," Los de open punten op en exporteer eendraadschema, situatieplan en dossier. ",[30,6881,6882],{"href":2451},"Documenten exporteren",[41,6884,6886],{"id":6885},"veelgestelde-vragen-over-amperio-en-planelec","Veelgestelde vragen over Amperio en PlanElec",[1396,6888,6890],{"id":6889},"wat-kost-amperio-per-jaar-en-wat-kost-planelec","Wat kost Amperio per jaar en wat kost PlanElec?",[12,6892,6893],{},"Amperio Pro kost € 374,40 per jaar of € 39 per maand exclusief btw aan lanceringstarief; je begint met één gratis werf gedurende 7 dagen. Voor je eigen installatie biedt Amperio Particulier aan: één werf voor eenmalig € 29 inclusief btw, zes maanden bewerkbaar. Bij PlanElec kost Pro sinds 2 november 2026 € 240 per jaar of € 24 per maand (de prijs blijft zolang het abonnement zonder onderbreking loopt) met drie bewerkplaatsen; dat zijn eindprijzen, want PlanElec rekent geen btw aan (vrijstellingsregeling kleine ondernemingen). Pro uitproberen blijft € 0 met afgeschermde gegevens in de exports, en Eenmalig gebruik kost € 12 per pand. Wie zich vóór 2 november heeft geregistreerd, gebruikt Pro tot en met 1 december 2026 gratis. Bronnen: de prijspagina’s van beide aanbieders, stand van 2 november 2026.",[1396,6895,6897],{"id":6896},"kan-ik-in-planelec-dicteren","Kan ik in PlanElec dicteren?",[12,6899,6900,6901,6903],{},"Ja. In de AI-assistent kies je ",[15,6902,6787],{}," en spreek je in het Nederlands, Frans, Duits of Engels. Je ziet de herkende tekst, verbetert hem en verzendt hem zelf; daarna voert de assistent de opdracht uit en controleert de zelfcontrole het project. Een opname duurt maximaal twee minuten.",[1396,6905,6907],{"id":6906},"werken-amperio-en-planelec-offline-op-de-werf","Werken Amperio en PlanElec offline op de werf?",[12,6909,6910,6911,39],{},"Allebei gedeeltelijk, op een andere manier. Amperio laat de laatst geopende werven raadplegen en taken, foto’s en spraakmemo’s zonder netwerk maken; schema en plan bewerken vraagt een verbinding. Bij PlanElec bewerk je een vooraf online geopend project zonder verbinding verder in grondplan, schema en verdeelkast; exporteren, uploaden, dicteren en de AI-functies wachten tot je weer online bent. Offline werken loopt bij PlanElec als pilot. ",[30,6912,6564],{"href":6563},[1396,6914,6916],{"id":6915},"kan-ik-een-amperio-schema-in-planelec-importeren","Kan ik een Amperio-schema in PlanElec importeren?",[12,6918,6919,6920,6922],{},"Niet als schema. PlanElec leest geen eendraadschema’s uit pdf of foto in. Het grondplan haal je uit een pdf of afbeelding met ",[15,6921,6843],{},", de verdeelkast uit kastfoto’s; stroomkringen en schema plan je daarna met de assistent of de automatische planning.",[1396,6924,6926],{"id":6925},"kan-ik-met-mijn-team-werken-en-wat-kost-dat","Kan ik met mijn team werken en wat kost dat?",[12,6928,6929],{},"Ja, in beide. Bij Amperio sluiten collega’s aan met een uitnodigingscode, zonder individuele betaling; of het aantal gebruikers de prijs beïnvloedt, vermeldt Amperio niet. Bij PlanElec nodig je collega’s per e-mail uit met een projectrol; Pro bevat drie bewerkplaatsen, elke extra plaats kost € 5 per maand, en wie alleen leest, heeft geen plaats nodig. Pro uitproberen geldt voor één persoon zonder organisatie.",[1396,6931,6933],{"id":6932},"werken-amperio-en-planelec-op-gsm-en-tablet","Werken Amperio en PlanElec op gsm en tablet?",[12,6935,6936],{},"Ja, allebei in de browser. Amperio richt de gsm vooral op taken, foto’s en raadplegen. PlanElec past de werkruimte aan op tablet en gsm en is als web-app te installeren; uitgebreide plannen teken je het best op laptop of desktop.",[1396,6938,6940],{"id":6939},"vervangt-de-arei-controle-van-amperio-of-planelec-de-keuring","Vervangt de AREI-controle van Amperio of PlanElec de keuring?",[12,6942,6943],{},"Nee, ze hebben elk een eigen rol. Beide controleren de gegevens die je invoert en helpen je de keuring voor te bereiden. De PlanElec-zelfcontrole toont welke ondersteunde regels beoordeeld zijn en waar gegevens ontbreken; metingen en omstandigheden ter plaatse vallen erbuiten. De officiële keuring doet het erkend organisme.",[41,6945,6947],{"id":6946},"verder-lezen","Verder lezen",[1450,6949,6950,6955,6960,6964,6969],{},[1453,6951,6952,6954],{},[30,6953,6560],{"href":6559}," – dicteren, bevestigen en ongedaan maken",[1453,6956,6957],{},[30,6958,6959],{"href":4371},"De PlanElec-assistent voor elektrische planning",[1453,6961,6962],{},[30,6963,3382],{"href":3381},[1453,6965,6966],{},[30,6967,6968],{"href":4891},"Trikker-alternatief PlanElec: functies en prijzen vergeleken",[1453,6970,6971],{},[30,6972,6974],{"href":6973},"\u002Fblog\u002Fbeste-eendraadschema-software-2026","Eendraadschema-software in België: 10 tools vergeleken",[41,6976,6978],{"id":6977},"vergelijk-op-je-eigen-project","Vergelijk op je eigen project",[12,6980,6981,6982,6986,6987,39],{},"Het eerlijkste oordeel komt van een echt project. Bekijk het ",[30,6983,6985],{"href":6984},"\u002Fexamples\u002Fdossiers\u002Fplanelec-pilot-dossier-nl.pdf","Nederlandse pilotdossier als PDF",", open daarna een eigen project, laat een plan herkennen, dicteer één ruimte in de assistent en lees de zelfcontrole. Met Pro uitproberen kost dat niets. ",[30,6988,6990],{"href":6989},"\u002F","Gratis beginnen met PlanElec",{"title":1467,"searchDepth":1468,"depth":1468,"links":6992},[6993,6994,6995,6996,6997,6998,6999,7008,7009],{"id":6282,"depth":1468,"text":6283},{"id":6372,"depth":1468,"text":6373},{"id":6568,"depth":1468,"text":6569},{"id":6610,"depth":1468,"text":6611},{"id":6676,"depth":1468,"text":6677},{"id":6805,"depth":1468,"text":6806},{"id":6885,"depth":1468,"text":6886,"children":7000},[7001,7002,7003,7004,7005,7006,7007],{"id":6889,"depth":1486,"text":6890},{"id":6896,"depth":1486,"text":6897},{"id":6906,"depth":1486,"text":6907},{"id":6915,"depth":1486,"text":6916},{"id":6925,"depth":1486,"text":6926},{"id":6932,"depth":1486,"text":6933},{"id":6939,"depth":1486,"text":6940},{"id":6946,"depth":1468,"text":6947},{"id":6977,"depth":1468,"text":6978},"2026-10-12","Amperio vs. PlanElec voor België: dicteren, AI-assistent, AREI-controle, verdeelkast, offline werken, werfopvolging en kosten over 12 maanden vergeleken.","2026-11-02",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-vs-amperio-editorial.jpg","\u002Fblog\u002Famperio-alternatief.nl","11 min",{"title":6176,"description":7011},"amperio-alternatief","blog\u002Famperio-alternatief.nl",[6320,1337,7021,3273,3274,7022,6221,3275,7023],"Amperio-alternatief","dicteren","elektrische planning België","-900FhvNsMoxurwJeGoBF-gZViQNwX52G1icB5vFDW4","\u002Fblog\u002Famperio-alternatief",{"id":7027,"title":7028,"articleId":7029,"body":7030,"category":1493,"date":7010,"description":7666,"extension":1496,"image":7043,"lastUpdated":7010,"locale":1497,"meta":7667,"navigation":1499,"ogImage":7668,"path":7669,"publishDate":7010,"readTime":7670,"refreshInterval":1486,"seo":7671,"seoTitle":7672,"slug":7673,"stem":7674,"tags":7675,"__hash__":7680,"kind":1515,"href":7681},"blog\u002Fblog\u002Feendraadschema-dicteren.nl.md","Eendraadschema dicteren: hoe spreek je een elektrische installatie in met PlanElec?","voice-dictation",{"type":9,"value":7031,"toc":7647},[7032,7038,7044,7048,7051,7114,7120,7124,7127,7229,7234,7238,7245,7248,7252,7255,7308,7311,7315,7318,7351,7356,7360,7363,7366,7371,7375,7385,7390,7393,7397,7403,7406,7422,7426,7432,7435,7442,7446,7449,7509,7516,7520,7523,7572,7576,7614,7618,7622,7628,7632,7635,7639],[12,7033,7034,7037],{},[15,7035,7036],{},"Ja, in PlanElec dicteer je je elektrische installatie: in de studio tik je in de AI-assistent op de microfoon, spreek je Nederlands, Frans, Duits of Engels, en de herkende tekst komt in het invoerveld."," De spraakherkenning kent Belgische vaktermen zoals AREI, XVB, eendraadschema of differentieel. Je leest de tekst, verbetert hem indien nodig en verstuurt hem pas daarna – er vertrekt niets automatisch. Daarna voert de PlanElec-assistent de opdracht uit in het projectmodel: toestellen in het grondplan, kringen en beveiligingen in de topologie, modules in de verdeelkast. Het eendraadschema volgt het kringmodel; je tekent het niet opnieuw. Na elke wijziging controleert de server het hele project met de AREI\u002FRGIE-zelfcontrole, en elke wijziging maak je in één stap ongedaan. Je hebt een PlanElec-account nodig, een browser met microfoontoegang en een internetverbinding.",[12,7039,7040],{},[22,7041],{"alt":7042,"src":7043},"Een elektricien dicteert een planningsnotitie in een smartphone.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-voice-dictation-editorial.webp",[41,7045,7047],{"id":7046},"hoe-dicteer-ik-een-eendraadschema-in-planelec","Hoe dicteer ik een eendraadschema in PlanElec?",[12,7049,7050],{},"„Eendraadschema dicteren” betekent in PlanElec: je beschrijft de installatie – ruimte, toestellen, maten, kringen, beveiliging – en PlanElec bouwt daaruit het model waaruit eendraadschema, situatieschema en verdeelkast ontstaan. Je dicteert dus geen lijnen, maar inhoud. Zo ga je te werk:",[1602,7052,7053,7075,7084,7094,7104],{},[1453,7054,7055,7058,7059,7062,7063,7066,7067,7070,7071,7074],{},[15,7056,7057],{},"Open het project in de studio"," en toon het paneel ",[15,7060,7061],{},"Activiteit & assistent",": via de botknop in de kopbalk (tooltip ",[15,7064,7065],{},"PlanElec-assistent openen","), met ",[15,7068,7069],{},"⌘J"," op de Mac of ",[15,7072,7073],{},"Ctrl+J"," op Windows en Linux. Op smalle schermen opent het paneel als sheet.",[1453,7076,7077,7080,7081,7083],{},[15,7078,7079],{},"Zet de cursor en tik op Dicteren."," De microfoonknop ",[15,7082,6787],{}," staat rechts in de invoerbalk. De eerste keer vraagt je browser toestemming voor de microfoon.",[1453,7085,7086,7089,7090,7093],{},[15,7087,7088],{},"Spreek."," Niveaubalkjes en een tijdsaanduiding tonen ",[15,7091,7092],{},"Opname loopt",". Eén opname duurt maximaal twee minuten; tien seconden voor het einde kondigt de tijdsaanduiding de automatische stop aan.",[1453,7095,7096,7099,7100,7103],{},[15,7097,7098],{},"Kies Opname gebruiken"," (vinkje) of druk op Enter. Na een kort ",[15,7101,7102],{},"Wordt uitgeschreven …"," staat de herkende tekst op de plaats van de cursor.",[1453,7105,7106,7109,7110,7113],{},[15,7107,7108],{},"Kijk de tekst na en verstuur."," Verbeter een verkeerd verstaan woord meteen in het veld en verstuur met ",[15,7111,7112],{},"Bericht verzenden"," of Enter.",[12,7115,7116,7119],{},[15,7117,7118],{},"Opname verwerpen"," (X) of Esc stopt de opname zonder tekst. Tijdens de opname is het invoerveld alleen-lezen en is verzenden geblokkeerd – een halve zin vertrekt dus nooit per ongeluk. Je kunt meerdere keren na elkaar in hetzelfde bericht dicteren en ertussen typen; elke nieuwe tekst komt op de cursorpositie.",[41,7121,7123],{"id":7122},"welke-zinnen-begrijpt-de-assistent-en-wat-gebeurt-ermee","Welke zinnen begrijpt de assistent – en wat gebeurt ermee?",[12,7125,7126],{},"Dicteren is een invoerweg voor de PlanElec-assistent. Alles wat je hem kunt typen, kun je hem ook zeggen. De tabel toont typische zinnen tijdens een opmeting en het resultaat in het project.",[49,7128,7129,7142],{},[52,7130,7131],{},[55,7132,7133,7136,7139],{},[58,7134,7135],{},"Ingesproken zin",[58,7137,7138],{},"Wat de assistent doet",[58,7140,7141],{},"Waar je het ziet",[68,7143,7144,7155,7165,7176,7187,7198,7209,7219],{},[55,7145,7146,7149,7152],{},[73,7147,7148],{},"„Gang, noordmuur: drie stopcontacten, 30 centimeter boven de afgewerkte vloer, eerste op 45 centimeter van de linkerhoek, asafstand 71 millimeter.”",[73,7150,7151],{},"Plaatst één raam met drie stopcontacten; de assen liggen op 0,45 m, 0,521 m en 0,592 m.",[73,7153,7154],{},"Grondplan en situatieschema",[55,7156,7157,7160,7163],{},[73,7158,7159],{},"„Voeg in de keuken een eigen kring voor het fornuis toe met beveiliging.”",[73,7161,7162],{},"Maakt kring en beveiligingstoestel aan in de topologie.",[73,7164,3764],{},[55,7166,7167,7170,7173],{},[73,7168,7169],{},"„Toon me het automatische installatievoorstel voor de hoofdverdeler.”",[73,7171,7172],{},"Berekent verbruikers, kringen, beveiligingen en plaatsing in de verdeler – zonder iets te wijzigen.",[73,7174,7175],{},"Antwoord in het gesprek",[55,7177,7178,7181,7184],{},[73,7179,7180],{},"„Neem dat voorstel over.”",[73,7182,7183],{},"Neemt precies het nagekeken voorstel over; bestaande kringen en plaatsingen blijven.",[73,7185,7186],{},"Eendraadschema en verdeelkast",[55,7188,7189,7192,7195],{},[73,7190,7191],{},"„Schakel de spots in de gang met de twee schakelaars aan de deuren.”",[73,7193,7194],{},"Vormt de schakelketen tussen schakelaars en armaturen.",[73,7196,7197],{},"Grondplan en eendraadschema",[55,7199,7200,7203,7206],{},[73,7201,7202],{},"„Leg voor alle kabels zonder tracé een kabelweg aan.”",[73,7204,7205],{},"Legt ontbrekende kabelwegen langs de muren; bestaande tracés blijven ongemoeid.",[73,7207,7208],{},"Situatieschema",[55,7210,7211,7214,7217],{},[73,7212,7213],{},"„Verdeel de kringen over de verdeelkast en balanceer de fasen.”",[73,7215,7216],{},"Plaatst modules op DIN-rails en verdeelt de belasting over de fasen.",[73,7218,1721],{},[55,7220,7221,7224,7227],{},[73,7222,7223],{},"„Welke controlebevindingen staan nog open?”",[73,7225,7226],{},"Leest de bevindingen van de zelfcontrole en legt oorzaak en betrokken elementen uit.",[73,7228,7175],{},[12,7230,7231,7232,39],{},"Maten mag je zeggen zoals je ze op de werf denkt: centimeters en millimeters zet de assistent zelf om naar meter, de exacte positie berekent PlanElec uit de muurgeometrie. „Noordmuur” is de muur die vanuit de ruimte naar het noorden kijkt; zonder ingestelde noordrichting geldt de bovenkant van het plan als noorden, en het resultaat meldt dat. Hoe hoek, afstand en hoogte precies worden gelezen, staat in het helpartikel ",[30,7233,6560],{"href":6559},[41,7235,7237],{"id":7236},"in-welke-talen-kan-ik-dicteren","In welke talen kan ik dicteren?",[12,7239,7240,7241,7244],{},"In alle vier de talen van PlanElec: ",[15,7242,7243],{},"Nederlands, Frans, Duits en Engels."," De spraakherkenning werkt in de taal van je interface. Wil je in het Frans dicteren, dan zet je de interface op Frans; antwoorden, actiekaarten en statusmeldingen verschijnen dan ook in het Frans.",[12,7246,7247],{},"Dat is handig in tweetalige teams en op werven in Brussel of aan de taalgrens: elke collega dicteert in zijn eigen taal in hetzelfde project. Ook Duitstalige installateurs uit Oost-België krijgen interface, assistent en vakwoordenschat volledig in het Duits, met Belgische begrippen zoals AREI.",[41,7249,7251],{"id":7250},"herkent-het-dictaat-vaktermen-zoals-xvb-differentieel-of-eendraadschema","Herkent het dictaat vaktermen zoals XVB, differentieel of eendraadschema?",[12,7253,7254],{},"Ja. PlanElec geeft bij elke opname een vakwoordenschat mee aan de spraakherkenning, die deze termen bij voorkeur herkent – tot 50 begrippen per taal. Afkortingen en kabeltypes gelden in alle talen, de vakwoorden worden per taal apart bijgehouden:",[49,7256,7257,7267],{},[52,7258,7259],{},[55,7260,7261,7264],{},[58,7262,7263],{},"Taal",[58,7265,7266],{},"Uittreksel uit de vakwoordenschat",[68,7268,7269,7277,7284,7292,7300],{},[55,7270,7271,7274],{},[73,7272,7273],{},"Alle talen",[73,7275,7276],{},"AREI, RGIE, XVB, EXVB, XFVB, VOB, VTMB, KNX, PV, MPPT, EAN, TT, TN-S",[55,7278,7279,7281],{},[73,7280,4742],{},[73,7282,7283],{},"eendraadschema, situatieschema, differentieel, automaat, zekeringkast, verdeelkast, dubbel stopcontact, lichtpunt, wisselschakelaar, kruisschakelaar, aftakdoos, aardingslus, equipotentiaal, laadpaal, omvormer, keuring, afgewerkte vloer, asafstand",[55,7285,7286,7289],{},[73,7287,7288],{},"Frans",[73,7290,7291],{},"schéma unifilaire, plan de position, différentiel, disjoncteur, tableau électrique, point lumineux, va-et-vient, boîte de dérivation, borne de recharge, onduleur, contrôle RGIE, sol fini, entraxe",[55,7293,7294,7297],{},[73,7295,7296],{},"Duits",[73,7298,7299],{},"Eindrahtschema, Fehlerstromschalter, Leitungsschutzschalter, Unterverteilung, Wechselschalter, Kreuzschalter, Abzweigdose, Potentialausgleich, Wallbox, Wechselrichter, Fertigfußboden, Achsabstand",[55,7301,7302,7305],{},[73,7303,7304],{},"Engels",[73,7306,7307],{},"single-line diagram, situation plan, residual current, circuit breaker, distribution board, two-way switch, intermediate switch, junction box, charging station, inverter, finished floor, centre distance",[12,7309,7310],{},"Een vakwoordenschat verhoogt de trefkans, maar garandeert ze niet. Daarom staat de tekst eerst in het veld: schrijft de herkenning „XVB” als „X V B”, dan verbeter je dat met twee toetsaanslagen.",[41,7312,7314],{"id":7313},"wat-gebeurt-er-voor-mijn-project-verandert","Wat gebeurt er voor mijn project verandert?",[12,7316,7317],{},"Tussen je zin en de wijziging in het project liggen tot drie controlepunten:",[1602,7319,7320,7329,7335],{},[1453,7321,7322,7325,7326,7328],{},[15,7323,7324],{},"De tekst."," Gedicteerde tekst wordt nooit automatisch verstuurd. Pas ",[15,7327,7112],{}," maakt van de tekst een opdracht.",[1453,7330,7331,7334],{},[15,7332,7333],{},"Het voorbeeld op vraag."," Twijfel je over een maat, zeg dan „toon me dat eerst als voorbeeld”: voor een rij dozen op een muur geeft de assistent een leesbare samenvatting zonder iets te plaatsen. Voor kringen berekent het automatische installatievoorstel per verdeler verbruikers, kringen, beveiligingen en plaatsing, eveneens zonder wijziging. Later wordt precies dat voorstel overgenomen; is het project intussen gewijzigd, dan vervalt het en moet het opnieuw berekend worden.",[1453,7336,7337,7340,7341,7344,7345,1628,7347,7350],{},[15,7338,7339],{},"De bevestiging bij grote impact."," Eenduidige, omkeerbare wijzigingen – een stopcontact plaatsen, een kring aanmaken, een kabelweg leggen – lopen na het versturen meteen. Acties met meer impact, zoals ruimtes verwijderen, kringen verwijderen, muren wijzigen of netvorm en aarding aanpassen, legt de assistent je voor met ",[15,7342,7343],{},"Bevestiging vereist",". Je kiest ",[15,7346,6637],{},[15,7348,7349],{},"Weigeren en uitvoering annuleren",". De bevestiging geldt voor precies die actie met precies die waarden.",[12,7352,7353,7354,39],{},"Klopt een gegeven niet – de positie valt in een deur, er zit al een doos op die plek, de hoogte ligt boven de plafondhoogte – dan plaatst de assistent niets en zegt hij waarom. Er wordt niets stilzwijgend verschoven. En elke uitgevoerde wijziging maak je op de actiekaart ongedaan met ",[15,7355,6795],{},[41,7357,7359],{"id":7358},"kan-ik-hele-projectwijzigingen-in-één-zin-dicteren","Kan ik hele projectwijzigingen in één zin dicteren?",[12,7361,7362],{},"Ja. De PlanElec-assistent werkt met meer dan 100 planningsopdrachten in het volledige projectmodel: grondplan, ruimtes, toestellen, kringen, schakelketens, kabels, verdeelkast, automatisering en KNX, PV-strings en lichtsturing. Naast losse opdrachten roept hij de automatische planning van PlanElec aan – standaarduitrusting van de ruimtes, kringtoewijzing, kabelwegen voor alle open kabels, invulling van de verdeelkast en fasebalancering.",[12,7364,7365],{},"Een zin als „Maak een standaardinstallatie voor dit project, leg daarna alle kabelwegen en verdeel de kringen over de verdeelkast” zet daarom een reeks acties in gang. Elke uitgevoerde actie verschijnt als eigen kaart met status en opdrachtgever en blijft afzonderlijk omkeerbaar. Voor de assistent iets wijzigt, leest hij projectstructuur, controlebevindingen en toestellencatalogus – hij plant met de stand die je op dat moment voor je hebt. Hij werkt met jouw projectrechten: wie alleen mag lezen, wijzigt ook via dicteren niets. Projecten verwijderen hoort niet bij zijn opdrachten.",[12,7367,7368,7369,39],{},"Wat de assistent verder kan, hoe hij vakvragen met bronnen beantwoordt en hoe het team zijn wijzigingen ziet, lees je in ",[30,7370,4372],{"href":4371},[41,7372,7374],{"id":7373},"wordt-na-het-dictaat-de-arei-zelfcontrole-uitgevoerd","Wordt na het dictaat de AREI-zelfcontrole uitgevoerd?",[12,7376,7377,7378,933,7381,7384],{},"Ja – na elke wijziging die de assistent uitvoert op basis van je gedicteerde opdracht. De server controleert dan het hele project met dezelfde AREI\u002FRGIE-zelfcontrole die ook het controleverslag gebruikt. Een actie geldt pas als afgerond wanneer die controle gelopen heeft. Op de actiekaart zie je ",[15,7379,7380],{},"Uitgevoerd en gecontroleerd",[15,7382,7383],{},"Controle: … opgelost, … nieuw, … resterend",". Zo weet je nog op de werf of de nieuwe kring een beveiliging of een doorsnede raakt – niet pas bij de export.",[12,7386,7387,7388],{},"Het dictaat zelf wijzigt niets: zolang de tekst alleen in het invoerveld staat, blijft het project ongewijzigd. Welke regels de zelfcontrole dekt en waar haar grenzen liggen, staat in de gids ",[30,7389,2458],{"href":2457},[12,7391,7392],{},"De zelfcontrole beoordeelt de ondersteunde regels op basis van jouw invoer. Metingen en omstandigheden ter plaatse horen bij de gelijkvormigheidscontrole voor de ingebruikname, die een erkend organisme ter plaatse uitvoert; ze omvat administratieve en visuele controles, controles door beproeving en controles door meting (AREI, afdeling 6.4.1). Geen meting, geen keuring: de controle blijft bij het erkende keuringsorganisme.",[41,7394,7396],{"id":7395},"werkt-dicteren-op-tablet-en-gsm-op-de-werf","Werkt dicteren op tablet en gsm op de werf?",[12,7398,7399,7400,7402],{},"Ja, zolang de browser microfoonopnames ondersteunt. PlanElec draait in de browser zonder installatie en is te installeren als web-app; op tablet en gsm past de interface zich aan. De knop ",[15,7401,6787],{}," verschijnt alleen als de browser kan opnemen. Opnames uit Safari en uit Chromium- of Firefox-browsers zet PlanElec al op het toestel om naar hetzelfde formaat, zodat ze allemaal gelijk verwerkt worden. Voor de microfoon vraagt PlanElec echo- en ruisonderdrukking en automatische niveauregeling aan.",[12,7404,7405],{},"Twee dingen plan je mee op de werf:",[1450,7407,7408,7416],{},[1453,7409,7410,7413,7414,39],{},[15,7411,7412],{},"Internetverbinding."," De opname gaat via de PlanElec-server naar de herkenning. Zonder verbinding geen dictaat. Geopende projecten kun je als pilot offline verder bewerken; dicteren en de assistent gebruik je weer zodra je online bent. Details in de gids ",[30,7415,6564],{"href":6563},[1453,7417,7418,7421],{},[15,7419,7420],{},"Toestemming voor de microfoon."," Is de microfoon geblokkeerd, dan verschijnt er een melding onder het invoerveld. Sta de toegang dan toe in de site-instellingen van je browser.",[41,7423,7425],{"id":7424},"waar-gaan-mijn-spraakgegevens-naartoe","Waar gaan mijn spraakgegevens naartoe?",[12,7427,7428,7429,7431],{},"Na ",[15,7430,6791],{}," stuurt je browser de opname naar PlanElec. PlanElec stuurt ze via de AI-dienst OpenRouter door naar het spraakherkenningsmodel Scribe van ElevenLabs en krijgt alleen de herkende tekst terug. De aanvraag vereist aanbieders die de gegevens niet bewaren en er niet mee trainen.",[12,7433,7434],{},"PlanElec bewaart noch de opname, noch de tekst ervan. Bewaard wordt pas de opdracht die je verstuurt – als deel van het gespreksverloop, zodat jij en je team wijzigingen kunnen nagaan. In het werkingslogboek staat per opname één regel met taal, duur en status, zonder inhoud, gebruikers- of project-ID. Verworpen opnames verlaten je toestel niet.",[12,7436,7437,7438,7441],{},"De transcriptie telt mee voor je ",[15,7439,7440],{},"AI-tegoed",", zoals alle AI-functies. Volstaat het niet voor een opname, dan meldt een tekst onder het invoerveld dat. Tijdens de Early Access is PlanElec, inclusief de assistent, gratis.",[41,7443,7445],{"id":7444},"van-opmeting-tot-pdf-dossier-hoe-ziet-een-verloop-eruit","Van opmeting tot pdf-dossier: hoe ziet een verloop eruit?",[12,7447,7448],{},"Zo gebruikt een elektrotechnisch bedrijf het dictaat bij een renovatie, van het eerste bezoek tot de documenten voor de keuring:",[1602,7450,7451,7460,7469,7475,7486,7492,7498],{},[1453,7452,7453,7456,7457,39],{},[15,7454,7455],{},"Grondplan voorbereiden (kantoor)."," Het plan van de architect importeren als PDF, DXF of afbeelding, het AI-voorstel met muren, ruimtes en openingen nakijken en overnemen. Hoe dat gaat, lees je in ",[30,7458,7459],{"href":5184},"Grondplan herkennen uit PDF, scan of Trikker-export",[1453,7461,7462,7465,7466,7468],{},[15,7463,7464],{},"Project openen op de werf."," Op tablet of gsm, met verbinding, en ",[15,7467,7061],{}," tonen.",[1453,7470,7471,7474],{},[15,7472,7473],{},"Ruimte per ruimte dicteren."," Per ruimte één zin met muur, afstand, hoogte en toestel. Tekst nakijken, versturen.",[1453,7476,7477,2725,7480,7482,7483,7485],{},[15,7478,7479],{},"Actiekaarten controleren.",[15,7481,7380],{}," en het controleresultaat lezen. Klopt iets niet: ",[15,7484,6795],{}," en opnieuw dicteren.",[1453,7487,7488,7491],{},[15,7489,7490],{},"Kringen vastleggen."," „Toon me het automatische installatievoorstel voor de hoofdverdeler”, voorstel nakijken, laten overnemen. Het eendraadschema volgt het kringmodel.",[1453,7493,7494,7497],{},[15,7495,7496],{},"Afwerking op kantoor."," Open bevindingen wegwerken, ontbrekende gegevens zoals kabellengtes aanvullen, verdeelkast invullen – via dictaat, toetsenbord of muis.",[1453,7499,7500,7503,7504,7506,7507,39],{},[15,7501,7502],{},"Documenten exporteren."," In de modus ",[15,7505,956],{}," eendraadschema, situatieschema en zelfcontroleverslag als pdf met jouw installateursgegevens maken, desgewenst als samengesteld dossier. Meer daarover in ",[30,7508,6882],{"href":2451},[12,7510,7511,7512,39],{},"De eendraadschema’s en situatieplannen stelt de verantwoordelijke van de uitvoering van het werk op; bij conformiteit ondertekenen hij en het erkend organisme ze (AREI, onderafdeling 3.1.2.1 a). PlanElec levert je de basis, de verantwoordelijkheid voor de inhoud blijft bij jou. Hoe een eendraadschema inhoudelijk opgebouwd moet zijn, lees je in ",[30,7513,7515],{"href":7514},"\u002Fblog\u002Feendraadschema-maken","Eendraadschema maken",[41,7517,7519],{"id":7518},"dicteren-typen-of-tekenen-wat-past-wanneer","Dicteren, typen of tekenen: wat past wanneer?",[12,7521,7522],{},"Alle drie de wegen schrijven in hetzelfde projectmodel. Je wisselt naargelang de situatie.",[49,7524,7525,7538],{},[52,7526,7527],{},[55,7528,7529,7532,7535],{},[58,7530,7531],{},"Invoerweg",[58,7533,7534],{},"Sterk bij",[58,7536,7537],{},"Let op",[68,7539,7540,7550,7561],{},[55,7541,7542,7544,7547],{},[73,7543,6787],{},[73,7545,7546],{},"Opmeting, handen vol, langere beschrijvingen met maten in één zin",[73,7548,7549],{},"Verbinding en microfoon nodig, maximaal twee minuten per opname",[55,7551,7552,7555,7558],{},[73,7553,7554],{},"Typen",[73,7556,7557],{},"Kantoor, gerichte correcties, opdrachten met benamingen die je exact wilt schrijven",[73,7559,7560],{},"Zelfde assistent, zelfde controle, zelfde stappen ongedaan maken",[55,7562,7563,7566,7569],{},[73,7564,7565],{},"Tekenen",[73,7567,7568],{},"Symbolen rechtstreeks plaatsen, positie fijn bijstellen, visuele controle",[73,7570,7571],{},"Bij geopende projecten ook offline, als pilot",[41,7573,7575],{"id":7574},"wat-zijn-de-grenzen-van-het-dictaat","Wat zijn de grenzen van het dictaat?",[1450,7577,7578,7584,7590,7596,7602,7608],{},[1453,7579,7580,7583],{},[15,7581,7582],{},"Tekst na de stop, niet live."," De herkenning verwerkt de volledige opname; de tekst verschijnt na het gebruiken van de opname.",[1453,7585,7586,7589],{},[15,7587,7588],{},"Twee minuten per opname."," Langere opdrachten dicteer je in meerdere opnames in hetzelfde bericht.",[1453,7591,7592,7595],{},[15,7593,7594],{},"Taal van de interface."," Meerdere talen door elkaar in één opname zijn niet voorzien.",[1453,7597,7598,7601],{},[15,7599,7600],{},"Veel opnames op korte tijd"," remt PlanElec af; na een ogenblik gaat het verder.",[1453,7603,7604,7607],{},[15,7605,7606],{},"Rijen dozen op een muur:"," maximaal vijf dozen in één raam met een vaste asafstand van 71 mm; drukknoppen plaatst de assistent afzonderlijk.",[1453,7609,7610,7613],{},[15,7611,7612],{},"Geen vervanging van meting en keuring."," De zelfcontrole beoordeelt de ondersteunde regels op basis van de ingevoerde gegevens; de gelijkvormigheidscontrole doet het erkend organisme ter plaatse (AREI, afdeling 6.4.1).",[41,7615,7617],{"id":7616},"veelgestelde-vragen-over-dicteren-in-planelec","Veelgestelde vragen over dicteren in PlanElec",[1396,7619,7621],{"id":7620},"wordt-gedicteerde-tekst-automatisch-verstuurd","Wordt gedicteerde tekst automatisch verstuurd?",[12,7623,7624,7625,7627],{},"Nee. De tekst verschijnt in het invoerveld, en jij beslist met ",[15,7626,7112],{}," of en wanneer hij een opdracht wordt.",[1396,7629,7631],{"id":7630},"heb-ik-een-app-nodig","Heb ik een app nodig?",[12,7633,7634],{},"Nee. Dicteren zit in de assistent in de browser. Je kunt PlanElec als web-app installeren, maar dat hoeft niet.",[1396,7636,7638],{"id":7637},"hoe-ziet-dat-eruit-op-de-startpagina","Hoe ziet dat eruit op de startpagina?",[12,7640,7641,7642,7646],{},"De ",[30,7643,7645],{"href":7644},"\u002F#demo","dicteerdemo op de startpagina"," toont het verloop ruimte kiezen, dicteren, nakijken, overnemen aan de hand van een nagebootst voorbeeld; de pagina neemt daarbij geen audio op. In de studio dicteer je daarna in je eigen project.",{"title":1467,"searchDepth":1468,"depth":1468,"links":7648},[7649,7650,7651,7652,7653,7654,7655,7656,7657,7658,7659,7660,7661],{"id":7046,"depth":1468,"text":7047},{"id":7122,"depth":1468,"text":7123},{"id":7236,"depth":1468,"text":7237},{"id":7250,"depth":1468,"text":7251},{"id":7313,"depth":1468,"text":7314},{"id":7358,"depth":1468,"text":7359},{"id":7373,"depth":1468,"text":7374},{"id":7395,"depth":1468,"text":7396},{"id":7424,"depth":1468,"text":7425},{"id":7444,"depth":1468,"text":7445},{"id":7518,"depth":1468,"text":7519},{"id":7574,"depth":1468,"text":7575},{"id":7616,"depth":1468,"text":7617,"children":7662},[7663,7664,7665],{"id":7620,"depth":1486,"text":7621},{"id":7630,"depth":1486,"text":7631},{"id":7637,"depth":1486,"text":7638},"In de PlanElec-studio dicteer je toestellen, kringen en maten aan de AI-assistent in het Nederlands, Frans, Duits of Engels. Je kijkt de herkende tekst na voor je hem verstuurt, elke wijziging doorloopt de AREI-zelfcontrole en maak je in één stap ongedaan.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-voice-dictation-editorial.jpg","\u002Fblog\u002Feendraadschema-dicteren.nl","10 min",{"title":7028,"description":7666},"Eendraadschema dicteren: je installatie inspreken","eendraadschema-dicteren","blog\u002Feendraadschema-dicteren.nl",[6787,7676,3764,7677,4589,7678,3275,7679],"Spraakinvoer","PlanElec-assistent","Werf","Opmeting","HUWGqcJx8vfCjvmSKW23uKRKZ3MjSo4bjeq74MO7Qps","\u002Fblog\u002Feendraadschema-dicteren",{"id":7683,"title":7684,"body":7685,"category":4028,"description":8253,"extension":1496,"guideId":8254,"image":8255,"locale":1497,"meta":8256,"navigation":1499,"order":8257,"path":8258,"publishedAt":7010,"readTime":3262,"seo":8259,"seoTitle":6564,"slug":8260,"stem":8261,"tags":8262,"updatedAt":7010,"__hash__":8268,"kind":2491,"href":6563,"date":7010},"help\u002Fhelp\u002Foffline-work.nl.md","PlanElec offline gebruiken: projecten zonder verbinding verder bewerken",{"type":9,"value":7686,"toc":8241},[7687,7698,7702,7706,7764,7767,7770,7775,7779,7782,7892,7895,7900,7904,7907,7916,7919,7924,7928,7931,7961,7966,7971,7975,7981,7999,8006,8011,8015,8086,8089,8093,8097,8166,8171,8175,8178,8181,8186,8190,8216,8218],[12,7688,7689,7690,7693,7694,7697],{},"Een project dat je online in de studio hebt geopend, maakt PlanElec automatisch klaar om zonder verbinding verder te werken. Zodra de statusweergave ",[15,7691,7692],{},"Offline klaar"," toont, bewerk je grondplan, eendraadschema en verdeelkast ook zonder netwerk. Je wijzigingen blijven op het toestel en worden bij het opnieuw verbinden met de server gesynchroniseerd; spreken ze een wijziging uit een andere sessie tegen, dan beslis je zelf. Documenten exporteren, projectstukken en foto’s uploaden, de AI-assistent en de AI-herkenning gebruik je zodra je weer online bent. Offline werken loopt als ",[15,7695,7696],{},"pilot",": de functie staat aan op planelec.be, de beproeving op de werf en op tablets loopt nog. Test de werkwijze daarom één keer vóór een belangrijke afspraak.",[12,7699,7700],{},[30,7701],{"id":3401},[41,7703,7705],{"id":7704},"wat-heb-ik-nodig-om-offline-te-werken","Wat heb ik nodig om offline te werken?",[49,7707,7708,7717],{},[52,7709,7710],{},[55,7711,7712,7714],{},[58,7713,1548],{},[58,7715,7716],{},"Waarom",[68,7718,7719,7727,7735,7743,7751],{},[55,7720,7721,7724],{},[73,7722,7723],{},"Project één keer online in de studio openen",[73,7725,7726],{},"De voorbereiding start alleen voor het geopende project en alleen met verbinding. Een project dat je nooit hebt geopend, bestaat offline niet.",[55,7728,7729,7732],{},[73,7730,7731],{},"Geldige aanmelding",[73,7733,7734],{},"Een lokale kopie ontstaat alleen uit een bevestigde sessie. Ontbreekt die, dan staat er „Niet klaar: Geldige sessie vereist”.",[55,7736,7737,7740],{},[73,7738,7739],{},"Live-sync ingeschakeld in de omgeving",[73,7741,7742],{},"De offline voorbereiding steunt op live-sync. Op planelec.be staat die aan; een schakelaar voor jou is er niet.",[55,7744,7745,7748],{},[73,7746,7747],{},"Recente browser met offlinecache",[73,7749,7750],{},"Zonder service worker meldt PlanElec „Niet klaar: Browser ondersteunt de offlinecache niet”.",[55,7752,7753,7756],{},[73,7754,7755],{},"Vrije opslag en een geschikte verbinding",[73,7757,7758,7759,7763],{},"Plattegrondafbeeldingen laadt PlanElec alleen met minstens 200 MB reserve en niet via mobiele data of databesparing (zie ",[30,7760,7762],{"href":7761},"#limits","Grenzen",").",[12,7765,7766],{},"Een organisatie heb je niet nodig. Live-sync synchroniseert ook je eigen sessies op meerdere toestellen.",[12,7768,7769],{},"Een knop „offline beschikbaar maken” is er niet. PlanElec bereidt het project op rustige momenten op de achtergrond voor, controleert de stand elke 30 seconden opnieuw en haalt na een onderbreking zelf in.",[12,7771,7772],{},[30,7773],{"id":7774},"status",[41,7776,7778],{"id":7777},"hoe-zie-ik-dat-een-project-offline-klaar-is","Hoe zie ik dat een project offline klaar is?",[12,7780,7781],{},"Rechtsonder in de statusbalk staat een rond statussymbool. De tooltip toont opslagstatus en offline status; een klik opent de details met opslagstatus, offline beschikbaarheid en verbinding.",[49,7783,7784,7795],{},[52,7785,7786],{},[55,7787,7788,7791,7793],{},[58,7789,7790],{},"Weergave",[58,7792,752],{},[58,7794,755],{},[68,7796,7797,7809,7820,7831,7842,7856,7867,7881],{},[55,7798,7799,7803,7806],{},[73,7800,7801],{},[15,7802,7692],{},[73,7804,7805],{},"Projectmodel en alle plattegrondafbeeldingen staan gecontroleerd op dit toestel.",[73,7807,7808],{},"Niets. Je kunt offline gaan.",[55,7810,7811,7814,7817],{},[73,7812,7813],{},"„Model offline beschikbaar · 2 afbeeldingen ontbreken”",[73,7815,7816],{},"Je kunt offline werken, maar de genoemde plattegrondafbeeldingen ontbreken. Eronder staat de reden.",[73,7818,7819],{},"Reden oplossen (opslag, wifi) of zonder die afbeeldingen werken.",[55,7821,7822,7825,7828],{},[73,7823,7824],{},"„Niet klaar: Wordt voorbereid …”",[73,7826,7827],{},"De voorbereiding loopt nog.",[73,7829,7830],{},"Project geopend en online laten.",[55,7832,7833,7836,7839],{},[73,7834,7835],{},"„Niet klaar: Lokale projectstand nog niet beschikbaar”",[73,7837,7838],{},"De lokale projectkopie is nog niet duurzaam bewaard.",[73,7840,7841],{},"Wachten; blijft de melding staan, de pagina online herladen.",[55,7843,7844,7847,7850],{},[73,7845,7846],{},"„Niet klaar: App nog niet offline beschikbaar”",[73,7848,7849],{},"De app zelf staat nog niet volledig op het toestel.",[73,7851,7852,7853,7855],{},"Online blijven tot ",[15,7854,7692],{}," verschijnt.",[55,7857,7858,7861,7864],{},[73,7859,7860],{},"„Niet klaar: Lokaal opslaan mislukt”",[73,7862,7863],{},"De browser kon de lokale kopie niet opslaan.",[73,7865,7866],{},"Vrije opslag nakijken; PlanElec probeert het zelf opnieuw.",[55,7868,7869,7872,7875],{},[73,7870,7871],{},"„Niet klaar: Live-sync uitgeschakeld”",[73,7873,7874],{},"Live-sync staat in deze omgeving uit. Het gewone opslaan op de server loopt gewoon door.",[73,7876,7877,7878,39],{},"Online werken; let op ",[15,7879,7880],{},"Opgeslagen",[55,7882,7883,7886,7889],{},[73,7884,7885],{},"„Er is een nieuwe appversie beschikbaar. Herlaad de app om deze offline beschikbaar te maken.”",[73,7887,7888],{},"Er is een nieuwere PlanElec-versie actief.",[73,7890,7891],{},"Online herladen; daarna start de voorbereiding opnieuw.",[12,7893,7894],{},"„Offline klaar” is de laatst gecontroleerde stand. De browser mag lokale gegevens bij plaatsgebrek zelf wissen; PlanElec merkt dat bij de volgende controle en meldt het.",[12,7896,7897],{},[30,7898],{"id":7899},"offline-scope",[41,7901,7903],{"id":7902},"wat-kan-ik-offline-bewerken","Wat kan ik offline bewerken?",[12,7905,7906],{},"Offline bewerk je alles wat in het projectmodel staat: muren, ruimtes, toestellen en kabelwegen in het grondplan, stroomkringen in het eendraadschema en de indeling van de verdeelkast, inclusief montage-instructies bij toestellen. Ongedaan maken en opnieuw uitvoeren werken zoals gewoonlijk.",[12,7908,7909,7910,1628,7912,7915],{},"Zonder verbinding toont het statussymbool ",[15,7911,6521],{},[15,7913,7914],{},"Lokaal opgeslagen",", en de details vullen aan met „Lokaal offline bewerken. Wijzigingen blijven op dit toestel; toegang en synchronisatie worden bij het herstellen van de verbinding gecontroleerd.” PlanElec telt de openstaande wijzigingen mee, bijvoorbeeld „3 wijzigingen in afwachting sinds 10:42”.",[12,7917,7918],{},"Herlaad je de pagina zonder verbinding, dan opent PlanElec het voorbereide project uit de lokale kopie. Je wijzigingen gaan daarbij niet verloren.",[12,7920,7921],{},[30,7922],{"id":7923},"reconnect",[41,7925,7927],{"id":7926},"wat-gebeurt-er-als-de-verbinding-terugkomt","Wat gebeurt er als de verbinding terugkomt?",[12,7929,7930],{},"PlanElec verstuurt de openstaande wijzigingen zelf zodra de browser weer online is, wanneer je terugkeert naar het tabblad en daarna elke 30 seconden zolang er iets openstaat. Je hoeft niets te starten.",[1602,7932,7933,7947,7950],{},[1453,7934,7935,7936,1628,7938,7940,7941,7944,7945,39],{},"Het statussymbool gaat van ",[15,7937,6521],{},[15,7939,7914],{}," via ",[15,7942,7943],{},"Opslaan..."," naar ",[15,7946,7880],{},[1453,7948,7949],{},"Wijzigingen die anderen intussen aan andere objecten hebben gemaakt, voegt PlanElec samen met de jouwe. Beide blijven bewaard.",[1453,7951,7952,7953,7956,7957,7960],{},"Vóór de synchronisatie controleert de server aanmelding en toegang. Is je sessie verlopen, dan verschijnt ",[15,7954,7955],{},"Sessie verlopen","; kies ",[15,7958,7959],{},"Opnieuw aanmelden",". Heeft iemand je bewerkingsrecht ingetrokken, dan meldt PlanElec „Je hebt geen bewerkingsrechten meer voor dit project.”",[12,7962,7963,7964,7855],{},"Mislukt een poging, dan wacht PlanElec telkens wat langer, hoogstens vijf minuten, en probeert opnieuw. Laat het tabblad open tot ",[15,7965,7880],{},[12,7967,7968],{},[30,7969],{"id":7970},"conflicts",[41,7972,7974],{"id":7973},"wat-als-mijn-offline-wijzigingen-botsen-met-die-van-anderen","Wat als mijn offline wijzigingen botsen met die van anderen?",[12,7976,7977,7978,39],{},"Heeft iemand hetzelfde object gewijzigd als jij, bijvoorbeeld dezelfde naam, dan voegt PlanElec niet stilzwijgend samen. Je ziet ",[15,7979,7980],{},"Wijzigingen konden niet worden samengevoegd",[1602,7982,7983,7990,7996],{},[1453,7984,7985,7986,7989],{},"Kies ",[15,7987,7988],{},"Lokale reservekopie downloaden",". Je krijgt een JSON-bestand met je lokale projectstand.",[1453,7991,7985,7992,7995],{},[15,7993,7994],{},"Serverversie laden"," en bevestig. De lokale wijzigingen van deze sessie worden vervangen door de gezamenlijk opgeslagen versie; andere tabbladen behouden hun lokale wijzigingen.",[1453,7997,7998],{},"Voer de wijzigingen die je wilt behouden opnieuw in op de actuele stand.",[12,8000,8001,8002,39],{},"De reservekopie bevat geen afbeeldingen, en PlanElec biedt geen import van dit bestand. Bewaar het en contacteer de support als je inhoud eruit moet herstellen. De overige opslag- en sync-meldingen lees je in ",[30,8003,8005],{"href":8004},"\u002Fhelp\u002Fveelvoorkomende-problemen-oplossen#sync","Veelvoorkomende problemen oplossen",[12,8007,8008],{},[30,8009],{"id":8010},"online-only",[41,8012,8014],{"id":8013},"wat-doe-ik-pas-weer-online","Wat doe ik pas weer online?",[49,8016,8017,8027],{},[52,8018,8019],{},[55,8020,8021,8024],{},[58,8022,8023],{},"Taak",[58,8025,8026],{},"Waarom online",[68,8028,8029,8041,8052,8060,8070,8078],{},[55,8030,8031,8038],{},[73,8032,8033,8034,8037],{},"Documenten exporteren, ",[15,8035,8036],{},"Afgifteversie maken",", archiveren",[73,8039,8040],{},"Export en archief horen niet bij het offline werken; de afgifteversie controleert en verzegelt de server.",[55,8042,8043,8046],{},[73,8044,8045],{},"Projectstukken en foto’s uploaden",[73,8047,8048,8049,8051],{},"Bestanden staan in de ",[15,8050,3903],{}," op de server. Een uploadwachtrij is er niet.",[55,8053,8054,8057],{},[73,8055,8056],{},"Grondplan herkennen met AI, verdeelkast herkennen van een foto",[73,8058,8059],{},"De herkenning draait op de server.",[55,8061,8062,8067],{},[73,8063,8064,8065],{},"AI-assistent in het paneel ",[15,8066,7061],{},[73,8068,8069],{},"Het taalmodel draait op de server.",[55,8071,8072,8075],{},[73,8073,8074],{},"PV-opbrengstprognose berekenen",[73,8076,8077],{},"De simulatie draait op de server.",[55,8079,8080,8083],{},[73,8081,8082],{},"Leden uitnodigen",[73,8084,8085],{},"Uitnodigingen beheert de server.",[12,8087,8088],{},"Plan deze stappen voor op kantoor of een pauze met netwerk. Je offline bewerkte stand is dan al gesynchroniseerd, en je exporteert uit het actuele project.",[12,8090,8091],{},[30,8092],{"id":2353},[41,8094,8096],{"id":8095},"welke-grenzen-heeft-offline-werken","Welke grenzen heeft offline werken?",[49,8098,8099,8108],{},[52,8100,8101],{},[55,8102,8103,8105],{},[58,8104,846],{},[58,8106,8107],{},"Wat er gebeurt",[68,8109,8110,8118,8126,8134,8142,8150,8158],{},[55,8111,8112,8115],{},[73,8113,8114],{},"Opslag",[73,8116,8117],{},"Plattegrondafbeeldingen laadt PlanElec alleen als er daarna minstens 200 MB vrij blijft. Anders: „Minder dan 200 MB vrij of opslagruimte onbekend”, alleen het model is offline klaar.",[55,8119,8120,8123],{},[73,8121,8122],{},"Mobiele data en databesparing",[73,8124,8125],{},"Bij databesparing, een verbinding met datalimiet of mobiele data en bij 2G pauzeren de downloads („Databesparing ingeschakeld”, „Downloads gepauzeerd bij een verbinding met datalimiet”). Sommige browsers melden het verbindingstype niet; daar laadt PlanElec ook via mobiele data.",[55,8127,8128,8131],{},[73,8129,8130],{},"Ontbrekende afbeeldingen",[73,8132,8133],{},"Ontbrekende plattegrondafbeeldingen telt de weergave mee. Het model blijft bewerkbaar, alleen de achtergrond ontbreekt offline. De actieve verdieping laadt PlanElec eerst.",[55,8135,8136,8139],{},[73,8137,8138],{},"Extra bestanden",[73,8140,8141],{},"3D-meubelmodellen en interactiegeluiden zijn offline niet gegarandeerd.",[55,8143,8144,8147],{},[73,8145,8146],{},"Toestel en browser",[73,8148,8149],{},"De lokale kopie geldt alleen voor deze browser op dit toestel.",[55,8151,8152,8155],{},[73,8153,8154],{},"Project sluiten, afmelden",[73,8156,8157],{},"Beide heffen de offline voorbereiding op. Open het project opnieuw online voor je offline gaat.",[55,8159,8160,8163],{},[73,8161,8162],{},"Rechten",[73,8164,8165],{},"Offline controleert PlanElec geen rechtenwijzigingen. Pas bij het opnieuw verbinden telt de actuele toegang.",[12,8167,8168],{},[30,8169],{"id":8170},"install",[41,8172,8174],{"id":8173},"moet-ik-planelec-als-web-app-installeren","Moet ik PlanElec als web-app installeren?",[12,8176,8177],{},"Nee. Offline werken gaat ook in een gewoon browsertabblad. Als web-app krijg je een eigen venster zonder browserbalk en een pictogram op je startscherm. Installeer PlanElec via de installatiefunctie van je browser, op telefoon en tablet meestal via „Toevoegen aan startscherm”. De app start in het projectoverzicht. Start je ze opnieuw, dan gebruikt ze het open venster in plaats van een tweede te openen.",[12,8179,8180],{},"De installatie alleen maakt geen project offline klaar. Doorslaggevend is de statusweergave in het geopende project. Op telefoon en tablet houdt de studio het scherm aan zolang hij zichtbaar is.",[12,8182,8183],{},[30,8184],{"id":8185},"checklist",[41,8187,8189],{"id":8188},"hoe-bereid-ik-een-werfbezoek-voor","Hoe bereid ik een werfbezoek voor?",[1602,8191,8192,8195,8201,8204,8207,8213],{},[1453,8193,8194],{},"Open het project op wifi in de studio, met eerst de verdieping die je ter plaatse nodig hebt.",[1453,8196,8197,8198,8200],{},"Wacht tot de statusweergave ",[15,8199,7692],{}," toont. Staat er dat afbeeldingen ontbreken, kijk dan de reden eronder na.",[1453,8202,8203],{},"Laat het project open. Sluit het niet en meld je niet af.",[1453,8205,8206],{},"Werk offline in één venster per project.",[1453,8208,8209,8210,8212],{},"Terug op het netwerk: wacht op ",[15,8211,7880],{}," voor je het tabblad sluit.",[1453,8214,8215],{},"Exporteer documenten en upload foto’s pas daarna.",[41,8217,6947],{"id":6946},[1450,8219,8220,8225,8229,8235],{},[1453,8221,8222],{},[30,8223,8005],{"href":8224},"\u002Fhelp\u002Fveelvoorkomende-problemen-oplossen",[1453,8226,8227],{},[30,8228,6882],{"href":2451},[1453,8230,8231],{},[30,8232,8234],{"href":8233},"\u002Fhelp\u002Fdocumenten-archiveren-en-verifieren","Documenten archiveren en verifiëren",[1453,8236,8237],{},[30,8238,8240],{"href":8239},"\u002Fhelp\u002Faan-de-slag","Aan de slag",{"title":1467,"searchDepth":1468,"depth":1468,"links":8242},[8243,8244,8245,8246,8247,8248,8249,8250,8251,8252],{"id":7704,"depth":1468,"text":7705},{"id":7777,"depth":1468,"text":7778},{"id":7902,"depth":1468,"text":7903},{"id":7926,"depth":1468,"text":7927},{"id":7973,"depth":1468,"text":7974},{"id":8013,"depth":1468,"text":8014},{"id":8095,"depth":1468,"text":8096},{"id":8173,"depth":1468,"text":8174},{"id":8188,"depth":1468,"text":8189},{"id":6946,"depth":1468,"text":6947},"PlanElec maakt geopende projecten automatisch klaar om zonder verbinding verder te werken. Voorwaarden, statusweergave, synchronisatie bij het opnieuw verbinden, conflicten, grenzen en tips voor je werfbezoek. Pilotfase.","offline-work","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Foffline-work-nl.webp",{},18,"\u002Fhelp\u002Foffline-work.nl",{"title":7684,"description":8253},"planelec-offline-gebruiken","help\u002Foffline-work.nl",[8263,8264,8265,8266,8267],"offline","live-sync","web-app","synchronisatie","werf","37vNEOGZtDGmRgOcLwBJYyFzwu60IF5ozAlZcizCyZc",{"id":8270,"title":8271,"body":8272,"category":9340,"description":9341,"extension":1496,"guideId":9342,"image":9343,"locale":1497,"meta":9344,"navigation":1499,"order":9345,"path":9346,"publishedAt":9347,"readTime":4035,"seo":9348,"seoTitle":4037,"slug":9349,"stem":9350,"tags":9351,"updatedAt":9347,"__hash__":9355,"kind":2491,"href":9356,"date":9347},"help\u002Fhelp\u002Fview-3d-lighting-study.nl.md","Hoe gebruik ik de 3D-weergave en de lichtstudie?",{"type":9,"value":8273,"toc":9327},[8274,8287,8291,8295,8298,8402,8407,8412,8416,8438,8447,8452,8456,8533,8536,8560,8593,8600,8605,8609,8612,8653,8658,8663,8667,8719,8732,8760,8766,8769,8774,8778,8781,8835,8838,8884,8887,8892,8896,8910,8941,8947,8952,8956,8970,9029,9032,9096,9099,9106,9110,9114,9184,9187,9192,9196,9294,9299,9301],[12,8275,8276,8277,8279,8280,933,8283,8286],{},"De 3D-weergave toont dezelfde projectstand als de 2D-plattegrond: verdiepingen, muren, openingen, trappen, meubels, toestellen en geplande kabelroutes. Elke gebruiker kan ze openen, zonder extra activering. Je hebt wel een browser met WebGL nodig; ontbreekt die, dan toont PlanElec een melding en werk je zonder beperking verder in 2D. In de modus ",[15,8278,1182],{}," plan je armaturen, vergelijk je de scènes ",[15,8281,8282],{},"Dagelijks",[15,8284,8285],{},"Avond",", stel je datum en tijd in voor zonnestand en schaduw en lees je een heatmap met oriëntatiewaarden in lux. De lichtstudie is een hulpmiddel voor planning en klantgesprek: ze rekent alleen het directe kunstlicht zonder reflecties en vervangt geen lichtplanning volgens een norm.",[12,8288,8289],{},[30,8290],{"id":3401},[41,8292,8294],{"id":8293},"wat-heb-ik-nodig-voor-de-3d-weergave","Wat heb ik nodig voor de 3D-weergave?",[12,8296,8297],{},"Je hebt geen speciaal abonnement of rol nodig. Of en hoe 3D verschijnt, hangt af van je browser en van de breedte van je werkvlak.",[49,8299,8300,8310],{},[52,8301,8302],{},[55,8303,8304,8307],{},[58,8305,8306],{},"Situatie",[58,8308,8309],{},"Wat PlanElec toont",[68,8311,8312,8324,8335,8349,8367,8380,8394],{},[55,8313,8314,8317],{},[73,8315,8316],{},"Browser met WebGL",[73,8318,8319,8320,8323],{},"De 3D-weergave laadt met de melding ",[15,8321,8322],{},"3D-weergave wordt geladen …"," en toont daarna het model.",[55,8325,8326,8329],{},[73,8327,8328],{},"Browser zonder WebGL",[73,8330,8331,8334],{},[15,8332,8333],{},"3D-weergave niet beschikbaar",". Het situatieschema blijft volledig bruikbaar in 2D.",[55,8336,8337,8340],{},[73,8338,8339],{},"Grafische verbinding door de browser gereset",[73,8341,8342,8345,8346,39],{},[15,8343,8344],{},"Weergave onderbroken"," met de knop ",[15,8347,8348],{},"Opnieuw laden",[55,8350,8351,8354],{},[73,8352,8353],{},"Breed desktopscherm",[73,8355,8356,8357,702,8360,933,8363,8366],{},"Weergaveschakelaar met ",[15,8358,8359],{},"2D",[15,8361,8362],{},"3D",[15,8364,8365],{},"2D + 3D"," (gedeelde weergave vanaf 1600 pixels breedte van het studiowerkvlak).",[55,8368,8369,8372],{},[73,8370,8371],{},"Smallere vensters en tablets",[73,8373,8374,8375,1628,8377,8379],{},"Alleen ",[15,8376,8359],{},[15,8378,8362],{},", telkens één weergave. Een gekozen gedeelde weergave schakelt automatisch naar één weergave.",[55,8381,8382,8385],{},[73,8383,8384],{},"Gsm in staande stand",[73,8386,8387,8388,8390,8391,8393],{},"Schakelaar ",[15,8389,8359],{}," \u002F ",[15,8392,8362],{}," in de kopbalk naast de projectnaam.",[55,8395,8396,8399],{},[73,8397,8398],{},"Rol kijker",[73,8400,8401],{},"Je ziet 3D en de lichtstudie, maar kunt scènenaam, omgevingshelderheid en armatuurwaarden niet wijzigen.",[12,8403,8404,8405,39],{},"Zolang de melding in plaats van het model staat, zijn werktuigen die alleen in 3D werken en de beeldexport van de lichtscène niet beschikbaar. Schakel dan met de weergaveschakelaar naar ",[15,8406,8359],{},[12,8408,8409],{},[30,8410],{"id":8411},"open-3d",[41,8413,8415],{"id":8414},"hoe-open-ik-de-3d-weergave","Hoe open ik de 3D-weergave?",[1602,8417,8418,8421,8435],{},[1453,8419,8420],{},"Open een project in de studio.",[1453,8422,8423,8424,8426,8427,8429,8430,8390,8432,8434],{},"Kies in de weergaveschakelaar bovenaan het werkvlak ",[15,8425,8362],{}," of, op een breed scherm, ",[15,8428,8365],{},". Op je gsm vind je ",[15,8431,8359],{},[15,8433,8362],{}," in de kopbalk.",[1453,8436,8437],{},"Het model verschijnt met de actieve verdieping. Je bent klaar wanneer muren, ruimtes en toestellen van je plattegrond ruimtelijk in beeld staan.",[12,8439,8440,8441,933,8443,8446],{},"Sommige werkmodi openen meteen in 3D: ",[15,8442,1182],{},[15,8444,8445],{},"Energie"," starten in de 3D-weergave, de andere modi in 2D. Selectie en projectstand zijn gedeeld tussen 2D en 3D. Wat je in de ene weergave selecteert, is ook in de andere geselecteerd.",[12,8448,8449],{},[30,8450],{"id":8451},"navigation",[41,8453,8455],{"id":8454},"hoe-beweeg-ik-in-de-3d-weergave","Hoe beweeg ik in de 3D-weergave?",[49,8457,8458,8468],{},[52,8459,8460],{},[55,8461,8462,8465],{},[58,8463,8464],{},"Invoer",[58,8466,8467],{},"Effect",[68,8469,8470,8478,8486,8494,8502,8509,8517,8525],{},[55,8471,8472,8475],{},[73,8473,8474],{},"Slepen met de linkermuisknop",[73,8476,8477],{},"Weergave draaien",[55,8479,8480,8483],{},[73,8481,8482],{},"Slepen met de rechter- of middelste muisknop, Shift + slepen",[73,8484,8485],{},"Weergave verschuiven",[55,8487,8488,8491],{},[73,8489,8490],{},"Scrollwiel",[73,8492,8493],{},"Zoomen",[55,8495,8496,8499],{},[73,8497,8498],{},"Pijltjestoetsen",[73,8500,8501],{},"Draaien in stappen van 5 graden",[55,8503,8504,8507],{},[73,8505,8506],{},"Plus \u002F min",[73,8508,8493],{},[55,8510,8511,8514],{},[73,8512,8513],{},"Toets 0",[73,8515,8516],{},"Weergave herstellen",[55,8518,8519,8522],{},[73,8520,8521],{},"Eén vinger",[73,8523,8524],{},"Draaien",[55,8526,8527,8530],{},[73,8528,8529],{},"Twee vingers",[73,8531,8532],{},"Zoomen (uit elkaar trekken) en tegelijk verschuiven",[12,8534,8535],{},"Linksonder in beeld vind je de camerabediening:",[1450,8537,8538,8544,8549],{},[1453,8539,8540,8543],{},[15,8541,8542],{},"Weergave inpassen"," brengt het hele model in beeld.",[1453,8545,8546,8548],{},[15,8547,8516],{}," zet het beginperspectief terug.",[1453,8550,8551,8552,8555,8556,8559],{},"Bij een selectie komen er ",[15,8553,8554],{},"Selectie tonen"," (de camera vliegt naar het gekozen object) en ",[15,8557,8558],{},"In 2D openen"," (terug naar de plattegrond met hetzelfde object in focus) bij.",[12,8561,8562,8563,702,8566,933,8569,8572,8573,933,8576,8578,8579,702,8582,933,8585,8588,8589,8592],{},"Voor meerdere bouwlagen kies je in de verdiepingsbalk of rechtsboven in beeld tussen ",[15,8564,8565],{},"Actieve verdieping",[15,8567,8568],{},"Gestapeld",[15,8570,8571],{},"Uit elkaar",". In de modi ",[15,8574,8575],{},"Meubels",[15,8577,1182],{}," wisselt een extra knop tussen ",[15,8580,8581],{},"Muren hoog",[15,8583,8584],{},"Muren in doorsnede",[15,8586,8587],{},"Muren laag",". Beide modi starten met de doorsnede, zodat je in de ruimtes kijkt. In de modus ",[15,8590,8591],{},"Elektro"," staan de muren volledig, omdat toestellen en leidingen daar op de muren zelf zitten. De muurweergave is een weergave-instelling en wijzigt je project niet.",[12,8594,8595,8596,39],{},"Hoogtes en verdiepingsposities haalt 3D uit je plattegrond. Hoe je verdiepingen op elkaar afstemt, lees je in ",[30,8597,8599],{"href":8598},"\u002Fhelp\u002Fverdiepingen-uitlijnen-en-nulpunt-gebouw","Verdiepingen uitlijnen en nulpunt van het gebouw",[12,8601,8602],{},[30,8603],{"id":8604},"furniture",[41,8606,8608],{"id":8607},"hoe-richt-ik-ruimtes-in-met-meubels","Hoe richt ik ruimtes in met meubels?",[12,8610,8611],{},"Meubels helpen je om stopcontacten, schakelaars en armaturen af te stemmen op het latere gebruik van de ruimte. Ze horen bij de plattegrond en verschijnen automatisch ook in 3D.",[1602,8613,8614,8619,8642,8645],{},[1453,8615,8616,8617,39],{},"Kies in de modusbalk ",[15,8618,8575],{},[1453,8620,8621,8622,8625,8626,8629,8630,933,8632,8635,8636,933,8639,39],{},"Open de catalogus ",[15,8623,8624],{},"Inrichting en buitenruimte",". De categorieën gaan van ",[15,8627,8628],{},"Wonen"," over ",[15,8631,368],{},[15,8633,8634],{},"Keukenapparaten"," tot ",[15,8637,8638],{},"Sanitair",[15,8640,8641],{},"Buitenruimte",[1453,8643,8644],{},"Kies een meubel en plaats het op de plattegrond.",[1453,8646,8647,8648,1628,8650,8652],{},"Schakel naar ",[15,8649,8362],{},[15,8651,8365],{},". Je bent klaar wanneer het meubel op dezelfde plek in de ruimte staat als in 2D.",[12,8654,441,8655,8657],{},[15,8656,8575],{}," kun je een meubel ook in 3D met het selectiewerktuig vastnemen en verschuiven. Een korte klik selecteert alleen; pas een echte sleepbeweging verschuift. Loslaten is één stap die je ongedaan kunt maken. De catalogus is een selectie van gangbare inrichting, geen volledige fabrikantencatalogus. Veel elektrische toestellen verschijnen in 3D als vereenvoudigde volumes, niet als getrouwe productmodellen.",[12,8659,8660],{},[30,8661],{"id":8662},"lighting-planning",[41,8664,8666],{"id":8665},"hoe-plan-ik-armaturen-in-de-modus-licht","Hoe plan ik armaturen in de modus Licht?",[1602,8668,8669,8681,8688,8713],{},[1453,8670,8616,8671,8673,8674,933,8677,8680],{},[15,8672,1182],{},". PlanElec opent de 3D-weergave met de panelen ",[15,8675,8676],{},"Lichtplanning",[15,8678,8679],{},"Lichtstudie","; de lagen voor lichtpunten en lichtvoorvertoning staan aan, kabels en maten zijn verborgen.",[1453,8682,8683,8684,8687],{},"Plaats armaturen via het toestellenpalet. Daar vind je ook het ",[15,8685,8686],{},"Spot Raster",": sleep een rechthoek of klik in de ruimte.",[1453,8689,8690,8691,8693,8694,702,8697,702,8700,702,8703,702,8706,933,8709,8712],{},"Pas in het paneel ",[15,8692,8676],{}," per ruimte ",[15,8695,8696],{},"Lichtstroom (lm)",[15,8698,8699],{},"Kleurtemperatuur (K)",[15,8701,8702],{},"Stralingshoek (°)",[15,8704,8705],{},"Kanteling (°)",[15,8707,8708],{},"Montagehoogte (m)",[15,8710,8711],{},"Groep"," aan. Gelijke armaturen in een ruimte staan gebundeld op één rij; je wijzigt ze samen of klapt de rij open.",[1453,8714,8715,8716,8718],{},"Verschuif armaturen indien nodig rechtstreeks in 3D: in de modus ",[15,8717,1182],{}," neemt het selectiewerktuig armaturen vast. Plafondarmaturen bewegen vrij in de ruimte, wandarmaturen volgen de dichtstbijzijnde muur.",[12,8720,8721,8722,8724,8725,1628,8728,8731],{},"De kolom ",[15,8723,3606],{}," toont ",[15,8726,8727],{},"Ontwerp",[15,8729,8730],{},"Gekoppeld",". Een ontwerp is een lichtpunt zonder koppeling met de elektrische planning. Zo koppel je het:",[1602,8733,8734,8744,8750],{},[1453,8735,8736,8737,8740,8741,39],{},"Open in de rij het ",[15,8738,8739],{},"Menu"," en kies ",[15,8742,8743],{},"Koppelen aan stroomkring",[1453,8745,1683,8746,8749],{},[15,8747,8748],{},"Stroomkring of bestaand lichtpunt"," het doel.",[1453,8751,8752,8753,8756,8757,8759],{},"Bevestig met ",[15,8754,8755],{},"Overnemen in elektrisch plan",". Je bent klaar wanneer de status op ",[15,8758,8730],{}," springt.",[12,8761,8762,8763,39],{},"Pas deze overname maakt een verbruiker aan of koppelt een bestaand lichtpunt. Vermogen en bedrading leidt PlanElec niet af uit de lichtvoorvertoning. Bedieningspunten en stroomkringen plan je zoals gewoonlijk, zie ",[30,8764,8765],{"href":2445},"Schakelketens, stroomkringen en kabelroutes",[12,8767,8768],{},"Nieuwe armaturen krijgen standaardwaarden voor de lichtstroom: hanglamp 800 lm, spot 400 lm, wandlamp 300 lm. Vul de waarden van de armaturen in die je echt plant, voor je de heatmap beoordeelt.",[12,8770,8771],{},[30,8772],{"id":8773},"light-preview",[41,8775,8777],{"id":8776},"hoe-werkt-de-lichtvoorvertoning-in-3d","Hoe werkt de lichtvoorvertoning in 3D?",[12,8779,8780],{},"De lichtvoorvertoning toont hoe het kunstlicht van je armaturen werkt in de ingerichte ruimte. Ze is illustratief: PlanElec vermeldt in het paneel uitdrukkelijk „geen luxberekening of verlichtingsattest”.",[1602,8782,8783,8791,8802,8821,8828],{},[1453,8784,8785,8786,8788,8789,39],{},"Open in de modus ",[15,8787,1182],{}," het paneel ",[15,8790,8679],{},[1453,8792,8793,8794,8797,8798,8801],{},"Zet in de sectie ",[15,8795,8796],{},"Voorbeeld"," de knop ",[15,8799,8800],{},"Lichtvoorvertoning"," aan. Bij het openen van een project staat hij uit.",[1453,8803,8804,8805,8808,8809,933,8811,8813,8814,6231,8817,8820],{},"Kies in de sectie ",[15,8806,8807],{},"Scène"," tussen ",[15,8810,8282],{},[15,8812,8285],{},". Per scène bewaar je een ",[15,8815,8816],{},"Scènenaam",[15,8818,8819],{},"Omgevingshelderheid"," en per armatuur of armatuurgroep aan\u002Fuit en dimniveau.",[1453,8822,8823,8824,8827],{},"Toon met ",[15,8825,8826],{},"Lichtbundels"," de stralingskegels als je richting en hoek wilt controleren.",[1453,8829,8830,8831,8834],{},"Exporteer met ",[15,8832,8833],{},"Scène als afbeelding exporteren"," een PNG van de huidige camera. Je bent klaar wanneer het beeld de scènenaam en de vermelding van de illustratieve voorvertoning bevat, zonder selectie- of hovermarkeringen.",[12,8836,8837],{},"Scènes worden per verdieping in het project bewaard en lopen mee met ongedaan maken en projectsynchronisatie. Ze wijzigen geen bedrading en geen elektrische vermogenswaarden.",[49,8839,8840,8856],{},[52,8841,8842],{},[55,8843,8844,8847,8850,8853],{},[58,8845,8846],{},"Kwaliteitsniveau",[58,8848,8849],{},"Actieve armaturen",[58,8851,8852],{},"waarvan met schaduw",[58,8854,8855],{},"Schaduwresolutie",[68,8857,8858,8870],{},[55,8859,8860,8863,8865,8867],{},[73,8861,8862],{},"Standaard",[73,8864,543],{},[73,8866,574],{},[73,8868,8869],{},"1024 px",[55,8871,8872,8877,8879,8881],{},[73,8873,8874],{},[15,8875,8876],{},"Lagere kwaliteit",[73,8878,1233],{},[73,8880,343],{},[73,8882,8883],{},"512 px",[12,8885,8886],{},"Op toestellen met aanraakbediening start de voorvertoning in lagere kwaliteit; je kunt altijd omschakelen. Extra lichtpunten boven dit budget blijven zichtbaar op het plan, maar dragen niet bij aan de verlichting in de voorvertoning. Ruimtevlakken en meubels ontvangen schaduw. Vereenvoudigde modellen en transparante planningsmuren beperken de zeggingskracht van het beeld.",[12,8888,8889],{},[30,8890],{"id":8891},"daylight",[41,8893,8895],{"id":8894},"hoe-stel-ik-zonnestand-en-schaduw-in","Hoe stel ik zonnestand en schaduw in?",[12,8897,8898,8899,8902,8903,8905,8906,8909],{},"De sectie ",[15,8900,8901],{},"Zon"," in het paneel ",[15,8904,8679],{}," heet in de interface ",[15,8907,8908],{},"Daglichtstudie · Locatie Brussel",". Ze richt in 3D een zonlicht met schaduwwerking.",[1602,8911,8912,8923,8928,8935],{},[1453,8913,8914,8915,8918,8919,8922],{},"Leg de ",[15,8916,8917],{},"Noordrichting"," vast: klik op ",[15,8920,8921],{},"Noorden instellen"," en sleep de noordpijl, of kies of het noorden boven, rechts, onder of links op het plan ligt. 0° betekent noorden bovenaan, gedraaid wordt met de klok mee. De noordrichting geldt voor het hele project.",[1453,8924,8925,8926,39],{},"Kies een ",[15,8927,5983],{},[1453,8929,8930,8931,8934],{},"Stel de ",[15,8932,8933],{},"Tijd"," in met de schuifregelaar. Die werkt in stappen van 10 minuten in de tijdzone Europa\u002FBrussel.",[1453,8936,8937,8938,39],{},"Lees onder de schuifregelaar azimut en hoogte van de zon af. Je bent klaar wanneer licht en schaduw in 3D meeschuiven met de tijd. Staat de zon onder de horizon, dan toont het paneel ",[15,8939,8940],{},"Zon onder de horizon",[12,8942,8943,8944,8946],{},"Zonlicht en schaduw zijn alleen actief in de modus ",[15,8945,1182],{},". De zonnestand wordt berekend met een astronomische benadering voor een vaste locatie in Brussel; een eigen projectlocatie is er momenteel niet. Datum en tijd onthoudt je browser per project; ze worden niet in het project bewaard en niet met anderen gedeeld. De daglichtstudie toont richting en schaduw van de zon, maar berekent geen daglichtwaarden in lux en telt niet mee in de heatmap.",[12,8948,8949],{},[30,8950],{"id":8951},"heatmap",[41,8953,8955],{"id":8954},"wat-toont-de-verlichtingsheatmap","Wat toont de verlichtingsheatmap?",[12,8957,8958,8959,8962,8963,8965,8966,1628,8968,39],{},"De heatmap rekent per ruimte de directe verlichtingssterkte van je armaturen op een werkvlak van 0,8 m. Ze verschijnt als gekleurde zone op de ",[15,8960,8961],{},"2D-plattegrond",". Omdat de modus ",[15,8964,1182],{}," in 3D start, schakel je daarvoor naar ",[15,8967,8359],{},[15,8969,8365],{},[1602,8971,8972,8985,8990,9012],{},[1453,8973,8974,8975,8977,8978,8980,8981,8984],{},"Open in het paneel ",[15,8976,8679],{}," de sectie ",[15,8979,304],{}," en zet ",[15,8982,8983],{},"Verlichtingsheatmap"," aan (standaard aan).",[1453,8986,8647,8987,8989],{},[15,8988,8359],{},". Je bent klaar wanneer de ruimtes met armaturen gekleurd zijn.",[1453,8991,8992,8993,2109,8996,8999,9000,9003,9004,9007,9008,9011],{},"Lees de tabel ",[15,8994,8995],{},"Resultaten per ruimte",[15,8997,8998],{},"Ē (lx)"," is het gemiddelde, ",[15,9001,9002],{},"Emin (lx)"," de laagste waarde, ",[15,9005,9006],{},"Emin\u002FĒ"," de gelijkmatigheid, ",[15,9009,9010],{},"Richtwaarde (lx)"," de vergelijkingswaarde.",[1453,9013,7641,9014,9016,9017,9020,9021,9024,9025,9028],{},[15,9015,3606],{}," vergelijkt het gemiddelde met de onderste richtwaarde: ",[15,9018,9019],{},"Bereikt"," vanaf de richtwaarde, ",[15,9022,9023],{},"Net eronder"," vanaf 80 %, ",[15,9026,9027],{},"Te laag"," daaronder.",[12,9030,9031],{},"De berekening houdt rekening met helderheid en dimniveau van de actieve scène. Verschuif je een armatuur, dan wordt alleen de betrokken ruimte herberekend. Per verdieping gebruikt de berekening maximaal 4.000 meetpunten.",[49,9033,9034,9044],{},[52,9035,9036],{},[55,9037,9038,9041],{},[58,9039,9040],{},"Ruimtetype",[58,9042,9043],{},"Richtwaarde in PlanElec",[68,9045,9046,9053,9060,9067,9075,9081,9089],{},[55,9047,9048,9050],{},[73,9049,320],{},[73,9051,9052],{},"100–200 lx",[55,9054,9055,9057],{},[73,9056,368],{},[73,9058,9059],{},"300–500 lx",[55,9061,9062,9064],{},[73,9063,382],{},[73,9065,9066],{},"200 lx",[55,9068,9069,9072],{},[73,9070,9071],{},"Gang",[73,9073,9074],{},"100 lx",[55,9076,9077,9079],{},[73,9078,337],{},[73,9080,9074],{},[55,9082,9083,9086],{},[73,9084,9085],{},"Kantoor",[73,9087,9088],{},"500 lx",[55,9090,9091,9094],{},[73,9092,9093],{},"andere ruimtes",[73,9095,9074],{},[12,9097,9098],{},"Deze richtwaarden zijn oriëntatiewaarden die PlanElec voor de status gebruikt. Het zijn geen normeisen, en het paneel vermeldt bij de tabel uitdrukkelijk: „Geen lichtplanning volgens een norm.”",[12,9100,9101,9102,9105],{},"Een ruimte toont ",[15,9103,9104],{},"Niet berekenbaar"," als ze geen meetpunten heeft of als een van haar armaturen geen bekende montagehoogte boven 0,8 m heeft. Ontbreekt de montagehoogte in de planning, dan gebruikt PlanElec de type- en verdiepingsinstellingen.",[12,9107,9108],{},[30,9109],{"id":2353},[41,9111,9113],{"id":9112},"wat-berekent-de-lichtstudie-niet","Wat berekent de lichtstudie niet?",[49,9115,9116,9128],{},[52,9117,9118],{},[55,9119,9120,9122,9125],{},[58,9121,3751],{},[58,9123,9124],{},"Wat je krijgt",[58,9126,9127],{},"Wat er niet in zit",[68,9129,9130,9141,9152,9163,9174],{},[55,9131,9132,9135,9138],{},[73,9133,9134],{},"Lichtvoorvertoning 3D",[73,9136,9137],{},"Illustratief beeld met scènes, dimniveau en schaduw",[73,9139,9140],{},"Geen luxwaarden, geen fotorealistische of fysisch exacte simulatie",[55,9142,9143,9146,9149],{},[73,9144,9145],{},"Heatmap en tabel",[73,9147,9148],{},"Direct licht op 0,8 m, gemiddelde, minimum, gelijkmatigheid",[73,9150,9151],{},"Geen reflecties, geen licht uit naburige ruimtes, geen kanteling van lichtbundels, geen afscherming door muren",[55,9153,9154,9157,9160],{},[73,9155,9156],{},"Armatuurgegevens",[73,9158,9159],{},"Lichtstroom, kleurtemperatuur, stralingshoek, montagehoogte",[73,9161,9162],{},"Geen fotometrie van de fabrikant (IES\u002FLDT), geen armatuurgeometrie, geen ledstrips",[55,9164,9165,9168,9171],{},[73,9166,9167],{},"Daglichtstudie",[73,9169,9170],{},"Zonrichting en schaduw in 3D voor Brussel",[73,9172,9173],{},"Geen eigen projectlocatie, geen daglichtwaarden, geen daglicht in de heatmap",[55,9175,9176,9178,9181],{},[73,9177,3006],{},[73,9179,9180],{},"Hulpmiddel voor planning en klantgesprek",[73,9182,9183],{},"Geen verlichtingsattest en geen lichtberekening volgens een norm",[12,9185,9186],{},"Heb je een sluitende verantwoording nodig, reken de verlichting dan door met lichtplanningssoftware en de fotometrische gegevens van de fabrikant. PlanElec levert daarvoor ruimtegeometrie, posities van de lichtpunten en montagehoogtes als vertrekpunt.",[12,9188,9189],{},[30,9190],{"id":9191},"troubleshooting",[41,9193,9195],{"id":9194},"waarom-zie-ik-geen-model-geen-schaduw-of-geen-waarden","Waarom zie ik geen model, geen schaduw of geen waarden?",[49,9197,9198,9208],{},[52,9199,9200],{},[55,9201,9202,9205],{},[58,9203,9204],{},"Wat je ziet",[58,9206,9207],{},"Oorzaak en oplossing",[68,9209,9210,9222,9233,9249,9260,9271,9284],{},[55,9211,9212,9216],{},[73,9213,9214],{},[15,9215,8333],{},[73,9217,9218,9219,9221],{},"De browser biedt geen WebGL. Werk verder in ",[15,9220,8359],{}," of open het project in een recente browser met grafische versnelling.",[55,9223,9224,9228],{},[73,9225,9226],{},[15,9227,8344],{},[73,9229,9230,9231,39],{},"De browser heeft de grafische verbinding gereset. Klik op ",[15,9232,8348],{},[55,9234,9235,9241],{},[73,9236,9237,9238,9240],{},"Geen ",[15,9239,8365],{}," in de schakelaar",[73,9242,9243,9244,933,9246,9248],{},"Het werkvlak is smaller dan 1600 pixels. Gebruik ",[15,9245,8359],{},[15,9247,8362],{}," na elkaar.",[55,9250,9251,9254],{},[73,9252,9253],{},"Geen zonneschaduw",[73,9255,9256,9257,9259],{},"Zon en schaduw werken alleen in de modus ",[15,9258,1182],{},". Controleer ook of de zon op het gekozen tijdstip boven de horizon staat.",[55,9261,9262,9265],{},[73,9263,9264],{},"Armaturen geven in 3D geen licht",[73,9266,9267,9268,9270],{},"Zet ",[15,9269,8800],{}," aan. Controleer aan\u002Fuit en dimniveau in de actieve scène. Armaturen boven het budget tellen niet mee.",[55,9272,9273,9278],{},[73,9274,9275],{},[15,9276,9277],{},"Geen berekening: voeg ruimtes toe of schakel de laag Lichtvoorvertoning in.",[73,9279,9280,9281,9283],{},"Teken gesloten ruimtes of zet de laag ",[15,9282,8800],{}," aan.",[55,9285,9286,9291],{},[73,9287,9288,9290],{},[15,9289,8833],{}," is grijs",[73,9292,9293],{},"De export heeft een zichtbare, volledig geladen 3D-weergave nodig.",[12,9295,9296,9297,39],{},"Meer hulp vind je bij ",[30,9298,8005],{"href":8224},[41,9300,6947],{"id":6946},[1450,9302,9303,9309,9313,9317,9321],{},[1453,9304,9305],{},[30,9306,9308],{"href":9307},"\u002Fhelp\u002Felektrische-symbolen-plaatsen-en-verbinden","Elektrische symbolen plaatsen en verbinden",[1453,9310,9311],{},[30,9312,8765],{"href":2445},[1453,9314,9315],{},[30,9316,8599],{"href":8598},[1453,9318,9319],{},[30,9320,3378],{"href":3377},[1453,9322,9323],{},[30,9324,9326],{"href":9325},"\u002Fhelp\u002Fpv-installatie-plannen","Pv-installatie plannen",{"title":1467,"searchDepth":1468,"depth":1468,"links":9328},[9329,9330,9331,9332,9333,9334,9335,9336,9337,9338,9339],{"id":8293,"depth":1468,"text":8294},{"id":8414,"depth":1468,"text":8415},{"id":8454,"depth":1468,"text":8455},{"id":8607,"depth":1468,"text":8608},{"id":8665,"depth":1468,"text":8666},{"id":8776,"depth":1468,"text":8777},{"id":8894,"depth":1468,"text":8895},{"id":8954,"depth":1468,"text":8955},{"id":9112,"depth":1468,"text":9113},{"id":9194,"depth":1468,"text":9195},{"id":6946,"depth":1468,"text":6947},"planning","De 3D-weergave is beschikbaar voor alle gebruikers. In de modus Licht plan je armaturen, vergelijk je lichtscènes, stel je zonnestand en schaduw in en lees je een heatmap met oriëntatiewaarden – zonder lichtberekening volgens een norm.","view-3d-lighting-study","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fview-3d-lighting-study.webp",{},17,"\u002Fhelp\u002Fview-3d-lighting-study.nl","2026-10-11",{"title":8271,"description":9341},"3d-weergave-en-lichtstudie","help\u002Fview-3d-lighting-study.nl",[9352,8679,8676,9353,9354,8575],"3D-weergave","Zonnestand","Heatmap","CzwEB6UTv-nYtcKAuzh641FDVo3oCSeY2gUI4Fmck6U","\u002Fhelp\u002F3d-weergave-en-lichtstudie",{"id":9358,"title":9359,"body":9360,"category":10176,"description":10177,"extension":1496,"guideId":10178,"image":10179,"locale":1497,"meta":10180,"navigation":1499,"order":10181,"path":10182,"publishedAt":9347,"readTime":3262,"seo":10183,"seoTitle":10184,"slug":10185,"stem":10186,"tags":10187,"updatedAt":9347,"__hash__":10193,"kind":2491,"href":8233,"date":9347},"help\u002Fhelp\u002Fdocument-archive-verification.nl.md","Documenten met versiebeheer archiveren en via QR-code verifiëren",{"type":9,"value":9361,"toc":10163},[9362,9375,9380,9384,9393,9478,9481,9508,9515,9520,9524,9592,9600,9605,9609,9657,9663,9669,9672,9677,9681,9707,9713,9718,9722,9739,9800,9813,9818,9822,9841,9844,9849,9853,9862,9926,9937,9940,9945,9949,9952,9972,9975,9980,9984,10015,10025,10029,10033,10079,10089,10094,10098,10153],[12,9363,9364,9365,9367,9368,9370,9371,9374],{},"Met ",[15,9366,8036],{}," in het onderdeel ",[15,9369,956],{}," bewaart PlanElec een pdf ongewijzigd in het projectarchief. Elke afgifteversie krijgt een willekeurig document-ID, een oplopend versienummer per documenttype, een QR-code op elke pagina en een SHA-256-hash. Voorwaarden: het project is opgeslagen, het document heeft geen openstaande correcties en je bent in het project Eigenaar, Beheerder of Bewerker. Wie de QR-code scant, ziet op de pagina ",[15,9372,9373],{},"Documentverificatie"," of precies deze archiefversie actueel, vervangen of ingetrokken is. Die controle bevestigt alleen archiefherkomst en bestandsintegriteit. Ze is geen AREI-keuring, geen conformiteitsverklaring en geen elektronische handtekening; de keuring doet het erkend organisme.",[12,9376,9377],{},[30,9378],{"id":9379},"document-types",[41,9381,9383],{"id":9382},"welke-documenten-kun-je-archiveren","Welke documenten kun je archiveren?",[12,9385,9386,9387,9389,9390,9392],{},"Gearchiveerd wordt elke pdf die je in ",[15,9388,956],{}," afgeeft via ",[15,9391,8036],{},". De gedocumenteerde reikwijdte zijn deze acht documenttypes:",[49,9394,9395,9404],{},[52,9396,9397],{},[55,9398,9399,9402],{},[58,9400,9401],{},"Document in Export",[58,9403,3606],{},[68,9405,9406,9415,9423,9433,9442,9450,9459,9468],{},[55,9407,9408,9412],{},[73,9409,9410],{},[15,9411,3764],{},[73,9413,9414],{},"beschikbaar",[55,9416,9417,9421],{},[73,9418,9419],{},[15,9420,3836],{},[73,9422,9414],{},[55,9424,9425,9430],{},[73,9426,9427],{},[15,9428,9429],{},"AREI-zelfcontrolerapport",[73,9431,9432],{},"beschikbaar, oriënterend; alleen met ingeschakelde zelfcontrole",[55,9434,9435,9440],{},[73,9436,9437],{},[15,9438,9439],{},"Kringlijst",[73,9441,7696],{},[55,9443,9444,9448],{},[73,9445,9446],{},[15,9447,4733],{},[73,9449,7696],{},[55,9451,9452,9457],{},[73,9453,9454],{},[15,9455,9456],{},"Kabellijst",[73,9458,7696],{},[55,9460,9461,9466],{},[73,9462,9463],{},[15,9464,9465],{},"Verdeelkast-indeling",[73,9467,9414],{},[55,9469,9470,9475],{},[73,9471,9472],{},[15,9473,9474],{},"Installatiedossier",[73,9476,9477],{},"beschikbaar; veldvalidatie met echte klantprojecten loopt nog",[12,9479,9480],{},"Toont Export nog andere documentkaarten met dezelfde knop, dan volgen die dezelfde archiefweg. Elk type heeft zijn eigen versiereeks: het installatiedossier telt apart van een los afgegeven eendraadschema.",[12,9482,9483,9486,9487,2109,9489,702,9491,702,9493,702,9495,702,9497,702,9499,6265,9501,9504,9505,39],{},[15,9484,9485],{},"Niet gearchiveerd"," worden de documenten in het onderdeel ",[15,9488,444],{},[15,9490,86],{},[15,9492,97],{},[15,9494,108],{},[15,9496,2020],{},[15,9498,2028],{},[15,9500,2036],{},[15,9502,9503],{},"Domotica-overdrachtsdossier"," ontstaan in de browser. Hun hash identificeert alleen de vastgelegde exportgegevens en is geen archiefbevestiging. Meer daarover in ",[30,9506,9507],{"href":37},"KNX plannen en documenteren",[12,9509,9510,9511,9514],{},"Ook een download via ",[15,9512,9513],{},"Concept downloaden"," komt niet in het archief. Concepten dragen de vermelding „CONCEPT” en blijven lokale bestanden.",[12,9516,9517],{},[30,9518],{"id":9519},"prerequisites",[41,9521,9523],{"id":9522},"wat-moet-in-orde-zijn-vóór-de-afgifte","Wat moet in orde zijn vóór de afgifte?",[49,9525,9526,9535],{},[52,9527,9528],{},[55,9529,9530,9532],{},[58,9531,1548],{},[58,9533,9534],{},"Waaraan je het herkent",[68,9536,9537,9558,9566,9584],{},[55,9538,9539,9542],{},[73,9540,9541],{},"Projectrol",[73,9543,9544,702,9547,1628,9550,9553,9554,9557],{},[15,9545,9546],{},"Eigenaar",[15,9548,9549],{},"Beheerder",[15,9551,9552],{},"Bewerker",". Een ",[15,9555,9556],{},"Kijker"," ziet het archief, maar kan niets afgeven.",[55,9559,9560,9563],{},[73,9561,9562],{},"Opgeslagen versie",[73,9564,9565],{},"Geen melding „Lokale wijzigingen zijn nog niet opgeslagen”. PlanElec archiveert altijd de opgeslagen serverversie.",[55,9567,9568,9571],{},[73,9569,9570],{},"Geen openstaande correcties",[73,9572,9573,9574,1628,9577,9580,9581,39],{},"De documentkaart toont ",[15,9575,9576],{},"Klaar voor afgifte",[15,9578,9579],{},"Klaar met aandachtspunten",", niet ",[15,9582,9583],{},"Correcties nodig",[55,9585,9586,9589],{},[73,9587,9588],{},"Volledige waarden",[73,9590,9591],{},"Een versie met verborgen waarden neemt de server nooit op in het archief.",[12,9593,9594,9595,9597,9598,39],{},"Typische correcties die de afgifte blokkeren zijn bijvoorbeeld „Aansluitgegevens nog niet bevestigd”, „Ontbrekende toestellen op het situatieschema plaatsen”, „Eendraadschema nakijken en bevestigen” of „Stroombaanaanduidingen aanvullen”. Zolang er één openstaat, blijft ",[15,9596,8036],{}," vergrendeld. Een concept kan wel. Hoe je de documenten voorbereidt, lees je in ",[30,9599,6882],{"href":2451},[12,9601,9602],{},[30,9603],{"id":9604},"release",[41,9606,9608],{"id":9607},"hoe-maak-je-een-afgifteversie","Hoe maak je een afgifteversie?",[1602,9610,9611,9617,9623,9635,9650],{},[1453,9612,9613,9614,9616],{},"Open in de studio het onderdeel ",[15,9615,956],{}," en sla het project op.",[1453,9618,9619,9620,9622],{},"Controleer het document met ",[15,9621,8796],{}," en kies, als dat wordt aangeboden, formaat en opties.",[1453,9624,9625,9626,9628,9629,9632,9633,39],{},"Klik op de documentkaart op ",[15,9627,8036],{},". Voor het dossier vind je dezelfde knop in het zijpaneel ",[15,9630,9631],{},"Dossieroverzicht",", onder ",[15,9634,9513],{},[1453,9636,9637,9638,9641,9642,9645,9646,9649],{},"Heeft het document aandachtspunten, dan opent het venster ",[15,9639,9640],{},"Aandachtspunten voor deze afgifteversie bevestigen",". Lees de lijst. Met ",[15,9643,9644],{},"Aandachtspunten bevestigen en archiveren"," ga je verder, met ",[15,9647,9648],{},"Annuleren"," stop je.",[1453,9651,9652,9653,9656],{},"PlanElec maakt de pdf, archiveert ze en downloadt het gearchiveerde bestand. De stap is gelukt wanneer de melding „Archiefversie … is aangemaakt en gedownload.” verschijnt en de nieuwe versie in het ",[15,9654,9655],{},"Documentarchief"," staat.",[12,9658,9659,9660,9662],{},"De bevestigde aandachtspunten blijven deel van het gearchiveerde afgiftebewijs. De bevestiging geldt alleen voor de huidige revisie en de gekozen uitvoer. De ",[15,9661,4733],{}," heeft altijd zo'n aandachtspunt: ze bevat modelhoeveelheden en is geen goedgekeurde bestellijst.",[12,9664,9665,9666,9668],{},"Staat de zelfcontrole in het project uit, dan vat het venster de bevindingen samen in één regel, bijvoorbeeld „3 bevindingen zonder beoordeling (zelfcontrole uit)”. Het ",[15,9667,9429],{}," kun je dan niet afgeven.",[12,9670,9671],{},"Wijzig je tijdens de voorbereiding het project of de exportselectie, dan stopt PlanElec. Start de export daarna opnieuw; zo hoort elke archiefversie bij een opgeslagen versie van het project.",[12,9673,9674],{},[30,9675],{"id":9676},"sealing",[41,9678,9680],{"id":9679},"wat-gebeurt-er-met-de-pdf-bij-het-archiveren","Wat gebeurt er met de pdf bij het archiveren?",[1450,9682,9683,9689,9695,9701],{},[1453,9684,9685,9688],{},[15,9686,9687],{},"Eigen document-ID:"," de server kent een willekeurige UUID toe en bewaart het bestand in een privé projectopslag. Het is alleen op te vragen met projecttoegang of met de toegangssleutel uit de QR-code.",[1453,9690,9691,9694],{},[15,9692,9693],{},"QR-code op elke pagina:"," rechtsonder staat op elke pagina een QR-code in een wit vlak, met daarnaast „PlanElec” en de eerste acht tekens van het document-ID.",[1453,9696,9697,9700],{},[15,9698,9699],{},"SHA-256-hash:"," na het plaatsen van de QR-codes berekent de server de SHA-256-hash van het afgewerkte bestand en slaat hem op. Het gedownloade bestand is precies dat bestand.",[1453,9702,9703,9706],{},[15,9704,9705],{},"Geen actieve inhoud:"," formuliervelden, annotaties, koppelingen en automatische acties worden uit de pdf verwijderd.",[12,9708,9709,9710,39],{},"Het archief aanvaardt pdf's tot 20 MB en tot 200 pagina's. Een gearchiveerde versie verandert niet meer. Na een projectwijziging maak je een nieuwe versie; de oude blijft bewaard als ",[15,9711,9712],{},"Vervangen",[12,9714,9715],{},[30,9716],{"id":9717},"archive",[41,9719,9721],{"id":9720},"waar-vind-je-de-versiegeschiedenis","Waar vind je de versiegeschiedenis?",[12,9723,9724,9725,9727,9728,9730,9731,9734,9735,9738],{},"Onder de documenten in ",[15,9726,956],{}," staat het onderdeel ",[15,9729,9655],{}," met de titel ",[15,9732,9733],{},"PDF-uitgaven met versiebeheer",". Elke regel toont documenttype, versienummer (bijvoorbeeld v2), status, tijdstip, aantal pagina's en de eerste twaalf tekens van de hash. Met ",[15,9736,9737],{},"Vernieuwen"," laad je de lijst opnieuw.",[49,9740,9741,9749],{},[52,9742,9743],{},[55,9744,9745,9747],{},[58,9746,7790],{},[58,9748,752],{},[68,9750,9751,9761,9770,9780,9790],{},[55,9752,9753,9758],{},[73,9754,9755],{},[15,9756,9757],{},"Actueel",[73,9759,9760],{},"Nieuwste versie van dit documenttype in het project",[55,9762,9763,9767],{},[73,9764,9765],{},[15,9766,9712],{},[73,9768,9769],{},"Er bestaat een nieuwere versie van hetzelfde type; het bestand blijft beschikbaar",[55,9771,9772,9777],{},[73,9773,9774],{},[15,9775,9776],{},"Ingetrokken",[73,9778,9779],{},"De openbare QR-toegang is uitgeschakeld",[55,9781,9782,9787],{},[73,9783,9784],{},[15,9785,9786],{},"Afgifteversie",[73,9788,9789],{},"Gemaakt met opgeslagen afgiftebewijs (revisie, bevestigde aandachtspunten)",[55,9791,9792,9797],{},[73,9793,9794],{},[15,9795,9796],{},"Bestaand archief zonder afgiftebewijs",[73,9798,9799],{},"Oudere archiefversie van vóór het afgiftebewijs",[12,9801,9802,9803,702,9806,933,9809,9812],{},"Elke regel biedt ",[15,9804,9805],{},"PDF",[15,9807,9808],{},"Sticker-PDF",[15,9810,9811],{},"Sticker-PNG",". Alle projectleden, ook kijkers, kunnen die bestanden downloaden.",[12,9814,9815],{},[30,9816],{"id":9817},"sticker",[41,9819,9821],{"id":9820},"hoe-druk-je-de-qr-sticker-af","Hoe druk je de QR-sticker af?",[1602,9823,9824,9830,9838],{},[1453,9825,9826,9827,9829],{},"Kies in het ",[15,9828,9655],{}," de gewenste versie.",[1453,9831,1857,9832,9834,9835,9837],{},[15,9833,9808],{}," voor een etiket van 40 × 40 mm met „PlanElec.be”, QR-code, versienummer en korte ID. ",[15,9836,9811],{}," levert alleen de QR-code als afbeelding van 472 × 472 pixels, wat overeenkomt met 40 mm bij 300 dpi.",[1453,9839,9840],{},"Druk het etiket op ware grootte af en scan het één keer ter controle voor je het opkleeft.",[12,9842,9843],{},"De sticker verwijst naar precies deze archiefversie. Na een nieuwe afgifte druk je dus ook een nieuwe sticker af. Voor een ingetrokken versie levert PlanElec geen sticker meer.",[12,9845,9846],{},[30,9847],{"id":9848},"verify",[41,9850,9852],{"id":9851},"wat-toont-de-controlepagina-na-het-scannen","Wat toont de controlepagina na het scannen?",[12,9854,9855,9856,1812,9858,9861],{},"De QR-code opent de pagina ",[15,9857,9373],{},[1300,9859,9860],{},"planelec.be\u002Fverify\u002F\u003Cdocument-ID>",". Ze is bereikbaar zonder aanmelding en wordt niet door zoekmachines geïndexeerd.",[49,9863,9864,9873],{},[52,9865,9866],{},[55,9867,9868,9871],{},[58,9869,9870],{},"Veld",[58,9872,1288],{},[68,9874,9875,9894,9902,9910,9918],{},[55,9876,9877,9879],{},[73,9878,3606],{},[73,9880,9881,702,9884,9887,9888,1628,9891],{},[15,9882,9883],{},"Actuele archiefversie",[15,9885,9886],{},"Vervangen door een nieuwere versie"," (met het nummer van de nieuwere versie), ",[15,9889,9890],{},"Openbare toegang ingetrokken",[15,9892,9893],{},"Document verwijderd",[55,9895,9896,9899],{},[73,9897,9898],{},"Type",[73,9900,9901],{},"Documenttype, bijvoorbeeld eendraadschema",[55,9903,9904,9907],{},[73,9905,9906],{},"Versie, pagina's, datum",[73,9908,9909],{},"Versienummer, aantal pagina's en tijdstip van archivering",[55,9911,9912,9915],{},[73,9913,9914],{},"SHA-256",[73,9916,9917],{},"Volledige hash van het gearchiveerde bestand",[55,9919,9920,9923],{},[73,9921,9922],{},"Document-ID",[73,9924,9925],{},"Volledige UUID",[12,9927,9928,9929,9932,9933,9936],{},"Projectnaam, klant en adres staan niet op de controlepagina. De inhoud open je met ",[15,9930,9931],{},"Gearchiveerde PDF openen",". Dat lukt alleen als de link uit de QR-code volledig is: achter ",[1300,9934,9935],{},"#access="," staat een toegangssleutel. De pagina haalt die sleutel na het laden uit de adresbalk. Ontbreekt hij, dan meldt ze „Deze link bevat geen toegangsrecht. Scan de volledige QR-code opnieuw.” Voor het uitleveren vergelijkt de server de hash van het opgeslagen bestand met de archiefhash en levert bij een verschil niets uit.",[12,9938,9939],{},"Wie de QR-code heeft, kan de pdf openen. Behandel afdrukken en stickers dus zoals het document zelf.",[12,9941,9942],{},[30,9943],{"id":9944},"hash",[41,9946,9948],{"id":9947},"hoe-controleer-je-zelf-een-pdf-tegen-de-hash","Hoe controleer je zelf een pdf tegen de hash?",[12,9950,9951],{},"Bereken de SHA-256-hash van het bestand dat je ontvangen hebt en vergelijk hem met de waarde op de controlepagina:",[1450,9953,9954,9960,9966],{},[1453,9955,9956,9957],{},"macOS: ",[1300,9958,9959],{},"shasum -a 256 bestand.pdf",[1453,9961,9962,9963],{},"Windows (PowerShell): ",[1300,9964,9965],{},"Get-FileHash bestand.pdf -Algorithm SHA256",[1453,9967,9968,9969],{},"Linux: ",[1300,9970,9971],{},"sha256sum bestand.pdf",[12,9973,9974],{},"Zijn beide waarden gelijk, dan is het bestand identiek aan de archiefversie. De bestandsnaam speelt geen rol. Een andere waarde ontstaat al wanneer de pdf opnieuw is opgeslagen, achteraf ondertekend, van opmerkingen voorzien of ingescand. Een afdruk kun je niet via de hash controleren; daarvoor gebruik je de QR-code en open je de gearchiveerde pdf.",[12,9976,9977],{},[30,9978],{"id":9979},"revoke",[41,9981,9983],{"id":9982},"hoe-trek-je-de-qr-toegang-in","Hoe trek je de QR-toegang in?",[1602,9985,9986,10000,10009],{},[1453,9987,9988,9989,9991,9992,9995,9996,1976,9998,39],{},"Zoek in het ",[15,9990,9655],{}," de betrokken versie en klik op ",[15,9993,9994],{},"QR intrekken",". Die knop zien alleen de ",[15,9997,9546],{},[15,9999,9549],{},[1453,10001,10002,10003,1934,10006,39],{},"Bevestig in het venster ",[15,10004,10005],{},"Openbare QR-toegang intrekken?",[15,10007,10008],{},"Toegang intrekken",[1453,10010,10011,10012,10014],{},"De regel toont daarna ",[15,10013,9776],{}," en de melding „De openbare QR-toegang is ingetrokken.” verschijnt.",[12,10016,10017,10018,10020,10021,10024],{},"Afgedrukte QR-codes van deze versie openen de pdf daarna niet meer; de controlepagina toont ",[15,10019,9890],{},". Projectleden behouden toegang via het archief. ",[15,10022,10023],{},"Intrekken kan niet ongedaan worden gemaakt."," Heb je opnieuw een geldige QR-code nodig, maak dan een nieuwe afgifteversie.",[12,10026,10027],{},[30,10028],{"id":3738},[41,10030,10032],{"id":10031},"wat-bevestigt-de-controle-en-wat-niet","Wat bevestigt de controle, en wat niet?",[49,10034,10035,10045],{},[52,10036,10037],{},[55,10038,10039,10042],{},[58,10040,10041],{},"De controlepagina bevestigt",[58,10043,10044],{},"De controlepagina bevestigt niet",[68,10046,10047,10055,10063,10071],{},[55,10048,10049,10052],{},[73,10050,10051],{},"Het bestand is met dit ID in een PlanElec-project gearchiveerd",[73,10053,10054],{},"Dat de installatie aan het AREI voldoet of een keuring heeft doorstaan",[55,10056,10057,10060],{},[73,10058,10059],{},"Het opgeslagen bestand heeft precies de getoonde SHA-256-hash",[73,10061,10062],{},"Een conformiteitsverklaring of een oordeel van een erkend organisme",[55,10064,10065,10068],{},[73,10066,10067],{},"Of deze versie actueel, vervangen, ingetrokken of verwijderd is",[73,10069,10070],{},"Een elektronische handtekening of de identiteit van een ondertekenaar",[55,10072,10073,10076],{},[73,10074,10075],{},"Wanneer de versie is gearchiveerd en hoeveel pagina's ze telt",[73,10077,10078],{},"Dat het ontwerp vakkundig juist is of zo op de werf is uitgevoerd",[12,10080,10081,10082,10084,10085,10088],{},"Het ",[15,10083,9429],{}," blijft ook gearchiveerd een softwarematige zelfcontrole van de ondersteunde regels. Wat het dekt, lees je in ",[30,10086,10087],{"href":2457},"Wat controleert de zelfcontrole",". Het officiële oordeel over de installatie geeft een erkend organisme.",[12,10090,10091],{},[30,10092],{"id":10093},"messages",[41,10095,10097],{"id":10096},"welke-meldingen-kun-je-bij-het-archiveren-krijgen","Welke meldingen kun je bij het archiveren krijgen?",[49,10099,10100,10109],{},[52,10101,10102],{},[55,10103,10104,10107],{},[58,10105,10106],{},"Melding",[58,10108,755],{},[68,10110,10111,10119,10127,10135,10143],{},[55,10112,10113,10116],{},[73,10114,10115],{},"„Voor deze uitvoer zijn nog correcties nodig.”",[73,10117,10118],{},"Openstaande correcties op de documentkaart oplossen",[55,10120,10121,10124],{},[73,10122,10123],{},"„Het project is nog niet volledig opgeslagen. …”",[73,10125,10126],{},"Opslagfout oplossen en de export opnieuw starten",[55,10128,10129,10132],{},[73,10130,10131],{},"„Het project of de exportselectie is tijdens de voorbereiding gewijzigd. …”",[73,10133,10134],{},"Export opnieuw starten zonder intussen te bewerken",[55,10136,10137,10140],{},[73,10138,10139],{},"„Deze versie is onvolledig en kan niet gearchiveerd worden. …”",[73,10141,10142],{},"De waarden zijn verborgen; deze versie blijft een concept",[55,10144,10145,10148],{},[73,10146,10147],{},"„Het archief kon niet worden geladen. Probeer opnieuw.”",[73,10149,10150,10152],{},[15,10151,9737],{}," kiezen in het documentarchief",[12,10154,10155,10156,10158,10159,39],{},"Terug naar ",[30,10157,6882],{"href":2451}," of naar de ",[30,10160,10162],{"href":10161},"\u002Fhelp","kennisbank",{"title":1467,"searchDepth":1468,"depth":1468,"links":10164},[10165,10166,10167,10168,10169,10170,10171,10172,10173,10174,10175],{"id":9382,"depth":1468,"text":9383},{"id":9522,"depth":1468,"text":9523},{"id":9607,"depth":1468,"text":9608},{"id":9679,"depth":1468,"text":9680},{"id":9720,"depth":1468,"text":9721},{"id":9820,"depth":1468,"text":9821},{"id":9851,"depth":1468,"text":9852},{"id":9947,"depth":1468,"text":9948},{"id":9982,"depth":1468,"text":9983},{"id":10031,"depth":1468,"text":10032},{"id":10096,"depth":1468,"text":10097},"exports","In Export maak je een afgifteversie: PlanElec archiveert de pdf ongewijzigd met eigen ID, QR-code en SHA-256-hash. De controlepagina bevestigt herkomst en bestandsintegriteit, geen AREI-keuring en geen handtekening.","document-archive-verification","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fdocument-archive-verification.webp",{},15,"\u002Fhelp\u002Fdocument-archive-verification.nl",{"title":9359,"description":10177},"Documenten versioneren, archiveren en via QR verifiëren","documenten-archiveren-en-verifieren","help\u002Fdocument-archive-verification.nl",[10188,10189,10190,9914,10191,10192],"documentarchief","afgifteversie","QR-code","versiebeheer","verificatie","yER0fN-0hCpgeMmOOCKbt2JCuRyiLkUcViDn0vz6AJw",{"id":10195,"title":10196,"body":10197,"category":2475,"description":11093,"extension":1496,"guideId":11094,"image":11095,"locale":1497,"meta":11096,"navigation":1499,"order":11097,"path":11098,"publishedAt":9347,"readTime":4035,"seo":11099,"seoTitle":4037,"slug":11100,"stem":11101,"tags":11102,"updatedAt":3255,"__hash__":11104,"kind":2491,"href":3381,"date":9347},"help\u002Fhelp\u002Ffloorplan-recognition.nl.md","Hoe laat ik een grondplan herkennen met AI?",{"type":9,"value":10198,"toc":11075},[10199,10216,10220,10224,10296,10302,10307,10311,10316,10320,10359,10363,10403,10408,10412,10419,10467,10479,10491,10496,10500,10513,10610,10617,10622,10626,10633,10638,10642,10648,10691,10697,10723,10728,10732,10737,10803,10820,10825,10830,10834,10863,10866,10871,10876,10880,10883,10954,10958,10962,11039,11043,11047,11052,11056],[12,10200,10201,10202,10205,10206,10208,10209,10212,10213,10215],{},"De grondplanherkenning leest een planpagina – PDF, PNG, JPEG of WebP, ook een PDF-export uit Trikker – en maakt er een ",[15,10203,10204],{},"voorstel"," van: muren, ruimtes met berekende oppervlakte, deuren en ramen, en de elektrische symbolen die PlanElec kent. Je hebt minstens de projectrol ",[15,10207,9552],{}," nodig. Het voorstel controleer je in het paneel ",[15,10210,10211],{},"Herkenning",", je corrigeert het waar nodig en je bevestigt de schaal. Pas dan neem je het met ",[15,10214,6847],{}," over in een lege verdieping – als één enkele stap om ongedaan te maken. Stroomkringen, eendraadschema en kabels ontstaan daarbij niet; die plan je daarna zoals gewoonlijk.",[12,10217,10218],{},[30,10219],{"id":3401},[41,10221,10223],{"id":10222},"wat-heb-je-nodig-voor-de-herkenning","Wat heb je nodig voor de herkenning?",[49,10225,10226,10235],{},[52,10227,10228],{},[55,10229,10230,10232],{},[58,10231,1548],{},[58,10233,10234],{},"Wat geldt",[68,10236,10237,10253,10261,10269,10277,10288],{},[55,10238,10239,10241],{},[73,10240,9541],{},[73,10242,10243,702,10245,1628,10247,10249,10250,10252],{},[15,10244,9546],{},[15,10246,9549],{},[15,10248,9552],{},". Met de rol ",[15,10251,9556],{}," kun je geen herkenning starten.",[55,10254,10255,10258],{},[73,10256,10257],{},"Bestandsformaat",[73,10259,10260],{},"PDF, PNG, JPEG of WebP tot 50 MB. DXF en DWG worden niet herkend.",[55,10262,10263,10266],{},[73,10264,10265],{},"Planpagina",[73,10267,10268],{},"Een pagina met een grondplan. Bij een PDF met meerdere pagina’s kies je zelf de pagina.",[55,10270,10271,10274],{},[73,10272,10273],{},"Doelverdieping",[73,10275,10276],{},"Een lege verdieping zonder muren. Overnemen in een verdieping waar al iets op staat, is geblokkeerd.",[55,10278,10279,10282],{},[73,10280,10281],{},"Schaal",[73,10283,10284,10285,10287],{},"Moet vóór de overname bevestigd zijn. Zonder bevestigde schaal blijft ",[15,10286,6847],{}," geblokkeerd.",[55,10289,10290,10293],{},[73,10291,10292],{},"Quotum",[73,10294,10295],{},"30 herkenningsruns per gebruiker per dag; elke run verbruikt ook je AI-tegoed.",[12,10297,10298,10299,10301],{},"Het bestand komt terecht in de ",[15,10300,3903],{}," van het project. Je laadt hetzelfde plan dus maar één keer op: het dient als bron voor de herkenning en blijft daarna beschikbaar als projectstuk.",[12,10303,10304],{},[30,10305],{"id":10306},"start",[41,10308,10310],{"id":10309},"waar-start-je-de-herkenning","Waar start je de herkenning?",[12,10312,10313,10314,39],{},"Er zijn twee ingangen. Beide leiden tot hetzelfde resultaat in het paneel ",[15,10315,10211],{},[1396,10317,10319],{"id":10318},"op-een-lege-verdieping","Op een lege verdieping",[1602,10321,10322,10331,10337,10343,10352],{},[1453,10323,8785,10324,10327,10328,7855],{},[15,10325,10326],{},"Plattegrond"," een verdieping zonder muren en zonder sjabloon. De kaart ",[15,10329,10330],{},"Hoe wil je deze verdieping starten?",[1453,10332,7985,10333,10336],{},[15,10334,10335],{},"Grondplan automatisch herkennen"," en daarna je bestand.",[1453,10338,10339,10340,10342],{},"PlanElec bewaart het plan bij de projectstukken en toont de voortgang in drie stappen. Met ",[15,10341,9648],{}," stop je de run.",[1453,10344,10345,10346,10349,10350,39],{},"Bij een plan van één pagina start de herkenning meteen. Telt de PDF meerdere pagina’s, dan opent het ",[15,10347,10348],{},"Voorbeeld van projectstuk",": blader naar de pagina met het grondplan en start daar ",[15,10351,6843],{},[1453,10353,10354,10355,10358],{},"Zo zie je dat het gelukt is: de melding „Grondplan herkend. Controleer het ontwerp en meet een bekende afstand na.” verschijnt en het venster ",[15,10356,10357],{},"Voorstel corrigeren"," opent.",[1396,10360,10362],{"id":10361},"vanuit-de-projectstukken","Vanuit de projectstukken",[1602,10364,10365,10379,10382,10394],{},[1453,10366,10367,10368,10370,10371,10374,10375,10378],{},"Open het paneel ",[15,10369,3903],{},". Naast een PDF staat de actie ",[15,10372,10373],{},"Plan met AI herkennen",", naast een afbeelding ",[15,10376,10377],{},"Foto met AI herkennen",". Beide starten de grondplanherkenning.",[1453,10380,10381],{},"Bij een PDF met meerdere pagina’s opent in de plaats daarvan het voorbeeld. Kies daar de pagina.",[1453,10383,10384,10385,10387,10388,10391,10392,39],{},"In het ",[15,10386,10348],{}," kies je bij ",[15,10389,10390],{},"Herkenningsmethode"," de methode en start je met ",[15,10393,6843],{},[1453,10395,10396,10397,10399,10400,10402],{},"Na de run schakelt PlanElec naar de modus ",[15,10398,10326],{}," en opent het paneel ",[15,10401,10211],{},". Het voorstel ligt als voorbeeld over de verdieping.",[12,10404,10405],{},[30,10406],{"id":10407},"method",[41,10409,10411],{"id":10410},"wat-doet-de-methode-automatisch","Wat doet de methode „Automatisch”?",[12,10413,10414,10415,10418],{},"Standaard staat ",[15,10416,10417],{},"Automatisch (PDF-vectoren + AI)"," ingesteld. De server beslist per pagina waar de muren vandaan komen:",[49,10420,10421,10434],{},[52,10422,10423],{},[55,10424,10425,10428,10431],{},[58,10426,10427],{},"Plan",[58,10429,10430],{},"Herkomst van de muren",[58,10432,10433],{},"Wat AI aanvult",[68,10435,10436,10447,10458],{},[55,10437,10438,10441,10444],{},[73,10439,10440],{},"Vector-PDF waarvan de muurlijnen gesloten ruimtes vormen",[73,10442,10443],{},"rechtstreeks uit de lijnen van de PDF",[73,10445,10446],{},"ruimtenamen, ruimtecategorieën, ramen, toestelsymbolen en gelezen maatlijnen",[55,10448,10449,10452,10455],{},[73,10450,10451],{},"Gescande PDF of PDF zonder gesloten muurlijnen",[73,10453,10454],{},"AI-beeldherkenning",[73,10456,10457],{},"bij PDF’s ook ruimtenamen uit de tekstlaag en deuren uit de getekende deurbogen",[55,10459,10460,10463,10465],{},[73,10461,10462],{},"PNG, JPEG, WebP",[73,10464,10454],{},[73,10466,332],{},[12,10468,10469,10470,10472,10473,1628,10476,39],{},"Lukt de AI-stap bij een vector-PDF niet, dan blijven de muren uit de PDF als voorstel behouden. Bovenaan het paneel ",[15,10471,10211],{}," zie je welke weg gevolgd werd, bijvoorbeeld ",[15,10474,10475],{},"Muren uit PDF + AI",[15,10477,10478],{},"Muurvoorstel uit PDF",[12,10480,10481,10484,10485,8902,10488,10490],{},[15,10482,10483],{},"LLM-beeldherkenning"," dwingt pure beeldherkenning af, zonder PDF-vectoren. Dat is een alternatief als de automatische keuze een zwak resultaat geeft. Met ",[15,10486,10487],{},"Opnieuw herkennen",[15,10489,10211],{}," start je hetzelfde plan opnieuw met de gekozen methode. Elke nieuwe run telt mee voor het daglimiet.",[12,10492,10493],{},[30,10494],{"id":10495},"review",[41,10497,10499],{"id":10498},"wat-staat-er-in-het-voorstel-en-hoe-controleer-je-het","Wat staat er in het voorstel en hoe controleer je het?",[12,10501,10502,10503,10505,10506,702,10508,1628,10511,39],{},"Het paneel ",[15,10504,10211],{}," deelt het voorstel op in onderdelen. Bovenaan staan de pagina en de status: ",[15,10507,2135],{},[15,10509,10510],{},"Invoer nodig",[15,10512,2704],{},[49,10514,10515,10526],{},[52,10516,10517],{},[55,10518,10519,10521,10523],{},[58,10520,3751],{},[58,10522,9204],{},[58,10524,10525],{},"Wat je beslist",[68,10527,10528,10541,10554,10568,10581,10594],{},[55,10529,10530,10535,10538],{},[73,10531,10532],{},[15,10533,10534],{},"Ruimtes",[73,10536,10537],{},"elke gesloten ruimte met berekende oppervlakte, de op het plan gedrukte oppervlakte en het verschil",[73,10539,10540],{},"naam overnemen of afvinken. Afvinken verwijdert alleen de naam; de muren blijven staan.",[55,10542,10543,10548,10551],{},[73,10544,10545],{},[15,10546,10547],{},"Openingen",[73,10549,10550],{},"deur of raam met breedte",[73,10552,10553],{},"afzonderlijke openingen aan- of afvinken",[55,10555,10556,10560,10563],{},[73,10557,10558],{},[15,10559,10281],{},[73,10561,10562],{},"herkomst, ankers in meter, afwijking",[73,10564,10565],{},[15,10566,10567],{},"Schaal bevestigen",[55,10569,10570,10575,10578],{},[73,10571,10572],{},[15,10573,10574],{},"Namen",[73,10576,10577],{},"de ruimtenamen die worden overgenomen",[73,10579,10580],{},"controle vóór de overname",[55,10582,10583,10588,10591],{},[73,10584,10585],{},[15,10586,10587],{},"Toestellen",[73,10589,10590],{},"herkende symbolen, zoals stopcontact, schakelaar, lichtpunt",[73,10592,10593],{},"afzonderlijke toestellen aan- of afvinken",[55,10595,10596,10601,10607],{},[73,10597,10598],{},[15,10599,10600],{},"Vragen",[73,10602,10603,10604],{},"open punten; blokkerende vragen dragen het label ",[15,10605,10606],{},"blokkeert",[73,10608,10609],{},"oplossen vóór je overneemt",[12,10611,10612,10613,10616],{},"Deze symbolen worden herkend: stopcontact, dubbel stopcontact, spatwaterdicht stopcontact, stopcontact met schakelaar, schakelaar, drukknop, beldrukknop, bewegingsmelder, lichtpunt, spot, wandlamp, TL-buis, transformator, ethernet- en coaxaansluiting, verdeelkast, aftakdoos, kookplaat, oven, vaatwasser, wasmachine, droogkast, koelkast, dampkap, boiler, rolluikmotor en rookmelder. Een symbool buiten deze lijst verschijnt als ",[15,10614,10615],{},"Onbekend symbool"," en wordt niet overgenomen.",[12,10618,10619],{},[30,10620],{"id":10621},"printed-areas",[1396,10623,10625],{"id":10624},"gedrukte-oppervlaktes-als-controle","Gedrukte oppervlaktes als controle",[12,10627,10628,10629,10632],{},"Veel bouwplannen vermelden de oppervlakte van elke ruimte. Dat getal komt uit het opschrift, niet uit de herkende muren – het is dus een onafhankelijke controle. Klopt het, dan staat ",[15,10630,10631],{},"✓ plan"," naast de ruimte. Wijkt een ruimte 10 % of meer af, dan meldt PlanElec dat boven de lijst met ruimtes: daar staat wellicht een muur verkeerd. Passen de gedrukte oppervlaktes in hun geheel niet bij de schaal, dan verschijnt er een vraag en meet je een gekende lengte na.",[12,10634,10635],{},[30,10636],{"id":10637},"scale",[41,10639,10641],{"id":10640},"hoe-komt-de-schaal-tot-stand","Hoe komt de schaal tot stand?",[12,10643,10644,10645,10647],{},"Een voorstel zonder bevestigde schaal wordt niet overgenomen. In het onderdeel ",[15,10646,10281],{}," zie je waar ze vandaan komt:",[49,10649,10650,10659],{},[52,10651,10652],{},[55,10653,10654,10656],{},[58,10655,7790],{},[58,10657,10658],{},"Herkomst",[68,10660,10661,10671,10681],{},[55,10662,10663,10668],{},[73,10664,10665],{},[15,10666,10667],{},"Uit maatlijnen",[73,10669,10670],{},"AI leest de maatlijnen op de pagina. Meerdere onafhankelijke maatlijnen worden samen beoordeeld.",[55,10672,10673,10678],{},[73,10674,10675],{},[15,10676,10677],{},"Uit de schaal van de PDF",[73,10679,10680],{},"De schaal die in de PDF zit. Ze wordt getoetst aan de gelezen maatlijnen; spreken die haar tegen, dan gelden de maatlijnen.",[55,10682,10683,10688],{},[73,10684,10685],{},[15,10686,10687],{},"Twee punten, zelf gemeten",[73,10689,10690],{},"Je hebt in het correctievenster een bekende afstand aangeduid en de lengte ingevuld.",[12,10692,10693,10694,10696],{},"Je eigen meting heeft voorrang. Spreekt ze echter meerdere overeenstemmende maatlijnen tegen, dan gebruikt PlanElec de maatlijnen en meldt dat onder ",[15,10695,10600],{},". Kijk dan na of je de juiste punten hebt gekozen.",[1602,10698,10699,10705,10708,10717],{},[1453,10700,10701,10702,10704],{},"Lees in het onderdeel ",[15,10703,10281],{}," de herkomst en de afwijking.",[1453,10706,10707],{},"Vergelijk een afstand waarvan je de lengte zeker kent met het voorstel, bijvoorbeeld een buitenmuur met maatlijn.",[1453,10709,10710,10711,10713,10714,39],{},"Klopt ze, kies dan ",[15,10712,10567],{},". De weergave wisselt naar ",[15,10715,10716],{},"Schaal bevestigd",[1453,10718,10719,10720,10722],{},"Klopt ze niet, open dan ",[15,10721,10357],{}," en meet de afstand zelf na.",[12,10724,10725],{},[30,10726],{"id":10727},"correct",[41,10729,10731],{"id":10730},"hoe-corrigeer-je-het-voorstel","Hoe corrigeer je het voorstel?",[12,10733,10734,10736],{},[15,10735,10357],{}," toont de originele pagina met de herkende muren erover. Ontbreekt alleen nog de schaal, dan opent het venster vanzelf. Wijzigingen worden pas bij de overname naar de verdieping geschreven.",[49,10738,10739,10748],{},[52,10740,10741],{},[55,10742,10743,10746],{},[58,10744,10745],{},"Hulpmiddel",[58,10747,1551],{},[68,10749,10750,10764,10774,10784,10794],{},[55,10751,10752,10757],{},[73,10753,10754],{},[15,10755,10756],{},"Afstand meten",[73,10758,10759,10760,10763],{},"twee punten van een bekende afstand aanduiden en de ",[15,10761,10762],{},"Lengte in meters"," invullen",[55,10765,10766,10771],{},[73,10767,10768],{},[15,10769,10770],{},"Hoek verplaatsen",[73,10772,10773],{},"een hoek naar de juiste plek slepen; na selectie ook met de pijltjestoetsen",[55,10775,10776,10781],{},[73,10777,10778],{},[15,10779,10780],{},"Muur toevoegen",[73,10782,10783],{},"begin en einde van een ontbrekende muur aanklikken; bestaande hoeken klikken vast",[55,10785,10786,10791],{},[73,10787,10788],{},[15,10789,10790],{},"Muur verwijderen",[73,10792,10793],{},"een foute muur aanklikken; de openingen erin verdwijnen mee",[55,10795,10796,10800],{},[73,10797,10798],{},[15,10799,6795],{},[73,10801,10802],{},"de laatste correctiestap in het venster terugdraaien",[1602,10804,10805,10811,10814],{},[1453,10806,10807,10808,10810],{},"Meet met ",[15,10809,10756],{}," een bekende lengte, liefst een lange.",[1453,10812,10813],{},"Controleer elke ruimte: ze moet rondom door muren gesloten zijn. Vul ontbrekende muren aan en verplaats verkeerd geplaatste hoeken.",[1453,10815,7985,10816,10819],{},[15,10817,10818],{},"Voorstel opslaan",". Daarmee geldt de schaal als bevestigd. Is de doelverdieping leeg en blokkeert geen enkele vraag, dan neemt PlanElec het voorstel meteen over. Anders zegt een melding waarom, en neem je het later zelf over.",[12,10821,10822,10823,39],{},"Een vervormde foto of een plan met een onduidelijke uitsnede kun je in dit venster niet rechtzetten. Leg het plan dan als sjabloon aan en stel het in via de lagenwerkbank, zie ",[30,10824,3378],{"href":3377},[12,10826,10827],{},[30,10828],{"id":10829},"apply",[41,10831,10833],{"id":10832},"hoe-neem-je-het-voorstel-over-in-de-verdieping","Hoe neem je het voorstel over in de verdieping?",[1602,10835,10836,10844,10850,10854],{},[1453,10837,10838,10839,2427,10841,10843],{},"Kies onderaan in het paneel ",[15,10840,10211],{},[15,10842,10273],{},". Die moet leeg zijn.",[1453,10845,10846,10847,10849],{},"Controleer dat de schaal bevestigd is en dat geen enkele vraag ",[15,10848,10606],{}," aangeeft.",[1453,10851,7985,10852,39],{},[15,10853,6847],{},[1453,10855,10856,10857,10859,10860,39],{},"Zo zie je dat het gelukt is: de melding „Het voorstel is overgenomen.” verschijnt en de modus ",[15,10858,10326],{}," toont muren, ruimtes, openingen en toestellen. Onder de muren ligt de originele pagina als sjabloon ",[15,10861,10862],{},"Herkende planpagina",[12,10864,10865],{},"De volledige overname is één stap om ongedaan te maken: ⌘Z of Ctrl+Z draait ze volledig terug. Kon een element niet worden ingepast – bijvoorbeeld een deur zonder passende muur of een toestel zonder muur in de buurt – dan meldt PlanElec hoeveel elementen niet zijn overgenomen. Die plaats je met de hand. Ruimtes krijgen een naam en, waar herkend, een ruimtecategorie. Vermeldt het plan geen hoogtes voor deuren en ramen, dan gebruikt PlanElec standaardwaarden; controleer die waar nodig.",[12,10867,10868,10869,39],{},"Heb je meerdere verdiepingen apart herkend, leg ze daarna sluitend op elkaar: ",[30,10870,8599],{"href":8598},[12,10872,10873],{},[30,10874],{"id":10875},"no-result",[41,10877,10879],{"id":10878},"wat-als-de-herkenning-niets-bruikbaars-oplevert","Wat als de herkenning niets bruikbaars oplevert?",[12,10881,10882],{},"Vindt de herkenning via de startkaart geen bruikbaar grondplan – minder dan drie muren –, dan verwerpt PlanElec het voorstel. Het plan ligt dan als sjabloon op de verdieping, de lagenwerkbank opent en je tekent de buitenmuren over. Andere situaties:",[49,10884,10885,10896],{},[52,10886,10887],{},[55,10888,10889,10891,10893],{},[58,10890,8306],{},[58,10892,752],{},[58,10894,10895],{},"Volgende stap",[68,10897,10898,10909,10920,10931,10943],{},[55,10899,10900,10903,10906],{},[73,10901,10902],{},"Daglimiet bereikt",[73,10904,10905],{},"30 runs vandaag gebruikt; ook mislukte runs tellen mee",[73,10907,10908],{},"De volgende dag (UTC) opnieuw proberen of het plan overtekenen",[55,10910,10911,10914,10917],{},[73,10912,10913],{},"Time-out",[73,10915,10916],{},"De run duurde te lang",[73,10918,10919],{},"Opnieuw proberen of een andere methode kiezen",[55,10921,10922,10925,10928],{},[73,10923,10924],{},"Bestand niet herkenbaar",[73,10926,10927],{},"Formaat niet ondersteund of groter dan 50 MB",[73,10929,10930],{},"PDF, PNG, JPEG of WebP gebruiken",[55,10932,10933,10937,10940],{},[73,10934,10935],{},[15,10936,10510],{},[73,10938,10939],{},"Meestal ontbreekt de schaal",[73,10941,10942],{},"In het correctievenster een bekende afstand meten",[55,10944,10945,10948,10951],{},[73,10946,10947],{},"AI-tegoed ontoereikend",[73,10949,10950],{},"Je resterende AI-tegoed volstaat niet voor deze run",[73,10952,10953],{},"Het plan als sjabloon overtekenen",[12,10955,10956],{},[30,10957],{"id":2353},[41,10959,10961],{"id":10960},"wat-herkent-de-ai-niet","Wat herkent de AI niet?",[49,10963,10964,10973],{},[52,10965,10966],{},[55,10967,10968,10970],{},[58,10969,846],{},[58,10971,10972],{},"Wat dat betekent",[68,10974,10975,10983,10997,11007,11015,11023,11031],{},[55,10976,10977,10980],{},[73,10978,10979],{},"Geen stroomkringen, geen schema, geen kabels",[73,10981,10982],{},"Herkend worden de plaats en de soort van de symbolen. Toewijzing, beveiligingen en eendraadschema plan je daarna.",[55,10984,10985,10988],{},[73,10986,10987],{},"Geen grondplan uit Trikker-projectbestanden",[73,10989,10990,10991,10993,10994,10996],{},"Een PDF-export uit Trikker wordt herkend zoals elke PDF. Een ",[1300,10992,2505],{},"-bestand importeer je als project (schema, stroomkringen, toestellen), zie ",[30,10995,2514],{"href":2513},"; het grondplan komt daarbij niet mee.",[55,10998,10999,11002],{},[73,11000,11001],{},"Geen overname zonder schaal",[73,11003,11004,11005,10287],{},"Zonder bevestigde schaal blijft ",[15,11006,6847],{},[55,11008,11009,11012],{},[73,11010,11011],{},"Alleen lege verdiepingen",[73,11013,11014],{},"De herkenning vult geen bestaand grondplan aan.",[55,11016,11017,11020],{},[73,11018,11019],{},"Geen DXF\u002FDWG-herkenning",[73,11021,11022],{},"DXF importeer je als sjabloon op schaal via de gewone import.",[55,11024,11025,11028],{},[73,11026,11027],{},"Geen doorsneden en gevels",[73,11029,11030],{},"De herkenning verwacht een grondplan; andere soorten bladen leveren geen bruikbaar voorstel op.",[55,11032,11033,11036],{},[73,11034,11035],{},"Een voorstel is geen opmeting",[73,11037,11038],{},"Controleer maten, muurverloop en symbolen voor je verder plant.",[12,11040,11041],{},[30,11042],{"id":3875},[41,11044,11046],{"id":11045},"wat-gebeurt-er-met-je-plan","Wat gebeurt er met je plan?",[12,11048,11049,11050,39],{},"Het bestand wordt bewaard bij de projectstukken van je project. Naar de externe AI-aanbieder gaat alleen de gekozen pagina: als afbeelding, en bij een PDF samen met de tekst van die pagina. De aanvraag loopt via een EU-route; de aanbieder bewaart ze niet en traint er niet mee. PlanElec registreert elke run met de verzonden pagina en het resultaat, zodat een voorstel later na te gaan is. De melding „De pagina wordt voor analyse naar een externe AI-aanbieder verzonden.” zie je rechtstreeks bij de actie ",[15,11051,6843],{},[41,11053,11055],{"id":11054},"hoe-ga-je-verder","Hoe ga je verder?",[1450,11057,11058,11063,11070],{},[1453,11059,11060,11061],{},"Symbolen aanvullen en met de topologie verbinden: ",[30,11062,9308],{"href":9307},[1453,11064,11065,11066],{},"Stroomkringen en verdeelborden plannen: ",[30,11067,11069],{"href":11068},"\u002Fhelp\u002Finstallatie-plannen-en-onderverdelers-vormen","Installatie plannen en onderverdelers vormen",[1453,11071,11072,11073],{},"Plan zonder AI overtekenen of de schaal manueel kalibreren: ",[30,11074,3378],{"href":3377},{"title":1467,"searchDepth":1468,"depth":1468,"links":11076},[11077,11078,11082,11083,11086,11087,11088,11089,11090,11091,11092],{"id":10222,"depth":1468,"text":10223},{"id":10309,"depth":1468,"text":10310,"children":11079},[11080,11081],{"id":10318,"depth":1486,"text":10319},{"id":10361,"depth":1486,"text":10362},{"id":10410,"depth":1468,"text":10411},{"id":10498,"depth":1468,"text":10499,"children":11084},[11085],{"id":10624,"depth":1486,"text":10625},{"id":10640,"depth":1468,"text":10641},{"id":10730,"depth":1468,"text":10731},{"id":10832,"depth":1468,"text":10833},{"id":10878,"depth":1468,"text":10879},{"id":10960,"depth":1468,"text":10961},{"id":11045,"depth":1468,"text":11046},{"id":11054,"depth":1468,"text":11055},"Laad een planpagina op als PDF, PNG, JPEG of WebP, controleer het AI-voorstel met muren, ruimtes, deuren, ramen en toestelsymbolen, bevestig de schaal en neem alles over in een lege verdieping.","floorplan-recognition","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ffloorplan-recognition-nl.webp",{},12,"\u002Fhelp\u002Ffloorplan-recognition.nl",{"title":10196,"description":11093},"grondplan-herkennen-met-ai","help\u002Ffloorplan-recognition.nl",[11103,4588,9805,10281,10534,3269],"Grondplanherkenning","yO75gY79CBsP59PNGB1UFA6JdQ_NEvtm_nJv_esCzvU",{"id":11106,"title":11107,"body":11108,"category":9340,"description":12109,"extension":1496,"guideId":12110,"image":12111,"locale":1497,"meta":12112,"navigation":1499,"order":12113,"path":12114,"publishedAt":9347,"readTime":7016,"seo":12115,"seoTitle":4037,"slug":12116,"stem":12117,"tags":12118,"updatedAt":9347,"__hash__":12124,"kind":2491,"href":9325,"date":9347},"help\u002Fhelp\u002Fpv-planning.nl.md","Hoe plan je een PV-installatie in PlanElec?",{"type":9,"value":11109,"toc":12097},[11110,11120,11125,11129,11252,11255,11260,11264,11333,11336,11341,11345,11408,11414,11504,11511,11517,11522,11526,11533,11557,11560,11607,11612,11616,11628,11712,11719,11722,11740,11745,11749,11794,11797,11871,11874,11902,11905,11910,11914,11946,11949,11954,11958,11965,11976,11982,11987,11991,11999,12020,12024,12028,12089],[12,11111,11112,11113,11115,11116,11119],{},"Een PV-installatie plan je in PlanElec in de studiomodus ",[15,11114,8445],{},": je belegt de dakvlakken in de 3D-weergave met modulevelden, maakt in het paneel ",[15,11117,11118],{},"PV-installatie"," een omvormer aan en wijst de modules als strings toe aan de MPPT-ingangen. Je hebt een plattegrond met dak nodig en een installatie met minstens één beveiligingstoestel waarop de omvormer wordt aangesloten. Het resultaat: een gedocumenteerde PV-generator in het eendraadschema, één stringsymbool per string op het situatieschema, een opbrengstvoorspelling op basis van PVGIS en een PV-planningsregister in het zelfcontrolerapport. De stringcontrole vergelijkt de module- en omvormergegevens die je documenteert; stabiliteit, beschaduwing door objecten in de omgeving en de controle van de uitgevoerde installatie vallen buiten PlanElec. De keuring doet het erkend organisme.",[12,11121,11122],{},[30,11123],{"id":11124},"overview",[41,11126,11128],{"id":11127},"welke-stappen-horen-bij-de-pv-planning","Welke stappen horen bij de PV-planning?",[49,11130,11131,11143],{},[52,11132,11133],{},[55,11134,11135,11138,11141],{},[58,11136,11137],{},"Stap",[58,11139,11140],{},"Waar in PlanElec",[58,11142,3006],{},[68,11144,11145,11162,11179,11195,11212,11226,11241],{},[55,11146,11147,11150,11159],{},[73,11148,11149],{},"Dak en modulevelden",[73,11151,11152,11153,11155,11156],{},"Modus ",[15,11154,8445],{},", 3D-weergave, balk ",[15,11157,11158],{},"Pv-panelen",[73,11160,11161],{},"Modulevelden met moduletype, oriëntatie en montagewijze",[55,11163,11164,11167,11176],{},[73,11165,11166],{},"Omvormer en MPPT’s",[73,11168,11169,11170,11172,11173],{},"Paneel ",[15,11171,11118],{}," → ",[15,11174,11175],{},"Omvormer aanmaken",[73,11177,11178],{},"Omvormer op een eigen stroomkring met MPPT-ingangen",[55,11180,11181,11184,11192],{},[73,11182,11183],{},"Strings vormen",[73,11185,11186,1628,11189],{},[15,11187,11188],{},"Strings toewijzen",[15,11190,11191],{},"Automatisch verdelen",[73,11193,11194],{},"Strings per MPPT met live controle van de grenswaarden",[55,11196,11197,11200,11209],{},[73,11198,11199],{},"String op het situatieschema",[73,11201,11202,11203,11172,11206],{},"Toestellenpalet ",[15,11204,11205],{},"Opwekking",[15,11207,11208],{},"Zonnepaneel \u002F PV-module",[73,11210,11211],{},"Precies één symbool per string, gekoppeld aan de omvormer",[55,11213,11214,11217,11223],{},[73,11215,11216],{},"PV-zijde in het eendraadschema",[73,11218,11219,11220,11222],{},"Omvormer selecteren in het ",[15,11221,3764],{},", inspector",[73,11224,11225],{},"DC-beveiliging, AC-scheidingspunt, kabeltrajecten en frame-PE",[55,11227,11228,11231,11238],{},[73,11229,11230],{},"Opbrengstvoorspelling",[73,11232,11169,11233,11172,11235],{},[15,11234,11118],{},[15,11236,11237],{},"PV-opbrengstvoorspelling",[73,11239,11240],{},"Jaar- en maandopbrengst, P50\u002FP90, verliesketen, rapport",[55,11242,11243,11245,11249],{},[73,11244,6532],{},[73,11246,11247],{},[15,11248,956],{},[73,11250,11251],{},"Zelfcontrolerapport met PV-register, PV-opbrengstrapport, materiaallijst (pilot)",[12,11253,11254],{},"De volgorde is een voorstel. Je kunt een omvormer ook eerst in het eendraadschema aanmaken en het dak later beleggen.",[12,11256,11257],{},[30,11258],{"id":11259},"roof-fields",[41,11261,11263],{"id":11262},"hoe-beleg-je-dakvlakken-met-modulevelden","Hoe beleg je dakvlakken met modulevelden?",[1602,11265,11266,11276,11301,11322],{},[1453,11267,11268,11269,11271,11272,11275],{},"Open in de studio de modus ",[15,11270,8445],{},". De 3D-weergave toont het hele gebouw met dak. PlanElec leidt de dakvlakken af uit de plattegrond; in de dakbalk kies je ",[15,11273,11274],{},"Dakvorm"," en helling.",[1453,11277,11278,11279,11281,11282,11285,11286,11289,11290,11292,11293,11296,11297,11300],{},"Kies in de balk ",[15,11280,11158],{}," een plaatsingswerktuig: ",[15,11283,11284],{},"Los paneel"," (één klik), ",[15,11287,11288],{},"Rij"," (lijn trekken), ",[15,11291,9870],{}," (rechthoek trekken) of ",[15,11294,11295],{},"Heel dakvlak"," (dakvlak aanklikken, het wordt volledig belegd). Met de schakelaar ",[15,11298,11299],{},"Beste indeling"," opent een klik op het vlak de beste formaatvarianten.",[1453,11302,11303,11304,11307,11308,702,11311,1628,11314,11317,11318,11321],{},"Stel vooraf de instellingen voor nieuwe velden in: staand of liggend, op platte daken ",[15,11305,11306],{},"Montage plat dak"," (",[15,11309,11310],{},"Vlak (0°)",[15,11312,11313],{},"Zuidopstelling",[15,11315,11316],{},"Oost-west",") met ",[15,11319,11320],{},"Hellingshoek (°)",". Op hellende daken liggen de modules evenwijdig aan het dak.",[1453,11323,11324,11325,11328,11329,11332],{},"Klik een veld aan met ",[15,11326,11327],{},"Selecteren",". In het veldmenu kies je het ",[15,11330,11331],{},"Moduletype"," uit de catalogus; vermogen en afmetingen gaan naar de stringplanning en de opbrengstvoorspelling. Slepen verplaatst het veld, de grepen wijzigen de grootte in het moduleraster, Delete verwijdert het.",[12,11334,11335],{},"Succescriterium: de balk toont het totale aantal modules en het geïnstalleerde vermogen in kWp. Elke bewerking van een veld is één ongedaan-maakstap. In de opbrengstvoorspelling rekenen velden zonder moduletype met een standaardmodule; aangenomen afmetingen zijn daar gemarkeerd.",[12,11337,11338],{},[30,11339],{"id":11340},"inverter-strings",[41,11342,11344],{"id":11343},"hoe-maak-je-omvormer-mppts-en-strings-aan","Hoe maak je omvormer, MPPT’s en strings aan?",[1602,11346,11347,11356,11382,11389,11401],{},[1453,11348,8785,11349,8788,11351,11353,11354,39],{},[15,11350,8445],{},[15,11352,11118],{}," en klik op ",[15,11355,11175],{},[1453,11357,11358,11359,11362,11363,11366,11367,11370,11371,11374,11375,11378,11379,39],{},"Zoek in het dialoogvenster onder ",[15,11360,11361],{},"Gecontroleerde catalogus"," of in de ",[15,11364,11365],{},"Synergrid-lijst (alle gehomologeerde omvormers)"," en neem het toestel over met ",[15,11368,11369],{},"In het project overnemen",". Staat je model er niet bij, kies dan ",[15,11372,11373],{},"Zonder catalogus aanmaken",". Ontbrekende fabrikantwaarden blijven leeg en worden niet verzonnen; spanningsgrenzen vul je aan onder ",[15,11376,11377],{},"Apparaatgegevens",", stroomgrenzen per MPPT onder ",[15,11380,11381],{},"Grenzen bewerken",[1453,11383,11384,11385,11388],{},"PlanElec sluit de omvormer aan op een eigen PV-kring. Een bestaande installatieautomaat voor een opwekker wordt hergebruikt. Anders ontstaat een nieuwe ",[15,11386,11387],{},"Automaat PV-omvormer"," (standaardwaarde C 25 A, 2-polig) onder de eerste differentieelschakelaar. Pas de dimensionering aan de nominale AC-stroom van je omvormer aan. Is er nog geen enkel beveiligingstoestel, dan meldt PlanElec dat je eerst een verdeler met installatieautomaat nodig hebt.",[1453,11390,11391,11392,11395,11396,1812,11398,11400],{},"Klik in een MPPT-sectie op ",[15,11393,11394],{},"Modules toewijzen"," of in de balk ",[15,11397,11158],{},[15,11399,11188],{},". Een banner toont de MPPT, de toegelaten stringlengte en de toetsen.",[1453,11402,11403,11404,11407],{},"Klik de modules in volgorde aan. De veldchip neemt alle vrije modules van een veld over in slangvolgorde. ",[15,11405,11406],{},"Enter"," maakt de string aan, Shift+Enter maakt een parallelle string op dezelfde MPPT, Esc verwerpt het ontwerp, Backspace haalt de laatste module terug.",[12,11409,11410,11411,11413],{},"Je kunt ook met ",[15,11412,11191],{}," alle vrije modules in één stap verdelen. De samenvatting noemt de aangemaakte strings per veld en MPPT, en de redenen waarom modules overblijven, bijvoorbeeld een te hoge modulestroom voor een MPPT.",[49,11415,11416,11429],{},[52,11417,11418],{},[55,11419,11420,11423,11426],{},[58,11421,11422],{},"Controle tijdens het toewijzen",[58,11424,11425],{},"Basis",[58,11427,11428],{},"Gevolg",[68,11430,11431,11442,11452,11462,11472,11483,11493],{},[55,11432,11433,11436,11439],{},[73,11434,11435],{},"Voc koud bij −10 °C",[73,11437,11438],{},"max. DC-spanning van de omvormer, systeemspanning van de module",[73,11440,11441],{},"Fout, blokkeert Enter",[55,11443,11444,11447,11450],{},[73,11445,11446],{},"Vmpp warm bij +70 °C",[73,11448,11449],{},"MPPT-minimum",[73,11451,11441],{},[55,11453,11454,11457,11460],{},[73,11455,11456],{},"Σ Imp, Σ Isc van parallelle strings",[73,11458,11459],{},"stroomgrenzen van de MPPT",[73,11461,11441],{},[55,11463,11464,11467,11470],{},[73,11465,11466],{},"aantal parallelle strings",[73,11468,11469],{},"max. parallelle strings van de MPPT",[73,11471,11441],{},[55,11473,11474,11477,11480],{},[73,11475,11476],{},"Vmpp koud, startspanning",[73,11478,11479],{},"MPPT-maximum, startspanning",[73,11481,11482],{},"Waarschuwing",[55,11484,11485,11488,11491],{},[73,11486,11487],{},"gemengde dakvlakken, oriëntaties, lengtes",[73,11489,11490],{},"strings op dezelfde MPPT",[73,11492,11482],{},[55,11494,11495,11498,11501],{},[73,11496,11497],{},"ontbrekende kenmerken",[73,11499,11500],{},"module- of omvormergegevens",[73,11502,11503],{},"Melding „controle onvolledig”",[12,11505,11506,11507,11510],{},"Een geblokkeerde string kun je bewust aanmaken met ",[15,11508,11509],{},"Toch aanmaken"," (Ctrl\u002F⌘+Enter); de bevinding blijft staan. Is het ontwerp te lang, dan stelt de banner een gelijkmatige verdeling over meerdere strings voor. Bij module-omvormers en optimizers meldt de controle „niet van toepassing”, omdat daar de regels van de fabrikant gelden.",[12,11512,8898,11513,11516],{},[15,11514,11515],{},"Conflicten"," telt modules zonder string, moduleverwijzingen die ontbreken, strings over meerdere dakvlakken en strings met meerdere moduletypes. PlanElec herstelt die conflicten niet stilzwijgend: je past de string bewust aan of verdeelt opnieuw.",[12,11518,11519],{},[30,11520],{"id":11521},"situation-plan",[41,11523,11525],{"id":11524},"hoe-verschijnt-een-string-op-het-situatieschema","Hoe verschijnt een string op het situatieschema?",[12,11527,11528,11529,11532],{},"Op het situatieschema staat een modulesymbool voor ",[15,11530,11531],{},"één volledige string",", niet voor één module. Elke string van een omvormer heeft precies één zo’n symbool nodig.",[1602,11534,11535,11547,11554],{},[1453,11536,11537,11538,11540,11541,11543,11544,11546],{},"Ga naar de modus ",[15,11539,8591],{}," en kies in het toestellenpalet onder ",[15,11542,11205],{}," het symbool ",[15,11545,11208],{},". Plaats het op de plek van het moduleveld op het plan.",[1453,11548,11549,11550,11553],{},"Selecteer het symbool. In de toestelbalk open je ",[15,11551,11552],{},"PV-string selecteren"," en kies je de vermelding „omvormer · string”.",[1453,11555,11556],{},"Herhaal dat voor elke string. Zijn er nog geen strings, dan vraagt de balk om eerst een omvormer met PV-strings toe te voegen.",[12,11558,11559],{},"Het symbool krijgt dan een label met string, aantal modules, modulevermogen en kWp. De zelfcontrole meldt elke afwijking:",[49,11561,11562,11574],{},[52,11563,11564],{},[55,11565,11566,11568,11571],{},[58,11567,10106],{},[58,11569,11570],{},"Oorzaak",[58,11572,11573],{},"Niveau",[68,11575,11576,11587,11597],{},[55,11577,11578,11581,11584],{},[73,11579,11580],{},"„… ontbreekt in het situatieschema”",[73,11582,11583],{},"Een gedocumenteerde string heeft geen symbool",[73,11585,11586],{},"Melding, invoer ontbreekt",[55,11588,11589,11592,11595],{},[73,11590,11591],{},"„… is n keer toegewezen in het situatieschema”",[73,11593,11594],{},"Meerdere symbolen verwijzen naar dezelfde string",[73,11596,11482],{},[55,11598,11599,11602,11605],{},[73,11600,11601],{},"„PV-symbool zonder geldige stringtoewijzing”",[73,11603,11604],{},"Het symbool heeft geen of een niet meer bestaande string",[73,11606,11586],{},[12,11608,11609],{},[30,11610],{"id":11611},"single-line",[41,11613,11615],{"id":11614},"wat-toont-de-pv-zijde-in-het-eendraadschema","Wat toont de PV-zijde in het eendraadschema?",[12,11617,11618,11619,11621,11622,11172,11624,11627],{},"Selecteer de omvormer in het ",[15,11620,3764],{},". Daar kun je ook een nieuwe omvormer aanmaken via de paletgroep ",[15,11623,11205],{},[15,11625,11626],{},"PV-omvormer",". De inspector verdeelt de PV-gegevens over vijf secties:",[49,11629,11630,11640],{},[52,11631,11632],{},[55,11633,11634,11637],{},[58,11635,11636],{},"Sectie in de inspector",[58,11638,11639],{},"Wat je documenteert",[68,11641,11642,11662,11672,11682,11702],{},[55,11643,11644,11649],{},[73,11645,11646],{},[15,11647,11648],{},"Omvormer en AC-aansluiting",[73,11650,11651,11652,702,11655,11658,11659],{},"fabrikant, type, ",[15,11653,11654],{},"Serienummer",[15,11656,11657],{},"Nominaal AC-vermogen (kW)",", spanningsgrenzen, bedrijfsmodus, batterij-interface, AC-fasen, ",[15,11660,11661],{},"AC-beschermingsgeleider (mm²)",[55,11663,11664,11669],{},[73,11665,11666],{},[15,11667,11668],{},"Gemeenschappelijke DC-beveiliging",[73,11670,11671],{},"gemeenschappelijke DC-scheidingsschakelaar en DC-overspanningsbeveiliging type 2, elk met inbouwstatus",[55,11673,11674,11679],{},[73,11675,11676],{},[15,11677,11678],{},"Moduletypes",[73,11680,11681],{},"modulegegevens uit de catalogus of eigen invoer",[55,11683,11684,11689],{},[73,11685,11686],{},[15,11687,11688],{},"MPPT’s en strings",[73,11690,11691,11694,11695,702,11698,11701],{},[15,11692,11693],{},"Samenvoeging van strings"," (rechtstreeks, Y-aftakking, combiner), ",[15,11696,11697],{},"Stringzekering",[15,11699,11700],{},"DC-kabeltraject"," met deeltrajecten",[55,11703,11704,11709],{},[73,11705,11706],{},[15,11707,11708],{},"PE van moduleframes en draagstructuur",[73,11710,11711],{},"equipotentiale groepen met voorschrift van de fabrikant, doorsnede, mechanische bescherming en lengte",[12,11713,11714,11715,11718],{},"Het schema toont daaruit enkele en parallelle strings per MPPT, Y-aftakking of combiner, de beveiligingstoestellen met hun status, het ",[15,11716,11717],{},"AC-scheidingspunt",", de gedocumenteerde kabeldeeltrajecten en de afzonderlijke frame-PE tot aan de aardingsaansluiting. Strings zonder MPPT verschijnen als „Niet-toegewezen DC-strings (open)”. Ontbrekende fabrikantgrenzen blijven zichtbaar en worden niet aangevuld.",[12,11720,11721],{},"Voor de frame-PE vraagt het AREI in 7.112.2 de aarding van het metalen raam van de modules en hun structuur, behalve als de fabrikant dat verbiedt, met minstens de doorsnede van de AC-beschermingsgeleider en minimaal 2,5 mm² bij mechanische bescherming of 4 mm² zonder. De zelfcontrole vergelijkt jouw doorsnede met dat minimum. Kies je als voorschrift „Verboden door de fabrikant”, dan verwacht ze een referentie als bewijs.",[12,11723,11724,11727,11728,11731,11732,11735,11736,11739],{},[15,11725,11726],{},"DC-lengtes afleiden:"," zet in de 3D-weergave met ",[15,11729,11730],{},"Dakdoorvoer"," een anker op het dak en wijs het in de stringregel toe onder ",[15,11733,11734],{},"Doorvoer",". PlanElec leidt dan drie deeltrajecten af: over het dak tot de doorvoer, verticaal door het plafond en door het gebouw tot de omvormer. Een getypte lengte heeft voorrang; ",[15,11737,11738],{},"Afleiding herstellen"," keert terug naar de geometrie. Ontbreekt een deeltraject, dan blijft de totale lengte onbekend in plaats van nul. Het gebouwtraject is een rechtstreekse verbinding; een eigen tracé kun je daarvoor nog niet tekenen.",[12,11741,11742],{},[30,11743],{"id":11744},"yield",[41,11746,11748],{"id":11747},"hoe-bereken-je-de-opbrengstvoorspelling","Hoe bereken je de opbrengstvoorspelling?",[1602,11750,11751,11761,11775,11785],{},[1453,11752,11753,11754,2427,11756,11758,11759,39],{},"Klap in het paneel ",[15,11755,11118],{},[15,11757,11237],{}," open en ga naar het tabblad ",[15,11760,8464],{},[1453,11762,7985,11763,11766,11767,11770,11771,11774],{},[15,11764,11765],{},"Locatie instellen",". PlanElec neemt het installatieadres uit de projectgegevens over en zoekt Belgische adressen. Controleer kaart en noordrichting, vink ",[15,11768,11769],{},"Locatie en noordrichting bevestigen"," aan en klik op ",[15,11772,11773],{},"Locatie bevestigen",". Zonder die bevestiging rekent de voorspelling niet.",[1453,11776,11777,11778,2109,11781,11784],{},"Controleer de ",[15,11779,11780],{},"Aannames",[15,11782,11783],{},"Systeemverliezen (%)"," (standaard 14 %), moduletechnologie, montagewijze, horizon (terreinmodel van PVGIS of geen) en stralingsdatabank.",[1453,11786,1857,11787,11790,11791,11793],{},[15,11788,11789],{},"Berekenen",". Het tabblad ",[15,11792,3006],{}," toont jaaropbrengst, vermogen, specifieke opbrengst in kWh\u002FkWp en de maandgrafiek.",[12,11795,11796],{},"De berekening gebruikt PVGIS 5.3 van het Gemeenschappelijk Centrum voor Onderzoek van de EU, per oriëntatiegroep. Alleen coördinaten en fysische parameters worden verstuurd, geen project- of klantnamen.",[49,11798,11799,11809],{},[52,11800,11801],{},[55,11802,11803,11806],{},[58,11804,11805],{},"Kerncijfer in het resultaat",[58,11807,11808],{},"Wat erachter zit",[68,11810,11811,11821,11831,11841,11851,11861],{},[55,11812,11813,11818],{},[73,11814,11815],{},[15,11816,11817],{},"P50 (mediaan)",[73,11819,11820],{},"mediaan van de jaaropbrengsten uit de afzonderlijke jaren van de PVGIS-databank",[55,11822,11823,11828],{},[73,11824,11825],{},[15,11826,11827],{},"P90 (in 9 van de 10 jaar bereikt)",[73,11829,11830],{},"10e percentiel van dezelfde jaren; bij ongeveer 19 jaren een schatting uit een kleine steekproef",[55,11832,11833,11838],{},[73,11834,11835],{},[15,11836,11837],{},"Opbrengst met forfait",[73,11839,11840],{},"opbrengst met het forfait voor systeemverliezen",[55,11842,11843,11848],{},[73,11844,11845],{},[15,11846,11847],{},"Nauwkeurigere opbrengst",[73,11849,11850],{},"forfait opgesplitst: omvormerkarakteristiek en DC-bekabeling uit je planning, overige verliezen als rest",[55,11852,11853,11858],{},[73,11854,11855],{},[15,11856,11857],{},"Clipping",[73,11859,11860],{},"begrenzing op het nominale AC-vermogen, per omvormer in kWh\u002Fjaar, aandeel en uren",[55,11862,11863,11868],{},[73,11864,11865],{},[15,11866,11867],{},"Opbrengstverloop over 25 jaar",[73,11869,11870],{},"garantiewaarden van de module, anders de gemarkeerde aanname van 0,5 % vermogensverlies per jaar",[12,11872,11873],{},"De verliesketen heeft een omvormer met strings nodig. Zonder nominaal AC-vermogen rekent ze zonder clipping met een constant rendement. Zonder gecontroleerd rendement geldt de gemarkeerde aanname van 96 %. Voor het verlies in de DC-bekabeling tellen lengte, doorsnede uit de inspector en modulespanning; ontbreekt iets, dan rekent de string met 2 % en noemt hij de reden. Is er een batterij aan de omvormer gedocumenteerd, dan is de clipping een bovengrens.",[12,11875,11876,11877,11880,11881,1628,11884,11887,11888,11891,11892,11895,11896,11899,11900,39],{},"In het tabblad ",[15,11878,11879],{},"Varianten"," vergelijk je andere modules met ",[15,11882,11883],{},"Zelfde indeling",[15,11885,11886],{},"Zelfde oppervlakte","; varianten wijzigen de planning en de strings niet. Wijzig je geometrie, locatie, aannames of strings, dan krijgt het resultaat de status ",[15,11889,11890],{},"Resultaat is verouderd"," en blijft het rapport geblokkeerd tot je opnieuw berekent. ",[15,11893,11894],{},"Rapport openen"," maakt het ",[15,11897,11898],{},"PV-opbrengstrapport"," uit de bevroren stand; je vindt het ook onder ",[15,11901,956],{},[12,11903,11904],{},"Grenzen: P50 en P90 beschrijven voorbije weerjaren, geen opbrengstgarantie. Beschaduwing door objecten in de scène wordt niet meegerekend en er is geen rendabiliteitsberekening. Een mislukte oriëntatiegroep blijft zichtbaar als gedeeltelijk resultaat, nooit als nulopbrengst.",[12,11906,11907],{},[30,11908],{"id":11909},"self-consumption",[41,11911,11913],{"id":11912},"kun-je-zelfverbruik-thuisbatterij-en-elektrische-wagen-inschatten","Kun je zelfverbruik, thuisbatterij en elektrische wagen inschatten?",[12,11915,11916,11917,11920,11921,1725,11923,11926,11927,11930,11931,11933,11934,11937,11938,11941,11942,11945],{},"Ja, als ",[15,11918,11919],{},"pilotfunctie"," binnen de opbrengstvoorspelling. Vul in het tabblad ",[15,11922,8464],{},[15,11924,11925],{},"Elektriciteitsverbruik"," het jaarverbruik in en kies een verbruiksprofiel; onder ",[15,11928,11929],{},"Elektrische wagen"," voeg je een of twee voertuigen toe. In het tabblad ",[15,11932,3006],{}," start ",[15,11935,11936],{},"Zelfverbruik berekenen"," de berekening voor een typisch jaar per kwartier: zelfverbruiksgraad, zelfvoorzieningsgraad, afname van het net en injectie per maand. De sectie ",[15,11939,11940],{},"Thuisbatterij"," vergelijkt zonder en met projectbatterij en rangschikt capaciteiten in de ",[15,11943,11944],{},"Groottevergelijking","; het voorstel steunt op een aangenomen drempel.",[12,11947,11948],{},"De profielen zijn gemiddelde Vlaamse huishoudens (Fluvius, 2024), niet jouw meter; voor Wallonië en Brussel wordt hetzelfde verloop aangenomen. Pieken worden afgevlakt, waardoor het nut van een batterij overschat kan worden. Er zijn geen tarieven, geen besparings- of terugverdienberekening, en de cijfers staan niet in het opbrengstrapport of in het dossier.",[12,11950,11951],{},[30,11952],{"id":11953},"self-check-report",[41,11955,11957],{"id":11956},"wat-staat-er-over-pv-in-het-zelfcontrolerapport","Wat staat er over PV in het zelfcontrolerapport?",[12,11959,11960,11961,11964],{},"Bevat het project een omvormer, dan voegt het AREI-zelfcontrolerapport de sectie ",[15,11962,11963],{},"PV-installatiegegevens voor de keuring"," toe. Die is uitdrukkelijk een projectgebonden planningsregister en geen verslag van een erkend controleorganisme. Per omvormer staan er:",[1450,11966,11967,11970,11973],{},[1453,11968,11969],{},"naam, fabrikant en model,",[1453,11971,11972],{},"serienummer en maximaal AC-vermogen,",[1453,11974,11975],{},"PV-generator met aantal modules, kWp, aantal MPPT’s en strings.",[12,11977,11978,11979,11981],{},"Zo heb je de gegevens klaar die volgens AREI 7.112.4 in het verslag van de gelijkvormigheidscontrole van een huishoudelijke PV-installatie staan. Niet ingevulde waarden verschijnen als „Niet ingevuld”. Het rapport toont ook de bevindingen van de PV-regels, bijvoorbeeld over de frame-PE volgens AREI 7.112.2 en over de stringopbouw. Welke regels PlanElec evalueert, lees je in ",[30,11980,6556],{"href":2457},". Staat de zelfcontrole voor het project uit, dan is er geen rapport.",[12,11983,11984],{},[30,11985],{"id":11986},"material-list",[41,11988,11990],{"id":11989},"wat-neemt-de-materiaallijst-over-uit-de-pv-planning","Wat neemt de materiaallijst over uit de PV-planning?",[12,11992,11993,11994,1725,11996,11998],{},"De materiaallijst is een ",[15,11995,11919],{},[15,11997,956],{},". Ze neemt van de PV-DC-zijde alleen gestructureerde gegevens over: modules met type en aantal, beveiligingstoestellen die uitdrukkelijk als aanwezig zijn gedocumenteerd, en bekende kabeldeeltrajecten. Plus- en mingeleider tellen samen voor de dubbele routelengte, een meegevoerde PE\u002FPA enkel. Geïntegreerde beveiligingen en een AC-scheidingspunt dat door de bronbeveiliging wordt uitgevoerd, worden niet dubbel geteld.",[12,12000,7641,12001,12004,12005,702,12008,702,12011,1628,12014,12017,12018,39],{},[15,12002,12003],{},"Stuklijst PV-installatie"," in het materiaaloverzicht vult montageposities aan met de status ",[15,12006,12007],{},"Onderbouwd",[15,12009,12010],{},"Aanname",[15,12012,12013],{},"Open",[15,12015,12016],{},"Extern berekend",". Open posities tonen een leemte in plaats van nul. Frame-PE, connectoren, reserves en snijverlies telt de DC-telling niet mee. De lijst is fabrikantneutraal, bevat geen prijzen en is geen bestellijst; stabiliteit en bevestiging berekent de configurator van de fabrikant of een stabiliteitsingenieur. Meer daarover in ",[30,12019,6882],{"href":2451},[12,12021,12022],{},[30,12023],{"id":2353},[41,12025,12027],{"id":12026},"wat-doet-planelec-niet-bij-pv","Wat doet PlanElec niet bij PV?",[49,12029,12030,12039],{},[52,12031,12032],{},[55,12033,12034,12036],{},[58,12035,4091],{},[58,12037,12038],{},"Wie of wat beslist",[68,12040,12041,12049,12057,12065,12073,12081],{},[55,12042,12043,12046],{},[73,12044,12045],{},"stabiliteit, dakhaken, ballast",[73,12047,12048],{},"configurator van de fabrikant of stabiliteitsingenieur",[55,12050,12051,12054],{},[73,12052,12053],{},"beschaduwing door naburige objecten",[73,12055,12056],{},"eigen beoordeling; PVGIS houdt alleen rekening met de terreinhorizon",[55,12058,12059,12062],{},[73,12060,12061],{},"DC-geleiderrollen L+, L-, M, PEM, PEL",[73,12063,12064],{},"niet gemodelleerd; geleiderkeuze en isolatiebewaking controleer je zelf",[55,12066,12067,12070],{},[73,12068,12069],{},"vrijgaven en certificaten van fabrikant",[73,12071,12072],{},"datasheets en documenten van de fabrikant",[55,12074,12075,12078],{},[73,12076,12077],{},"netaansluiting en aanmelding",[73,12079,12080],{},"netbeheerder (Fluvius)",[55,12082,12083,12086],{},[73,12084,12085],{},"gelijkvormigheidscontrole",[73,12087,12088],{},"erkend organisme",[12,12090,12091,12092,12094,12095,39],{},"De kring van de omvormer plan je zoals elke andere stroomkring: zie ",[30,12093,11069],{"href":11068},". Hoe je symbolen op het situatieschema plaatst en verbindt, lees je in ",[30,12096,9308],{"href":9307},{"title":1467,"searchDepth":1468,"depth":1468,"links":12098},[12099,12100,12101,12102,12103,12104,12105,12106,12107,12108],{"id":11127,"depth":1468,"text":11128},{"id":11262,"depth":1468,"text":11263},{"id":11343,"depth":1468,"text":11344},{"id":11524,"depth":1468,"text":11525},{"id":11614,"depth":1468,"text":11615},{"id":11747,"depth":1468,"text":11748},{"id":11912,"depth":1468,"text":11913},{"id":11956,"depth":1468,"text":11957},{"id":11989,"depth":1468,"text":11990},{"id":12026,"depth":1468,"text":12027},"Dakvlakken beleggen, modules als strings aan een MPPT toewijzen, de PV-zijde in het eendraadschema documenteren en de opbrengst met PVGIS inschatten, met alle grenzen.","pv-planning","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fpv-planning-nl.webp",{},14,"\u002Fhelp\u002Fpv-planning.nl",{"title":11107,"description":12109},"pv-installatie-plannen","help\u002Fpv-planning.nl",[12119,12120,12121,12122,12123,3273,3275],"fotovoltaïsche installatie","PV-string","omvormer","MPPT","opbrengstvoorspelling","1G4D1o74_kBGuDGagjrNND4roLi6BhKK3-eMkbd_BWg",{"id":12126,"title":12127,"body":12128,"category":4028,"description":13560,"extension":1496,"guideId":9191,"image":13561,"locale":1497,"meta":13562,"navigation":1499,"order":13563,"path":13564,"publishedAt":9347,"readTime":7670,"seo":13565,"seoTitle":4037,"slug":13566,"stem":13567,"tags":13568,"updatedAt":13574,"__hash__":13575,"kind":2491,"href":8224,"date":9347},"help\u002Fhelp\u002Ftroubleshooting.nl.md","Veelvoorkomende problemen in PlanElec oplossen",{"type":9,"value":12129,"toc":13545},[12130,12133,12137,12320,12325,12329,12341,12344,12391,12409,12412,12417,12421,12430,12449,12511,12518,12523,12527,12534,12559,12562,12565,12577,12587,12592,12596,12620,12669,12672,12697,12700,12792,12801,12813,12820,12825,12829,12835,12911,12914,12917,12956,12962,12967,12971,12974,13009,13055,13064,13069,13073,13079,13129,13132,13165,13168,13188,13195,13200,13204,13210,13231,13238,13243,13247,13250,13357,13362,13367,13371,13374,13443,13453,13461,13466,13470,13473,13515,13529,13533],[12,12131,12132],{},"Bijna elke blokkering in PlanElec noemt zelf haar oorzaak: een schaal die nog niet bevestigd is, een toestel zonder stroomkring, een open punt vóór de afgifteversie, een onvolledige kabelroute, een module zonder plaats op een rij, een sync-toestand, een bereikte AI-limiet of een browser zonder WebGL. Deze pagina koppelt elke melding aan haar oorzaak in het programma en leidt je stap voor stap naar de oplossing. Je hebt een geopend project in de studio nodig. Verdwijnt een melding, dan ziet PlanElec het punt niet meer in de ingevoerde gegevens. De vakkundige controle van de installatie en de keuring door het erkend organisme blijven daarvan los.",[41,12134,12136],{"id":12135},"welk-probleem-heb-je","Welk probleem heb je?",[49,12138,12139,12149],{},[52,12140,12141],{},[55,12142,12143,12145,12147],{},[58,12144,9204],{},[58,12146,11570],{},[58,12148,3751],{},[68,12150,12151,12167,12181,12195,12213,12227,12241,12258,12275,12289,12303],{},[55,12152,12153,12158,12161],{},[73,12154,12155,12156],{},"„Zonder bevestigde schaal blijft de overname geblokkeerd.” of status ",[15,12157,10510],{},[73,12159,12160],{},"Schaal van het herkende grondplan ontbreekt of is niet bevestigd",[73,12162,12163],{},[30,12164,12166],{"href":12165},"#floorplan-scale","Grondplan overnemen",[55,12168,12169,12172,12175],{},[73,12170,12171],{},"„Het plan telt … pagina’s. Kies in het voorbeeld de pagina met het grondplan.”",[73,12173,12174],{},"Pdf met meerdere pagina’s",[73,12176,12177],{},[30,12178,12180],{"href":12179},"#floorplan-pages","Pdf en bestandsformaat",[55,12182,12183,12186,12189],{},[73,12184,12185],{},"Toestel ontbreekt in het eendraadschema, „… toestellen zonder stroombaan”",[73,12187,12188],{},"Toestel hangt aan geen enkele beveiliging",[73,12190,12191],{},[30,12192,12194],{"href":12193},"#device-without-circuit","Toestel zonder stroomkring",[55,12196,12197,12204,12207],{},[73,12198,12199,12201,12202],{},[15,12200,8036],{}," is geblokkeerd, status ",[15,12203,9583],{},[73,12205,12206],{},"Minstens één open punt voor dit document",[73,12208,12209],{},[30,12210,12212],{"href":12211},"#export-blocked","Export geblokkeerd",[55,12214,12215,12218,12221],{},[73,12216,12217],{},"„Zelfcontrole staat uit” bij het zelfcontrolerapport",[73,12219,12220],{},"Zelfcontrole voor het project uitgeschakeld",[73,12222,12223],{},[30,12224,12226],{"href":12225},"#self-check-off","Zelfcontrole uit",[55,12228,12229,12232,12235],{},[73,12230,12231],{},"Rode of gele markering „!” bij een symbool, oranje stip op een toestel",[73,12233,12234],{},"Bevinding van de zelfcontrole, ontbrekende koppeling of kleur van de stroomkring",[73,12236,12237],{},[30,12238,12240],{"href":12239},"#colour-markers","Kleurmarkeringen",[55,12242,12243,12249,12252],{},[73,12244,12245,12248],{},[15,12246,12247],{},"Route onvolledig"," of „lengte ontbreekt voor exacte ΔU-berekening”",[73,12250,12251],{},"Kabelroute niet doorlopend gelegd, geen lengte ingevoerd",[73,12253,12254],{},[30,12255,12257],{"href":12256},"#cable-length","Kabellengte",[55,12259,12260,12266,12269],{},[73,12261,12262,12265],{},[15,12263,12264],{},"Niet-geplaatste modules"," in de verdeelkast",[73,12267,12268],{},"Module bestaat, maar heeft geen plaats op een DIN-rail",[73,12270,12271],{},[30,12272,12274],{"href":12273},"#cabinet-unplaced","Modules plaatsen",[55,12276,12277,12280,12283],{},[73,12278,12279],{},"„Niet klaar: Live-sync uitgeschakeld”, „Conflict”, „gereserveerd in een andere sessie”",[73,12281,12282],{},"Opslag- en synchronisatietoestand",[73,12284,12285],{},[30,12286,12288],{"href":12287},"#sync","Opslaan en sync",[55,12290,12291,12294,12297],{},[73,12292,12293],{},"„Het daglimiet voor herkenningen is bereikt.” of AI-tegoed is onvoldoende",[73,12295,12296],{},"Daglimiet van de herkenning of AI-tegoed opgebruikt",[73,12298,12299],{},[30,12300,12302],{"href":12301},"#ai-limit","AI-limiet",[55,12304,12305,12311,12314],{},[73,12306,12307,1628,12309],{},[15,12308,8333],{},[15,12310,8344],{},[73,12312,12313],{},"Geen WebGL of grafische verbinding gereset",[73,12315,12316],{},[30,12317,12319],{"href":12318},"#fallback-3d","3D-melding",[12,12321,12322],{},[30,12323],{"id":12324},"floorplan-scale",[41,12326,12328],{"id":12327},"waarom-kan-ik-het-herkende-grondplan-niet-overnemen","Waarom kan ik het herkende grondplan niet overnemen?",[12,12330,12331,12332,12334,12335,12337,12338,12340],{},"De AI-grondplanherkenning neemt muren en ruimtes pas over als de schaal bevestigd is. Ontbreekt er een gegeven, dan staat de run op ",[15,12333,10510],{}," met de melding „Voor de overname ontbreekt nog een gegeven, meestal de schaal. Controleer en vul aan.” In het onderdeel ",[15,12336,10281],{}," van het paneel ",[15,12339,10211],{}," staat dan: „Zonder bevestigde schaal blijft de overname geblokkeerd.”",[12,12342,12343],{},"Zo geef je de overname vrij:",[1602,12345,12346,12362,12372,12380,12386],{},[1453,12347,12348,12349,12351,12352,12354,12355,702,12357,1628,12359,12361],{},"Open in de studio het paneel ",[15,12350,10211],{},". Het onderdeel ",[15,12353,10281],{}," toont waar de schaal vandaan komt, bijvoorbeeld ",[15,12356,10667],{},[15,12358,10677],{},[15,12360,10687],{},", en de gebruikte ankers in meter.",[1453,12363,12364,12365,8740,12367,12369,12370,39],{},"Ontbreekt de schaal of meldt PlanElec „De in het plan gedrukte oppervlaktes passen niet bij de schaal. Meet een gekende lengte na.”, open dan ",[15,12366,10357],{},[15,12368,10756],{},". Markeer twee punten van een bekende afstand, voer de lengte in meter in en kies ",[15,12371,10818],{},[1453,12373,12374,12375,12377,12378,39],{},"Controleer een tweede bekende lengte in het plan. Klopt die, kies dan ",[15,12376,10567],{},". Succescriterium: het onderdeel toont ",[15,12379,10716],{},[1453,12381,12382,12383,12385],{},"Kies onderaan de ",[15,12384,10273],{},". „De doelverdieping moet leeg zijn.” Is ze dat niet, dan meldt PlanElec „De doelverdieping is niet leeg.” Maak dan een lege verdieping aan of kies een andere.",[1453,12387,7985,12388,12390],{},[15,12389,6847],{},". De overname is één stap die je ongedaan kunt maken.",[12,12392,12393,12394,12396,12397,12400,12401,12403,12404,933,12407,39],{},"Werk je zonder AI met een plan als sjabloon, dan toont de laagwerkbank in de stap ",[15,12395,10281],{}," „Nog geen schaal” zolang je niet gekalibreerd hebt. Kies daar twee punten van een bekende afstand of in de werkbalk ",[15,12398,12399],{},"Kalibreren",", en rond af met ",[15,12402,2695],{},". Details: ",[30,12405,3378],{"href":12406},"\u002Fhelp\u002Fgrondplan-importeren-en-kalibreren#calibrate",[30,12408,3382],{"href":3381},[12,12410,12411],{},"De herkenning levert een voorstel. Maten, muurverloop en ruimtegrenzen controleer je zelf aan het originele plan, vóór je aan de elektrische planning begint.",[12,12413,12414],{},[30,12415],{"id":12416},"floorplan-pages",[41,12418,12420],{"id":12419},"wat-als-de-pdf-meerdere-paginas-heeft-of-niet-herkend-wordt","Wat als de pdf meerdere pagina’s heeft of niet herkend wordt?",[12,12422,12423,12424,12426,12427,12429],{},"Start je op een lege verdieping met ",[15,12425,10335],{},", dan slaat PlanElec het bestand op in de documentenmap van het project. Bij een pdf met meerdere pagina’s gokt PlanElec geen pagina. Je ziet „Het plan telt {aantal} pagina’s. Kies in het voorbeeld de pagina met het grondplan.” en het ",[15,12428,10348],{}," gaat open.",[1602,12431,12432,12438,12443],{},[1453,12433,12434,12435,12437],{},"Blader in het ",[15,12436,10348],{}," naar de pagina met het grondplan.",[1453,12439,7985,12440,12442],{},[15,12441,6843],{},". De herkenning loopt alleen voor die pagina.",[1453,12444,12445,12446,12448],{},"Controleer het resultaat in het paneel ",[15,12447,10211],{}," zoals hierboven beschreven.",[49,12450,12451,12462],{},[52,12452,12453],{},[55,12454,12455,12457,12459],{},[58,12456,10106],{},[58,12458,11570],{},[58,12460,12461],{},"Oplossing",[68,12463,12464,12479,12490,12500],{},[55,12465,12466,12469,12472],{},[73,12467,12468],{},"„Dit bestand kan niet worden herkend. Mogelijk zijn PDF, PNG, JPEG en WebP tot 50 MB.”",[73,12470,12471],{},"Ander formaat, bv. DXF, of bestand te groot",[73,12473,12474,12475,12478],{},"DXF via ",[15,12476,12477],{},"Plan uploaden"," als sjabloon importeren; afbeelding of pdf verkleinen",[55,12480,12481,12484,12487],{},[73,12482,12483],{},"„De automatische herkenning heeft geen bruikbaar grondplan gevonden. …”",[73,12485,12486],{},"Geen bruikbaar voorstel",[73,12488,12489],{},"Het plan ligt klaar als sjabloon: instellen en buitenmuren overtekenen",[55,12491,12492,12495,12498],{},[73,12493,12494],{},"„De herkenning duurde te lang en is afgebroken. …”",[73,12496,12497],{},"Tijdslimiet van de run",[73,12499,10919],{},[55,12501,12502,12505,12508],{},[73,12503,12504],{},"„Herkenning is nog niet beschikbaar — het bestand blijft bruikbaar als projectstuk”",[73,12506,12507],{},"Functie niet bereikbaar voor je account of je rol",[73,12509,12510],{},"Het bestand als sjabloon overtekenen",[12,12512,12513,12514,39],{},"Voor architectenplannen met meerdere grondplannen op één blad markeer je bij het importeren per grondplan een uitsnede: ",[30,12515,12517],{"href":12516},"\u002Fhelp\u002Fgrondplan-importeren-en-kalibreren#sections","Meerdere grondplannen op één blad scheiden",[12,12519,12520],{},[30,12521],{"id":12522},"device-without-circuit",[41,12524,12526],{"id":12525},"waarom-verschijnt-een-toestel-niet-in-het-eendraadschema","Waarom verschijnt een toestel niet in het eendraadschema?",[12,12528,12529,12530,12533],{},"Het eendraadschema tekent elke stroomkring vanaf haar beveiliging met de verbruikers die erop aangesloten zijn. Een toestel dat je op het grondplan hebt gezet maar aan geen stroomkring hebt toegewezen, heeft zo’n pad niet en verschijnt dus nog niet. De zelfcontrole meldt dat als „\"{naam}\" is niet aangesloten”, in ",[15,12531,12532],{},"Installatie"," staat de taak „{aantal} toestellen zonder stroombaan”.",[1602,12535,12536,12541,12548,12554],{},[1453,12537,4167,12538,12540],{},[15,12539,12532],{},". Zonder selectie toont het zijpaneel de openstaande taken.",[1453,12542,12543,12544,12547],{},"Kies bij de toestellen zonder stroombaan ",[15,12545,12546],{},"Automatisch toewijzen",". Het voorbeeld van de automatische planning toont per toestel de stroombaan en de beveiliging; je neemt het bewust over.",[1453,12549,12550,12551,39],{},"Voor een gerichte toewijzing selecteer je het toestel en gebruik je ",[15,12552,12553],{},"Stroombaan toewijzen",[1453,12555,4167,12556,12558],{},[15,12557,3764],{},". Succescriterium: het toestel staat onder zijn stroomkring.",[12,12560,12561],{},"Maak een toestel geen tweede keer aan om het in het schema te zien. Het blijft hetzelfde object in grondplan, installatie en schema.",[12,12563,12564],{},"Twee verwante meldingen:",[1450,12566,12567,12574],{},[1453,12568,12569,12570,12573],{},"„{naam}: verdeelbord open” betekent: elektrisch verbonden, maar nog aan geen verdeelbord toegewezen. ",[15,12571,12572],{},"Verdeelbord vormen"," opent het voorbeeld. In de export verschijnt daarbij „Verdelertoewijzing nog open. Voltooi de installatie.”",[1453,12575,12576],{},"„Verbruiker {referentie} is niet op het situatieplan geplaatst” is het omgekeerde geval: het toestel bestaat elektrisch, maar heeft geen symbool op het situatieplan. Voor de export van het situatieplan luidt de melding „Ontbrekende toestellen op het situatieschema plaatsen”.",[12,12578,12579,12580,933,12584,39],{},"Meer hierover: ",[30,12581,12583],{"href":12582},"\u002Fhelp\u002Finstallatie-plannen-en-onderverdelers-vormen#assignment","Een bestaand toestel op het grondplan toewijzen",[30,12585,12586],{"href":6871},"Automatische planning",[12,12588,12589],{},[30,12590],{"id":12591},"export-blocked",[41,12593,12595],{"id":12594},"waarom-is-afgifteversie-maken-geblokkeerd","Waarom is „Afgifteversie maken” geblokkeerd?",[12,12597,12598,12599,12601,12602,12604,12605,12607,12608,933,12611,1934,12614,1628,12617,39],{},"In ",[15,12600,956],{}," heeft elk document een kaart met een status en twee wegen: ",[15,12603,9513],{}," levert altijd een pdf met conceptvermelding, zodra het document inhoud heeft. ",[15,12606,8036],{}," wordt pas actief als er voor dit document geen blokkering meer openstaat. De koptekst vat dat samen als ",[15,12609,12610],{},"Conceptdocumenten",[15,12612,12613],{},"Definitieve indiening",[15,12615,12616],{},"Klaar voor export",[15,12618,12619],{},"Nog niet klaar",[49,12621,12622,12630],{},[52,12623,12624],{},[55,12625,12626,12628],{},[58,12627,3606],{},[58,12629,752],{},[68,12631,12632,12642,12651,12660],{},[55,12633,12634,12639],{},[73,12635,12636],{},[15,12637,12638],{},"Concept",[73,12640,12641],{},"Voor dit document ontbreekt nog inhoud („Inhoud voor dit document toevoegen”).",[55,12643,12644,12648],{},[73,12645,12646],{},[15,12647,9583],{},[73,12649,12650],{},"Minstens één blokkering staat open. Alleen het concept is mogelijk.",[55,12652,12653,12657],{},[73,12654,12655],{},[15,12656,9579],{},[73,12658,12659],{},"Geen blokkeringen, wel aandachtspunten. Je bevestigt ze vóór de archivering.",[55,12661,12662,12666],{},[73,12663,12664],{},[15,12665,9576],{},[73,12667,12668],{},"Geen blokkeringen en geen aandachtspunten.",[12,12670,12671],{},"Zo vind je de blokkering:",[1602,12673,12674,12679,12682,12691],{},[1453,12675,4167,12676,12678],{},[15,12677,956],{},". Onder de status van elke kaart staat het eerste open punt als link.",[1453,12680,12681],{},"Klik erop. PlanElec springt naar de weergave waarin je het oplost.",[1453,12683,12684,12685,12687,12688,12690],{},"Los het punt op en keer terug naar ",[15,12686,956],{},". De volgende blokkering schuift op, tot ",[15,12689,8036],{}," actief is.",[1453,12692,12693,12694,12696],{},"Staan er alleen nog aandachtspunten open, dan verschijnt „Aandachtspunten voor deze afgifteversie bevestigen”. Met ",[15,12695,9644],{}," worden ze deel van de opgeslagen afgifteversie.",[12,12698,12699],{},"Veelvoorkomende blokkeringen bij nieuwe projecten:",[49,12701,12702,12712],{},[52,12703,12704],{},[55,12705,12706,12709],{},[58,12707,12708],{},"Tekst in de export",[58,12710,12711],{},"Waar je het oplost",[68,12713,12714,12727,12743,12756,12766,12776,12784],{},[55,12715,12716,12719],{},[73,12717,12718],{},"„Eendraadschema nakijken en bevestigen”",[73,12720,12721,11172,12723,12726],{},[15,12722,3764],{},[15,12724,12725],{},"Schema als nagekeken markeren",". Elke latere wijziging aan het schema heft de markering op.",[55,12728,12729,12732],{},[73,12730,12731],{},"„Aansluitgegevens nog niet bevestigd”",[73,12733,12734,12736,12737,11172,12740],{},[15,12735,12532],{}," → „Aansluiting is een aanname” → ",[15,12738,12739],{},"Controleren en bevestigen",[15,12741,12742],{},"Aansluitgegevens bevestigen",[55,12744,12745,12748],{},[73,12746,12747],{},"„Plaatsingswijzen aanvullen en bevestigen”, „Onderbrekingsvermogen aanvullen”",[73,12749,12750,12752,12753],{},[15,12751,956],{}," → onderdeel ",[15,12754,12755],{},"Ontbrekende gegevens aanvullen",[55,12757,12758,12761],{},[73,12759,12760],{},"„Ontbrekende toestellen op het situatieschema plaatsen”",[73,12762,12763,12764],{},"Situatieplan, zie ",[30,12765,12194],{"href":12193},[55,12767,12768,12771],{},[73,12769,12770],{},"„Ontbrekende modules op de DIN-rails plaatsen”",[73,12772,12773,12774],{},"Verdeelkast, zie ",[30,12775,12274],{"href":12273},[55,12777,12778,12781],{},[73,12779,12780],{},"„Stroombaanaanduidingen aanvullen”",[73,12782,12783],{},"Elke stroomkring een aanduiding geven; de link leidt naar de verdeelkast",[55,12785,12786,12789],{},[73,12787,12788],{},"„Tegenstrijdige koppelingen controleren”",[73,12790,12791],{},"Eendraadschema: de koppelingen van het genoemde element corrigeren",[12,12793,12794,12796,12797,12800],{},[15,12795,12725],{}," blijft uitgeschakeld zolang er controlebevindingen openstaan: „Los de openstaande controlebevindingen op voordat je het schema als gecontroleerd markeert.” De knop ",[15,12798,12799],{},"Waarschuwingen"," ernaast springt naar de eerste open bevinding.",[12,12802,12803,12806,12807,1725,12810,39],{},[15,12804,12805],{},"Fouten en waarschuwingen van de zelfcontrole:"," een fout, een ontbrekende invoer of een niet-geëvalueerde regel blokkeert de afgifteversie. Een waarschuwing blokkeert niet; ze verschijnt als aandachtspunt dat je bevestigt. De bevindingen lees je in het paneel ",[15,12808,12809],{},"Evaluatie",[15,12811,12812],{},"Waarschuwingen · Validatie",[12,12814,12815,12816,933,12818,39],{},"Heb je net iets gewijzigd, dan toont de kaart „Lokale wijzigingen zijn nog niet opgeslagen. Je kunt al een concept downloaden.” De afgifteversie volgt zodra de stand opgeslagen is. Meer details: ",[30,12817,6882],{"href":2451},[30,12819,10087],{"href":2457},[12,12821,12822],{},[30,12823],{"id":12824},"colour-markers",[41,12826,12828],{"id":12827},"waarom-is-een-schakelaar-of-een-lamp-oranje-gemarkeerd","Waarom is een schakelaar of een lamp oranje gemarkeerd?",[12,12830,12831,12832,12834],{},"Oranje heeft in PlanElec afhankelijk van de weergave een van twee betekenissen: op het grondplan is een toestel met een oranje stip nog niet aan de installatie gekoppeld, en een lijn of symbool dat volledig oranje is, draagt gewoon de kleur van zijn stroomkring. Bevindingen van de zelfcontrole kleuren in het ",[15,12833,3764],{}," geen enkel symbool: ze verschijnen als een kleine markering in de hoek van het symbool, een rode cirkel met „!” voor een fout en een gele driehoek met „!” voor een waarschuwing.",[49,12836,12837,12848],{},[52,12838,12839],{},[55,12840,12841,12843,12846],{},[58,12842,9204],{},[58,12844,12845],{},"Waar",[58,12847,752],{},[68,12849,12850,12862,12874,12886,12896],{},[55,12851,12852,12855,12859],{},[73,12853,12854],{},"Rode cirkel met „!” in de hoek van een symbool",[73,12856,12857],{},[15,12858,3764],{},[73,12860,12861],{},"De zelfcontrole meldt een fout voor dit element. Heeft een element beide, dan toont de markering de fout.",[55,12863,12864,12867,12871],{},[73,12865,12866],{},"Gele driehoek met „!” in de hoek van een symbool",[73,12868,12869],{},[15,12870,3764],{},[73,12872,12873],{},"De zelfcontrole meldt een waarschuwing voor dit element.",[55,12875,12876,12879,12883],{},[73,12877,12878],{},"Kader dat kort pulseert rond een symbool",[73,12880,12881],{},[15,12882,3764],{},[73,12884,12885],{},"Er is net een bevinding bijgekomen, of je hebt ze aangeklikt in de lijst met bevindingen. Het kader verdwijnt na enkele seconden.",[55,12887,12888,12891,12893],{},[73,12889,12890],{},"Kleine oranje stip rechtsboven aan een toestel",[73,12892,6435],{},[73,12894,12895],{},"Het toestel is nog aan geen enkel element van de installatie gekoppeld. Een groene stip betekent: gekoppeld.",[55,12897,12898,12901,12904],{},[73,12899,12900],{},"Toestelsymbool of lijn volledig in het oranje",[73,12902,12903],{},"Grondplan, eendraadschema",[73,12905,12906,12907,12910],{},"Kleur van de stroomkring of, in de kleurmodus ",[15,12908,12909],{},"Symbooltype",", van het symbooltype. Dat is geen bevinding.",[12,12912,12913],{},"Opmerkingen krijgen geen markering bij het symbool en staan alleen in de lijst met bevindingen. Daartoe hoort de aanbeveling om vóór een differentieelschakelaar van 30 mA een vertraagde differentieelschakelaar van type S te plaatsen (selectiviteit): dat is een praktijkaanbeveling volgens IEC 60364-5-53, geen AREI-verplichting voor woningen.",[12,12915,12916],{},"Zo vind je de reden:",[1602,12918,12919,12925,12932,12937],{},[1453,12920,12921,12922,12924],{},"Tik of klik in het ",[15,12923,3764],{}," op de markering bij het symbool. De lijst met bevindingen opent met alle bevindingen van dat element, telkens met reden en voorstel. De kleine legende rechtsboven in het schema verklaart de markeringen.",[1453,12926,12927,12928,1725,12930,39],{},"Klik je in de lijst met bevindingen op een bevinding, dan springt het eendraadschema naar het element en licht het kort op. Alle bevindingen lees je ook in het paneel ",[15,12929,12809],{},[15,12931,12812],{},[1453,12933,12934,12935,39],{},"Een oranje stip op het grondplan wordt groen zodra het toestel aan de installatie gekoppeld is, bijvoorbeeld door het aan een stroomkring toe te wijzen: zie ",[30,12936,12194],{"href":12193},[1453,12938,7641,12939,12942,12943,933,12946,12948,12949,12952,12953,39],{},[15,12940,12941],{},"Kleurmodus"," zet je in de symboollegenda om tussen ",[15,12944,12945],{},"Stroomkring",[15,12947,12909],{},": op het grondplan via ",[15,12950,12951],{},"Lagen"," in de linkerbalk, in het eendraadschema via de knop ",[15,12954,12955],{},"Symboollegenda",[12,12957,12958,12959,12961],{},"Staat de zelfcontrole voor het project uit, dan toont het eendraadschema geen controlemarkeringen: zie ",[30,12960,12226],{"href":12225},". De 3D-weergave en de PDF-export tonen geen controlemarkeringen.",[12,12963,12964],{},[30,12965],{"id":12966},"self-check-off",[41,12968,12970],{"id":12969},"wanneer-schakel-je-de-zelfcontrole-voor-een-project-uit","Wanneer schakel je de zelfcontrole voor een project uit?",[12,12972,12973],{},"De AREI-zelfcontrole kun je per project uitschakelen. Dat is bedoeld voor vakmensen die een bestaande, niet-conforme installatie als vertrekpunt documenteren. Voor een nieuwe planning blijft ze aan.",[1602,12975,12976,12985,12990,13004],{},[1453,12977,12978,12979,11172,12982,39],{},"Open het projectmenu (logo linksboven) → ",[15,12980,12981],{},"Projectinstellingen…",[15,12983,12984],{},"Algemeen",[1453,12986,12987,12988,1032],{},"Schakel ",[15,12989,5096],{},[1453,12991,12992,12993,12996,12997,13000,13001,39],{},"Kies in het venster „Zelfcontrole uitschakelen?” bij ",[15,12994,12995],{},"Aanleiding (optioneel)"," bijvoorbeeld ",[15,12998,12999],{},"Bestaande toestand als vertrekpunt documenteren"," en bevestig met ",[15,13002,13003],{},"Uitschakelen",[1453,13005,13006,13007,39],{},"Succescriterium: in de studio verschijnt de melding ",[15,13008,12226],{},[49,13010,13011,13021],{},[52,13012,13013],{},[55,13014,13015,13018],{},[58,13016,13017],{},"Wat verandert",[58,13019,13020],{},"Effect bij uitgeschakelde zelfcontrole",[68,13022,13023,13031,13039,13047],{},[55,13024,13025,13028],{},[73,13026,13027],{},"Bevindingen in de editor",[73,13029,13030],{},"„De AREI-controle loopt op de achtergrond verder. Bevindingen worden niet getoond en exports bevatten geen controlevermeldingen.”",[55,13032,13033,13036],{},[73,13034,13035],{},"Zelfcontrolerapport",[73,13037,13038],{},"Geblokkeerd: „Zelfcontrole staat uit” of „Niet beschikbaar zolang de zelfcontrole uit staat.”",[55,13040,13041,13044],{},[73,13042,13043],{},"Regel-, kabel- en aansluitbevindingen",[73,13045,13046],{},"Worden aandachtspunten; de afgifte toont „{aantal} bevindingen zonder beoordeling (zelfcontrole uit)”",[55,13048,13049,13052],{},[73,13050,13051],{},"Blijft blokkeren",[73,13053,13054],{},"Tegenstrijdige koppelingen, ontbrekende inhoud, niet-geplaatste toestellen, verdeelborden en modules, ontbrekende stroombaanaanduidingen, niet weergeefbare modules en de schemabevestiging",[12,13056,13057,13058,933,13060,13063],{},"Via de melding ",[15,13059,12226],{},[15,13061,13062],{},"Zelfcontrole inschakelen"," zet je de normale toestand op elk moment terug.",[12,13065,13066],{},[30,13067],{"id":13068},"cable-length",[41,13070,13072],{"id":13071},"waarom-ontbreekt-een-kabellengte-of-staat-er-route-onvolledig","Waarom ontbreekt een kabellengte of staat er „Route onvolledig”?",[12,13074,13075,13076,13078],{},"PlanElec bepaalt de lengte van een kabel in deze volgorde: een gemeten lengte die jij invoert, gaat voor. Anders geldt de lengte van de getekende route. Is de route niet doorlopend gelegd, dan geeft PlanElec geen geschat getal, maar toont het ",[15,13077,12247],{},". Zonder lengte meldt de zelfcontrole „Kabel \"{label}\" — lengte ontbreekt voor exacte ΔU-berekening”.",[49,13080,13081,13091],{},[52,13082,13083],{},[55,13084,13085,13087,13089],{},[58,13086,7790],{},[58,13088,11570],{},[58,13090,12461],{},[68,13092,13093,13106,13118],{},[55,13094,13095,13100,13103],{},[73,13096,13097],{},[15,13098,13099],{},"Nog niet gelegd",[73,13101,13102],{},"De kabel heeft nog geen route",[73,13104,13105],{},"Route automatisch of manueel tekenen",[55,13107,13108,13112,13115],{},[73,13109,13110],{},[15,13111,12247],{},[73,13113,13114],{},"Er ontbreekt een stuk, vaak de overgang tussen verdiepingen",[73,13116,13117],{},"Ontbrekend stuk of stijgpunt aanvullen",[55,13119,13120,13123,13126],{},[73,13121,13122],{},"„Geen verbinding heeft haltes op beide verdiepingen.”",[73,13124,13125],{},"Geen trap, schacht of stijgpunt verbindt beide verdiepingen",[73,13127,13128],{},"Verticale verbinding aanmaken, daarna leggen",[12,13130,13131],{},"Route vervolledigen:",[1602,13133,13134,13143,13149,13159],{},[1453,13135,13136,13137,11172,13140,39],{},"Open op het situatieplan ",[15,13138,13139],{},"Koppelen en leidingen",[15,13141,13142],{},"Kabeltracé",[1453,13144,7985,13145,13148],{},[15,13146,13147],{},"Alles automatisch bekabelen"," voor de actieve verdieping, of klik op een kabel om de tussenpunten te bewerken.",[1453,13150,13151,13152,13155,13156,39],{},"Bij een kabel tussen verdiepingen kies je ",[15,13153,13154],{},"Trap, schacht of stijgpunt kiezen"," en daarna ",[15,13157,13158],{},"Via verbinding leggen",[1453,13160,13161,13162,13164],{},"Succescriterium: in plaats van ",[15,13163,12247],{}," staat de lengte in meter.",[12,13166,13167],{},"Gemeten lengte invoeren, bijvoorbeeld bij een bestaande installatie:",[1602,13169,13170,13173,13178],{},[1453,13171,13172],{},"Selecteer de kabel in het kabeltracé of in het eendraadschema.",[1453,13174,4167,13175,39],{},[15,13176,13177],{},"Kabeltype en geleiders bewerken",[1453,13179,13180,13181,13184,13185,39],{},"Vul ",[15,13182,13183],{},"Gemeten lengte (m)"," in en kies ",[15,13186,13187],{},"Kabelgegevens opslaan",[12,13189,13190,13191,39],{},"De gemeten lengte gaat naar de kabellijst en de spanningsvalberekening; de geometrische waarde van de route blijft als vergelijking bewaard. Meer hierover: ",[30,13192,13194],{"href":13193},"\u002Fhelp\u002Fschakelketens-stroomkringen-en-kabelroutes#cable-routes","Kabelroute plannen en bijwerken",[12,13196,13197],{},[30,13198],{"id":13199},"cabinet-unplaced",[41,13201,13203],{"id":13202},"waarom-staan-modules-bij-niet-geplaatste-modules","Waarom staan modules bij „Niet-geplaatste modules”?",[12,13205,13206,13207,13209],{},"Een module die in het project bestaat maar nog op geen enkele DIN-rail zit, staat in de verdeelkast bovenaan bij ",[15,13208,12264],{},", met de melding „Aanwezig in het schema, maar nog niet aan een DIN-rail toegewezen.” Dat gebeurt bijvoorbeeld als je een beveiliging in het eendraadschema of in de installatie aanmaakt. Selecteer je haar in een andere weergave, dan zegt PlanElec: „Deze module is nog niet geplaatst. Je vindt ze bij de ongeplaatste modules.”",[1602,13211,13212,13217,13225,13228],{},[1453,13213,4167,13214,13216],{},[15,13215,1721],{}," voor het betrokken verdeelbord.",[1453,13218,1614,13219,13221,13222,13224],{},[15,13220,12264],{}," op de module (",[15,13223,587],{},"). PlanElec zet ze op de eerstvolgende vrije plaats.",[1453,13226,13227],{},"Meldt PlanElec „Geen vrije plaats in de toegewezen kast.”, maak dan eerst plaats op de rijen of bekijk de kastplanning van het verdeelbord.",[1453,13229,13230],{},"Succescriterium: de balk verdwijnt zodra er geen module meer openstaat.",[12,13232,13233,13234,39],{},"Voor de pdf van de verdeelkast is een niet-geplaatste module een blokkering: „Ontbrekende modules op de DIN-rails plaatsen”. Meer hierover: ",[30,13235,13237],{"href":13236},"\u002Fhelp\u002Finstallatie-plannen-en-onderverdelers-vormen#cabinet","Modules en behuizing concretiseren",[12,13239,13240],{},[30,13241],{"id":13242},"sync",[41,13244,13246],{"id":13245},"wat-betekenen-de-opslag-en-sync-meldingen","Wat betekenen de opslag- en sync-meldingen?",[12,13248,13249],{},"De opslagstatus zie je aan het ronde statussymbool in de statusbalk rechtsonder. Een klik opent de details: opslagstatus, offline beschikbaarheid en verbinding.",[49,13251,13252,13262],{},[52,13253,13254],{},[55,13255,13256,13258,13260],{},[58,13257,10106],{},[58,13259,752],{},[58,13261,755],{},[68,13263,13264,13276,13291,13302,13319,13330,13344],{},[55,13265,13266,13268,13271],{},[73,13267,7871],{},[73,13269,13270],{},"De offline voorbereiding heeft live-sync nodig. Het gewone opslaan op de server loopt gewoon door.",[73,13272,13273,13274,39],{},"Niets. Let op ",[15,13275,7880],{},[55,13277,13278,13283,13286],{},[73,13279,13280,13282],{},[15,13281,7914],{},", „Opgeslagen in deze browser. De serverback-up is nog niet voltooid.”",[73,13284,13285],{},"De wijzigingen staan in de browser, de server heeft ze nog niet.",[73,13287,13288,13289,7855],{},"Verbinding controleren; het tabblad openlaten tot ",[15,13290,7880],{},[55,13292,13293,13296,13299],{},[73,13294,13295],{},"„Een bewerkt object is momenteel gereserveerd in een andere sessie. …”",[73,13297,13298],{},"Iemand bewerkt hetzelfde object in een andere sessie.",[73,13300,13301],{},"Niets. Je wijzigingen blijven lokaal bewaard; het opslaan wordt automatisch opnieuw geprobeerd.",[55,13303,13304,13308,13311],{},[73,13305,13306],{},[15,13307,7980],{},[73,13309,13310],{},"Je wijzigingen spreken de gezamenlijk opgeslagen versie tegen.",[73,13312,13313,13315,13316,13318],{},[15,13314,7988],{},", daarna ",[15,13317,7994],{}," en bevestigen.",[55,13320,13321,13324,13327],{},[73,13322,13323],{},"„Conflict: dit project is elders gewijzigd. Gelieve te herladen.”",[73,13325,13326],{},"Het project is elders opgeslagen.",[73,13328,13329],{},"Pagina herladen en je laatste wijziging nakijken.",[55,13331,13332,13338,13341],{},[73,13333,13334,13337],{},[15,13335,13336],{},"Herladen nodig",": „Deze pagina draait op een oudere versie. …”",[73,13339,13340],{},"Er is een nieuwe appversie actief.",[73,13342,13343],{},"Pagina herladen; je wijzigingen zijn lokaal bewaard.",[55,13345,13346,13350,13353],{},[73,13347,13348],{},[15,13349,7955],{},[73,13351,13352],{},"Je aanmelding is verlopen.",[73,13354,13355,39],{},[15,13356,7959],{},[12,13358,13359,13361],{},[15,13360,7994],{}," vervangt de lokale wijzigingen van deze sessie door het opgeslagen project. Download daarom eerst de reservekopie als je de wijzigingen wilt houden. Andere tabbladen behouden hun lokale wijzigingen.",[12,13363,13364],{},[30,13365],{"id":13366},"ai-limit",[41,13368,13370],{"id":13369},"wat-doe-je-als-het-ai-tegoed-of-de-daglimiet-bereikt-is","Wat doe je als het AI-tegoed of de daglimiet bereikt is?",[12,13372,13373],{},"AI-functies hebben twee grenzen: daglimieten per gebruiker voor de grondplanherkenning (30 runs) en de herkenning van een verdeelkast op foto’s (20 runs), en het AI-tegoed van je account, dat alle AI-functies samen gebruiken, waaronder de grondplanherkenning, de herkenning van een verdeelkast op foto’s en de PlanElec-assistent.",[49,13375,13376,13386],{},[52,13377,13378],{},[55,13379,13380,13382,13384],{},[58,13381,10106],{},[58,13383,11570],{},[58,13385,12461],{},[68,13387,13388,13399,13410,13421,13432],{},[55,13389,13390,13393,13396],{},[73,13391,13392],{},"„Het daglimiet voor herkenningen is bereikt. Morgen zijn er weer runs beschikbaar.”",[73,13394,13395],{},"Daglimiet van de grondplanherkenning bereikt",[73,13397,13398],{},"De volgende dag (UTC) opnieuw starten; intussen het sjabloon overtekenen",[55,13400,13401,13404,13407],{},[73,13402,13403],{},"„Je resterende AI-tegoed is onvoldoende voor deze analyse.”",[73,13405,13406],{},"AI-tegoed te klein voor deze run",[73,13408,13409],{},"Stand in het gebruikersmenu bekijken; zonder AI verder plannen",[55,13411,13412,13415,13418],{},[73,13413,13414],{},"„Er is tegoed gereserveerd voor een lopende analyse. Probeer het over enkele minuten opnieuw.”",[73,13416,13417],{},"Er loopt nog een andere analyse",[73,13419,13420],{},"Even wachten en opnieuw starten",[55,13422,13423,13426,13429],{},[73,13424,13425],{},"„Te veel aanvragen. Probeer het later opnieuw.”",[73,13427,13428],{},"Korte afremming",[73,13430,13431],{},"Later opnieuw proberen",[55,13433,13434,13437,13440],{},[73,13435,13436],{},"„Modules konden niet worden herkend.”",[73,13438,13439],{},"Herkenning van de verdeelkast mislukt, ook bij bereikte daglimiet",[73,13441,13442],{},"Later opnieuw proberen of de modules manueel plaatsen",[12,13444,13445,13446,13448,13449,13452],{},"De stand van je tegoed toont het gebruikersmenu (je profielfoto) onder ",[15,13447,7440],{}," als „{percent}% beschikbaar”, net als de instellingen onder ",[15,13450,13451],{},"AI en gegevenstoestemming",". Daaronder staat op welke dag het weer wordt aangevuld: het tegoed vernieuwt elke kalendermaand, ongebruikt tegoed schuift niet door. „Je AI-tegoed voor deze maand is opgebruikt.” betekent: tot die dag zijn er geen AI-runs meer beschikbaar. Ook mislukte analyses die de aanbieder aanrekent, verbruiken tegoed.",[12,13454,13455,13456,13458,13459,39],{},"Zonder AI plan je volledig verder: het plan als sjabloon importeren en overtekenen, toestellen uit het palet plaatsen, modules in de verdeelkast plaatsen. Over de assistent: ",[30,13457,6560],{"href":6559},". Over de fotoherkenning: ",[30,13460,6647],{"href":6646},[12,13462,13463],{},[30,13464],{"id":13465},"fallback-3d",[41,13467,13469],{"id":13468},"waarom-toont-de-3d-weergave-alleen-een-melding","Waarom toont de 3D-weergave alleen een melding?",[12,13471,13472],{},"De 3D-weergave heeft WebGL in de browser nodig. Ontbreekt dat of start de 3D-weergave niet, dan vervangt PlanElec de scène door een melding met uitleg. Het situatieplan blijft in 2D volledig bruikbaar.",[49,13474,13475,13485],{},[52,13476,13477],{},[55,13478,13479,13481,13483],{},[58,13480,10106],{},[58,13482,11570],{},[58,13484,12461],{},[68,13486,13487,13500],{},[55,13488,13489,13494,13497],{},[73,13490,13491,13493],{},[15,13492,8333],{},": „Deze browser biedt geen WebGL. Het situatieplan blijft volledig bruikbaar in 2D.”",[73,13495,13496],{},"De browser biedt geen WebGL",[73,13498,13499],{},"WebGL of hardwareversnelling in de browser inschakelen of een andere recente browser gebruiken; in 2D verderwerken",[55,13501,13502,13507,13510],{},[73,13503,13504,13506],{},[15,13505,8344],{},": „De grafische verbinding is door de browser gereset.”",[73,13508,13509],{},"De browser heeft de grafische verbinding gereset",[73,13511,13512,13514],{},[15,13513,8348],{}," kiezen",[12,13516,13517,13518,13520,13521,933,13523,13525,13526,39],{},"De gedeelde weergave ",[15,13519,8365],{}," biedt PlanElec alleen aan in een breed desktopvenster. Op een smartphone kies je tussen ",[15,13522,8359],{},[15,13524,8362],{},". Meer over de 3D-weergave: ",[30,13527,13528],{"href":9356},"3D-weergave en lichtstudie",[41,13530,13532],{"id":13531},"staat-je-probleem-er-niet-bij","Staat je probleem er niet bij?",[12,13534,13535,13536,13538,13539,13541,13542,13544],{},"Begin met de werkwijze in ",[30,13537,8240],{"href":8239},": veel blokkeringen verdwijnen als situatieplan, installatie, verdeelkast en eendraadschema in die volgorde volledig zijn. Bekijk daarna in het paneel ",[15,13540,12809],{}," de open bevindingen en in ",[15,13543,956],{}," de eerste blokkering per document.",{"title":1467,"searchDepth":1468,"depth":1468,"links":13546},[13547,13548,13549,13550,13551,13552,13553,13554,13555,13556,13557,13558,13559],{"id":12135,"depth":1468,"text":12136},{"id":12327,"depth":1468,"text":12328},{"id":12419,"depth":1468,"text":12420},{"id":12525,"depth":1468,"text":12526},{"id":12594,"depth":1468,"text":12595},{"id":12827,"depth":1468,"text":12828},{"id":12969,"depth":1468,"text":12970},{"id":13071,"depth":1468,"text":13072},{"id":13202,"depth":1468,"text":13203},{"id":13245,"depth":1468,"text":13246},{"id":13369,"depth":1468,"text":13370},{"id":13468,"depth":1468,"text":13469},{"id":13531,"depth":1468,"text":13532},"Schaal ontbreekt, toestel niet in het schema, export geblokkeerd, kabellengte open, module niet geplaatst, sync-melding, AI-limiet of 3D-melding: oorzaak en oplossing per melding.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ftroubleshooting-nl.webp",{},16,"\u002Fhelp\u002Ftroubleshooting.nl",{"title":12127,"description":13560},"veelvoorkomende-problemen-oplossen","help\u002Ftroubleshooting.nl",[13569,13570,13571,13572,13573,8266],"probleemoplossing","export","schaal","zelfcontrole","kabellengte","2026-10-17","HlCqVHkKbHDmCz76pCgJy-vZ_4sAQZO1OLLQgEtKReA",{"id":13577,"title":13578,"body":13579,"category":2475,"description":14334,"extension":1496,"guideId":14335,"image":14336,"locale":1497,"meta":14337,"navigation":1499,"order":14338,"path":14339,"publishedAt":9347,"readTime":14340,"seo":14341,"seoTitle":14342,"slug":14343,"stem":14344,"tags":14345,"updatedAt":9347,"__hash__":14350,"kind":2491,"href":6646,"date":9347},"help\u002Fhelp\u002Fcabinet-photo-recognition.nl.md","Een verdeelkast herkennen van foto’s: DIN-modules controleren en importeren",{"type":9,"value":13580,"toc":14322},[13581,13588,13591,13595,13599,13686,13692,13697,13701,13704,13799,13802,13807,13811,13848,13851,13855,13887,13890,13895,13899,13915,13918,13921,13925,13929,13938,14062,14065,14079,14082,14086,14090,14102,14105,14133,14136,14139,14144,14148,14155,14219,14228,14231,14235,14239,14313],[12,13582,13583,13584,13587],{},"In de kasteditor leest PlanElec foto’s van een bestaand verdeelbord en stelt het de zichtbare DIN-modules voor: rij, startpositie, breedte in modulebreedtes (TE), moduletype en leesbare waarden zoals nominale stroom of gevoeligheid. Je hebt een opgeslagen project nodig, de projectrol Eigenaar, Beheerder of Bewerker en een ",[15,13585,13586],{},"leeg"," verdeelbord. Je controleert en corrigeert elk voorstel voordat je het importeert; pas dan staan de modules op hun plaats. Verborgen bedrading, stroomkringen en beveiligingsrelaties leidt de herkenning niet af – die elektrische planning vul je daarna zelf aan.",[12,13589,13590],{},"De fotoherkenning is bedoeld voor bestaande installaties en uitbreidingen waarbij je de aanwezige opbouw snel als vertrekpunt wilt vastleggen. Elke run telt mee voor je daglimiet en verbruikt je AI-tegoed.",[12,13592,13593],{},[30,13594],{"id":3401},[41,13596,13598],{"id":13597},"wat-heb-je-nodig-voor-de-fotoherkenning","Wat heb je nodig voor de fotoherkenning?",[49,13600,13601,13609],{},[52,13602,13603],{},[55,13604,13605,13607],{},[58,13606,1548],{},[58,13608,10234],{},[68,13610,13611,13622,13640,13655,13662,13669,13677],{},[55,13612,13613,13616],{},[73,13614,13615],{},"Project",[73,13617,13618,13619,39],{},"Het project is geopend en opgeslagen. Pas dan toont de kasteditor de knop ",[15,13620,13621],{},"Foto’s",[55,13623,13624,13627],{},[73,13625,13626],{},"Werkruimte",[73,13628,13629,13632,13633,933,13636,13639],{},[15,13630,13631],{},"Opbouw"," in de kasteditor. In ",[15,13634,13635],{},"Bedrading",[15,13637,13638],{},"Tabellen"," is het fotopaneel niet beschikbaar.",[55,13641,13642,13644],{},[73,13643,9541],{},[73,13645,13646,702,13648,1628,13650,10249,13652,13654],{},[15,13647,9546],{},[15,13649,9549],{},[15,13651,9552],{},[15,13653,9556],{}," zijn uploaden, herkennen en importeren geblokkeerd.",[55,13656,13657,13659],{},[73,13658,75],{},[73,13660,13661],{},"Een geselecteerd, leeg verdeelbord: geen geplaatste modules en geen toestellen die al aan dit bord zijn toegewezen.",[55,13663,13664,13666],{},[73,13665,13621],{},[73,13667,13668],{},"JPEG, PNG of WebP, maximaal zes foto’s per verdeelbord. Andere bestandsformaten verschijnen niet in de fotolijst.",[55,13670,13671,13674],{},[73,13672,13673],{},"Daglimiet",[73,13675,13676],{},"20 herkenningsruns per gebruiker per dag. De teller start opnieuw om middernacht UTC (in België 1 uur, tijdens de zomertijd 2 uur).",[55,13678,13679,13681],{},[73,13680,7440],{},[73,13682,13683,13684,39],{},"Elke run verbruikt je persoonlijke AI-tegoed. Hoeveel er nog beschikbaar is, zie je in het gebruikersmenu onder ",[15,13685,7440],{},[12,13687,13688,13689,13691],{},"Is het verdeelbord niet leeg, dan blijft ",[15,13690,6861],{}," geblokkeerd en toont het paneel: “Herkenning is alleen beschikbaar voor een leeg verdeelbord.” Dat geldt ook wanneer in de installatie al beveiligingen aan dit bord zijn toegewezen die nog niet geplaatst zijn.",[12,13693,13694],{},[30,13695],{"id":13696},"recognised",[41,13698,13700],{"id":13699},"wat-herkent-planelec-op-een-foto-van-een-verdeelkast","Wat herkent PlanElec op een foto van een verdeelkast?",[12,13702,13703],{},"De herkenning beschrijft alleen wat op de foto’s zichtbaar en leesbaar is. Onleesbare of onduidelijke gegevens blijven leeg en worden niet met standaardwaarden ingevuld.",[49,13705,13706,13716],{},[52,13707,13708],{},[55,13709,13710,13713],{},[58,13711,13712],{},"Gegeven",[58,13714,13715],{},"Resultaat in het voorstel",[68,13717,13718,13726,13734,13742,13749,13757,13765,13777,13788],{},[55,13719,13720,13723],{},[73,13721,13722],{},"Zichtbare DIN-modules",[73,13724,13725],{},"Per module een kader op de foto en een regel in de controlelijst",[55,13727,13728,13731],{},[73,13729,13730],{},"Rij en startpositie",[73,13732,13733],{},"Geschat van boven naar onder en van links naar rechts; leeg als de plaats onduidelijk is",[55,13735,13736,13739],{},[73,13737,13738],{},"Breedte",[73,13740,13741],{},"Geschatte breedte in TE",[55,13743,13744,13746],{},[73,13745,11331],{},[73,13747,13748],{},"Keuze uit 17 types, waaronder hoofdschakelaar, RCD, RCBO, AFDD, SPD, zekeringen, contactoren, tijdschakelaars, energiemeters en KNX-toestellen",[55,13750,13751,13754],{},[73,13752,13753],{},"Leesbare waarden",[73,13755,13756],{},"Stroom (A), polen, uitschakelkarakteristiek (B, C, D, K, Z), gevoeligheid (mA) en differentieeltype (A, B, F, AC), alleen als ze op de foto leesbaar zijn",[55,13758,13759,13762],{},[73,13760,13761],{},"Opdruk",[73,13763,13764],{},"De gelezen tekst verschijnt onder de module in de controlelijst",[55,13766,13767,13770],{},[73,13768,13769],{},"Onleesbare module",[73,13771,13772,13773,13776],{},"Type ",[15,13774,13775],{},"Onbekende DIN-module",", zodat plaats en breedte toch behouden blijven",[55,13778,13779,13782],{},[73,13780,13781],{},"Bedrading, stroomkringen, beveiligingspad",[73,13783,13784,13787],{},[15,13785,13786],{},"Niet herkend."," Ook onzichtbare geleiders, bruggen en elektrische toewijzingen worden niet afgeleid",[55,13789,13790,13793],{},[73,13791,13792],{},"Kastafmetingen en standaardwaarden",[73,13794,13795,13798],{},[15,13796,13797],{},"Niet aangenomen."," De herkenning verzint geen kastmaten en geen gebruikelijke nominale waarden",[12,13800,13801],{},"Tekst die op een foto staat, behandelt PlanElec uitsluitend als beeldinhoud. Die tekst stuurt de herkenning niet.",[12,13803,13804],{},[30,13805],{"id":13806},"photos",[41,13808,13810],{"id":13809},"hoe-upload-en-koppel-je-de-fotos","Hoe upload en koppel je de foto’s?",[1602,13812,13813,13824,13833,13842,13845],{},[1453,13814,9613,13815,13817,13818,11172,13821,39],{},[15,13816,1721],{}," en kies in de bordkeuze in de bovenste balk het verdeelbord dat je wilt vastleggen. Bestaat het nog niet, maak het dan aan via ",[15,13819,13820],{},"Meer kastacties",[15,13822,13823],{},"Nieuwe verdeler",[1453,13825,13826,13827,11353,13829,1609,13831,39],{},"Blijf in de werkruimte ",[15,13828,13631],{},[15,13830,13621],{},[15,13832,6857],{},[1453,13834,1857,13835,13838,13839,13841],{},[15,13836,13837],{},"Foto’s uploaden"," en kies een of meer afbeeldingen. De foto’s worden in de ",[15,13840,3903],{}," van het project bewaard en automatisch aan dit verdeelbord gekoppeld.",[1453,13843,13844],{},"Bestaande projectfoto’s activeer je met het selectievakje voor hun naam. Staat er “Nog geen passende projectfoto’s.”, dan bevat het project nog geen JPEG-, PNG- of WebP-afbeelding.",[1453,13846,13847],{},"Controleer de tabbladen boven het voorbeeld: elke gekoppelde foto heeft een eigen tabblad. Een klik toont de foto in het paneel.",[12,13849,13850],{},"Succescriterium: de gewenste foto’s zijn aangevinkt en verschijnen als tabblad. Bij een zevende foto meldt PlanElec “Selecteer maximaal 6 foto’s.” en koppelt het die niet.",[1396,13852,13854],{"id":13853},"welke-fotos-helpen-de-herkenning","Welke foto’s helpen de herkenning?",[1450,13856,13857,13863,13872,13878],{},[1453,13858,13859,13862],{},[15,13860,13861],{},"Eén verdeelbord per run."," Alle gekoppelde foto’s tonen hetzelfde bord; de herkenning behandelt ze als aanzichten van één kast.",[1453,13864,13865,13868,13869,39],{},[15,13866,13867],{},"Overzicht en close-ups combineren."," Staat dezelfde module op meerdere foto’s, dan voegt de herkenning die aanzichten samen tot één module met meerdere ",[15,13870,13871],{},"fotoaanzichten",[1453,13873,13874,13877],{},[15,13875,13876],{},"Leesbare opdrukken."," Waarden zoals nominale stroom of gevoeligheid neemt PlanElec alleen over als ze op de foto leesbaar zijn. Wat verborgen of onscherp is, blijft leeg.",[1453,13879,13880,13883,13884,39],{},[15,13881,13882],{},"Originelen blijven bewaard."," Voor de analyse verkleint PlanElec elke foto tot maximaal 3200 pixels langs de langste zijde. Het origineel blijft in de projectstukken en levert de ",[15,13885,13886],{},"Uitsnede op oorspronkelijke resolutie",[12,13888,13889],{},"Het paneel wijst erop: geselecteerde foto’s worden voor analyse naar de AI-dienst gestuurd. Koppel dus alleen foto’s die je hiervoor mag gebruiken.",[12,13891,13892],{},[30,13893],{"id":13894},"recognise",[41,13896,13898],{"id":13897},"hoe-start-je-de-herkenning","Hoe start je de herkenning?",[1602,13900,13901,13904,13909],{},[1453,13902,13903],{},"Controleer dat het juiste verdeelbord geselecteerd is en dat de passende foto’s gekoppeld zijn.",[1453,13905,1857,13906,13908],{},[15,13907,6861],{},". Tijdens de analyse staat op de knop “Herkenning loopt …”.",[1453,13910,13911,13912,39],{},"Wacht op de melding “Herkenning klaar voor controle.” Boven op de foto verschijnen nu kaders rond de herkende modules, met daaronder het onderdeel ",[15,13913,13914],{},"Herkende modules controleren",[12,13916,13917],{},"Elke run die de AI-dienst bereikt, telt mee voor de daglimiet van 20 runs – ook als er geen bruikbaar voorstel terugkomt. Is je AI-tegoed onvoldoende, dan vermeldt PlanElec die reden uitdrukkelijk, bijvoorbeeld “Je resterende AI-tegoed is onvoldoende voor deze analyse.”",[12,13919,13920],{},"Sluit je het paneel voordat je importeert, dan blijft het laatste voorstel voor dit verdeelbord bewaard. Bij de volgende keer laadt PlanElec het opnieuw – wel in zijn oorspronkelijke vorm. Correcties die je in de controlelijst hebt gemaakt maar niet hebt geïmporteerd, zijn dan verloren.",[12,13922,13923],{},[30,13924],{"id":10495},[41,13926,13928],{"id":13927},"hoe-controleer-en-corrigeer-je-het-voorstel","Hoe controleer en corrigeer je het voorstel?",[12,13930,13931,13932,13934,13935,13937],{},"Het onderdeel ",[15,13933,13914],{}," toont elke herkende module met haar velden. Een klik op een kader in de foto selecteert de bijbehorende module; de ",[15,13936,13886],{}," toont ze vergroot. Zo vergelijk je opdruk en waarden rechtstreeks met het origineel.",[49,13939,13940,13949],{},[52,13941,13942],{},[55,13943,13944,13947],{},[58,13945,13946],{},"Veld of actie",[58,13948,1551],{},[68,13950,13951,13961,13970,13979,13989,13999,14015,14028,14038,14052],{},[55,13952,13953,13958],{},[73,13954,13955],{},[15,13956,13957],{},"Naam",[73,13959,13960],{},"Naam van de module in de kast. Blijft hij leeg, dan gebruikt PlanElec de naam van het moduletype",[55,13962,13963,13967],{},[73,13964,13965],{},[15,13966,11331],{},[73,13968,13969],{},"Type corrigeren, bijvoorbeeld als een RCBO als automaat werd herkend",[55,13971,13972,13976],{},[73,13973,13974],{},[15,13975,11288],{},[73,13977,13978],{},"DIN-rail van boven geteld; 1 is de bovenste rij",[55,13980,13981,13986],{},[73,13982,13983],{},[15,13984,13985],{},"Startpositie",[73,13987,13988],{},"Positie in TE vanaf de linkerrand van de rij; 0 is de eerste plaats, halve stappen zoals 2,5 kunnen",[55,13990,13991,13996],{},[73,13992,13993],{},[15,13994,13995],{},"Breedte (TE)",[73,13997,13998],{},"Modulebreedte in stappen van 0,5 TE",[55,14000,14001,14012],{},[73,14002,14003,702,14006,702,14009],{},[15,14004,14005],{},"Stroom (A)",[15,14007,14008],{},"Polen",[15,14010,14011],{},"Gevoeligheid (mA)",[73,14013,14014],{},"Afgelezen waarden controleren, aanvullen of leegmaken",[55,14016,14017,14025],{},[73,14018,14019,702,14022,14024],{},[15,14020,14021],{},"Fotoaanzicht 1",[15,14023,326],{}," …",[73,14026,14027],{},"Springt naar de foto waarop de module op die plaats te zien is",[55,14029,14030,14035],{},[73,14031,14032],{},[15,14033,14034],{},"Verwerpen",[73,14036,14037],{},"Verwijdert een foute regel uit het voorstel",[55,14039,14040,14049],{},[73,14041,14042,14045,14046],{},[15,14043,14044],{},"Samenvoegen met module"," + ",[15,14047,14048],{},"Samenvoegen",[73,14050,14051],{},"Voegt twee regels samen die dezelfde fysieke module op verschillende foto’s tonen",[55,14053,14054,14059],{},[73,14055,14056],{},[15,14057,14058],{},"Splitsen",[73,14060,14061],{},"Maakt het laatste fotoaanzicht los als aparte module, als twee verschillende modules werden samengevoegd",[12,14063,14064],{},"Zo pak je het aan:",[1602,14066,14067,14070,14073,14076],{},[1453,14068,14069],{},"Loop de lijst van boven naar onder door en vergelijk elke module met kader en uitsnede.",[1453,14071,14072],{},"Verwerp regels die geen module zijn en voeg dubbel herkende modules samen.",[1453,14074,14075],{},"Corrigeer type, rij, startpositie en breedte. Ontbreekt bij een module een rij of startpositie, dan toont het paneel “Vul voor elke module een rij en startpositie in.”",[1453,14077,14078],{},"Controleer de afgelezen waarden. Uitschakelkarakteristiek en differentieeltype neemt PlanElec alleen over als ze leesbaar waren; als apart veld kun je ze in de controlelijst niet bewerken.",[12,14080,14081],{},"Succescriterium: elke resterende module heeft een rij en startpositie, en in dezelfde rij overlappen geen modules.",[12,14083,14084],{},[30,14085],{"id":10829},[41,14087,14089],{"id":14088},"wat-gebeurt-er-bij-gecontroleerde-modules-importeren","Wat gebeurt er bij “Gecontroleerde modules importeren”?",[1602,14091,14092,14099],{},[1453,14093,14094,14095,14098],{},"Klik onder de controlelijst op ",[15,14096,14097],{},"Gecontroleerde modules importeren",". De knop is actief zodra er minstens één module is, elke module een rij en startpositie heeft en het verdeelbord leeg is.",[1453,14100,14101],{},"PlanElec meldt “Modules geïmporteerd.” De modules staan nu op hun plaats in de kast.",[12,14103,14104],{},"Bij het importeren geldt:",[1450,14106,14107,14115,14121,14127],{},[1453,14108,14109,14112,14113,39],{},[15,14110,14111],{},"Eén stap ongedaan maken."," De volledige import draai je in één keer terug met ",[15,14114,6795],{},[1453,14116,14117,14120],{},[15,14118,14119],{},"Rijen worden aangevuld, niet vervangen."," Heeft het bord minder rijen dan herkend, dan maakt PlanElec de ontbrekende aan. Bestaande rijen, ook rijen met een eigen naam, blijven behouden.",[1453,14122,14123,14126],{},[15,14124,14125],{},"Rijbreedte groeit mee."," Is er per rij te weinig plaats, dan verbreedt PlanElec de rijen tot de breedste geïmporteerde bezetting. Meer dan 72 TE per rij kan niet.",[1453,14128,14129,14132],{},[15,14130,14131],{},"Foto’s blijven gekoppeld."," Elke geïmporteerde module houdt haar fotoaanzichten als bewijs.",[12,14134,14135],{},"Verschijnt “Modules konden niet worden geïmporteerd.”, dan overlappen meestal twee modules in dezelfde rij, reikt een module voorbij 72 TE, of is het verdeelbord intussen niet meer leeg. Corrigeer de waarden en probeer opnieuw.",[12,14137,14138],{},"Het importeren start je alleen zelf in het paneel. De PlanElec-assistent kan geen foto’s koppelen en geen fotovoorstel importeren, omdat die stap een visuele controle in de editor vraagt.",[12,14140,14141],{},[30,14142],{"id":14143},"next-steps",[41,14145,14147],{"id":14146},"hoe-gaat-het-verder-na-de-import","Hoe gaat het verder na de import?",[12,14149,14150,14151,14154],{},"De geïmporteerde modules geven de ",[15,14152,14153],{},"fysieke bestaande toestand"," van het verdeelbord weer. Ze tonen de afgelezen waarden, bijvoorbeeld “C16”, maar zijn nog niet elektrisch ingebonden: ze hebben geen aansluitklemmen, geen stroomkring en geen beveiligingspad.",[49,14156,14157,14165],{},[52,14158,14159],{},[55,14160,14161,14163],{},[58,14162,10895],{},[58,14164,12845],{},[68,14166,14167,14181,14195,14208],{},[55,14168,14169,14172],{},[73,14170,14171],{},"Module op de foto nakijken",[73,14173,14174,14175,14177,14178,14180],{},"Laat het paneel ",[15,14176,6857],{}," open en beweeg in ",[15,14179,13631],{}," over een geïmporteerde module: het paneel toont haar fotouitsnede",[55,14182,14183,14186],{},[73,14184,14185],{},"Stroomkringen en beveiligingspaden bepalen",[73,14187,14188,14189,14191,14192],{},"Onderdeel ",[15,14190,12532],{},"; zie ",[30,14193,14194],{"href":12582},"Een installatie plannen en onderverdelers vormen",[55,14196,14197,14200],{},[73,14198,14199],{},"Rijbezetting en behuizing controleren",[73,14201,14202,14203,14191,14205],{},"Werkruimte ",[15,14204,13631],{},[30,14206,14207],{"href":13236},"Modules en behuizing uitwerken",[55,14209,14210,14213],{},[73,14211,14212],{},"Automatisch opnieuw bezetten",[73,14214,14215,14218],{},[15,14216,14217],{},"Auto-Toewijzen"," bouwt het bord na een bevestiging volledig opnieuw op en vervangt zo de gefotografeerde opstelling",[12,14220,14221,14222,14224,14225,39],{},"Wil je de gefotografeerde opstelling behouden, gebruik dan geen ",[15,14223,14217],{}," voor dit verdeelbord. Hoe Auto-Toewijzen werkt, lees je in ",[30,14226,14227],{"href":6871},"Automatische planning gebruiken en controleren",[12,14229,14230],{},"Een geïmporteerde bestaande toestand is een planningsstand, geen opname met meetwaarden. Wat achter afdekkingen zit, welke geleiders waarheen lopen en of beveiligingen correct gedimensioneerd zijn, controleer je ter plaatse. De keuring volgens het AREI doet het erkend organisme.",[12,14232,14233],{},[30,14234],{"id":2353},[41,14236,14238],{"id":14237},"welke-meldingen-en-grenzen-zijn-er","Welke meldingen en grenzen zijn er?",[49,14240,14241,14250],{},[52,14242,14243],{},[55,14244,14245,14248],{},[58,14246,14247],{},"Melding of situatie",[58,14249,9207],{},[68,14251,14252,14265,14273,14281,14289,14297,14305],{},[55,14253,14254,14260],{},[73,14255,14256,14257,14259],{},"Knop ",[15,14258,13621],{}," ontbreekt",[73,14261,14262,14263],{},"Het project is nog niet opgeslagen, of je bent niet in de werkruimte ",[15,14264,13631],{},[55,14266,14267,14270],{},[73,14268,14269],{},"“Herkenning is alleen beschikbaar voor een leeg verdeelbord.”",[73,14271,14272],{},"In het bord zijn modules geplaatst of toestellen toegewezen. Kies een leeg verdeelbord of maak een nieuw aan",[55,14274,14275,14278],{},[73,14276,14277],{},"“Selecteer maximaal 6 foto’s.”",[73,14279,14280],{},"Vink eerst een andere foto uit voordat je er nog een koppelt",[55,14282,14283,14286],{},[73,14284,14285],{},"“Modules konden niet worden herkend.”",[73,14287,14288],{},"De AI-dienst gaf geen geldig voorstel, of je daglimiet van 20 runs is bereikt. Probeer later opnieuw; de daglimiet start om middernacht UTC opnieuw",[55,14290,14291,14294],{},[73,14292,14293],{},"Melding over het AI-tegoed",[73,14295,14296],{},"Je persoonlijke AI-tegoed is onvoldoende of gereserveerd voor een lopende analyse. Het gebruikersmenu toont de stand",[55,14298,14299,14302],{},[73,14300,14301],{},"“Foto niet beschikbaar”",[73,14303,14304],{},"Het bestand is uit de projectstukken verwijderd of kan niet worden geladen. Koppel een andere foto",[55,14306,14307,14310],{},[73,14308,14309],{},"“Modules konden niet worden geïmporteerd.”",[73,14311,14312],{},"Overlapping in een rij, positie buiten 72 TE of verdeelbord niet meer leeg",[12,14314,14315,14316,14318,14319,39],{},"Meer algemene foutbeelden vind je in ",[30,14317,8005],{"href":8224},". Hoe PlanElec grondplannen uit pdf’s en afbeeldingen herkent, staat in ",[30,14320,14321],{"href":3381},"Een grondplan herkennen met AI",{"title":1467,"searchDepth":1468,"depth":1468,"links":14323},[14324,14325,14326,14329,14330,14331,14332,14333],{"id":13597,"depth":1468,"text":13598},{"id":13699,"depth":1468,"text":13700},{"id":13809,"depth":1468,"text":13810,"children":14327},[14328],{"id":13853,"depth":1486,"text":13854},{"id":13897,"depth":1468,"text":13898},{"id":13927,"depth":1468,"text":13928},{"id":14088,"depth":1468,"text":14089},{"id":14146,"depth":1468,"text":14147},{"id":14237,"depth":1468,"text":14238},"PlanElec herkent op maximaal zes foto’s zichtbare DIN-modules met rij, startpositie, breedte en type en stelt ze voor in een leeg verdeelbord. Je controleert elke module en importeert de bezetting in één stap die je ongedaan kunt maken.","cabinet-photo-recognition","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fcabinet-photo-recognition.webp",{},13,"\u002Fhelp\u002Fcabinet-photo-recognition.nl","7 min",{"title":13578,"description":14334},"Verdeelkast en DIN-modules herkennen van foto’s","verdeelkast-herkennen-van-foto","help\u002Fcabinet-photo-recognition.nl",[14346,14347,4588,14348,14349],"verdeelkast","foto","DIN-modules","bestaande installatie","NpJJy1l-oejB7jdpshOCWBj0J-OEXypv8xQDw2IM4m4",{"id":14352,"title":14353,"body":14354,"category":4028,"description":14799,"extension":1496,"guideId":14800,"image":14801,"locale":1497,"meta":14802,"navigation":1499,"order":14803,"path":14804,"publishedAt":14805,"readTime":14340,"seo":14806,"seoTitle":14807,"slug":14808,"stem":14809,"tags":14810,"updatedAt":14805,"__hash__":14816,"kind":2491,"href":8598,"date":14805},"help\u002Fhelp\u002Ffloor-alignment-building-origin.nl.md","Hoe lijn ik verdiepingen op elkaar uit en waarvoor dient het nulpunt van het gebouw?",{"type":9,"value":14355,"toc":14789},[14356,14370,14374,14482,14487,14491,14494,14497,14518,14521,14526,14530,14533,14610,14624,14631,14636,14640,14666,14672,14677,14681,14684,14687,14707,14712,14716,14747,14752,14756,14771,14776,14778],[12,14357,14358,14359,14362,14363,708,14366,14369],{},"Om verdiepingen sluitend op elkaar te leggen, open je de uitlijning van de verdieping die moet verschuiven, toon je een andere verdieping als overlay en plaats je minstens twee ",[15,14360,14361],{},"puntenparen"," (bijvoorbeeld de hoek rechtsonder en een tweede hoek). Je kunt ook verschuiving en rotatie met de hand invoeren. Daarna kies je ",[15,14364,14365],{},"Uitlijning opslaan",[15,14367,14368],{},"Nulpunt hierheen verplaatsen"," dient daar niet voor: het nulpunt van het gebouw is één punt voor het hele project, en wie het verplaatst, verschuift alle verdiepingen over dezelfde vector. Hun onderlinge ligging verandert niet.",[41,14371,14373],{"id":14372},"welk-hulpmiddel-voor-welk-doel","Welk hulpmiddel voor welk doel?",[49,14375,14376,14387],{},[52,14377,14378],{},[55,14379,14380,14383,14385],{},[58,14381,14382],{},"Doel",[58,14384,10745],{},[58,14386,12845],{},[68,14388,14389,14410,14433,14445,14458,14470],{},[55,14390,14391,14394,14400],{},[73,14392,14393],{},"Een verdieping laten samenvallen met een andere (hoeken, muren)",[73,14395,14396,14399],{},[15,14397,14398],{},"Verdiepingen uitlijnen"," met puntenparen",[73,14401,14402,14403,14405,14406,14409],{},"Werkbalk in de modus ",[15,14404,10326],{},", menu ",[15,14407,14408],{},"Verdiepingen beheren",", statusmarkering van de verdieping in het gebouwoverzicht",[55,14411,14412,14415,14430],{},[73,14413,14414],{},"De uitlijning enkele centimeters bijstellen",[73,14416,14417,14420,14421,702,14424,702,14427],{},[15,14418,14419],{},"Fijnafstelling",": pijlen, ",[15,14422,14423],{},"X-verschuiving (m)",[15,14425,14426],{},"Y-verschuiving (m)",[15,14428,14429],{},"Rotatie (°)",[73,14431,14432],{},"Uitlijningsvenster",[55,14434,14435,14438,14443],{},[73,14436,14437],{},"Een trap of schacht als gemeenschappelijk punt gebruiken",[73,14439,14440],{},[15,14441,14442],{},"Trap of schacht overnemen",[73,14444,14432],{},[55,14446,14447,14450,14454],{},[73,14448,14449],{},"Het nulpunt van het hele gebouw vastleggen",[73,14451,14452],{},[15,14453,14368],{},[73,14455,14402,14456],{},[15,14457,10326],{},[55,14459,14460,14463,14468],{},[73,14461,14462],{},"Terug naar de beginwaarden",[73,14464,14465],{},[15,14466,14467],{},"Terugzetten naar aannames",[73,14469,14432],{},[55,14471,14472,14475,14480],{},[73,14473,14474],{},"Peil afgewerkte vloer, vrije hoogte en vloerplaat invullen",[73,14476,14477],{},[15,14478,14479],{},"Fysieke hoogtes",[73,14481,14432],{},[12,14483,14484],{},[30,14485],{"id":14486},"origin",[41,14488,14490],{"id":14489},"waarom-verschuiven-alle-verdiepingen-als-ik-het-nulpunt-instel","Waarom verschuiven alle verdiepingen als ik het nulpunt instel?",[12,14492,14493],{},"Het nulpunt van het gebouw is het beginpunt van het gemeenschappelijke coördinatenstelsel van het project. Het bestaat maar één keer, niet per verdieping. Het wordt bewaard in de coördinaten van de referentieverdieping; klik je op een andere verdieping, dan wordt het punt eerst naar de referentieverdieping overgebracht.",[12,14495,14496],{},"Bij het instellen verschuift PlanElec de opgeslagen ligging van alle verdiepingen over dezelfde vector. De bevestiging zegt het zelf: „Nulpunt van het gebouw ingesteld. Alle verdiepingen behouden hun relatieve positie.” Het nulpunt wijzigt dus het vertrekpunt van de coördinaten, niet de afstand tussen twee verdiepingen. Liggen twee verdiepingen vooraf niet sluitend op elkaar, dan doen ze dat achteraf ook niet.",[12,14498,14499,14500,14502,14503,14505,14506,14509,14510,14513,14514,14517],{},"Zo stel je het nulpunt in: ga naar de modus ",[15,14501,10326],{},", kies in de werkbalk ",[15,14504,14368],{}," en klik op het gewenste punt. Wandknopen klikken vast, waardoor het nulpunt op een echte hoek van het gebouw valt. Zolang je het nulpunt nog nooit hebt ingesteld en de referentieverdieping actief is, stelt de markering ",[15,14507,14508],{},"Nulpunt hier plaatsen (linksonder)"," de linkeronderhoek van de buitencontour voor. ",[15,14511,14512],{},"Nulpunt en markeringen tonen"," toont het merkteken, ",[15,14515,14516],{},"Naar nulpunt"," centreert het beeld erop.",[12,14519,14520],{},"Wil je de hoek rechtsonder als nulpunt, plaats het dan daar op de referentieverdieping. Dat lijnt de andere verdiepingen niet uit; daarvoor heb je de uitlijning hieronder nodig.",[12,14522,14523],{},[30,14524],{"id":14525},"pairs",[41,14527,14529],{"id":14528},"hoe-lijn-ik-een-verdieping-uit-met-puntenparen","Hoe lijn ik een verdieping uit met puntenparen?",[12,14531,14532],{},"Puntenparen zijn de meest directe weg wanneer de verdiepingen dezelfde buitenmaten hebben.",[1602,14534,14535,14538,14560,14580,14589,14592,14605],{},[1453,14536,14537],{},"Activeer de verdieping die moet verschuiven. De referentieverdieping verschuift niet (zie verder).",[1453,14539,14540,14541,14543,14544,14546,14547,14550,14551,14553,14554,14556,14557,39],{},"Open de uitlijning: ",[15,14542,14398],{}," in de werkbalk van de modus ",[15,14545,10326],{},", of ",[15,14548,14549],{},"Positie uitlijnen …"," in het menu ",[15,14552,14408],{}," van de verdiepingsselectie, of een klik op de statusmarkering van de verdieping in het gebouwoverzicht. Ook de werkbalk voor trappen biedt ",[15,14555,14398],{},". Het venster heet ",[15,14558,14559],{},"Verdiepingen uitlijnen en hoogtes vastleggen",[1453,14561,1683,14562,14565,14566,14569,14570,702,14573,933,14576,14579],{},[15,14563,14564],{},"Referentie-overlay"," bij ",[15,14567,14568],{},"Andere verdieping tonen"," de verdieping die als voorbeeld dient. ",[15,14571,14572],{},"Dekking van overlay",[15,14574,14575],{},"Knipperen",[15,14577,14578],{},"Referentie tonen"," (ingedrukt houden of Alt ingedrukt houden) helpen bij het vergelijken.",[1453,14581,1683,14582,8797,14585,14588],{},[15,14583,14584],{},"Puntenparen",[15,14586,14587],{},"Puntenpaar plaatsen",". Die is alleen actief met een zichtbare overlay. Het venster sluit: klik eerst het punt in het huidige grondplan aan („Selecteer het punt in het huidige grondplan”), daarna hetzelfde punt in de overlay.",[1453,14590,14591],{},"Herhaal dat met een tweede punt dat ver van het eerste ligt, bijvoorbeeld de andere hoek van de onderste muur. Vanaf twee puntenparen volgen verschuiving en rotatie automatisch; één enkel paar bepaalt de rotatie niet. Liggen twee punten op elkaar, dan bepalen ze geen ligging.",[1453,14593,14594,14595,702,14598,933,14601,14604],{},"Controleer ",[15,14596,14597],{},"Gemiddelde afwijking",[15,14599,14600],{},"Grootste afwijking",[15,14602,14603],{},"Waargenomen schaalafwijking",". De schaal blijft vast op 50 planeenheden per meter; alleen verschuiving en rotatie veranderen. Duidelijke afwijkingen tonen dat de plannen niet exact op elkaar passen.",[1453,14606,7985,14607,14609],{},[15,14608,14365],{},". Het opslaan vormt één enkele stap om ongedaan te maken.",[12,14611,9364,14612,14615,14616,14619,14620,14623],{},[15,14613,14614],{},"Markeringen in het grondplan bewerken"," versleep je de markeringen; ",[15,14617,14618],{},"Terug naar de uitlijning"," opent het venster opnieuw. Afzonderlijke paren kunnen pas vanaf drie paren worden verwijderd; ",[15,14621,14622],{},"Puntenparen verwerpen"," wist ze allemaal.",[12,14625,14626,14627,8797,14629,39],{},"Een trap of schacht die de actieve verdieping met de referentieverdieping verbindt, kan als paar dienen: kies onder ",[15,14628,14442],{},[15,14630,6847],{},[12,14632,14633],{},[30,14634],{"id":14635},"numeric",[41,14637,14639],{"id":14638},"hoe-voer-ik-verschuiving-en-rotatie-met-de-hand-in","Hoe voer ik verschuiving en rotatie met de hand in?",[12,14641,14642,14643,14645,14646,702,14648,933,14650,14652,14653,702,14656,702,14659,933,14662,14665],{},"Onder ",[15,14644,14419],{}," vul je ",[15,14647,14423],{},[15,14649,14426],{},[15,14651,14429],{}," in. De verschuiving geldt in meters in het coördinatenstelsel van het gebouw; laat een overlay zichtbaar om het resultaat te controleren. De knoppen ",[15,14654,14655],{},"Naar boven",[15,14657,14658],{},"Naar beneden",[15,14660,14661],{},"Naar links",[15,14663,14664],{},"Naar rechts"," verschuiven de verdieping 1 cm, met Shift 10 cm.",[12,14667,14668,14669,14671],{},"Zolang puntenparen de ligging bepalen, zijn deze velden vergrendeld („Verschuiving en rotatie volgen uit de puntenparen en zijn daarom vergrendeld.”). Kies ",[15,14670,14622],{}," om weer met de hand te werken.",[12,14673,14674],{},[30,14675],{"id":14676},"reference",[41,14678,14680],{"id":14679},"welke-verdieping-is-de-referentieverdieping","Welke verdieping is de referentieverdieping?",[12,14682,14683],{},"Het venster vermeldt ze bovenaan: „Gebouwoorsprong:” gevolgd door de naam van de verdieping. De referentieverdieping bepaalt het nulpunt van het gebouw. Standaard is dat de verdieping met niveau 0, anders de laagste. Haar verschuiving volgt uit het ingestelde nulpunt en wordt in het venster niet bewerkt: geen puntenparen, velden en pijlen vergrendeld.",[12,14685,14686],{},"De interface biedt geen opdracht om zelf een referentieverdieping te kiezen. Verwijder je de referentieverdieping, dan neemt de naburige verdieping de rol over, springt het nulpunt terug naar de standaardwaarde en behouden de overige verdiepingen hun onderlinge ligging.",[12,14688,14689,14690,14693,14694,702,14697,14700,14701,708,14704,14706],{},"Een nieuwe verdieping ligt eerst op dezelfde plaats als de referentie. Bij ",[15,14691,14692],{},"Verdieping aanmaken"," vraagt „Hoe ligt de verdieping ten opzichte van de referentie?” naar ",[15,14695,14696],{},"Zoals de referentie",[15,14698,14699],{},"Nu inpassen"," (opent meteen de uitlijning) of ",[15,14702,14703],{},"Later",[15,14705,14699],{}," ontbreekt wanneer de nieuwe verdieping zelf de referentie zou worden.",[12,14708,14709],{},[30,14710],{"id":14711},"reset",[41,14713,14715],{"id":14714},"hoe-maak-ik-een-uitlijning-ongedaan-of-zet-ik-ze-terug","Hoe maak ik een uitlijning ongedaan of zet ik ze terug?",[1450,14717,14718,14723,14735],{},[1453,14719,14720,14722],{},[15,14721,14467],{}," zet verschuiving en rotatie op nul, de status op „Aangenomen”, de hoogtes op de standaardwaarden van het niveau en verwijdert de overlay. Op de referentieverdieping herstelt het de verschuiving die uit het nulpunt volgt, zonder het nulpunt te verplaatsen.",[1453,14724,14725,14726,14729,14730,1628,14733,39],{},"Sluit je het venster met niet-opgeslagen wijzigingen, dan vraagt ",[15,14727,14728],{},"Uitlijning verwerpen?"," wat je wilt: ",[15,14731,14732],{},"Verder bewerken",[15,14734,14034],{},[1453,14736,14737,14738,702,14741,1628,14744,39],{},"De stand van elke verdieping toont de statusweergave: ",[15,14739,14740],{},"Aangenomen",[15,14742,14743],{},"Bevestigd",[15,14745,14746],{},"Controleren",[12,14748,14749],{},[30,14750],{"id":14751},"heights",[41,14753,14755],{"id":14754},"waar-vul-ik-de-verdiepingshoogtes-in","Waar vul ik de verdiepingshoogtes in?",[12,14757,14758,14759,2109,14761,702,14764,933,14767,14770],{},"In hetzelfde venster onder ",[15,14760,14479],{},[15,14762,14763],{},"Peil afgewerkte vloer (m)",[15,14765,14766],{},"Vrije hoogte (m)",[15,14768,14769],{},"Dikte vloerplaat erboven (m)",". Standaardwaarden blijven aannames; alleen werkelijk gewijzigde hoogtes worden bij het opslaan bevestigd. Overlappen verdiepingen elkaar in hoogte, dan weigert PlanElec het opslaan en vermeldt het vereiste minimumpeil.",[12,14772,14773,14774,39],{},"Ligging en hoogtes worden samen opgeslagen met ",[15,14775,14365],{},[41,14777,6947],{"id":6946},[1450,14779,14780,14785],{},[1453,14781,14782,14784],{},[30,14783,3378],{"href":3377}," om elk plan eerst op schaal in te stellen.",[1453,14786,14787,39],{},[30,14788,9308],{"href":9307},{"title":1467,"searchDepth":1468,"depth":1468,"links":14790},[14791,14792,14793,14794,14795,14796,14797,14798],{"id":14372,"depth":1468,"text":14373},{"id":14489,"depth":1468,"text":14490},{"id":14528,"depth":1468,"text":14529},{"id":14638,"depth":1468,"text":14639},{"id":14679,"depth":1468,"text":14680},{"id":14714,"depth":1468,"text":14715},{"id":14754,"depth":1468,"text":14755},{"id":6946,"depth":1468,"text":6947},"Lijn een verdieping uit op een andere met puntenparen of een numerieke verschuiving en begrijp waarom ‘Nulpunt hierheen verplaatsen’ alle verdiepingen samen verschuift.","floor-alignment-building-origin","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ffloor-alignment-building-origin-nl.webp",{},11,"\u002Fhelp\u002Ffloor-alignment-building-origin.nl","2026-10-09",{"title":14353,"description":14799},"Verdiepingen uitlijnen en nulpunt gebouw","verdiepingen-uitlijnen-en-nulpunt-gebouw","help\u002Ffloor-alignment-building-origin.nl",[14811,14812,14813,14584,14814,14815],"Verdiepingen","Uitlijning","Nulpunt gebouw","Overlay","Hoogtes","XTztlXvGwvYw0MUNM95vsgAFUU4aqcdtvgiw6knXphw",{"id":14818,"title":14819,"articleId":14820,"body":14821,"category":1493,"date":15381,"description":15382,"extension":1496,"image":14839,"lastUpdated":15381,"locale":1497,"meta":15383,"navigation":1499,"ogImage":15384,"path":15385,"publishDate":15381,"readTime":4035,"refreshInterval":11097,"seo":15386,"seoTitle":15387,"slug":15388,"stem":15389,"tags":15390,"__hash__":15397,"kind":1515,"href":15398},"blog\u002Fblog\u002Fled-strip-power-supply.nl.md","Ledstrip berekenen: welke voeding, hoeveel voedingspunten, welke doorsnede?","led-strip-power-supply",{"type":9,"value":14822,"toc":15361},[14823,14834,14840,14844,14847,14861,14864,14988,14991,14995,15002,15005,15009,15012,15074,15080,15084,15091,15098,15102,15105,15119,15122,15193,15204,15208,15211,15231,15235,15241,15247,15257,15261,15267,15270,15273,15275,15279,15282,15286,15289,15293,15296,15300,15303,15307,15310,15314,15317,15321,15331,15335,15352],[12,14824,14825,14828,14829,14833],{},[15,14826,14827],{},"Een ledstrip verbruikt watt per meter maal lengte, de stroom is dat vermogen gedeeld door de spanning, en de voeding kies je met ongeveer 20 % reserve. Vijf meter strip van 14,4 W\u002Fm op 24 V vraagt 72 W en 3 A: een voeding van 100 W volstaat."," Daarna bepalen twee lengtes de kwaliteit: hoe ver je de strip in één stuk mag voeden en hoe lang de kabel van de voeding naar de strip is. Beide reken je in een minuut uit met de ",[30,14830,14832],{"href":14831},"\u002Ftools\u002Fled-strip-berekenen","gratis ledstripcalculator",", waarna je de installatie in PlanElec uitwerkt tot in het eendraadschema.",[12,14835,14836],{},[22,14837],{"alt":14838,"src":14839},"Een elektricien bereidt een ledstrip met profiel en voeding voor.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-led-strip-power-supply-editorial.webp",[41,14841,14843],{"id":14842},"hoe-bereken-je-vermogen-en-stroom-van-een-ledstrip","Hoe bereken je vermogen en stroom van een ledstrip?",[12,14845,14846],{},"Twee formules volstaan:",[1450,14848,14849,14855],{},[1453,14850,14851,14852],{},"vermogen: ",[1300,14853,14854],{},"P = W\u002Fm × lengte",[1453,14856,14857,14858],{},"stroom: ",[1300,14859,14860],{},"I = P \u002F U",[12,14862,14863],{},"Het vermogen per meter staat in de datasheet en geldt bij volle helderheid. Bij strips met meerdere kanalen (CCT, RGB, RGBW) is het de waarde met alle kanalen op vollast. Reken met die waarde, ook als je de kleuren later zelden tegelijk voluit zet. Neem de lengte die je echt plaatst: een strip knip je alleen op de knipmarkeringen, meestal elke 50 of 100 mm. Van 2,37 m wordt dan 2,35 m bij een knipmaat van 50 mm.",[49,14865,14866,14884],{},[52,14867,14868],{},[55,14869,14870,14873,14876,14879,14882],{},[58,14871,14872],{},"Strip 24 V, 14,4 W\u002Fm",[58,14874,14875],{},"Vermogen",[58,14877,14878],{},"Stroom",[58,14880,14881],{},"Nodig met 20 % reserve",[58,14883,2149],{},[68,14885,14886,14903,14920,14937,14954,14971],{},[55,14887,14888,14891,14894,14897,14900],{},[73,14889,14890],{},"2 m",[73,14892,14893],{},"28,8 W",[73,14895,14896],{},"1,2 A",[73,14898,14899],{},"34,6 W",[73,14901,14902],{},"36 W",[55,14904,14905,14908,14911,14914,14917],{},[73,14906,14907],{},"3 m",[73,14909,14910],{},"43,2 W",[73,14912,14913],{},"1,8 A",[73,14915,14916],{},"51,8 W",[73,14918,14919],{},"60 W",[55,14921,14922,14925,14928,14931,14934],{},[73,14923,14924],{},"5 m",[73,14926,14927],{},"72 W",[73,14929,14930],{},"3,0 A",[73,14932,14933],{},"86,4 W",[73,14935,14936],{},"100 W",[55,14938,14939,14942,14945,14948,14951],{},[73,14940,14941],{},"8 m",[73,14943,14944],{},"115,2 W",[73,14946,14947],{},"4,8 A",[73,14949,14950],{},"138,2 W",[73,14952,14953],{},"150 W",[55,14955,14956,14959,14962,14965,14968],{},[73,14957,14958],{},"10 m",[73,14960,14961],{},"144 W",[73,14963,14964],{},"6,0 A",[73,14966,14967],{},"172,8 W",[73,14969,14970],{},"185 W",[55,14972,14973,14976,14979,14982,14985],{},[73,14974,14975],{},"15 m",[73,14977,14978],{},"216 W",[73,14980,14981],{},"9,0 A",[73,14983,14984],{},"259,2 W",[73,14986,14987],{},"320 W",[12,14989,14990],{},"De kolom voeding toont de eerstvolgende gangbare handelsmaat. De datasheet van je voeding bepaalt de werkelijke reeks.",[41,14992,14994],{"id":14993},"hoe-groot-moet-de-voeding-zijn","Hoe groot moet de voeding zijn?",[12,14996,14997,14998,15001],{},"Reken ",[1300,14999,15000],{},"voeding ≥ P × 1,2",". De 20 % reserve houdt de voeding koel en duurzaam en vangt toleranties van strip en voeding op. Zit de voeding in een krap vals plafond, in een meubel of bij hoge omgevingstemperatuur, dan geldt bovendien de derating uit de datasheet: veel toestellen leveren daar minder dan hun nominaal vermogen.",[12,15003,15004],{},"Zo beantwoord je ook de omgekeerde vraag: hoeveel strip past op een bestaande voeding? Een voeding van 60 W levert met reserve 50 W, dus ruim 5 m strip van 9,6 W\u002Fm of bijna 3,5 m van 14,4 W\u002Fm. Volstaat de grootste voeding niet, dan verdeel je de installatie in delen met elk een eigen voeding.",[41,15006,15008],{"id":15007},"_12-v-24-v-of-48-v","12 V, 24 V of 48 V?",[12,15010,15011],{},"Bij hetzelfde vermogen halveert de dubbele spanning de stroom, en de spanningsval in de kabel daalt in dezelfde verhouding. Voor 60 W over 5 m voedingskabel van 1,5 mm² koper:",[49,15013,15014,15030],{},[52,15015,15016],{},[55,15017,15018,15021,15024,15027],{},[58,15019,15020],{},"Spanning",[58,15022,15023],{},"Stroom bij 60 W",[58,15025,15026],{},"Spanningsval kabel",[58,15028,15029],{},"in %",[68,15031,15032,15046,15060],{},[55,15033,15034,15037,15040,15043],{},[73,15035,15036],{},"12 V",[73,15038,15039],{},"5,0 A",[73,15041,15042],{},"0,58 V",[73,15044,15045],{},"4,9 %",[55,15047,15048,15051,15054,15057],{},[73,15049,15050],{},"24 V",[73,15052,15053],{},"2,5 A",[73,15055,15056],{},"0,29 V",[73,15058,15059],{},"1,2 %",[55,15061,15062,15065,15068,15071],{},[73,15063,15064],{},"48 V",[73,15066,15067],{},"1,25 A",[73,15069,15070],{},"0,15 V",[73,15072,15073],{},"0,3 %",[12,15075,15076,15079],{},[15,15077,15078],{},"24 V is de standaard in woningen:"," ruim verkrijgbaar, langere stukken per voedingspunt dan 12 V en in de badkamer binnen de ZLVS-grenzen (zie verder). 12 V blijft zinvol voor korte strips in meubels en nissen of bij bestaande 12V-componenten. 48 V komt tot zijn recht bij lange lijnen en profielsystemen. 5 V is voorbehouden aan digitale pixelstrips en heel korte stukken.",[41,15081,15083],{"id":15082},"wanneer-heeft-een-ledstrip-meerdere-voedingspunten-nodig","Wanneer heeft een ledstrip meerdere voedingspunten nodig?",[12,15085,15086,15087,15090],{},"Ook op de strip zelf valt spanning weg. Voed je hem te lang in één stuk, dan brandt het einde zichtbaar zwakker en verschuift bij RGB- en RGBW-strips de kleur. Fabrikanten geven daarom een ",[15,15088,15089],{},"maximale lengte per voedingspunt"," op. Die staat in de datasheet en daalt naarmate het vermogen per meter stijgt.",[12,15092,15093,15094,15097],{},"De berekening: ",[1300,15095,15096],{},"voedingspunten = lengte ÷ maximale lengte per voedingspunt",", naar boven afgerond. Een strip van 12 m met 5 m fabrikantlengte heeft drie voedingspunten nodig; elk draagt dan een derde van de stroom. Elk voedingspunt krijgt een eigen kabel vanaf de voeding, parallel getrokken. Voor een lichtkoof rondom betekent dat: voeding centraal, voedingspunten in de hoeken, in plaats van één lange band vanaf één kant.",[41,15099,15101],{"id":15100},"welke-doorsnede-voor-de-kabel-van-voeding-naar-strip","Welke doorsnede voor de kabel van voeding naar strip?",[12,15103,15104],{},"Zeer lage spanning betekent hoge stromen bij een lage spanning, dus elke meter kabel telt. De formule is de bekende eenfasige formule zonder arbeidsfactor:",[12,15106,15107,15110,15111,15114,15115,15118],{},[1300,15108,15109],{},"ΔU = 2 × ρ × L × I \u002F S",", met ",[1300,15112,15113],{},"ρ"," = 0,0175 Ω·mm²\u002Fm voor koper en ",[1300,15116,15117],{},"L"," de enkele lengte.",[12,15120,15121],{},"Voor een strip van 24 V met 3 A:",[49,15123,15124,15139],{},[52,15125,15126],{},[55,15127,15128,15130,15133,15136],{},[58,15129,3826],{},[58,15131,15132],{},"0,75 mm²",[58,15134,15135],{},"1,5 mm²",[58,15137,15138],{},"2,5 mm²",[68,15140,15141,15154,15166,15179],{},[55,15142,15143,15145,15148,15151],{},[73,15144,14924],{},[73,15146,15147],{},"0,70 V · 2,9 %",[73,15149,15150],{},"0,35 V · 1,5 %",[73,15152,15153],{},"0,21 V · 0,9 %",[55,15155,15156,15158,15161,15163],{},[73,15157,14958],{},[73,15159,15160],{},"1,40 V · 5,8 %",[73,15162,15147],{},[73,15164,15165],{},"0,42 V · 1,8 %",[55,15167,15168,15170,15173,15176],{},[73,15169,14975],{},[73,15171,15172],{},"2,10 V · 8,8 %",[73,15174,15175],{},"1,05 V · 4,4 %",[73,15177,15178],{},"0,63 V · 2,6 %",[55,15180,15181,15184,15187,15190],{},[73,15182,15183],{},"max. bij 3 %",[73,15185,15186],{},"5,1 m",[73,15188,15189],{},"10,3 m",[73,15191,15192],{},"17,1 m",[12,15194,15195,15196,15199,15200,39],{},"We plannen met ",[15,15197,15198],{},"hoogstens 3 % spanningsval"," op de voedingskabel, zodat de strip gelijkmatig brandt. Het AREI noemt voor voedingskabels op zeer lage spanning geen vast percentage; we nemen de 3 % over die voor verlichtingskringen gebruikelijk is, als planningsgrens. De stroombelastbaarheid van dunne kabels controleer je bijkomend volgens de fabrikant; de calculator stelt daarom pas vanaf 0,75 mm² een doorsnede voor. De basis voor spanningsval op 230 V lees je in ",[30,15201,15203],{"href":15202},"\u002Fblog\u002Fspanningsval-berekenen-kabeldoorsnede","Spanningsval berekenen",[41,15205,15207],{"id":15206},"wat-verandert-er-bij-rgb-rgbw-en-tunable-white","Wat verandert er bij RGB, RGBW en tunable white?",[12,15209,15210],{},"Strips met meerdere kanalen verdelen hun vermogen over de kanalen: twee bij CCT (tunable white), drie bij RGB, vier bij RGBW, vijf bij RGB+CCT. Een RGBW-strip van 19,2 W\u002Fm over 4 m vraagt 76,8 W en 3,2 A, dus 0,8 A per kanaal. Daaruit volgen drie planningspunten:",[1450,15212,15213,15219,15225],{},[1453,15214,15215,15218],{},[15,15216,15217],{},"Controller:"," hij moet de stroom per kanaal leveren. 0,8 A is geen probleem, 15 m van dezelfde strip met 3 A per kanaal niet meer voor elke controller.",[1453,15220,15221,15224],{},[15,15222,15223],{},"Aantal aders:"," de gemeenschappelijke plus en één geleider per kanaal. Mono heeft 2 aders, CCT 3, RGB 4, RGBW 5, RGB+CCT 6.",[1453,15226,15227,15230],{},[15,15228,15229],{},"Spanningsval:"," de gemeenschappelijke plusgeleider voert de stroom van alle kanalen, elke kanaalgeleider alleen zijn deel. De werkzame stroom is daardoor kleiner dan bij een even sterke strip met één kanaal. In het voorbeeld met 5 m en 0,75 mm² geeft dat 1,9 % in plaats van 3,1 %. De calculator houdt daar automatisch rekening mee.",[41,15232,15234],{"id":15233},"wat-eist-het-arei-bij-ledstrips","Wat eist het AREI bij ledstrips?",[12,15236,15237,15240],{},[15,15238,15239],{},"Spanning en aard van de stroom staan op het eendraadschema."," Onderafdeling 3.1.2.1 a vraagt dat voor elke huishoudelijke installatie. Een strip achter een voeding documenteer je dus met „24 V ⎓“, niet alleen met de 230V-kring ervoor. Tabel 2.23 heeft daarvoor een eigen symbool gelijkrichter AC↔DC; een veiligheidstransformator met AC-uitgang krijgt het transformatorsymbool.",[12,15242,15243,15246],{},[15,15244,15245],{},"ZLVS vraagt een toegelaten bron en een correcte scheiding."," Onderafdeling 4.2.5.3 a bepaalt de toegelaten bronnen: een ledvoeding met ZLVS-uitgang voldoet daaraan, „lage spanning“ op zich nog niet. Volgens 4.2.5.3 c leg je ZLVS-geleiders met 10 mm afstand tot andere kringen, met bijkomende isolatie of in een kabel die volledig geïsoleerd is voor de hoogste aanwezige spanning. Dat speelt vooral in gedeelde dozen met drukknop, controller en 230V-bedrading.",[12,15248,15249,15252,15253,39],{},[15,15250,15251],{},"In de badkamer tellen volume en spanning."," Tabel 7.2 bij onderafdeling 7.1.4.2 a laat in de volumes 0 en 1 hoogstens 12 V wisselspanning of 30 V rimpelvrije gelijkspanning toe, in volume 2 tot 25 V AC of 60 V DC. Een strip van 24 V DC in een douchenis mag dus, als hij geschikt is voor dat volume. De ZLVS-bron, dus de voeding, staat volgens onderafdeling 7.1.5.2 buiten de volumes 0 en 1. Welke kabels in welk volume mogen, lees je in ",[30,15254,15256],{"href":15255},"\u002Fblog\u002Fbadkamer-kabels-arei-zones","Kabels in de badkamer volgens de AREI-volumes",[41,15258,15260],{"id":15259},"zo-reken-je-online","Zo reken je online",[12,15262,7641,15263,15266],{},[30,15264,15265],{"href":14831},"ledstripcalculator"," geeft alle waarden uit dit artikel in één overzicht: vermogen, stroom totaal en per kanaal, nodige voedingspunten, grootte van de voeding, aanbevolen doorsnede van de voedingskabel en de vergelijking van doorsneden met spanningsval, eindspanning en maximale lengte. Hij dekt 5, 12, 24 en 48 V, strips met één kleur, CCT, RGB, RGBW en RGB+CCT, start met typische striptypes en neemt je eigen datasheetwaarden over.",[12,15268,15269],{},"Elk resultaat deel je als link of druk je af, handig om af te stemmen met klant en leverancier. AI-assistenten in de browser gebruiken de calculator rechtstreeks via WebMCP en geven dezelfde deelbare link terug.",[12,15271,15272],{},"De rollen zijn duidelijk: de calculator levert het ontwerp op basis van je datasheetwaarden. De fabrikantgegevens over lengte per voedingspunt, derating, warmteafvoer in het profiel en stroombelastbaarheid van de kabel bevestigt de betreffende datasheet.",[41,15274,1394],{"id":1393},[1396,15276,15278],{"id":15277},"mag-ik-de-strip-in-het-midden-voeden","Mag ik de strip in het midden voeden?",[12,15280,15281],{},"Ja. Een voeding in het midden halveert de lengte naar elke kant en telt als twee voedingspunten over elk de halve striplengte. Voor lange lijnen is dat vaak eleganter dan twee kabels naar beide uiteinden.",[1396,15283,15285],{"id":15284},"heeft-elke-ledstrip-een-aluminium-profiel-nodig","Heeft elke ledstrip een aluminium profiel nodig?",[12,15287,15288],{},"Vanaf een gemiddeld vermogen wel: het profiel voert de warmte af en bepaalt samen met de afdekking het lichtbeeld. Hoeveel vermogen per meter zonder profiel mag, bepaalt de fabrikant.",[1396,15290,15292],{"id":15291},"hoeveel-meter-past-op-een-voeding-van-100-w","Hoeveel meter past op een voeding van 100 W?",[12,15294,15295],{},"Met 20 % reserve heb je ruim 83 W: ongeveer 5,8 m bij 14,4 W\u002Fm, 8,7 m bij 9,6 W\u002Fm of 4,3 m bij 19,2 W\u002Fm (RGBW).",[1396,15297,15299],{"id":15298},"mag-ik-twee-voedingen-op-één-strip-aansluiten","Mag ik twee voedingen op één strip aansluiten?",[12,15301,15302],{},"Plan liever aparte delen met elk een eigen voeding. Of voedingen parallel of op een doorlopende strip mogen werken, beslist uitsluitend de fabrikant.",[1396,15304,15306],{"id":15305},"hoort-de-voeding-in-het-verdeelbord-of-bij-de-strip","Hoort de voeding in het verdeelbord of bij de strip?",[12,15308,15309],{},"Beide werken. Op de DIN-rail in het verdeelbord is ze bereikbaar en koel, maar vraagt ze lange kabels op zeer lage spanning; dan beslist de doorsnedetabel hierboven. Decentraal dicht bij de strip blijft de voedingskabel kort, maar de voeding moet bereikbaar en geschikt zijn voor de inbouwplaats.",[1396,15311,15313],{"id":15312},"welke-kabel-komt-tussen-controller-en-rgbw-strip","Welke kabel komt tussen controller en RGBW-strip?",[12,15315,15316],{},"Een vijfaderige kabel (gemeenschappelijke plus en vier kanalen), gedimensioneerd op de kanaalstroom en de lengte. Bij RGB+CCT zijn het zes aders.",[41,15318,15320],{"id":15319},"ledverlichting-plannen-in-planelec","Ledverlichting plannen in PlanElec",[12,15322,12598,15323,15325,15326,15330],{},[30,15324,1337],{"href":6989}," plaats je armaturen, voeding, schakelaars en drukknoppen rechtstreeks op het grondplan, wijs je ze toe aan stroomkringen en maak je er eendraadschema, situatieplan en materiaallijst van. De zelfcontrole bewaakt onder meer het aantal lichtpunten per kring en de spanningsval. Sturingen met Shelly- of KNX-actoren en drukknoppen plan je in hetzelfde project. ",[30,15327,15329],{"href":15328},"\u002Fauth\u002Fregister","Registreer je gratis"," en start je eerste verlichtingsplan.",[41,15332,15334],{"id":15333},"gerelateerde-artikels","Gerelateerde artikels",[1450,15336,15337,15342,15346],{},[1453,15338,15339],{},[30,15340,15341],{"href":15202},"Spanningsval berekenen: hoe lang mag je kabel zijn?",[1453,15343,15344],{},[30,15345,15256],{"href":15255},[1453,15347,15348],{},[30,15349,15351],{"href":15350},"\u002Fblog\u002Fdomotica-arei","Smart Home en AREI: waar let je op bij domotica?",[12,15353,15354,15355,15360],{},"Officiële basis: ",[30,15356,15359],{"href":15357,"rel":15358},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fpublicaties\u002Falgemeen-reglement-op-de",[2532],"FOD Economie, AREI Boek 1 V06",", in het bijzonder onderafdeling 3.1.2.1, tabel 2.23, onderafdeling 4.2.5.3 en de onderafdelingen 7.1.4.2 en 7.1.5.2.",{"title":1467,"searchDepth":1468,"depth":1468,"links":15362},[15363,15364,15365,15366,15367,15368,15369,15370,15371,15379,15380],{"id":14842,"depth":1468,"text":14843},{"id":14993,"depth":1468,"text":14994},{"id":15007,"depth":1468,"text":15008},{"id":15082,"depth":1468,"text":15083},{"id":15100,"depth":1468,"text":15101},{"id":15206,"depth":1468,"text":15207},{"id":15233,"depth":1468,"text":15234},{"id":15259,"depth":1468,"text":15260},{"id":1393,"depth":1468,"text":1394,"children":15372},[15373,15374,15375,15376,15377,15378],{"id":15277,"depth":1486,"text":15278},{"id":15284,"depth":1486,"text":15285},{"id":15291,"depth":1486,"text":15292},{"id":15298,"depth":1486,"text":15299},{"id":15305,"depth":1486,"text":15306},{"id":15312,"depth":1486,"text":15313},{"id":15319,"depth":1468,"text":15320},{"id":15333,"depth":1468,"text":15334},"2026-10-05","Bereken vermogen, stroom, voeding, voedingspunten en voedingskabel voor ledstrips op 12, 24 en 48 V. Met formules, tabellen, het RGBW-geval, de AREI-regels voor ZLVS en badkamer en een gratis calculator.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-led-strip-power-supply-editorial.jpg","\u002Fblog\u002Fled-strip-power-supply.nl",{"title":14819,"description":15382},"Ledstrip berekenen: voeding, voedingspunten, doorsnede","ledstrip-voeding-berekenen","blog\u002Fled-strip-power-supply.nl",[15391,15392,15393,15394,15395,15396],"ledstrip","voeding","verlichting","spanningsval","zlvs","calculator","2bdhVpWUHPm8wRPS377tzIOM_Ndy_1OhFUy5ofxyKn0","\u002Fblog\u002Fledstrip-voeding-berekenen",{"id":15400,"title":15401,"articleId":15402,"body":15403,"category":1493,"date":15909,"description":15910,"extension":1496,"image":4578,"lastUpdated":7010,"locale":1497,"meta":15911,"navigation":1499,"ogImage":4581,"path":15912,"publishDate":15909,"readTime":4035,"refreshInterval":1486,"seo":15913,"seoTitle":15914,"slug":15915,"stem":15916,"tags":15917,"__hash__":15918,"kind":1515,"href":4371},"blog\u002Fblog\u002Fai-assistent-elektrische-planning.nl.md","AI-assistent voor elektrische planning: wat doet de PlanElec-assistent in jouw project?","planelec-ai-assistant",{"type":9,"value":15404,"toc":15889},[15405,15411,15415,15419,15422,15425,15428,15432,15435,15578,15583,15587,15590,15625,15634,15640,15645,15649,15655,15718,15723,15735,15739,15749,15752,15756,15766,15777,15781,15788,15791,15795,15801,15804,15808,15811,15814,15818,15822,15825,15829,15838,15842,15851,15855,15861,15865,15868,15872,15875,15879],[12,15406,15407,15410],{},[15,15408,15409],{},"De PlanElec-assistent is de AI-assistent in de studio van PlanElec: je beschrijft in je eigen woorden wat er in het project moet gebeuren, en hij voert het uit in het volledige projectmodel – grondplan, toestellen, stroomkringen, kabels, verdeelkast, KNX, PV-strings en lichtsturing."," Duidelijke, omkeerbare wijzigingen voert hij meteen uit; risicovolle acties pas na jouw bevestiging. Na elke wijziging controleert de server het hele project met dezelfde AREI\u002FRGIE-zelfcontrole als het controleverslag, en elke wijziging maak je in één stap ongedaan. Vakvragen beantwoordt hij met geverifieerde bronnen uit de AREI-tekst en de PlanElec-hulp. Tijdens de Early Access is de assistent gratis voor elk aangemeld account.",[12,15412,15413],{},[22,15414],{"alt":6190,"src":4578},[41,15416,15418],{"id":15417},"wat-is-de-planelec-assistent","Wat is de PlanElec-assistent?",[12,15420,15421],{},"De PlanElec-assistent is een taalmodel dat werkt met de planningscommando's van PlanElec. Hij tekent niet vrij in je plan, maar gebruikt dezelfde commando's die je zelf via de interface start: meer dan 100 planningscommando's voor grondplan en situatieplan, ruimtes, toestellen, stroomkringen, schakelketens, kabels, verdeelkast en verdeelborden, automatisering en KNX, PV-strings en lichtsturing. Daarnaast maakt hij projecten en verdiepingen aan en navigeert hij voor jou door de interface.",[12,15423,15424],{},"Voor hij iets wijzigt, leest de assistent het project: projectoverzicht, structuur, actuele controlebevindingen en de toestellencatalogus. Hij plant dus met precies de stand van zaken die je op dat moment voor je hebt – niet met een kopie of een gok.",[12,15426,15427],{},"De assistent werkt met jouw projectrechten. Wie een project mag bekijken maar niet bewerken, wijzigt het ook via de assistent niet.",[41,15429,15431],{"id":15430},"wat-kan-de-assistent-in-een-project-doen","Wat kan de assistent in een project doen?",[12,15433,15434],{},"De assistent bestrijkt het planningsverloop van een leeg project tot een gevulde verdeelkast. De tabel toont typische opdrachten per domein. De formuleringen zijn voorbeelden: je schrijft zoals je een collega een opdracht geeft.",[49,15436,15437,15448],{},[52,15438,15439],{},[55,15440,15441,15443,15446],{},[58,15442,4091],{},[58,15444,15445],{},"Voorbeeldopdracht",[58,15447,8107],{},[68,15449,15450,15461,15472,15482,15493,15503,15514,15525,15535,15546,15556,15567],{},[55,15451,15452,15455,15458],{},[73,15453,15454],{},"Project en verdiepingen",[73,15456,15457],{},"\"Maak een nieuw project aan en voeg een verdieping toe.\"",[73,15459,15460],{},"Project en verdieping worden aangemaakt; de assistent brengt je er meteen naartoe.",[55,15462,15463,15466,15469],{},[73,15464,15465],{},"Grondplan en ruimtes",[73,15467,15468],{},"\"Splits de woonkamer in een zit- en eethoek en geef beide ruimtes een naam.\"",[73,15470,15471],{},"Ruimtegeometrie en namen worden in het grondplan aangepast.",[55,15473,15474,15476,15479],{},[73,15475,10587],{},[73,15477,15478],{},"\"Plaats drie stopcontacten in de keuken.\"",[73,15480,15481],{},"De stopcontacten staan in het grondplan, klaar voor stroomkring en eendraadschema.",[55,15483,15484,15487,15490],{},[73,15485,15486],{},"Standaarduitrusting",[73,15488,15489],{},"\"Maak een standaardinstallatie voor dit project.\"",[73,15491,15492],{},"De ruimtes krijgen een voorgestelde basisuitrusting die je daarna aanpast.",[55,15494,15495,15497,15500],{},[73,15496,2841],{},[73,15498,15499],{},"\"Voeg in de keuken een afzonderlijke kookkring met beveiliging toe.\"",[73,15501,15502],{},"Stroomkring en beveiliging worden in de topologie aangemaakt en verschijnen in het eendraadschema.",[55,15504,15505,15508,15511],{},[73,15506,15507],{},"Schakelketens en verlichting",[73,15509,15510],{},"\"Schakel de spots in de gang met de twee schakelaars aan de deuren.\"",[73,15512,15513],{},"De schakelketen tussen schakelaars en lichtpunten wordt opgebouwd.",[55,15515,15516,15519,15522],{},[73,15517,15518],{},"Kabels",[73,15520,15521],{},"\"Leg een kabeltraject aan voor alle kabels zonder verloop.\"",[73,15523,15524],{},"Ontbrekende kabeltrajecten volgen de muren; bestaande trajecten blijven ongewijzigd.",[55,15526,15527,15529,15532],{},[73,15528,1721],{},[73,15530,15531],{},"\"Verdeel de stroomkringen over de verdeelkast en balanceer de fasen.\"",[73,15533,15534],{},"Modules komen op de DIN-rails en de belasting wordt over de fasen verdeeld.",[55,15536,15537,15540,15543],{},[73,15538,15539],{},"KNX en automatisering",[73,15541,15542],{},"\"Wijs de verlichting in de woonkamer toe aan vrije kanalen van de KNX-schakelactor.\"",[73,15544,15545],{},"De kanaaltoewijzing in de KNX-actor wordt ingesteld en in het eendraadschema gedocumenteerd.",[55,15547,15548,15550,15553],{},[73,15549,5083],{},[73,15551,15552],{},"\"Stel de PV-strings voor de omvormer voor.\"",[73,15554,15555],{},"Strings worden aan de MPPT-ingangen toegewezen; ontbrekende gegevens blijven zichtbaar.",[55,15557,15558,15561,15564],{},[73,15559,15560],{},"Controlebevindingen",[73,15562,15563],{},"\"Leg de huidige validatiebevindingen in dit project uit.\"",[73,15565,15566],{},"De assistent leest de bevindingen van de zelfcontrole en legt oorzaak en betrokken elementen uit.",[55,15568,15569,15572,15575],{},[73,15570,15571],{},"Vakvraag",[73,15573,15574],{},"\"Welke AREI-regel geldt voor differentieelbeveiliging? Toon mij de bron.\"",[73,15576,15577],{},"Antwoord met geverifieerde bronnen uit de AREI-tekst en de PlanElec-hulp.",[12,15579,15580,15581,39],{},"Veel van deze opdrachten gebruiken op de achtergrond de deterministische automatisering van PlanElec: ruimte-uitrusting, toewijzing van stroomkringen, kabeltrajecten of de indeling van de verdeelkast. De assistent vertaalt je opdracht naar de juiste commando's en parameters. Hoe die automatisering werkt, lees je in de handleiding ",[30,15582,12586],{"href":6871},[41,15584,15586],{"id":15585},"hoe-open-je-de-assistent-en-geef-je-een-opdracht","Hoe open je de assistent en geef je een opdracht?",[12,15588,15589],{},"Open een project in de studio. Je opent de assistent op drie manieren:",[1602,15591,15592,15601,15608],{},[1453,15593,15594,15595,15598,15599,7763],{},"Met de ",[15,15596,15597],{},"botknop in de bovenbalk"," (tooltip ",[15,15600,7065],{},[1453,15602,9364,15603,7070,15605,15607],{},[15,15604,7069],{},[15,15606,7073],{}," op Windows en Linux.",[1453,15609,15610,15611,1934,15614,1628,15617,15620,15621,15624],{},"Via de ",[15,15612,15613],{},"opdrachtzoeker",[15,15615,15616],{},"⌘K",[15,15618,15619],{},"Ctrl+K",": typ je opdracht en kies ",[15,15622,15623],{},"Naar de assistent sturen: '…'",". De zoektekst gaat meteen als opdracht naar de assistent.",[12,15626,15627,15628,15630,15631,15633],{},"In het invoerveld staat als voorbeeld \"Bijvoorbeeld: plaats drie stopcontacten in de keuken…\". Beschrijf het gewenste resultaat en verstuur met ",[15,15629,7112],{}," of Enter; Shift+Enter voegt een nieuwe regel in. Terwijl de assistent werkt, zie je de status (\"Bezig\", \"Actie wordt uitgevoerd\"). Met ",[15,15632,9648],{}," stop je een lopende opdracht; wijzigingen die al zijn uitgevoerd, blijven bestaan en maak je afzonderlijk ongedaan.",[12,15635,15636,15637,39],{},"Een goede opdracht noemt plaats en resultaat: \"Voeg in de badkamer een spatwaterdicht stopcontact naast de lavabo toe\" is preciezer dan \"Werk de badkamer af\". Ontbreekt er informatie, dan vraagt de assistent ernaar, of de actiekaart meldt ",[15,15638,15639],{},"Meer informatie of bewijs is vereist",[12,15641,15642,15643,39],{},"De activiteitenkolom, de filters en de geschiedenis leggen we uit in de handleiding ",[30,15644,6560],{"href":6559},[41,15646,15648],{"id":15647},"hoe-controleert-planelec-elke-wijziging-van-de-assistent","Hoe controleert PlanElec elke wijziging van de assistent?",[12,15650,15651,15654],{},[15,15652,15653],{},"Na elke wijziging controleert de server het volledige project met dezelfde AREI\u002FRGIE-zelfcontrole als het controleverslag."," Een actie geldt pas als afgerond wanneer die controle gelopen heeft. Op de actiekaart zie je het resultaat meteen:",[49,15656,15657,15666],{},[52,15658,15659],{},[55,15660,15661,15664],{},[58,15662,15663],{},"Melding op de actiekaart",[58,15665,752],{},[68,15667,15668,15677,15686,15699,15709],{},[55,15669,15670,15674],{},[73,15671,15672],{},[15,15673,7380],{},[73,15675,15676],{},"De wijziging is opgeslagen en de zelfcontrole is daarna uitgevoerd.",[55,15678,15679,15683],{},[73,15680,15681],{},[15,15682,7383],{},[73,15684,15685],{},"Hoe de controlebevindingen door deze wijziging verschoven zijn.",[55,15687,15688,15696],{},[73,15689,15690,8390,15693],{},[15,15691,15692],{},"Doel bereikt",[15,15694,15695],{},"Doel nog niet bereikt",[73,15697,15698],{},"Of het beoogde resultaat van je opdracht effectief in het project staat.",[55,15700,15701,15706],{},[73,15702,15703],{},[15,15704,15705],{},"Betrokken elementen: …",[73,15707,15708],{},"Hoeveel elementen de wijziging raakt.",[55,15710,15711,15715],{},[73,15712,15713],{},[15,15714,7343],{},[73,15716,15717],{},"De actie wacht op jouw akkoord (zie volgende sectie).",[12,15719,15720,15721,39],{},"Nieuwe bevindingen meldt de assistent meteen in het gesprek. Zo zie je direct of een extra stroomkring bijvoorbeeld een beveiliging of kabeldoorsnede raakt – niet pas in het eindverslag. Welke regels de zelfcontrole dekt, staat in ",[30,15722,2458],{"href":2457},[12,15724,15725,15728,15729,15731,15732,39],{},[15,15726,15727],{},"Elke wijziging van de assistent is precies één stap ongedaan maken."," Met ",[15,15730,6795],{}," op de actiekaart draai je ze volledig terug; bij meerdere opdrachten één voor één, te beginnen met de meest recente. De kaart toont daarna ",[15,15733,15734],{},"Ongedaan gemaakt",[41,15736,15738],{"id":15737},"welke-acties-moet-je-uitdrukkelijk-bevestigen","Welke acties moet je uitdrukkelijk bevestigen?",[12,15740,15741,15742,15744,15745,1628,15747,39],{},"Duidelijke en omkeerbare wijzigingen – een stopcontact plaatsen, een ruimte hernoemen, een kabeltraject aanleggen – voert de assistent meteen uit. Acties met een grotere impact legt hij je ter goedkeuring voor: de actiekaart toont ",[15,15743,7343],{}," met de geplande parameters. Je kiest ",[15,15746,6637],{},[15,15748,7349],{},[12,15750,15751],{},"De bevestiging geldt voor precies deze actie met precies deze waarden. Verandert de opdracht, dan is een nieuwe goedkeuring nodig. Projecten verwijderen kan de assistent niet; die stap blijft bij jou.",[41,15753,15755],{"id":15754},"hoe-ziet-je-team-wat-de-assistent-heeft-gewijzigd","Hoe ziet je team wat de assistent heeft gewijzigd?",[12,15757,15758,15759,15761,15762,15765],{},"Elke actie verschijnt in de kolom ",[15,15760,7061],{}," als actiekaart met tool, status en opdrachtgever. In de projectgeschiedenis dragen opgeslagen wijzigingen van de assistent een bot-tegel en de vermelding ",[15,15763,15764],{},"Assistent · in opdracht van …"," met de naam van het teamlid dat de opdracht gaf.",[12,15767,15768,15769,15772,15773,15776],{},"Zo blijft in het team zichtbaar wie welke wijziging heeft gevraagd, ook als je de geschiedenis van een collega bekijkt. De filter ",[15,15770,15771],{},"Assistent"," bundelt gesprekken en acties van de assistent; de filter ",[15,15774,15775],{},"Team"," toont alle projectwijzigingen, inclusief de opdrachten die je collega's aan de assistent gaven.",[41,15778,15780],{"id":15779},"hoe-beantwoordt-de-assistent-vakvragen-over-het-arei-en-planelec","Hoe beantwoordt de assistent vakvragen over het AREI en PlanElec?",[12,15782,15783,15784,15787],{},"Vakvragen beantwoordt de assistent met onderbouwde bronnen. Hij doorzoekt de PlanElec-hulp, de volledige AREI-tekst (Boek 1) en de PlanElec-blog en toont de vindplaatsen onder ",[15,15785,15786],{},"Geverifieerde bronnen",". De server toetst elke bronvermelding aan de echte tekst; citaten die daar niet in staan, worden verworpen.",[12,15789,15790],{},"Zo is elk antwoord controleerbaar: je ziet uit welk artikel of welke hulpsectie een uitspraak komt en leest het zelf na. Goede vragen om te starten zijn \"Welke AREI-regel geldt voor differentieelbeveiliging? Toon mij de bron.\" of \"Waarom meldt de zelfcontrole een bevinding bij de badkamerkring?\".",[41,15792,15794],{"id":15793},"waar-worden-je-gegevens-verwerkt","Waar worden je gegevens verwerkt?",[12,15796,15797,15800],{},[15,15798,15799],{},"Het taalmodel draait in de EU-regio. De AI-aanbieder slaat je aanvragen niet op en traint er niet mee."," PlanElec stuurt aanvragen uitsluitend naar aanbieders zonder gegevensbewaring; gegevensverzameling door de aanbieder is uitgesloten. De betrokken AI-dienstverleners staan als subverwerkers in de verwerkersovereenkomst van PlanElec.",[12,15802,15803],{},"Je project en de gesprekken en acties van de assistent bewaart PlanElec zelf, zodat jij en je team opdrachten en wijzigingen later kunnen nagaan.",[41,15805,15807],{"id":15806},"wat-doet-de-assistent-en-wie-is-verantwoordelijk-voor-ontwerp-en-keuring","Wat doet de assistent – en wie is verantwoordelijk voor ontwerp en keuring?",[12,15809,15810],{},"De assistent doet het werk in het planningsmodel: toestellen plaatsen, stroomkringen opbouwen, kabeltrajecten aanleggen, de verdeelkast invullen en controlebevindingen met bronnen uitleggen. De vakinhoudelijke verantwoordelijkheid voor het ontwerp draag jij als installateur of studiebureau; de keuring doet het erkend organisme.",[12,15812,15813],{},"De zelfcontrole beoordeelt de ondersteunde regels op basis van de ingevoerde projectgegevens. Metingen, omstandigheden ter plaatse en fabrikantgegevens controleer jij op de werf en het erkend organisme bij de keuring. Een project zonder bevindingen betekent dus: geen fouten in de ondersteunde regels die met de gegevens te controleren zijn – en een goed voorbereide basis voor je eigen nazicht en de keuring.",[41,15815,15817],{"id":15816},"veelgestelde-vragen-over-de-planelec-assistent","Veelgestelde vragen over de PlanElec-assistent",[1396,15819,15821],{"id":15820},"begrijpt-de-assistent-nederlands-en-frans","Begrijpt de assistent Nederlands en Frans?",[12,15823,15824],{},"Ja. Je schrijft in het Nederlands, Frans, Duits of Engels, en de assistent antwoordt in jouw taal. Ook de interface, de actiekaarten en de statusmeldingen zijn er in alle vier de talen.",[1396,15826,15828],{"id":15827},"kan-ik-opdrachten-aan-de-assistent-dicteren","Kan ik opdrachten aan de assistent dicteren?",[12,15830,15831,15832,15834,15835,39],{},"Ja. Met de microfoonknop ",[15,15833,6787],{}," in het invoerveld spreek je je opdracht in; de herkenning kent vaktermen zoals XVB of eendraadschema. De herkende tekst verschijnt in het veld, je kijkt hem na, verbetert hem en verstuurt hem zelf. Hoe dat op de werf verloopt, lees je in ",[30,15836,15837],{"href":7681},"Eendraadschema dicteren",[1396,15839,15841],{"id":15840},"kan-de-assistent-mijn-project-verwijderen","Kan de assistent mijn project verwijderen?",[12,15843,15844,15845,15847,15848,15850],{},"Nee. Projecten verwijderen hoort niet bij de commando's van de assistent. Risicovolle wijzigingen binnen een project voert hij pas uit na ",[15,15846,6637],{},", en elke uitgevoerde wijziging draai je met ",[15,15849,6795],{}," terug.",[1396,15852,15854],{"id":15853},"wat-kost-de-assistent","Wat kost de assistent?",[12,15856,15857,15858,15860],{},"Tijdens de Early Access is de PlanElec-assistent gratis, net als de rest van PlanElec. Je hebt een PlanElec-account en een project in de studio nodig. De AI-functies gebruiken het ",[15,15859,7440],{}," van je account; het beschikbare deel zie je in het gebruikersmenu.",[1396,15862,15864],{"id":15863},"wie-kan-de-assistent-gebruiken","Wie kan de assistent gebruiken?",[12,15866,15867],{},"Elk aangemeld account in de studio – zonder aparte activering of speciaal abonnement. Voor projectwijzigingen heb je bewerkingsrechten in dat project nodig.",[1396,15869,15871],{"id":15870},"neemt-de-assistent-de-automatische-planning-over","Neemt de assistent de automatische planning over?",[12,15873,15874],{},"Nee, hij gebruikt ze. De automatische planning levert navolgbare, regelgebaseerde voorstellen; de assistent kiest de juiste functies en parameters voor je opdracht en combineert ze met gerichte afzonderlijke wijzigingen.",[1396,15876,15878],{"id":15877},"kan-ik-een-grondplan-van-de-architect-of-uit-trikker-overnemen","Kan ik een grondplan van de architect of uit Trikker overnemen?",[12,15880,15881,15882,15885,15886,39],{},"Ja, via de AI-herkenning in de projectstukken. Hoe een pdf, scan of Trikker-export een bewerkbaar grondplan wordt en hoe je een bestaande verdeelkast via een foto vastlegt, lees je in ",[30,15883,15884],{"href":5184},"Grondplan overnemen uit pdf, scan of Trikker-export",". De functievergelijking met Trikker vind je in ",[30,15887,15888],{"href":4891},"Trikker-alternatief PlanElec",{"title":1467,"searchDepth":1468,"depth":1468,"links":15890},[15891,15892,15893,15894,15895,15896,15897,15898,15899,15900],{"id":15417,"depth":1468,"text":15418},{"id":15430,"depth":1468,"text":15431},{"id":15585,"depth":1468,"text":15586},{"id":15647,"depth":1468,"text":15648},{"id":15737,"depth":1468,"text":15738},{"id":15754,"depth":1468,"text":15755},{"id":15779,"depth":1468,"text":15780},{"id":15793,"depth":1468,"text":15794},{"id":15806,"depth":1468,"text":15807},{"id":15816,"depth":1468,"text":15817,"children":15901},[15902,15903,15904,15905,15906,15907,15908],{"id":15820,"depth":1486,"text":15821},{"id":15827,"depth":1486,"text":15828},{"id":15840,"depth":1486,"text":15841},{"id":15853,"depth":1486,"text":15854},{"id":15863,"depth":1486,"text":15864},{"id":15870,"depth":1486,"text":15871},{"id":15877,"depth":1486,"text":15878},"2026-10-03","De PlanElec-assistent voert je opdrachten in gewone taal uit in het hele project – van grondplan en stroomkringen tot de verdeelkast. Elke wijziging doorloopt de AREI-zelfcontrole en maak je in één stap ongedaan.",{},"\u002Fblog\u002Fai-assistent-elektrische-planning.nl",{"title":15401,"description":15910},"AI-assistent voor elektrische planning: wat doet hij?","ai-assistent-elektrische-planning","blog\u002Fai-assistent-elektrische-planning.nl",[7677,4588,4589,7023,3273,3275,13572,4593],"p22KK-TCg_KYwoGGpqKFuZ6bI8H7zAk-3PGlPST9grI",{"id":15920,"title":15921,"articleId":15922,"body":15923,"category":16481,"date":15909,"description":16482,"extension":1496,"image":15936,"lastUpdated":3258,"locale":1497,"meta":16483,"navigation":1499,"ogImage":16484,"path":16485,"publishDate":15909,"readTime":4035,"refreshInterval":1486,"seo":16486,"seoTitle":16487,"slug":16488,"stem":16489,"tags":16490,"__hash__":16492,"kind":1515,"href":5184},"blog\u002Fblog\u002Fgrondplan-herkennen-verdeelkast-foto-ai.nl.md","Hoe neem je een grondplan over uit pdf, scan of Trikker-export – en de verdeelkast via een foto?","ai-floor-plan-cabinet-recognition",{"type":9,"value":15924,"toc":16461},[15925,15931,15937,15941,15944,16004,16007,16011,16019,16032,16035,16040,16044,16081,16084,16088,16093,16133,16143,16148,16152,16158,16180,16189,16193,16205,16215,16219,16225,16257,16271,16275,16278,16334,16340,16343,16347,16377,16380,16386,16390,16396,16399,16403,16409,16422,16426,16430,16433,16437,16440,16444,16447,16451,16454,16458],[12,15926,15927,15930],{},[15,15928,15929],{},"PlanElec maakt van een bestaand plan een bewerkbaar grondplan: zet een pdf, scan of Trikker-pdf-export bij de projectstukken en kies Plattegrond herkennen."," PlanElec stelt muren, ruimtes met oppervlakte, deuren en vensters en toestelsymbolen zoals stopcontacten, schakelaars en lichtpunten voor. Jij controleert het voorstel, bevestigt de schaal en neemt alles met één klik over in een lege verdieping – de oorspronkelijke pagina blijft eronder als onderlegger. Een bestaande verdeelkast leg je volgens hetzelfde principe vast met foto's: PlanElec herkent de zichtbare DIN-modules, jij controleert ze en neemt ze over in een leeg verdeelbord.",[12,15932,15933],{},[22,15934],{"alt":15935,"src":15936},"Een elektricien neemt de installatie in een woonruimte op.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-ai-floor-plan-cabinet-recognition-editorial.webp",[41,15938,15940],{"id":15939},"wat-herkent-planelec-in-een-plan-of-foto","Wat herkent PlanElec in een plan of foto?",[12,15942,15943],{},"De AI-herkenning levert altijd een voorstel dat je controleert voor je het overneemt. De tabel toont per bron wat PlanElec herkent en waar je op let.",[49,15945,15946,15958],{},[52,15947,15948],{},[55,15949,15950,15952,15955],{},[58,15951,3189],{},[58,15953,15954],{},"Wat PlanElec herkent",[58,15956,15957],{},"Wat je controleert",[68,15959,15960,15971,15982,15993],{},[55,15961,15962,15965,15968],{},[73,15963,15964],{},"Vector-pdf (bv. plan van de architect)",[73,15966,15967],{},"Methode Automatisch: muurvoorstel rechtstreeks uit de pdf-vectoren. Met LLM-beeldherkenning ook ruimtes, deuren, vensters en toestelsymbolen",[73,15969,15970],{},"Muurverloop, schaal, vergelijking met de op het plan gedrukte oppervlaktes",[55,15972,15973,15976,15979],{},[73,15974,15975],{},"Scan of foto van een plan (PNG, JPEG, WebP, gescande pdf)",[73,15977,15978],{},"Muren, ruimtes, openingen en symbolen via AI-beeldherkenning",[73,15980,15981],{},"Muurverloop op schuine of verborgen plaatsen, schaal, vragen in het voorstel",[55,15983,15984,15987,15990],{},[73,15985,15986],{},"Trikker-plan als pdf-export",[73,15988,15989],{},"Grondplan en ondersteunde symbolen: stopcontact, dubbel stopcontact, spatwaterdicht stopcontact, schakelaar, lichtpunt",[73,15991,15992],{},"Symbolen die niet toe te wijzen zijn – die zijn gemarkeerd en worden niet overgenomen",[55,15994,15995,15998,16001],{},[73,15996,15997],{},"Foto's van een verdeelkast (tot 6 per run)",[73,15999,16000],{},"Zichtbare DIN-modules met rij, startpositie, breedte en type, en afgelezen waarden zoals stroom, polen of gevoeligheid",[73,16002,16003],{},"Type, positie en waarden van elke module; samenvoegen van aanzichten van dezelfde module",[12,16005,16006],{},"Het symbolenvocabularium is afgestemd op Belgische plannen en op Trikker-exports. Stroomkringen, bedrading en eendraadschema haalt de herkenning niet uit plannen of foto's – die plan je daarna in het project, met de assistent en de automatische planning.",[41,16008,16010],{"id":16009},"welke-bestanden-kan-planelec-als-grondplan-herkennen","Welke bestanden kan PlanElec als grondplan herkennen?",[12,16012,16013,16015,16016,16018],{},[15,16014,6843],{}," verwerkt pdf, PNG, JPEG en WebP. Naast de actie kies je de ",[15,16017,10390],{},":",[1450,16020,16021,16027],{},[1453,16022,16023,16026],{},[15,16024,16025],{},"Automatisch (PDF-vectoren \u002F LLM)"," – standaard. Bevat de pdf vectorgegevens, dan leest PlanElec de muurlijnen er deterministisch uit en levert een muurvoorstel. Scans en afbeeldingen analyseert het met AI-beeldherkenning.",[1453,16028,16029,16031],{},[15,16030,10483],{}," – analyseert de pagina altijd als afbeelding, ook bij een vector-pdf. Deze methode levert naast de muren ook ruimtes met naam en oppervlakte, deuren, vensters en toestelsymbolen.",[12,16033,16034],{},"Herkend wordt de pagina die je in het voorbeeld open hebt. Bij een pdf met meerdere pagina's blader je dus eerst naar de juiste verdieping.",[12,16036,16037,16038,39],{},"DXF-bestanden en andere referentieplannen gebruik je via de gewone import als achtergrond op schaal; dat beschrijft de handleiding ",[30,16039,3378],{"href":3377},[41,16041,16043],{"id":16042},"hoe-start-je-de-herkenning-van-een-grondplan","Hoe start je de herkenning van een grondplan?",[1602,16045,16046,16051,16056,16062,16075],{},[1453,16047,16048,16049,39],{},"Open het project in de studio en laad het plan op bij ",[15,16050,3903],{},[1453,16052,16053,16054,39],{},"Open het bestand. Het verschijnt in het ",[15,16055,10348],{},[1453,16057,16058,16059,16061],{},"Blader bij bestanden met meerdere pagina's naar de gewenste pagina, kies de methode en klik op ",[15,16060,6843],{},". De tooltip meldt dat de pagina voor analyse naar een externe AI-aanbieder gaat.",[1453,16063,16064,16065,702,16068,933,16071,16074],{},"De voortgang toont ",[15,16066,16067],{},"Pagina wordt voorbereid",[15,16069,16070],{},"Plan wordt gelezen",[15,16072,16073],{},"Resultaat wordt gecontroleerd",". Volgens de melding in de interface duurt dat meestal ongeveer 30 seconden.",[1453,16076,16077,16078,16080],{},"Het voorstel verschijnt in het deelvenster ",[15,16079,10211],{},", ingedeeld in ruimtes, openingen, schaal, namen, toestellen en eventuele vragen.",[12,16082,16083],{},"De herkenning starten leden met de rol bewerker of hoger.",[41,16085,16087],{"id":16086},"hoe-bepaalt-planelec-de-schaal","Hoe bepaalt PlanElec de schaal?",[12,16089,16090,16091,16018],{},"Pas de schaal maakt van een planpagina een grondplan met juiste maten. PlanElec bepaalt ze op een van deze manieren en toont de bron in de sectie ",[15,16092,10281],{},[49,16094,16095,16104],{},[52,16096,16097],{},[55,16098,16099,16102],{},[58,16100,16101],{},"Methode in de interface",[58,16103,3189],{},[68,16105,16106,16115,16124],{},[55,16107,16108,16112],{},[73,16109,16110],{},[15,16111,10667],{},[73,16113,16114],{},"De maatlijnen op het plan worden gelezen en onderling vergeleken",[55,16116,16117,16121],{},[73,16118,16119],{},[15,16120,10677],{},[73,16122,16123],{},"De fysieke schaal die in de pdf is vastgelegd",[55,16125,16126,16130],{},[73,16127,16128],{},[15,16129,10687],{},[73,16131,16132],{},"Een gekende afstand die je zelf aanduidt",[12,16134,16135,16136,16139,16140,16142],{},"Als controle gebruikt PlanElec de ",[15,16137,16138],{},"op het plan gedrukte oppervlaktes",". Elke ruimte toont haar berekende oppervlakte naast \"Op het plan gedrukt: … m²\"; komen ze overeen, dan staat er ",[15,16141,10631],{},", anders de afwijking in procent. Wijken ruimtes af, dan meldt het voorstel dat daar wellicht een muur verkeerd staat. Spreken maatlijnen en je eigen ankerpunt elkaar tegen, dan vraagt PlanElec je om een gekende lengte na te meten.",[12,16144,9364,16145,16147],{},[15,16146,10567],{}," geef je de schaal vrij. Zonder bevestigde schaal blijft de overname geblokkeerd – zo belandt er geen grondplan op de verkeerde schaal in het project.",[41,16149,16151],{"id":16150},"hoe-corrigeer-je-het-voorstel-voor-de-overname","Hoe corrigeer je het voorstel voor de overname?",[12,16153,16154,16155,16157],{},"In het voorstel vink je ruimtes, openingen en toestellen uit die je niet wilt overnemen. Voor de geometrie opent ",[15,16156,10357],{}," een editor op de oorspronkelijke pagina:",[1450,16159,16160,16165,16170,16175],{},[1453,16161,16162,16164],{},[15,16163,10770],{}," – een hoek naar de juiste plaats slepen, na selectie ook met de pijltjestoetsen.",[1453,16166,16167,16169],{},[15,16168,10780],{}," – begin en einde van een ontbrekende muur aanklikken; bestaande hoeken klikken vast.",[1453,16171,16172,16174],{},[15,16173,10790],{}," – een overbodige muur met de bijbehorende openingen wissen.",[1453,16176,16177,16179],{},[15,16178,10756],{}," – twee punten van een gekende afstand aanduiden en de lengte in meter invullen.",[12,16181,16182,16183,1628,16186,16188],{},"Wijzigingen in het voorstel komen pas bij de overname in de verdieping terecht. Met ",[15,16184,16185],{},"Opnieuw herkennen met AI",[15,16187,10487],{}," start je indien nodig een nieuwe run.",[41,16190,16192],{"id":16191},"hoe-neem-je-het-herkende-grondplan-over-in-het-project","Hoe neem je het herkende grondplan over in het project?",[12,16194,16195,16196,16198,16199,16201,16202,16204],{},"Kies bij ",[15,16197,10273],{}," een lege verdieping en klik op ",[15,16200,6847],{},". PlanElec schrijft muren, ruimtes, openingen en toestellen in één stap in de verdieping en legt de oorspronkelijke pagina eronder als onderlegger ",[15,16203,10862],{},". Zo vergelijk je plan en resultaat op elk moment rechtstreeks.",[12,16206,16207,16208,1628,16211,16214],{},"De volledige overname maak je met ",[15,16209,16210],{},"⌘Z",[15,16212,16213],{},"Ctrl+Z"," in één stap ongedaan. Elementen die niet eenduidig aan een muur of ruimtezijde toe te wijzen zijn, meldt PlanElec als \"Niet overgenomen\" met hun aantal; die plaats je daarna met de hand.",[41,16216,16218],{"id":16217},"hoe-neem-je-een-trikker-plan-over-in-planelec","Hoe neem je een Trikker-plan over in PlanElec?",[12,16220,16221,16224],{},[15,16222,16223],{},"De weg van Trikker naar PlanElec loopt via de pdf-export."," PlanElec neemt daaruit het grondplan en de ondersteunde symbolen over; stroomkringen en eendraadschema plan je daarna in PlanElec.",[1602,16226,16227,16230,16238,16246,16252],{},[1453,16228,16229],{},"Exporteer het plan in Trikker als pdf.",[1453,16231,16232,16233,16235,16236,39],{},"Laad de pdf in PlanElec op bij ",[15,16234,3903],{}," en open hem in het ",[15,16237,10348],{},[1453,16239,16240,16241,11353,16243,16245],{},"Kies als methode ",[15,16242,10483],{},[15,16244,6843],{},". Zo leest PlanElec naast de muren ook ruimtes, openingen en symbolen, ongeacht of de export vectorgegevens bevat.",[1453,16247,16248,16249,16251],{},"Controleer in ",[15,16250,10211],{}," de ruimtes, de schaal en de symbolen. Symbolen die PlanElec niet kan toewijzen, zijn gemarkeerd met \"Niet toe te wijzen — wordt niet overgenomen.\"",[1453,16253,16254,16255,39],{},"Bevestig de schaal, kies een lege doelverdieping en klik op ",[15,16256,6847],{},[12,16258,16259,16260,16262,16263,16265,16266,16268,16269,39],{},"Trikker-projectbestanden (.trik) importeer je als projecten met ",[30,16261,2514],{"href":2513},"; schema, stroomkringen en toestellen komen mee, en ook het situatieplan: verdiepingen, muren met hun dikte, ruimtes, deuren, ramen, garagepoorten en trappen. Wat niet wordt overgenomen, staat in het importrapport. Heb je een Trikker-plan alleen als pdf, dan laat je het grondplan daaruit herkennen. Met grondplan en toestellen in het project bouw je daarna stroomkringen, schakelketens, kabeltrajecten en verdeelkast op met de ",[30,16264,7677],{"href":4371}," of de ",[30,16267,6872],{"href":6871},". Een vergelijking van functies en prijzen vind je in ",[30,16270,15888],{"href":4891},[41,16272,16274],{"id":16273},"hoe-leg-je-een-bestaande-verdeelkast-vast-met-fotos","Hoe leg je een bestaande verdeelkast vast met foto's?",[12,16276,16277],{},"Bij renovatie, uitbreiding of opname van een bestaande installatie begint de planning vaak bij het bestaande verdeelbord. PlanElec leest de zichtbare modules uit foto's en vult er een leeg verdeelbord mee in de verdeelkasteditor:",[1602,16279,16280,16290,16296,16300,16329],{},[1453,16281,16282,16283,16286,16287,12429],{},"Open in de verdeelkasteditor via de bovenbalk ",[15,16284,16285],{},"Foto's",". Het venster ",[15,16288,16289],{},"Kastfoto's",[1453,16291,7985,16292,16295],{},[15,16293,16294],{},"Foto's uploaden"," (JPEG, PNG of WebP) of vink bestaande projectfoto's aan – tot zes per run. Meerdere aanzichten van dezelfde rij zijn uitdrukkelijk voorzien.",[1453,16297,1857,16298,39],{},[15,16299,6861],{},[1453,16301,14642,16302,16304,16305,702,16307,702,16309,933,16311,16313,16314,702,16316,1628,16318,16320,16321,16323,16324,16326,16327,39],{},[15,16303,13914],{}," zie je elke module met ",[15,16306,11331],{},[15,16308,11288],{},[15,16310,13985],{},[15,16312,13995],{},", en afgelezen waarden zoals ",[15,16315,14005],{},[15,16317,14008],{},[15,16319,14011],{},". Een uitsnede op oorspronkelijke resolutie toont de bijbehorende plek op de foto. Tonen twee foto's dezelfde module, dan voeg je de aanzichten samen met ",[15,16322,14048],{}," of splits je ze met ",[15,16325,14058],{},"; foute herkenningen haal je weg met ",[15,16328,14034],{},[1453,16330,16331,16332,39],{},"Neem het resultaat over met ",[15,16333,14097],{},[12,16335,16336,16337,16339],{},"De herkenning kent de gangbare moduletypes, van hoofdschakelaar, differentieelschakelaar, automaat en combinatieschakelaar (RCBO) over overspanningsbeveiliging tot contactoren, teleruptoren, tijdschakelaars, energiemeters en KNX-componenten. Onbekende modules verschijnen als ",[15,16338,13775],{},"; die wijs je bij de controle toe.",[12,16341,16342],{},"Een foto toont de voorkant van een verdeelbord – verborgen bedrading en elektrische verbindingen leidt PlanElec daar niet uit af. Welke module welke stroomkring beveiligt, leg je in het project vast.",[41,16344,16346],{"id":16345},"hoeveel-herkenningen-zijn-er-per-dag-mogelijk","Hoeveel herkenningen zijn er per dag mogelijk?",[49,16348,16349,16359],{},[52,16350,16351],{},[55,16352,16353,16356],{},[58,16354,16355],{},"Functie",[58,16357,16358],{},"Daglimiet per gebruiker",[68,16360,16361,16369],{},[55,16362,16363,16366],{},[73,16364,16365],{},"Herkenning van grondplannen",[73,16367,16368],{},"30 herkenningen",[55,16370,16371,16374],{},[73,16372,16373],{},"Herkenning van verdeelkasten (foto's)",[73,16375,16376],{},"20 runs",[12,16378,16379],{},"Is de daglimiet bereikt, dan meldt PlanElec dat in de interface; de volgende dag zijn er weer runs beschikbaar. Je opgeladen projectstukken blijven intussen volledig bruikbaar.",[12,16381,16382,16383,16385],{},"Daarnaast gebruiken alle AI-functies het ",[15,16384,7440],{}," van je account; het beschikbare deel zie je in het gebruikersmenu. Tijdens de Early Access is PlanElec gratis.",[41,16387,16389],{"id":16388},"wat-gebeurt-er-met-je-plannen-en-fotos","Wat gebeurt er met je plannen en foto's?",[12,16391,16392,16395],{},[15,16393,16394],{},"Voor de analyse gaan de planpagina of de geselecteerde foto's naar de AI-dienst. Het taalmodel draait in de EU-regio; de AI-aanbieder slaat de aanvragen niet op en traint er niet mee."," De interface meldt die doorgifte vóór elke run. De betrokken AI-dienstverleners staan als subverwerkers in de verwerkersovereenkomst van PlanElec.",[12,16397,16398],{},"Je originele bestanden blijven als projectstukken in PlanElec bewaard, het plan bovendien als onderlegger in de verdieping. Ook de herkenningsruns en hun resultaten bewaart PlanElec bij het project. Voor een latere opname van de bestaande installatie of een keuring blijft het brondocument zo bij het project.",[41,16400,16402],{"id":16401},"hoe-gaat-het-verder-na-de-herkenning","Hoe gaat het verder na de herkenning?",[12,16404,16405,16406,16408],{},"Met grondplan, ruimtes en toestellen in het project begint de eigenlijke elektrische planning. De automatische planning vult ruimte-uitrusting, schakelketens, toewijzing van stroomkringen, kabeltrajecten, fasenverdeling en indeling van de verdeelkast aan als bewerkbare voorstellen. De ",[30,16407,7677],{"href":4371}," voert opdrachten zoals \"Voeg in de keuken een afzonderlijke kookkring met beveiliging toe\" meteen uit en controleert daarna het hele project met de AREI-zelfcontrole.",[12,16410,16411,16412,16414,16415,16419,16420,39],{},"Welke regels die zelfcontrole dekt, lees je in ",[30,16413,2458],{"href":2457},". De vakinhoudelijke verantwoordelijkheid voor het ontwerp draag jij; de keuring doet het erkend organisme. Hoe de elektrische structuur daarna als één installatie leesbaar wordt, beschrijft ",[30,16416,16418],{"href":16417},"\u002Fblog\u002Fvan-grondplan-naar-installatie-en-verdeelkast","Van grondplan naar installatie en verdeelkast","; wat Trikker 2.0 voor Mac brengt en wat PlanElec daarnaast al kan, lees je in ",[30,16421,5951],{"href":5950},[41,16423,16425],{"id":16424},"veelgestelde-vragen-over-ai-herkenning","Veelgestelde vragen over AI-herkenning",[1396,16427,16429],{"id":16428},"kan-ik-een-herkend-grondplan-overnemen-in-een-verdieping-met-bestaande-muren","Kan ik een herkend grondplan overnemen in een verdieping met bestaande muren?",[12,16431,16432],{},"De overname gebeurt in een lege doelverdieping. Maak indien nodig een nieuwe verdieping aan en neem het voorstel daarin over.",[1396,16434,16436],{"id":16435},"herkent-planelec-ook-stroomkringen-op-een-plan","Herkent PlanElec ook stroomkringen op een plan?",[12,16438,16439],{},"Nee. De herkenning levert geometrie, ruimtes, openingen en toestelsymbolen. Stroomkringen en eendraadschema ontstaan in het project – met de assistent, de automatische planning of met de hand.",[1396,16441,16443],{"id":16442},"wat-gebeurt-er-met-symbolen-die-planelec-niet-kent","Wat gebeurt er met symbolen die PlanElec niet kent?",[12,16445,16446],{},"Ze zijn in het voorstel gemarkeerd als niet toe te wijzen en worden niet overgenomen. Het juiste toestel plaats je na de overname zelf.",[1396,16448,16450],{"id":16449},"kan-ik-dwg-bestanden-laten-herkennen","Kan ik DWG-bestanden laten herkennen?",[12,16452,16453],{},"DWG-bestanden verwerkt PlanElec niet. Exporteer het plan als pdf voor de herkenning of als DXF voor de achtergrond op schaal.",[1396,16455,16457],{"id":16456},"wie-mag-de-herkenning-starten","Wie mag de herkenning starten?",[12,16459,16460],{},"Herkenning van grondplannen en verdeelkasten starten projectleden met bewerkingsrechten.",{"title":1467,"searchDepth":1468,"depth":1468,"links":16462},[16463,16464,16465,16466,16467,16468,16469,16470,16471,16472,16473,16474],{"id":15939,"depth":1468,"text":15940},{"id":16009,"depth":1468,"text":16010},{"id":16042,"depth":1468,"text":16043},{"id":16086,"depth":1468,"text":16087},{"id":16150,"depth":1468,"text":16151},{"id":16191,"depth":1468,"text":16192},{"id":16217,"depth":1468,"text":16218},{"id":16273,"depth":1468,"text":16274},{"id":16345,"depth":1468,"text":16346},{"id":16388,"depth":1468,"text":16389},{"id":16401,"depth":1468,"text":16402},{"id":16424,"depth":1468,"text":16425,"children":16475},[16476,16477,16478,16479,16480],{"id":16428,"depth":1486,"text":16429},{"id":16435,"depth":1486,"text":16436},{"id":16442,"depth":1486,"text":16443},{"id":16449,"depth":1486,"text":16450},{"id":16456,"depth":1486,"text":16457},"tutorial","PlanElec herkent in een pdf, scan of Trikker-export muren, ruimtes, deuren, vensters en toestelsymbolen, en vult een lege verdeelkast op basis van foto's. Jij controleert het voorstel en neemt het met één klik over.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-ai-floor-plan-cabinet-recognition-editorial.jpg","\u002Fblog\u002Fgrondplan-herkennen-verdeelkast-foto-ai.nl",{"title":15921,"description":16482},"Grondplan uit pdf of scan en verdeelkast uit foto (AI)","grondplan-herkennen-verdeelkast-foto-ai","blog\u002Fgrondplan-herkennen-verdeelkast-foto-ai.nl",[16491,4588,1979,3269,14346,14347,14349,7023],"grondplan herkennen","zKfx58TRTQbymls43Gvfv1w0y5_Qvphf03NA4GcU020",{"id":16494,"title":16495,"articleId":16496,"body":16497,"category":5442,"date":16994,"description":16995,"extension":1496,"image":16509,"lastUpdated":3258,"locale":1497,"meta":16996,"navigation":1499,"ogImage":16997,"path":16998,"publishDate":16994,"readTime":4035,"refreshInterval":1468,"seo":16999,"seoTitle":17000,"slug":17001,"stem":17002,"tags":17003,"__hash__":17007,"kind":1515,"href":5950},"blog\u002Fblog\u002Ftrikker-2-0-mac.nl.md","Trikker 2.0 voor Mac: wat de bèta brengt – en wat PlanElec vandaag al kan","trikker-2-0-mac-beta",{"type":9,"value":16498,"toc":16971},[16499,16505,16510,16527,16531,16534,16606,16609,16613,16616,16620,16623,16626,16633,16637,16643,16672,16678,16682,16685,16689,16695,16699,16710,16714,16717,16724,16727,16734,16738,16749,16754,16758,16768,16773,16780,16784,16787,16791,16910,16915,16917,16921,16924,16928,16937,16941,16947,16951,16954,16958,16961,16965],[12,16500,16501,16504],{},[15,16502,16503],{},"Trikker 2.0 is sinds 30 september 2026 in bèta beschikbaar – voor het eerst ook voor macOS."," Goed nieuws voor elektriciens met een Mac. Op de definitieve versie hoef je niet te wachten: PlanElec draait vandaag al op de Mac, zonder installatie, rechtstreeks in de browser. Hetzelfde project open je daarna op de Windows-pc op kantoor of op de tablet op de werf. En de nieuwe PDF-export van Trikker past daar precies bij: uit een Trikker-pdf herkent PlanElec het grondplan en maakt er een bewerkbaar project van.",[12,16506,16507],{},[22,16508],{"alt":6190,"src":16509},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-trikker-2-0-mac-beta-editorial.webp",[12,16511,16512,16513,6231,16518,1875,16522,39],{},"Gegevens over Trikker: stand 2 oktober 2026, gegevens over PlanElec: stand 3 oktober 2026. De gegevens over Trikker komen uit de ",[30,16514,16517],{"href":16515,"rel":16516},"https:\u002F\u002Fwww.trikker.be\u002Ffr\u002Fblog\u002Factualites-2\u002Ftrikker-2-0-en-beta-une-nouvelle-base-desormais-aussi-sur-macos-14",[2532],"bèta-aankondiging",[30,16519,16521],{"href":5372,"rel":16520},[2532],"Trikker-startpagina",[30,16523,16526],{"href":16524,"rel":16525},"https:\u002F\u002Fwww.trikker.be\u002Ffaq",[2532],"Trikker-FAQ",[41,16528,16530],{"id":16529},"wat-is-er-nieuw-in-trikker-20","Wat is er nieuw in Trikker 2.0?",[12,16532,16533],{},"Trikker 2.0 is vooral een nieuwe technische basis. Volgens de fabrikant zit er meer dan een jaar werk in.",[49,16535,16536,16549],{},[52,16537,16538],{},[55,16539,16540,16543,16546],{},[58,16541,16542],{},"Vernieuwing",[58,16544,16545],{},"Wat Trikker aankondigt",[58,16547,16548],{},"Stand op 2 oktober 2026",[68,16550,16551,16562,16573,16584,16595],{},[55,16552,16553,16556,16559],{},[73,16554,16555],{},"macOS",[73,16557,16558],{},"Trikker draait voor het eerst native op de Mac",[73,16560,16561],{},"Bèta, download beschikbaar",[55,16563,16564,16567,16570],{},[73,16565,16566],{},"Windows",[73,16568,16569],{},"Nieuwe versie met dezelfde interface als op de Mac",[73,16571,16572],{},"Bèta, naast de huidige versie",[55,16574,16575,16578,16581],{},[73,16576,16577],{},"PDF-export",[73,16579,16580],{},"Plannen rechtstreeks als PDF bewaren",[73,16582,16583],{},"Onderdeel van de bèta",[55,16585,16586,16589,16592],{},[73,16587,16588],{},"Webversie (iPad\u002FAndroid)",[73,16590,16591],{},"Volgt „kort daarna“",[73,16593,16594],{},"Aangekondigd, zonder datum",[55,16596,16597,16600,16603],{},[73,16598,16599],{},"Licenties",[73,16601,16602],{},"Bestaande licenties blijven geldig",[73,16604,16605],{},"Volgens de FAQ nog per computer",[12,16607,16608],{},"Trikker geeft zelf aan dat de bèta nog fouten kan bevatten. Een datum voor de definitieve versie noemt de fabrikant niet.",[41,16610,16612],{"id":16611},"bestaat-trikker-nu-voor-mac","Bestaat Trikker nu voor Mac?",[12,16614,16615],{},"Ja, als bèta. Sinds 30 september 2026 biedt Trikker een download voor macOS aan. Voor je lopende klantenprojecten overzet, test je de bèta best eerst met een niet-kritisch project. Let ook op de licentie: volgens de FAQ werkt een Trikker-licentie op één computer tegelijk. Wie tegelijk op de Mac op kantoor en op een laptop op de werf werkt, heeft er twee nodig.",[41,16617,16619],{"id":16618},"en-in-de-browser-op-een-ipad-of-op-android","En in de browser, op een iPad of op Android?",[12,16621,16622],{},"Bij Trikker is een webversie aangekondigd, maar nog zonder datum. Tot dan ondersteunt Trikker volgens de FAQ alleen Windows-tablets.",[12,16624,16625],{},"PlanElec is van bij het begin gebouwd voor de browser. Je meldt je aan en begint te werken – op de Mac, onder Windows, onder Linux of op een tablet. Geen download, geen update-installer, geen licentie die aan één computer vastzit. Je projecten staan in je account en zijn op elk toestel up-to-date.",[422,16627],{":height":16628,":width":16629,"alt":16630,"caption":16631,"src":16632},"820","1180","Situatieplan van het gelijkvloers van een eengezinswoning in PlanElec met technische ruimte, hal met trap, keuken en leefruimte, geopend in de browser op tabletformaat","Hetzelfde situatieplan in de browser op een tablet – zonder app te installeren.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fnl-tablet.png",[41,16634,16636],{"id":16635},"trikker-plannen-als-pdf-overnemen-in-planelec","Trikker-plannen als pdf overnemen in PlanElec",[12,16638,16639,16640,16642],{},"Een .trik-bestand importeer je als project, zie ",[30,16641,2514],{"href":2513},"; daarbij komt ook het situatieplan mee in het grondplan: verdiepingen met naam, muren met hun dikte, ruimtes met naam, deuren met draairichting, ramen, garagepoorten en trappen, de geplaatste toestellen gekoppeld aan hun kring. Wat niet wordt overgenomen, staat in het importrapport. Heb je een plan alleen als pdf, dan leest PlanElec het als grondplan. Zo ga je van een pdf naar een bewerkbaar grondplan:",[1602,16644,16645,16648,16654,16660,16666],{},[1453,16646,16647],{},"Bewaar het plan in Trikker 2.0 met de rechtstreekse PDF-export.",[1453,16649,16650,16651,16653],{},"Zet de pdf in het PlanElec-project bij ",[15,16652,3903],{},"; ook scans en foto’s als PNG, JPEG of WebP werken.",[1453,16655,16656,16657,16659],{},"Start in het voorbeeld van het projectstuk ",[15,16658,6843],{},". Vector-pdf’s leest PlanElec rechtstreeks uit de vectorgegevens, scans en foto’s met AI-beeldherkenning.",[1453,16661,16662,16663,16665],{},"Controleer het voorstel: bevestig de schaal, vergelijk ruimtes en oppervlaktes, verschuif in ",[15,16664,10357],{}," hoeken of voeg muren toe en verwijder ze.",[1453,16667,16668,16669,16671],{},"Neem het met ",[15,16670,6847],{}," over in een lege verdieping. De originele pagina blijft als onderlegger; ⌘Z \u002F Ctrl+Z draait de overname volledig terug.",[12,16673,16674,16675,39],{},"PlanElec neemt muren, ruimtes met oppervlakte, deuren en ramen, ondersteunde toestelsymbolen (stopcontact, dubbel stopcontact, spatwaterdicht stopcontact, schakelaar, lichtpunt) en de schaal over. Symbolen die PlanElec niet eenduidig kan toewijzen, worden gemarkeerd en niet overgenomen. Stroomkringen en eendraadschema plan je daarna in PlanElec, met de automatische planning en de PlanElec-assistent. ",[30,16676,16677],{"href":3377},"Een grondplan importeren en kalibreren",[41,16679,16681],{"id":16680},"wat-je-vandaag-al-met-planelec-plant","Wat je vandaag al met PlanElec plant",[12,16683,16684],{},"Mac-ondersteuning beantwoordt de vraag naar het platform. In de praktijk telt iets anders: sluiten grondplan, kringen, verdeelkast en documenten op elkaar aan, zonder dat je iets twee keer invoert? Daarvoor is PlanElec gemaakt. Alle beelden in dit artikel komen uit een fictief voorbeeldproject in de huidige PlanElec.",[1396,16686,16688],{"id":16687},"eén-project-alle-plannen","Eén project, alle plannen",[12,16690,16691,16692,39],{},"Je tekent het grondplan of legt er een afbeelding, PDF of DXF onder. Ruimtes starten desgewenst met een voorgestelde uitrusting. Schakelketens, kringen, kabels, fasen en kabelwegen stelt PlanElec automatisch voor, en jij past ze aan. Situatieplan en eendraadschema ontstaan uit hetzelfde model: wijzig je een kring, dan wijzigt die overal. ",[30,16693,16694],{"href":6871},"Zo werkt de automatische planning",[1396,16696,16698],{"id":16697},"de-planelec-assistent-voert-opdrachten-uit","De PlanElec-assistent voert opdrachten uit",[12,16700,16701,16702,16704,16705,16707,16708,39],{},"Open de PlanElec-assistent met ⌘J \u002F Ctrl+J en schrijf wat je nodig hebt, bijvoorbeeld „plaats drie stopcontacten in de keuken”. De assistent werkt in het hele project: grondplan, ruimtes, toestellen, stroomkringen, kabels, verdeelkast, PV-strings en lichtsturing. Na elke wijziging controleert PlanElec het project met de AREI-zelfcontrole en meldt nieuwe bevindingen; elke wijziging draai je met één klik op ",[15,16703,6795],{}," terug. Risicovolle acties voert hij pas uit na ",[15,16706,6637],{},". Vakvragen beantwoordt hij met onderbouwde bronnen. Het taalmodel draait in de EU-regio; de AI-aanbieder slaat je aanvragen niet op en traint er niet mee. ",[30,16709,6560],{"href":6559},[1396,16711,16713],{"id":16712},"zonnepanelen-correct-gedocumenteerd","Zonnepanelen correct gedocumenteerd",[12,16715,16716],{},"Een pv-installatie is in PlanElec meer dan een omvormersymbool. Je legt strings, MPPT's, moduletype en aantal modules vast, de DC-beveiliging en het DC-kabeltraject met kabeltype, doorsnede, plaatsingswijze en lengte. Dat alles verschijnt automatisch op het eendraadschema en het situatieplan. Ontbreekt er een gegeven, dan toont PlanElec dat meteen.",[422,16718],{":height":16719,":width":16720,"alt":16721,"caption":16722,"src":16723},"1003","1680","Eendraadschema in PlanElec met twee pv-strings op MPPT A en B, aarding van de moduleframes en geopende omvormerinspector met de string Zuiddak west","Twee pv-strings op het eendraadschema, rechts de string „Zuiddak west“ met MPPT, moduletype, framearding en DC-kabeltraject.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fnl-pv.png",[12,16725,16726],{},"De modules zelf leg je in de energiemodus rechtstreeks op het dakvlak in de 3D-weergave. PlanElec kleurt elke module volgens haar MPPT en toetst elke string aan de grenzen van module en omvormer: openklemspanning bij koude, MPP-spanning bij warmte, stromen en parallelle strings. Een string die niet past, valt op voordat hij op het dak ligt.",[422,16728],{":height":16729,":width":16730,"alt":16731,"caption":16732,"src":16733},"1080","1920","3D-weergave in PlanElec: woning met twee bouwlagen, zadeldak en 16 pv-modules in twee kleuren voor MPPT A en B, links het paneel PV-installatie met spannings- en stroomcontrole per string","Energiemodus in 3D: 16 modules op het zuiddak, gekleurd per MPPT; links de stringcontrole met spanningen en stromen tegenover de grenzen van de omvormer.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fnl-3d.png",[1396,16735,16737],{"id":16736},"de-verdeelkast-plant-mee","De verdeelkast plant mee",[12,16739,9364,16740,16742,16743,16745,16746,16748],{},[15,16741,14217],{}," verdeel je de beveiligingstoestellen automatisch over de DIN-rails, of je sleept ze zelf op hun plaats. Differentieelgroepen, reserve en bedrading blijven zichtbaar, en PlanElec toont of alle kringen geplaatst zijn. Zo hoort de verdeelkast bij de planning en is ze geen aparte tekening meer. Bij bestaande installaties begin je met foto’s: bij ",[15,16744,6857],{}," herkent PlanElec met ",[15,16747,6861],{}," zichtbare DIN-modules met rij, startpositie, breedte en type. Je controleert het voorstel en neemt het over in een lege verdeelkast; de bedrading, die een foto niet toont, vul je aan in de planning.",[422,16750],{":height":16719,":width":16720,"alt":16751,"caption":16752,"src":16753},"Verdeelkasteditor in PlanElec met hoofdschakelaar, differentieelschakelaars en automaten op drie DIN-rails","Het hoofdbord met hoofdschakelaar, differentieelgroepen en automaten, waaronder de vierpolige automaat voor de omvormer – alle kringen zijn geplaatst.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fnl-schaltschrank.png",[1396,16755,16757],{"id":16756},"van-plan-tot-volledig-dossier","Van plan tot volledig dossier",[12,16759,16760,16761,16764,16765,39],{},"Trikker 2.0 brengt een rechtstreekse PDF-export. PlanElec gaat een stap verder: eendraadschema, situatieplan, verdeelkast en zelfcontroleverslag bundel je tot ",[15,16762,16763],{},"één"," installatiedossier met voorblad, inhoudstafel, paginanummers, je bedrijfsgegevens en je logo. Voor je het aanmaakt, toont PlanElec per document wat nog ontbreekt – zo zie je in één oogopslag of alle gegevens volledig zijn. Elke versie wordt gearchiveerd en krijgt een QR-link. ",[30,16766,16767],{"href":2451},"Meer over de exports",[422,16769],{":height":16719,":width":16720,"alt":16770,"caption":16771,"src":16772},"Exportscherm in PlanElec met projectgegevens, documentkeuze voor het dossier en dossieroverzicht met planformaat en kleurmodus","Eén gegevensbron voor alle documenten: het dossier toont vóór het downloaden welke gegevens nog openstaan.","\u002Fimages\u002Fblog\u002Ftrikker-2-0-mac\u002Fnl-dossier.png",[12,16774,16775,16776,16779],{},"Hoe het resultaat eruitziet, toont ons ",[30,16777,16778],{"href":6984},"pilotdossier als PDF"," – een fictief voorbeeld, rechtstreeks uit het product geëxporteerd.",[1396,16781,16783],{"id":16782},"samen-aan-hetzelfde-project","Samen aan hetzelfde project",[12,16785,16786],{},"Deel projecten via een uitnodiging per e-mail met collega's, ontwerpers of klanten. Rollen bepalen wie bewerkt en wie alleen leest. De live synchronisatie houdt geopende sessies op elkaar afgestemd, ook je eigen sessies op Mac en tablet. Tijdens Early Access is dat gratis; vanaf de start van de tarieven hoort het uitnodigen van extra personen bij Pro.",[41,16788,16790],{"id":16789},"native-app-of-browser-wat-past-bij-jou","Native app of browser – wat past bij jou?",[49,16792,16793,16805],{},[52,16794,16795],{},[55,16796,16797,16799,16802],{},[58,16798,4902],{},[58,16800,16801],{},"Native app (Trikker 2.0 bèta)",[58,16803,16804],{},"Browser (PlanElec)",[68,16806,16807,16817,16828,16839,16850,16859,16868,16878,16888,16899],{},[55,16808,16809,16811,16814],{},[73,16810,12532],{},[73,16812,16813],{},"Download en installatie per computer",[73,16815,16816],{},"Geen – een recente browser volstaat",[55,16818,16819,16822,16825],{},[73,16820,16821],{},"Updates",[73,16823,16824],{},"Nieuwe versie installeren",[73,16826,16827],{},"Automatisch bij de volgende keer openen",[55,16829,16830,16833,16836],{},[73,16831,16832],{},"Meerdere toestellen",[73,16834,16835],{},"Eén licentie per gelijktijdig gebruikte computer",[73,16837,16838],{},"Eén account, alle toestellen",[55,16840,16841,16844,16847],{},[73,16842,16843],{},"Tablet",[73,16845,16846],{},"Webversie aangekondigd; vandaag Windows-tablets",[73,16848,16849],{},"In de browser, vandaag",[55,16851,16852,16854,16856],{},[73,16853,5135],{},[73,16855,5030],{},[73,16857,16858],{},"Delen met rollen, live synchronisatie",[55,16860,16861,16863,16865],{},[73,16862,4589],{},[73,16864,5030],{},[73,16866,16867],{},"PlanElec-assistent, elke wijziging gecontroleerd en omkeerbaar",[55,16869,16870,16873,16875],{},[73,16871,16872],{},"Grondplan uit pdf\u002Fscan",[73,16874,5030],{},[73,16876,16877],{},"Plattegrondherkenning met controle vóór overname",[55,16879,16880,16883,16885],{},[73,16881,16882],{},"Kast uit foto",[73,16884,5030],{},[73,16886,16887],{},"DIN-modules als controleerbaar voorstel",[55,16889,16890,16893,16896],{},[73,16891,16892],{},"Zonder internet",[73,16894,16895],{},"Tijdelijk offline bruikbaar",[73,16897,16898],{},"Internetverbinding nodig",[55,16900,16901,16904,16907],{},[73,16902,16903],{},"Bestaande projecten",[73,16905,16906],{},"Je Trikker-bestanden",[73,16908,16909],{},"Grondplan herkennen uit Trikker-pdf; .trik-bestanden met situatieplan als project importeren",[12,16911,16912,16913,39],{},"Wie veel zonder netwerk werkt of veel lopende Trikker-dossiers heeft, is met de geïnstalleerde toepassing goed bediend. Wie tussen kantoor, werf en klant van toestel wisselt, in team plant, pv-installaties netjes wil documenteren of bestaande plannen en kastfoto’s met AI wil inlezen, is met PlanElec beter uitgerust. De AI-gegevens over Trikker steunen op de startpagina en de bèta-aankondiging, gecontroleerd op 3 oktober 2026. De uitgebreide vergelijking met prijzen vind je in ",[30,16914,15888],{"href":4891},[41,16916,1394],{"id":1393},[1396,16918,16920],{"id":16919},"is-trikker-20-al-af","Is Trikker 2.0 al af?",[12,16922,16923],{},"Nee. Op 2 oktober 2026 is Trikker 2.0 een bèta; een datum voor de definitieve versie noemt de fabrikant niet.",[1396,16925,16927],{"id":16926},"kan-ik-mijn-trikker-projecten-openen-in-planelec","Kan ik mijn Trikker-projecten openen in PlanElec?",[12,16929,16930,16931,16933,16934,16936],{},"Een .trik-bestand importeer je met ",[15,16932,2514],{}," als project: schema, stroomkringen en toestellen komen mee, en ook het situatieplan met verdiepingen, muren met hun dikte, ruimtes, deuren, ramen, garagepoorten en trappen. Wat niet wordt overgenomen, staat in het importrapport. Heb je een plan alleen als pdf, start dan in PlanElec ",[15,16935,6843],{},", controleer en neem over. Lopende dossiers werk je af in Trikker.",[1396,16938,16940],{"id":16939},"wat-kost-planelec","Wat kost PlanElec?",[12,16942,16943,16944,16946],{},"Tijdens Early Access niets, ook niet voor de assistent en de herkenning; voor de AI-functies geldt een persoonlijk tegoed, waarvan het gebruikersmenu het verbruik als percentage toont. De geplande tarieven staan op de ",[30,16945,6274],{"href":4449},"; de startdatum kondigen we tijdig aan.",[1396,16948,16950],{"id":16949},"heb-ik-een-mac-of-windows-nodig","Heb ik een Mac of Windows nodig?",[12,16952,16953],{},"Geen van beide. PlanElec werkt in elke recente browser op macOS, Windows en Linux. Je hebt alleen een internetverbinding nodig.",[1396,16955,16957],{"id":16956},"vervangt-planelec-de-keuring","Vervangt PlanElec de keuring?",[12,16959,16960],{},"Nee – de rollen zijn duidelijk verdeeld. De AREI-zelfcontrole, die ook elke wijziging van de assistent controleert, toont je de hiaten vóór de oplevering; een conformiteitsattest is ze niet. De officiële keuring doet een erkend keuringsorganisme.",[41,16962,16964],{"id":16963},"probeer-het-nu-op-je-mac","Probeer het nu op je Mac",[12,16966,16967,16968,39],{},"Maak een klein project aan: een Trikker-plan als pdf laten herkennen of het grondplan tekenen, stopcontacten en verlichting plaatsen of dat aan de assistent vragen, kringen en verdeelkast controleren, dossier exporteren. Zo zie je aan een eigen project of PlanElec bij jouw manier van werken past – op het toestel dat nu voor je staat. ",[30,16969,16970],{"href":6989},"Gratis starten met PlanElec",{"title":1467,"searchDepth":1468,"depth":1468,"links":16972},[16973,16974,16975,16976,16977,16985,16986,16993],{"id":16529,"depth":1468,"text":16530},{"id":16611,"depth":1468,"text":16612},{"id":16618,"depth":1468,"text":16619},{"id":16635,"depth":1468,"text":16636},{"id":16680,"depth":1468,"text":16681,"children":16978},[16979,16980,16981,16982,16983,16984],{"id":16687,"depth":1486,"text":16688},{"id":16697,"depth":1486,"text":16698},{"id":16712,"depth":1486,"text":16713},{"id":16736,"depth":1486,"text":16737},{"id":16756,"depth":1486,"text":16757},{"id":16782,"depth":1486,"text":16783},{"id":16789,"depth":1468,"text":16790},{"id":1393,"depth":1468,"text":1394,"children":16987},[16988,16989,16990,16991,16992],{"id":16919,"depth":1486,"text":16920},{"id":16926,"depth":1486,"text":16927},{"id":16939,"depth":1486,"text":16940},{"id":16949,"depth":1486,"text":16950},{"id":16956,"depth":1486,"text":16957},{"id":16963,"depth":1468,"text":16964},"2026-10-02","Trikker 2.0 is sinds 30 september 2026 in bèta beschikbaar voor macOS. Wat er nieuw is, hoe je Trikker-pdf’s via plattegrondherkenning overneemt en vandaag in de browser plant – op Mac, pc en tablet.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-trikker-2-0-mac-beta-editorial.jpg","\u002Fblog\u002Ftrikker-2-0-mac.nl",{"title":16495,"description":16995},"Trikker 2.0 voor Mac: de bèta en wat PlanElec al kan","trikker-2-0-mac","blog\u002Ftrikker-2-0-mac.nl",[3269,17004,17005,16555,1337,4892,17006,3764,5083],"Trikker 2.0","Trikker Mac","Elektrisch plan België","YtsUvZ7Em95IfA4fTsjK42fStL2hl4wrI1ERtE_p9R4",{"id":17009,"title":17010,"articleId":17011,"body":17012,"category":5442,"date":17486,"description":17487,"extension":1496,"image":17043,"lastUpdated":15381,"locale":1497,"meta":17488,"navigation":1499,"ogImage":17489,"path":17490,"publishDate":17486,"readTime":4035,"refreshInterval":1503,"seo":17491,"seoTitle":17492,"slug":17493,"stem":17494,"tags":17495,"__hash__":17502,"kind":1515,"href":17503},"blog\u002Fblog\u002Frcd-sealing-abolished-2026.nl.md","Wat verandert er op 1 november 2026 aan de verzegeling van differentieelschakelaars?","rcd-sealing-abolished-2026",{"type":9,"value":17013,"toc":17473},[17014,17018,17038,17044,17047,17051,17054,17135,17142,17146,17153,17156,17209,17213,17216,17241,17244,17248,17255,17270,17281,17285,17288,17309,17312,17316,17319,17334,17338,17341,17356,17364,17368,17371,17374,17378,17436,17439,17443,17468],[41,17015,17017],{"id":17016},"wat-verandert-er-op-1-november-2026","Wat verandert er op 1 november 2026?",[12,17019,17020,17021,17024,17025,17028,17029,17034,17035,39],{},"Vanaf ",[15,17022,17023],{},"1 november 2026"," moet een erkend organisme de differentieelstroombeschermingsinrichting aan het begin van een huishoudelijke elektrische installatie ",[15,17026,17027],{},"niet langer verzegelen"," wanneer de installatie conform wordt bevonden. Het ",[30,17030,17033],{"href":17031,"rel":17032},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Fcgi\u002Farticle.pl?language=nl&sum_date=2026-09-15&lg_txt=n&numac_search=2026006432",[2532],"koninklijk besluit van 13 augustus 2026",", gepubliceerd in het Belgisch Staatsblad van 15 september 2026 (numac 2026006432), schrapt het voorschrift in de delen 4 en 6 van boek 1 van het AREI. Boek 1 krijgt daardoor ",[15,17036,17037],{},"versie 07",[12,17039,17040],{},[22,17041],{"alt":17042,"src":17043},"Elektrische onderdelen tijdens de voorbereiding op de werkbank.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-rcd-sealing-abolished-2026-editorial.webp",[12,17045,17046],{},"De verplichting zelf om aan het begin van de installatie ten minste één differentieel van ten hoogste 300 mA te plaatsen, blijft ongewijzigd. Wat verdwijnt, is uitsluitend de verzegeling van dat toestel door de keurder — en de bijbehorende vermelding daarvan in het keuringsverslag.",[41,17048,17050],{"id":17049},"welke-bepalingen-worden-precies-geschrapt","Welke bepalingen worden precies geschrapt?",[12,17052,17053],{},"Het besluit telt vijf artikelen; drie ervan wijzigen boek 1.",[49,17055,17056,17068],{},[52,17057,17058],{},[55,17059,17060,17063,17066],{},[58,17061,17062],{},"Artikel KB 13\u002F08\u002F2026",[58,17064,17065],{},"Bepaling in boek 1",[58,17067,8107],{},[68,17069,17070,17085,17100,17114,17125],{},[55,17071,17072,17075,17082],{},[73,17073,17074],{},"Art. 1",[73,17076,17077,17078,17081],{},"Deel 4, onderafdeling ",[15,17079,17080],{},"4.2.4.3., b.",", derde alinea",[73,17083,17084],{},"Volledig opgeheven: zowel de ongenaakbaarheid van de ingangsklemmen als de verzegeling die dat blijvend moest maken.",[55,17086,17087,17090,17097],{},[73,17088,17089],{},"Art. 2",[73,17091,17092,17093,17096],{},"Deel 6, onderafdeling ",[15,17094,17095],{},"6.4.6.4., b.6."," (besluiten)",[73,17098,17099],{},"Vervangen: het verslag van de gelijkvormigheidscontrole bevestigt enkel nog het viseren van schema's en plannen.",[55,17101,17102,17105,17111],{},[73,17103,17104],{},"Art. 3",[73,17106,17092,17107,17110],{},[15,17108,17109],{},"6.5.7.2., b.6.",", tweede alinea",[73,17112,17113],{},"Vervangen: het verslag van het controlebezoek vermeldt enkel nog dat de schema's en plannen opnieuw geviseerd zijn.",[55,17115,17116,17119,17122],{},[73,17117,17118],{},"Art. 4",[73,17120,17121],{},"—",[73,17123,17124],{},"Inwerkingtreding op de eerste dag van de tweede maand na publicatie, dus 1 november 2026.",[55,17126,17127,17130,17132],{},[73,17128,17129],{},"Art. 5",[73,17131,17121],{},[73,17133,17134],{},"Uitvoering door de minister bevoegd voor Energie.",[12,17136,17137,17138,17141],{},"De geschrapte alinea in 4.2.4.3., b. luidde: „Gepaste maatregelen verzekeren de ongenaakbaarheid van de ingangsklemmen van de in de 1ste alinea bedoelde differentieelstroombeschermingsinrichting(en). Het blijvend karakter van deze ongenaakbaarheid wordt verwezenlijkt door verzegeling uitgevoerd door de persoon die volgens afdeling 6.4.1. belast is met de gelijkvormigheidscontrole vóór de ingebruikname.\" Die hele alinea verdwijnt — niet alleen het woord verzegeling. De algemene bescherming tegen elektrische schokken bij ",[15,17139,17140],{},"rechtstreekse aanraking"," (afdeling 4.2.2., onder meer door omhulsels en isolatie) blijft onverkort gelden; een verdeelbord moet zijn actieve delen dus nog altijd afschermen.",[41,17143,17145],{"id":17144},"is-de-verzegeling-de-enige-wijziging-in-versie-07","Is de verzegeling de enige wijziging in versie 07?",[12,17147,17148,17149,17152],{},"Ja. In een woord-voor-woordvergelijking van de volledige Nederlandse en Franse tekst van versie 06 en versie 07 verschillen alleen de drie genoemde passages en de versieaanduiding op de titelpagina. ",[15,17150,17151],{},"Inhoudelijk verandert verder niets","; alle andere afwijkingen zijn paginering en regelafbreking.",[12,17154,17155],{},"Verwar dit niet met twee andere data:",[49,17157,17158,17170],{},[52,17159,17160],{},[55,17161,17162,17164,17167],{},[58,17163,5983],{},[58,17165,17166],{},"Besluit",[58,17168,17169],{},"Wat wijzigt",[68,17171,17172,17183,17198],{},[55,17173,17174,17177,17180],{},[73,17175,17176],{},"01\u002F04\u002F2026",[73,17178,17179],{},"KB van 6 oktober 2025",[73,17181,17182],{},"Boek 1 versie 06: geaarde gelijkstroomsystemen (TN, TT, IT) in het AREI opgenomen.",[55,17184,17185,17188,17191],{},[73,17186,17187],{},"01\u002F10\u002F2026",[73,17189,17190],{},"KB van 20 juli 2026",[73,17192,17193,17194,17197],{},"Uitsluitend ",[15,17195,17196],{},"boek 3"," (luchtlijnen hoogspanning) — niet huishoudelijk.",[55,17199,17200,17203,17206],{},[73,17201,17202],{},"01\u002F11\u002F2026",[73,17204,17205],{},"KB van 13 augustus 2026",[73,17207,17208],{},"Boek 1 versie 07: verzegeling van de differentieel opgeheven.",[41,17210,17212],{"id":17211},"waarom-wordt-de-verzegeling-afgeschaft","Waarom wordt de verzegeling afgeschaft?",[12,17214,17215],{},"Het verslag aan de Koning motiveert de opheffing met vijf praktijksituaties die telkens discussie opleverden over nut en toepassing:",[1450,17217,17218,17221,17228,17231,17238],{},[1453,17219,17220],{},"na het verwijderen van een zegel kan alleen een erkend organisme opnieuw verzegelen, en dan enkel via een nieuwe controle;",[1453,17222,17223,17224,17227],{},"bij een ",[15,17225,17226],{},"niet-conform"," verklaarde installatie verplichtte boek 1 het organisme niet om te verzegelen;",[1453,17229,17230],{},"de verzegeling gold alleen voor huishoudelijke installaties;",[1453,17232,17233,17234,17237],{},"bij een belangrijke wijziging of uitbreiding kon de verzegeling ",[15,17235,17236],{},"gedeeltelijk"," zijn: enkel de differentieel waarop de werken betrekking hadden, moest verzegeld worden;",[1453,17239,17240],{},"het afschrikkende karakter van een zegel als veiligheidsmaatregel is beperkt.",[12,17242,17243],{},"De beslissing kwam er in overleg met vertegenwoordigers van installateurs, erkende organismen en openbare netbeheerders. Het verslag stelt uitdrukkelijk dat de opheffing geen afbreuk doet aan de veiligheid van huishoudelijke installaties.",[41,17245,17247],{"id":17246},"hoe-zag-zon-verzegeling-er-in-de-praktijk-uit","Hoe zag zo'n verzegeling er in de praktijk uit?",[12,17249,17250,17251,17254],{},"Het AREI schreef nooit een ",[15,17252,17253],{},"vorm"," voor. De tekst eiste enkel „verzegeling\" door de persoon belast met de gelijkvormigheidscontrole — niet een bepaald materiaal, kleur of merkteken. In de praktijk betekende dat meestal:",[1450,17256,17257,17264,17267],{},[1453,17258,17259,17260,17263],{},"een afdekplaatje of klemmenkap over de ",[15,17261,17262],{},"ingangsklemmen"," van de hoofddifferentieel, met twee oogjes of gaatjes;",[1453,17265,17266],{},"een dun metaaldraadje door die oogjes, tot een gesloten lus;",[1453,17268,17269],{},"een loodje of kunststof zegel op de lus, dichtgeknepen met een loodtang, vaak met het kenteken van het erkend organisme.",[12,17271,17272,17273,17276,17277,17280],{},"Het zegel zat dus op de ",[15,17274,17275],{},"ingang"," van de differentieel, niet op de uitgang: het bewees dat alles achter het toestel via die maximaal 300 mA-beveiliging gevoed werd, en het kon niet worden verbroken zonder zichtbaar spoor. Belangrijk: dit staat volledig los van de ",[15,17278,17279],{},"zegels van de netbeheerder"," op de aansluiting en de meter — ook op een digitale meter. Die blijven onaangeroerd en mogen nooit worden verwijderd.",[41,17282,17284],{"id":17283},"mijn-hoofddifferentieel-is-niet-verzegeld-is-dat-een-inbreuk","Mijn hoofddifferentieel is niet verzegeld — is dat een inbreuk?",[12,17286,17287],{},"Niet noodzakelijk, en vanaf 1 november 2026 in elk geval niet meer. Een ontbrekend zegel op een oudere installatie heeft doorgaans een van deze verklaringen:",[1450,17289,17290,17297,17300,17306],{},[1453,17291,17292,17293,17296],{},"de installatie werd bij de controle ",[15,17294,17295],{},"niet conform"," verklaard; dan verplichtte boek 1 het organisme niet om te verzegelen;",[1453,17298,17299],{},"er werd na de controle aan het bord gewerkt en het zegel werd verbroken — wat op zich geen inbreuk op boek 1 is, wel een verlies aan bewijswaarde;",[1453,17301,17302,17303,17305],{},"bij een uitbreiding werd slechts ",[15,17304,16763],{}," van meerdere differentiëlen aan het begin verzegeld;",[1453,17307,17308],{},"het geplaatste toestel of de kastopbouw liet geen verzegeling van de ingangsklemmen toe.",[12,17310,17311],{},"Een zegel op de meterkast of de aansluitkabel is iets anders: dat is het zegel van de distributienetbeheerder en heeft niets met het AREI-voorschrift te maken. Zekerheid over jouw installatie geeft het laatste keuringsverslag: daarin stond tot nu toe uitdrukkelijk of er verzegeld werd.",[41,17313,17315],{"id":17314},"mag-een-bestaand-zegel-nu-zomaar-weg","Mag een bestaand zegel nu zomaar weg?",[12,17317,17318],{},"Vanaf 1 november 2026 vloeit uit boek 1 geen verplichting meer voort om een zegel op de differentieel aan te brengen of intact te houden. Verwijder het toch niet zelf:",[1450,17320,17321,17324,17331],{},[1453,17322,17323],{},"werken aan een verdeelbord blijven werken onder spanning in de nabijheid van de voedingskabel en horen bij een vakman;",[1453,17325,17326,17327,17330],{},"zegels van de netbeheerder op meter, hoofdzekering of aansluiting vallen ",[15,17328,17329],{},"niet"," onder deze wijziging en blijven verboden terrein;",[1453,17332,17333],{},"een intact zegel blijft een praktisch bewijs dat er sinds de laatste controle niets aan de voeding veranderd is.",[41,17335,17337],{"id":17336},"wat-betekent-dit-voor-keuringsverslagen-en-dossiers","Wat betekent dit voor keuringsverslagen en dossiers?",[12,17339,17340],{},"Verslagen die na 1 november 2026 worden opgesteld, vermelden de verzegeling niet meer. Wat wel blijft:",[1450,17342,17343,17350,17353],{},[1453,17344,17345,17346,17349],{},"de bevestiging dat het erkend organisme de ",[15,17347,17348],{},"eendraadschema's en situatieplannen"," heeft geviseerd, bij de gelijkvormigheidscontrole én bij het controlebezoek;",[1453,17351,17352],{},"de vermelding van de uiterste datum van het volgende controlebezoek (hoofdstuk 6.5.);",[1453,17354,17355],{},"de beoordeling van de installatie volgens de voorschriften die op dat ogenblik gelden.",[12,17357,17358,17359,17363],{},"Oudere verslagen met een verzegelingsvermelding blijven gewoon geldig. Een installatie hoeft niet opnieuw gekeurd te worden omdat een voorschrift wegvalt: een controle beoordeelt de installatie naar het recht dat van toepassing is, en het ",[30,17360,17362],{"href":17361},"\u002Fblog\u002Felektrische-keuring","controlebezoek van een bestaande installatie"," volgt zijn eigen periodiciteit.",[41,17365,17367],{"id":17366},"wat-betekent-de-wijziging-voor-de-zelfcontrole-van-planelec","Wat betekent de wijziging voor de zelfcontrole van PlanElec?",[12,17369,17370],{},"Niets – en dat is logisch. De AREI\u002FRGIE-zelfcontrole in PlanElec werkt op het projectmodel: eendraadschema, situatieplan, kringen, beveiligingen en verdeelbord. Verzegelen is een handeling van de keurder op de geplaatste installatie, geen eigenschap van een plan; de verzegeling was daarom nooit een controleregel. De hoofddifferentieel van maximaal 300 mA aan het begin controleert de zelfcontrole wel verder, want die verplichting blijft (4.2.4.3 b).",[12,17372,17373],{},"Voor bestaande installaties leg je per kring vast uit welke periode hij stamt: vóór 1 oktober 1981, onder het oude AREI, onder het nieuwe AREI vanaf 1 juni 2020 of actuele werken. De zelfcontrole past daarop de toegelaten afwijkingen uit deel 8 toe en benoemt ze in de bevindingen. De regelwerktekst in PlanElec is boek 1 versie 06 (van toepassing sinds 1 april 2026). Metingen en de keuring ter plaatse doet het erkend organisme.",[41,17375,17377],{"id":17376},"bronnen","Bronnen",[49,17379,17380,17388],{},[52,17381,17382],{},[55,17383,17384,17386],{},[58,17385,3189],{},[58,17387,1288],{},[68,17389,17390,17401,17413,17425],{},[55,17391,17392,17398],{},[73,17393,17394],{},[30,17395,17397],{"href":17031,"rel":17396},[2532],"KB 13 augustus 2026, BS 15 september 2026",[73,17399,17400],{},"Besluittekst en verslag aan de Koning",[55,17402,17403,17410],{},[73,17404,17405],{},[30,17406,17409],{"href":17407,"rel":17408},"https:\u002F\u002Fwww.ejustice.just.fgov.be\u002Feli\u002Farrete\u002F2026\u002F08\u002F13\u002F2026006432\u002Fjustel",[2532],"Geconsolideerde versie in Justel",[73,17411,17412],{},"Officiële consolidatie",[55,17414,17415,17422],{},[73,17416,17417],{},[30,17418,17421],{"href":17419,"rel":17420},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FAREI-Bijlage-Boek-1-installaties-op-laagspanning-en-op-zeer-lage-spanning-2026-v07.pdf",[2532],"Boek 1 van het AREI, van toepassing vanaf 1 november 2026 (PDF)",[73,17423,17424],{},"Versie 07, volledige tekst",[55,17426,17427,17433],{},[73,17428,17429],{},[30,17430,17432],{"href":15357,"rel":17431},[2532],"FOD Economie — AREI-overzichtspagina",[73,17434,17435],{},"Alle boeken en wijzigingsbesluiten",[12,17437,17438],{},"Dit artikel vat de officiële teksten samen; bindend is de tekst in het Belgisch Staatsblad.",[41,17440,17442],{"id":17441},"verwante-artikelen","Verwante artikelen",[1450,17444,17445,17451,17456,17462],{},[1453,17446,17447],{},[30,17448,17450],{"href":17449},"\u002Fblog\u002Farei-reglementen-2026","AREI-regelgeving 2026: de belangrijkste wijzigingen",[1453,17452,17453],{},[30,17454,17455],{"href":17361},"Elektrische keuring in België",[1453,17457,17458],{},[30,17459,17461],{"href":17460},"\u002Fblog\u002Finspectie-checklist","Inspectiechecklist: wat de keurder nakijkt",[1453,17463,17464],{},[30,17465,17467],{"href":17466},"\u002Fblog\u002Fdifferentieel-type-a-vs-type-b","Differentieel type A of type B",[12,17469,17470],{},[30,17471,17472],{"href":6989},"Bouw je elektrisch dossier op in PlanElec →",{"title":1467,"searchDepth":1468,"depth":1468,"links":17474},[17475,17476,17477,17478,17479,17480,17481,17482,17483,17484,17485],{"id":17016,"depth":1468,"text":17017},{"id":17049,"depth":1468,"text":17050},{"id":17144,"depth":1468,"text":17145},{"id":17211,"depth":1468,"text":17212},{"id":17246,"depth":1468,"text":17247},{"id":17283,"depth":1468,"text":17284},{"id":17314,"depth":1468,"text":17315},{"id":17336,"depth":1468,"text":17337},{"id":17366,"depth":1468,"text":17367},{"id":17376,"depth":1468,"text":17377},{"id":17441,"depth":1468,"text":17442},"2026-09-27","Vanaf 1 november 2026 vervalt de verplichte verzegeling van de differentieel aan het begin van een huishoudelijke installatie. Wat het KB van 13 augustus 2026 precies schrapt, wat onveranderd blijft en wat het betekent voor keuringsverslagen.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-rcd-sealing-abolished-2026-editorial.jpg","\u002Fblog\u002Frcd-sealing-abolished-2026.nl",{"title":17010,"description":17487},"Verzegeling differentieel: wat verandert op 1\u002F11\u002F2026","verzegeling-differentieel-vervalt-2026","blog\u002Frcd-sealing-abolished-2026.nl",[3275,3276,17496,17497,17498,17499,12088,17500,17501,1513],"verzegeling","differentieel","differentieelschakelaar","keuring","boek 1 versie 07","KB 13 augustus 2026","Jl9zrNa8iT_eA4cL3Oq1reOvFSK5LyJVbiLyE8ymBN8","\u002Fblog\u002Fverzegeling-differentieel-vervalt-2026",{"id":17505,"title":1457,"articleId":17506,"body":17507,"category":1493,"date":18457,"description":18458,"extension":1496,"image":17525,"lastUpdated":1494,"locale":1497,"meta":18459,"navigation":1499,"ogImage":18460,"path":18461,"publishDate":18457,"readTime":2482,"refreshInterval":11097,"seo":18462,"seoTitle":18463,"slug":18464,"stem":18465,"tags":18466,"__hash__":18471,"kind":1515,"href":1030},"blog\u002Fblog\u002Fdomotica-knx-basics.nl.md","domotica-knx-basics",{"type":9,"value":17508,"toc":18443},[17509,17513,17520,17526,17529,17682,17686,17689,17703,17718,17722,17749,17752,17875,17879,17882,17918,17929,17932,17936,17939,17945,17951,17974,17980,17994,17998,18001,18008,18015,18025,18032,18038,18042,18045,18053,18056,18076,18079,18083,18170,18182,18185,18189,18195,18278,18286,18290,18306,18323,18336,18341,18345,18348,18366,18369,18399,18402,18404,18433,18438],[41,17510,17512],{"id":17511},"wat-hoort-er-bij-een-knx-installatie-op-het-eendraadschema-en-het-situatieplan","Wat hoort er bij een KNX-installatie op het eendraadschema en het situatieplan?",[12,17514,17515,17516,17519],{},"In het keuringsdossier hoort de ",[15,17517,17518],{},"elektrische"," installatie thuis: de busvoeding als vast toestel in het bord met haar beveiliging tegen overstroom, de KNX-actor als sturingseenheid, elke geschakelde stroombaan met type, doorsnede, aantal geleiders en plaatsingswijze, en elke drukknop als sturingseenheid met zijn kenmerking. Wat er níét in thuishoort: groepsadressen, toestelparameters, sfeerinstellingen en logica. Die leven in het ETS-project en zijn geen voorwerp van het AREI.",[12,17521,17522],{},[22,17523],{"alt":17524,"src":17525},"Een elektricien bekijkt onderdelen voor woningautomatisering.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-domotica-knx-basics-editorial.webp",[12,17527,17528],{},"Die scheidingslijn is het hele artikel in één zin. De rest legt uit waarom ze daar ligt en wat er aan welke kant staat.",[49,17530,17531,17549],{},[52,17532,17533],{},[55,17534,17535,17537,17540,17543,17546],{},[58,17536,3751],{},[58,17538,17539],{},"Wat het elektrisch is",[58,17541,17542],{},"Op het eendraadschema",[58,17544,17545],{},"Op het situatieplan",[58,17547,17548],{},"In het ETS-project",[68,17550,17551,17576,17601,17624,17646,17667],{},[55,17552,17553,17556,17559,17567,17573],{},[73,17554,17555],{},"KNX-busvoeding",[73,17557,17558],{},"vast toestel, 230 V-verbruiker in het bord",[73,17560,17561,17562,17566],{},"ja, met bovenliggende beschermingsinrichting tegen overstroom (",[17563,17564,17565],"em",{},"3.1.2.2 a",")",[73,17568,17569,17570,17566],{},"op de plaats van het schakel- en verdeelbord (",[17563,17571,17572],{},"3.1.2.3 a",[73,17574,17575],{},"als toestel van de lijn",[55,17577,17578,17581,17590,17596,17598],{},[73,17579,17580],{},"Buskabel tussen de bustoestellen",[73,17582,17583,17584,702,17587,17566],{},"leiding op zeer lage spanning (",[17563,17585,17586],{},"5.2.2.2",[17563,17588,17589],{},"5.2.9.15",[73,17591,17592,17593,17595],{},"niet begrepen in de in ",[17563,17594,17565],{}," opgesomde verplichte gegevens over de leidingen van de stroombanen",[73,17597,224],{},[73,17599,17600],{},"lijn- en zonetopologie",[55,17602,17603,17606,17613,17616,17621],{},[73,17604,17605],{},"KNX-actor in het bord",[73,17607,17608,17609,17612],{},"stuurinrichting volgens ",[17563,17610,17611],{},"5.3.3.2 b"," en schakelorgaan",[73,17614,17615],{},"ja, als vast toestel in de stroombaan",[73,17617,17618,17619,17566],{},"op de plaats van het bord (",[17563,17620,17572],{},[73,17622,17623],{},"ja, met applicatie en parameters",[55,17625,17626,17629,17632,17638,17643],{},[73,17627,17628],{},"Actorkanaal → lichtpunt",[73,17630,17631],{},"stroombaan op 230 V",[73,17633,17634,17635,17566],{},"ja: type, doorsnede, aantal geleiders, plaatsingswijze; lichtpunt genummerd (",[17563,17636,17637],{},"3.1.2.1 a",[73,17639,17640,17641,17566],{},"lichtpunt met letter van de stroombaan en nummer (",[17563,17642,17637],{},[73,17644,17645],{},"communicatieobject van het kanaal",[55,17647,17648,17651,17654,17659,17664],{},[73,17649,17650],{},"Drukknop \u002F bedieningsplaats",[73,17652,17653],{},"sturingseenheid op de bus, zonder eigen stroombaan op 230 V",[73,17655,17656,17657,17566],{},"ja, als sturingseenheid met volgnummer (",[17563,17658,17637],{},[73,17660,17661,17662,17566],{},"letter van de stroombaan plus nummer van het lichtpunt dat hij bedient (",[17563,17663,17637],{},[73,17665,17666],{},"groepsadres",[55,17668,17669,17672,17675,17677,17679],{},[73,17670,17671],{},"Groepsadressen, parameters, sferen",[73,17673,17674],{},"geen elektrisch materieel",[73,17676,224],{},[73,17678,224],{},[73,17680,17681],{},"ja — en uitsluitend daar",[41,17683,17685],{"id":17684},"wat-betekent-domotica-of-gebouwautomatisering","Wat betekent domotica of gebouwautomatisering?",[12,17687,17688],{},"Domotica is in België de gangbare term voor de automatisering van de woning: bedienen, schakelen, regelen en koppelen van verlichting, rolluiken, verwarming en toegang via één gemeenschappelijke sturingslaag in plaats van via telkens één vast bedrade schakelaar. „Gebouwautomatisering\" betekent hetzelfde, een maat groter, in de niet-huishoudelijke bouw.",[12,17690,17691,17692,708,17695,17698,17699,17702],{},"Het AREI kent de term — maar niet als een aparte regelcategorie met eigen verplichtingen, wel als een ",[15,17693,17694],{},"symbolenfamilie",[17563,17696,17697],{},"Tabel 2.23",", opgenomen in ",[17563,17700,17701],{},"hoofdstuk 2.13",", voert onder letter J „Domotica\" de sturingseenheid. Die „wordt weergegeven door een rechthoek die uit twee delen bestaat\": onderaan het basissymbool — de tabel geeft als voorbeeld een schakelaar of een contactdoos met schakelaar —, bovenaan het type sturing van de eenheid.",[12,17704,17705,17706,17709,17710,17713,17714,17717],{},"Daar volgen twee dingen uit. Ten eerste: een domoticabedieningsplaats is in de tekenvoorschriften een ",[15,17707,17708],{},"sturingseenheid",", geen gewone schakelaar — en sturingseenheden moeten volgens ",[17563,17711,17712],{},"onderafdeling 3.1.2.1 punt a"," uitdrukkelijk genummerd worden, naast de lichtpunten en de contactdozen. Ten tweede: het AREI schrijft geen KNX-specifiek symbool voor. Waar ",[17563,17715,17716],{},"tabel 2.23"," geen symbool bevat, mag volgens dezelfde onderafdeling „elk ander duidelijk identificeerbaar en in de legende van de eendraadsschema's en de situatieplannen gedefinieerd symbool\" gebruikt worden. Bij een businstallatie is de legende dus geen bijzaak.",[41,17719,17721],{"id":17720},"wat-is-knx-en-waarin-verschilt-het-van-een-conventionele-installatie","Wat is KNX en waarin verschilt het van een conventionele installatie?",[12,17723,17724,17725,17728,17729,17732,17733,17736,17737,17740,17741,17744,17745,17748],{},"KNX is een fabrikantoverschrijdende standaard voor gebouwautomatisering. De KNX Association somt de erkenningen op: ISO\u002FIEC erkende KNX in 2006 als internationale norm ",[15,17726,17727],{},"ISO\u002FIEC 14543-3",", CENELEC in 2003 als Europese norm ",[15,17730,17731],{},"EN 50090",", CEN in 2006 als ",[15,17734,17735],{},"EN 13321-1"," (als loutere verwijzing naar EN 50090) en ",[15,17738,17739],{},"EN 13321-2"," (KNXnet\u002FIP), SAC in 2007 als Chinese norm ",[15,17742,17743],{},"GB\u002FT 20965"," en ANSI\u002FASHRAE in 2005 als Amerikaanse norm ",[15,17746,17747],{},"ANSI\u002FASHRAE 135",". Precies dat onderscheidt KNX van een systeembus die één fabrikant zelf definieert: de norm is van geen enkel merk.",[12,17750,17751],{},"De bustoestellen wisselen hun informatie uit over één gemeenschappelijk medium — volgens de KNX Association „twisted pair, radio frequency, power line or IP\u002FEthernet\". De te verzenden informatie wordt „in een telegram verpakt\" en van een sensor naar de actoren gestuurd. In de Belgische woningbouw is de getwiste tweedraadskabel de regel; de andere media zijn vooral renovatie- en koppelwegen.",[49,17753,17754,17766],{},[52,17755,17756],{},[55,17757,17758,17760,17763],{},[58,17759,6689],{},[58,17761,17762],{},"Conventionele installatie",[58,17764,17765],{},"KNX-installatie",[68,17767,17768,17779,17790,17801,17812,17823,17838,17849,17864],{},[55,17769,17770,17773,17776],{},[73,17771,17772],{},"Wat de bedieningsplaats doet",[73,17774,17775],{},"onderbreekt zelf de stroombaan, er staat 230 V op de schakelaar",[73,17777,17778],{},"zet een telegram op de bus; 230 V wordt door het actorkanaal in het bord geschakeld",[55,17780,17781,17784,17787],{},[73,17782,17783],{},"Leiding naar de bedieningsplaats",[73,17785,17786],{},"vermogenleiding, aantal geleiders afhankelijk van de schakeling",[73,17788,17789],{},"buskabel op zeer lage spanning",[55,17791,17792,17795,17798],{},[73,17793,17794],{},"Extra bedieningsplaats",[73,17796,17797],{},"extra kruisschakelaar plus telkens twee correspondentiedraden",[73,17799,17800],{},"extra drukknop op de bestaande bus, toewijzing in de ETS",[55,17802,17803,17806,17809],{},[73,17804,17805],{},"Functiewijziging na oplevering",[73,17807,17808],{},"herbedraden",[73,17810,17811],{},"herparametreren in de ETS, de bedrading blijft",[55,17813,17814,17817,17820],{},[73,17815,17816],{},"Waar de functie zit",[73,17818,17819],{},"in de bedrading",[73,17821,17822],{},"decentraal in sensor en actor, niet in een centrale eenheid",[55,17824,17825,17828,17835],{},[73,17826,17827],{},"Keuringsdocumenten volgens AREI",[73,17829,17830,17831,702,17833,17566],{},"eendraadschema en situatieplan (",[17563,17832,17565],{},[17563,17834,17572],{},[73,17836,17837],{},"dezelfde documenten met dezelfde verplichte inhoud, plus het ETS-project als aparte documentatie die het AREI niet regelt",[55,17839,17840,17843,17846],{},[73,17841,17842],{},"Indienststelling",[73,17844,17845],{},"inschakelen en nakijken",[73,17847,17848],{},"bijkomend adresseren en programmeren met de ETS",[55,17850,17851,17854,17857],{},[73,17852,17853],{},"Foutopsporing",[73,17855,17856],{},"meten in de stroombaan",[73,17858,17859,17860,17863],{},"meten in de stroombaan ",[15,17861,17862],{},"en"," busdiagnose",[55,17865,17866,17869,17872],{},[73,17867,17868],{},"Afhankelijkheid van het planningsinstrument",[73,17870,17871],{},"geen",[73,17873,17874],{},"wijzigingen vragen het ETS-project en toegang daartoe",[41,17876,17878],{"id":17877},"welke-rol-hebben-busvoeding-sensor-drukknop-actor-kanaal-en-verbruiker","Welke rol hebben busvoeding, sensor, drukknop, actor, kanaal en verbruiker?",[12,17880,17881],{},"Dat wordt het kortst duidelijk aan één keten. Een plafondlichtpunt in de gang moet bediend worden vanaf een drukknop naast de voordeur.",[1602,17883,17884,17894,17900,17906,17912],{},[1453,17885,17886,17889,17890,17893],{},[15,17887,17888],{},"Busvoeding."," Een module in het bord wordt gevoed vanaf een stroombaan op 230 V en stelt op haar klemmen BUS+ en BUS− de bedrijfsspanning voor alle bustoestellen ter beschikking. Het is een vast toestel en heeft zoals elk ander een bovenliggende beschermingsinrichting tegen overstroom nodig. Zonder die voeding staat de bus stroomloos en werkt ",[15,17891,17892],{},"geen enkele"," drukknop — ook die in de gang niet.",[1453,17895,17896,17899],{},[15,17897,17898],{},"Drukknop als sensor."," De drukknop hangt aan de bus, niet aan de stroombaan. Een druk op de knop maakt een telegram dat de drukknop op de bus zet. Hij voert geen belastingsstroom.",[1453,17901,17902,17905],{},[15,17903,17904],{},"Telegram."," Het telegram is gericht aan een groepsadres, niet aan een kabel. Alle toestellen die naar dat adres luisteren, ontvangen het tegelijk.",[1453,17907,17908,17911],{},[15,17909,17910],{},"Actorkanaal."," De schakelactor in het bord heeft meerdere kanalen. Precies het kanaal waarvan het communicatieobject met dat groepsadres verbonden is, sluit zijn relais.",[1453,17913,17914,17917],{},[15,17915,17916],{},"Stroombaan en verbruiker."," Pas hier loopt er stroom: vanaf de beveiliging tegen overstroom, over het actorkanaal, door de leiding naar het lichtpunt. Dit deel is een volstrekt gewone elektrische installatie en wordt volgens de gewone regels gedimensioneerd, beveiligd en gedocumenteerd.",[12,17919,17920,17921,17924,17925,17928],{},"Het actorkanaal is daarmee de ",[15,17922,17923],{},"stuurinrichting"," in de zin van ",[17563,17926,17927],{},"onderafdeling 5.3.3.2",". Punt b laat bij zeer lage spanning en laagspanning naast schakelaars en vermogensschakelaars uitdrukkelijk contactoren, stuurhulpmiddelen en „elektronische schakelingen\" toe, „op voorwaarde dat zij voldoen aan de desbetreffende door de Koning bekrachtigde of door het NBN geregistreerde normen of dat zij beantwoorden aan bepalingen die ten minste een gelijkwaardig veiligheidsniveau bieden\". Een KNX-actor is dus geen buitenbeentje, maar ook geen vrijgeleide: de normconformiteit van het product blijft een voorwaarde.",[12,17930,17931],{},"Punt d van dezelfde onderafdeling laat uitdrukkelijk toe dat één inrichting meerdere gelijktijdig werkende elektrische machines of toestellen stuurt. Een kanaal dat vier spots van dezelfde groep schakelt, is daarmee gedekt. Datzelfde punt maakt ook duidelijk dat de stuurinrichting eveneens vereist is wanneer de werking van het toestel afhangt van een relais, een thermostaat of een soortgelijk onderdeel — de automatisering vervangt de bedieningsinrichting niet, ze ís er een.",[41,17933,17935],{"id":17934},"wat-wordt-elektrisch-met-230-v-gevoed-en-wat-communiceert-over-de-bus","Wat wordt elektrisch met 230 V gevoed en wat communiceert over de bus?",[12,17937,17938],{},"De scheiding loopt aan de klemmen van de actor, niet langs de soort toestel.",[12,17940,17941,17944],{},[15,17942,17943],{},"Op 230 V staan:"," de voedingsleiding naar de busvoeding, de voedingsleiding naar de actor, elke geschakelde vertrekleiding van het actorkanaal naar het lichtpunt of de rolluikmotor, en alles wat toch al conventioneel bedraad is.",[12,17946,17947,17950],{},[15,17948,17949],{},"Over de bus lopen:"," drukknoppen, aanwezigheids- en helderheidssensoren, ruimtethermostaten, displays en de communicatie tussen actoren onderling.",[12,17952,17953,17954,17957,17958,17961,17962,17965,17966,17969,17970,17973],{},"De buskabel is een leiding op ",[15,17955,17956],{},"zeer lage spanning",". Voor de plaatsing geldt ",[17563,17959,17960],{},"onderafdeling 5.2.2.2",": alle plaatsingswijzen voor leidingen op laagspanning zijn ook toepasbaar op leidingen op zeer lage spanning, maar: „De elektrische en\u002Fof mechanische karakteristieken mogen echter versoepeld worden behalve bij uitwendige invloeden BE2 of BE3 of CA2.\" ",[17563,17963,17964],{},"Onderafdeling 5.2.9.15 punt b"," bevestigt dat voor installaties op zeer lage spanning en noemt de weinige voorschriften uit ",[17563,17967,17968],{},"afdeling 5.2.9"," die er niet gelden. Of de concrete busvoeding veiligheidszeerlagespanning levert en dus bijkomend ",[17563,17971,17972],{},"onderafdeling 5.2.2.3"," speelt, staat in het gegevensblad van de fabrikant — dat is een producteigenschap, geen eigenschap van „KNX\".",[12,17975,17976,17977,17979],{},"Twee andere punten uit ",[17563,17978,17927],{}," raken precies die grens:",[1450,17981,17982,17988],{},[1453,17983,17984,17987],{},[15,17985,17986],{},"Punt c",": behalve voor meetdoeleinden worden eenpolige stuurinrichtingen niet op nulgeleiders geplaatst. Een eenpolig schakelkanaal hoort in de fasegeleider, niet in de nulgeleider — dat het bevel uit software komt, verandert daar niets aan.",[1453,17989,17990,17993],{},[15,17991,17992],{},"Punt f",": stuurkringen worden zo ontworpen en aangebracht dat de risico's beperkt worden die ontstaan door een toevallige aanraking van één of meer punten van de stuurkring met het lichaam of met de aarde, waardoor een ongewilde indienststelling kan ontstaan of de buitendienststelling van het gestuurde toestel verhinderd kan worden. De bus is een stuurkring in precies die zin.",[41,17995,17997],{"id":17996},"welke-informatie-heeft-de-keuring-nodig-en-wat-hoort-bij-de-ets-projectering","Welke informatie heeft de keuring nodig en wat hoort bij de ETS-projectering?",[12,17999,18000],{},"Het erkend organisme keurt de elektrische installatie aan de hand van de documenten die het AREI voorschrijft. Die lijst verandert niet door KNX.",[12,18002,18003,18004,18007],{},"Het eendraadschema bevat volgens ",[17563,18005,18006],{},"onderafdeling 3.1.2.2 punt a"," ten minste: de kenmerken van de elektrische leidingen (type, doorsnede, aantal geleiders), de plaatsingswijze van de leidingen, het type en de kenmerken van de differentieelstroombeschermingsinrichtingen, het type en de kenmerken van de beschermingsinrichtingen tegen overstroom, de schakelaars, de verbindingsdozen, de aftakdozen, de contactdozen, de lichtpunten, de vaste machines en toestellen en de bronnen. Busvoeding en actor zijn vaste toestellen en vallen onder hetzelfde punt als elke andere bordmodule.",[12,18009,18010,18011,18014],{},"Het situatieplan duidt volgens ",[17563,18012,18013],{},"onderafdeling 3.1.2.3 punt a"," de plaats aan van de schakel- en verdeelborden, de verbindings- en aftakdozen, de contactdozen, de lichtpunten, de schakelaars, de vaste machines en toestellen en de bronnen „die op het ééndraadsschema voorkomen\".",[12,18016,18017,18018,18020,18021,18024],{},"De kenmerking volgens ",[17563,18019,17712],{}," is bij een businstallatie het punt waar slordigheid het snelst opvalt. Op het eendraadschema wordt elke elementaire stroombaan met een hoofdletter aangeduid; elk lichtpunt, elke contactdoos ",[15,18022,18023],{},"en elke sturingseenheid"," wordt genummerd „in volgorde, vertrekkende vanaf de beschermingsinrichting tegen overstroom van de elementaire stroombaan\". Voor het situatieplan geldt: „Elke schakelaar en elke sturingseenheid wordt gekenmerkt door de letter van de stroombaan waarvan ze deel uitmaken, gevolgd door het nummer van het lichtpunt of het toestel dat hij bedient.\" Een KNX-drukknop is zo'n sturingseenheid — de toewijzing „deze knop bedient dat lichtpunt\" is dus een gegeven van het keuringsdossier en niet alleen van de ETS.",[12,18026,18027,18028,18031],{},"Volgens ",[17563,18029,18030],{},"onderafdeling 3.1.2.1 punt d"," worden schema's, plannen en documenten bijgewerkt en ter plaatse ter beschikking gesteld van iedereen die bevoegd is voor toezicht, keuring, onderhoud, herstelling of verbouwing van de installatie. Wie de toewijzing later in de ETS wijzigt, past het plan mee aan.",[12,18033,18034,18037],{},[15,18035,18036],{},"In de ETS horen daarentegen thuis:"," fysieke adressen, groepsadressen, applicatieprogramma's, parameters, sferen, tijd- en logicafuncties, de lijn- en zonetopologie en de reservekopie van het project. Niets daarvan staat in het AREI, en niets daarvan vervangt een gegeven dat het AREI vraagt. Omgekeerd geldt evenzeer: een net ETS-project is geen eendraadschema.",[41,18039,18041],{"id":18040},"wanneer-is-knx-zinvol-en-welke-bijkomende-inspanning-brengt-het-mee","Wanneer is KNX zinvol en welke bijkomende inspanning brengt het mee?",[12,18043,18044],{},"Deze paragraaf is vakpraktijk, geen norm — het AREI doet daar geen uitspraak over.",[12,18046,18047,18048,18052],{},"KNX loont waar het aantal bedieningsplaatsen, koppelingen of latere wijzigingen hoog ligt: veel bedieningsplaatsen voor hetzelfde lichtpunt, rolluiksturing over hele gevels, het koppelen van zonwering, verwarming en aanwezigheid, gebruiken die over de jaren veranderen. Vanaf drie of vier bedieningsplaatsen loopt het bedradingswerk van een kruisschakeling snel op; de conventionele alternatieven daarvoor — drukknoppen met een teleruptor — staan in ",[30,18049,18051],{"href":18050},"\u002Fnl\u002Fblog\u002Fwisselschakelaar-kruisschakelaar-eendraadschema","Wisselschakelaar, kruisschakelaar of serieschakelaar"," en zijn voor veel eengezinswoningen het zuinigere antwoord.",[12,18054,18055],{},"De bijkomende inspanning is reëel en valt op drie plaatsen:",[1450,18057,18058,18064,18070],{},[1453,18059,18060,18063],{},[15,18061,18062],{},"Ontwerp."," Het tracé van de buskabel, bordruimte voor voeding en actoren, reserve op de kanalen en een kanaalbenaming die over vijf jaar nog leesbaar is.",[1453,18065,18066,18069],{},[15,18067,18068],{},"Indienststelling."," ETS-licentie, projectering, adressering, programmering en functietest. Dat is een aparte prestatie met een eigen tijdsbesteding, geen bijproduct van de bedrading.",[1453,18071,18072,18075],{},[15,18073,18074],{},"Oplevering en gebruik."," Het ETS-project hoort aan de bouwheer overgedragen te worden. Zonder projectbestand en zonder iemand met ETS-toegang wordt elke latere wijziging duur.",[12,18077,18078],{},"De vaakst voorkomende rekenfout is niet de materiaalprijs, maar de aanname dat de programmering klaar is zodra de bedrading klaar is.",[41,18080,18082],{"id":18081},"hoe-verhoudt-knx-zich-tot-merkgebonden-systemen-matter-home-assistant-en-draadloze-retrofit","Hoe verhoudt KNX zich tot merkgebonden systemen, Matter, Home Assistant en draadloze retrofit?",[49,18084,18085,18099],{},[52,18086,18087],{},[55,18088,18089,18091,18094,18096],{},[58,18090,1640],{},[58,18092,18093],{},"Wat het is",[58,18095,17816],{},[58,18097,18098],{},"Wat daarvan in het elektrisch dossier hoort",[68,18100,18101,18114,18128,18142,18156],{},[55,18102,18103,18105,18108,18111],{},[73,18104,197],{},[73,18106,18107],{},"fabrikantoverschrijdende standaard (EN 50090, EN 13321-1, ISO\u002FIEC 14543-3)",[73,18109,18110],{},"decentraal in sensor en actor",[73,18112,18113],{},"busvoeding, actor en alle geschakelde stroombanen",[55,18115,18116,18119,18122,18125],{},[73,18117,18118],{},"Merkgebonden bussysteem",[73,18120,18121],{},"systeemwereld van één leverancier, technisch vaak gelijkaardig maar zonder fabrikantoverschrijdende norm",[73,18123,18124],{},"afhankelijk van de fabrikant",[73,18126,18127],{},"dezelfde toestellen als bij KNX; het symbool hoort in de legende gedefinieerd",[55,18129,18130,18133,18136,18139],{},[73,18131,18132],{},"Matter",[73,18134,18135],{},"IP-gebaseerd connectiviteitsprotocol van de Connectivity Standards Alliance; loopt over Wi-Fi en Thread, Bluetooth Low Energy dient voor de commissioning",[73,18137,18138],{},"in het toestel en in de bedieningsapp",[73,18140,18141],{},"enkel de vaste installatie erachter; het toestel zelf is meestal stekkerklaar",[55,18143,18144,18147,18150,18153],{},[73,18145,18146],{},"Home Assistant",[73,18148,18149],{},"opensourcesoftware op een server die bestaande systemen — ook KNX — samenbrengt",[73,18151,18152],{},"in de software",[73,18154,18155],{},"niets eigens; de server is een gewone verbruiker",[55,18157,18158,18161,18164,18167],{},[73,18159,18160],{},"Draadloze module achter de schakelaar",[73,18162,18163],{},"relaismodule in de inbouwdoos, draadloos gestuurd",[73,18165,18166],{},"in de module en in de app",[73,18168,18169],{},"verschijnt wanneer de vaste bedrading daarvoor gewijzigd wordt",[12,18171,18172,18173,18176,18177,18181],{},"Het beslissende onderscheid voor de keuring luidt niet „slim of niet\", maar ",[15,18174,18175],{},"vast geïnstalleerd of niet",". Een stekkerklare tussenstekker verandert niets aan de vaste installatie. Een DIN-railmodule in het bord en een actor die een lichtkring schakelt, maken deel uit van de vaste installatie. De afbakening voor wifimodules, slimme stopcontacten en lampen behandelt ",[30,18178,18180],{"href":18179},"\u002Fnl\u002Fblog\u002Fdomotica-arei","Smart Home en AREI","; dit artikel blijft bij de bekabelde bus.",[12,18183,18184],{},"Matter en KNX sluiten elkaar overigens niet uit. Matter standaardiseert de verstandhouding tussen IP-toestellen en apps, KNX de vaste automatisering in het gebouw; in de praktijk ontmoeten ze elkaar in een gateway, niet op dezelfde kabel.",[41,18186,18188],{"id":18187},"kan-planelec-de-ets-vervangen","Kan PlanElec de ETS vervangen?",[12,18190,18191,18194],{},[15,18192,18193],{},"Nee, en dat is ook niet zijn taak."," PlanElec documenteert de elektrische installatie samen met de geplande automatiseringsfuncties en bereidt de adressen voor ETS voor. De ETS projecteert en programmeert de KNX-toestellen. Dat zijn twee werkstappen met twee resultaten, en je hebt ze allebei nodig.",[49,18196,18197,18207],{},[52,18198,18199],{},[55,18200,18201,18203,18205],{},[58,18202,8023],{},[58,18204,1337],{},[58,18206,2489],{},[68,18208,18209,18218,18229,18238,18247,18257,18266],{},[55,18210,18211,18214,18216],{},[73,18212,18213],{},"Eendraadschema en situatieplan met busvoeding, actor, lastkringen en drukknoppen",[73,18215,206],{},[73,18217,224],{},[55,18219,18220,18223,18226],{},[73,18221,18222],{},"Kanaaltoewijzing: welk kanaal welke last schakelt, welke toets het bedient",[73,18224,18225],{},"ja (planning)",[73,18227,18228],{},"ja (programmering)",[55,18230,18231,18234,18236],{},[73,18232,18233],{},"Logische buslijnen met voeding en busstroombudget",[73,18235,18225],{},[73,18237,206],{},[55,18239,18240,18243,18245],{},[73,18241,18242],{},"Klemmenplan en blad voor de kastdeur",[73,18244,206],{},[73,18246,224],{},[55,18248,18249,18252,18255],{},[73,18250,18251],{},"Fysieke adressen en groepsadressen",[73,18253,18254],{},"ja (voorstel, bestanden in ETS-formaat)",[73,18256,206],{},[55,18258,18259,18262,18264],{},[73,18260,18261],{},"Communicatieobjecten, parameters, scènes en logica",[73,18263,224],{},[73,18265,206],{},[55,18267,18268,18274,18276],{},[73,18269,18270,18271,3419],{},"Programmering, busdiagnose tijdens bedrijf, ",[1300,18272,18273],{},".knxproj",[73,18275,224],{},[73,18277,206],{},[12,18279,18280,18281,18283,18284,39],{},"Wie een KNX-installatie in dienst stelt, heeft de ETS nodig. Wie ze aan de keuring voorlegt, heeft een eendraadschema en een situatieplan nodig. PlanElec levert die tweede helft en houdt ze consistent met de kanaalplanning. Sinds november 2026 stelt PlanElec bovendien fysieke adressen en groepsadressen in drie niveaus met datapunttype voor en exporteert het de groepsadressen als CSV of XML in het formaat van ETS. Een ",[1300,18282,18273],{},"-bestand ontstaat niet, en de koppeling met communicatieobjecten maak je in ETS. Hoe verdeelbord, kanaalplan, klemmenplan en dossier ontstaan aan de hand van een voorbeeldappartement, toont ",[30,18285,1532],{"href":1516},[41,18287,18289],{"id":18288},"hoe-documenteer-je-een-knx-installatie-in-planelec","Hoe documenteer je een KNX-installatie in PlanElec?",[12,18291,18292,18293,18295,18296,933,18299,18302,18303,18305],{},"Open de projectmetadata en kies bij ",[15,18294,1509],{}," het profiel KNX. Daarmee krijg je de merkneutrale bordmodules ",[15,18297,18298],{},"KNX-voeding",[15,18300,18301],{},"KNX-actor",", en in het grondplan plaats je drukknoppen uit ",[15,18304,684],{},". De busvoeding parametreer je met haar busstroom, te kiezen zijn 320 mA en 640 mA. De actor krijgt een functie (schakelen of rolluik), een aantal kanalen (4, 8, 12 of 16) en een nominale stroom per kanaal (6, 10 of 16 A).",[12,18307,18308,18309,18311,18312,18314,18315,18318,18319,18322],{},"In het onderdeel ",[15,18310,444],{}," wijs je aan elk kanaal zijn lasten en bedieningspunten toe; één drukknop kan meerdere kanalen bedienen, meerdere drukknoppen hetzelfde kanaal. Onder ",[15,18313,830],{}," wijs je modules en bedieningspunten toe aan de geplande buslijnen en kies je de voeding van de lijn. Gekende busstromen en onbekende bijdragen toont PlanElec apart. Het eendraadschema toont voeding en actor elk één keer; voor elk bezet kanaal verschijnen een vermogenlijn ",[1300,18316,18317],{},"OUT"," naar de last en een aparte lijn ",[1300,18320,18321],{},"KNX IN"," naar het bedieningspunt. De drukknop situeer je op het situatieplan met het drukknopsymbool.",[12,18324,14642,18325,18328,18329,18331,18332,18335],{},[15,18326,18327],{},"Export → Domotica"," maak je het kanaalplan, het klemmenplan, de functielijst per ruimte, het topologiediagram, de domotica-stuklijst en het zelfcontrolerapport, apart of gebundeld als domotica-overdrachtsdossier. Het ",[15,18330,967],{}," draagt een watermerk en is ook met open gegevens exporteerbaar. Voor de ",[15,18333,18334],{},"finale versie"," gaat PlanElec na of er een beveiligde busvoeding is, of de actoren achter een automaat of differentieelautomaat liggen, of toegewezen lasten een vermogen hebben, of een verbruiker dubbel is toegewezen, of een kanaal overbelast zou zijn en of een als KNX-gestuurd gemarkeerde last een kanaal heeft. Een drukknop zonder kanaaltoewijzing blijft een waarschuwing en blokkeert niet.",[12,18337,18338,18339,39],{},"Ondersteund zijn lichtkringen en rolluikmotoren. De geïllustreerde stap-voor-stap-handleiding staat in de kennisbank: ",[30,18340,9507],{"href":37},[41,18342,18344],{"id":18343},"wat-controleert-de-arei-zelfcontrole-bij-knx","Wat controleert de AREI-zelfcontrole bij KNX?",[12,18346,18347],{},"De zelfcontrole is indicatief en beoordeelt de ondersteunde regels op basis van je projectgegevens. Voor automatiseringsinstallaties komen er twee controles bij:",[1450,18349,18350,18360],{},[1453,18351,18352,18355,18356,18359],{},[15,18353,18354],{},"Kanaalbelasting:"," ze vergelijkt de stroomsom van de gedocumenteerde lastvermogens met de nominale kanaalstroom (beschermingsdoel volgens ",[17563,18357,18358],{},"onderafdeling 4.4.1.1","). Ontbreekt een vermogen, dan meldt ze een gegevenslacune in plaats van een geslaagd resultaat.",[1453,18361,18362,18365],{},[15,18363,18364],{},"Gekende busstroom:"," ze vergelijkt de gekende toestelstromen van een lijn met de capaciteit van de voeding en waarschuwt bij overschrijding. Onbekende bijdragen blijven als open gemarkeerd.",[12,18367,18368],{},"De rest van de busplanning controleer je aan de hand van de documentatie van de fabrikant:",[1450,18370,18371,18377,18383,18393],{},[1453,18372,18373,18376],{},[15,18374,18375],{},"Bedieningslogica:"," of een drukknop aan het juiste kanaal hangt, beslist jouw planning; elektrisch is ook een verkeerde toewijzing onberispelijk.",[1453,18378,18379,18382],{},[15,18380,18381],{},"Buskabel:"," tracé, lengte van de streng en aantal deelnemers per lijn staan in de fabrikantdocumentatie.",[1453,18384,18385,18388,18389,18392],{},[15,18386,18387],{},"Productconformiteit:"," of actor en voeding voldoen aan de normen die ",[17563,18390,18391],{},"onderafdeling 5.3.3.2 punt b"," vraagt, is een eigenschap van het product, niet van de tekening.",[1453,18394,18395,18398],{},[15,18396,18397],{},"ETS-gegevens:"," parametrering en cyberveiligheid van de installatie horen bij de ETS-projectering.",[12,18400,18401],{},"De gelijkvormigheidscontrole van de uitgevoerde installatie, met de bijbehorende metingen, doet het erkend organisme.",[41,18403,1448],{"id":1447},[1450,18405,18406,18410,18415,18421,18427],{},[1453,18407,18408],{},[30,18409,18180],{"href":18179},[1453,18411,18412],{},[30,18413,18414],{"href":18050},"Wisselschakelaar, kruisschakelaar of serieschakelaar in het eendraadschema",[1453,18416,18417],{},[30,18418,18420],{"href":18419},"\u002Fnl\u002Fblog\u002Feendraadschema-maken","Zelf een eendraadschema maken",[1453,18422,18423],{},[30,18424,18426],{"href":18425},"\u002Fnl\u002Fblog\u002Fsituatieschema-tekenen-handleiding","Situatieplan tekenen",[1453,18428,18429],{},[30,18430,18432],{"href":18431},"\u002Fnl\u002Fblog\u002Farei-elektrische-symbolen-overzicht","AREI-symbolen in overzicht",[12,18434,18435],{},[30,18436,18437],{"href":15328},"Leg je KNX-documentatie aan in PlanElec →",[12,18439,18440],{},[17563,18441,18442],{},"Regelgeving: AREI\u002FRGIE Boek 1 V06 — hoofdstuk 2.13 met tabel 2.23 letter J, onderafdelingen 3.1.2.1, 3.1.2.2, 3.1.2.3, 4.4.1.1, 5.2.2.2, 5.2.2.3, 5.2.9.15 en 5.3.3.2. Gecontroleerd op 5 oktober 2026. KNX-gegevens volgens de publicaties van de KNX Association (standaardisatie, technologie). De officiële tekst, de werkelijke toestand van de installatie en de keuring door het erkend organisme blijven doorslaggevend.",{"title":1467,"searchDepth":1468,"depth":1468,"links":18444},[18445,18446,18447,18448,18449,18450,18451,18452,18453,18454,18455,18456],{"id":17511,"depth":1468,"text":17512},{"id":17684,"depth":1468,"text":17685},{"id":17720,"depth":1468,"text":17721},{"id":17877,"depth":1468,"text":17878},{"id":17934,"depth":1468,"text":17935},{"id":17996,"depth":1468,"text":17997},{"id":18040,"depth":1468,"text":18041},{"id":18081,"depth":1468,"text":18082},{"id":18187,"depth":1468,"text":18188},{"id":18288,"depth":1468,"text":18289},{"id":18343,"depth":1468,"text":18344},{"id":1447,"depth":1468,"text":1448},"2026-09-25","Bus in plaats van correspondentiedraden: wat er bij een KNX-installatie op het eendraadschema en het situatieplan hoort, wat in de ETS hoort en hoe PlanElec beide scheidt – met de AREI-vindplaats bij elke uitspraak.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-domotica-knx-basics-editorial.jpg","\u002Fblog\u002Fdomotica-knx-basics.nl",{"title":1457,"description":18458},"Domotica en KNX: wat hoort op plan en eendraadschema?","domotica-knx-elektrische-installatie","blog\u002Fdomotica-knx-basics.nl",[3275,3276,197,18467,18468,3273,3274,18469,18470,1513],"domotica","gebouwautomatisering","drukknop","actor","iERmZMC23KMJX__zreErKDcYvxjGAJbNCfuQl8B3_4E",{"id":18473,"title":18474,"articleId":18475,"body":18476,"category":19087,"date":19088,"description":19089,"extension":1496,"image":18500,"lastUpdated":15381,"locale":1497,"meta":19090,"navigation":1499,"ogImage":19091,"path":19092,"publishDate":19088,"readTime":4035,"refreshInterval":11097,"seo":19093,"seoTitle":4037,"slug":19094,"stem":19095,"tags":19096,"__hash__":19099,"kind":1515,"href":19100},"blog\u002Fblog\u002Fbreaking-capacity-mcb.nl.md","Uitschakelvermogen van een automaat: 3, 6 of 10 kA?","breaking-capacity-mcb",{"type":9,"value":18477,"toc":19075},[18478,18482,18496,18501,18511,18525,18529,18536,18547,18650,18653,18659,18663,18674,18701,18707,18717,18721,18724,18750,18761,18769,18773,18784,18797,18804,18808,18818,18845,18859,18868,18872,18875,18941,18959,18965,18969,18976,18989,18992,18996,18999,19022,19031,19033,19060,19065],[41,18479,18481],{"id":18480},"wat-betekenen-3-ka-6-ka-en-10-ka-op-een-automaat","Wat betekenen 3 kA, 6 kA en 10 kA op een automaat?",[12,18483,18484,18485,18488,18489,18492,18493,18495],{},"De kA-waarde is het ",[15,18486,18487],{},"onderbrekingsvermogen",": de waarde van de stroom die het beschermingstoestel kan onderbreken op een welbepaalde spanning en onder voorgeschreven gebruiks- en werkingsvoorwaarden. Zo omschrijft het AREI het in ",[17563,18490,18491],{},"afdeling 2.6.4",", waar de reglementaire term ",[15,18494,18487],{}," luidt; op de werf en in catalogi heet dezelfde grootheid meestal uitschakelvermogen. Een automaat van 3 kA beheerst een kortsluiting van 3.000 A op zijn plaats van plaatsing; een hogere kortsluitstroom vernielt hem in plaats van door hem onderbroken te worden.",[12,18497,18498],{},[22,18499],{"alt":17042,"src":18500},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-breaking-capacity-mcb-editorial.webp",[12,18502,18503,18504,18507,18508,18510],{},"Die grootheid staat los van de nominale stroom op de kap. Een ",[1300,18505,18506],{},"C16"," van 3 kA en een ",[1300,18509,18506],{}," van 10 kA beschermen dezelfde leiding tegen dezelfde overbelasting — ze verschillen alleen in hoeveel kortsluitenergie ze zelf overleven bij het onderbreken.",[12,18512,18513,18514,18517,18518,11307,18521,18524],{},"Wat telt is dus niet wat jij kiest, maar welke kortsluitstroom er op de ",[15,18515,18516],{},"plaats van installatie"," te verwachten is. Het AREI zegt het letterlijk: het onderbrekingsvermogen van een beschermingsinrichting tegen kortsluiting moet ",[15,18519,18520],{},"ten minste gelijk zijn aan de te verwachten kortsluitstroom op de plaats waar het toestel aangebracht is, zoals bepaald volgens de regels van goed vakmanschap",[17563,18522,18523],{},"onderafdeling 4.4.2.1",", punt 1).",[41,18526,18528],{"id":18527},"welk-onderbrekingsvermogen-eist-het-arei-in-een-woning","Welk onderbrekingsvermogen eist het AREI in een woning?",[12,18530,18531,18532,18535],{},"Anders dan bij de nominale stroom blijft het hier niet bij een principe: voor huishoudelijke installaties noemt ",[17563,18533,18534],{},"onderafdeling 5.3.5.5 punt e"," concrete cijfers.",[12,18537,18538,18539,18542,18543,18546],{},"Het vertrekpunt is een bovengrens, geen toesteleigenschap. Aan de ",[15,18540,18541],{},"uitgangsklemmen van de eerste beschermingsinrichtingen tegen overstroom, geplaatst na de algemene differentieelstroombeschermingsinrichting(en)",", mag de te verwachten eenfasige kortsluitstroom ",[15,18544,18545],{},"niet groter zijn dan 3.000 A",". Stroomopwaarts van die uitgangsklemmen gelden minima:",[49,18548,18549,18565],{},[52,18550,18551],{},[55,18552,18553,18556,18562],{},[58,18554,18555],{},"Plaats in de installatie",[58,18557,18558,18559,17566],{},"Eis van het AREI (",[17563,18560,18561],{},"5.3.5.5 e",[58,18563,18564],{},"Gebruikelijke toestelkeuze",[68,18566,18567,18581,18594,18607,18621,18635],{},[55,18568,18569,18572,18578],{},[73,18570,18571],{},"Beschermingsinrichting tegen overstroom van de distributienetbeheerder (voor de meter)",[73,18573,18574,18575],{},"minimum onderbrekingsvermogen ",[15,18576,18577],{},"6.000 A",[73,18579,18580],{},"toestel van de DNB, niet jouw keuze",[55,18582,18583,18586,18591],{},[73,18584,18585],{},"Smeltzekeringen en penautomaten van de installatie",[73,18587,18574,18588],{},[15,18589,18590],{},"3.000 A",[73,18592,18593],{},"bestaand materieel, vandaag zelden nieuw geplaatst",[55,18595,18596,18599,18604],{},[73,18597,18598],{},"Beschermingsinrichtingen tegen overstroom van de installatie in het algemeen",[73,18600,18574,18601,18603],{},[15,18602,18590],{},", aanduiding „3000\" in een rechthoek",[73,18605,18606],{},"automaat met Icn 3 kA of hoger",[55,18608,18609,18612,18618],{},[73,18610,18611],{},"Eerste automaten stroomafwaarts van het DNB-toestel (penautomaten uitgezonderd)",[73,18613,18614,18615],{},"bijkomend een markering voor ",[15,18616,18617],{},"energiebeperkingsklasse 3",[73,18619,18620],{},"automaat met klasse 3-markering",[55,18622,18623,18626,18632],{},[73,18624,18625],{},"Differentieelstroombeschermingsinrichtingen en schakelinrichtingen",[73,18627,18628,18629],{},"weerstaan aan ",[15,18630,18631],{},"I²t ≥ 22,5 kA²s bij 3.000 A",[73,18633,18634],{},"differentieel met «3000 A, 22,5 kA2s» (In ≤ 40 A)",[55,18636,18637,18640,18647],{},[73,18638,18639],{},"Vertrekautomaten stroomafwaarts van bovengenoemde uitgangsklemmen",[73,18641,18642,18643,18646],{},"volgen uit ",[17563,18644,18645],{},"4.4.2.1"," punt 1 de daar heersende kortsluitstroom (≤ 3.000 A)",[73,18648,18649],{},"automaat met Icn ≥ 3 kA",[12,18651,18652],{},"Twee lezingen vallen daarmee weg. Ten eerste „3 kA volstaat altijd\" — dat geldt enkel zolang de bovengrens van 3.000 A aan die uitgangsklemmen effectief gerespecteerd wordt. Ten tweede „6 kA is verplicht\" — de 6.000 A slaan op het toestel van de distributienetbeheerder, niet op jouw vertrekautomaten. 6 kA in de verdeelkast is een gangbare en onschadelijke reserve, maar geen AREI-eis voor de vertrekken.",[12,18654,18655,18656,18658],{},"Voor niet-huishoudelijke installaties noemt het AREI zulke cijfers niet. Daar geldt alleen ",[17563,18657,18523],{}," punt 1, en moet de kortsluitstroom op de plaats van plaatsing bepaald worden.",[41,18660,18662],{"id":18661},"wat-is-het-verschil-tussen-icn-icu-en-ics-en-welke-waarde-staat-op-een-huishoudelijke-automaat","Wat is het verschil tussen Icn, Icu en Ics — en welke waarde staat op een huishoudelijke automaat?",[12,18664,18665,18666,18669,18670,18673],{},"Die drie afkortingen komen niet uit het AREI maar uit de productnormen van de toestellen. Het AREI verwijst daarvoor uitdrukkelijk naar de door de Koning bekrachtigde of door het NBN geregistreerde normen (",[17563,18667,18668],{},"onderafdeling 5.3.5.5 punt d"," voor smeltzekeringen, ",[17563,18671,18672],{},"punt a"," voor de kalibreerelementen).",[1450,18675,18676,18689,18695],{},[1453,18677,18678,18681,18682,18685,18686,18688],{},[15,18679,18680],{},"Icn"," — nominaal kortsluitonderbrekingsvermogen volgens IEC 60898-1, de norm voor vermogensschakelaars voor huishoudelijk gebruik. Dat is de waarde die een DIN-railautomaat in een Belgische woningverdeelkast draagt. Ze staat als amperewaarde ",[15,18683,18684],{},"zonder eenheid in een rechthoek"," op het toestel — de „3000\" uit ",[17563,18687,18561],{}," is precies die aanduiding.",[1453,18690,18691,18694],{},[15,18692,18693],{},"Icu"," — ultiem kortsluitonderbrekingsvermogen volgens IEC 60947-2, de norm voor vermogensschakelaars in industriële toepassingen. Het toestel onderbreekt de kortsluiting, maar hoeft daarna niet meer bedrijfsklaar te zijn.",[1453,18696,18697,18700],{},[15,18698,18699],{},"Ics"," — bedrijfskortsluitonderbrekingsvermogen volgens dezelfde norm: de stroom waarna het toestel verder in dienst mag blijven. Ics wordt uitgedrukt als percentage van Icu (bijvoorbeeld 50 %, 75 % of 100 %).",[12,18702,18703,18704,18706],{},"Gevolg voor het schema: teken je een woning, dan documenteer je ",[15,18705,18680],{},". Icu en Ics duiken pas op wanneer er een vermogensschakelaar volgens IEC 60947-2 in het bord zit, bijvoorbeeld als hoofdschakelaar van een grotere installatie.",[12,18708,18709,18710,18713,18714,7763],{},"Het AREI heeft daarnaast een eigen begrip voor het versterkte geval: is de stroomafwaartse beschermingsinrichting een vermogensschakelaar en de stroomopwaartse een smeltzekering of een vermogensschakelaar, dan laat die techniek toe dat de stroomafwaartse automaat een ",[15,18711,18712],{},"versterkt ultiem onderbrekingsvermogen"," heeft (",[17563,18715,18716],{},"onderafdeling 4.4.1.3",[41,18718,18720],{"id":18719},"waarvan-hangt-de-kortsluitstroom-op-de-plaats-van-plaatsing-af","Waarvan hangt de kortsluitstroom op de plaats van plaatsing af?",[12,18722,18723],{},"De te verwachten kortsluitstroom is geen eigenschap van jouw installatie alleen. Hij volgt uit de impedantie van de volledige lus, van de voedende transformator tot de foutplaats, en daalt met elke meter leiding:",[1450,18725,18726,18732,18738,18744],{},[1453,18727,18728,18731],{},[15,18729,18730],{},"Vermogen en kortsluitspanning van de voedende transformator"," — hoe groter de cabine, hoe hoger de kortsluitstroom aan laagspanningszijde.",[1453,18733,18734,18737],{},[15,18735,18736],{},"Lengte en doorsnede van de aansluitleiding"," van de distributiekabel tot de meterkast.",[1453,18739,18740,18743],{},[15,18741,18742],{},"Lengte en doorsnede van de leidingen binnen de installatie"," — daarom ligt de waarde aan een vertrekautomaat altijd lager dan aan de voeding.",[1453,18745,18746,18749],{},[15,18747,18748],{},"Aantal en aard van de in serie liggende verbindingen"," — klemmen, verzamelrails, kamrails.",[12,18751,18752,18753,18756,18757,18760],{},"Het AREI weerspiegelt dat in de documentatieplicht. Voor niet-huishoudelijke installaties moeten onder meer de kenmerken van de bronnen (schijnbaar vermogen, nominale spanningen, nominale stromen, impedanties) worden opgegeven, samen met plaatsingswijze, aantal geleiders, doorsnede en ",[15,18754,18755],{},"lengte van de elektrische leidingen"," — en uitdrukkelijk de hoogste te verwachten kortsluitstromen boven 3.000 A op het voedingspunt en in elk schakel- en verdeelbord (",[17563,18758,18759],{},"onderafdeling 3.1.2.2 punt b","). Precies die grootheden gaan de berekening in.",[12,18762,18763,18766,18767,18524],{},[15,18764,18765],{},"Het betrouwbare cijfer voor jouw aansluiting levert de distributienetbeheerder."," De waarde hangt af van het cabinevermogen en de aansluitlengte; een vuistregel voor „de Belgische woningaansluiting\" is geen ontwerpbasis. Vraag het cijfer op in plaats van het te schatten – het AREI vraagt een bepaling „volgens de regels van goed vakmanschap\" (",[17563,18768,18523],{},[41,18770,18772],{"id":18771},"wat-als-het-onderbrekingsvermogen-ter-plaatse-niet-volstaat","Wat als het onderbrekingsvermogen ter plaatse niet volstaat?",[12,18774,18775,18776,18779,18780,18783],{},"Het AREI laat een automaat met een te laag onderbrekingsvermogen uitdrukkelijk toe — maar onder één voorwaarde. ",[17563,18777,18778],{},"Onderafdeling 4.4.1.3"," stelt: het is toegelaten een beschermingsinrichting te gebruiken met een onderbrekingsvermogen kleiner dan de aangenomen kortsluitstroom op het punt van plaatsing, maar ",[15,18781,18782],{},"stroomopwaarts moet dan een ander toestel geplaatst worden dat ten minste het nodige onderbrekingsvermogen bezit",". Dat stroomopwaartse toestel laat dan niet meer energie door dan het stroomafwaartse toestel en de beschermde leidingen zonder beschadiging kunnen verdragen.",[12,18785,18786,18787,18790,18791,18794,18795,7763],{},"Zijn beide in serie geplaatste toestellen vermogensschakelaars, dan noemt het AREI die begeleidingsbescherming ",[15,18788,18789],{},"filiatie",". En het zegt er meteen bij waar de dimensionering vandaan komt: om de karakteristieken van de filiatie te bepalen, moeten de ",[15,18792,18793],{},"filiatietabellen van de beschermingsinrichtingen"," opgevraagd worden, opgesteld volgens de productnormen van de vermogensschakelaars (",[17563,18796,18716],{},[12,18798,18799,18800,39],{},"Dat is het kernpunt: filiatie valt niet te berekenen en niet uit datasheets af te leiden, maar volgt enkel uit de beproefde combinatie van twee concrete toesteltypes van dezelfde of een vrijgegeven fabrikant. Hoe dat uitpakt in een installatie met onderverdeelborden per verdieping, staat in ",[30,18801,18803],{"href":18802},"\u002Fnl\u002Fblog\u002Fmeerdere-verdiepingen-elektriciteit-plannen","Elektriciteit plannen over meerdere verdiepingen",[41,18805,18807],{"id":18806},"waar-komt-het-onderbrekingsvermogen-in-het-eendraadschema-en-waarom-wil-de-keuring-het-zien","Waar komt het onderbrekingsvermogen in het eendraadschema, en waarom wil de keuring het zien?",[12,18809,18810,18811,18814,18815,18817],{},"Het eendraadschema van een huishoudelijke installatie moet ",[15,18812,18813],{},"type en kenmerken van de beschermingsinrichtingen tegen overstroom"," aanduiden (",[17563,18816,18006],{},"). Het onderbrekingsvermogen is zo'n kenmerk; de omkaderde amperewaarde hoort dus naast de nominale stroom en de karakteristiek bij de automaat.",[12,18819,18820,18821,18824,18825,18827,18828,18830,18831,18834,18835,11307,18841,18844],{},"Voor ",[15,18822,18823],{},"niet-huishoudelijke"," installaties is dat nog explicieter. Daar somt ",[17563,18826,18759],{}," de kenmerken van de beschermingsinrichtingen apart op en vermeldt uitdrukkelijk „de nominale stroom; het ",[15,18829,18487],{},"; de aard en de kenmerken van de onderbreking met inbegrip van de instellingen\". En de markering van elk schakel- en verdeelbord draagt daar naast volgnummer, voedingsspanning en geaard netsysteem ook ",[15,18832,18833],{},"de te verwachten maximale kortsluitstroom ter hoogte van het bord"," en, indien van toepassing, ",[15,18836,18837,18838],{},"het gebruik van de filiatietechniek volgens ",[17563,18839,18840],{},"4.4.1.3",[17563,18842,18843],{},"onderafdeling 3.1.3.3 punt b","). De keurder kan de streefwaarde dus op het bord aflezen en met de automaten vergelijken.",[12,18846,18847,18848,18851,18852,11307,18855,18858],{},"Er is nog een tweede reden. Het ",[15,18849,18850],{},"overschrijden van het toegelaten kortsluitvermogen voor het geïnstalleerd materieel"," noemt het AREI uitdrukkelijk als voorbeeld van een ",[15,18853,18854],{},"belangrijke wijziging of belangrijke uitbreiding",[17563,18856,18857],{},"afdeling 2.11.2",") — en een belangrijke wijziging vraagt een nieuwe gelijkvormigheidscontrole. Wordt de aansluiting verzwaard of de cabine gewijzigd, controleer dan ook de automaten – anders ontstaat naast een technisch ook een formeel probleem.",[12,18860,18861,18862,11307,18865,18867],{},"Op het toestel zelf is de aanduiding hoe dan ook voorgeschreven: „3000\" in een rechthoek bij kleine vermogensschakelaars, en bij differentieelinrichtingen zonder overstroombeveiliging met In ≤ 40 A de vermelding «3000 A, 22,5 kA2s» — samen op eenzelfde vlak en ",[15,18863,18864],{},"zichtbaar na installatie",[17563,18866,18534],{},"). Staat de waarde in het schema, dan is die visuele vergelijking ter plaatse in een oogwenk gebeurd.",[41,18869,18871],{"id":18870},"wat-is-het-verschil-met-de-nominale-stroom-en-met-de-bcd-karakteristiek","Wat is het verschil met de nominale stroom en met de B\u002FC\u002FD-karakteristiek?",[12,18873,18874],{},"Drie verschillende eigenschappen, drie verschillende regels — ze worden geregeld door elkaar gehaald:",[49,18876,18877,18890],{},[52,18878,18879],{},[55,18880,18881,18884,18887],{},[58,18882,18883],{},"Eigenschap",[58,18885,18886],{},"Beantwoordt de vraag",[58,18888,18889],{},"Bepalende plaats",[68,18891,18892,18911,18924],{},[55,18893,18894,18899,18902],{},[73,18895,18896],{},[15,18897,18898],{},"Nominale stroom",[73,18900,18901],{},"Vanaf wanneer schakelt de automaat af wegens overbelasting?",[73,18903,18904,1934,18907,18910],{},[17563,18905,18906],{},"onderafdeling 4.4.1.4",[17563,18908,18909],{},"tabel 4.11",": maximum per doorsnede",[55,18912,18913,18918,18921],{},[73,18914,18915],{},[15,18916,18917],{},"Karakteristiek B\u002FC\u002FD",[73,18919,18920],{},"Hoe snel schakelt hij af bij welk veelvoud van de nominale stroom?",[73,18922,18923],{},"productnorm IEC 60898-1; het AREI schrijft geen kromme voor",[55,18925,18926,18931,18934],{},[73,18927,18928],{},[15,18929,18930],{},"Onderbrekingsvermogen",[73,18932,18933],{},"Welke kortsluitstroom overleeft hij bij het onderbreken?",[73,18935,18936,18938,18939],{},[17563,18937,18523],{}," punt 1, voor woningen aangevuld door ",[17563,18940,18561],{},[12,18942,18943,18946,18947,18950,18951,18954,18955,39],{},[17563,18944,18945],{},"Tabel 4.11"," begrenst uitsluitend de ",[15,18948,18949],{},"nominale stroom"," per doorsnede — 1,5 mm² ten hoogste 16 A, 2,5 mm² ten hoogste 20 A, 6 mm² ten hoogste 40 A enzovoort. Over het onderbrekingsvermogen zegt ze niets. Een ",[1300,18952,18953],{},"C20"," op 2,5 mm² kan volledig conform de tabel zijn en op het onderbrekingsvermogen toch tekortschieten. De volledige toewijzing doorsnede ↔ nominale stroom staat in ",[30,18956,18958],{"href":18957},"\u002Fnl\u002Fblog\u002Fkabeldoorsnede-automaat","Kabeldoorsnede en automaat",[12,18960,18961,18962,18964],{},"De karakteristiek gaat over de werkingstijd. Het AREI eist daarover enkel dat de stroom na een zuivere kortsluiting onderbroken wordt vóór de geleidertemperatuur de toelaatbare grens overschrijdt, en geeft daarvoor de adiabatische formule (",[17563,18963,18523],{},", punt 2). Welke letter past, volgt uit de last en de leidinglengte, niet uit een AREI-voorschrift.",[41,18966,18968],{"id":18967},"hoe-leg-je-het-onderbrekingsvermogen-vast-in-planelec","Hoe leg je het onderbrekingsvermogen vast in PlanElec?",[12,18970,18971,18972,18975],{},"Twee gegevens werken samen. De ",[15,18973,18974],{},"kortsluitstroom (Icc)"," aan de voeding stel je in bij de projecteigenschappen onder de netconfiguratie; keuzemogelijkheden zijn 3, 4,5, 6 en 10 kA, met kA of A als weergave-eenheid. De waarde verschijnt in het eendraadschema onder het opschrift van de netaansluiting.",[12,18977,10081,18978,18981,18982,18985,18986,18988],{},[15,18979,18980],{},"onderbrekingsvermogen Icn"," stel je per automaat in: selecteer de automaat in het eendraadschema en open in de inspector het veld „Onderbrekingsvermogen Icn\". Beschikbaar zijn „Niet gedocumenteerd\" en 3, 4,5, 6, 10, 15, 20 en 25 kA. Sinds de update van 28 augustus 2026 verschijnt een ingestelde waarde als omkaderde amperewaarde bij de automaat — 3 kA als ",[1300,18983,18984],{},"3000",", zonder eenheid, zoals ",[17563,18987,18561],{}," het voor de toestelmarkering voorschrijft — en blijft ze identiek in editor, voorbeeld en pdf. Waarden boven 25 kA worden niet als rechthoek getekend, omdat IEC 60898-1 daar ophoudt.",[12,18990,18991],{},"„Niet gedocumenteerd\" is bewust een aparte toestand en geen stille 3 kA: in het schema staat alleen wat je op het toestel echt hebt afgelezen.",[41,18993,18995],{"id":18994},"wat-de-arei-zelfcontrole-bij-het-onderbrekingsvermogen-controleert","Wat de AREI-zelfcontrole bij het onderbrekingsvermogen controleert",[12,18997,18998],{},"De regel „Uitschakelvermogen tegenover kortsluitstroom\" werkt met de twee gegevens uit de vorige sectie:",[1450,19000,19001,19012,19019],{},[1453,19002,19003,19004,19007,19008,19011],{},"Ze vergelijkt de Icn van elke automaat met de drempel ",[1300,19005,19006],{},"min(Icc aan de voeding, 3 kA)"," en meldt een ",[15,19009,19010],{},"fout"," wanneer het toestel daaronder blijft.",[1453,19013,19014,19015,19018],{},"Ze beoordeelt alleen met ",[15,19016,19017],{},"uitdrukkelijk ingestelde Icc",". Ontbreekt die waarde, dan zie je „Uitschakelvermogen niet beoordeelbaar\" – de controle geldt als onvolledig, niet als geslaagd.",[1453,19020,19021],{},"Ontbreekt bij een automaat de Icn, dan meldt ze „niet gedocumenteerd\" als open gegevenshiaat.",[12,19023,19024,19025,19027,19028,19030],{},"De taken zijn duidelijk verdeeld. Icc is invoer: de waarde komt van de distributienetbeheerder of uit de berekening volgens de regels van goed vakmanschap. Filiatie volgens ",[17563,19026,18840],{}," staaf je met de combinatietabellen van de fabrikant. Energiebeperkingsklasse 3 en de I²t-weerstand van de differentiëlen (22,5 kA²s bij 3.000 A, ",[17563,19029,18561],{},") lees je af op het echte toestel. De beoordeling van de uitgevoerde installatie doet het erkend organisme.",[41,19032,6947],{"id":6946},[1450,19034,19035,19039,19045,19050,19056],{},[1453,19036,19037],{},[30,19038,18958],{"href":18957},[1453,19040,19041],{},[30,19042,19044],{"href":19043},"\u002Fnl\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen: opbouw en modulekeuze",[1453,19046,19047],{},[30,19048,17467],{"href":19049},"\u002Fnl\u002Fblog\u002Fdifferentieel-type-a-vs-type-b",[1453,19051,19052],{},[30,19053,19055],{"href":19054},"\u002Fnl\u002Fblog\u002Faarding-tt-tns-belgie","Aarding TT en TN-S in België",[1453,19057,19058],{},[30,19059,18803],{"href":18802},[12,19061,19062],{},[30,19063,19064],{"href":6989},"Onderbrekingsvermogen documenteren in PlanElec →",[12,19066,19067],{},[17563,19068,19069,19070,19074],{},"Reglementaire basis: AREI\u002FRGIE Boek 1 V06 — afdelingen 2.6.4 en 2.11.2, onderafdelingen 3.1.2.2, 3.1.3.3, 4.4.1.3, 4.4.1.4 met tabel 4.11, 4.4.2.1 en 5.3.5.5. Icn, Icu en Ics komen uit IEC 60898-1 respectievelijk IEC 60947-2, niet uit het AREI. De officiële tekst van de ",[30,19071,19073],{"href":15357,"rel":19072},[2532],"FOD Economie"," is bepalend.",{"title":1467,"searchDepth":1468,"depth":1468,"links":19076},[19077,19078,19079,19080,19081,19082,19083,19084,19085,19086],{"id":18480,"depth":1468,"text":18481},{"id":18527,"depth":1468,"text":18528},{"id":18661,"depth":1468,"text":18662},{"id":18719,"depth":1468,"text":18720},{"id":18771,"depth":1468,"text":18772},{"id":18806,"depth":1468,"text":18807},{"id":18870,"depth":1468,"text":18871},{"id":18967,"depth":1468,"text":18968},{"id":18994,"depth":1468,"text":18995},{"id":6946,"depth":1468,"text":6947},"faq","2026-09-21","Wat 3 kA, 6 kA en 10 kA betekenen, welke minimumwaarden het AREI voor huishoudelijke installaties noemt, waarvan de kortsluitstroom op de plaats van plaatsing afhangt en hoe de waarde in het eendraadschema komt.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-breaking-capacity-mcb-editorial.jpg","\u002Fblog\u002Fbreaking-capacity-mcb.nl",{"title":18474,"description":19089},"uitschakelvermogen-automaat-ka","blog\u002Fbreaking-capacity-mcb.nl",[3275,3276,18487,19097,19098,3273,14346,1513],"kortsluitstroom","vermogensschakelaar","S2M5_wIwhga6k-rntQnFkKrDsaotAsw0YoDuOQfGOKA","\u002Fblog\u002Fuitschakelvermogen-automaat-ka",{"id":19102,"title":19103,"body":19104,"category":4028,"description":19433,"extension":1496,"guideId":19434,"image":19435,"locale":1497,"meta":19436,"navigation":1499,"order":19437,"path":19438,"publishedAt":19439,"readTime":14340,"seo":19440,"seoTitle":4037,"slug":19441,"stem":19442,"tags":19443,"updatedAt":9347,"__hash__":19446,"kind":2491,"href":6559,"date":19439},"help\u002Fhelp\u002Fstudio-aktivitaet-assistent.nl.md","Hoe gebruik ik activiteit en de assistent in de studio?",{"type":9,"value":19105,"toc":19423},[19106,19111,19115,19124,19134,19137,19141,19144,19150,19191,19198,19202,19222,19228,19231,19237,19255,19260,19312,19314,19319,19323,19328,19390,19393,19396,19400,19406,19413,19417],[12,19107,19108,19110],{},[15,19109,7061],{}," brengt uw gesprekken en opdrachten aan de PlanElec-assistent samen met bevestigde projectwijzigingen. De assistent is beschikbaar voor elke aangemelde gebruiker: hij voert opdrachten meteen uit in het project, controleert elke wijziging met de AREI-zelfcheck en houdt ze klaar als één stap ongedaan maken. Bevestigde projectwijzigingen van het team verschijnen zodra projectgeschiedenis voor uw account is ingeschakeld.",[41,19112,19114],{"id":19113},"hoe-open-ik-het-paneel","Hoe open ik het paneel?",[12,19116,19117,19118,19120,19121,19123],{},"Open een project in de studio. Gebruik de schakelaar onderaan de zijbalk met werkmodi (rail), de botknop rechts in de kopbalk of ",[15,19119,7069],{}," op een Mac \u002F ",[15,19122,7073],{},". Het paneel verschijnt naast het werkvlak; op smalle schermen opent het als een uitschuifpaneel.",[12,19125,9364,19126,19129,19130,19133],{},[15,19127,19128],{},"⌘K \u002F Ctrl+K"," opent u de opdrachtenzoeker. Daarna verschijnt ",[15,19131,19132],{},"Naar de assistent sturen: ‘…’"," wanneer uw zoekopdracht geen resultaten heeft of minstens vier woorden bevat. Zodra u deze optie kiest, opent het paneel en wordt de zoektekst meteen als opdracht verstuurd.",[12,19135,19136],{},"De projectgeschiedenis in het projectmenu of via de geschiedenisknop opent in de studio de teamactiviteit. Buiten de studio opent een apart geschiedenisvenster.",[41,19138,19140],{"id":19139},"wat-tonen-de-filters","Wat tonen de filters?",[12,19142,19143],{},"De tijdlijn groepeert gebeurtenissen per dag, met de nieuwste dag bovenaan. Binnen een dag staan ze van vroeg naar laat. Bovenaan ziet u ook hoeveel leden online zijn.",[12,19145,19146,19147,39],{},"Elke wijziging van een lid toont wie het project heeft gewijzigd: avatar en naam, de wijziging en het tijdstip. Een lid dat het project heeft verlaten, verschijnt als ",[15,19148,19149],{},"Voormalig lid",[49,19151,19152,19161],{},[52,19153,19154],{},[55,19155,19156,19159],{},[58,19157,19158],{},"Filter",[58,19160,1288],{},[68,19162,19163,19173,19182],{},[55,19164,19165,19170],{},[73,19166,19167],{},[15,19168,19169],{},"Alles",[73,19171,19172],{},"Geladen projectwijzigingen, berichten en acties van de assistent.",[55,19174,19175,19179],{},[73,19176,19177],{},[15,19178,15775],{},[73,19180,19181],{},"Alle geladen projectwijzigingen, ook assistentwijzigingen in opdracht van andere teamleden.",[55,19183,19184,19188],{},[73,19185,19186],{},[15,19187,15771],{},[73,19189,19190],{},"Gesprekken en acties van de assistent, plus opgeslagen wijzigingen met de assistent als oorsprong.",[12,19192,19193,19194,19197],{},"De filterbalk verschijnt wanneer zowel geschiedenis als assistent beschikbaar zijn. Is slechts één onderdeel ingeschakeld, dan ziet u de inhoud daarvan meteen. U kunt oudere projectwijzigingen laden. Als het doel nog beschikbaar is, brengt ",[15,19195,19196],{},"Tonen"," u naar de huidige toestand, niet naar een historische projectkopie.",[41,19199,19201],{"id":19200},"hoe-geef-en-controleer-ik-een-opdracht","Hoe geef en controleer ik een opdracht?",[1602,19203,19204,19207,19212,19215],{},[1453,19205,19206],{},"Typ uw vraag of beschrijf de gewenste wijziging in het invoerveld.",[1453,19208,7985,19209,19211],{},[15,19210,7112],{}," of druk op Enter. Shift+Enter voegt een nieuwe regel toe.",[1453,19213,19214],{},"Controleer het antwoord en de actiekaarten. Die vermelden het hulpmiddel, de status en de opdrachtgever.",[1453,19216,19217,19218,1628,19220,39],{},"Vereist een actie bevestiging, controleer ze dan en kies ",[15,19219,6637],{},[15,19221,7349],{},[12,19223,19224,19225,19227],{},"Zolang een opdracht loopt, wordt de verzendknop ",[15,19226,9648],{}," (vierkant pictogram). Daarmee stopt u de lopende opdracht; al uitgevoerde wijzigingen worden hierdoor niet automatisch ongedaan gemaakt.",[41,19229,6802],{"id":19230},"hoe-dicteer-ik-een-opdracht",[12,19232,19233,19234,19236],{},"Als uw browser microfoonopnames ondersteunt, staat rechts in de invoerbalk de microfoonknop ",[15,19235,6787],{},". De eerste keer vraagt uw browser toestemming om de microfoon voor PlanElec te gebruiken.",[1602,19238,19239,19244,19247,19252],{},[1453,19240,19241,19242,39],{},"Zet de cursor op de plaats in het invoerveld waar de tekst moet komen en kies ",[15,19243,6787],{},[1453,19245,19246],{},"Spreek uw opdracht in de taal van de interface in, bijvoorbeeld: “Hal, noordmuur: drie stopcontacten, 30 centimeter boven de afgewerkte vloer.” Niveaubalken en een timer tonen dat er wordt opgenomen.",[1453,19248,7985,19249,19251],{},[15,19250,6791],{}," (vinkje) of druk op Enter. Na een korte omzetting verschijnt de herkende tekst op de cursorpositie.",[1453,19253,19254],{},"Controleer en verbeter de tekst en verzend hem zoals gewoonlijk. Gedicteerde tekst wordt nooit automatisch verzonden.",[12,19256,19257,19259],{},[15,19258,7118],{}," (X) of Esc beëindigt de opname zonder tekst. Een opname stopt automatisch na 2 minuten; tien seconden vooraf verandert de timer van kleur. Blokkeert de browser de microfoon, dan verschijnt er een melding onder het invoerveld; sta de toegang dan toe in de site-instellingen van uw browser.",[49,19261,19262,19271],{},[52,19263,19264],{},[55,19265,19266,19268],{},[58,19267,8306],{},[58,19269,19270],{},"Melding onder het invoerveld",[68,19272,19273,19281,19289,19297,19304],{},[55,19274,19275,19278],{},[73,19276,19277],{},"Toegang tot de microfoon geblokkeerd",[73,19279,19280],{},"Toegang toestaan in de browserinstellingen",[55,19282,19283,19286],{},[73,19284,19285],{},"Geen microfoon gevonden",[73,19287,19288],{},"Microfoon aansluiten of ander toestel gebruiken",[55,19290,19291,19294],{},[73,19292,19293],{},"Niets verstaan",[73,19295,19296],{},"Opnieuw en duidelijker spreken",[55,19298,19299,19301],{},[73,19300,7600],{},[73,19302,19303],{},"Even wachten",[55,19305,19306,19309],{},[73,19307,19308],{},"AI-tegoed onvoldoende",[73,19310,19311],{},"De omzetting telt mee voor het AI-tegoed",[41,19313,7425],{"id":7424},[12,19315,7428,19316,19318],{},[15,19317,6791],{}," stuurt uw browser de opname naar PlanElec. PlanElec stuurt ze via de AI-dienst OpenRouter door naar het spraakherkenningsmodel Scribe van ElevenLabs en krijgt alleen de herkende tekst terug. Het verzoek vraagt aanbieders die de gegevens niet bewaren en niet voor training gebruiken. PlanElec bewaart noch de opname noch de tekst ervan; alleen wat u daarna als opdracht verzendt, wordt opgeslagen. Verworpen opnames verlaten uw toestel niet.",[41,19320,19322],{"id":19321},"kan-de-assistent-dozen-met-exacte-maten-op-een-muur-plaatsen","Kan de assistent dozen met exacte maten op een muur plaatsen?",[12,19324,19325,19326,39],{},"Ja. Eén zin met ruimte, muur, afstand en hoogte volstaat, bijvoorbeeld: ‘Gang, noordmuur: drie stopcontacten, 30 cm boven de afgewerkte vloer, de eerste op 45 cm van de linkerhoek, asafstand 71 mm’. De assistent geeft de maten door in meter; de exacte positie wordt daaruit berekend. In dit voorbeeld zitten de drie stopcontacten in één gemeenschappelijk afdekraam, met de assen op 0,45 m, 0,521 m en 0,592 m. U kunt de zin typen of inspreken met ",[15,19327,6787],{},[49,19329,19330,19340],{},[52,19331,19332],{},[55,19333,19334,19337],{},[58,19335,19336],{},"In de zin",[58,19338,19339],{},"Toepassing",[68,19341,19342,19350,19358,19366,19374,19382],{},[55,19343,19344,19347],{},[73,19345,19346],{},"‘noordmuur’, ‘oostmuur’",[73,19348,19349],{},"De muur die vanuit de ruimte gezien naar die windrichting wijst. De ingestelde noordrichting is bepalend; zonder ingestelde noordrichting geldt de bovenkant van het plan als noorden en het resultaat vermeldt dat.",[55,19351,19352,19355],{},[73,19353,19354],{},"‘van de linkerhoek’, ‘van de rechterhoek’",[73,19356,19357],{},"Links en rechts gelden vanuit de ruimte, met de blik naar de muur. Er wordt gemeten op het binnenvlak vanaf de binnenhoek; de dikte van de aangrenzende muur is dus al afgetrokken.",[55,19359,19360,19363],{},[73,19361,19362],{},"‘de eerste op 45 cm’, ‘midden op 1,20 m’",[73,19364,19365],{},"Afstand tot de eerste as van de doos of tot het midden van het afdekraam.",[55,19367,19368,19371],{},[73,19369,19370],{},"‘asafstand 71 mm’, ‘dubbel stopcontact’",[73,19372,19373],{},"Meerdere dozen in één gemeenschappelijk afdekraam met 71 mm asafstand, maximaal vijf. Een andere asafstand wordt geweigerd.",[55,19375,19376,19379],{},[73,19377,19378],{},"‘op 1,5 m van elkaar’",[73,19380,19381],{},"Afzonderlijke afdekramen met die afstand van midden tot midden.",[55,19383,19384,19387],{},[73,19385,19386],{},"‘30 cm boven de afgewerkte vloer’",[73,19388,19389],{},"Hoogte van het midden van de doos, opgeslagen als eigen montagehoogte. Zonder hoogte geldt de standaardhoogte van het toesteltype.",[12,19391,19392],{},"Meerdere stopcontacten in één afdekraam worden één toestel met meerdere stopcontacten, zoals een dubbel stopcontact. Schakelaars, ethernet- en coaxaansluitingen in één afdekraam vormen een gemeenschappelijk afdekraam. Mogelijk zijn stopcontacten, spatwaterdichte stopcontacten, schakelaars, rolluikschakelaars (alleen enkel) en ethernet- en coaxaansluitingen. Drukknoppen plaatst de assistent nog altijd één voor één.",[12,19394,19395],{},"Past een gegeven niet, dan plaatst de assistent niets en noemt hij de reden: bijvoorbeeld wanneer de positie in een deur valt, er op die plek op dezelfde hoogte al een doos zit, de hoogte boven de hoogte van de ruimte ligt of meerdere muren van de ruimte in dezelfde richting wijzen. Er wordt niets stilzwijgend verschoven. Op verzoek maakt de assistent eerst een voorbeeld zonder iets te wijzigen. De geplaatste rij is één stap ongedaan maken.",[41,19397,19399],{"id":19398},"hoe-herken-ik-een-wijziging-van-de-assistent","Hoe herken ik een wijziging van de assistent?",[12,19401,19402,19403,19405],{},"Elke agentactie verschijnt met de opdrachtgever in het activiteitenpaneel. Opgeslagen assistentwijzigingen krijgen in de projectgeschiedenis een bottegel en ",[15,19404,15764],{},". De naam hoort bij het lid dat de opdracht gaf, ook wanneer u wijzigingen van een ander teamlid bekijkt. Met toegang tot de geschiedenis blijft deze aanduiding zichtbaar, ook zonder eigen chattoegang.",[12,19407,19408,19409,19412],{},"Buiten de studio staat in het geschiedenisvenster een klein botpictogram naast de uitvoerder. Beweeg de muis erover of geef het toetsenbordfocus: de tooltip toont ",[15,19410,19411],{},"Assistent in opdracht van …",". Gesprekken en acties die alleen informatie lezen zijn geen opgeslagen projectwijzigingen.",[41,19414,19416],{"id":19415},"kan-ik-een-agentactie-ongedaan-maken","Kan ik een agentactie ongedaan maken?",[12,19418,19419,19420,19422],{},"Ondersteunde, voltooide projectwijzigingen bieden ",[15,19421,6795],{}," op de actiekaart. Deze knop is alleen actief voor de laatste geschikte wijziging met een geldig herstelitem en een passende projectcontext. Antwoorden, leesacties en niet-ondersteunde acties hebben deze mogelijkheid niet. Een geschiedenisitem op zich is geen herstelknop. Controleer na het ongedaan maken de actiestatus en het project.",{"title":1467,"searchDepth":1468,"depth":1468,"links":19424},[19425,19426,19427,19428,19429,19430,19431,19432],{"id":19113,"depth":1468,"text":19114},{"id":19139,"depth":1468,"text":19140},{"id":19200,"depth":1468,"text":19201},{"id":19230,"depth":1468,"text":6802},{"id":7424,"depth":1468,"text":7425},{"id":19321,"depth":1468,"text":19322},{"id":19398,"depth":1468,"text":19399},{"id":19415,"depth":1468,"text":19416},"Volg projectwijzigingen en assistentopdrachten in de studio, controleer de opdrachtgever en geef de PlanElec-assistent opdrachten in uw eigen woorden.","studio-activity-assistant","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fstudio-activity-assistant-nl.webp",{},10,"\u002Fhelp\u002Fstudio-aktivitaet-assistent.nl","2026-09-15",{"title":19103,"description":19433},"studio-activiteit-assistent","help\u002Fstudio-aktivitaet-assistent.nl",[19444,19445,15771,4588],"Studio","Projectgeschiedenis","Dx8CHQc8ON831YGuF1nCgeUiJA7Rfs7rJmFoqmN1a7Y",{"id":19448,"title":16418,"articleId":19449,"body":19450,"category":19584,"date":19585,"description":19586,"extension":1496,"image":19471,"lastUpdated":15381,"locale":1497,"meta":19587,"navigation":1499,"ogImage":19588,"path":19589,"publishDate":19585,"readTime":19590,"refreshInterval":4037,"seo":19591,"seoTitle":4037,"slug":19592,"stem":19593,"tags":19594,"__hash__":19597,"kind":1515,"href":16417},"blog\u002Fblog\u002Finstallation-topology.nl.md","installation-topology",{"type":9,"value":19451,"toc":19578},[19452,19466,19472,19476,19479,19485,19488,19492,19495,19500,19503,19508,19512,19546,19552,19555,19559,19571,19574],[12,19453,19454,19455,19458,19459,19461,19462,19465],{},"Een toestel op het grondplan toont ",[15,19456,19457],{},"waar"," het staat. De nieuwe weergave ",[15,19460,12532],{}," maakt ook duidelijk ",[15,19463,19464],{},"waardoor"," het gevoed en beveiligd wordt. Dezelfde toestellen vormen vervolgens de basis voor onderverdelers, kastopbouw en eendraadschema. Je voert elke verbruiker maar één keer in.",[12,19467,19468],{},[22,19469],{"alt":19470,"src":19471},"Elektriciens bereiden de planning van een verdeelkast voor.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-installation-topology-editorial.webp",[41,19473,19475],{"id":19474},"eerst-elektrisch-plannen-daarna-de-kast-kiezen","Eerst elektrisch plannen, daarna de kast kiezen",[12,19477,19478],{},"Elektrische structuur en fysieke uitvoering beantwoorden verschillende vragen. Een stroomkring kan al gepland zijn terwijl verdeler, behuizing of rijindeling nog openstaan. Zulke ontwerpen blijven na opslaan en herladen behouden; open punten blijven zichtbaar gemarkeerd.",[422,19480],{":height":614,":width":19481,"alt":19482,"caption":19483,"src":19484},"1440","Volledige installatie van de voorbeeldwoning met voeding, beveiligingen en verbruikers.","Voeding, beveiligingen en verbruikers vormen één installatie. De fysieke verdelerplanning kan nog openstaan.","\u002Fhelp\u002Finstallation-topology\u002Fnl-02-installation-overview.png",[12,19486,19487],{},"Selecteer een verbruiker om zijn voedings- en beveiligingspad te zien. Zoeken en inklapbare delen maken de installatie leesbaar; in de boomweergave bereik je alle acties ook op smalle schermen.",[41,19489,19491],{"id":19490},"een-voorbeeld-met-bestaande-toestellen","Een voorbeeld met bestaande toestellen",[12,19493,19494],{},"In het fictieve voorbeeld wijs je een bestaand stopcontact in de woonkamer toe aan een stroomkring. Daarna selecteer je de samenhorende beveiligingen voor de verdieping. Het voorbeeld toont voedingspunt, modules en gevolgen voor toewijzingen voordat je de onderverdeler aanmaakt.",[422,19496],{":height":19497,":width":716,"alt":19498,"caption":19498,"src":19499},"618","Voorbeeld voor het vormen van de onderverdeler verdieping.","\u002Fhelp\u002Finstallation-topology\u002Fnl-04-board-preview.png",[12,19501,19502],{},"Het bevestigde kader stelt de fysieke verdeler en zijn ingebouwde toestellen voor. Gevoede contactdozen en lampen blijven erbuiten. De voedingskabel plan je uitdrukkelijk met beveiliging en kabelgegevens; een getekend kader voegt geen onbekende toestellen toe.",[422,19504],{":height":614,":width":19481,"alt":19505,"caption":19506,"src":19507},"Onderverdeler en verbruikers buiten het kader in dezelfde installatie.","Geselecteerde beveiligingen worden na controle aan een fysieke verdeler toegewezen. De gevoede verbruikers blijven buiten het kader.","\u002Fhelp\u002Finstallation-topology\u002Fnl-05-board-created.png",[41,19509,19511],{"id":19510},"verder-werken-in-hetzelfde-project","Verder werken in hetzelfde project",[49,19513,19514,19523],{},[52,19515,19516],{},[55,19517,19518,19521],{},[58,19519,19520],{},"Volgende weergave",[58,19522,3006],{},[68,19524,19525,19532,19539],{},[55,19526,19527,19529],{},[73,19528,1721],{},[73,19530,19531],{},"Modules, rijen en behuizing uitwerken met de ingevoerde ruimteaannames",[55,19533,19534,19536],{},[73,19535,3764],{},[73,19537,19538],{},"Dezelfde elektrische installatie op documentbladen controleren",[55,19540,19541,19543],{},[73,19542,956],{},[73,19544,19545],{},"Documenten van de opgeslagen versie met zichtbare status maken",[422,19547],{":height":19548,":width":19481,"alt":19549,"caption":19550,"src":19551},"900","Afgeleid eendraadschema van het voorbeeldproject.","Het eendraadschema en de geëxporteerde plannen komen uit dezelfde opgeslagen projectversie.","\u002Fhelp\u002Finstallation-topology\u002Fnl-07-derived-schema.png",[12,19553,19554],{},"Behuizingsvoorstellen gebruiken modulebehoefte, ingevoerde reserve en toebehoren. Met generieke toestellen of zonder montagegegevens is het resultaat een schatting; zodra je fabrikantgegevens en montagevoorwaarden invoert, wordt het concreet. Schema en dossier leveren de documenten; de vakmatige vrijgave doet de elektricien, de keuring het erkende organisme.",[41,19556,19558],{"id":19557},"wat-verandert-er-voor-bestaande-projecten","Wat verandert er voor bestaande projecten?",[12,19560,19561,19562,19566,19567,39],{},"Bestaande toestellen en verdelers blijven bruikbaar. De nieuwe weergave maakt hun elektrische structuur als één installatie leesbaar; de verdeelkasteditor blijft bewerkbaar voor de concrete opbouw. De voorgestelde volgorde is een startpunt en geen blokkade: je werkt verder in de weergave die bij je taak past. Wie net begint, vindt de eerste stappen in ",[30,19563,19565],{"href":19564},"\u002Fblog\u002Faan-de-slag-met-planelec","Aan de slag met PlanElec","; hoe meubels, 3D-weergaven en lichtsferen het plan aanvullen, lees je in ",[30,19568,19570],{"href":19569},"\u002Fblog\u002F3d-meubels-lichtplanning","Meubels, 3D-weergaven en lichtsferen in PlanElec",[12,19572,19573],{},"De geïllustreerde handleiding behandelt toewijzing, open ontwerpen, onderverdelers, voedingskabels, kastplanning en export stap voor stap.",[12,19575,19576,39],{},[30,19577,14194],{"href":11068},{"title":1467,"searchDepth":1468,"depth":1468,"links":19579},[19580,19581,19582,19583],{"id":19474,"depth":1468,"text":19475},{"id":19490,"depth":1468,"text":19491},{"id":19510,"depth":1468,"text":19511},{"id":19557,"depth":1468,"text":19558},"product_update","2026-09-13","De nieuwe installatieboom verbindt bestaande toestellen, beveiligingspaden, onderverdelers en documenten in één planningsproces.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-installation-topology-editorial.jpg","\u002Fblog\u002Finstallation-topology.nl","4 min",{"title":16418,"description":19586},"van-grondplan-naar-installatie-en-verdeelkast","blog\u002Finstallation-topology.nl",[1337,19595,19596],"Installation","Topology","MXisgcxtJPmniDVrqNEy40YpqGTQpGo061Ovd7fTa5o",{"id":19599,"title":14194,"body":19600,"category":4028,"description":20084,"extension":1496,"guideId":19449,"image":20085,"locale":1497,"meta":20086,"navigation":1499,"order":20087,"path":20088,"publishedAt":19585,"readTime":20089,"seo":20090,"seoTitle":4037,"slug":20091,"stem":20092,"tags":20093,"updatedAt":20096,"__hash__":20097,"kind":2491,"href":11068,"date":19585},"help\u002Fhelp\u002Finstallation-topology.nl.md",{"type":9,"value":19601,"toc":20070},[19602,19607,19610,19614,19638,19641,19644,19648,19697,19702,19706,19727,19730,19735,19739,19746,19763,19768,19775,19779,19782,19815,19830,19835,19839,19842,19845,19849,19854,19858,19861,19905,19910,19915,19919,19936,19940,19947,19951,19954,19958,19995,19998,20003,20006,20009,20012,20017,20022,20026,20031,20035,20041,20048,20057,20061,20064],[12,19603,12598,19604,19606],{},[15,19605,12532],{}," plant u welke beveiliging welke stroomkring en verbruikers voedt. U gebruikt de toestellen die al op het grondplan staan. Een behuizing of vaste moduleplaatsen zijn nog niet nodig. Vervolgens vormt u onderverdelers, werkt u de kastopbouw uit en controleert u het afgeleide eendraadschema.",[12,19608,19609],{},"Deze handleiding volgt één fictieve voorbeeldwoning in hetzelfde projectbestand. De afbeeldingen tonen echte productweergaven van dat project. De volgorde helpt u op weg; bestaande projecten en andere zinvolle startpunten blijven mogelijk. Een planningsweergave of geëxporteerd ontwerp bevestigt niet dat een installatie elektrisch veilig is.",[41,19611,19613],{"id":19612},"snel-starten-van-verdeler-naar-topologie","Snel starten: van verdeler naar topologie",[1602,19615,19616,19619,19628,19635],{},[1453,19617,19618],{},"Plaats verbruikers en een verdeler op het grondplan.",[1453,19620,19621,19622,19625,19626,39],{},"Selecteer de verdeler en ",[15,19623,19624],{},"Installatie automatisch aanvullen",". Dezelfde actie staat bij ",[15,19627,12532],{},[1453,19629,19630,19631,19634],{},"Controleer de doelverdeler, nieuwe stroomkringen, beveiligingen en benodigde ruimte. ",[15,19632,19633],{},"Voorstel toepassen"," vult de planning aan en opent de topologie van de verdeler.",[1453,19636,19637],{},"Open de kastweergave om de voorbereide indeling te controleren.",[12,19639,19640],{},"Alle niet-toegewezen verbruikers zonder toewijzing aan een andere verdeler worden meegenomen. Bestaande stroomkringen, kabelgegevens en moduleposities blijven behouden. Een nog niet geconfigureerde kast krijgt een behuizingsvoorstel; onvoldoende ruimte in een bestaande behuizing wordt gemeld. Toestellen die handmatige planning vereisen en ontbrekende voedingsgegevens blijven open. Eén stap ongedaan maken herstelt de vorige toestand. Als het project wijzigt, controleer dan het bijgewerkte voorstel voordat u het toepast. Het voorbeeld toont elke geplande toewijzing per ruimte met stroombaan, beveiliging en differentieelschakelaar. Een lege stroombaan waarvan de naam overeenkomt met de verbruiker wordt hergebruikt in plaats van een extra beveiliging aan te maken.",[12,19642,19643],{},"De volgende onderdelen leggen de handmatige bewerking en controle van de installatie uit.",[41,19645,19647],{"id":19646},"waarvoor-dient-elke-weergave","Waarvoor dient elke weergave?",[49,19649,19650,19659],{},[52,19651,19652],{},[55,19653,19654,19656],{},[58,19655,7790],{},[58,19657,19658],{},"Wat u hier plant",[68,19660,19661,19669,19676,19683,19690],{},[55,19662,19663,19666],{},[73,19664,19665],{},"Grondplan \u002F situatieschema",[73,19667,19668],{},"Plaats van toestellen en ruimtelijke kabelwegen",[55,19670,19671,19673],{},[73,19672,12532],{},[73,19674,19675],{},"Voeding, beveiligingspaden, stroomkringen en verdelergrenzen",[55,19677,19678,19680],{},[73,19679,1721],{},[73,19681,19682],{},"Concrete toestellen, behuizing, rijen en moduleplaatsen",[55,19684,19685,19687],{},[73,19686,3764],{},[73,19688,19689],{},"Documentweergave van dezelfde elektrische installatie",[55,19691,19692,19694],{},[73,19693,956],{},[73,19695,19696],{},"Documenten van de opgeslagen projectversie met zichtbare controlestatus",[12,19698,19699],{},[30,19700],{"id":19701},"assignment",[41,19703,19705],{"id":19704},"een-bestaand-grondplantoestel-toewijzen","Een bestaand grondplantoestel toewijzen",[1602,19707,19708,19714,19719,19724],{},[1453,19709,19710,19711,39],{},"Plaats toestellen op het grondplan of open een bestaand project. Zie ",[30,19712,19713],{"href":9307},"elektrische symbolen plaatsen en verbinden",[1453,19715,4167,19716,19718],{},[15,19717,12532],{},", zoek het toestel en selecteer het in de boom of grafische weergave.",[1453,19720,1857,19721,19723],{},[15,19722,12553],{},", kies de bestaande doelkring en bevestig.",[1453,19725,19726],{},"Controleer het getoonde beveiligingspad. De verwijzing naar het grondplan brengt u naar het bijbehorende symbool.",[12,19728,19729],{},"U wijst hetzelfde toestel toe. Maak geen tweede verbruiker om die in het schema te zien. In het voorbeeld krijgt de bestaande woonkamercontactdoos haar stroomkring.",[422,19731],{":height":19548,":width":19481,"alt":19732,"caption":19733,"src":19734},"Dezelfde woonkamercontactdoos op het grondplan na haar elektrische toewijzing.","Het grondplansymbool blijft bestaan; alleen de elektrische toewijzing is aangevuld.","\u002Fhelp\u002Finstallation-topology\u002Fnl-01-floorplan-assignment.png",[41,19736,19738],{"id":19737},"verbruikers-verplaatsen-in-de-lijst-met-stroombanen","Verbruikers verplaatsen in de lijst met stroombanen",[12,19740,19741,19742,19745],{},"De weergave ",[15,19743,19744],{},"Stroombanen"," toont per verdeelbord en differentieelschakelaar elke eindstroombaan met haar verbruikers, het totaal van het opgegeven vermogen en de fase. Verbruikers zonder stroombaan staan bovenaan.",[1602,19747,19748,19755,19758],{},[1453,19749,4167,19750,19752,19753,39],{},[15,19751,12532],{}," en kies de weergave ",[15,19754,19744],{},[1453,19756,19757],{},"Sleep een verbruiker naar de gewenste stroombaan. Zijn kabels verhuizen mee.",[1453,19759,9364,19760,19762],{},[15,19761,6795],{}," draait u de stap volledig terug.",[12,19764,19765,19766,39],{},"Alleen elementen die rechtstreeks aan de automaat hangen, zijn verplaatsbaar; een aftakdoos neemt haar verbruikers mee. De ruimtefilter toont alleen stroombanen die de gekozen ruimte voeden. Zonder muis selecteert u de verbruiker en gebruikt u ",[15,19767,12553],{},[422,19769],{":height":19770,":width":19771,"alt":19772,"caption":19773,"src":19774},"810","1370","Lijst met stroombanen van het voorbeeldhuis met hoofdverdeler en onderverdeling verdieping.","Elke stroombaan staat met aanduiding, nominale stroom, fase en verbruikers onder haar differentieelschakelaar.","\u002Fhelp\u002Finstallation-topology\u002Fnl-10-circuit-list.png",[41,19776,19778],{"id":19777},"openstaande-taken-afwerken","Openstaande taken afwerken",[12,19780,19781],{},"Zonder selectie toont het zijpaneel de openstaande taken – één regel per probleem, niet per toestel.",[49,19783,19784,19793],{},[52,19785,19786],{},[55,19787,19788,19790],{},[58,19789,8023],{},[58,19791,19792],{},"Oplossing in het zijpaneel",[68,19794,19795,19805],{},[55,19796,19797,19800],{},[73,19798,19799],{},"Verbruikers zonder stroombaan",[73,19801,19802,19804],{},[15,19803,12546],{}," opent het voorstel van de automatische planning",[55,19806,19807,19810],{},[73,19808,19809],{},"Verdeelbord open: elektrisch verbonden, maar aan geen verdeelbord toegewezen",[73,19811,19812,19814],{},[15,19813,12572],{}," opent het voorbeeld voor de hele keten vanaf het bovenste toestel",[12,19816,19817,19818,19821,19822,19825,19826,19829],{},"Daaronder staan acties voor de volledige installatie. ",[15,19819,19820],{},"Fasen balanceren"," verdeelt eenfasige stroombanen bij een driefasige aansluiting gelijkmatiger over L1–L3, zonder moduleplaatsen te verschuiven. ",[15,19823,19824],{},"Ontbrekende kabels aanvullen"," maakt alleen ontbrekende kabels aan; bestaande kabels en hun gegevens blijven ongewijzigd. ",[15,19827,19828],{},"Kabeltracés berekenen"," vult ontbrekende tracés op het plan aan en laat manueel getekende tracés ongewijzigd.",[12,19831,19832],{},[30,19833],{"id":19834},"supply-path",[41,19836,19838],{"id":19837},"het-volledige-voedings-en-beveiligingspad-lezen","Het volledige voedings- en beveiligingspad lezen",[12,19840,19841],{},"Ga terug naar de installatie. Netaansluiting, meter, beveiligingen, stroomkringen en verbruikers blijven samen bereikbaar. Selecteer een verbruiker om zijn pad naar de voeding te zien. Gebruik toestelreferenties en kringlabels om grondplan en schema te vergelijken.",[12,19843,19844],{},"Zoeken, in-\u002Fuitklappen en de boomweergave helpen bij grote projecten. Ingeklapte delen blijven aanwezig. Stuurrelaties, schakelfuncties en bustoewijzingen zijn aanvullende relaties; maak er geen willekeurige voedingsverbindingen van.",[422,19846],{":height":19770,":width":19771,"alt":19847,"caption":19848,"src":19484},"Installatieoverzicht van de voorbeeldwoning met voedingsketen en verbruikers.","Het overzicht gebruikt de bestaande projecttoestellen.",[12,19850,19851],{},[30,19852],{"id":19853},"draft",[41,19855,19857],{"id":19856},"verder-plannen-zonder-vastgelegde-verdeelkast","Verder plannen zonder vastgelegde verdeelkast",[12,19859,19860],{},"Een nog te bepalen verdeler is een bewaarbare ontwerpstatus. Sla het project op en laad het opnieuw: de open toewijzing blijft bestaan en wordt niet automatisch bij een hoofdverdeler ondergebracht.",[49,19862,19863,19871],{},[52,19864,19865],{},[55,19866,19867,19869],{},[58,19868,3606],{},[58,19870,10895],{},[68,19872,19873,19881,19889,19897],{},[55,19874,19875,19878],{},[73,19876,19877],{},"Elektrisch niet toegewezen",[73,19879,19880],{},"Voeding of stroomkring bepalen",[55,19882,19883,19886],{},[73,19884,19885],{},"Elektrisch verbonden, verdeler open",[73,19887,19888],{},"Een passende fysieke groep plannen",[55,19890,19891,19894],{},[73,19892,19893],{},"Verdeler bepaald, opbouw open",[73,19895,19896],{},"Voeding controleren, behuizing en modules uitwerken",[55,19898,19899,19902],{},[73,19900,19901],{},"Modules geplaatst",[73,19903,19904],{},"Opbouw, elektrische gegevens en documenten controleren",[422,19906],{":height":19770,":width":19771,"alt":19907,"caption":19908,"src":19909},"Elektrisch gepland installatiedeel waarvan de fysieke verdeler nog openstaat.","Een elektrische verbinding betekent nog geen afgewerkte kastopbouw.","\u002Fhelp\u002Finstallation-topology\u002Fnl-03-draft-without-board.png",[12,19911,19912],{},[30,19913],{"id":19914},"distribution-board",[41,19916,19918],{"id":19917},"van-een-selectie-een-onderverdeler-maken","Van een selectie een onderverdeler maken",[1602,19920,19921,19924,19930,19933],{},[1453,19922,19923],{},"Selecteer de samenhorende beveiligingen. Gebruik de afzonderlijke selectievakjes in de boom of meervoudige selectie in de grafische weergave.",[1453,19925,1857,19926,19929],{},[15,19927,19928],{},"Verdeelbord vormen uit selectie"," en geef die een duidelijke naam.",[1453,19931,19932],{},"Lees het voorbeeld: voedingspunt, modules, verbruikers buiten de kast, bestaande verdelergrenzen en getroffen plaatsingen.",[1453,19934,19935],{},"Bevestig alleen een geschikte selectie. Bij tegenstrijdige keuzes verklaart de toepassing waarom; pas de selectie aan.",[422,19937],{":height":19497,":width":716,"alt":19938,"caption":19939,"src":19499},"Voorbeeld van de onderverdeler verdieping met voedingspunt, modules en gevolgen.","Een selectiekader alleen legt nog geen blijvende verdelergrens vast.",[12,19941,19942,19943,19946],{},"Na bevestiging horen de beveiligingen bij de nieuwe fysieke verdeler. De gevoede contactdozen en lampen staan ",[15,19944,19945],{},"buiten"," het kader. Elektrisch achtergeschakelde onderverdelers zijn geen behuizingen die in elkaar zitten.",[422,19948],{":height":19770,":width":19771,"alt":19949,"caption":19950,"src":19507},"Bevestigde onderverdeler met beveiligingen binnen en verbruikers buiten het kader.","Tot een verdeler behoren en door die verdeler gevoed worden zijn verschillende begrippen.",[12,19952,19953],{},"Controleer vervolgens de voeding: selecteer de werkelijk voorgeschakelde beveiliging en geef kabelgegevens op, zoals aderenaantal, doorsnede en lengte. Bevestig die verbinding uitdrukkelijk. Groeperen verzint geen beveiliging of voedingskabel. De radiale planning vereist één eenduidig bovenliggend voedingspad; lokale bronnen zoals PV worden afzonderlijk behandeld.",[41,19955,19957],{"id":19956},"wat-gebeurt-er-bij-verwijderen","Wat gebeurt er bij verwijderen?",[49,19959,19960,19969],{},[52,19961,19962],{},[55,19963,19964,19967],{},[58,19965,19966],{},"Actie",[58,19968,11428],{},[68,19970,19971,19979,19987],{},[55,19972,19973,19976],{},[73,19974,19975],{},"Verdeler groepering opheffen",[73,19977,19978],{},"De fysieke groep verdwijnt; elektrische toestellen blijven beschikbaar",[55,19980,19981,19984],{},[73,19982,19983],{},"Moduleplaatsing verwijderen",[73,19985,19986],{},"Het toestel verlaat zijn rijpositie; het elektrische toestel blijft bestaan",[55,19988,19989,19992],{},[73,19990,19991],{},"Elektrisch toestel verwijderen",[73,19993,19994],{},"Het inhoudelijke object en de betrokken verbindingen veranderen",[12,19996,19997],{},"Lees telkens het voorbeeld of de bevestiging en controleer de betrokken weergaven. Samenhorende inhoudelijke wijzigingen zijn te volgen via ongedaan maken\u002Fopnieuw uitvoeren.",[12,19999,20000],{},[30,20001],{"id":20002},"cabinet",[41,20004,14207],{"id":20005},"modules-en-behuizing-uitwerken",[12,20007,20008],{},"Open de verdeelkast vanuit de geselecteerde onderverdeler. Bestaande toestellen worden overgenomen en ongeplaatste modules blijven vindbaar. Kies concrete modules, controleer hun breedte in module-eenheden (TE) en plan de rijen.",[12,20010,20011],{},"De behuizingsplanning toont de modulebehoefte en gebruikt de ingevoerde reserve en ruimte voor klemmen\u002Ftoebehoren. Controleer montagewijze, bedradingsruimte, warmteafvoer en fabrikantvoorwaarden. Bij generieke modules of ontbrekende gegevens blijft de ruimte een schatting. Een voorgestelde behuizing is geen uitvoeringsgoedkeuring.",[422,20013],{":height":19548,":width":19481,"alt":20014,"caption":20015,"src":20016},"Kasteditor met de overgenomen onderverdeler en behuizingsplanning.","Elektrische toewijzing en rijpositie zijn afzonderlijk bewerkbaar. Herschikken binnen dezelfde kast verandert het beveiligingspad niet.","\u002Fhelp\u002Finstallation-topology\u002Fnl-06-cabinet-planning.png",[12,20018,20019],{},[30,20020],{"id":20021},"schema-export",[41,20023,20025],{"id":20024},"het-eendraadschema-controleren-en-documenten-exporteren","Het eendraadschema controleren en documenten exporteren",[12,20027,4167,20028,20030],{},[15,20029,3764],{},". Dezelfde verbruikers, beveiligingen en verdelers verschijnen in de documentweergave. Controleer de bladen per verdeler en de kruisverwijzingen. Het schema wordt uit het projectmodel gerenderd en is geen schermafbeelding van de installatieboom.",[422,20032],{":height":19548,":width":19481,"alt":20033,"caption":20034,"src":19551},"Eendraadschema afgeleid uit het gemeenschappelijke projectmodel.","Verschuiven of zoomen in de topologieweergave verandert geen PDF-coördinaten.",[12,20036,20037,20038,20040],{},"Ga naar ",[15,20039,956],{},", controleer de opgeslagen versie en kies de gewenste documenten. Open toewijzingen, kabelgegevens en controles blijven zichtbaar. Een download die als ontwerp wordt aangeboden, blijft een ontwerp. Documentproductie vervangt geen vakcontrole of officiële keuring.",[422,20042],{":height":20043,":width":20044,"alt":20045,"caption":20046,"src":20047},"1273","1800","Echte exportuitvoer uit het opgeslagen voorbeeldproject.","Ook dit document gebruikt dezelfde toestellen. De zichtbare status geeft aan waarvoor het bedoeld is.","\u002Fhelp\u002Finstallation-topology\u002Fnl-08-export-result.png",[12,20049,20050,20051,933,20054,39],{},"Lees verder: ",[30,20052,20053],{"href":2451},"documenten exporteren",[30,20055,20056],{"href":2457},"wat controleert de zelfcontrole?",[41,20058,20060],{"id":20059},"werken-op-tablet-smartphone-of-met-toetsenbord","Werken op tablet, smartphone of met toetsenbord",[12,20062,20063],{},"Op smalle schermen staat de boomweergave centraal. Gebruik selectievakjes en benoemde acties voor toewijzing en onderverdelers. Met de pijltjestoetsen beweegt u door de boom, met Enter opent u de selectie en met de spatiebalk voegt u een element toe aan de meervoudige selectie.",[422,20065],{":height":20066,":width":471,"alt":20067,"caption":20068,"src":20069},"844","Mobiele boomweergave met dezelfde toestellen en bereikbare planningsacties.","De grafische weergave en de boom bewerken hetzelfde project.","\u002Fhelp\u002Finstallation-topology\u002Fnl-09-mobile-tree.png",{"title":1467,"searchDepth":1468,"depth":1468,"links":20071},[20072,20073,20074,20075,20076,20077,20078,20079,20080,20081,20082,20083],{"id":19612,"depth":1468,"text":19613},{"id":19646,"depth":1468,"text":19647},{"id":19704,"depth":1468,"text":19705},{"id":19737,"depth":1468,"text":19738},{"id":19777,"depth":1468,"text":19778},{"id":19837,"depth":1468,"text":19838},{"id":19856,"depth":1468,"text":19857},{"id":19917,"depth":1468,"text":19918},{"id":19956,"depth":1468,"text":19957},{"id":20005,"depth":1468,"text":14207},{"id":20024,"depth":1468,"text":20025},{"id":20059,"depth":1468,"text":20060},"Wijs bestaande grondplantoestellen toe, controleer beveiligingspaden en werk een elektrische planning uit tot onderverdelers, kastopbouw en eendraadschema.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Finstallation-topology.webp",{},9,"\u002Fhelp\u002Finstallation-topology.nl","9 min.",{"title":14194,"description":20084},"installatie-plannen-en-onderverdelers-vormen","help\u002Finstallation-topology.nl",[12532,20094,20095,1721,3764],"Topologie","Onderverdeler","2026-10-07","jsx7XgYJ4dpE2VCWdY9wIyJgfM5hP9BP0TzudYrd7ZY",{"id":20099,"title":20100,"articleId":20101,"body":20102,"category":19584,"date":20227,"description":20228,"extension":1496,"image":20116,"lastUpdated":15381,"locale":1497,"meta":20229,"navigation":1499,"ogImage":20230,"path":20231,"publishDate":20227,"readTime":19590,"refreshInterval":4037,"seo":20232,"seoTitle":20233,"slug":20234,"stem":20235,"tags":20236,"__hash__":20237,"kind":1515,"href":19569},"blog\u002Fblog\u002F3d-furniture-lighting.nl.md","PlanElec krijgt meer diepte: meubels, 3D-weergaven en lichtsferen","3d-furniture-lighting",{"type":9,"value":20103,"toc":20220},[20104,20111,20117,20122,20126,20129,20132,20136,20146,20151,20162,20166,20169,20172,20177,20183,20187,20190,20195,20198,20203,20207,20210],[12,20105,20106,20107,20110],{},"Waar komt de sofa? Hoe werkt een hanglamp boven de eettafel? En hoe liggen de verdiepingen boven elkaar? Met deze update bekijk je je planning in PlanElec ruimtelijk en bespreek je ze makkelijker met klant en team: ",[15,20108,20109],{},"meubels, bijpassende 2D-bovenaanzichten en een illustratieve lichtvoorvertoning vullen de 3D-viewer aan."," De 3D-weergave is beschikbaar voor alle gebruikers.",[12,20112,20113],{},[22,20114],{"alt":20115,"src":20116},"Een elektricien en een klant bespreken de plaats van een hanglamp.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-3d-furniture-lighting-editorial.webp",[422,20118],{":height":16719,":width":16720,"alt":20119,"caption":20120,"src":20121},"Gemeubileerde woon- en eetruimte met open keuken in de 3D-viewer van PlanElec","De gemeubileerde woon- en eetruimte is zichtbaar in de 3D-viewer.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fnl-wohnen-3d.png",[41,20123,20125],{"id":20124},"meubels-geven-het-grondplan-schaal","Meubels geven het grondplan schaal",[12,20127,20128],{},"Een ruimte wordt tastbaar zodra de sofa, tafel en keukenkasten erin staan. De catalogus bevat 45 modellen voor wonen, eten, slapen, keuken en toestellen. Bij elk meubelmodel hoort een passend SVG-bovenaanzicht voor het 2D-plan. Positie, afmetingen en draaihoek vormen de gezamenlijke basis voor beide weergaven.",[12,20130,20131],{},"Zo zie je bijvoorbeeld meteen of een stopcontact handig naast de sofa ligt of een lamp bij de geplande eethoek past. Meubels plaats en draai je, je past hun afmetingen aan en verbergt ze wanneer nodig.",[41,20133,20135],{"id":20134},"eén-project-twee-perspectieven","Eén project, twee perspectieven",[12,20137,9364,20138,702,20140,933,20142,20145],{},[15,20139,8359],{},[15,20141,8362],{},[15,20143,20144],{},"Gesplitst"," schakel je tussen grondplan, ruimtelijk beeld en een directe vergelijking. De gesplitste weergave is ideaal voor overleg: links de positie in het plan, rechts de ruimtelijke context. Een tweede model heb je daarvoor niet nodig.",[422,20147],{":height":16719,":width":16720,"alt":20148,"caption":20149,"src":20150},"Dezelfde gemeubileerde ruimte naast elkaar als 2D-grondplan en 3D-weergave","De gedeelde weergave toont links het grondplan en rechts de 3D-viewer.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fnl-grundriss-und-3d.png",[12,20152,20153,20154,20157,20158,20161],{},"Ook bij het plaatsen heb je meer vrijheid: houd ",[15,20155,20156],{},"Shift"," ingedrukt om het vastklikken tijdelijk uit te schakelen. Op tablet en smartphone doet de schakelaar ",[15,20159,20160],{},"Vrij plaatsen"," hetzelfde. Bij meubels stel je zo ook de draaihoek in zonder vaste hoekstappen.",[41,20163,20165],{"id":20164},"lichtsferen-uitproberen","Lichtsferen uitproberen",[12,20167,20168],{},"De lichtplanning voegt hanglampen, spots en wandlampen toe als ontwerp. Je stelt positie en hoogte, kleurtemperatuur en relatieve helderheid, stralingshoek en kanteling in. Met groepen bedien je bijvoorbeeld eethoek en zithoek samen.",[12,20170,20171],{},"Met aparte scènes voor dagelijks gebruik en de avond vergelijk je verschillende sferen. Omgevingshelderheid, ingeschakelde lampen en dimstanden veranderen de indruk van de ruimte; optionele lichtkegels tonen de richting van het licht. Een scène exporteer je daarna als afbeelding om ze tijdens een bespreking te delen.",[422,20173],{":height":16719,":width":16720,"alt":20174,"caption":20175,"src":20176},"Geëxporteerde avondscène met warm licht, schaduwen en zichtbare lichtkegels","De avondscène toont warme lichtbundels en de bediening van de voorvertoning.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fnl-lichtszene.png",[12,20178,20179,20182],{},[15,20180,20181],{},"De lichtvoorvertoning toont sfeer en richting."," Luxwaarden berekent ze niet; voor een verlichtingsstudie gebruik je een lichttechnisch rekenprogramma. Een lamp die je als ontwerp toevoegt, wordt pas na jouw uitdrukkelijke overname deel van de elektrische planning.",[41,20184,20186],{"id":20185},"verdiepingen-en-afmetingen-in-samenhang-bekijken","Verdiepingen en afmetingen in samenhang bekijken",[12,20188,20189],{},"De viewer toont naar keuze de actieve verdieping, het gestapelde gebouw of de verdiepingen uit elkaar getrokken. Zo bekijk je indeling en inrichting over meerdere verdiepingen samen.",[422,20191],{":height":16719,":width":16720,"alt":20192,"caption":20193,"src":20194},"Twee gemeubileerde verdiepingen in de uit elkaar getrokken 3D-weergave","De uit elkaar getrokken weergave toont beide gemeubileerde verdiepingen.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fnl-geschosse.png",[12,20196,20197],{},"Inschakelbare maatlijnen tonen afmetingen en ruimtehoogte. Niet-bevestigde standaardhoogtes blijven als aanname aangeduid, zodat je een planningswaarde nooit verwart met een gemeten waarde.",[422,20199],{":height":16719,":width":16720,"alt":20200,"caption":20201,"src":20202},"3D-weergave met ruimteafmetingen en een hoogte die als aanname is aangeduid","Maatlijnen tonen de afmetingen van de ruimte; de niet bevestigde hoogte blijft als aanname aangeduid.","\u002Fimages\u002Fblog\u002F3d-furniture-lighting\u002Fnl-abmessungen.png",[41,20204,20206],{"id":20205},"wat-je-ermee-wint","Wat je ermee wint",[12,20208,20209],{},"Inrichting en lichtideeën zitten in hetzelfde project als de elektrische planning. Je bespreekt stopcontacten, schakelaars en lampen op de plek waar meubels en mensen later echt staan, in plaats van op een abstracte lijn in het plan. Op kleine schermen of zonder WebGL werk je verder in de 2D-weergaven; het project blijft hetzelfde.",[12,20211,20212,20213,20215,20216,39],{},"De opnames tonen een voorbereid voorbeeldproject. Open je project, voeg meubels toe en schakel naar ",[15,20214,20144],{}," om grondplan en ruimtelijke weergave samen te zien. Het volledige aanbod staat in het ",[30,20217,20219],{"href":20218},"\u002Ffeatures","functieoverzicht",{"title":1467,"searchDepth":1468,"depth":1468,"links":20221},[20222,20223,20224,20225,20226],{"id":20124,"depth":1468,"text":20125},{"id":20134,"depth":1468,"text":20135},{"id":20164,"depth":1468,"text":20165},{"id":20185,"depth":1468,"text":20186},{"id":20205,"depth":1468,"text":20206},"2026-09-12","Meubels in je grondplan, 2D en 3D naast elkaar en een illustratieve lichtvoorvertoning: zo maak je je planning met deze update aanschouwelijk.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-3d-furniture-lighting-editorial.jpg","\u002Fblog\u002F3d-furniture-lighting.nl",{"title":20100,"description":20228},"PlanElec in 3D: meubels, 3D-weergaven en lichtsferen","3d-meubels-lichtplanning","blog\u002F3d-furniture-lighting.nl",[1337,8362,8575,8676],"7zaWyBBqOzHOhJTG9GpF5ONU7-JbhDPWbIKqXjU5Yx4",{"id":20239,"title":38,"body":20240,"category":2475,"description":20654,"extension":1496,"guideId":20655,"image":20396,"locale":1497,"meta":20656,"navigation":1499,"order":20657,"path":20658,"publishedAt":20227,"readTime":4035,"seo":20659,"seoTitle":4037,"slug":20660,"stem":20661,"tags":20662,"updatedAt":20663,"__hash__":20664,"kind":2491,"href":37,"date":20227},"help\u002Fhelp\u002Fknx-planning-documentation.nl.md",{"type":9,"value":20241,"toc":20641},[20242,20248,20253,20257,20260,20280,20286,20301,20307,20315,20321,20324,20328,20332,20338,20345,20352,20356,20373,20384,20390,20397,20401,20407,20412,20417,20421,20427,20432,20436,20442,20446,20455,20510,20513,20518,20522,20535,20538,20542,20548,20551,20555,20559,20573,20586,20589,20603,20607,20611,20614,20616],[12,20243,20244,20245,20247],{},"Met ingeschakelde ",[15,20246,444],{},"-planning documenteert PlanElec modules, kanalen, bedienpunten, toetsen, buslijnen en klemmen in hetzelfde project. Je exporteert kanaal- en klemmenplannen, functies per ruimte, logische topologie, aantallen en een overdrachtsdossier met zelfcontrolerapport. Een actief automatiseringsprofiel en toegang voor je account zijn vereist. Fysieke adressen, groepsadressen en datapunttypes bereidt PlanElec voor op de import in ETS; de programmering in ETS en een officieel conformiteitsattest vervangt de planning niet.",[12,20249,20250],{},[30,20251],{"id":20252},"practical-example",[41,20254,20256],{"id":20255},"praktijkvoorbeeld-twee-armaturen-bedienen-vanaf-twee-plaatsen","Praktijkvoorbeeld: twee armaturen bedienen vanaf twee plaatsen",[12,20258,20259],{},"Dit fictieve voorbeeld documenteert een plafondlamp en een wandlamp in de woonkamer, bediend met twee drukknoppen. De schermafbeeldingen tonen de Franse interface. Kanaaltoewijzingen, de melding over ontbrekend vermogen en de aantallen zijn gecontroleerd; de afbeeldingen tonen geen volledig gevalideerd installatiedossier.",[1602,20261,20262,20268,20274],{},[1453,20263,20264,20267],{},[15,20265,20266],{},"Profiel en apparaten:"," kies KNX in de projectmetadata. Plaats de twee armaturen en twee drukknoppen uit de categorie bedienpunten en sensoren op het situatieschema. Geef ze duidelijke, verschillende namen. Voeg de voeding en de actor toe aan het bord.",[1453,20269,20270,20273],{},[15,20271,20272],{},"Elektrische verbinding:"," controleer in Installatie de stroombaan, de voeding van de modules en hun bordtoewijzing. Is een armatuur niet beschikbaar in de lijst met ontvangers, controleer dan de elektrische verbinding. Een logische kanaaltoewijzing vervangt het beveiligingspad niet.",[1453,20275,20276,20279],{},[15,20277,20278],{},"Kanaal:"," wijs beide armaturen en beide drukknoppen toe aan CH1. Het voorbeeld gebruikt “Plafonnier salon”, “Applique salon”, “Poussoir entrée” en “Poussoir canapé”. De drukknoppen gebruiken hier een busaansluiting. Voeg een duidelijke notitie over de bedoelde functie toe.",[422,20281],{":height":20282,":width":20283,"alt":20284,"caption":20284,"src":20285},"220","1790","CH1 koppelt twee armaturen aan twee drukknoppen. De niet-toegewezen klem blijft zichtbaar. Franse interface, fictieve gegevens.","\u002Fhelp\u002Fknx-example\u002Ffr-04-matrice-affectations.jpg",[1602,20287,20289,20295],{"start":20288},4,[1453,20290,20291,20294],{},[15,20292,20293],{},"Ontbrekende gegevens:"," meldt de matrix een ontbrekend armatuurvermogen, vul dan de werkelijke apparaatgegevens in. Met de fictieve waarden van 24 W en 12 W verdween die melding. Dit is nog geen volledige controle van de elektrische compatibiliteit.",[1453,20296,20297,20300],{},[15,20298,20299],{},"Lijn en voeding:"," wijs de apparaten toe onder Lijnen en selecteer de voedingsmodule van de lijn expliciet. Controleer daarna de busstroom: onbekende bijdragen blijven open gegevens. Een logische lijn is geen opgemeten kabeltraject.",[422,20302],{":height":20303,":width":20304,"alt":20305,"caption":20305,"src":20306},"1009","2073","De lijn heeft een voeding van 640 mA, maar drie bijdragen aan de busstroom zijn onbekend. Het verbruik is dus nog niet volledig gecontroleerd. Franse interface.","\u002Fhelp\u002Fknx-example\u002Ffr-05-ligne-alimentation.jpg",[1602,20308,20309],{"start":1503},[1453,20310,20311,20314],{},[15,20312,20313],{},"Aantallen:"," open Export → Domotica en download de domotica-aantallen als ontwerp. Vergelijk het resultaat met de geplande apparaten. De gecontroleerde export bevat één voeding, één actor en twee drukknoppen. De twee armaturen staan niet in deze domoticalijst; vul ze aan vanuit het overige materiaaloverzicht. Dit voorbeeld levert geen kabellengtes of bestelnummers van fabrikanten.",[422,20316],{":height":20317,":width":20318,"alt":20319,"caption":20319,"src":20320},"1600","1132","Werkelijk geëxporteerde PDF: één voeding, één actor en twee drukknoppen. Het watermerk BROUILLON duidt een ontwerp aan, geen attest.","\u002Fhelp\u002Fknx-example\u002Ffr-06-quantites.png",[12,20322,20323],{},"Controleer voor de keuringsdocumenten ook het situatieschema, de apparaatkenmerken, het volledige eendraadschema en open exportmeldingen. De getoonde aantallen bevestigen die stappen niet. De volgende onderdelen lichten de beschikbare documenten en hun status toe.",[12,20325,20326],{},[30,20327],{"id":1598},[41,20329,20331],{"id":20330},"hoe-activeer-ik-domoticaplanning","Hoe activeer ik domoticaplanning?",[12,20333,20334,20335,20337],{},"Open de projectmetadata en kies het passende automatiseringsprofiel, bijvoorbeeld KNX. Profielen bepalen welke toestellen en verbindingen worden aangeboden. Met ingeschakelde toegang verschijnt ",[15,20336,444],{},". Ontbreekt dit onderdeel, dan is de functie niet beschikbaar voor dit project of account; alleen een profiel kiezen geeft geen toegang.",[12,20339,20340,20341,20344],{},"Een wissel tussen actieve systeemprofielen behoudt bestaande toewijzingen. De bevestigde keuze ",[15,20342,20343],{},"Geen gebouwautomatisering"," verwijdert daarentegen het logische Domotica-planningsdocument en de automatiseringstoewijzingen; geplaatste grondplantoestellen blijven behouden. Lees de bevestiging voordat u het profiel verwijdert en controleer behouden toestellen en aansluitingen na een wissel. Onbekende fabrikantgegevens blijven onbekend en moeten aan het werkelijke product worden getoetst.",[12,20346,20347,20350],{},[30,20348],{"id":20349},"devices",[30,20351],{"id":1733},[41,20353,20355],{"id":20354},"hoe-documenteer-ik-drukknoppen-en-hun-toetsen","Hoe documenteer ik drukknoppen en hun toetsen?",[12,20357,20358,20359,20361,20362,20365,20366,20368,20369,20372],{},"Plaats toestellen uit ",[15,20360,684],{}," op het grondplan. Selecteer een toestel en gebruik ",[15,20363,20364],{},"Bedieningspunt instellen",". Kies de werkelijke ",[15,20367,4204],{}," en controleer de ",[15,20370,20371],{},"Spanningsklasse",". Die klasse is een planningsgegeven, geen elektrisch bewijs.",[12,20374,20375,20376,20379,20380,20383],{},"Bij ",[15,20377,20378],{},"Toets- \u002F ingangstoewijzing"," koppel je gedocumenteerde toetsen aan kanalen. Eén bedienpunt kan meerdere kanalen bedienen; meerdere bedienpunten kunnen hetzelfde kanaal delen. Een toewijzing zonder toetsnummer blijft geldig, maar verschijnt als ",[15,20381,20382],{},"Toets niet gedocumenteerd"," in de functielijst. RF\u002FIP wordt als draadloze stuurverbinding getoond en maakt geen fysiek kabeltraject aan.",[12,20385,20386,20388],{},[30,20387],{"id":1671},[30,20389],{"id":1773},[422,20391],{":height":20392,":width":20393,"alt":20394,"caption":20395,"src":20396},"510","952","Kanaalmatrix met één CH1-kaart voor een plafondlamp en drukknopingang, ruimte en beveiliging, met een leeg klemveld.","De kaart documenteert CH1 met plafondlamp, drukknopingang, ruimte en beveiliging; het lege klemveld blijft zichtbaar als open planningsgegeven.","\u002Fhelp\u002Fworkflows\u002Fnl-domotica-channels.png",[41,20398,20400],{"id":20399},"hoe-maak-ik-het-kanaalblad-voor-de-kastdeur","Hoe maak ik het kanaalblad voor de kastdeur?",[12,20402,20403,20404,20406],{},"Plaats geschikte modules in het verdeelbord en voeg hun kanalen toe. De kanaalmatrix bij ",[15,20405,444],{}," koppelt elk kanaal aan verbruikers en bedienpunten. Gebruik begrijpelijke kanaalnamen en voeg zo nodig notities toe. Meerdere verbruikers en bedienpunten blijven volledig behouden; hun logische koppeling vervangt geen beveiligingspad of gedocumenteerd kabeltraject.",[12,20408,10081,20409,20411],{},[15,20410,86],{}," gebruikt dezelfde gegevens en sortering: verdeelbord, module, kanaal, verbruiker, ruimte, beveiliging, klem, bedienpunt en notitie. Kies het bord bij export en sorteer op module, beveiliging, ruimte of klem. De liggende A4-PDF dient als kastdeurblad; CSV is bedoeld voor verdere bewerking. Lege velden betekenen ontbrekende planningsgegevens, niet dat een onderdeel overbodig is.",[12,20413,20414],{},[30,20415],{"id":20416},"schema",[41,20418,20420],{"id":20419},"hoe-neem-ik-lijnen-en-klemmen-op","Hoe neem ik lijnen en klemmen op?",[12,20422,20423,20424,20426],{},"Wijs bij ",[15,20425,830],{}," modules en bedienpunten aan de geplande buslijnen toe en documenteer voedingen en eventuele koppelaars. Bekende busstromen en onbekende bijdragen staan apart. De topologie toont deze logische relaties; de verbindingslijnen zijn geen gemeten buskabeltrajecten.",[12,20428,1745,20429,20431],{},[15,20430,97],{}," een verdeelbord en beheer klemmenstroken, nummers, types, bestemmingen en handmatige bruggen. Voorinvullen vereist een uitdrukkelijke actie. De opgeslagen klemmen blijven de bron voor matrix en export; PDF-rijen schrijven geen nummering terug. Dit is geen bedradingsschema per afzonderlijke geleider.",[12,20433,20434],{},[30,20435],{"id":13570},[422,20437],{":height":20438,":width":20393,"alt":20439,"caption":20440,"src":20441},"141","Domotica-exportopties voor verdeelbord, sortering, versie en de status ontwerp of definitief.","Deze keuzes bepalen de omvang en status van de Domotica-export; ze bevestigen geen complete documentgegevens of geslaagde controle.","\u002Fhelp\u002Fworkflows\u002Fnl-domotica-export.png",[41,20443,20445],{"id":20444},"welke-onderdelen-bevat-het-domotica-overdrachtsdossier","Welke onderdelen bevat het domotica-overdrachtsdossier?",[12,20447,20448,20449,20451,20452,20454],{},"Open export en het onderdeel ",[15,20450,444],{},". Kies verdeelbord, sortering, versie en status. Elke documentkaart biedt een voorbeeld en PDF; kanaal- en klemmenplannen bieden ook CSV, de topologie ook SVG. ",[15,20453,963],{}," bundelt de zes documenttypes achter een voorblad.",[49,20456,20457,20466],{},[52,20458,20459],{},[55,20460,20461,20463],{},[58,20462,990],{},[58,20464,20465],{},"Inhoud en grens",[68,20467,20468,20475,20482,20489,20496,20503],{},[55,20469,20470,20472],{},[73,20471,86],{},[73,20473,20474],{},"Alle kanaaltoewijzingen voor de gekozen borden, A4 liggend",[55,20476,20477,20479],{},[73,20478,97],{},[73,20480,20481],{},"Gedocumenteerde klemmen, bestemmingen en bruggen, A4 liggend",[55,20483,20484,20486],{},[73,20485,108],{},[73,20487,20488],{},"Toetsen en verbruikers in gewone taal; geplande functies, geen geverifieerde programmering",[55,20490,20491,20493],{},[73,20492,2020],{},[73,20494,20495],{},"Logische lijnen van het hele project, ook als volledig SVG; grote PDF-diagrammen gebruiken overlappende pagina’s",[55,20497,20498,20500],{},[73,20499,2028],{},[73,20501,20502],{},"Aantallen modules, voedingen, bedienpunten en bestaande signaalkabelsegmenten; geen prijzen of geschatte meters",[55,20504,20505,20507],{},[73,20506,2036],{},[73,20508,20509],{},"Bestaande zelfcontrole met bevindingen en controlegrenzen; een ontbrekende controle wordt uitdrukkelijk vermeld",[12,20511,20512],{},"De bordkeuze beperkt het kanaal-, klemmen- en functieplan. Topologie, aantallen en conformiteitsrapport omvatten het volledige project. Functies worden gegroepeerd volgens de ruimte van het bedienpunt; de verbruikers kunnen elders liggen.",[12,20514,20515],{},[30,20516],{"id":20517},"readiness",[41,20519,20521],{"id":20520},"wanneer-kan-ik-definitief-kiezen","Wanneer kan ik DEFINITIEF kiezen?",[12,20523,20524,20527,20528,20531,20532,20534],{},[15,20525,20526],{},"ONTWERP"," blijft mogelijk zodra er planningsgegevens zijn en staat als watermerk op elke PDF-pagina en in SVG. CSV begint met een status- en metadataregel. ",[15,20529,20530],{},"DEFINITIEF"," vereist dat aan de bestaande exportvoorwaarden is voldaan. De interface toont open punten en biedt ",[15,20533,2052],{},". Latere wijzigingen kunnen definitieve export opnieuw blokkeren.",[12,20536,20537],{},"De domoticazelfcontrole onderscheidt bevindingen, ontbrekende invoer en controles die uitdrukkelijk niet zijn uitgevoerd. Onbekende vermogens of nominale kanaalstromen zijn geen geslaagde controle. Ook een definitief document is geen officieel conformiteitsattest. Raadpleeg de dekking van de zelfcontrole voor de precieze grenzen.",[41,20539,20541],{"id":20540},"wat-betekenen-versie-datum-en-hash","Wat betekenen versie, datum en hash?",[12,20543,20544,20547],{},[15,20545,20546],{},"Versie"," is een vrij gekozen documentkenmerk, aanvankelijk A. De PDF-metadata bevat project, bordomvang, versie, aanmaaktijd en SHA-256-gegevenshash; het dossier toont die ook op het voorblad. Versie, tijd, status en hash staan op elke PDF-pagina. Gegevens en taal worden bij de start vastgelegd. Een wijziging van planning of exportopties maakt een geopend voorbeeld ongeldig.",[12,20549,20550],{},"De hash identificeert de exportgegevens en opties. Het is geen handtekening, geen hash van het uiteindelijke PDF-bestand en geen archiefbevestiging. Bewaar het document dat daadwerkelijk wordt overgedragen.",[12,20552,20553],{},[30,20554],{"id":2274},[41,20556,20558],{"id":20557},"hoe-bereid-ik-de-ets-import-voor","Hoe bereid ik de ETS-import voor?",[12,20560,20561,20562,20564,20565,20567,20568,708,20570,20572],{},"Open in het Domotica-tabblad de weergave ",[15,20563,1070],{}," en kies de groepsadresstructuur: ",[15,20566,1150],{}," (standaard, bv. 1\u002F1\u002F1 = verlichting, gelijkvloers, eerste object) of ",[15,20569,1154],{},[15,20571,1078],{}," kent in één stap toe die je ongedaan kunt maken:",[1450,20574,20575,20578,20581],{},[1453,20576,20577],{},"fysieke adressen per KNX-lijn op basis van zone en lijn: lijnkoppelaar x.y.0, actoren vanaf x.y.1 in de volgorde in de kast, daarna busbedieningspunten per ruimte; voedingen krijgen geen adres,",[1453,20579,20580],{},"drieledige groepsadressen met een datapunttype per kanaal: schakelen en status 1.001, dimmen 3.007 en 5.001, rolluik 1.008, 1.007 en 5.001, verwarming 9.001, 5.001 en 20.102,",[1453,20582,20583,20584,39],{},"één groepsadres (17.001) per scène en één per centrale functie uit de weergave ",[15,20585,924],{},[12,20587,20588],{},"Je kunt elk adres overschrijven. Een overschreven of met het slot vergrendeld adres blijft bij elk volgend voorstel behouden. De zelfcontrole meldt dubbele adressen als conflict.",[12,20590,14642,20591,20593,20594,20593,20596,20598,20599,20602],{},[15,20592,956],{}," › ",[15,20595,444],{},[15,20597,1269],{}," download je de groepsadressen als CSV (ETS-formaat „3\u002F1” met hoofd-, midden- en subgroep) of XML en importeer je ze in ETS via ",[15,20600,20601],{},"Groepsadressen importeren",". De lijst met fysieke adressen als CSV helpt bij het aanmaken en programmeren van de toestellen. Controleer de geïmporteerde adressen in ETS; toestellen, parameters en koppelingen met communicatieobjecten maak je daar aan.",[12,20604,20605],{},[30,20606],{"id":2353},[41,20608,20610],{"id":20609},"wat-valt-buiten-deze-documentatie","Wat valt buiten deze documentatie?",[12,20612,20613],{},"PlanElec stelt KNX-adressen voor en exporteert groepsadressen voor de ETS-import, maar maakt geen ETS-projectbestand aan, kiest geen productdatabank, koppelt geen communicatieobjecten en programmeert geen toestellen. Logische lijnen, toetstoewijzingen, busbudgetten en klemmenplannen bewijzen geen werkelijke programmering, busdiagnose, isolatie of fabrikantcompatibiliteit. De aantallenlijst bestelt geen producten. Het zelfcontrolerapport beschrijft zijn beperkte omvang; een vakinhoudelijke beoordeling van de werkelijke installatie blijft nodig.",[41,20615,2434],{"id":2433},[1450,20617,20618,20623,20627,20632,20636],{},[1453,20619,20620],{},[30,20621,20622],{"href":32},"Domotica-installatie plannen en documenteren",[1453,20624,20625],{},[30,20626,2446],{"href":2445},[1453,20628,20629],{},[30,20630,20631],{"href":9307},"Elektrische symbolen plaatsen en met de topologie verbinden",[1453,20633,20634],{},[30,20635,6882],{"href":2451},[1453,20637,20638],{},[30,20639,20640],{"href":2457},"Wat de AREI-zelfcontrole controleert",{"title":1467,"searchDepth":1468,"depth":1468,"links":20642},[20643,20644,20645,20646,20647,20648,20649,20650,20651,20652,20653],{"id":20255,"depth":1468,"text":20256},{"id":20330,"depth":1468,"text":20331},{"id":20354,"depth":1468,"text":20355},{"id":20399,"depth":1468,"text":20400},{"id":20419,"depth":1468,"text":20420},{"id":20444,"depth":1468,"text":20445},{"id":20520,"depth":1468,"text":20521},{"id":20540,"depth":1468,"text":20541},{"id":20557,"depth":1468,"text":20558},{"id":20609,"depth":1468,"text":20610},{"id":2433,"depth":1468,"text":2434},"Twee armaturen en twee drukknoppen toewijzen, voeding en buslijn documenteren en een eerste materiaallijst exporteren met een geïllustreerd praktijkvoorbeeld.","knx-planning-documentation",{},8,"\u002Fhelp\u002Fknx-planning-documentation.nl",{"title":38,"description":20654},"knx-plannen-en-documenteren","help\u002Fknx-planning-documentation.nl",[197,18467,18468,18469,18470,3273,13570],"2026-11-03","PZVs5LM0LnL3XF5uixr7wmRAAvQz4j8Spz32O84DBkQ",{"id":20666,"title":20667,"articleId":20668,"body":20669,"category":1493,"date":21420,"description":21421,"extension":1496,"image":20686,"lastUpdated":15381,"locale":1497,"meta":21422,"navigation":1499,"ogImage":21423,"path":21424,"publishDate":21420,"readTime":21425,"refreshInterval":11097,"seo":21426,"seoTitle":21427,"slug":21428,"stem":21429,"tags":21430,"__hash__":21434,"kind":1515,"href":21435},"blog\u002Fblog\u002Fcable-routes-and-lengths.nl.md","Kabeltracés en kabellengtes: hoe bepaal je de lengte van een leiding in je elektrisch plan?","cable-routes-and-lengths",{"type":9,"value":20670,"toc":21407},[20671,20675,20681,20687,20694,20796,20799,20803,20814,20831,20834,20841,20844,20848,20851,20965,20972,20984,20988,20991,21005,21009,21016,21019,21048,21052,21071,21074,21104,21107,21111,21114,21204,21211,21214,21218,21221,21227,21233,21245,21248,21252,21259,21266,21269,21272,21298,21307,21311,21314,21360,21363,21365,21393,21399],[41,20672,20674],{"id":20673},"hoe-bepaal-je-de-lengte-van-een-leiding-in-je-elektrisch-plan","Hoe bepaal je de lengte van een leiding in je elektrisch plan?",[12,20676,20677,20680],{},[15,20678,20679],{},"Meet het traject dat de kabel werkelijk aflegt, niet de vogelvlucht: horizontaal langs de muren binnen de installatiezones, verticaal naar het toestel toe, met de omwegen rond deuren en ramen en met de marge in het bord en in de doos."," De rechte lijn is geen ruwe schatting van dat traject, maar een ondergrens. In het voorbeeld verderop is het echte traject 68 % langer.",[12,20682,20683],{},[22,20684],{"alt":20685,"src":20686},"Elektriciens bepalen een kabeltracé ter plaatse.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-cable-routes-and-lengths-editorial.webp",[12,20688,20689,20690,20693],{},"De lengte is de invoerwaarde van de spanningsval en daarmee een criterium bij de keuze van de doorsnede (",[17563,20691,20692],{},"onderafdeling 5.2.1.2. punt b.","), en ze is de meeteenheid van je materiaalcalculatie. Een gegokte lengte maakt beide berekeningen waardeloos, zonder dat iemand het merkt.",[49,20695,20696,20709],{},[52,20697,20698],{},[55,20699,20700,20703,20706],{},[58,20701,20702],{},"Deel van het traject",[58,20704,20705],{},"Waardoor het bepaald wordt",[58,20707,20708],{},"Waar de waarde vandaan komt",[68,20710,20711,20722,20733,20744,20756,20770,20784],{},[55,20712,20713,20716,20719],{},[73,20714,20715],{},"Horizontaal traject langs de muren",[73,20717,20718],{},"Grondplan en het toegelaten plaatsingsgabarit",[73,20720,20721],{},"meetbaar op plan",[55,20723,20724,20727,20730],{},[73,20725,20726],{},"Verticaal stuk tussen gabarit en toestel",[73,20728,20729],{},"Inbouwhoogte van het toestel ten opzichte van de horizontale baan",[73,20731,20732],{},"inbouwhoogte min hoogte van de baan",[55,20734,20735,20738,20741],{},[73,20736,20737],{},"Verticaal stuk naar de volgende bouwlaag",[73,20739,20740],{},"Verdiepingshoogte en ligging van de stijgweg",[73,20742,20743],{},"bouwplan, doorsnede",[55,20745,20746,20749,20754],{},[73,20747,20748],{},"Omweg rond deuren, ramen en muuropeningen",[73,20750,20751],{},[17563,20752,20753],{},"onderafdeling 5.2.9.10. punt b.",[73,20755,20721],{},[55,20757,20758,20761,20764],{},[73,20759,20760],{},"Ingegraven traject naar het bijgebouw",[73,20762,20763],{},"Sleufverloop plus één afdaling en één opgang tot op diepte",[73,20765,20766,20767],{},"minimum 0,60 m volgens ",[17563,20768,20769],{},"onderafdeling 5.2.9.2. punt a.",[55,20771,20772,20775,20778],{},[73,20773,20774],{},"Marge aan het klempunt in het bord",[73,20776,20777],{},"Klemligging, bedrading, latere wijzigbaarheid",[73,20779,20780,20781],{},"bedrijfsafspraak — ",[15,20782,20783],{},"geen norm",[55,20785,20786,20789,20792],{},[73,20787,20788],{},"Marge in de doos, schakelaar of toestel",[73,20790,20791],{},"Aansluitwijze en plaats in de behuizing",[73,20793,20780,20794],{},[15,20795,20783],{},[12,20797,20798],{},"De twee laatste regels staan er bewust zo: het AREI noemt voor marges en reservelengtes geen enkele waarde. Waarom je toch een marge nodig hebt, staat verderop.",[41,20800,20802],{"id":20801},"waarom-is-de-vogelvlucht-systematisch-te-kort","Waarom is de vogelvlucht systematisch te kort?",[12,20804,20805,20806,20809,20810,20813],{},"Omdat een verzonken leiding niet diagonaal mag lopen. ",[17563,20807,20808],{},"Onderafdeling 5.2.9.10. punt b."," bindt elektrische leidingen die ",[15,20811,20812],{},"zonder buis"," in de muren van lokalen verzonken worden aan een vast gabarit:",[1450,20815,20816,20819,20822,20825,20828],{},[1453,20817,20818],{},"Het traject volgt alleen horizontale en verticale wegen; horizontale wegen in een plafond staan haaks op de verticale wanden.",[1453,20820,20821],{},"Horizontale trajecten bevinden zich op 25 à 35 cm van de vloer of van het plafond, en eveneens op 25 à 35 cm boven de onderkant van de bovendrempel van het raam, voor zover ze dan minstens 25 cm onder het plafond blijven.",[1453,20823,20824],{},"Verticale trajecten liggen zo dicht mogelijk in een hoek van het lokaal, of op 10 à 20 cm van de lijsten of kozijnen van de deuren.",[1453,20826,20827],{},"Plaatsing buiten dit gabarit gebeurt verticaal ten opzichte van een zichtbaar toestel.",[1453,20829,20830],{},"De dekkende bepleistering is niet dunner dan 0,4 cm.",[12,20832,20833],{},"Het gabarit heeft een veiligheidsdoel — wie later boort, moet weten waar niets zit — en een neveneffect op de lengte: elke diagonaal wordt een trap van een horizontaal en een verticaal stuk, en elke deuropening dwingt een boog erboven of eronder af.",[12,20835,20836,20837,20840],{},"Een doorgerekend voorbeeld. Een schakelaar ligt in de tegenoverliggende hoek van een ruimte van 4,8 × 3,6 m, dus 6,0 m in vogelvlucht van het bord. Langs de muren is dat 4,8 m plus 3,6 m, dus 8,4 m. De horizontale baan ligt 30 cm boven de vloer. Daar komt de afdaling bij van het klempunt in het bord naar die baan, zeg 0,9 m, en de opgang van de baan naar de schakelaarhoogte van 110 cm, dus 0,8 m. Samen 10,1 m — ",[15,20838,20839],{},"68 % meer dan de rechte lijn",", en dat zonder enige marge.",[12,20842,20843],{},"Bij een stopcontact valt die laatste stap bijna weg: ligt de horizontale baan op 25 à 35 cm van de vloer en het stopcontact op 30 cm, dan is de verticale afdaling nagenoeg nul. Bekijk schakelaars en stopcontacten daarom apart in plaats van één forfaitair percentage op alles te leggen.",[41,20845,20847],{"id":20846},"wat-betekent-de-plaatsingswijze-voor-de-lengte","Wat betekent de plaatsingswijze voor de lengte?",[12,20849,20850],{},"Ze bepaalt of het gabarit überhaupt geldt en welke meetkundige dwang er bijkomt.",[49,20852,20853,20866],{},[52,20854,20855],{},[55,20856,20857,20860,20863],{},[58,20858,20859],{},"Plaatsingswijze",[58,20861,20862],{},"Gevolg voor het tracé",[58,20864,20865],{},"Vindplaats",[68,20867,20868,20881,20894,20907,20923,20936,20949],{},[55,20869,20870,20873,20876],{},[73,20871,20872],{},"Verzonken zonder buis, in muren",[73,20874,20875],{},"Gebonden aan het gabarit; bepleistering ≥ 0,4 cm",[73,20877,20878],{},[17563,20879,20880],{},"5.2.9.10. punt b.",[55,20882,20883,20886,20889],{},[73,20884,20885],{},"Verzonken in beton of cement",[73,20887,20888],{},"Dekking ≥ 3 cm; het tracé volgt bekisting en wapening, niet de kortste lijn",[73,20890,20891],{},[17563,20892,20893],{},"5.2.9.10. punt a.",[55,20895,20896,20899,20902],{},[73,20897,20898],{},"Verzonken in buis",[73,20900,20901],{},"Het gabarit van 5.2.9.10 b geldt naar de letter niet; wel minimum buigstralen en de plicht om geleiders altijd te kunnen intrekken en verwijderen",[73,20903,20904],{},[17563,20905,20906],{},"5.2.9.3. punt e.",[55,20908,20909,20912,20915],{},[73,20910,20911],{},"Opbouw, kabelgoot, kabelbaan",[73,20913,20914],{},"Vrijer tracé, maar trekkrachten door het eigen gewicht mogen bij verticale stukken niet op de klemmen werken",[73,20916,20917,702,20920],{},[17563,20918,20919],{},"5.2.9.5.",[17563,20921,20922],{},"5.2.9.6.",[55,20924,20925,20928,20931],{},[73,20926,20927],{},"Onder lijsten en plinten",[73,20929,20930],{},"Het tracé volgt de plint, dus feitelijk de omtrek van het lokaal",[73,20932,20933],{},[17563,20934,20935],{},"5.2.9.4.",[55,20937,20938,20941,20944],{},[73,20939,20940],{},"Ingegraven",[73,20942,20943],{},"Minstens 0,60 m diep, behalve bij technische onmogelijkheid ⇒ twee verticale stukken bovenop de sleuflengte",[73,20945,20946],{},[17563,20947,20948],{},"5.2.9.2. punt a.",[55,20950,20951,20954,20960],{},[73,20952,20953],{},"Zeer lage spanning (ZLS)",[73,20955,20956,20959],{},[17563,20957,20958],{},"Punt b."," van 5.2.9.10 is uitdrukkelijk uitgesloten — bel- en SELV-leidingen zijn niet aan het gabarit gebonden",[73,20961,20962],{},[17563,20963,20964],{},"5.2.9.15. punt b.",[12,20966,20967,20968,20971],{},"De buigstralen voor ter plaatse gebogen buizen zijn concreet: niet kleiner dan tien keer de buitendiameter bij metalen buizen, acht keer bij soepele thermoplastische en vijf keer bij stijve thermoplastische buizen (",[17563,20969,20970],{},"onderafdeling 5.2.9.3. punt e.","). Bij een buis van 25 mm is dat 12,5 tot 25 cm straal per hoek. In een woning met een tiental richtingsveranderingen per stroombaan telt dat aan.",[12,20973,20974,20975,20979,20980,39],{},"Welke plaatsingswijze wanneer past, staat in ",[30,20976,20978],{"href":20977},"\u002Fnl\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex of vrije bedrading","; de kabeltypes zelf in ",[30,20981,20983],{"href":20982},"\u002Fnl\u002Fblog\u002Fxvb-vs-vob-kabel","XVB of VOB",[41,20985,20987],{"id":20986},"tel-je-de-enkele-afstand-of-heen-en-terug","Tel je de enkele afstand of heen en terug?",[12,20989,20990],{},"De enkele afstand, van het bord tot de verbruiker. De terugleider zit in de formule, niet in de invoer: eenfasig staat daar factor 2, driefasig factor √3. Vul je de dubbele lengte in, dan tel je de terugleider twee keer en kies je de doorsnede onnodig groot.",[12,20992,20993,20994,20997,20998,21001,21002,39],{},"Het criterium zelf staat niet als getal in het AREI. ",[17563,20995,20996],{},"Afdeling 5.2.5."," — in het Nederlands „Spanningsval”, in het Frans „Chute de tension”, in het Duits „Spannungsänderung” — vraagt enkel de spanningsval te beperken tot de waarden beschreven in de regels van goed vakmanschap. De courante 3 % voor verlichting en 5 % voor andere eindkringen zijn een invulling volgens IEC\u002FNBN HD 60364-5-52. Rekenwijze, netvormen en voorbeelden staan in ",[30,20999,15203],{"href":21000},"\u002Fnl\u002Fblog\u002Fspanningsval-berekenen-kabeldoorsnede","; de koppeling doorsnede–beveiliging in ",[30,21003,21004],{"href":18957},"Kabeldoorsnede per automaat",[41,21006,21008],{"id":21007},"hoe-tel-je-een-leiding-die-aan-een-verbindingsdoos-gesplitst-is","Hoe tel je een leiding die aan een verbindingsdoos gesplitst is?",[12,21010,21011,21012,21015],{},"Fysiek zijn het meerdere kabels, elektrisch is het één pad. Voor de spanningsval telt de som over het ",[15,21013,21014],{},"volledige"," traject van de bovenliggende beveiliging tot de verbruiker, niet het langste losse segment. Drie deelstukken van elk 12 m geven 36 m, en wie alleen het laatste stuk rekent, onderschat het resultaat met twee derde.",[12,21017,21018],{},"Waarom de opsplitsing tóch in het model moet staan:",[1450,21020,21021,21028,21034,21041],{},[1453,21022,21023,21024,21027],{},"Elk deelstuk kan een eigen doorsnede en een eigen plaatsingswijze hebben. Beide horen voor huishoudelijke installaties in het eendraadschema (",[17563,21025,21026],{},"onderafdeling 3.1.2.2. punt a.","), en beide wegen anders door in de berekening.",[1453,21029,21030,21031,7763],{},"Verbindings- en aftakdozen zijn zelf verplichte schema-inhoud en moeten daarnaast met hun ligging op het situatieplan verschijnen (",[17563,21032,21033],{},"onderafdeling 3.1.2.3. punt a.",[1453,21035,21036,21037,21040],{},"Verbindingen mogen enkel op welbepaalde plaatsen liggen: in borden, in verbindings- of aftakdozen, op klemmen van schakelaars en stopcontacten, of in voldoende ruime plafonddozen (",[17563,21038,21039],{},"onderafdeling 5.2.6.1.","). Een las midden in de muur is geen tracékeuze maar een inbreuk.",[1453,21042,21043,21044,21047],{},"Bij verzonken buisinstallaties geldt bovendien: in verbindings-, aftak- en trekdozen blijven geleiders en kabels toegankelijk, en T-stukken en bochten zijn verboden (",[17563,21045,21046],{},"onderafdeling 5.2.9.3. punt i.2.","). De doos is dus ook meetkundig een routepunt en geen loutere klemplaats.",[41,21049,21051],{"id":21050},"welke-marges-en-reservelengtes-zijn-gebruikelijk-en-wat-zegt-het-arei-daarover","Welke marges en reservelengtes zijn gebruikelijk — en wat zegt het AREI daarover?",[12,21053,21054,21055,21058,21059,21062,21063,21066,21067,21070],{},"Over de grootte van een marge zegt het AREI ",[15,21056,21057],{},"niets",". Noch ",[17563,21060,21061],{},"afdeling 5.2.5.",", noch ",[17563,21064,21065],{},"afdeling 5.2.9.",", noch de documentatievoorschriften in ",[17563,21068,21069],{},"afdeling 3.1.2."," noemen een percentage, een reservelengte of een snijverliesfactor. Elk getal dat je daarvoor gebruikt, is een afspraak van je bedrijf — en hoort ook zo in je rekenblad te staan.",[12,21072,21073],{},"Het reglement legt wel de voorwaarden vast waaruit een marge volgt:",[1450,21075,21076,21082,21088,21098],{},[1453,21077,21078,21079,7763],{},"Aansluitingen op toestellen mogen niet aan trek- en draaikrachten onderworpen worden (",[17563,21080,21081],{},"onderafdeling 5.2.6.2. punt b.",[1453,21083,21084,21085,7763],{},"Bij verticale stukken mogen trekkrachten door het eigen gewicht van de leidingen niet op de aansluitklemmen werken (",[17563,21086,21087],{},"onderafdeling 5.2.9.5.",[1453,21089,21090,21091,21094,21095,21097],{},"In buizen moet het ",[15,21092,21093],{},"altijd"," mogelijk blijven geleiders of kabels in te trekken of te verwijderen (",[17563,21096,20970],{},"). Een buistracé op de millimeter berekend maakt precies dat onmogelijk.",[1453,21099,21100,21101,21103],{},"In dozen blijven de geleiders toegankelijk (",[17563,21102,21046],{},") — wat zonder een lus in de behuizing niet lukt.",[12,21105,21106],{},"Praktisch betekent dat: de marge is geen veiligheidsbuffer op een onzekere berekening, maar een materiaalpost met een doel. Leg je ze forfaitair als percentage op de totale lengte, dan documenteer je percentage, herkomst en de planstand waarvoor het geldt. Een waarde zonder herkomst is bij de volgende planstand niet meer navolgbaar en verhuist stilzwijgend naar offertes.",[41,21108,21110],{"id":21109},"moet-de-kabellengte-op-het-eendraadschema-staan","Moet de kabellengte op het eendraadschema staan?",[12,21112,21113],{},"Hier onderscheidt het AREI twee gevallen, en dat onderscheid wordt vaak over het hoofd gezien.",[49,21115,21116,21131],{},[52,21117,21118],{},[55,21119,21120,21123,21126,21129],{},[58,21121,21122],{},"Document en soort installatie",[58,21124,21125],{},"Gevraagde gegevens over de leiding",[58,21127,21128],{},"Lengte vereist?",[58,21130,20865],{},[68,21132,21133,21150,21170,21185],{},[55,21134,21135,21138,21141,21145],{},[73,21136,21137],{},"Eendraadschema, huishoudelijke installatie",[73,21139,21140],{},"Type, doorsnede, aantal geleiders, plaatsingswijze",[73,21142,21143],{},[15,21144,224],{},[73,21146,21147],{},[17563,21148,21149],{},"3.1.2.2. punt a.",[55,21151,21152,21155,21161,21165],{},[73,21153,21154],{},"Stroombaanschema, niet-huishoudelijke installatie",[73,21156,21157,21158],{},"Plaatsingswijze, aard, aantal en doorsnede van de geleiders ",[15,21159,21160],{},"en de lengte van de elektrische leidingen",[73,21162,21163],{},[15,21164,206],{},[73,21166,21167],{},[17563,21168,21169],{},"3.1.2.2. punt b.",[55,21171,21172,21175,21178,21180],{},[73,21173,21174],{},"Gemeenschappelijke delen van een woongebouw",[73,21176,21177],{},"Mag zich beperken tot de voorschriften voor huishoudelijke installaties",[73,21179,224],{},[73,21181,21182],{},[17563,21183,21184],{},"3.1.2.1. punt e.",[55,21186,21187,21190,21196,21199],{},[73,21188,21189],{},"Situatieplan, huishoudelijke installatie",[73,21191,7641,21192,21195],{},[15,21193,21194],{},"ligging"," van borden, verbindings- en aftakdozen, stopcontacten, lichtpunten, schakelaars, vaste toestellen en bronnen",[73,21197,21198],{},"nee — ligging, geen lengte",[73,21200,21201],{},[17563,21202,21203],{},"3.1.2.3. punt a.",[12,21205,21206,21207,21210],{},"In de woningbouw is de lengte dus een ",[15,21208,21209],{},"ontwerpgegeven, geen tekenverplichting",". Net dat maakt haar riskant: omdat ze nergens op het schema hoeft te staan, controleert niemand ze — terwijl de doorsnede die eruit volgt wél op het schema staat en wél gecontroleerd wordt. Wie de lengte niet vastlegt, kan achteraf niet meer verantwoorden waarom er ergens 2,5 mm² en elders 4 mm² gekozen is.",[12,21212,21213],{},"Bij een niet-huishoudelijke installatie is het eenduidig: zonder lengteopgave is het stroombaanschema onvolledig.",[41,21215,21217],{"id":21216},"van-lengte-naar-materiaallijst-en-prijs","Van lengte naar materiaallijst en prijs",[12,21219,21220],{},"Via twee afzonderlijke uitvoeren die dezelfde opgeloste lengte gebruiken.",[12,21222,7641,21223,21226],{},[15,21224,21225],{},"kabellijst"," geeft per kabel één regel: type, aantal aders, doorsnede, lengte, Van en Naar, de plaatsingswijzen langs het tracé en de CPR-brandklasse; daarnaast stroom, spanningsval in volt en procent, eindspanning en de toegepaste limiet. Ontbreekt een lengte, dan blijft de regel zonder getal in plaats van met een geschatte waarde.",[12,21228,7641,21229,21232],{},[15,21230,21231],{},"materiaallijst"," bundelt dezelfde kabels per uitvoering en geeft ze in meter; is er een meterprijs, dan volgt daaruit de post. Twee zaken horen daar uitdrukkelijk bij:",[1450,21234,21235,21242],{},[1453,21236,21237,21238,21241],{},"De opgegeven lengtes zijn ",[15,21239,21240],{},"nettolengtes uit het model; snijverlies en installatiereserves zijn niet meegerekend."," De marge uit de vorige paragraaf zit er dus nog niet in.",[1453,21243,21244],{},"Een stroomkring zonder kabeltracé verdwijnt niet, maar verschijnt met 0 m en de vermelding „Tracé ontbreekt”. Een materiaallijst die voor een hele woning verdacht krap oogt, heeft meestal net die regels.",[12,21246,21247],{},"Het projectoverzicht maakt hetzelfde onderscheid: het toont ofwel een volledige totaallengte, ofwel een met „≥” gemarkeerd subtotaal met het aantal ontbrekende lengtes, ofwel helemaal geen getal. Een werkelijke totaallengte van 0 m en een onbekende lengte zijn twee verschillende toestanden.",[41,21249,21251],{"id":21250},"hoe-legt-planelec-het-tracé-automatisch-en-waar-blijven-routepunten-nodig","Hoe legt PlanElec het tracé automatisch, en waar blijven routepunten nodig?",[12,21253,21254,21255,21258],{},"In het situatieplan onder ",[15,21256,21257],{},"Koppelen en leidingen → Kabelroute",". Bestaan er kabels in de topologie, dan bekabel je de actieve bouwlaag in één keer of een geselecteerde leiding afzonderlijk.",[12,21260,21261,21262,21265],{},"Het algoritme zoekt het kortste pad ",[15,21263,21264],{},"langs de getekende muren",", niet dwars door het lokaal: begin- en eindpunt worden op de dichtstbijzijnde muurzijde geprojecteerd, daarna loopt een kortstepadzoektocht over de muurknopen. Is er geen muurpad — bijvoorbeeld omdat het grondplan daar onderbroken is — dan valt de route terug op de rechte lijn. De opgegeven lengte volgt exact de zichtbare polylijn; bewust schuine muursegmenten worden niet kunstmatig naar een orthogonale maat verlengd.",[12,21267,21268],{},"Om bij te werken selecteer je een kabellijn: een klik op een stuk voegt een routepunt in en start het verslepen, een dubbelklik verwijdert het. Een versleept routepunt wordt pas bij het loslaten bewaard en kun je in één stap ongedaan maken. Bij het heropbouwen van een stroomkring blijven kabelgegevens, handmatige lengte en het bewaarde tracé behouden.",[12,21270,21271],{},"Vier punten die je moet kennen:",[1450,21273,21274,21280,21286,21292],{},[1453,21275,21276,21279],{},[15,21277,21278],{},"Het automatische tracé is tweedimensionaal."," Het ligt in het vlak van de bouwlaag; hoogteverschillen binnen één verdieping — de opgang naar het gabarit, de afdaling naar de schakelaar — tellen niet mee in de lengte. Daar zijn routepunten voor, of de handmatige lengte.",[1453,21281,21282,21285],{},[15,21283,21284],{},"Tussen bouwlagen"," kies je uitdrukkelijk een bestaande trap, schacht of stijgweg. PlanElec verzint geen verticale verbinding. Ontbreekt die of ontbreken betrouwbare hoogtes, dan blijft de route onvolledig in plaats van een schijnbare lengte te geven. Bestaat de verbinding wel, dan telt het hoogteverschil mee.",[1453,21287,21288,21291],{},[15,21289,21290],{},"De handmatige lengte heeft voorrang"," op de berekende route. Dat is de bewuste uitweg voor opgemeten afstanden — en meteen de plek waar een oude waarde ongemerkt kan blijven staan als het tracé later wijzigt.",[1453,21293,21294,21297],{},[15,21295,21296],{},"Het muurtracé is een aanname over de uitvoering",", geen vaststelling. Of de kabel in het gabarit, in buis of in opbouw ligt, bepaalt de plaatsingswijze die je per deelstuk instelt — niet de router.",[12,21299,21300,21301,21304,21305,39],{},"De bediening stap voor stap staat in de handleiding ",[30,21302,8765],{"href":21303},"\u002Fnl\u002Fhelp\u002Fschakelketens-stroomkringen-en-kabelroutes",". Welk schakelaartype aan het einde van de keten staat, behandelt ",[30,21306,18051],{"href":18050},[41,21308,21310],{"id":21309},"wat-de-zelfcontrole-over-lengte-berekent-en-wat-ter-plaatse-blijft","Wat de zelfcontrole over lengte berekent en wat ter plaatse blijft",[12,21312,21313],{},"De zelfcontrole beoordeelt de ondersteunde regels aan de hand van de ingevoerde gegevens. Concreet over lengte:",[1450,21315,21316,21322,21328,21337,21346],{},[1453,21317,21318,21321],{},[15,21319,21320],{},"Spanningsval bij een volledig pad:"," ze berekent de spanningsval over het hele traject van beveiliging tot verbruiker. Ontbreekt de lengte van een deelstuk of is het pad niet doorlopend terug te volgen, dan meldt ze een datagat in plaats van een resultaat. Een waarde uit deelgegevens zou systematisch te gunstig uitvallen.",[1453,21323,21324,21327],{},[15,21325,21326],{},"Duidelijke aannames:"," 80 % van de nominale stroom van de bovenliggende beveiliging als lastgeval, cos φ 0,95, koper en een weerstandsmodel zonder reactantie en temperatuurcorrectie.",[1453,21329,21330,21333,21334,21336],{},[15,21331,21332],{},"Richtwaarden 3 % en 5 %:"," ze volgen de invulling volgens IEC\u002FNBN HD 60364-5-52; ",[17563,21335,21061],{}," verwijst naar de regels van goed vakmanschap.",[1453,21338,21339,21342,21343,21345],{},[15,21340,21341],{},"Tracé en uitvoering:"," of het getekende tracé overeenstemt met de plaatsing, het gabarit van ",[17563,21344,20880],{}," gerespecteerd is en er marge voorzien is, blijkt op de werf, niet uit de tekening.",[1453,21347,21348,21351,21352,21355,21356,21359],{},[15,21349,21350],{},"Stroombelastbaarheid:"," plaatsingswijze, bundeling en omgevingstemperatuur volgens ",[17563,21353,21354],{},"onderafdeling 4.4.1.4."," beoordeelt het ontwerp; ",[17563,21357,21358],{},"tabel 4.11."," begrenst enkel de beveiliging per doorsnede.",[12,21361,21362],{},"Metingen en de officiële beoordeling doet het erkend organisme.",[41,21364,6947],{"id":6946},[1450,21366,21367,21372,21376,21380,21385,21389],{},[1453,21368,21369],{},[30,21370,21371],{"href":21000},"Spanningsval berekenen: hoe lang mag de kabel zijn?",[1453,21373,21374],{},[30,21375,21004],{"href":18957},[1453,21377,21378],{},[30,21379,20978],{"href":20977},[1453,21381,21382],{},[30,21383,21384],{"href":20982},"XVB of VOB: welke kabel waarvoor?",[1453,21386,21387],{},[30,21388,18051],{"href":18050},[1453,21390,21391],{},[30,21392,18426],{"href":18425},[12,21394,21395],{},[30,21396,21398],{"href":21397},"\u002Fnl","PlanElec openen en kabeltracés leggen →",[12,21400,21401],{},[17563,21402,21403,21404,39],{},"Reglementaire basis: AREI\u002FRGIE Boek 1 V06 — onderafdelingen 3.1.2.1., 3.1.2.2., 3.1.2.3., 4.4.1.4. met tabel 4.11., 5.2.1.2., 5.2.6.1., 5.2.6.2., 5.2.9.2., 5.2.9.3., 5.2.9.4., 5.2.9.5., 5.2.9.6., 5.2.9.10. en 5.2.9.15., en afdeling 5.2.5. Officiële tekst: ",[30,21405,19073],{"href":15357,"rel":21406},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":21408},[21409,21410,21411,21412,21413,21414,21415,21416,21417,21418,21419],{"id":20673,"depth":1468,"text":20674},{"id":20801,"depth":1468,"text":20802},{"id":20846,"depth":1468,"text":20847},{"id":20986,"depth":1468,"text":20987},{"id":21007,"depth":1468,"text":21008},{"id":21050,"depth":1468,"text":21051},{"id":21109,"depth":1468,"text":21110},{"id":21216,"depth":1468,"text":21217},{"id":21250,"depth":1468,"text":21251},{"id":21309,"depth":1468,"text":21310},{"id":6946,"depth":1468,"text":6947},"2026-08-31","Meet het traject, niet de vogelvlucht: installatiezones volgens AREI 5.2.9.10, plaatsingswijze, deelstukken aan verbindingsdozen, marges uit de vakpraktijk en wanneer het AREI de lengte in het schema eist.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-cable-routes-and-lengths-editorial.jpg","\u002Fblog\u002Fcable-routes-and-lengths.nl","12 min",{"title":20667,"description":21421},"Kabeltracés en kabellengtes bepalen in je elektrisch plan","kabelwegen-en-kabellengtes-bepalen","blog\u002Fcable-routes-and-lengths.nl",[3275,3276,21431,13573,21432,15394,21433,21231,3274,1513],"kabeltracé","leidinglengte","plaatsingswijze","vTUhtDtB37_S_YY8M-FeVjfGyD5k06_JUCJ1wfMA7xo","\u002Fblog\u002Fkabelwegen-en-kabellengtes-bepalen",{"id":21437,"title":21438,"articleId":21439,"body":21440,"category":1493,"date":21420,"description":22637,"extension":1496,"image":21454,"lastUpdated":15381,"locale":1497,"meta":22638,"navigation":1499,"ogImage":22639,"path":22640,"publishDate":21420,"readTime":2482,"refreshInterval":11097,"seo":22641,"seoTitle":22642,"slug":22643,"stem":22644,"tags":22645,"__hash__":22650,"kind":1515,"href":22651},"blog\u002Fblog\u002Fbill-of-materials-electrical.nl.md","Materiaallijst van een elektrische installatie: welke posten horen erin?","bill-of-materials-electrical",{"type":9,"value":21441,"toc":22622},[21442,21446,21449,21455,21619,21622,21633,21637,21654,21664,21667,21671,21678,21689,21809,21823,21827,21830,21967,21970,21981,21985,21988,22119,22122,22149,22155,22159,22162,22165,22202,22208,22212,22219,22222,22247,22257,22261,22267,22270,22304,22315,22319,22322,22325,22328,22343,22351,22355,22415,22419,22432,22435,22472,22475,22486,22510,22516,22543,22547,22554,22582,22584,22612,22617],[41,21443,21445],{"id":21444},"welke-posten-horen-in-de-materiaallijst-van-een-elektrische-installatie","Welke posten horen in de materiaallijst van een elektrische installatie?",[12,21447,21448],{},"Zeven groepen: verdeelbord, beveiligingstoestellen, leidingen, dozen, schakelaars en contactdozen, aarding, klein materiaal. Een lijst is niet volledig omdat alle zeven titels erin staan, maar omdat elke post een herleidbare herkomst heeft — een aantal uit het plan, een regel uit het AREI of een uitdrukkelijk benoemde aanname van je bedrijf. Ontbreekt die herkomst, dan is de hoeveelheid niet controleerbaar en bij de volgende planversie ook niet meer corrigeerbaar.",[12,21450,21451],{},[22,21452],{"alt":21453,"src":21454},"Elektriciens sorteren installatiemateriaal op de werkbank.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-bill-of-materials-electrical-editorial.webp",[49,21456,21457,21473],{},[52,21458,21459],{},[55,21460,21461,21464,21467,21470],{},[58,21462,21463],{},"Postengroep",[58,21465,21466],{},"Typische afzonderlijke posten",[58,21468,21469],{},"Hoeveelheid volgt uit",[58,21471,21472],{},"Normanker",[68,21474,21475,21493,21515,21532,21553,21571,21599],{},[55,21476,21477,21479,21482,21485],{},[73,21478,75],{},[73,21480,21481],{},"Kast met achterwand en deur, rijen en draagrails, afdekkingen, kamrails, eindkappen, voedingsklemmen, markering",[73,21483,21484],{},"Aantal modules per rij, scheiding volgens tarief",[73,21486,21487,702,21490],{},[17563,21488,21489],{},"5.3.5.1. punten a. en c.",[17563,21491,21492],{},"3.1.3.1.",[55,21494,21495,21498,21501,21504],{},[73,21496,21497],{},"Beveiligingstoestellen",[73,21499,21500],{},"Algemene lastscheidingsschakelaar, differentieelinrichtingen 300 mA en 30 mA, automaten, eventueel overspanningsafleider",[73,21502,21503],{},"Aantal eindstroombanen en hun toewijzing aan de differentieelgroepen",[73,21505,21506,702,21509,702,21512],{},[17563,21507,21508],{},"5.3.5.1. punt b.",[17563,21510,21511],{},"4.2.4.3. punt b.",[17563,21513,21514],{},"5.2.1.2.",[55,21516,21517,21520,21523,21526],{},[73,21518,21519],{},"Leidingen",[73,21521,21522],{},"Kabel per type, aderaantal en doorsnede in meter; buizen, voorbedrade buis, grondkabel",[73,21524,21525],{},"Kabeltracé per stroombaan plus marge",[73,21527,21528,702,21530],{},[17563,21529,21149],{},[17563,21531,21514],{},[55,21533,21534,21537,21540,21543],{},[73,21535,21536],{},"Dozen",[73,21538,21539],{},"Verbindings- en aftakdozen, inbouwdozen voor volle muur of holle wand, plafond- en wanduitlaatdozen, trekdozen",[73,21541,21542],{},"Aantal toestellen plus aantal aftakpunten",[73,21544,21545,702,21547,702,21550],{},[17563,21546,21149],{},[17563,21548,21549],{},"5.2.6.1.",[17563,21551,21552],{},"5.3.5.2. punt a.",[55,21554,21555,21558,21561,21564],{},[73,21556,21557],{},"Schakelaars en contactdozen",[73,21559,21560],{},"Sokkels, wippen en afdekkingen, afdekramen per combinatie, vochtige-ruimtevarianten met dichting",[73,21562,21563],{},"Aantal bedieningsplaatsen en contactdozen uit het situatieplan",[73,21565,21566,702,21568],{},[17563,21567,21203],{},[17563,21569,21570],{},"5.3.5.2. punten a. en b.",[55,21572,21573,21576,21579,21582],{},[73,21574,21575],{},"Aarding",[73,21577,21578],{},"Aardingslus, aardgeleider, aardingsonderbreker, hoofdequipotentiale geleider, bijkomende equipotentiale geleiders, aansluitklemmen",[73,21580,21581],{},"Omtrek van het gebouw, aantal vreemde geleidende delen, badkamers",[73,21583,21584,702,21587,702,21590,702,21593,702,21596],{},[17563,21585,21586],{},"5.4.2.1.",[17563,21588,21589],{},"5.4.2.2.",[17563,21591,21592],{},"5.4.3.5.",[17563,21594,21595],{},"5.4.4.1.",[17563,21597,21598],{},"5.4.4.2.",[55,21600,21601,21604,21607,21610],{},[73,21602,21603],{},"Klein materiaal",[73,21605,21606],{},"Bevestigingsmiddelen en beugels, klemmen, trekontlastingen, dekseltjes, markeringsmateriaal, dichtingen",[73,21608,21609],{},"Aanname per post — bedrijfsconventie",[73,21611,21612,702,21614,702,21617],{},[17563,21613,20919],{},[17563,21615,21616],{},"5.2.6.2. punt b.",[17563,21618,21492],{},[12,21620,21621],{},"De laatste rij is bewust anders gemerkt: voor klein materiaal noemt het AREI geen hoeveelheden. Het noemt voorwaarden waaruit de posten volgen — daarover verder.",[12,21623,21624,21625,933,21629,39],{},"In dit artikel staan bewust geen prijzen: een prijsvork zonder benoemde bron en datum is na één kwartaal fout en wordt toch verder geciteerd. Hoe je offertes vergelijkbaar maakt, lees je in ",[30,21626,21628],{"href":21627},"\u002Fnl\u002Fblog\u002Fkosten-elektriciteitsplan","Wat kost een elektriciteitsplan?",[30,21630,21632],{"href":21631},"\u002Fnl\u002Fblog\u002Fkostenvergelijking-zelf-vs-elektricien","Kostenvergelijking: zelf tekenen of elektricien",[41,21634,21636],{"id":21635},"is-een-materiaallijst-verplicht-volgens-het-arei","Is een materiaallijst verplicht volgens het AREI?",[12,21638,21639,21640,21643,21644,21647,21648,9580,21651,39],{},"Nee. Het AREI kent de materiaallijst enkel als ",[15,21641,21642],{},"toegelaten bijlage"," bij het dossier: „De schema's, plannen en documenten kunnen worden aangevuld met documenten die op een meer gedetailleerde wijze de verschillende kenmerken van het elektrisch materieel en\u002Fof de producten bevatten\" (",[17563,21645,21646],{},"onderafdeling 3.1.2.1. punt c.","). Het woord is ",[17563,21649,21650],{},"kunnen",[17563,21652,21653],{},"moeten",[12,21655,21656,21657,21660,21661,7763],{},"Verplicht zijn voor een nieuwe huishoudelijke installatie het eendraadschema en het situatieplan, opgesteld door de verantwoordelijke van de uitvoering van het werk (",[17563,21658,21659],{},"onderafdeling 3.1.2.1. punt a.","). Voeg je de materiaallijst als bijlage toe, dan deelt ze het lot van die bijlagen: ze wordt geactualiseerd en ter plaatse ter beschikking gehouden van iedereen die gemachtigd is tot toezicht, controle, onderhoud, herstelling of omvorming (",[17563,21662,21663],{},"onderafdeling 3.1.2.1. punt d.",[12,21665,21666],{},"Praktisch gevolg: de materiaallijst is een werkinstrument voor calculatie en bestelling, geen keuringsdocument. De keurder merkt haar afwezigheid niet op. Hij merkt wel op wanneer de installatie materiaal bevat dat er niet hoort — en net daar werkt een nette lijst op vooruit, omdat ze de keuze vooraf vastlegt.",[41,21668,21670],{"id":21669},"welke-gegevens-moet-het-plan-bevatten-om-de-hoeveelheden-te-laten-kloppen","Welke gegevens moet het plan bevatten om de hoeveelheden te laten kloppen?",[12,21672,21673,21674,21677],{},"Het eendraadschema levert bijna de volledige postenlijst, maar niet de belangrijkste hoeveelheid. ",[17563,21675,21676],{},"Onderafdeling 3.1.2.2. punt a."," eist ten minste: type, doorsnede en aantal geleiders van elke elektrische leiding, de plaatsingswijze, type en kenmerken van de differentieelstroombeschermingsinrichtingen, type en kenmerken van de beschermingsinrichtingen tegen overstroom, de schakelaars, de verbindingsdozen, de aftakdozen, de contactdozen, de lichtpunten, de vaste machines en toestellen en de bronnen.",[12,21679,21680,21681,21684,21685,21688],{},"Dat is een opvallend volledige opsomming — en ze bevat ",[15,21682,21683],{},"geen lengte",". De lengte van de elektrische leidingen wordt alleen geëist voor niet-huishoudelijke installaties (",[17563,21686,21687],{},"onderafdeling 3.1.2.2. punt b.","). In de woningbouw staat de bepalende invoerwaarde voor de kabelhoeveelheid dus in geen enkel verplicht document.",[49,21690,21691,21704],{},[52,21692,21693],{},[55,21694,21695,21698,21701],{},[58,21696,21697],{},"Hoeveelheid in de lijst",[58,21699,21700],{},"Invoerwaarde",[58,21702,21703],{},"Staat in een verplicht document?",[68,21705,21706,21723,21737,21749,21761,21773,21788,21799],{},[55,21707,21708,21711,21714],{},[73,21709,21710],{},"Aantal contactdozen",[73,21712,21713],{},"Contactdozen in schema en situatieplan",[73,21715,21716,21717,702,21720,17566],{},"ja (",[17563,21718,21719],{},"3.1.2.2. a.",[17563,21721,21722],{},"3.1.2.3. a.",[55,21724,21725,21728,21731],{},[73,21726,21727],{},"Aantal schakelaars",[73,21729,21730],{},"Schakelaars in het schema, hun plaats op het plan",[73,21732,21716,21733,702,21735,17566],{},[17563,21734,21719],{},[17563,21736,21722],{},[55,21738,21739,21742,21745],{},[73,21740,21741],{},"Aantal dozen",[73,21743,21744],{},"Verbindings- en aftakdozen in het schema",[73,21746,21716,21747,17566],{},[17563,21748,21719],{},[55,21750,21751,21754,21757],{},[73,21752,21753],{},"Aantal automaten",[73,21755,21756],{},"Aantal eindstroombanen",[73,21758,21716,21759,17566],{},[17563,21760,21719],{},[55,21762,21763,21766,21769],{},[73,21764,21765],{},"Kabeltype en doorsnede",[73,21767,21768],{},"Type, doorsnede, aderaantal per leiding",[73,21770,21716,21771,17566],{},[17563,21772,21719],{},[55,21774,21775,21780,21783],{},[73,21776,21777],{},[15,21778,21779],{},"Kabellengte in meter",[73,21781,21782],{},"Tracé langs muren, zones en verdiepingen",[73,21784,21785],{},[15,21786,21787],{},"nee — enkel bij niet-huishoudelijke installaties",[55,21789,21790,21793,21796],{},[73,21791,21792],{},"Aardingsmateriaal",[73,21794,21795],{},"Omtrek van het gebouw, aantal vreemde geleidende delen",[73,21797,21798],{},"nee — volgt uit hoofdstuk 5.4, niet uit het schema",[55,21800,21801,21803,21806],{},[73,21802,21603],{},[73,21804,21805],{},"Plaatsingswijze, bevestigingsafstanden, aansluitwijze",[73,21807,21808],{},"nee — bedrijfsconventie",[12,21810,21811,21812,21815,21816,21818,21819,39],{},"Het situatieplan draagt de ",[15,21813,21814],{},"plaats"," van diezelfde toestellen, niet hun aantal of lengte (",[17563,21817,21033],{},"). De kabelhoeveelheid ontstaat er pas uit zodra een tracé getekend is; de systematiek staat in ",[30,21820,21822],{"href":21821},"\u002Fnl\u002Fblog\u002Fkabelwegen-en-kabellengtes-bepalen","Kabeltracés en kabellengtes",[41,21824,21826],{"id":21825},"hoeveel-beveiligingstoestellen-heb-ik-nodig-en-waaruit-volgt-dat-aantal","Hoeveel beveiligingstoestellen heb ik nodig — en waaruit volgt dat aantal?",[12,21828,21829],{},"Niet uit ervaring, maar uit vier regels die samen het aantal modules in het bord bepalen. Dit is het deel van de materiaallijst dat het AREI het sterkst stuurt.",[49,21831,21832,21843],{},[52,21833,21834],{},[55,21835,21836,21838,21840],{},[58,21837,2132],{},[58,21839,20865],{},[58,21841,21842],{},"Gevolg voor de hoeveelheid",[68,21844,21845,21857,21869,21881,21897,21913,21929,21941,21954],{},[55,21846,21847,21850,21854],{},[73,21848,21849],{},"Hoofdverdeelbord met een algemene lastscheidingsschakelaar; huishoudelijk niet minder dan 40 A",[73,21851,21852],{},[17563,21853,21508],{},[73,21855,21856],{},"1 post, toegekende stroom niet lager dan 40 A",[55,21858,21859,21862,21866],{},[73,21860,21861],{},"Aan de oorsprong van de installatie ten minste één differentieelinrichting van hoogstens 300 mA, met scheidingsfunctie",[73,21863,21864],{},[17563,21865,21511],{},[73,21867,21868],{},"ten minste 1 post 300 mA",[55,21870,21871,21874,21878],{},[73,21872,21873],{},"Onmiddellijk daarna ten minste één inrichting met hoge of zeer hoge gevoeligheid, waarop contactdozen, verlichting, badkamer, wasmachine, droogkast en vaatwasser aangesloten worden",[73,21875,21876],{},[17563,21877,21511],{},[73,21879,21880],{},"ten minste 1 post 30 mA",[55,21882,21883,21890,21894],{},[73,21884,21885,21886,21889],{},"Hoogstens ",[15,21887,21888],{},"acht eindstroombanen"," per zo'n differentieelinrichting",[73,21891,21892],{},[17563,21893,21511],{},[73,21895,21896],{},"vanaf de negende betrokken stroombaan een bijkomende 30 mA-inrichting",[55,21898,21899,21905,21910],{},[73,21900,21885,21901,21904],{},[15,21902,21903],{},"acht contactdozen"," per eindstroombaan",[73,21906,21907],{},[17563,21908,21909],{},"5.3.5.2. punt b.",[73,21911,21912],{},"vanaf het negende stopcontact een extra stroombaan met automaat en kabel",[55,21914,21915,21922,21926],{},[73,21916,21917,21918,21921],{},"Ten minste ",[15,21919,21920],{},"twee afzonderlijke verlichtingsstroombanen"," bij meer dan twee ruimten",[73,21923,21924],{},[17563,21925,21909],{},[73,21927,21928],{},"minimaal 2 lichtkringen",[55,21930,21931,21934,21938],{},[73,21932,21933],{},"Afzonderlijke stroombaan per toestel met vaste standplaats vanaf 2600 W en voor wasmachine, vaatwasser, droogkast, elektrisch fornuis, kookplaat en oven",[73,21935,21936],{},[17563,21937,21514],{},[73,21939,21940],{},"1 stroombaan, 1 beveiliging en 1 kabel per genoemd toestel",[55,21942,21943,21946,21951],{},[73,21944,21945],{},"Differentieelinrichtingen in huishoudelijke installaties ten minste type A; aan de oorsprong ten minste 40 A nominale stroom",[73,21947,21948],{},[17563,21949,21950],{},"5.3.5.3. punt a.",[73,21952,21953],{},"sluit type AC uit en legt een ondergrens op de bouwgrootte",[55,21955,21956,21959,21964],{},[73,21957,21958],{},"Beveiligings- en bedieningstoestellen van verschillende tarieven op afzonderlijke panelen op ten minste 10 cm of in aparte borden",[73,21960,21961],{},[17563,21962,21963],{},"5.3.5.1. punt c.",[73,21965,21966],{},"vergroot de kast of dwingt een tweede af",[12,21968,21969],{},"Die ketting verklaart waarom materiaallijsten die uit een ruimtetelling ontstaan bijna altijd te krap zijn: het aantal contactdozen bepaalt niet alleen de contactdoosposten, maar via de achtregel ook het aantal stroombanen, dus het aantal automaten, het aantal kabels en uiteindelijk de bouwgrootte van de kast.",[12,21971,21972,21973,21977,21978,39],{},"Welke toestellen een eigen kring vragen staat in ",[30,21974,21976],{"href":21975},"\u002Fnl\u002Fblog\u002Feigen-stroomkring-verplicht-toestellen","Welke toestellen een eigen stroomkring nodig hebben","; de bordindeling zelf in ",[30,21979,21980],{"href":19043},"Verdeelkast plannen",[41,21982,21984],{"id":21983},"welk-aardingsmateriaal-wordt-stelselmatig-vergeten","Welk aardingsmateriaal wordt stelselmatig vergeten?",[12,21986,21987],{},"Het meeste ervan. Aarding staat in het eendraadschema als één symbool, maar in de materiaallijst als zes tot tien posten met voorgeschreven minimumdoorsneden. Die doorsneden zijn cijfers uit het reglement, niet uit de catalogus.",[49,21989,21990,22002],{},[52,21991,21992],{},[55,21993,21994,21997,22000],{},[58,21995,21996],{},"Post",[58,21998,21999],{},"Voorgeschreven minimum",[58,22001,20865],{},[68,22003,22004,22017,22030,22043,22056,22069,22081,22093,22106],{},[55,22005,22006,22009,22012],{},[73,22007,22008],{},"Aardingslus in de fundering",[73,22010,22011],{},"ten minste 35 mm² geometrische doorsnede, volle geleider of zeven samengeslagen draden, zonder lassen",[73,22013,22014],{},[17563,22015,22016],{},"5.4.2.1. punten b.1.3. en b.1.2.",[55,22018,22019,22022,22025],{},[73,22020,22021],{},"Metaal van de aardingslus",[73,22023,22024],{},"volle geleider: blank gehard elektrolytisch koper of verlood koper; zevendradige geleider: gehard koper",[73,22026,22027],{},[17563,22028,22029],{},"5.4.2.1. punt b.1.4.",[55,22031,22032,22035,22038],{},[73,22033,22034],{},"Bevestiging van de aardingslus",[73,22036,22037],{},"uitsluitend koper of materiaal zonder corrosieve werking",[73,22039,22040],{},[17563,22041,22042],{},"5.4.2.1. punt b.1.5.",[55,22044,22045,22048,22051],{},[73,22046,22047],{},"Bijkomende aardelektrode, horizontaal",[73,22049,22050],{},"ten minste 35 mm², diepte ten minste 0,80 m, minimumlengte 15 m",[73,22052,22053],{},[17563,22054,22055],{},"5.4.2.1. punt b.3.",[55,22057,22058,22061,22064],{},[73,22059,22060],{},"Bijkomende aardelektrode, staaf of pen",[73,22062,22063],{},"minimumlengte 1,50 m, waarvan ten minste 1,50 m ingedreven onder het peil −0,60 m",[73,22065,22066],{},[17563,22067,22068],{},"5.4.2.1. punt b.4.1.",[55,22070,22071,22074,22077],{},[73,22072,22073],{},"Aardgeleider",[73,22075,22076],{},"16 mm² koper met corrosiewerende bekleding, anders 25 mm² koper, 50 mm² bij aluminium of staal",[73,22078,22079],{},[17563,22080,21589],{},[55,22082,22083,22086,22089],{},[73,22084,22085],{},"Aardingsonderbreker",[73,22087,22088],{},"klem of strip die enkel met gereedschap losgemaakt kan worden",[73,22090,22091],{},[17563,22092,21592],{},[55,22094,22095,22098,22101],{},[73,22096,22097],{},"Hoofdequipotentiale geleider",[73,22099,22100],{},"halve doorsnede van de grootste beschermingsgeleider, minimaal 6 mm² koper, mag beperkt tot 25 mm²",[73,22102,22103],{},[17563,22104,22105],{},"5.4.4.1. punt a.",[55,22107,22108,22111,22114],{},[73,22109,22110],{},"Bijkomende equipotentiale geleiders",[73,22112,22113],{},"ten minste 2,5 mm² mechanisch beschermd, 4 mm² onbeschermd",[73,22115,22116],{},[17563,22117,22118],{},"5.4.4.2. punt a.",[12,22120,22121],{},"Drie punten die in calculaties ontbreken:",[1450,22123,22124,22134,22143],{},[1453,22125,22126,22129,22130,22133],{},[15,22127,22128],{},"De aardingslus is werfmateriaal, geen elektromateriaal."," Ze is vereist bij elk nieuw gebouw waarvan de bodem van de funderingssleuf op ten minste 60 cm diepte ligt (",[17563,22131,22132],{},"5.4.2.1. punt b.1.1.","), en ze wordt geplaatst voordat iemand aan stopcontacten denkt. Wie de elektromateriaallijst pas na de ruwbouw opmaakt, heeft die post structureel niet meer in beeld.",[1453,22135,22136,11307,22139,22142],{},[15,22137,22138],{},"De uiteinden blijven bereikbaar",[17563,22140,22141],{},"5.4.2.1. punt b.1.6.","). Dat is een uitvoeringseis met een materiaalgevolg: put, deksel, aanduiding.",[1453,22144,22145,22148],{},[15,22146,22147],{},"De hoofdequipotentiale verbinding is geen enkele klem",", maar één geleider per vreemd geleidend deel — water, gas, verwarming — met een aansluitklem aan de betrokken leiding. De hoeveelheid volgt uit de technieken, niet uit het elektroplan.",[12,22150,22151,22152,39],{},"Welk aardingsstelsel geldt behandelt ",[30,22153,22154],{"href":19054},"Aarding TT of TN-S",[41,22156,22158],{"id":22157},"waarom-ontbreken-verbindingsdozen-en-inbouwdozen-zo-vaak-in-de-lijst","Waarom ontbreken verbindingsdozen en inbouwdozen zo vaak in de lijst?",[12,22160,22161],{},"Omdat ze in je hoofd bij de kabel horen en in de catalogus bij het toebehoren — terwijl het AREI ze uitdrukkelijk als eigen onderdelen benoemt.",[12,22163,22164],{},"Vier regels maken ze onvermijdelijk:",[1450,22166,22167,22176,22185,22193],{},[1453,22168,22169,22172,22173,22175],{},[15,22170,22171],{},"Verbindingen mogen enkel op bepaalde plaatsen liggen:"," in schakel- en verdeelborden, in verbindings- of aftakdozen, aan de klemmen van schakelaars of contactdozen, of in voldoende grote plafonddozen waaraan verlichtingstoestellen hangen (",[17563,22174,21039],{},"). Elke aftakking op het plan is dus een materiaalpost.",[1453,22177,22178,11307,22181,22184],{},[15,22179,22180],{},"In buizen zijn verbindingen verboden",[17563,22182,22183],{},"onderafdeling 5.2.9.3. punt f.","). Wie een tracé zonder doos tekent, tekent een niet-toegelaten uitvoering.",[1453,22186,22187,11307,22190,22192],{},[15,22188,22189],{},"In verbindings-, aftak- en trekdozen blijven de geleiders bereikbaar; T-stukken en bochten zijn verboden",[17563,22191,21046],{},"). Dat sluit de kleinst mogelijke doos uit en werkt door op de bouwgrootte, dus op de prijs.",[1453,22194,22195,11307,22198,22201],{},[15,22196,22197],{},"In muren ingebouwde contactdozen zitten in metalen dozen of in dozen uit isolerend materiaal",[17563,22199,22200],{},"onderafdeling 5.3.5.2. punt a.","). De inbouwdoos is dus geen optie maar verplicht materiaal — één per inbouwpunt, en in een holle wand een ander type dan in metselwerk.",[12,22203,22204,22205,22207],{},"Daarbij komt: verbindingsdozen en aftakdozen behoren tot de verplichte inhoud van het eendraadschema (",[17563,22206,21026],{},"). Een schema zonder die dozen is onvolledig — en een materiaallijst die daaruit wordt afgeleid ook.",[41,22209,22211],{"id":22210},"hoeveel-kabelreserve-moet-ik-inrekenen","Hoeveel kabelreserve moet ik inrekenen?",[12,22213,22214,22215,22218],{},"Over de ",[15,22216,22217],{},"hoogte"," van een marge zegt het AREI niets — geen percentage, geen reservelengte, geen snijverliesfactor. Elk cijfer dat je gebruikt is een conventie van je bedrijf en hoort als zodanig in het rekenblad.",[12,22220,22221],{},"Wat het reglement wél vastlegt, zijn de voorwaarden waaruit een reserve volgt:",[1450,22223,22224,22229,22234,22241],{},[1453,22225,22226,22227,7763],{},"Aansluitingen op toestellen mogen niet aan trek- en wringkrachten blootgesteld worden (",[17563,22228,21081],{},[1453,22230,22231,22232,7763],{},"Bij verticale delen mogen trekkrachten door het eigen gewicht niet op de aansluitklemmen inwerken (",[17563,22233,21087],{},[1453,22235,21090,22236,21094,22239,7763],{},[15,22237,22238],{},"te allen tijde",[17563,22240,20970],{},[1453,22242,22243,22244,22246],{},"In dozen blijven de geleiders bereikbaar (",[17563,22245,21046],{},"), wat zonder lus in de doos niet lukt.",[12,22248,22249,22250,22252,22253,39],{},"De marge is dus geen veiligheidsopslag op een onzekere berekening, maar een materiaalpost met een doel. Wie ze forfaitair toepast, documenteert best percentage, herkomst en geldigheidsdatum mee. De herleiding van de basislengte staat in ",[30,22251,21822],{"href":21821},"; welk begeleidend materiaal een plaatsingswijze meebrengt in ",[30,22254,22256],{"href":22255},"\u002Fnl\u002Fblog\u002Fplaatsingswijzen-arei-eendraadschema","Plaatsingswijzen volgens het AREI",[41,22258,22260],{"id":22259},"hoeveel-vrije-plaatsen-horen-in-het-verdeelbord","Hoeveel vrije plaatsen horen in het verdeelbord?",[12,22262,22263,22264,22266],{},"Het AREI schrijft ",[15,22265,17871],{}," vrije plaatsen voor. Een volledige tekstvergelijking van de negen delen in de Nederlandse, Franse en Duitse versie levert geen vindplaats op die een aantal vrije modules, een percentage of een minimumreserve noemt. Wie een cijfer noemt, noemt een bedrijfsconventie — wat legitiem is, zolang het zo gezegd wordt.",[12,22268,22269],{},"Wat het reglement in plaats daarvan eist en wat praktisch dezelfde richting uitgaat:",[1450,22271,22272,22282,22288,22293,22298],{},[1453,22273,22274,22275,22278,22279,7763],{},"Stroombanen worden zo aangelegd dat ze later bij toezicht, controle, onderhoud, herstelling, ",[15,22276,22277],{},"wijziging of uitbreiding"," identificeerbaar zijn (",[17563,22280,22281],{},"onderafdeling 3.1.3.1.",[1453,22283,22284,22285,22287],{},"Bedienings-, beschermings- en scheidingsinrichtingen zijn duidelijk, opvallend en onuitwisbaar individueel gemerkt (",[17563,22286,22281],{},"). Markeringsmateriaal is dus een post, geen vriendelijkheid.",[1453,22289,22290,22291,7763],{},"Stroombanen die vóór de hoofdschakelaar aangesloten zijn, moeten als zodanig gemerkt zijn (",[17563,22292,22281],{},[1453,22294,22295,22296,7763],{},"Elke wijziging of uitbreiding wordt op het situatieplan aangebracht, dat op ieder ogenblik de bestaande toestand weergeeft (",[17563,22297,21659],{},[1453,22299,22300,22301,7763],{},"Het materieel in het bord blijft gemakkelijk bereikbaar, in huishoudelijke installaties zonder speciale middelen (",[17563,22302,22303],{},"onderafdeling 5.3.5.1. punt c.",[12,22305,22306,22307,22310,22311,22314],{},"En één kastregel die vaker over het hoofd wordt gezien dan vrije plaatsen: schakel- en verdeelborden in huishoudelijke installaties zijn van klasse I of II, ",[15,22308,22309],{},"voorzien van een achterwand en een deur",", uit onbrandbaar en niet-hygroscopisch materiaal; de achterwand mag tijdens de hele gebruiksduur niet weggenomen kunnen worden (",[17563,22312,22313],{},"onderafdeling 5.3.5.1. punt a.","). Deur en achterwand zijn dus geen uitrustingsvariant.",[41,22316,22318],{"id":22317},"waar-ligt-de-grens-tussen-materiaalkosten-en-arbeidskosten","Waar ligt de grens tussen materiaalkosten en arbeidskosten?",[12,22320,22321],{},"Bij de vraag of de hoeveelheid uit het plan volgt of uit de uitvoering.",[12,22323,22324],{},"Materiaalkosten volgen uit stuks en meters en zijn uit het model af te leiden. Arbeidskosten volgen uit tracés, ondergronden, bereikbaarheid en volgorde — grootheden die op het eendraadschema en het situatieplan helemaal niet staan. Hetzelfde stopcontact kost hetzelfde materiaal, of het nu in een holle wand of in beton komt; de inspanning verschilt een veelvoud.",[12,22326,22327],{},"Praktisch voor de calculatie:",[1450,22329,22330,22337,22340],{},[1453,22331,22332,22333,22336],{},"Een materiaallijst is ",[15,22334,22335],{},"geen halve offertesom",". Ze is de helft die je kunt controleren.",[1453,22338,22339],{},"Posten die beide raken — sleuven, doorboringen, kernboringen, stelling — horen uitdrukkelijk bij de arbeidszijde, anders komen ze nergens voor.",[1453,22341,22342],{},"De plaatsingswijze beslist over beide zijden tegelijk: ze bepaalt welk begeleidend materiaal nodig is en hoe arbeidsintensief de uitvoering wordt.",[12,22344,22345,22346,933,22348,22350],{},"Hoe je beide zijden in een offerte apart toont, lees je in ",[30,22347,21628],{"href":21627},[30,22349,21632],{"href":21631},". Prijzen verouderen, de herleiding niet.",[41,22352,22354],{"id":22353},"welke-calculatiefouten-maken-de-lijst-onbruikbaar","Welke calculatiefouten maken de lijst onbruikbaar?",[1450,22356,22357,22368,22374,22380,22386,22397,22403,22409],{},[1453,22358,22359,22362,22363,702,22365,22367],{},[15,22360,22361],{},"Geteld per ruimte in plaats van per stroombaan."," De achtregels voor contactdozen per kring en eindstroombanen per differentieel (",[17563,22364,21909],{},[17563,22366,21511],{},") brengen posten voort die in geen enkele ruimtelijst voorkomen.",[1453,22369,22370,22373],{},[15,22371,22372],{},"Hemelsbrede afstand in plaats van kabeltracé."," Binnenshuis ligt de rechte lijn stelselmatig ver onder het werkelijke tracé — het is geen schatting maar een ondergrens.",[1453,22375,22376,22379],{},[15,22377,22378],{},"Nettolengtes zonder marge gebruikt."," De marge bestaat om de vier hierboven genoemde redenen, niet uit voorzichtigheid.",[1453,22381,22382,22385],{},[15,22383,22384],{},"Aardingsmateriaal vergeten",", omdat het in het schema één symbool is en in de planning een ruwbouwthema.",[1453,22387,22388,22391,22392,22394,22395,7763],{},[15,22389,22390],{},"Inbouwdozen en aftakdozen als toebehoren behandeld",", terwijl ze verplichte schema-inhoud zijn (",[17563,22393,21149],{},") en in metselwerk dwingend (",[17563,22396,21552],{},[1453,22398,22399,22402],{},[15,22400,22401],{},"Afdekramen en afdekkingen niet apart gevoerd."," Een drievoudige combinatie is één raam en drie sokkels, niet drie complete toestellen.",[1453,22404,22405,22408],{},[15,22406,22407],{},"Een stroombaan zonder getekende kabel valt geruisloos weg"," en maakt de totale lengte te klein, zonder dat er een regel ontbreekt.",[1453,22410,22411,22414],{},[15,22412,22413],{},"Prijzen uit een oude stand overgenomen",", zonder datum en bron te vermelden. Een hoeveelheid zonder prijs is onvolledig; een prijs zonder datum is fout.",[41,22416,22418],{"id":22417},"hoe-ontstaat-de-materiaallijst-in-planelec-en-wat-zegt-ze-niet","Hoe ontstaat de materiaallijst in PlanElec — en wat zegt ze niet?",[12,22420,22421,22422,22424,22425,22427,22428,22431],{},"Via het tabblad ",[15,22423,956],{},". Daar staat de ",[15,22426,4733],{}," als apart document; de knop ",[15,22429,22430],{},"Materiaaloverzicht openen"," toont ze in detail, pdf en csv komen uit dezelfde afleiding. De gedetailleerde materiaallijst is een pilotfunctie: vier reproduceerbare voorbeelddossiers tonen het exportpad, de vakinhoudelijke veldtest met echte projecten volgt nog.",[12,22433,22434],{},"Wat het overzicht bevat:",[1450,22436,22437,22459,22469],{},[1453,22438,22439,22440,702,22442,702,22445,702,22448,702,22451,702,22453,702,22456,39],{},"Posten in zeven categorieën: ",[15,22441,701],{},[15,22443,22444],{},"Materieel en sokkels",[15,22446,22447],{},"Afdekkingen en ramen",[15,22449,22450],{},"Installatiemateriaal",[15,22452,21497],{},[15,22454,22455],{},"Kabel",[15,22457,22458],{},"Verdeling",[1453,22460,22461,22462,933,22465,22468],{},"Twee weergaven: ",[15,22463,22464],{},"Per categorie",[15,22466,22467],{},"Per ruimte","; posten zonder ruimtetoewijzing verschijnen apart, zodat ze niet stilzwijgend verdwijnen.",[1453,22470,22471],{},"Een kopregel met het aantal verbruikers, posten, stuks en de kabellengte.",[12,22473,22474],{},"Sinds de update van 16 juli 2026 splitst het overzicht contactdozen, schakelaars en geselecteerde aansluitingen op in merkonafhankelijke onderdelen — sokkels, afdekkingen, ramen en installatiedozen. Vast aangesloten toestellen bevatten aansluitdoos, klem en trekontlasting; toestelspecifiek toebehoren niet. Verdeelkasten en kamrails volgen het gemodelleerde aantal rijen en modules.",[12,22476,22477,22478,22481,22482,22485],{},"Zes ",[15,22479,22480],{},"basisaannames"," worden in het overzicht uitdrukkelijk getoond in plaats van op de achtergrond te werken. De belangrijkste voor de calculatie: kabellengtes zijn ",[15,22483,22484],{},"nettolengtes uit het model; snijverlies en installatiereserves zijn niet ingerekend."," Even uitdrukkelijk: de inbouwdoos volgt een eenduidig gekoppelde muur; anders wordt in ruimten met een holle wand holle wand aangenomen, en anders inbouw in metselwerk.",[12,22487,22488,22489,22491,22492,1748,22495,933,22498,22501,22502,22505,22506,22509],{},"De marge uit de vorige paragraaf leg je zelf vast: op de kaart van de materiaallijst in het tabblad ",[15,22490,956],{}," stel je onder ",[15,22493,22494],{},"Kabelreserve van het project",[15,22496,22497],{},"Toeslag (%)",[15,22499,22500],{},"Meter per aansluiting"," in; per kabel ingestelde reserves en handmatige lengtes gaan voor. Pdf en csv van de materiaallijst bevatten daarbij een deel ",[15,22503,22504],{},"Kabelhoeveelheden"," met totalen per kabeltype, ruimte en systeem, de aangerekende reserve en de herkomst van elke lengte: berekend langs het tracé, geschat zonder tracé of handmatig vastgezet. Een ",[15,22507,22508],{},"Controlelijst"," noemt kabels zonder eindpunt, zonder bepaalbare lengte of zonder kabeltype. Zo blijft je marge een gedocumenteerde aanname in plaats van een verborgen getal.",[12,22511,22512,22513,22515],{},"Wat de lijst bewust ",[15,22514,17329],{}," doet:",[1450,22517,22518,22524,22530,22536],{},[1453,22519,22520,22523],{},[15,22521,22522],{},"Ze noemt geen prijzen en is geen bestelvrijgave."," Alle posten zijn merkonafhankelijk en moeten vóór bestelling naar concrete artikelen vertaald en vakkundig nagekeken worden.",[1453,22525,22526,22529],{},[15,22527,22528],{},"Ze verzint geen ontbrekende hoeveelheden."," Een stroombaan zonder kabeltracé verschijnt met 0 m en de vermelding „Routing ontbreekt\", in plaats van geschat te worden. Een verdacht krappe lijst heeft meestal net die regels.",[1453,22531,22532,22535],{},[15,22533,22534],{},"Ze vult geen aardingsmateriaal aan"," dat niet in het model staat. Aardingslus, aardgeleider en equipotentiale verbindingen zijn modelinhoud, geen automatische toevoeging.",[1453,22537,22538,22539,22542],{},"Bij PV-installaties worden ",[15,22540,22541],{},"openstaande DC-materiaalgegevens als opmerkingen getoond"," — ontbrekende strings, moduletypes, tracélengtes — in plaats van ze te overbruggen.",[41,22544,22546],{"id":22545},"wat-de-arei-zelfcontrole-hierover-niet-doet","Wat de AREI-zelfcontrole hierover niet doet",[12,22548,22549,22550,22553],{},"De zelfcontrole beoordeelt de geplande ",[15,22551,22552],{},"installatie",", niet de volledigheid van een materiaallijst. Concreet:",[1450,22555,22556,22563,22570,22576,22579],{},[1453,22557,22558,22559,22562],{},"Ze controleert ",[15,22560,22561],{},"geen hoeveelheden",". Er is geen regel die meldt dat een post ontbreekt, te krap bemeten of dubbel gevoerd is.",[1453,22564,22565,22566,22569],{},"Voor aarding controleert ze enkel of hoofdequipotentiale verbinding en aardelektrode ",[15,22567,22568],{},"gedocumenteerd"," zijn en of het stelsel daarbij past — niet welke doorsnede de geplaatste geleider heeft of hoeveel meter aardingslus nodig was.",[1453,22571,22558,22572,22575],{},[15,22573,22574],{},"geen prijzen, geen beschikbaarheid en geen artikeltoewijzing."," Merkonafhankelijke posten blijven merkonafhankelijk.",[1453,22577,22578],{},"Ze berekent de spanningsval enkel bij een volledig pad; ontbreekt een deellengte, dan meldt ze een gegevenslacune in plaats van een resultaat. Voor de materiaallijst betekent dat: de kabelhoeveelheid kan onvolledig zijn zonder dat een regel aanslaat.",[1453,22580,22581],{},"Meting en keuring blijven bij de vakman ter plaatse en het erkend organisme; de officiële beoordeling gebeurt uitsluitend door het erkend organisme.",[41,22583,6947],{"id":6946},[1450,22585,22586,22591,22595,22600,22604,22608],{},[1453,22587,22588],{},[30,22589,22590],{"href":21821},"Kabeltracés en kabellengtes bepalen",[1453,22592,22593],{},[30,22594,22256],{"href":22255},[1453,22596,22597],{},[30,22598,22599],{"href":19043},"Verdeelkast plannen: opbouw en dimensionering",[1453,22601,22602],{},[30,22603,21976],{"href":21975},[1453,22605,22606],{},[30,22607,21628],{"href":21627},[1453,22609,22610],{},[30,22611,21632],{"href":21631},[12,22613,22614],{},[30,22615,22616],{"href":21397},"PlanElec openen en materiaallijst afleiden →",[12,22618,22619],{},[17563,22620,22621],{},"Reglementaire basis: AREI\u002FRGIE Boek 1 V06 — onderafdelingen 3.1.2.1., 3.1.2.2., 3.1.2.3., 3.1.3.1., 4.2.4.3., 5.2.1.2. met tabel 5.1., 5.2.6.1., 5.2.6.2., 5.2.9.3., 5.2.9.5., 5.3.5.1., 5.3.5.2., 5.3.5.3., 5.4.2.1., 5.4.2.2., 5.4.3.5., 5.4.4.1. en 5.4.4.2. Doorslaggevend blijven de officiële tekst, de werkelijke toestand van de installatie en de controle door het erkend organisme.",{"title":1467,"searchDepth":1468,"depth":1468,"links":22623},[22624,22625,22626,22627,22628,22629,22630,22631,22632,22633,22634,22635,22636],{"id":21444,"depth":1468,"text":21445},{"id":21635,"depth":1468,"text":21636},{"id":21669,"depth":1468,"text":21670},{"id":21825,"depth":1468,"text":21826},{"id":21983,"depth":1468,"text":21984},{"id":22157,"depth":1468,"text":22158},{"id":22210,"depth":1468,"text":22211},{"id":22259,"depth":1468,"text":22260},{"id":22317,"depth":1468,"text":22318},{"id":22353,"depth":1468,"text":22354},{"id":22417,"depth":1468,"text":22418},{"id":22545,"depth":1468,"text":22546},{"id":6946,"depth":1468,"text":6947},"Zeven postengroepen, hun herleiding uit eendraadschema en situatieplan, de posten die stelselmatig vergeten worden — aardingsmateriaal, dozen, kabelreserve, vrije plaatsen — en waar het AREI wél en niet een hoeveelheid vastlegt.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-bill-of-materials-electrical-editorial.jpg","\u002Fblog\u002Fbill-of-materials-electrical.nl",{"title":21438,"description":22637},"Materiaallijst elektrische installatie: welke posten?","materiaallijst-elektrische-installatie","blog\u002Fbill-of-materials-electrical.nl",[3275,3276,21231,22646,22647,22648,22649,3273,1513],"stuklijst","calculatie","aarding","verdeelbord","gBfuEttXavukcOtf_uzwq_NtZqBYZeQ-CGBFJgZw2vI","\u002Fblog\u002Fmateriaallijst-elektrische-installatie",{"id":22653,"title":22654,"articleId":22655,"body":22656,"category":1493,"date":21420,"description":23766,"extension":1496,"image":22678,"lastUpdated":15381,"locale":1497,"meta":23767,"navigation":1499,"ogImage":23768,"path":23769,"publishDate":21420,"readTime":23770,"refreshInterval":11097,"seo":23771,"seoTitle":23772,"slug":23773,"stem":23774,"tags":23775,"__hash__":23780,"kind":1515,"href":23781},"blog\u002Fblog\u002Fmulti-storey-electrical-planning.nl.md","Elektriciteit plannen over meerdere verdiepingen: heeft elke verdieping een eigen bord nodig?","multi-storey-electrical-planning",{"type":9,"value":22657,"toc":23749},[22658,22662,22673,22679,22690,22701,22705,22708,22844,22854,22858,22861,22870,22887,22898,22996,23031,23041,23045,23056,23059,23088,23095,23100,23104,23122,23143,23153,23159,23163,23166,23169,23243,23249,23258,23262,23269,23275,23288,23307,23334,23338,23341,23354,23371,23377,23381,23384,23399,23407,23419,23427,23440,23444,23451,23459,23463,23474,23477,23509,23523,23527,23536,23542,23561,23565,23568,23574,23587,23590,23616,23627,23631,23634,23639,23657,23662,23703,23705,23739,23744],[41,22659,22661],{"id":22660},"heeft-elke-verdieping-een-eigen-verdeelbord-nodig","Heeft elke verdieping een eigen verdeelbord nodig?",[12,22663,22664,22665,22668,22669,22672],{},"Neen. Het AREI kent geen regel „één bord per verdieping\". Het vraagt een hoofdschakel- en verdeelbord met een algemene lastscheidingsschakelaar waarvan de toegekende stroomsterkte in huishoudelijke installaties niet minder dan 40 A bedraagt (",[17563,22666,22667],{},"onderafdeling 5.3.5.1. punt b.","), en dat schakel- en verdeelborden in huishoudelijke installaties gemakkelijk bereikbaar zijn zonder bijzondere hulpmiddelen (",[17563,22670,22671],{},"punt c.","). Of daar een tweede bord op de bovenverdieping bij hoort, beslis jij — niet de norm.",[12,22674,22675],{},[22,22676],{"alt":22677,"src":22678},"Elektriciens stemmen de installatie over meerdere verdiepingen af.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-multi-storey-electrical-planning-editorial.webp",[12,22680,22681,22682,22685,22686,22689],{},"Wat de norm wél oplegt zijn aantalsgrenzen, en net die duwen het aantal stroombanen omhoog in een rijwoning van drie of vier niveaus: per eindstroombaan blijft het aantal enkelvoudige of meervoudige contactdozen beperkt tot acht, en minstens twee afzonderlijke stroombanen voeden de verlichtingstoestellen voor wooneenheden die meer dan twee lokalen en\u002Fof plaatsen bevatten (",[17563,22683,22684],{},"onderafdeling 5.3.5.2. punt b.","). Daarbovenop mogen er ten hoogste acht eindstroombanen per differentieelstroombeschermingsinrichting met hoge of zeer hoge gevoeligheid geïnstalleerd worden (",[17563,22687,22688],{},"onderafdeling 4.2.4.3. punt b.","). Een onderverdeelbord volgt uit die grenzen en uit de leidinglengtes — niet uit een verdiepingsgrens.",[12,22691,22692,22693,22696,22697,22700],{},"De term die het AREI daarvoor gebruikt, helpt bij het denken: een ",[15,22694,22695],{},"elementaire stroombaan"," is het deel van een installatie tussen twee opeenvolgende beschermingsinrichtingen tegen overstroom (hoofdstroombaan) of het deel na de laatste beschermingsinrichting (eindstroombaan) — ",[17563,22698,22699],{},"afdeling 2.6.1."," De voedingsleiding naar een onderverdeelbord is dus geen eindstroombaan maar een hoofdstroombaan. Alle regels die over eindstroombanen gaan — de acht contactdozen, de acht kringen per differentieel — gelden er niet voor.",[41,22702,22704],{"id":22703},"wanneer-is-een-onderverdeelbord-per-verdieping-zinvol-en-wanneer-niet","Wanneer is een onderverdeelbord per verdieping zinvol — en wanneer niet?",[12,22706,22707],{},"De beslissing volgt uit vier waarneembare grootheden: aantal eindstroombanen, langste leidingtracé, bereikbaarheid en geplande uitbreiding. Onderstaande toewijzing vat samen wat in een Belgische woning in de praktijk speelt; de normkolom noemt de bepaling die de grens überhaupt veroorzaakt.",[49,22709,22710,22726],{},[52,22711,22712],{},[55,22713,22714,22716,22720,22723],{},[58,22715,8306],{},[58,22717,22719],{"align":22718},"center","Eén bord volstaat",[58,22721,22722],{"align":22718},"Onderverdeelbord zinvol",[58,22724,22725],{},"Normverwijzing",[68,22727,22728,22741,22756,22770,22785,22800,22814,22829],{},[55,22729,22730,22733,22736,22738],{},[73,22731,22732],{},"Twee niveaus, compacte rijwoning, minder dan ca. 15 eindstroombanen",[73,22734,22735],{"align":22718},"✓",[73,22737,17121],{"align":22718},[73,22739,22740],{},"geen voorschrift; het aantal volgt uit 5.3.5.2. b en 4.2.4.3. b",[55,22742,22743,22746,22748,22750],{},[73,22744,22745],{},"Meer dan 16 eindstroombanen, dus meer dan twee gevoelige differentiëlen nodig",[73,22747,17121],{"align":22718},[73,22749,22735],{"align":22718},[73,22751,22752,22753,17566],{},"ten hoogste 8 eindstroombanen per gevoelige differentieel (",[17563,22754,22755],{},"4.2.4.3. b",[55,22757,22758,22761,22763,22765],{},[73,22759,22760],{},"Verste leiding ruim boven 25–30 m vanaf het bord",[73,22762,17121],{"align":22718},[73,22764,22735],{"align":22718},[73,22766,22767,22768,17566],{},"spanningsval te beperken volgens de regels van goed vakmanschap (",[17563,22769,21061],{},[55,22771,22772,22775,22777,22779],{},[73,22773,22774],{},"Zolder met warmtepomp, voorbereiding laadpaal of bureau gepland",[73,22776,17121],{"align":22718},[73,22778,22735],{"align":22718},[73,22780,22781,22782,17566],{},"voedingsvermogen met gelijktijdigheidsfactor te bepalen (",[17563,22783,22784],{},"afdeling 3.2.1.",[55,22786,22787,22790,22792,22794],{},[73,22788,22789],{},"Bord in de kelder, bovenverdieping enkel via een ladder bereikbaar",[73,22791,17121],{"align":22718},[73,22793,22735],{"align":22718},[73,22795,22796,22797,17566],{},"gemakkelijk bereikbaar zonder bijzondere hulpmiddelen (",[17563,22798,22799],{},"5.3.5.1. c",[55,22801,22802,22805,22807,22809],{},[73,22803,22804],{},"Afzonderlijke energietarieven of een eigen DNB-meter per niveau",[73,22806,17121],{"align":22718},[73,22808,22735],{"align":22718},[73,22810,22811,22812,17566],{},"gescheiden platen op ≥ 10 cm of afzonderlijke borden (",[17563,22813,22799],{},[55,22815,22816,22819,22821,22823],{},[73,22817,22818],{},"Huurappartement per verdieping, elk een eigen installatie",[73,22820,17121],{"align":22718},[73,22822,22735],{"align":22718},[73,22824,22825,22826,17566],{},"elke wooneenheid heeft een eigen huishoudelijke installatie (begrip in ",[17563,22827,22828],{},"2.2.1.1.",[55,22830,22831,22834,22836,22838],{},[73,22832,22833],{},"Renovatie, één verdieping blijft voorlopig ongemoeid",[73,22835,22735],{"align":22718},[73,22837,17121],{"align":22718},[73,22839,22840,22841,17566],{},"de controle beperkt zich tot toegevoegde of gewijzigde delen (",[17563,22842,22843],{},"6.4.7.3.",[12,22845,22846,22847,22849,22850,22853],{},"Twee argumenten die vaak tégen een tweede bord pleiten: elk extra bord is een extra plaats die zonder hulpmiddelen bereikbaar, bedienbaar en onderhoudbaar moet blijven (",[17563,22848,22799],{},"), en het moet individueel gemarkeerd zijn met duidelijk aangeduide voedingsspanning (",[17563,22851,22852],{},"onderafdeling 3.1.3.3. punt a.","). In een duplex met twee slaapkamers kost dat meer dan het aan kabel bespaart.",[41,22855,22857],{"id":22856},"hoe-dimensioneer-je-de-voedingsleiding-naar-het-onderverdeelbord","Hoe dimensioneer je de voedingsleiding naar het onderverdeelbord?",[12,22859,22860],{},"In drie stappen, waarvan alleen de laatste met een cijfer in het AREI staat.",[12,22862,22863,22866,22867,22869],{},[15,22864,22865],{},"Eerst het voedingsvermogen."," Bij het vaststellen van het voedingsvermogen van een installatie of een deel daarvan mag rekening worden gehouden met de gelijktijdigheidsfactor en de gebruiksfactor van de belastingen (",[17563,22868,22784],{},"). Het AREI noemt daar geen getal — welke factor gepast is, is een kwestie van de regels van goed vakmanschap en van het werkelijke gebruik van de verdieping.",[12,22871,22872,22875,22876,22879,22883,22884,22886],{},[15,22873,22874],{},"Dan de toelaatbare stroom."," De toelaatbare stroom ",[17563,22877,22878],{},"I",[22880,22881,22882],"sub",{},"Z"," van een elektrische leiding hangt af van de doorsnede van de geleider, de isolatie, de aard van de leiding, de plaatsingswijze en omgeving, en de omgevingstemperatuur (",[17563,22885,21354],{},"). Een voedingsleiding die 6 m verticaal door een gesloten kokerkanaal loopt, heeft niet dezelfde belastbaarheid als diezelfde leiding vrij op een kabelbaan — de plaatsingswijze zit in de berekening, niet in de opsmuk.",[12,22888,22889,22892,22893,11307,22895,22897],{},[15,22890,22891],{},"Ten slotte het kaliber."," Voor huishoudelijke installaties begrenst ",[17563,22894,21358],{},[17563,22896,21354],{},") de maximale nominale stroom van de beschermingsinrichting in functie van de doorsnede:",[49,22899,22900,22913],{},[52,22901,22902],{},[55,22903,22904,22907,22910],{},[58,22905,22906],{},"Doorsnede van de geleider",[58,22908,22909],{},"Maximale nominale stroom van de smeltzekering",[58,22911,22912],{},"Maximale nominale stroom van de vermogensschakelaar",[68,22914,22915,22925,22934,22944,22955,22966,22976,22986],{},[55,22916,22917,22919,22922],{},[73,22918,15135],{},[73,22920,22921],{},"10 A",[73,22923,22924],{},"16 A",[55,22926,22927,22929,22931],{},[73,22928,15138],{},[73,22930,22924],{},[73,22932,22933],{},"20 A",[55,22935,22936,22939,22941],{},[73,22937,22938],{},"4 mm²",[73,22940,22933],{},[73,22942,22943],{},"25 A",[55,22945,22946,22949,22952],{},[73,22947,22948],{},"6 mm²",[73,22950,22951],{},"32 A",[73,22953,22954],{},"40 A",[55,22956,22957,22960,22963],{},[73,22958,22959],{},"10 mm²",[73,22961,22962],{},"50 A",[73,22964,22965],{},"63 A",[55,22967,22968,22971,22973],{},[73,22969,22970],{},"16 mm²",[73,22972,22965],{},[73,22974,22975],{},"80 A",[55,22977,22978,22981,22983],{},[73,22979,22980],{},"25 mm²",[73,22982,22975],{},[73,22984,22985],{},"100 A",[55,22987,22988,22991,22993],{},[73,22989,22990],{},"35 mm²",[73,22992,22985],{},[73,22994,22995],{},"125 A",[12,22997,22998,22999,23002,23003,23005,23008,23009,23011,23014,23015,23017,23019,23020,23022,23025,23026,23028,23030],{},"De tabel is een bovengrens, geen advies. Ze zegt welk kaliber een doorsnede verdraagt — niet welke doorsnede jouw voedingsleiding nodig heeft. De bijkomende voorwaarde staat in ",[17563,23000,23001],{},"onderafdeling 4.4.3.2.",": de nominale stroom ",[17563,23004,22878],{},[22880,23006,23007],{},"n"," van de beveiliging tegen overbelasting moet ten minste gelijk zijn aan de gebruiksstroom ",[17563,23010,22878],{},[22880,23012,23013],{},"B"," van de stroombaan en kleiner dan de toelaatbare stroom ",[17563,23016,22878],{},[22880,23018,22882],{}," van de leiding die ze beschermt; de conventionele werkstroom ",[17563,23021,22878],{},[22880,23023,23024],{},"f"," overschrijdt 1,45 × ",[17563,23027,22878],{},[22880,23029,22882],{}," niet.",[12,23032,23033,23036,23037,23040],{},[15,23034,23035],{},"Vakpraktijk, geen norm:"," in een Belgische woning geeft de berekening voor een voedingsleiding naar een verdiepingsbord vaak 6 mm² met een C32-automaat of 10 mm² met C40. De algemene schakelaar van het onderverdeelbord voer je vaak uit op 40 A; de ondergrens van 40 A uit ",[17563,23038,23039],{},"5.3.5.1. b"," geldt wel alleen voor de algemene lastscheidingsschakelaar van het hoofdschakel- en verdeelbord. Het AREI schrijft geen van die waarden voor; het begrenst alleen naar boven.",[41,23042,23044],{"id":23043},"moet-de-voedingsleiding-in-het-hoofdbord-beveiligd-zijn","Moet de voedingsleiding in het hoofdbord beveiligd zijn?",[12,23046,23047,23048,23051,23052,23055],{},"In principe ja, en wel aan het begin ervan. Een beveiliging tegen kortsluiting wordt geplaatst aan het begin van elke stroombaan die bestaat uit elektrische leidingen met gelijkwaardige eigenschappen (",[17563,23049,23050],{},"onderafdeling 4.4.2.2. punt a.","). Voor overbelasting geldt hetzelfde principe: de beveiliging wordt in de regel geplaatst waar een wijziging van doorsnede, aard, plaatsingswijze of samenstelling de toelaatbare stroom verlaagt (",[17563,23053,23054],{},"onderafdeling 4.4.3.1.",") — dus precies waar de rail van het hoofdbord overgaat in een kabel van 6 mm².",[12,23057,23058],{},"Het AREI kent daar drie afwijkingen op die in installaties over meerdere niveaus echt voorkomen:",[1450,23060,23061,23070,23079],{},[1453,23062,23063,23066,23067,7763],{},[15,23064,23065],{},"Stroomopwaartse beveiliging volstaat."," Aan het begin van een stroombaan mag de kortsluitbeveiliging ontbreken, op voorwaarde dat wordt nagegaan of de stroomopwaartse beveiliging haar functie nog kan vervullen (",[17563,23068,23069],{},"4.4.2.2. a",[1453,23071,23072,23075,23076,7763],{},[15,23073,23074],{},"Drie meter speling."," De beveiliging mag tot 3 m van het begin van de stroombaan op de leiding worden geplaatst, op voorwaarde dat dat stuk geen aansluitingen, aftakkingen, doorsnedeverminderingen of verkleiningen van schakelapparatuur bevat en zich niet in de nabijheid van brandbare materialen bevindt (",[17563,23077,23078],{},"4.4.2.2. b",[1453,23080,23081,23084,23085,7763],{},[15,23082,23083],{},"Som van de aftakkingen."," Van beveiliging tegen overbelasting mag worden afgezien bij een leiding die meerdere individueel beveiligde aftakkingen voedt, op voorwaarde dat de som van de nominale of ingestelde stromen van de beschermingsinrichtingen van die aftakkingen kleiner is dan de nominale of ingestelde stroom van de inrichting die de beschouwde leiding tegen overbelasting zou beschermen (",[17563,23086,23087],{},"onderafdeling 4.4.3.3.",[12,23089,23090,23091,23094],{},"Die derde afwijking wordt bij voedingsleidingen het vaakst verkeerd gelezen. Ze laat niet toe de voeding onbeveiligd te laten — ze laat toe de ",[15,23092,23093],{},"overbelastingsbeveiliging"," weg te laten wanneer de som van de stroomafwaartse kalibers de leiding sowieso nooit kan overbelasten. De kortsluitbeveiliging blijft onaangeroerd. In een onderverdeelbord met acht C16 en twee C20 tellen de kalibers op tot 168 A; een voedingsleiding van 6 mm² valt niet onder die afwijking.",[12,23096,23097,23098,7763],{},"Vergeet de markering niet: stroombanen die stroomopwaarts van de algemene schakelaar van het schakel- en verdeelbord aangesloten zijn, moeten als dusdanig gemarkeerd zijn (",[17563,23099,22281],{},[41,23101,23103],{"id":23102},"vraagt-het-arei-selectiviteit-tussen-hoofdbord-en-onderverdeelbord","Vraagt het AREI selectiviteit tussen hoofdbord en onderverdeelbord?",[12,23105,23106,23107,23110,23111,933,23114,23117,23118,23121],{},"Voor een gewone huishoudelijke installatie: ",[15,23108,23109],{},"neen."," Het woord selectiviteit staat in het AREI uitsluitend in de context van veiligheidsinstallaties en kritische installaties. Daar staat dat de goede werking van stroombanen met veiligheidsverbruikers respectievelijk van veiligheidsstroombanen niet mag worden beïnvloed door elektrische fouten in andere stroombanen, en dat dit „selectiviteit tussen de beschermingsinrichtingen vereist\" (",[17563,23112,23113],{},"onderafdelingen 5.5.7.1. punt a.",[17563,23115,23116],{},"5.5.7.2.","; woordelijk hetzelfde voor kritische installaties in ",[17563,23119,23120],{},"hoofdstuk 5.6.","). Voor de voedingsleiding naar de slaapverdieping van een eengezinswoning bestaat er geen overeenkomstig voorschrift.",[12,23123,23124,23125,11307,23128,23131,23132,23135,23136,23139,23140,7763],{},"Wat het AREI wél regelt, is de ",[15,23126,23127],{},"coördinatie van in serie geplaatste beschermingsinrichtingen",[17563,23129,23130],{},"onderafdeling 4.4.1.3.",") — en dat is iets anders dan selectiviteit. Worden meerdere beschermingsinrichtingen in serie geplaatst, dan kunnen ze zo gecoördineerd worden dat de stroomopwaartse inrichting bij een kortsluiting de energie die door de stroomafwaartse inrichtingen vloeit, beperkt tot een waarde die deze inrichtingen en de door hen beschermde leidingen aankunnen. Zijn beide vermogensschakelaars, dan heet die bijkomende bescherming ",[15,23133,23134],{},"back-upbescherming","; voor het bepalen ervan moeten de back-uptabellen van de fabrikant worden opgevraagd, opgesteld volgens de productnormen voor vermogensschakelaars (",[17563,23137,23138],{},"4.4.1.3.","). Bij niet-huishoudelijke installaties moet de toepassing van die techniek zelfs op de markering van het schakel- en verdeelbord staan (",[17563,23141,23142],{},"onderafdeling 3.1.3.3. punt b.",[12,23144,23145,23146,23148,23149,23152],{},"Het verschil in één zin: ",[15,23147,23134],{}," zorgt ervoor dat de stroomafwaartse automaat een kortsluiting overleeft die hij alleen niet kon onderbreken. ",[15,23150,23151],{},"Selectiviteit"," zorgt ervoor dat bij een fout op de bovenverdieping niet het hele huis donker wordt. Het eerste is een veiligheidsvraag en staat in het AREI; het tweede is een comfort- en beschikbaarheidsvraag en is buiten veiligheidsinstallaties een ontwerpkeuze.",[12,23154,23155,23158],{},[15,23156,23157],{},"Vakpraktijk:"," een trapsgewijze afstemming — stroomopwaarts trager en groter, stroomafwaarts sneller en kleiner, bij differentiëlen bijkomend via gevoeligheid en vertragingstijd — is in installaties over meerdere niveaus gebruikelijk en verstandig. Maar het is een uitwerking volgens IEC 60364-5-53 en fabrikantgegevens, geen AREI-verplichting. Wie ze in een controleverslag als „AREI-eis\" verdedigt, beroept zich op een bepaling die niet bestaat.",[41,23160,23162],{"id":23161},"mag-één-stroombaan-meerdere-verdiepingen-voeden","Mag één stroombaan meerdere verdiepingen voeden?",[12,23164,23165],{},"Ja. Het AREI kent geen regel die een eindstroombaan tot één niveau beperkt. Een verlichtingskring die gang, traphal en bovengang samen voedt, is toegelaten — en in Belgische rijwoningen de normale gang van zaken, want de traphal hoort geometrisch bij beide niveaus.",[12,23167,23168],{},"Alle aantals- en toewijzingsgrenzen blijven echter onverkort gelden, en die tellen over de verdiepingen heen:",[49,23170,23171,23181],{},[52,23172,23173],{},[55,23174,23175,23177,23179],{},[58,23176,846],{},[58,23178,2590],{},[58,23180,20865],{},[68,23182,23183,23196,23208,23219,23231],{},[55,23184,23185,23188,23191],{},[73,23186,23187],{},"Enkelvoudige of meervoudige contactdozen per eindstroombaan",[73,23189,23190],{},"ten hoogste 8",[73,23192,23193],{},[17563,23194,23195],{},"5.3.5.2. b",[55,23197,23198,23201,23204],{},[73,23199,23200],{},"Afzonderlijke verlichtingsstroombanen bij meer dan twee lokalen en\u002Fof plaatsen",[73,23202,23203],{},"minstens 2",[73,23205,23206],{},[17563,23207,23195],{},[55,23209,23210,23213,23215],{},[73,23211,23212],{},"Eindstroombanen per differentieel met hoge of zeer hoge gevoeligheid",[73,23214,23190],{},[73,23216,23217],{},[17563,23218,22755],{},[55,23220,23221,23224,23227],{},[73,23222,23223],{},"Differentieel aan het begin van de installatie",[73,23225,23226],{},"ten hoogste 300 mA",[73,23228,23229],{},[17563,23230,22755],{},[55,23232,23233,23236,23239],{},[73,23234,23235],{},"Vaste toestellen met een gemeenschappelijk bedieningstoestel in een gemengde kring",[73,23237,23238],{},"tellen als 1 contactdoos",[73,23240,23241],{},[17563,23242,23195],{},[12,23244,23245,23246,23248],{},"De derde en vierde rij spelen samen zodra er een onderverdeelbord bij komt. Onmiddellijk na de beschermingsinrichting aan het begin van de installatie wordt minstens één differentieel met hoge of zeer hoge gevoeligheid geplaatst, waarop minstens de contactdozen voor niet-vaste toestellen, de verlichting, de lokalen met badkuip en\u002Fof douche en de wasmachines, droogkasten en vaatwassers worden aangesloten — met ten hoogste acht eindstroombanen per differentieel (",[17563,23247,22755],{},"). Een badkamer op de bovenverdieping die vanuit het bord daar gevoed wordt, heeft die toewijzing dus ook dáár nodig; de 300 mA aan het begin van de installatie vervangt ze niet.",[12,23250,23251,23252,23254,23255,39],{},"Twee praktische beperkingen die uit het principe volgen en niet uit een artikel: een eindstroombaan over drie niveaus wordt lang, en spanningsval in elektrische leidingen moet beperkt blijven tot de waarden beschreven in de regels van goed vakmanschap (",[17563,23253,21061],{}," — het AREI noemt daar zelf geen percentage). En een kring die over drie niveaus uitwaaiert, is bij het zoeken naar een fout lastig, omdat je dat installatiedeel niet meer op één plaats spanningsloos maakt. Hoe je de bijbehorende lengtes onderbouwd bepaalt, staat in ",[30,23256,23257],{"href":21821},"Kabelwegen en kabellengtes",[41,23259,23261],{"id":23260},"hoe-voer-je-de-voedingsleiding-door-de-vloerplaat","Hoe voer je de voedingsleiding door de vloerplaat?",[12,23263,23264,23265,23268],{},"De doorvoering zelf is geregeld. Bij vloerdoorvoeringen wordt de elektrische leiding ter hoogte van de afgewerkte vloer beschermd tegen mechanische beschadiging en tegen vloeistoffen die over de afgewerkte vloer kunnen lopen. Gebeurt de doorvoering met geleiders in buizen, dan zijn die buizen waterdicht en steekt hun bovenuiteinde boven de vloer uit — minstens even hoog als de plinten, indien aanwezig, en minstens 10 cm (",[17563,23266,23267],{},"onderafdeling 5.2.1.5.","). Diezelfde bepaling vraagt bij doorvoeringen tussen lokalen met sterk verschillende luchtvochtigheid bijzondere voorzorgen tegen condensatie; niet-afgedichte buizen worden dan naar het vochtigste lokaal toe schuin naar beneden gelegd.",[12,23270,23271,23272,23274],{},"Voor het verticale tracé binnen één verdieping gelden de plaatsingszones: leidingen die zonder buis in wanden van lokalen worden ingebouwd, lopen uitsluitend horizontaal of verticaal, waarbij verticale tracés zo dicht mogelijk bij een hoek van het lokaal liggen of op 10 tot 20 cm van deurlijsten of -kozijnen (",[17563,23273,20753],{},"). Horizontale tracés liggen 25 tot 35 cm boven de vloer of onder het plafond.",[12,23276,10081,23277,23280,23281,702,23284,23287],{},[15,23278,23279],{},"kokerkanaal"," is een eigen, in het AREI benoemde plaatsingswijze (",[17563,23282,23283],{},"onderafdeling 5.2.2.1. punt h.1",[17563,23285,23286],{},"figuur 5.11.",") — en de juiste keuze zodra meerdere leidingen hetzelfde verticale tracé volgen. Twee aandachtspunten:",[1450,23289,23290,23296],{},[1453,23291,23292,23293,7763],{},"Worden in een kabelbaan of een kokerkanaal stroombaanleidingen met verschillende spanningen gebruikt, dan worden verbindingen, aansluitingen en aftakkingen uitgevoerd in gedeelten waar de leidingen met verschillende spanning van elkaar gescheiden zijn (",[17563,23294,23295],{},"onderafdeling 5.2.9.6.",[1453,23297,23298,23299,23302,23303,23306],{},"Geïsoleerde geleiders en kabels die in bundel of in één vlak worden geplaatst, bezitten minstens de eigenschap F2 of behoren minstens tot klasse C",[22880,23300,23301],{},"ca"," — ongeacht de lengte van het traject waarover ze effectief gebundeld liggen (",[17563,23304,23305],{},"onderafdeling 5.2.7.3.","). Een schacht met zes kabels is precies zo'n bundel.",[12,23308,23309,23312,23313,23315,23316,1934,23319,23322,23323,933,23326,23329,23330,23333],{},[15,23310,23311],{},"Wat het AREI hier niet regelt:"," de brandwerende afdichting van de schacht tussen de verdiepingen. Het AREI vraagt een bepaald brandgedrag van leidingen – bijvoorbeeld eigenschap F2 of klasse C",[22880,23314,23301],{}," in bouwkundige holten (",[17563,23317,23318],{},"onderafdeling 4.3.3.5. punt b",[17563,23320,23321],{},"5.2.7.3.",") – en brandweerstand alleen voor veiligheidsinstallaties en kritische installaties (",[17563,23324,23325],{},"hoofdstukken 5.5.",[17563,23327,23328],{},"5.6.",") en voor bijzondere plaatsen, zoals ruimten met brandbaar vloeibaar diëlektricum (",[17563,23331,23332],{},"4.3.3.7. b","). De compartimentering van een woongebouw regelt het bouwrecht – de basisnormen brandpreventie en de gewestelijke voorschriften. Daarvoor verwijs je naar het brandveiligheidsdossier van het project, niet naar een AREI-artikel.",[41,23335,23337],{"id":23336},"hoe-loopt-de-equipotentiaalverbinding-over-meerdere-niveaus","Hoe loopt de equipotentiaalverbinding over meerdere niveaus?",[12,23339,23340],{},"Er zijn twee soorten equipotentiaalverbinding, en slechts één ervan loopt door het hele gebouw.",[12,23342,7641,23343,23346,23347,23350,23351,7763],{},[15,23344,23345],{},"hoofdequipotentiaalverbinding"," is gebouwbreed. De doorsnede van hoofdequipotentiaalgeleiders bedraagt minstens de helft van de doorsnede van de dikste beschermingsgeleider van de installatie — de aardingsgeleider niet meegerekend — met een minimum van 6 mm² koper; de doorsnede mag beperkt worden tot 25 mm² koper of de elektrisch gelijkwaardige doorsnede in een ander metaal (",[17563,23348,23349],{},"onderafdeling 5.4.4.1. punt a.","). Die geleiders zijn groen-geel geïsoleerd en volgen de voorschriften voor beschermingsgeleiders (",[17563,23352,23353],{},"punt b.",[12,23355,7641,23356,23359,23360,23363,23364,23367,23368,7763],{},[15,23357,23358],{},"bijkomende equipotentiaalverbinding"," is daarentegen uitdrukkelijk plaatselijk. In een lokaal met badkuip en\u002Fof douche verbindt ze plaatselijk alle massa's van het elektrisch materieel met de gelijktijdig aanraakbare vreemde geleidende delen die zich ",[15,23361,23362],{},"in dat lokaal"," bevinden (",[17563,23365,23366],{},"onderafdeling 7.1.4.4.","). Een badkamer op de bovenverdieping krijgt dus haar eigen bijkomende equipotentiaalverbinding; die wordt niet van het gelijkvloers naar boven doorgetrokken. De doorsneden: minstens de helft van de doorsnede van de met een massa verbonden beschermingsgeleider, en in geen geval minder dan 2,5 mm² bij mechanisch beschermde en 4 mm² bij niet mechanisch beschermde geleiders (",[17563,23369,23370],{},"onderafdeling 5.4.4.2. punt a.",[12,23372,23373,23374,39],{},"Praktisch gevolg voor de voedingsleiding: de beschermingsgeleider loopt in dezelfde kabel mee naar boven; vreemde geleidende delen — water- en verwarmingsleidingen, metalen constructies — worden aangesloten waar ze het gebouw binnenkomen, via de hoofdequipotentiaalverbinding, en niet nog eens per verdieping. Welk aardingsschema daarachter zit, behandelt ",[30,23375,23376],{"href":19054},"Aarding: TT of TN-S",[41,23378,23380],{"id":23379},"hoe-moeten-de-verdiepingen-op-het-situatieplan-en-het-eendraadschema-verschijnen","Hoe moeten de verdiepingen op het situatieplan en het eendraadschema verschijnen?",[12,23382,23383],{},"Het AREI scheidt beide documenten netjes, en die scheiding bepaalt waar een verdieping überhaupt zichtbaar wordt.",[12,23385,10081,23386,23388,23389,23391,23392,23394,23395,23398],{},[15,23387,3274],{}," duidt de ",[15,23390,21814],{}," aan van de schakel- en verdeelborden, de verbindingsdozen, de aftakdozen, de contactdozen, de lichtpunten, de schakelaars, de vaste machines en toestellen en de bronnen die op het eendraadschema voorkomen (",[17563,23393,21033],{},"). Het meervoud bij „schakel- en verdeelborden\" is de sleutel: een onderverdeelbord op de bovenverdieping moet op het situatieplan ",[15,23396,23397],{},"gesitueerd"," zijn. Een schema alleen volstaat niet.",[12,23400,10081,23401,23403,23404,23406],{},[15,23402,3273],{}," vermeldt de eigenschappen van de elektrische leidingen — type, doorsnede, aantal geleiders —, de plaatsingswijzen, type en eigenschappen van de differentieel- en de overstroombeveiligingen, de schakelaars, de verbindings- en aftakdozen, de contactdozen, de lichtpunten, de vaste machines en toestellen en de bronnen (",[17563,23405,21026],{},"). Voor een voedingsleiding betekent dat concreet: type, doorsnede, aantal geleiders en plaatsingswijze zijn verplichte gegevens, geen extraatje.",[12,23408,23409,23410,23412,23413,23416,23417,39],{},"Over de markering: elementaire stroombanen worden op het eendraadschema aangeduid met een hoofdletter; lichtpunten, contactdozen en stuureenheden met een nummer in de volgorde waarin ze in de stroombaan voorkomen, te beginnen bij de stroomopwaartse overstroombeveiliging. Op het situatieplan dragen dezelfde elementen de letter van hun stroombaan en het volgnummer uit het schema (",[17563,23411,21659],{},", figuren 3.1. en 3.2.). Die markering is verdiepingsonafhankelijk — een kring ",[1300,23414,23415],{},"C"," die over twee niveaus loopt, heet op beide niveaus ",[1300,23418,23415],{},[12,23420,23421,23422,23424,23425,7763],{},"Elk schakel- en verdeelbord is bovendien duidelijk, goed zichtbaar en onuitwisbaar individueel gemarkeerd, met duidelijk aangeduide voedingsspanning (",[17563,23423,22852],{},"), en de bedienings-, beschermings- en scheidingsinrichtingen van de stroombanen dragen individuele markeringen tenzij iedere mogelijkheid tot vergissen uitgesloten is (",[17563,23426,22281],{},[12,23428,23429,23432,23433,23436,23437,39],{},[15,23430,23431],{},"Wat het AREI niet oplegt:"," dat er per verdieping een apart blad ontstaat of dat er per bord een apart schema wordt getekend. Beide zijn voorstellingspraktijk — wel een zeer gevestigde, want een situatieplan met twee over elkaar gelegde grondplannen wordt onleesbaar. Hoe beide documenten zich tot elkaar verhouden, staat in ",[30,23434,23435],{"href":3102},"eendraadschema vs. situatieplan","; de opbouw van een situatieplan behandelt ",[30,23438,23439],{"href":18425},"een situatieplan tekenen",[41,23441,23443],{"id":23442},"heeft-elke-verdieping-een-rookmelder-nodig","Heeft elke verdieping een rookmelder nodig?",[12,23445,23446,23447,23450],{},"Dat is ",[15,23448,23449],{},"geen AREI-vraag."," Het AREI schrijft rookmelders voor huishoudelijke installaties niet voor. De verplichting komt uit het gewestelijke woonrecht: Vlaanderen, Wallonië en Brussel regelen elk afzonderlijk hoeveel melders waar moeten hangen, en de eisen verschillen zowel in het aantal per niveau als in het toepassingsgebied voor bestaande woningen.",[12,23452,23453,23454,23458],{},"Voor de planning over meerdere verdiepingen telt alleen het gevolg: het bewijs van de melders hoort niet in het AREI-controleverslag maar in de gewestelijke conformiteit, en waar de melders op 230 V werken, verschijnt hun stroombaan gewoon op het eendraadschema. De gewestelijke regels in detail staan in ",[30,23455,23457],{"href":23456},"\u002Fnl\u002Fblog\u002Frookmelder-verplicht-belgie","Rookmelder verplicht in België"," — daar en niet hier, zodat er maar één onderhouden versie bestaat.",[41,23460,23462],{"id":23461},"wat-geldt-er-als-je-achteraf-een-verdieping-inricht","Wat geldt er als je achteraf een verdieping inricht?",[12,23464,23465,23466,23469,23470,23473],{},"Een ingerichte zolder is bijna altijd een ",[15,23467,23468],{},"belangrijke uitbreiding",". Het AREI omschrijft die als een wijziging of uitbreiding van een elektrische installatie die een bijkomende, nog niet door een gelijkvormigheidscontrole afgedekte impact heeft op de veiligheid van personen of goederen — en noemt als voorbeeld uitdrukkelijk „toevoeging van een kring in een huishoudelijke installatie\" (",[17563,23471,23472],{},"afdeling 2.11.2.",", begripsbepalingen). Een nieuw onderverdeelbord met zes kringen voldoet daar meermaals aan.",[12,23475,23476],{},"Daaruit volgt drieërlei:",[1450,23478,23479,23489,23501],{},[1453,23480,23481,23484,23485,23488],{},[15,23482,23483],{},"Controle vóór ingebruikname."," Belangrijke wijzigingen of uitbreidingen worden vóór ingebruikname aan een gelijkvormigheidscontrole onderworpen; die controle is beperkt tot de toegevoegde of gewijzigde delen (",[17563,23486,23487],{},"onderafdeling 6.4.7.3.","). De oude gelijkvloerse installatie wordt dus niet automatisch volledig mee gecontroleerd — maar wijzigingen die een ongewijzigd deel beïnvloeden, moeten in het controleverslag vermeld worden, en dat ongewijzigde deel wordt wél gecontroleerd voor wat de gewijzigde kenmerken betreft (ibidem).",[1453,23490,23491,23494,23495,23497,23498,23500],{},[15,23492,23493],{},"300 mA voor de hele installatie."," Bij belangrijke wijzigingen of uitbreidingen van een oude huishoudelijke elektrische installatie wordt de ",[15,23496,21014],{}," elektrische installatie beschermd door minstens één differentieel van ten hoogste 300 mA (",[17563,23499,22688],{},"). Dat is het voorschrift dat een zolderinrichting geregeld duurder maakt dan begroot.",[1453,23502,23503,23506,23507,7763],{},[15,23504,23505],{},"Het situatieplan gaat mee."," Elke wijziging of uitbreiding van een huishoudelijke installatie wordt weergegeven op het situatieplan, dat op elk moment de bestaande toestand van de elementen toont. Oudere delen waarvan de uitvoering ter plaatse vóór 1 oktober 1981 begon en die op het eendraadschema staan, krijgen de vermelding „oud gedeelte\" (",[17563,23508,21659],{},[12,23510,23511,23512,23514,23515,23518,23519,39],{},"Bij wijzigingen die ",[15,23513,17329],{}," belangrijk zijn, is geen nieuw eendraadschema nodig; een korte, gedateerde en ondertekende beschrijving van de wijziging met naam, hoedanigheid en adres van de verantwoordelijke volstaat (",[17563,23516,23517],{},"3.1.2.1. a","). Het situatieplan moet niettemin actueel blijven. De volledige volgorde voor nieuwbouw staat in de ",[30,23520,23522],{"href":23521},"\u002Fnl\u002Fblog\u002Feendraadschema-nieuwbouw-checklist","Checklist eendraadschema nieuwbouw",[41,23524,23526],{"id":23525},"eengezinswoning-of-meergezinswoning-verandert-dat-het-antwoord","Eengezinswoning of meergezinswoning — verandert dat het antwoord?",[12,23528,23529,23530,23532,23533,23535],{},"Ja, en wel op een punt dat vaak over het hoofd wordt gezien. Zolang alle verdiepingen tot ",[15,23531,16763],{}," wooneenheid behoren, is de hele installatie één huishoudelijke installatie: één eendraadschema, één situatieplan, één controle, en de aantalsgrenzen uit ",[17563,23534,23195],{}," gelden voor die ene eenheid.",[12,23537,23538,23539,23541],{},"Zodra er per verdieping een eigen wooneenheid ontstaat, ontstaan er meerdere huishoudelijke installaties — elk met een eigen hoofdschakel- en verdeelbord met algemene lastscheidingsschakelaar van minstens 40 A (",[17563,23540,23039],{},"), een eigen schema, een eigen situatieplan en een eigen controle. De acht contactdozen per eindstroombaan tellen dan per wooneenheid, niet per gebouw.",[12,23543,23544,23545,23548,23549,23552,23553,23556,23557,23560],{},"Voor de ",[15,23546,23547],{},"gemeenschappelijke delen"," — traphalverlichting, belinstallatie, buitenverlichting, meterlokaal — bestaat een uitdrukkelijke versoepeling: in afwijking van de voorschriften voor niet-huishoudelijke installaties is het toegelaten zich voor de schema's, plannen en documenten van de gemeenschappelijke delen van een residentieel geheel te beperken tot de voorschriften voor huishoudelijke installaties (",[17563,23550,23551],{},"onderafdeling 3.1.2.1. punt e.","). Hetzelfde geldt voor de markering van de bijbehorende schakel- en verdeelborden (",[17563,23554,23555],{},"onderafdeling 3.1.3.3. punt c.","). Praktisch: voor het traphalbord volstaat een eendraadschema in het vertrouwde huishoudelijke formaat — je hoeft geen kortsluitstromen, impedanties en gebruikscategorieën te documenteren zoals ",[17563,23558,23559],{},"3.1.2.2. b"," anders vraagt.",[41,23562,23564],{"id":23563},"hoe-lijn-je-de-verdiepingen-in-planelec-op-elkaar-uit","Hoe lijn je de verdiepingen in PlanElec op elkaar uit?",[12,23566,23567],{},"Verdiepingen zijn in PlanElec geen losse tekeningen maar niveaus van één gebouwmodel. Je maakt ze aan, sorteert ze en kopieert de buitencontour of de gebouwstructuur van het ene niveau naar het volgende; een gemeenschappelijk nulpunt houdt de grondplannen dekkend, en een referentie-overlay toont de buurverdieping met instelbare dekking.",[12,23569,23570,23571,23573],{},"Het uitlijnen zelf verloopt via ",[15,23572,14361],{},": je zet hetzelfde markante punt eerst in het huidige grondplan en daarna in het getoonde referentiegrondplan. Vanaf twee puntenparen volgen verschuiving en rotatie automatisch. PlanElec toont daarna de gemiddelde en de grootste afwijking in centimeter plus de restafwijking per puntenpaar; de pijltoetsen verschuiven met 1 cm, met Shift met 10 cm. De schaal blijft daarbij vast — de uitlijning is star en vervormt een verdieping nooit om punten samen te trekken.",[12,23575,23576,23577,702,23580,933,23583,23586],{},"De verticale verbinding is een eigen element met de soorten ",[15,23578,23579],{},"trap",[15,23581,23582],{},"schacht",[15,23584,23585],{},"stijgzone",". Een trap teken je op één verdieping en verschijnt op de buurverdieping als hetzelfde bedienbare element, gespiegeld weergegeven — doorlopend tot de snijlijn, daarna gestippeld. Wijzigingen aan de geprojecteerde tweeling worden naar de bronverdieping teruggeschreven. Een puntenpaar kun je rechtstreeks uit een trap of schacht overnemen.",[12,23588,23589],{},"Voor de elektriciteit hangt daar meer aan vast dan het lijkt:",[1450,23591,23592,23598,23604,23610],{},[1453,23593,23594,23597],{},[15,23595,23596],{},"Schakelketens"," zijn projectbreed. Tijdens het tekenen zet je een keten voort via de verdiepingskeuze; de weergave vermeldt hoeveel leden op deze verdieping liggen en hoeveel in totaal over hoeveel verdiepingen.",[1453,23599,7641,23600,23603],{},[15,23601,23602],{},"kringtoewijzing"," werkt over verdiepingen heen: verbruikers op meerdere verdiepingen wijs je samen toe aan een bestaande automaat, en de selectie overleeft het wisselen van verdieping.",[1453,23605,23606,23609],{},[15,23607,23608],{},"Fysieke kabelroutes"," lopen wel degelijk over verdiepingen heen, maar in twee soorten etappes: verdiepingsetappes teken en bewerk je lokaal op hun eigen niveau, de verticale etappe kies je via een verbinder in plaats van ze te tekenen. De verticale lengte wordt afgeleid uit de verdiepingshoogtes en de horizontale verspringing zolang ze niet gemeten is — en telt mee in de kabellengte en dus in de spanningsvalberekening. Verdiepingshoogtes zijn gemarkeerd als aanname of als bevestigde waarde; standaard 2,50 m vrije hoogte en 0,30 m vloerdikte.",[1453,23611,23612,23615],{},[15,23613,23614],{},"Onderverdeelborden"," ontstaan als een eigen bord met een voedingsleiding vanaf het bovenliggende bord. PlanElec maakt daarvoor de voedingsautomaat in het voedende bord aan, hangt de algemene schakelaar van het onderbord eronder en stelt kaliber en doorsnede voor op basis van de verwachte belasting en een gelijktijdigheidsfactor van 0,7. De verdiepingstoewijzing van een bord ontstaat doordat je het bordsymbool in het grondplan van die verdieping plaatst.",[12,23617,23618,23619,23622,23623,23626],{},"Bij het ",[15,23620,23621],{},"exporteren"," krijgt elke verdieping een eigen pagina van het situatieplan, met eigen naamblok; verdiepingen zonder getekende muren worden overgeslagen. Het eendraadschema wordt opgebouwd als ",[15,23624,23625],{},"één blad per bord",", hoofdbord eerst, en één bord kan zelf meerdere A4-pagina's beslaan. Tussen de bladen plaatst PlanElec verwijzingen in beide richtingen: op het blad van het hoofdbord draagt het vertrek naar het onderbord diens bladnummer, en op het blad van het onderbord draagt de voeding het bladnummer van het voedende bord.",[41,23628,23630],{"id":23629},"wat-de-zelfcontrole-bij-meerdere-verdiepingen-controleert-en-wat-je-zelf-regelt","Wat de zelfcontrole bij meerdere verdiepingen controleert – en wat je zelf regelt",[12,23632,23633],{},"De AREI\u002FRGIE-zelfcontrole beoordeelt de ondersteunde regels op basis van de ingevoerde projectgegevens. Voor installaties over meerdere verdiepingen betekent dat:",[12,23635,23636],{},[15,23637,23638],{},"Dit controleert ze:",[1450,23640,23641,23644,23647,23654],{},[1453,23642,23643],{},"Of een voedingsleiding tussen twee borden een eigen beschermingsinrichting in het voedende bord heeft, naar een bestaand doelbord verwijst en aan beide kanten consistent is toegewezen. Ontbreekt daar iets, dan is dat een fout, geen tip.",[1453,23645,23646],{},"De spanningsval met de werkelijke kabellengte, inclusief de verticale etappes van routes over verdiepingen heen. Ontbreekt de lengte, dan volgt geen fout maar een niet-blokkerende melding dat de invoer ontbreekt.",[1453,23648,23649,23650,23653],{},"Een trapsgewijze afstemming tussen stroomopwaartse en stroomafwaartse differentiëlen — uitdrukkelijk als ",[15,23651,23652],{},"praktijkaanbeveling volgens IEC 60364-5-53",", niet als AREI-regel, en daarom als waarschuwing die je kunt overrulen.",[1453,23655,23656],{},"De rookmelderdekking per verdieping — eveneens als overrulebare waarschuwing en uitdrukkelijk als verwijzing naar gewestelijk recht, niet naar het AREI. Zijn slaapkamers of gangen als ruimtetype ingevuld, dan meldt PlanElec per ruimte; pas als op een verdieping geen zo'n ruimtetype herkenbaar is, valt ze terug op de verdiepingsregel.",[12,23658,23659],{},[15,23660,23661],{},"Dit regel je zelf:",[1450,23663,23664,23670,23679,23685,23691,23697],{},[1453,23665,7641,23666,23669],{},[15,23667,23668],{},"doorsnede van de voedingsleiding",". De leiding tussen twee borden wordt als stroombaan met beschermingsinrichting bijgehouden, maar niet als eigen kabelsegment met doorsnede. De doorsnede die bij het aanmaken verschijnt, is een voorbeeldberekening en geen bewaarde waarde — ze duikt daarom noch in de doorsnedecontrole noch in de spanningsvalberekening op.",[1453,23671,7641,23672,23675,23676,23678],{},[15,23673,23674],{},"ampèreafstemming"," tussen de voedingsautomaat en de algemene schakelaar van het onderbord. Dat is een bewuste keuze: de coördinatie van in serie geplaatste beschermingsinrichtingen verloopt volgens ",[17563,23677,23138],{}," via doorgelaten energie en uitschakelvermogen, en dus via de back-uptabellen van de fabrikant, niet via de nominale stroom.",[1453,23680,23681,23684],{},[15,23682,23683],{},"Kortsluitselectiviteit tussen vermogensschakelaars."," Daar bestaat geen regel voor — en volgens het AREI ook geen verplichting buiten veiligheids- en kritische installaties.",[1453,23686,7641,23687,23690],{},[15,23688,23689],{},"stijgzone als concept",". Ze is een soort verticale verbinder in het grondplan en dient het kabelrouten; geen controleregel evalueert ze.",[1453,23692,23693,23696],{},[15,23694,23695],{},"Brandwerende afdichting, compartimentering en schachtafsluiting."," Dat regelt het bouwrecht, niet het AREI en niet de zelfcontrole.",[1453,23698,23699,23702],{},[15,23700,23701],{},"Meting en keuring."," Meetwaarden neemt de elektricien ter plaatse op; de officiële beoordeling doet het erkend organisme.",[41,23704,6947],{"id":6946},[1450,23706,23707,23712,23717,23722,23726,23730,23734],{},[1453,23708,23709],{},[30,23710,23711],{"href":19043},"Verdeelkast plannen: opbouw en modules",[1453,23713,23714],{},[30,23715,23716],{"href":18425},"Een situatieplan tekenen",[1453,23718,23719],{},[30,23720,23721],{"href":21821},"Kabelwegen en kabellengtes bepalen",[1453,23723,23724],{},[30,23725,23376],{"href":19054},[1453,23727,23728],{},[30,23729,23522],{"href":23521},[1453,23731,23732],{},[30,23733,23457],{"href":23456},[1453,23735,23736],{},[30,23737,18474],{"href":23738},"\u002Fnl\u002Fblog\u002Fuitschakelvermogen-automaat-ka",[12,23740,23741],{},[30,23742,23743],{"href":21397},"PlanElec openen en verdiepingen aanmaken →",[12,23745,23746],{},[17563,23747,23748],{},"Reglementaire basis: AREI\u002FRGIE Boek 1 V06 — onderafdeling 2.2.1.1., afdelingen 2.6.1. en 2.11.2., onderafdelingen 3.1.2.1., 3.1.2.2., 3.1.2.3., 3.1.3.1., 3.1.3.3., afdeling 3.2.1., onderafdelingen 4.2.4.3., 4.3.3.5. en 4.3.3.7., hoofdstuk 4.4. (onderafdelingen 4.4.1.3., 4.4.1.4. met tabel 4.11., 4.4.2.2., 4.4.3.1., 4.4.3.2., 4.4.3.3.), afdelingen 5.2.1.5., 5.2.2.1., 5.2.5., 5.2.7.3., 5.2.9.6., 5.2.9.10., onderafdelingen 5.3.5.1., 5.3.5.2., 5.4.4.1., 5.4.4.2., 5.5.7.1., 5.5.7.2., 6.4.7.3. en 7.1.4.4. Doorslaggevend zijn de officiële tekst, de werkelijke toestand van de installatie en de controle door het erkend organisme.",{"title":1467,"searchDepth":1468,"depth":1468,"links":23750},[23751,23752,23753,23754,23755,23756,23757,23758,23759,23760,23761,23762,23763,23764,23765],{"id":22660,"depth":1468,"text":22661},{"id":22703,"depth":1468,"text":22704},{"id":22856,"depth":1468,"text":22857},{"id":23043,"depth":1468,"text":23044},{"id":23102,"depth":1468,"text":23103},{"id":23161,"depth":1468,"text":23162},{"id":23260,"depth":1468,"text":23261},{"id":23336,"depth":1468,"text":23337},{"id":23379,"depth":1468,"text":23380},{"id":23442,"depth":1468,"text":23443},{"id":23461,"depth":1468,"text":23462},{"id":23525,"depth":1468,"text":23526},{"id":23563,"depth":1468,"text":23564},{"id":23629,"depth":1468,"text":23630},{"id":6946,"depth":1468,"text":6947},"Wanneer een onderverdeelbord per verdieping zinvol is, hoe je de voedingsleiding dimensioneert en beveiligt, wat het AREI écht zegt over selectiviteit, en hoe verdiepingen op het situatieplan en het eendraadschema verschijnen — met AREI-artikel bij elke uitspraak.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-multi-storey-electrical-planning-editorial.jpg","\u002Fblog\u002Fmulti-storey-electrical-planning.nl","14 min",{"title":22654,"description":23766},"Meerdere verdiepingen: elk een eigen verdeelbord nodig?","meerdere-verdiepingen-elektriciteit-plannen","blog\u002Fmulti-storey-electrical-planning.nl",[3275,3276,23776,23777,23778,3273,3274,23779,1513],"verdiepingen","onderverdeelbord","voedingsleiding","meerdere niveaus","RL5r8rcGNFJJKKA-2Ll_UjKnlkgUF-LUdeMe7DhISw8","\u002Fblog\u002Fmeerdere-verdiepingen-elektriciteit-plannen",{"id":23783,"title":23784,"articleId":23785,"body":23786,"category":1493,"date":21420,"description":25261,"extension":1496,"image":23822,"lastUpdated":15381,"locale":1497,"meta":25262,"navigation":1499,"ogImage":25263,"path":25264,"publishDate":21420,"readTime":21425,"refreshInterval":11097,"seo":25265,"seoTitle":25266,"slug":25267,"stem":25268,"tags":25269,"__hash__":25274,"kind":1515,"href":25275},"blog\u002Fblog\u002Finstallation-methods-arei.nl.md","Plaatsingswijzen volgens het AREI: welke vermelding hoort in het eendraadschema?","installation-methods-arei",{"type":9,"value":23787,"toc":25246},[23788,23792,23817,23823,23829,24165,24171,24175,24188,24208,24212,24218,24283,24289,24306,24310,24313,24334,24347,24366,24370,24373,24444,24451,24458,24462,24471,24503,24507,24517,24526,24536,24556,24576,24605,24609,24619,24622,24629,24633,24636,24736,24761,24765,24771,24982,24988,25006,25044,25048,25051,25105,25112,25116,25206,25208,25233,25238],[41,23789,23791],{"id":23790},"welke-plaatsingswijzen-kent-het-arei-en-welke-hoort-in-het-eendraadschema","Welke plaatsingswijzen kent het AREI — en welke hoort in het eendraadschema?",[12,23793,23794,23799,23800,8635,23802,23805,23806,23809,23810,23813,23814,23816],{},[15,23795,23796,23797,7763],{},"In het eendraadschema van een woning vermeld je voor elke leiding de plaatsingswijze, naast kabeltype, doorsnede en aantal geleiders (",[17563,23798,21026],{}," Je kiest uit de zeventien plaatsingswijzen ",[17563,23801,30],{},[17563,23803,23804],{},"q"," van ",[17563,23807,23808],{},"onderafdeling 5.2.2.1.",": van luchtlijnen over ondergrondse plaatsing, opbouw, inbouw, plinten en goten tot verwarmingsleidingen in zolderingen en vloeren. Andere plaatsingswijzen zijn volgens de regels van goed vakmanschap toegelaten (",[17563,23811,23812],{},"onderafdeling 5.2.2.4.","). Voor de meeste van die wijzen bevat ",[17563,23815,21065],{}," eigen, bindende regels.",[12,23818,23819],{},[22,23820],{"alt":23821,"src":23822},"Een elektricien legt installatiebuizen in een ruwbouw.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-installation-methods-arei-editorial.webp",[12,23824,23825,23826,23828],{},"Een doel noemt het AREI voor deze verplichting niet, vakinhoudelijk is het duidelijk: de toelaatbare stroom IZ van een leiding is onder meer functie van „de plaatsing en de omgeving van de elektrische leiding” (",[17563,23827,21354],{},"). Zonder de plaatsingswijze kun je niet beoordelen of een doorsnede bij de stroombaan past.",[49,23830,23831,23849],{},[52,23832,23833],{},[55,23834,23835,23841,23843,23846],{},[58,23836,23837,23838,17566],{},"Letter (",[17563,23839,23840],{},"5.2.2.1.",[58,23842,20859],{},[58,23844,23845],{},"Typische toepassing in de woningbouw",[58,23847,23848],{},"Bijzondere regels",[68,23850,23851,23870,23886,23901,23916,23932,23953,23969,23984,24003,24019,24035,24051,24070,24087,24104,24119,24135,24150],{},[55,23852,23853,23855,23858,23861],{},[73,23854,30],{},[73,23856,23857],{},"luchtlijnen",[73,23859,23860],{},"voeding naar een bijgebouw",[73,23862,23863,23866,23867,17566],{},[17563,23864,23865],{},"5.2.9.1."," (verwijst naar boek 3, ",[17563,23868,23869],{},"hoofdstuk 7.1.",[55,23871,23872,23875,23878,23881],{},[73,23873,23874],{},"b.1",[73,23876,23877],{},"rechtstreeks ingegraven",[73,23879,23880],{},"tuinstopcontact, carport",[73,23882,23883,23885],{},[17563,23884,20948],{},": minstens 0,60 m diep, enkel kabels",[55,23887,23888,23891,23894,23897],{},[73,23889,23890],{},"b.2",[73,23892,23893],{},"ingegraven met mechanische bescherming",[73,23895,23896],{},"kabel onder afdekband",[73,23898,23899],{},[17563,23900,20948],{},[55,23902,23903,23906,23909,23912],{},[73,23904,23905],{},"b.3",[73,23907,23908],{},"ingegraven in een huls",[73,23910,23911],{},"doorgang onder oprit of terras",[73,23913,23914],{},[17563,23915,20948],{},[55,23917,23918,23921,23924,23927],{},[73,23919,23920],{},"c",[73,23922,23923],{},"contactlijn voor rol- of glijcontacten",[73,23925,23926],{},"niet relevant in de woningbouw",[73,23928,23929],{},[17563,23930,23931],{},"5.2.1.4. punt a.",[55,23933,23934,23937,23940,23943],{},[73,23935,23936],{},"d",[73,23938,23939],{},"in opbouw",[73,23941,23942],{},"zichtbare XVB in kelder, garage, techniek",[73,23944,23945,23946,23949,23950,23952],{},"Definitie ",[17563,23947,23948],{},"5.2.2.1. d.",": afstand tot de wand ≤ 0,3 × buitendiameter; ",[17563,23951,20919],{},": in principe enkel kabels",[55,23954,23955,23958,23961,23964],{},[73,23956,23957],{},"e",[73,23959,23960],{},"in verzonken buizen",[73,23962,23963],{},"standaard bij nieuwbouw: VOB in preflex",[73,23965,23966],{},[17563,23967,23968],{},"5.2.9.3.",[55,23970,23971,23973,23976,23979],{},[73,23972,23024],{},[73,23974,23975],{},"in sierlijsten, plinten en lijsten",[73,23977,23978],{},"renovatie, zichtbare kabelgoot",[73,23980,23981,23983],{},[17563,23982,20935],{},": enkel geïsoleerde geleiders of eenaderige kabels",[55,23985,23986,23989,23992,23995],{},[73,23987,23988],{},"g",[73,23990,23991],{},"in de vrije lucht met klemmen of op kabelrekken, kabelladders, kraagstukken, haken",[73,23993,23994],{},"technische ruimte, stookplaats",[73,23996,23945,23997,24000,24001,23952],{},[17563,23998,23999],{},"5.2.2.1. g.",": afstand tot alle wanden ≥ 0,3 × buitendiameter; ",[17563,24002,20919],{},[55,24004,24005,24008,24011,24014],{},[73,24006,24007],{},"h",[73,24009,24010],{},"in kabelbanen of goten",[73,24012,24013],{},"verdeeltracé in de technische ruimte",[73,24015,24016,24018],{},[17563,24017,20922],{},": in open goten in principe enkel kabels",[55,24020,24021,24024,24027,24030],{},[73,24022,24023],{},"i",[73,24025,24026],{},"in kokers",[73,24028,24029],{},"tracé boven de vloer",[73,24031,24032],{},[17563,24033,24034],{},"5.2.9.7.",[55,24036,24037,24040,24043,24046],{},[73,24038,24039],{},"j",[73,24041,24042],{},"in open, gesloten of met zand gevulde kabelkanalen",[73,24044,24045],{},"vloerkanaal, industriële toepassing",[73,24047,24048],{},[17563,24049,24050],{},"5.2.9.8.",[55,24052,24053,24056,24059,24062],{},[73,24054,24055],{},"k",[73,24057,24058],{},"in holle constructieruimten, holten en geprefabriceerde uitgeholde blokken",[73,24060,24061],{},"holle blokken, verlaagd plafond",[73,24063,24064,933,24067],{},[17563,24065,24066],{},"5.2.9.9.",[17563,24068,24069],{},"4.3.3.5. punt b.",[55,24071,24072,24075,24078,24081],{},[73,24073,24074],{},"l",[73,24076,24077],{},"achter wandpanelen",[73,24079,24080],{},"gipskartonwand, houtskeletbouw",[73,24082,24083,933,24085],{},[17563,24084,24066],{},[17563,24086,24069],{},[55,24088,24089,24092,24095,24098],{},[73,24090,24091],{},"m",[73,24093,24094],{},"rechtstreeks verzonken, zonder buizen",[73,24096,24097],{},"XVB rechtstreeks in de sleuf",[73,24099,24100,24103],{},[17563,24101,24102],{},"5.2.9.10.",": gabarit, beton ≥ 3 cm, bepleistering ≥ 0,4 cm",[55,24105,24106,24108,24111,24114],{},[73,24107,23007],{},[73,24109,24110],{},"in geprefabriceerde leidingen",[73,24112,24113],{},"zelden in de woningbouw",[73,24115,24116],{},[17563,24117,24118],{},"5.2.9.11.",[55,24120,24121,24124,24127,24130],{},[73,24122,24123],{},"o",[73,24125,24126],{},"op isolatoren",[73,24128,24129],{},"bestaande oude installaties",[73,24131,24132],{},[17563,24133,24134],{},"5.2.9.12.",[55,24136,24137,24139,24142,24145],{},[73,24138,12],{},[73,24140,24141],{},"onder water",[73,24143,24144],{},"zwembadtechniek",[73,24146,24147],{},[17563,24148,24149],{},"5.2.2.1. punt p.",[55,24151,24152,24154,24157,24160],{},[73,24153,23804],{},[73,24155,24156],{},"in zolderingen, vloeren en muren voor verwarmingsleidingen en -panelen",[73,24158,24159],{},"vloerverwarming, verwarmingsmatten",[73,24161,24162],{},[17563,24163,24164],{},"5.2.9.13.",[12,24166,24167,24168,24170],{},"Andere plaatsingswijzen zijn toegelaten, maar vallen onder de restbepaling: ze beantwoorden aan „de desbetreffende regels van goed vakmanschap” (",[17563,24169,23812],{},"). Wie buiten de lijst werkt, verlaat dus het gebied waarvoor het AREI zelf een regel formuleert.",[41,24172,24174],{"id":24173},"wat-is-het-verschil-tussen-punt-e-en-punt-m","Wat is het verschil tussen punt e en punt m?",[12,24176,24177,24178,24180,24181,24183,24184,24187],{},"Dit is het vaakst verwarde paar, want in de dagelijkse taal heet allebei „inbouw”. Het verschil is de buis. Punt ",[17563,24179,23957],{}," heet in de Nederlandse tekst letterlijk „in verzonken buizen” — de Franse tekst zegt „sous conduits encastrés”. Punt ",[17563,24182,24091],{}," heet daarentegen uitdrukkelijk „rechtstreeks verzonken, ",[15,24185,24186],{},"zonder"," buizen”.",[12,24189,24190,24191,24193,24194,24197,24198,24193,24200,24203,24204,24207],{},"Dat is geen woordenspel maar het verschil tussen twee regelsets. Voor ",[17563,24192,23957],{}," geldt ",[17563,24195,24196],{},"onderafdeling 5.2.9.3."," met de buisregels: buigstralen, geleiders die altijd inschuifbaar en verwijderbaar blijven, geen verbindingen in de buis. Voor ",[17563,24199,24091],{},[17563,24201,24202],{},"onderafdeling 5.2.9.10."," met het gabarit en de minimale bedekking. Welk materiaal je in welk geval kiest en wat dat kost, staat vergeleken in ",[30,24205,24206],{"href":20977},"preflex versus vrije bedrading","; dit artikel beschrijft de systematiek waarin beide varianten staan.",[41,24209,24211],{"id":24210},"waarom-bepaalt-de-plaatsingswijze-de-toelaatbare-stroom","Waarom bepaalt de plaatsingswijze de toelaatbare stroom?",[12,24213,24214,24217],{},[17563,24215,24216],{},"Onderafdeling 4.4.1.4."," noemt vijf grootheden waarvan IZ afhangt. De plaatsingswijze is er één van, en het is de enige die je niet aan de kabel zelf kunt aflezen.",[49,24219,24220,24233],{},[52,24221,24222],{},[55,24223,24224,24230],{},[58,24225,24226,24227],{},"Grootheid volgens ",[17563,24228,24229],{},"4.4.1.4.",[58,24231,24232],{},"Wat ze in het plan betekent",[68,24234,24235,24245,24253,24261,24272],{},[55,24236,24237,24240],{},[73,24238,24239],{},"doorsnede van de geleiders",[73,24241,24242,24243,17566],{},"vermelding in het eendraadschema (",[17563,24244,21149],{},[55,24246,24247,24250],{},[73,24248,24249],{},"isolatie van de geleiders",[73,24251,24252],{},"kabeltype, bijvoorbeeld XVB of VOB",[55,24254,24255,24258],{},[73,24256,24257],{},"samenstelling van de elektrische leiding",[73,24259,24260],{},"een- of meeraderig, wapening, scherm",[55,24262,24263,24266],{},[73,24264,24265],{},"plaatsing en omgeving van de leiding",[73,24267,24268,24269,24271],{},"plaatsingswijze: vermelding in het eendraadschema (",[17563,24270,21149],{},"); omgeving: niet voorgeschreven",[55,24273,24274,24277],{},[73,24275,24276],{},"omgevingstemperatuur",[73,24278,24279,24280],{},"waar de leiding ligt, zie ",[17563,24281,24282],{},"5.2.3.1.",[12,24284,24285,24286,24288],{},"De eigenlijke berekening staat niet in het AREI. De tekst zegt enkel dat de toelaatbare stroom „volgens de regels van goed vakmanschap” berekend moet worden (",[17563,24287,24229],{},") en dat de bevoegde ministers daarvoor nadere regels kunnen vaststellen. In de praktijk komen de tabellen en correctiefactoren dus uit de normenreeks NBN HD 60364-5-52, niet uit het AREI zelf.",[12,24290,24291,24292,24294,24295,24298,24299,24302,24303,39],{},"Wat het AREI wél vastlegt, wordt daar vaak mee verward: ",[17563,24293,21358],{}," geeft voor huishoudelijke installaties de ",[15,24296,24297],{},"maximale"," nominale stroom per doorsnede, apart voor de smeltzekering en voor de vermogensschakelaar: bij 1,5 mm² 10 A respectievelijk 16 A, bij 2,5 mm² 16 A respectievelijk 20 A, bij 4 mm² 20 A respectievelijk 25 A, bij 6 mm² 32 A respectievelijk 40 A, bij 10 mm² 50 A respectievelijk 63 A. Die tabel kent de plaatsingswijze niet. Ze is een bovengrens, geen vrijgeleide: de voorwaarde IZ ≥ IB uit ",[17563,24300,24301],{},"onderafdeling 5.2.1.2. punt a."," moet daarnaast vervuld zijn. Een grotere doorsnede is niet in strijd met tabel 4.11; de tabel begrenst de nominale stroom per doorsnede, niet de doorsnede bij een lagere nominale stroom. De koppeling doorsnede-beveiliging staat uitgewerkt in ",[30,24304,24305],{"href":18957},"kabeldoorsnede en automaat",[41,24307,24309],{"id":24308},"wat-doen-bundeling-omgevingstemperatuur-en-isolatiemateriaal-met-de-belastbaarheid","Wat doen bundeling, omgevingstemperatuur en isolatiemateriaal met de belastbaarheid?",[12,24311,24312],{},"Alle drie verlagen ze IZ, en in alle drie de gevallen levert het AREI de randvoorwaarde, niet de factor.",[12,24314,24315,24318,24319,24322,24323,24326,24327,24330,24331,24333],{},[15,24316,24317],{},"Bundeling."," Het AREI legt de grens exact vast: een kabel of geïsoleerde geleider is ",[15,24320,24321],{},"afzonderlijk geïnstalleerd"," wanneer hij op minstens 20 mm van elke andere kabel of geïsoleerde geleider ligt (",[17563,24324,24325],{},"afdeling 2.7.1.","). Alles daaronder is „in bundel of in laag” geplaatst. Dat onderscheid heeft in het AREI een rechtstreeks gevolg — maar voor de brandvoortplanting, niet voor de opwarming: afzonderlijk geplaatste geleiders en kabels hebben minstens de karakteristiek F1 of klasse Eca (",[17563,24328,24329],{},"onderafdeling 5.2.7.2.","), in bundel of in laag minstens F2 of klasse Cca (",[17563,24332,23305],{},"), en dat „onafhankelijk van de afstand waarover ze effectief in bundel of laag geïnstalleerd zijn”. De thermische bundelingsfactor zelf volgt opnieuw uit de regels van goed vakmanschap.",[12,24335,24336,2725,24339,24342,24343,24346],{},[15,24337,24338],{},"Omgevingstemperatuur.",[17563,24340,24341],{},"Onderafdeling 5.2.3.1."," eist dat leidingen geschikt zijn voor de laagste en de hoogste plaatselijke omgevingstemperatuur en enkel binnen het door de fabrikant opgegeven temperatuurbereik geplaatst worden. Daar komt ",[17563,24344,24345],{},"afdeling 5.2.8."," bij: leidingen mogen in de buurt van verwarmings- of warmeluchtleidingen en rookafvoeren niet aan schadelijke temperaturen blootgesteld worden en moeten voldoende afstand houden of door een warmteschild gescheiden zijn. Wie een leiding vlak naast de verwarmingscollector legt, verandert daarmee haar thermische omgeving — en die maakt deel uit van dezelfde vermelding als de plaatsingswijze.",[12,24348,24349,24352,24353,24355,24356,24358,24359,24362,24363,24365],{},[15,24350,24351],{},"Thermische isolatie."," Het AREI bevat ",[15,24354,17871],{}," eigen reductiefactor voor leidingen in of onder isolatiemateriaal. „Thermische isolatie” komt in het reglement voor als voorzorg bij temperaturen onder −25 °C (",[17563,24357,24282],{},") en in het hoofdstuk over verwarmingspanelen, waar isolatiemateriaal in contact met de verwarmingsinstallatie onbrandbaar moet zijn (",[17563,24360,24361],{},"5.2.9.13. punt b.5.","). Een leiding in een geïsoleerd hellend dak valt dus onder „plaatsing en omgeving” van ",[17563,24364,24229],{}," en wordt beoordeeld volgens de regels van goed vakmanschap — niet volgens een AREI-tabel die niet bestaat.",[41,24367,24369],{"id":24368},"waar-hoort-de-plaatsingswijze-thuis-eendraadschema-situatieplan-of-materiaallijst","Waar hoort de plaatsingswijze thuis: eendraadschema, situatieplan of materiaallijst?",[12,24371,24372],{},"Die drie documenten hebben in het AREI duidelijk gescheiden verplichte inhoud.",[49,24374,24375,24386],{},[52,24376,24377],{},[55,24378,24379,24381,24384],{},[58,24380,990],{},[58,24382,24383],{},"Plaatsingswijze vereist?",[58,24385,20865],{},[68,24387,24388,24402,24417,24431],{},[55,24389,24390,24393,24398],{},[73,24391,24392],{},"eendraadschema (huishoudelijk)",[73,24394,24395,24397],{},[15,24396,206],{},", uitdrukkelijk",[73,24399,24400],{},[17563,24401,21149],{},[55,24403,24404,24407,24413],{},[73,24405,24406],{},"situatieplan (huishoudelijk)",[73,24408,24409,24410,24412],{},"nee — daar staat de ",[15,24411,21814],{}," van de onderdelen",[73,24414,24415],{},[17563,24416,21203],{},[55,24418,24419,24422,24427],{},[73,24420,24421],{},"stroombaanschema (niet-huishoudelijk)",[73,24423,24424,24426],{},[15,24425,206],{},", samen met lengte en aantal geleiders",[73,24428,24429],{},[17563,24430,21169],{},[55,24432,24433,24435,24438],{},[73,24434,21231],{},[73,24436,24437],{},"niet voorgeschreven",[73,24439,24440,24441],{},"toegelaten als bijlage bij ",[17563,24442,24443],{},"3.1.2.1. punt c.",[12,24445,24446,24447,24450],{},"De materiaallijst is in het AREI geen verplicht document. ",[17563,24448,24449],{},"Onderafdeling 3.1.2.1. punt c."," laat enkel toe schema’s en plannen aan te vullen met documenten „die op een meer gedetailleerde wijze de verschillende kenmerken van het elektrisch materieel en\u002Fof de producten bevatten”. Een kabellijst met de plaatsingswijze per leiding is precies zo’n bijlage: nuttig voor calculatie en uitvoering; de vermelding hoort toch in het eendraadschema zelf.",[12,24452,24453,24454,24457],{},"Hoe schema en situatieplan zich verder verdelen, staat in ",[30,24455,24456],{"href":21821},"kabelwegen en kabellengtes","; daar lees je ook waarom de lengte enkel in het niet-huishoudelijke stroombaanschema verplicht is.",[41,24459,24461],{"id":24460},"wanneer-verandert-de-plaatsingswijze-binnen-één-leiding","Wanneer verandert de plaatsingswijze binnen één leiding?",[12,24463,24464,24465,24468,24469,7763],{},"Een leiding heeft zelden maar één plaatsingswijze. Van het bord door de muur, over het plafond, de grond in en weer tegen een buitenmuur: dat zijn er vier. Het AREI heeft daar een eigen begrip voor. Als ",[15,24466,24467],{},"begin van een stroombaan"," geldt het begin van de elektrische leiding „hetzij de plaats waar de doorsnede, aard of samenstelling van de elektrische leiding of haar plaatsingswijze verandert” (",[17563,24470,22699],{},[12,24472,24473,24474,24476,24477,24479,24480,24482,24483,24485,24486,24488,24489,702,24491,24476,24493,702,24495,702,24497,933,24500,24502],{},"Praktisch betekent dat: elke wissel van plaatsingswijze is een eigen beschouwingstraject. Voor de dimensionering telt in principe het ongunstigste deeltraject: volgens ",[17563,24475,24301],{}," in samenhang met ",[17563,24478,21354],{}," moet IZ minstens IB bereiken; ",[17563,24481,23054],{}," verlangt in principe de overbelastingsbeveiliging op de plaats waar een wissel de toelaatbare stroom IZ van de beschermde leiding vermindert (uitzonderingen: ",[17563,24484,23087],{},"). Een leiding die twee meter door een bundel buizen loopt en daarna vrij in het plafond ligt, wordt daarom niet op het vrije stuk gedimensioneerd. Voor de voorstelling legt het AREI niet vast dat alle, de langste of de ongunstigste wijze gekozen moet worden (",[17563,24487,21026],{},"). Als vaktechnische aanbeveling documenteer je alle voorkomende wijzen in volgorde, omdat verplichtingen aan afzonderlijke trajecten gekoppeld zijn: ",[17563,24490,20919],{},[17563,24492,24066],{},[17563,24494,24069],{},[17563,24496,24102],{},[17563,24498,24499],{},"5.2.7.1. punt 3",[17563,24501,23321],{}," Zo vergelijkt de controleur het schema met de zichtbare installatie.",[41,24504,24506],{"id":24505},"welke-regels-gelden-voor-verzonken-leidingen","Welke regels gelden voor verzonken leidingen?",[12,24508,24509,24510,24513,24514,24516],{},"Voor de rechtstreekse plaatsing zonder buis (",[17563,24511,24512],{},"punt m",") is ",[17563,24515,24202],{}," de maatgevende bepaling, en ze is ongewoon concreet.",[12,24518,12598,24519,24522,24523,7763],{},[15,24520,24521],{},"beton of cement"," verzonken leidingen worden bedekt met een laag beton of cement van minstens 3 cm; geleiders met enkel basisisolatie mogen er helemaal niet in verzonken worden (",[17563,24524,24525],{},"punt a.",[12,24527,24528,24529,24532,24533,24535],{},"Voor leidingen zonder buis die ",[15,24530,24531],{},"in de muren van lokalen"," verzonken worden, gelden afhankelijk van de inbouwsituatie ook de regels van het gabarit (",[17563,24534,23353],{},"):",[1450,24537,24538,24541,24544,24547,24550,24553],{},[1453,24539,24540],{},"het traject volgt alleen horizontale en verticale wegen; horizontale wegen in een plafond staan haaks op de verticale wanden;",[1453,24542,24543],{},"horizontale trajecten bevinden zich op 25 à 35 cm van de vloer of het plafond, en eveneens op 25 à 35 cm boven de onderkant van de bovendrempel van het raam, voor zover ze dan minstens 25 cm onder het plafond blijven;",[1453,24545,24546],{},"verticale trajecten liggen zo dicht mogelijk in een hoek van het lokaal of op 10 à 20 cm van de lijsten of kozijnen van de deuren;",[1453,24548,24549],{},"buiten dit gabarit mag enkel verticaal ten opzichte van een zichtbaar toestel geplaatst worden;",[1453,24551,24552],{},"de leidingen worden noch bij de plaatsing noch later aan mechanische invloeden onderworpen en zonder beschadiging aan de wanden gehecht;",[1453,24554,24555],{},"de dekkende bepleistering is minstens 0,4 cm dik.",[12,24557,24558,24559,24561,24562,24565,24566,24569,24570,24573,24574,7763],{},"Voor buizen geldt in de plaats daarvan ",[17563,24560,24196],{},": geleiders of kabels moeten altijd ingeschoven en verwijderd kunnen worden (",[17563,24563,24564],{},"punt e.","), verbindingen in de buis zijn verboden (",[17563,24567,24568],{},"punt f.","), en in ingebouwde buizen zijn T-stukken en hoekstukken niet toegelaten terwijl de geleiders in verbindings-, aftak- en trekdozen toegankelijk blijven (",[17563,24571,24572],{},"punt i.2.","). Buizen uit brandbaar materiaal mogen enkel gebruikt worden als ze minstens 3 cm diep in onbrandbaar materiaal zitten (",[17563,24575,24568],{},[12,24577,24578,24579,24582,24583,24585,24586,24589,24590,24592,24593,24595,24596,11307,24599,24601,24602,24604],{},"Eén belangrijke uitzondering: voor ",[15,24580,24581],{},"installaties op zeer lage spanning (ZLS)"," geldt het gabarit van ",[17563,24584,20880],{}," uitdrukkelijk niet (",[17563,24587,24588],{},"onderafdeling 5.2.9.15. punt b.","). Bovendien vervallen voor ZLS de eerste alinea van ",[17563,24591,20919],{},", de tweede alinea van ",[17563,24594,24066],{}," en de eerste alinea van ",[17563,24597,24598],{},"5.2.9.12. punt a.",[17563,24600,20964],{},"). Bus-, bel- en stuurleidingen op ZLS moeten dus niet in het zonepatroon blijven; de overige toepasselijke regels van ",[17563,24603,21065],{}," blijven wel van toepassing.",[41,24606,24608],{"id":24607},"wat-geldt-voor-ondergrondse-leidingen","Wat geldt voor ondergrondse leidingen?",[12,24610,24611,24614,24615,24618],{},[17563,24612,24613],{},"Onderafdeling 5.2.9.2. punt a."," is een van de scherpste bepalingen van het hoofdstuk. In de grond en in ontoegankelijke ondergrondse hulzen mogen — met uitzondering van onafhankelijke beschermingsgeleiders — ",[15,24616,24617],{},"enkel kabels"," geplaatst worden. De minimale diepte is 0,60 m, gemeten vanaf het grondvlak, „behalve indien het technisch onmogelijk is”. Kan die diepte niet gehaald worden, dan komt er een doorlopend of afgedicht omhulsel in duurzaam en weerstandbiedend materiaal in de plaats.",[12,24620,24621],{},"Bovendien moet de kabel aan één van drie voorwaarden voldoen: een geaard elektrisch scherm met wapening of versterkte buitenmantel; of een weerstandbiedende buitenmantel plus een doorlopende afdekking die bij graafwerken beschermt en aan beide zijden uitsteekt; of plaatsing in een huls dan wel een gelijkwaardig systeem. Is aan één daarvan voldaan, dan zijn voor de bescherming tegen elektrische schokken geen bijkomende maatregelen vereist.",[12,24623,24624,24625,24628],{},"Voor de signalisatie in de grond bevat ",[17563,24626,24627],{},"punt d."," eigen regels: merktekens aan de uiteinden van rechte stukken, minstens om de tweehonderd meter, met een oppervlakte van minstens 0,01 m² en een bliksemschicht in reliëf. Aansluitingen van laagspanningsnetgebruikers zijn daarvan vrijgesteld.",[41,24630,24632],{"id":24631},"welke-kabel-mag-in-welke-plaatsingswijze","Welke kabel mag in welke plaatsingswijze?",[12,24634,24635],{},"De plaatsingswijze beperkt de kabelkeuze, los van de doorsnede.",[49,24637,24638,24649],{},[52,24639,24640],{},[55,24641,24642,24644,24647],{},[58,24643,20859],{},[58,24645,24646],{},"Toegelaten",[58,24648,20865],{},[68,24650,24651,24663,24675,24686,24698,24711,24724],{},[55,24652,24653,24656,24658],{},[73,24654,24655],{},"ondergronds",[73,24657,24617],{},[73,24659,24660],{},[17563,24661,24662],{},"5.2.9.2. a.",[55,24664,24665,24668,24671],{},[73,24666,24667],{},"in de vrije lucht en in opbouw",[73,24669,24670],{},"in principe enkel kabels; uitzonderingen gelden voor bepaalde onafhankelijke beschermings-, equipotentiale en geaarde actieve geleiders",[73,24672,24673],{},[17563,24674,20919],{},[55,24676,24677,24680,24682],{},[73,24678,24679],{},"open goot",[73,24681,24670],{},[73,24683,24684],{},[17563,24685,20922],{},[55,24687,24688,24691,24694],{},[73,24689,24690],{},"gesloten goot",[73,24692,24693],{},"ook geïsoleerde geleiders; buiten de lokalen van de elektrische dienst volwandig en met deksel dat enkel met gereedschap opengaat",[73,24695,24696],{},[17563,24697,20922],{},[55,24699,24700,24703,24706],{},[73,24701,24702],{},"sierlijsten, plinten en lijsten",[73,24704,24705],{},"geïsoleerde geleiders of eenaderige kabels",[73,24707,24708],{},[17563,24709,24710],{},"5.2.9.4. b.",[55,24712,24713,24716,24719],{},[73,24714,24715],{},"buizen",[73,24717,24718],{},"geïsoleerde geleiders of kabels",[73,24720,24721],{},[17563,24722,24723],{},"5.2.9.3. b.",[55,24725,24726,24729,24732],{},[73,24727,24728],{},"holle constructieruimten",[73,24730,24731],{},"geen geleiders met enkel basisisolatie",[73,24733,24734],{},[17563,24735,24066],{},[12,24737,24738,24739,24741,24742,24745,24746,24749,24750,24752,24753,24756,24757,39],{},"Daar komt de brandklasse bij. In ",[15,24740,24728],{}," en in ",[15,24743,24744],{},"sierlijsten, plinten of lijsten uit brandbare materialen"," eist ",[17563,24747,24748],{},"onderafdeling 4.3.3.5. punt b."," uitdrukkelijk de karakteristiek of klasse van ",[17563,24751,23321],{}," — dus F2 of minstens Cca. Een houtskeletwand is een holle constructieruimte. Welk kabeltype bij welke toepassing hoort, staat in ",[30,24754,24755],{"href":20982},"XVB versus VOB","; voor natte ruimten gelden bovendien de volumeregels uit ",[30,24758,24760],{"href":24759},"\u002Fnl\u002Fblog\u002Fbadkamer-kabels-arei-zones","badkamerkabels en AREI-zones",[41,24762,24764],{"id":24763},"hoe-legt-planelec-de-plaatsingswijze-vast-en-wat-staat-er-in-de-export","Hoe legt PlanElec de plaatsingswijze vast, en wat staat er in de export?",[12,24766,24767,24768,16018],{},"PlanElec kent vijftien plaatsingswijzen en houdt bij elke wijze de AREI-verwijzing bij waaronder ze valt. De benamingen komen overeen met de zichtbare opties in het kabelmenu ",[15,24769,24770],{},"Kabel bewerken",[49,24772,24773,24786],{},[52,24774,24775],{},[55,24776,24777,24780,24783],{},[58,24778,24779],{},"Keuze in PlanElec",[58,24781,24782],{},"Korte code",[58,24784,24785],{},"Vastgelegde AREI-verwijzing",[68,24787,24788,24800,24815,24828,24841,24854,24867,24880,24893,24906,24919,24931,24943,24956,24969],{},[55,24789,24790,24792,24795],{},[73,24791,13631],{},[73,24793,24794],{},"AP",[73,24796,24797],{},[17563,24798,24799],{},"5.2.2.1. d",[55,24801,24802,24805,24808],{},[73,24803,24804],{},"Leiding in buis op de wand",[73,24806,24807],{},"AR",[73,24809,24810,8390,24812],{},[17563,24811,24799],{},[17563,24813,24814],{},"5.2.9.3. h",[55,24816,24817,24820,24823],{},[73,24818,24819],{},"Inbouw in flexibele buis",[73,24821,24822],{},"UR",[73,24824,24825],{},[17563,24826,24827],{},"5.2.2.1. e",[55,24829,24830,24833,24836],{},[73,24831,24832],{},"Inbouw direct",[73,24834,24835],{},"UD",[73,24837,24838],{},[17563,24839,24840],{},"5.2.2.1. m",[55,24842,24843,24846,24849],{},[73,24844,24845],{},"Achter wandpanelen",[73,24847,24848],{},"HW",[73,24850,24851],{},[17563,24852,24853],{},"5.2.2.1. l",[55,24855,24856,24859,24862],{},[73,24857,24858],{},"Plint \u002F lijst",[73,24860,24861],{},"FL",[73,24863,24864],{},[17563,24865,24866],{},"5.2.2.1. f",[55,24868,24869,24872,24875],{},[73,24870,24871],{},"Ondergronds",[73,24873,24874],{},"EV",[73,24876,24877],{},[17563,24878,24879],{},"5.2.2.1. b.1 + b.2",[55,24881,24882,24885,24888],{},[73,24883,24884],{},"Ondergronds in kabelbuis",[73,24886,24887],{},"ER",[73,24889,24890],{},[17563,24891,24892],{},"5.2.2.1. b.3",[55,24894,24895,24898,24901],{},[73,24896,24897],{},"Kabelgoot \u002F -ladder",[73,24899,24900],{},"KW",[73,24902,24903],{},[17563,24904,24905],{},"5.2.2.1. g + h",[55,24907,24908,24911,24914],{},[73,24909,24910],{},"In holle constructieruimte",[73,24912,24913],{},"FV",[73,24915,24916],{},[17563,24917,24918],{},"5.2.2.1. k",[55,24920,24921,24924,24927],{},[73,24922,24923],{},"In buis",[73,24925,24926],{},"IR",[73,24928,24929],{},[17563,24930,23968],{},[55,24932,24933,24936,24939],{},[73,24934,24935],{},"Bundel van buizen",[73,24937,24938],{},"RB",[73,24940,24941],{},[17563,24942,23968],{},[55,24944,24945,24948,24951],{},[73,24946,24947],{},"Als luchtlijnen",[73,24949,24950],{},"FR",[73,24952,24953],{},[17563,24954,24955],{},"5.2.2.1. a",[55,24957,24958,24961,24964],{},[73,24959,24960],{},"In kokers",[73,24962,24963],{},"KS",[73,24965,24966],{},[17563,24967,24968],{},"5.2.2.1. i",[55,24970,24971,24974,24977],{},[73,24972,24973],{},"In open, gesloten of met zand gevuld kabelkanaal",[73,24975,24976],{},"KK",[73,24978,24979],{},[17563,24980,24981],{},"5.2.2.1. j",[12,24983,24984,24985,24987],{},"De plaatsingswijze hangt aan het deeltraject, niet aan de hele kabel: een kabelroute in het grondplan kan per stuk een andere wijze dragen, en elk deeltraject krijgt zijn eigen kleur met de tweeletterige code. In het eendraadschema tekent PlanElec standaard alle voorkomende wijzen in hun volgorde; de eerste wijze ligt bij de beveiligingsschakelaar. Vanaf drie wijzen toont de markeerzone twee tekens en „+n” voor de overige; de legende vermeldt alle voorkomende wijzen, ook de wijzen die onder „+n” zijn samengevat. De kabellijst vermeldt de volledige volgorde per kabel. De toewijzing per deeltraject blijft in het kabelmodel en in de controle per deeltraject behouden. De kabellijst (CSV en pdf) vermeldt per kabel de plaatsingswijze en lengte van elk deeltraject in de volgorde van het traject zodra alle deeltrajecten een plaatsingswijze hebben; anders vermeldt ze de voorkomende wijzen zonder lengtes. Ontbreekt de lengte van een deeltraject, dan staat er „—”, nooit 0. De lijst neemt alleen de plaatsingswijzen van de betreffende kabel over, niet die van andere kabels in dezelfde tak; de totale kabellengte blijft in de lengtekolom beschikbaar. Ze kan als aanvullende bijlage volgens ",[17563,24986,21646],{}," dienen.",[12,24989,24990,24991,24994,24995,24998,24999,25002,25003,25005],{},"De tekens gebruiken de geometrie uit tabel 2.23 categorie C: de cirkel ",[15,24992,24993],{},"op"," de draaglijn duidt uitsluitend de ",[15,24996,24997],{},"luchtlijn"," aan; de buiscirkel staat ",[15,25000,25001],{},"naast"," de draaglijn. Holle constructieruimte, kabelgoot, kabelkanaal en koker hebben geen eigen teken in tabel 2.23 en krijgen daarom een eigen herkenbaar teken met legende in het schema en in de pdf-uitvoer (",[17563,25004,21659],{},"). Kabelmenu, editor, voorbeeld en pdf gebruiken dezelfde tekenbron en draaglijn.",[12,25007,25008,25009,25012,25013,25015,25016,25019,25020,25023,25024,25027,25028,25031,25032,25035,25036,25039,25040,25043],{},"In de bewerkingsmodus kun je de leiding in het eendraadschema rechtstreeks aanklikken, ook als nog geen plaatsingswijze is gedocumenteerd; de toegankelijke benaming is ",[15,25010,25011],{},"Kabelleiding bewerken",". Het kabelmenu ",[15,25014,24770],{}," toont de kabels van de tak vanaf de beveiligingsschakelaar, in de volgorde van het traject. Als er meerdere kabels of deeltrajecten zijn, staat per kabel ",[15,25017,25018],{},"Kabel: {van} → {naar}","; elk deeltraject verschijnt als ",[15,25021,25022],{},"Deeltraject {nummer} · {lengte}"," of met „—” als de lengte onbekend is. Bovenaan stelt de keuze onder ",[15,25025,25026],{},"Installatiemethode voor alle deeltrajecten"," de plaatsingswijze in voor alle deeltrajecten van de tak; elk afzonderlijk deeltraject kan daarna via zijn plaatsingswijze-optie worden gewijzigd. Zolang plaatsingswijzen ontbreken of niet bevestigd zijn, toont het exporttabblad een afzonderlijk onderdeel voor de gezamenlijke controle: ",[15,25029,25030],{},"Kabels stap voor stap controleren"," opent het, ",[15,25033,25034],{},"Een plaatsingswijze kiezen"," is daar de keuze; ",[15,25037,25038],{},"Lege deeltrajecten in selectie aanvullen"," vult alleen lege velden aan, en ",[15,25041,25042],{},"Plaatsingswijzen van deze kabel bevestigen"," bevestigt de gegevens per kabel.",[41,25045,25047],{"id":25046},"wat-de-zelfcontrole-over-de-plaatsingswijze-controleert-en-wat-ter-plaatse-blijft","Wat de zelfcontrole over de plaatsingswijze controleert en wat ter plaatse blijft",[12,25049,25050],{},"De zelfcontrole toetst de regels die uit de ingevoerde projectgegevens te beslissen zijn. Voor de plaatsingswijze betekent dat concreet:",[1450,25052,25053,25062,25090,25099],{},[1453,25054,25055,25058,25059,25061],{},[15,25056,25057],{},"Doorsnede tegenover beveiliging:"," de zelfcontrole toetst of de kabeldoorsnede bij de nominale stroom van de beveiliging past. Dat is de koppeling uit ",[17563,25060,21358],{},", en die kent de plaatsingswijze niet. De toelaatbare stroom bij de ingevoerde plaatsingswijze, bundeling, omgevingstemperatuur en isolatiemateriaal beoordeelt het ontwerp.",[1453,25063,25064,25067,25068,25070,25071,11172,25073,25075,25076,25078,25079,933,25082,25085,25086,25089],{},[15,25065,25066],{},"Brandklasse in holle wanden:"," voor deeltrajecten met de plaatsingswijze ",[15,25069,24845],{}," en voor aansluitpunten in lokalen met holle wanden moet de kabel zonder een kabelbrede gedocumenteerde buis minstens het kenmerk F2 of de klasse Cca hebben (",[17563,25072,24748],{},[17563,25074,23305],{},"). Ligt de klasse lager en is er geen buis gedocumenteerd, dan meldt PlanElec een fout; ontbreekt de brandklasse, een gegevenslacune. De keuze ",[15,25077,24910],{},", de uitzonderingen van ",[17563,25080,25081],{},"onderafdeling 5.2.7.1. punt 3",[17563,25083,25084],{},"onderafdeling 5.2.7.3. punt 1"," en de buisregel van ",[17563,25087,25088],{},"onderafdeling 5.2.7.4."," vallen momenteel buiten de controle.",[1453,25091,25092,25095,25096,25098],{},[15,25093,25094],{},"Maten op de werf:"," het gabarit van ",[17563,25097,20880],{},", de dikte van bepleistering en betonbedekking en de diepte van ondergrondse leidingen zijn geen gegevens in het model; die controleert de installateur op de werf.",[1453,25100,25101,25104],{},[15,25102,25103],{},"Uitvoering:"," of de ingevoerde plaatsingswijze overeenkomt met wat werkelijk geplaatst is, blijkt bij de visuele controle ter plaatse. Metingen en de officiële beoordeling doet het erkend organisme.",[12,25106,25107,25108,39],{},"De volledige omvang staat in ",[30,25109,25111],{"href":25110},"\u002Fnl\u002Fhelp\u002Fwat-controleert-de-zelfcontrole","wat de zelfcontrole controleert",[41,25113,25115],{"id":25114},"welke-fouten-vallen-op-bij-de-keuring","Welke fouten vallen op bij de keuring?",[1450,25117,25118,25130,25138,25147,25157,25165,25189,25197],{},[1453,25119,25120,25123,25124,25126,25127,25129],{},[15,25121,25122],{},"Geïsoleerde geleiders in plaats van kabels in opbouw of in een open goot."," Losse VOB-aders zichtbaar tegen de muur of in een goot zijn in strijd met ",[17563,25125,20919],{}," respectievelijk ",[17563,25128,20922],{},": daar zijn in principe alleen kabels toegelaten, met de daar genoemde uitzonderingen.",[1453,25131,25132,25135,25136],{},[15,25133,25134],{},"Sleuf buiten het gabarit."," Diagonale trajecten en verlopen dwars door het midden van de muur zijn de klassieker bij ",[17563,25137,20880],{},[1453,25139,25140,25143,25144,7763],{},[15,25141,25142],{},"Te dunne bedekking."," Minder dan 0,4 cm bepleistering boven de leiding of minder dan 3 cm beton bij ingegoten leidingen (",[17563,25145,25146],{},"5.2.9.10. punten a. en b.",[1453,25148,25149,25152,25153,25156],{},[15,25150,25151],{},"Verbinding in de buis."," Klemmen en lasdoppen in een buis zijn verboden (",[17563,25154,25155],{},"5.2.9.3. punt f.","); aansluitingen in trek- en verbindingsdozen horen op een geschikt klemmenblok.",[1453,25158,25159,25162,25163,7763],{},[15,25160,25161],{},"Buis niet meer natrekbaar."," Te scherpe bochten of overvolle buizen schenden de eis dat geleiders altijd ingeschoven en verwijderd kunnen worden (",[17563,25164,20906],{},[1453,25166,25167,25170,25171,25173,25174,25176,25177,1628,25179,11307,25181,11172,25183,25185,25186,25188],{},[15,25168,25169],{},"Holle constructieruimte met Eca in plaats van F2\u002FCca"," — vaak in houtbouw en verlaagde plafonds. PlanElec meldt dat momenteel alleen voor ",[15,25172,24845],{}," en voor ruimten met holle wanden, niet voor de keuze ",[15,25175,24910],{},". Normatief biedt een buis alleen vrijstelling als ze voldoet aan de voorwaarden van ",[17563,25178,25081],{},[17563,25180,25084],{},[17563,25182,24748],{},[17563,25184,23305],{},"); buizen moeten bovendien aan ",[17563,25187,25088],{}," voldoen.",[1453,25190,25191,25194,25195,7763],{},[15,25192,25193],{},"Ondergrondse kabel te ondiep."," Minder dan 0,60 m zonder doorlopend beschermingsomhulsel (",[17563,25196,20948],{},[1453,25198,25199,25202,25203,25205],{},[15,25200,25201],{},"Plaatsingswijze ontbreekt in het schema."," Een eendraadschema met type, doorsnede en aantal geleiders maar zonder plaatsingswijze is onvolledig (",[17563,25204,21149],{},") — hoe netjes de installatie ook uitgevoerd is.",[41,25207,6947],{"id":6946},[1450,25209,25210,25214,25218,25223,25228],{},[1453,25211,25212],{},[30,25213,18958],{"href":18957},[1453,25215,25216],{},[30,25217,23257],{"href":21821},[1453,25219,25220],{},[30,25221,25222],{"href":20982},"XVB versus VOB: welke kabel waarvoor",[1453,25224,25225],{},[30,25226,25227],{"href":20977},"Preflex versus vrije bedrading",[1453,25229,25230],{},[30,25231,25232],{"href":18419},"Eendraadschema maken: stap voor stap",[12,25234,25235],{},[30,25236,25237],{"href":21397},"PlanElec openen en plaatsingswijzen invullen →",[12,25239,25240],{},[17563,25241,25242,25243,39],{},"Reglementaire basis: AREI\u002FRGIE boek 1 V06 — afdelingen 2.6.1., 2.7.1., 2.7.2., 5.2.2., 5.2.8., onderafdelingen 3.1.2.1., 3.1.2.2., 3.1.2.3., 4.3.3.5., 4.4.1.4. met tabel 4.11., 4.4.3.1., 5.2.1.2., 5.2.3.1., 5.2.7.2., 5.2.7.3. en afdeling 5.2.9. met de onderafdelingen 5.2.9.1. tot 5.2.9.15. Officiële tekst: ",[30,25244,19073],{"href":15357,"rel":25245},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":25247},[25248,25249,25250,25251,25252,25253,25254,25255,25256,25257,25258,25259,25260],{"id":23790,"depth":1468,"text":23791},{"id":24173,"depth":1468,"text":24174},{"id":24210,"depth":1468,"text":24211},{"id":24308,"depth":1468,"text":24309},{"id":24368,"depth":1468,"text":24369},{"id":24460,"depth":1468,"text":24461},{"id":24505,"depth":1468,"text":24506},{"id":24607,"depth":1468,"text":24608},{"id":24631,"depth":1468,"text":24632},{"id":24763,"depth":1468,"text":24764},{"id":25046,"depth":1468,"text":25047},{"id":25114,"depth":1468,"text":25115},{"id":6946,"depth":1468,"text":6947},"De plaatsingswijze hoort in het eendraadschema. Alle zeventien plaatsingswijzen uit AREI 5.2.2.1, hun regels in afdeling 5.2.9, de invloed op de toelaatbare stroom en typische keuringsfouten, met artikelverwijzing bij elke uitspraak.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-installation-methods-arei-editorial.jpg","\u002Fblog\u002Finstallation-methods-arei.nl",{"title":23784,"description":25261},"Plaatsingswijzen AREI: welke vermelding in het schema?","plaatsingswijzen-arei-eendraadschema","blog\u002Finstallation-methods-arei.nl",[3275,3276,25270,3273,25271,25272,25273,1513],"plaatsingswijzen","toelaatbare stroom","kabelplaatsing","installatiezones","wY7jeWHoV-baMSk1XTkm8GwLzKCKf2fPdU7-tP7Fz8M","\u002Fblog\u002Fplaatsingswijzen-arei-eendraadschema",{"id":25277,"title":25278,"articleId":25279,"body":25280,"category":1493,"date":21420,"description":25836,"extension":1496,"image":25294,"lastUpdated":15381,"locale":1497,"meta":25837,"navigation":1499,"ogImage":25838,"path":25839,"publishDate":21420,"readTime":7016,"refreshInterval":11097,"seo":25840,"seoTitle":25841,"slug":25842,"stem":25843,"tags":25844,"__hash__":25848,"kind":1515,"href":25849},"blog\u002Fblog\u002Fswitch-types-single-line-diagram.nl.md","Wisselschakelaar, kruisschakelaar of serieschakelaar: welke hoort waar in het eendraadschema?","switch-types-single-line-diagram",{"type":9,"value":25281,"toc":25822},[25282,25286,25289,25295,25306,25423,25433,25437,25448,25451,25460,25464,25467,25470,25495,25498,25502,25508,25517,25539,25545,25549,25552,25555,25567,25570,25574,25581,25588,25591,25595,25598,25608,25623,25637,25641,25648,25686,25691,25695,25698,25705,25711,25715,25722,25732,25738,25741,25747,25751,25754,25778,25780,25812,25817],[41,25283,25285],{"id":25284},"welke-schakeling-hoort-bij-hoeveel-bedieningsplaatsen","Welke schakeling hoort bij hoeveel bedieningsplaatsen?",[12,25287,25288],{},"Het aantal plaatsen waar je hetzelfde lichtpunt wil bedienen bepaalt de schakeling. Eén plaats is een gewone schakelaar. Twee plaatsen vragen twee wisselschakelaars. Drie of meer plaatsen vragen nog altijd twee wisselschakelaars aan de uiteinden, met daartussen één kruisschakelaar per extra bedieningsplaats. De serieschakelaar valt buiten die reeks: die bedient twee groepen afzonderlijk vanaf één enkele plaats.",[12,25290,25291],{},[22,25292],{"alt":25293,"src":25294},"Elektriciens controleren schakelaars in een gang.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-switch-types-single-line-diagram-editorial.webp",[12,25296,25297,25298,25301,25302,25305],{},"Die functies staan elk met een eigen symbool in ",[17563,25299,25300],{},"tabel 2.23."," van het AREI, opgenomen in ",[17563,25303,25304],{},"hoofdstuk 2.13."," Dezelfde tabel geldt zowel voor het eendraadschema als voor het situatieplan van een huishoudelijke installatie.",[49,25307,25308,25326],{},[52,25309,25310],{},[55,25311,25312,25315,25318,25321,25323],{},[58,25313,25314],{},"Bedieningsplaatsen",[58,25316,25317],{},"Schakeling",[58,25319,25320],{},"Omschrijving in tabel 2.23, rubriek E",[58,25322,10587],{},[58,25324,25325],{},"Verbinding tussen de plaatsen",[68,25327,25328,25343,25359,25375,25391,25406],{},[55,25329,25330,25332,25335,25338,25341],{},[73,25331,343],{},[73,25333,25334],{},"enkelvoudige schakeling",[73,25336,25337],{},"„Schakelaar — algemeen symbool”",[73,25339,25340],{},"1 schakelaar",[73,25342,17871],{},[55,25344,25345,25348,25351,25354,25357],{},[73,25346,25347],{},"1, maar twee afzonderlijke lichtgroepen",[73,25349,25350],{},"serieschakeling",[73,25352,25353],{},"„Eenpolige omschakelaar (dubbele aansteking: om twee stroombanen afzonderlijk te sluiten of te openen op een enkele plaats)”",[73,25355,25356],{},"1 serieschakelaar met twee kanalen",[73,25358,17871],{},[55,25360,25361,25363,25366,25369,25372],{},[73,25362,326],{},[73,25364,25365],{},"wisselschakeling (va-et-vient)",[73,25367,25368],{},"„Eenpolige wisselschakelaar (dubbele richting: om een stroombaan te sluiten of te openen op twee plaatsen)”",[73,25370,25371],{},"2 wisselschakelaars",[73,25373,25374],{},"2 correspondentiegeleiders",[55,25376,25377,25379,25382,25385,25388],{},[73,25378,577],{},[73,25380,25381],{},"kruisschakeling",[73,25383,25384],{},"„Kruisschakelaar … in combinatie met twee wisselschakelaars aan de twee uiteinden”",[73,25386,25387],{},"2 wisselschakelaars + 1 kruisschakelaar",[73,25389,25390],{},"2 correspondentiegeleiders per tussenstuk",[55,25392,25393,25396,25398,25401,25404],{},[73,25394,25395],{},"n ≥ 3",[73,25397,25381],{},[73,25399,25400],{},"idem",[73,25402,25403],{},"2 wisselschakelaars + (n − 2) kruisschakelaars",[73,25405,25390],{},[55,25407,25408,25411,25414,25417,25420],{},[73,25409,25410],{},"onbeperkt",[73,25412,25413],{},"drukknopsturing",[73,25415,25416],{},"„Drukknop” samen met „Impulsschakelaar”",[73,25418,25419],{},"1 drukknop per plaats + 1 impulsschakelaar in het schakelbord",[73,25421,25422],{},"1 gemeenschappelijke stuurleiding, knoppen parallel",[12,25424,25425,25426,25429,25430,25432],{},"Het AREI schrijft die aantallen geleiders niet zelf voor — ze volgen uit het schakelprincipe. Wat het AREI wél verplicht, is dat het eendraadschema het type, de doorsnede en het ",[15,25427,25428],{},"aantal geleiders"," van elke elektrische leiding vermeldt, samen met de schakelaars zelf (",[17563,25431,21026],{},"). Een wisselschakeling die je als „gewone lichtkring” tekent, laat dus een verplichte gegevenspost weg.",[41,25434,25436],{"id":25435},"wat-is-het-verschil-tussen-een-wisselschakelaar-en-een-serieschakelaar","Wat is het verschil tussen een wisselschakelaar en een serieschakelaar?",[12,25438,25439,25440,25443,25444,25447],{},"Beide zien er in de winkel dubbel uit, maar ze doen het tegenovergestelde. De wisselschakelaar verlegt één stroombaan naar twee mogelijke uitgangen: samen met een tweede wisselschakelaar bedien je daarmee ",[15,25441,25442],{},"hetzelfde"," lichtpunt vanaf twee plaatsen. De serieschakelaar — in tabel 2.23 „eenpolige omschakelaar, dubbele aansteking” — bedient ",[15,25445,25446],{},"twee verschillende"," stroombanen afzonderlijk vanaf één plaats.",[12,25449,25450],{},"Praktisch gevolg: een serieschakelaar vervangt nooit een wisselschakeling en omgekeerd. Wie in een gang twee bedieningsplaatsen nodig heeft en er een serieschakelaar plaatst, heeft twee knoppen die elk hun eigen lamp aan- en uitzetten, niet één lamp die je van beide kanten bedient.",[12,25452,25453,25454,25457,25458,7763],{},"Let ook op de terminologie in het AREI zelf. De Nederlandse tekst gebruikt „eenpolige omschakelaar” voor wat op de werf een serieschakelaar of dubbele aansteking heet, en „kruisschakelaar” voor wat in de Franse tekst „commutateur intermédiaire pour va-et-vient” is en in de praktijk ",[17563,25455,25456],{},"permutateur",". Gebruik je afwijkende benamingen, neem dan de omschrijving uit tabel 2.23 over in je legende: het AREI laat elk duidelijk identificeerbaar symbool toe op voorwaarde dat het in de legende van de eendraadschema's en de situatieplannen gedefinieerd is (",[17563,25459,21659],{},[41,25461,25463],{"id":25462},"hoeveel-aders-heb-je-nodig-voor-een-wisselschakeling","Hoeveel aders heb je nodig voor een wisselschakeling?",[12,25465,25466],{},"Tussen de twee wisselschakelaars lopen twee correspondentiegeleiders. Daar komt bij: de fase naar de eerste schakelaar, de geschakelde geleider van de tweede schakelaar naar het lichtpunt, de nulgeleider tot bij het lichtpunt en de beschermingsgeleider waar die vereist is. Bij een kruisschakeling verandert dat principe niet — je knipt de correspondentie gewoon door en steekt er per extra plaats een kruisschakelaar tussen, telkens met twee geleiders aan elke zijde.",[12,25468,25469],{},"Twee AREI-regels sturen de keuze van die geleiders:",[1450,25471,25472,25485],{},[1453,25473,25474,25477,25478,11307,25481,25484],{},[15,25475,25476],{},"Doorsnede."," Voor elektrische leidingen die niet integraal deel uitmaken van een toestel is een doorsnede kleiner dan 2,5 mm² in principe verboden. ",[17563,25479,25480],{},"Tabel 5.1.",[17563,25482,25483],{},"onderafdeling 5.2.1.2.",") staat 1,5 mm² uitdrukkelijk toe voor „elektrische leidingen die deel uitmaken van stroombanen zonder contactdoos” — dat is precies een zuivere verlichtingskring met zijn schakelaars.",[1453,25486,25487,25490,25491,25494],{},[15,25488,25489],{},"Kleur."," De combinatie groen-geel is voorbehouden aan beschermingsgeleiders, vereffeningsgeleiders en geaarde actieve geleiders (PEN, PEM, PEL); groen en\u002Fof geel gebruiken voor andere actieve geleiders is verboden (",[17563,25492,25493],{},"onderafdeling 5.1.6.2.","). Blauw is voorbehouden aan de nulgeleider in stroombanen die er een hebben. Bevat de stroombaan geen nulgeleider, dan mag de blauw gemerkte ader van een meeraderige kabel voor een ander doel dienen — behalve als beschermings- of vereffeningsgeleider. Een correspondentiegeleider mag dus blauw zijn in een kabel zonder nulgeleider, maar nooit groen-geel.",[12,25496,25497],{},"Voor de kabeltypes zelf geeft tabel 2.23 zijn eigen voorbeelden: een XVB-kabel Cca met een aantal geleiders van een bepaalde doorsnede, of losse H07V-U-geleiders Eca in een buis in een wand. Zet in je schema het werkelijk geplaatste type en de werkelijke plaatsingswijze; die twee zijn allebei verplichte inhoud van het eendraadschema.",[41,25499,25501],{"id":25500},"welk-symbool-teken-je-in-het-eendraadschema-en-welk-op-het-situatieplan","Welk symbool teken je in het eendraadschema en welk op het situatieplan?",[12,25503,25504,25505,39],{},"Het symbool is hetzelfde — tabel 2.23 geldt voor beide documenten. Het verschil zit in wat het document beantwoordt, en in de ",[15,25506,25507],{},"kenmerking",[12,25509,25510,25511,25513,25514,25516],{},"Op het eendraadschema moeten de schakelaars aanwezig zijn, samen met verbindings- en aftakdozen, contactdozen, lichtpunten, vaste machines en toestellen, de beveiligingen en de leidinggegevens (",[17563,25512,21026],{},"). Elke elementaire stroombaan krijgt een hoofdletter; elk lichtpunt, elke contactdoos en elke sturingseenheid wordt genummerd in volgorde, vertrekkend vanaf de beschermingsinrichting tegen overstroom van die stroombaan (",[17563,25515,21659],{},", figuur 3.1.).",[12,25518,25519,25520,25522,25523,25525,25526,11307,25529,25531,25532,25535,25536,25538],{},"Op het situatieplan moet de ",[15,25521,21814],{}," van diezelfde schakelaars staan (",[17563,25524,21033],{},"). En daar zit de regel die in de praktijk het vaakst wordt overgeslagen: elke schakelaar en elke sturingseenheid wordt gekenmerkt door de letter van de stroombaan waarvan ze deel uitmaken, ",[15,25527,25528],{},"gevolgd door het nummer van het lichtpunt of het toestel dat hij bedient",[17563,25530,21659],{},", figuur 3.2.). Twee wisselschakelaars die samen lichtpunt ",[1300,25533,25534],{},"B3"," bedienen dragen dus allebei de aanduiding ",[1300,25537,25534],{}," — niet twee opeenvolgende eigen nummers.",[12,25540,25541,25542,39],{},"Dat is meteen de reden waarom een schakelketen geen cosmetisch detail is: zonder vastgelegde relatie tussen schakelaar en lichtpunt kun je die kenmerking niet correct zetten. Hoe beide documenten elkaar aanvullen staat uitgewerkt in ",[30,25543,25544],{"href":5957},"eendraadschema versus situatieplan",[41,25546,25548],{"id":25547},"wanneer-kies-je-drukknoppen-met-een-impulsschakelaar-in-plaats-van-een-kruisschakeling","Wanneer kies je drukknoppen met een impulsschakelaar in plaats van een kruisschakeling?",[12,25550,25551],{},"Vanaf drie of vier bedieningsplaatsen groeit een kruisschakeling snel in bekabeling: elke extra plaats vraagt twee correspondentiegeleiders heen en terug. Drukknoppen die parallel op één stuurleiding staan en samen een impulsschakelaar aansturen, schalen beter. Tabel 2.23 rubriek E bevat daarvoor beide symbolen: de „drukknop” en de „impulsschakelaar”.",[12,25553,25554],{},"Twee aandachtspunten:",[1450,25556,25557,25560],{},[1453,25558,25559],{},"De impulsschakelaar zit in het schakel- en verdeelbord en hoort dus ook dáár in het eendraadschema, met zijn eigen beveiliging bovenstrooms. Hij is geen eigenschap van de schakelaar in de gang.",[1453,25561,25562,25563,25566],{},"Het AREI aanvaardt uitdrukkelijk „stuurhulpmiddelen” en „elektronische schakelingen” als stuurinrichting naast gewone schakelaars en vermogensschakelaars (",[17563,25564,25565],{},"onderafdeling 5.3.3.2. punt b.","). Een impulsschakelaar is dus een reguliere oplossing, op voorwaarde dat hij aan de betreffende normen voldoet.",[12,25568,25569],{},"Een verwante variant is de trapautomaat of tijdschakelaar; tabel 2.23 kent daarvoor eveneens een symbool. De keuze tussen impulsschakelaar en tijdschakelaar is functioneel, niet normatief: de eerste houdt vast tot de volgende puls, de tweede valt na een ingestelde tijd terug.",[41,25571,25573],{"id":25572},"mag-een-schakelaar-eenpolig-zijn-en-mag-hij-in-de-nulgeleider","Mag een schakelaar eenpolig zijn — en mag hij in de nulgeleider?",[12,25575,25576,25577,25580],{},"Eenpolig mag. ",[17563,25578,25579],{},"Onderafdeling 5.3.3.2. punt c."," stelt uitdrukkelijk dat het toegelaten is niet alle actieve geleiders te onderbreken wanneer daar geen gevaren uit voortspruiten. Een klassieke eenpolige lichtschakelaar die de fase onderbreekt, past daarin.",[12,25582,25583,25584,25587],{},"Maar dezelfde bepaling zet er meteen een grens op: ",[15,25585,25586],{},"tenzij voor het uitvoeren van metingen is het niet toegelaten een eenpolige stuurinrichting te voorzien in de nulgeleider."," Een eenpolige schakelaar die per vergissing op de nulgeleider is aangesloten laat het toestel onder spanning staan terwijl het uit lijkt te zijn. Dat is een klassieke bevinding bij een keuring en geen detail dat je uit een tekening kunt afleiden — het moet spanningsloos ter plaatse worden nagegaan.",[12,25589,25590],{},"Tweepolig schakelen blijft mogelijk en is soms gewenst, bijvoorbeeld bij een vast aangesloten toestel dat volledig van het net moet kunnen. Tabel 2.23 bevat daarvoor zowel de „tweepolige schakelaar” als de „tweepolige wisselschakelaar”. De polariteit is dus een aparte eigenschap naast de schakelfunctie, geen andere schakeling.",[41,25592,25594],{"id":25593},"hoeveel-lichtpunten-mag-één-schakelketen-voeden","Hoeveel lichtpunten mag één schakelketen voeden?",[12,25596,25597],{},"Hier lopen twee AREI-regels door elkaar die vaak worden verward.",[12,25599,25600,25601,25604,25605,25607],{},"De limiet van acht geldt voor ",[15,25602,25603],{},"contactdozen",": per eindstroombaan blijft het aantal enkelvoudige of meervoudige contactdozen beperkt tot acht (",[17563,25606,22684],{},"). Een zuivere verlichtingskring valt daar niet onder.",[12,25609,25610,25611,25614,25615,25619,25620,25622],{},"Zodra je contactdozen, verlichtingstoestellen en andere vaste toestellen op ",[15,25612,25613],{},"dezelfde"," eindstroombaan zet, gelden de voorschriften van een contactdozenkring — en dan telt de tekst: „één vast toestel of een geheel van vaste toestellen bediend door een gemeenschappelijk bedieningstoestel ",[25616,25617,25618],"span",{},"wordt"," gelijkgesteld met een contactdoos” (",[17563,25621,22684],{},"). Vier spots die samen aan één schakelketen hangen tellen in zo'n gemengde kring dus als één eenheid, niet als vier.",[12,25624,25625,25626,25629,25630,25632,25633,39],{},"Daarnaast: voor wooneenheden met meer dan twee lokalen en\u002Fof plaatsen voorzien ",[15,25627,25628],{},"minstens twee afzonderlijke stroombanen"," de voeding van de verlichtingstoestellen (",[17563,25631,22684],{},"). Eén enkele lichtkring voor een volledige woning is dus geen ontwerpkeuze maar een tekortkoming. Meer over de telling in gemengde kringen staat in ",[30,25634,25636],{"href":25635},"\u002Fblog\u002Fstopcontacten-per-circuit","stopcontacten per stroomkring",[41,25638,25640],{"id":25639},"waar-mag-de-schakelaar-in-de-badkamer-staan","Waar mag de schakelaar in de badkamer staan?",[12,25642,25643,25644,25647],{},"Voor ruimten met bad en\u002Fof douche legt ",[17563,25645,25646],{},"onderafdeling 7.1.5.2."," per volume vast wat is toegelaten. Voor bedieningstoestellen — waaronder een gewone lichtschakelaar — komt dat neer op:",[49,25649,25650,25660],{},[52,25651,25652],{},[55,25653,25654,25657],{},[58,25655,25656],{},"Volume",[58,25658,25659],{},"Bedieningstoestel toegelaten?",[68,25661,25662,25670,25678],{},[55,25663,25664,25667],{},[73,25665,25666],{},"volume 0",[73,25668,25669],{},"Niet toegelaten, met uitzondering van bedieningstoestellen die deel uitmaken van de daar toegelaten vaste toestellen en op ZLVS gevoed worden (punt b.)",[55,25671,25672,25675],{},[73,25673,25674],{},"volume 1",[73,25676,25677],{},"Enkel bedieningstoestellen gevoed op ZLVS, met de energiebron buiten de volumes 0 en 1 (punt c., 4.)",[55,25679,25680,25683],{},[73,25681,25682],{},"volume 2",[73,25684,25685],{},"Bedieningstoestellen gevoed op laagspanning zijn toegelaten (punt d., 5.), naast de ZLVS-variant (punt d., 4.)",[12,25687,25688,25689,39],{},"Een 230 V-wisselschakelaar hoort dus buiten de volumes 0 en 1. Een trekschakelaar aan het plafond is een gebruikelijke oplossing en heeft in tabel 2.23 zijn eigen symbool („eenpolige trekschakelaar”), maar hij ontsnapt niet aan de volumeregels — het toestel zelf moet in een toegelaten volume liggen. De volumes en de bijhorende leidingregels staan verder uitgewerkt in ",[30,25690,24760],{"href":15255},[41,25692,25694],{"id":25693},"wanneer-vervangt-domotica-de-kruisschakeling","Wanneer vervangt domotica de kruisschakeling?",[12,25696,25697],{},"Zodra hetzelfde lichtpunt vanaf veel plaatsen én in verschillende sferen moet worden bediend, wordt een busgestuurde oplossing praktischer dan een groeiende kruisschakeling. Het AREI heeft daarvoor een eigen rubriek in tabel 2.23: rubriek J, „Domotica”. De sturingseenheid wordt er weergegeven door een rechthoek uit twee delen — onderaan het basissymbool (bijvoorbeeld een schakelaar of een contactdoos met schakelaar), bovenaan het type sturing van de eenheid.",[12,25699,25700,25701,25704],{},"Wat níét verdwijnt met domotica: elk gebruikstoestel of elke elektrische machine moet bediend worden via een stuurinrichting, en die is ook nodig wanneer de werking afhangt van een relais, een thermostaat of een gelijkaardig orgaan (",[17563,25702,25703],{},"onderafdeling 5.3.3.2. punt d.","). De actor in het bord vervangt de vereiste stuurinrichting niet; hij is er een. Wat verandert is de tekening: je documenteert een sturingseenheid met haar sturingstype in plaats van drie kruisschakelaars in serie.",[12,25706,25707,25708,39],{},"De praktische keuzecriteria en de valkuilen bij gemengde installaties staan in ",[30,25709,25710],{"href":15350},"domotica en het AREI",[41,25712,25714],{"id":25713},"hoe-ontstaat-de-schakelketen-in-planelec-en-wat-verandert-er-in-het-eendraadschema","Hoe ontstaat de schakelketen in PlanElec en wat verandert er in het eendraadschema?",[12,25716,25717,25718,25721],{},"In het grondplan verbindt het gereedschap ",[15,25719,25720],{},"Schakelketen"," een schakelaar met de lichtpunten die hij bedient. Voor vrije schakelaars en lampen van een ruimte kan PlanElec een voorstel maken; een geldige keten bevat minstens één schakelaar en één lamp, en een toestel kan niet tegelijk in twee ketens zitten. Over etages heen blijft de keten projectbreed samenhangend; per verdieping zie je de lokale deeltrajecten en de vervolgmarkeringen.",[12,25723,7641,25724,25727,25728,25731],{},[15,25725,25726],{},"schakelfunctie"," wordt uit de keten afgeleid: één schakelaar geeft aan\u002Fuit, twee schakelaars geven aan beide uiteinden een wisselschakelaar, en vanaf drie krijgen het eerste en het laatste toestel een wisselschakelaar terwijl de tussenliggende kruisschakelaars worden. De ",[15,25729,25730],{},"polariteit"," kies je apart — de twee eigenschappen worden pas bij het tekenen gecombineerd. Bij drie of meer bedieningsplaatsen wordt de tweepolige variant niet weergegeven, omdat de RGIE-symboolset daarvoor geen tweepolige kruisschakelaar bevat; die combinatie wordt dan als eenpolig getekend.",[12,25733,25734,25735,25737],{},"Drukknoppen, dimmers en de serieschakelaar worden bewust ",[15,25736,17329],{}," automatisch afgeleid. De serieschakelaar blijft als handmatige keuze beschikbaar, precies omdat hij twee gescheiden stroombanen vanaf één plaats beschrijft: je wijst elke lamp bewust toe aan kanaal A of B.",[12,25739,25740],{},"De verbinding tussen schakelaar en lichtpunten wordt duurzaam bewaard en werkt het eendraadschema meteen bij zodra de toestellen aan een stroomkring zijn toegewezen. Nog niet geplaatste armaturen blijven in dezelfde schakelgroep en schuiven bij het plaatsen automatisch in de keten. De automatische verlichting vult enkel ontbrekende lichtpunten aan, als transparante planningsdichtheid van één lichtpunt per begonnen 8 m², in keuken en badkamer per 6 m²; een AREI-minimum is dat niet.",[12,25742,25743,25744,39],{},"De bediening zelf staat stap voor stap in de handleiding ",[30,25745,25746],{"href":2445},"schakelketens, stroomkringen en kabelroutes",[41,25748,25750],{"id":25749},"wat-de-arei-zelfcontrole-controleert-en-wat-ter-plaatse-gecontroleerd-wordt","Wat de AREI-zelfcontrole controleert en wat ter plaatse gecontroleerd wordt",[12,25752,25753],{},"De zelfcontrole is indicatief en beoordeelt de ondersteunde regels aan de hand van de ingevoerde gegevens. Voor schakelaars betekent dat:",[1450,25755,25756,25763,25766,25769,25775],{},[1453,25757,25758,25759,25762],{},"Ze controleert de ",[15,25760,25761],{},"plausibiliteit"," van elke stuurgroep: een groep bevat minstens één schakelaar en minstens één geschakelde last. Groepen zonder schakelaar, zonder last of met één enkel element meldt ze.",[1453,25764,25765],{},"Of de gekozen schakeling overeenkomt met de bedoelde bediening, beslis jij. Twee wisselschakelaars in twee verschillende kamers zijn technisch een geldige keten en in de praktijk zelden zinvol.",[1453,25767,25768],{},"Of een eenpolige schakelaar werkelijk de fase en niet de nulgeleider onderbreekt, stel je spanningsloos ter plaatse vast; dat staat in geen enkele tekening.",[1453,25770,2042,25771,25774],{},[15,25772,25773],{},"impulsschakelaar",", een DIN-rail-dimmer, een trapautomaat of een schemerschakelaar wordt in het huidige eendraadschema niet getekend. Vóór de export meldt PlanElec ze uitdrukkelijk als „niet-weergeefbare kastmodules” die je nakijkt of verwijdert.",[1453,25776,25777],{},"Metingen en de officiële beoordeling bij de keuring doet het erkend organisme.",[41,25779,6947],{"id":6946},[1450,25781,25782,25788,25792,25797,25802,25807],{},[1453,25783,25784],{},[30,25785,25787],{"href":25786},"\u002Fblog\u002Farei-elektrische-symbolen-overzicht","AREI-symbolen voor beide plannen",[1453,25789,25790],{},[30,25791,25232],{"href":7514},[1453,25793,25794],{},[30,25795,18426],{"href":25796},"\u002Fblog\u002Fsituatieschema-tekenen-handleiding",[1453,25798,25799],{},[30,25800,25801],{"href":15350},"Domotica en het AREI",[1453,25803,25804],{},[30,25805,25806],{"href":15398},"Ledstrip berekenen: voeding, voedingspunten en doorsnede",[1453,25808,25809],{},[30,25810,25811],{"href":1030},"Domotica en KNX: wat hoort op het plan en op het eendraadschema?",[12,25813,25814],{},[30,25815,25816],{"href":6989},"Open PlanElec en leg je schakelketens vast →",[12,25818,25819],{},[17563,25820,25821],{},"Regelbasis: AREI Boek 1 V06 — hoofdstuk 2.13 en tabel 2.23, onderafdelingen 3.1.2.1., 3.1.2.2., 3.1.2.3., 5.1.6.2., 5.2.1.2. met tabel 5.1., 5.3.3.2., 5.3.5.2. en 7.1.5.2. Redactie en controle: PlanElec-team, 5 oktober 2026.",{"title":1467,"searchDepth":1468,"depth":1468,"links":25823},[25824,25825,25826,25827,25828,25829,25830,25831,25832,25833,25834,25835],{"id":25284,"depth":1468,"text":25285},{"id":25435,"depth":1468,"text":25436},{"id":25462,"depth":1468,"text":25463},{"id":25500,"depth":1468,"text":25501},{"id":25547,"depth":1468,"text":25548},{"id":25572,"depth":1468,"text":25573},{"id":25593,"depth":1468,"text":25594},{"id":25639,"depth":1468,"text":25640},{"id":25693,"depth":1468,"text":25694},{"id":25713,"depth":1468,"text":25714},{"id":25749,"depth":1468,"text":25750},{"id":6946,"depth":1468,"text":6947},"Het aantal bedieningsplaatsen bepaalt de schakeling. Symbolen uit tabel 2.23, aders per variant, nummering op het situatieplan en de grens met domotica — met AREI-artikel bij elke uitspraak.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-switch-types-single-line-diagram-editorial.jpg","\u002Fblog\u002Fswitch-types-single-line-diagram.nl",{"title":25278,"description":25836},"Wissel-, kruis- of serieschakelaar in het eendraadschema","wisselschakelaar-kruisschakelaar-eendraadschema","blog\u002Fswitch-types-single-line-diagram.nl",[3275,3276,25845,25846,25847,3273,6216,15393,1513],"wisselschakelaar","kruisschakelaar","serieschakelaar","NTuPwxO0KBf-spidjPm-IYwsWSWQ_e-zbWXwcymYwAM","\u002Fblog\u002Fwisselschakelaar-kruisschakelaar-eendraadschema",{"id":25851,"title":25852,"articleId":25853,"body":25854,"category":1493,"date":26479,"description":26480,"extension":1496,"image":25874,"lastUpdated":15381,"locale":1497,"meta":26481,"navigation":1499,"ogImage":26482,"path":26483,"publishDate":26479,"readTime":4035,"refreshInterval":11097,"seo":26484,"seoTitle":4037,"slug":26485,"stem":26486,"tags":26487,"__hash__":26490,"kind":1515,"href":25786},"blog\u002Fblog\u002Farei-electrical-symbols.nl.md","AREI-symbolen: overzicht voor eendraadschema en situatieplan","arei-electrical-symbols",{"type":9,"value":25855,"toc":26463},[25856,25860,25870,25875,25878,25882,25885,25905,25908,25912,25915,26030,26033,26037,26040,26047,26204,26210,26214,26217,26228,26232,26235,26249,26252,26256,26263,26266,26270,26273,26290,26293,26297,26320,26324,26327,26330,26333,26336,26340,26343,26346,26372,26390,26394,26397,26400,26407,26411,26414,26417,26419,26453,26458],[41,25857,25859],{"id":25858},"kort-antwoord-tabel-223-is-de-basis-eigen-tekens-verklaart-de-legende","Kort antwoord: tabel 2.23 is de basis, eigen tekens verklaart de legende",[12,25861,25862,25865,25866,25869],{},[15,25863,25864],{},"Voor het eendraadschema en het situatieplan van een huishoudelijke elektrische installatie gebruik je de grafische symbolen uit AREI\u002FRGIE Boek 1, hoofdstuk 2.13, tabel 2.23."," Die tabel is uitdrukkelijk ",[15,25867,25868],{},"niet-limitatief",". Ontbreekt een passend symbool, dan gebruik je een ander duidelijk herkenbaar teken en leg je de betekenis vast in de legende van schema en plan (onderafdeling 3.1.2.1 a).",[12,25871,25872],{},[22,25873],{"alt":17042,"src":25874},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-arei-electrical-symbols-editorial.webp",[12,25876,25877],{},"De legende is dus een duidelijk geregeld hulpmiddel: elk teken blijft binnen het document eenduidig, en de verplichte technische gegevens staan er bijkomend bij. Deze gids behandelt huishoudelijke installaties volgens Boek 1 V06; voor niet-huishoudelijke installaties en bijzondere schakelschema's vraagt Boek 1 bijkomende gegevens (3.1.2.2 b).",[41,25879,25881],{"id":25880},"drie-informatielagen","Drie informatielagen",[12,25883,25884],{},"Hoofdstuk 2.13 bevat de symboolgroepen. Onderafdeling 3.1.2.1 a bepaalt dat die tekens voor huishoudelijke eendraadschema's en situatieplannen worden gebruikt en laat de legendeoplossing toe als tabel 2.23 geen teken biedt. Zo onderscheidt het AREI drie vragen:",[1602,25886,25887,25893,25899],{},[1453,25888,25889,25892],{},[15,25890,25891],{},"Welk materieel is bedoeld?"," Dat toont het basissymbool.",[1453,25894,25895,25898],{},[15,25896,25897],{},"Welke eigenschappen heeft het?"," Die staan als waarden, aanduidingen of bijkomende gegevens op het schema (3.1.2.2 a).",[1453,25900,25901,25904],{},[15,25902,25903],{},"Waar zit het en tot welke kring behoort het?"," Dat verbindt het situatieplan via de kringreferentie (3.1.2.3 a).",[12,25906,25907],{},"Een vertrouwd ogend symbool is dus nog geen volledige vermelding. Bij een differentieelschakelaar horen type, aanspreekstroom en verdere kenmerken erbij, bij een leiding type, doorsnede, aantal geleiders en plaatsingswijze.",[41,25909,25911],{"id":25910},"hoofdgroepen-in-tabel-223","Hoofdgroepen in tabel 2.23",[12,25913,25914],{},"Het overzicht gaat over de betekenis, niet over de exacte vorm van elk teken. Voor de getekende vorm blijft de officiële tabel de bron.",[49,25916,25917,25929],{},[52,25918,25919],{},[55,25920,25921,25923,25926],{},[58,25922,8711],{},[58,25924,25925],{},"Voorbeelden",[58,25927,25928],{},"Waarvoor je ze nodig hebt",[68,25930,25931,25942,25953,25964,25975,25986,25997,26008,26019],{},[55,25932,25933,25936,25939],{},[73,25934,25935],{},"A. Algemene tekens",[73,25937,25938],{},"gelijkstroom, wisselstroom, een- en driefasige wisselstroom",[73,25940,25941],{},"aard van de stroom en voeding herkenbaar maken",[55,25943,25944,25947,25950],{},[73,25945,25946],{},"B. Schakel- en verdeelinrichtingen",[73,25948,25949],{},"verdeelbord, doos, verbindings-\u002Faftakdoos, aftakkast, aardingsonderbreker",[73,25951,25952],{},"structurele knooppunten en borden tonen",[55,25954,25955,25958,25961],{},[73,25956,25957],{},"C. Elektrische leidingen",[73,25959,25960],{},"ondergronds, bovengronds, zichtbaar, ingebouwd, in buis, aantal geleiders",[73,25962,25963],{},"traject en opbouw van de leiding beschrijven",[55,25965,25966,25969,25972],{},[73,25967,25968],{},"D. Beveiligingen",[73,25970,25971],{},"smeltzekering, automaat met aanduiding M, O, Δ, differentieelschakelaar, aarding",[73,25973,25974],{},"bescherming tegen overstroom, foutstroom en aarding weergeven",[55,25976,25977,25980,25983],{},[73,25978,25979],{},"E. Schakelaars en sturing",[73,25981,25982],{},"schakelaar, wissel- en kruisschakelaar, drukknop, dimmer, teleruptor, thermostaat, bewegingssensor",[73,25984,25985],{},"tonen welk punt of toestel wordt bediend",[55,25987,25988,25991,25994],{},[73,25989,25990],{},"F. Contactdozen",[73,25992,25993],{},"enkel, meervoudig, dicht, met randaarde, met kinderbescherming, met schakelaar, data",[73,25995,25996],{},"het juiste aansluitpunt onderscheiden",[55,25998,25999,26002,26005],{},[73,26000,26001],{},"G. Verbruikstoestellen",[73,26003,26004],{},"lichtpunt, armatuur, verwarming, huishoudtoestel, motor, laadpunt, kWh-meter",[73,26006,26007],{},"vaste of gelokaliseerde verbruikers aanduiden",[55,26009,26010,26013,26016],{},[73,26011,26012],{},"H. Bronnen en omzetters",[73,26014,26015],{},"transformator, zonnecel, gelijkrichter\u002Fomvormer, DC\u002FDC-omzetter",[73,26017,26018],{},"productie en omzetting documenteren",[55,26020,26021,26024,26027],{},[73,26022,26023],{},"J. Domotica",[73,26025,26026],{},"basisteken met lokale, draadloze, geprogrammeerde of sensorsturing",[73,26028,26029],{},"elektrische functie en sturingswijze combineren",[12,26031,26032],{},"De groepen zijn een bouwdoos, geen verplichte lijst: je gebruikt de tekens die je installatie werkelijk bevat. Of een toestel juist gekozen en gedimensioneerd is, blijkt uit het ontwerp; het symbool stelt het voor. De kenmerken van de bronnen vermeld je op het eendraadschema of je houdt ze beschikbaar in het dossier van de elektrische installatie (opmerking bij tabel 2.23).",[41,26034,26036],{"id":26035},"twaalf-catalogustekens-naast-elkaar","Twaalf catalogustekens naast elkaar",[12,26038,26039],{},"De beeldplaat toont twaalf tekens uit de PlanElec-catalogus in zwart-wit. Het is een catalogusweergave, geen schermopname van een project. De volgorde loopt van links naar rechts en daarna per rij van boven naar beneden, gelijk met de genummerde tabel eronder. De rasterweergave vergroot de ongewijzigde geometrie van de bronbestanden. Eenduidig wordt een teken pas door benaming, volgnummer en technische gegevens, niet door de vorm alleen.",[422,26041],{":height":26042,":width":26043,"alt":26044,"caption":26045,"src":26046},"600","660","Zwart-witte beeldplaat met twaalf PlanElec-catalogustekens voor beveiligingen, schakelaars, aansluitpunten, leidingen en PV.","De twaalf tekens staan in dezelfde volgorde als in de tabel: van links naar rechts, rij per rij.","\u002Fblog\u002Fsymbols\u002Fcatalog-12.png",[49,26048,26049,26062],{},[52,26050,26051],{},[55,26052,26053,26056,26059],{},[58,26054,26055],{},"Nr. en benaming",[58,26057,26058],{},"Betekenis in het document",[58,26060,26061],{},"Typische verwarring",[68,26063,26064,26075,26090,26101,26112,26123,26134,26145,26156,26167,26182,26193],{},[55,26065,26066,26069,26072],{},[73,26067,26068],{},"1. Automaat",[73,26070,26071],{},"Overstroombeveiliging; nominale stroom, curve, poolaantal en afschakelvermogen komen uit de technische gegevens.",[73,26073,26074],{},"Zelfde basisgeometrie als de differentieelschakelaar; benaming en differentiële kenmerken niet verwisselen.",[55,26076,26077,26080,26083],{},[73,26078,26079],{},"2. Differentieelschakelaar",[73,26081,26082],{},"Differentieelschakelaar; type, aanspreekstroom, nominale stroom en poolaantal vullen het teken aan.",[73,26084,26085,26086,26089],{},"Zelfde basisgeometrie als de automaat; ",[1300,26087,26088],{},"30 mA"," alleen legt geen RCD-type vast.",[55,26091,26092,26095,26098],{},[73,26093,26094],{},"3. Hoofd-lastschakelaar",[73,26096,26097],{},"Lastschakelaar in het gedocumenteerde voedingspad.",[73,26099,26100],{},"Niet gelijkstellen aan de stroomafwaartse automaat. Verplicht op het hoofdbord, in woningen minstens 40 A (5.3.5.1 b). De scheidingsfunctie van de differentieelschakelaar aan het voedingspunt (4.2.4.3 b) is een aparte eis; welk toestel de functie van algemene lastscheidingsschakelaar vervult, toont het schema eenduidig.",[55,26102,26103,26106,26109],{},[73,26104,26105],{},"4. Stopcontact",[73,26107,26108],{},"Gewoon stopcontact in het eendraadschema en het situatieplan.",[73,26110,26111],{},"Niet lezen als geschakeld stopcontact, dichte contactdoos of data-aansluiting.",[55,26113,26114,26117,26120],{},[73,26115,26116],{},"5. Spatwaterbestendig stopcontact",[73,26118,26119],{},"Dichte contactdoos met eigen catalogusgeometrie.",[73,26121,26122],{},"De extra aanduiding vervangt geen werkelijke omgevings- of toestelgegevens.",[55,26124,26125,26128,26131],{},[73,26126,26127],{},"6. Stopcontact met tweepolige schakelaar",[73,26129,26130],{},"Stopcontact met tweepolige schakelaar.",[73,26132,26133],{},"Een gewoon stopcontact plus afzonderlijk gedocumenteerde schakelaar zegt iets anders.",[55,26135,26136,26139,26142],{},[73,26137,26138],{},"7. Lichtuitlaat",[73,26140,26141],{},"Lichtuitlaat of lichtpunt.",[73,26143,26144],{},"Niet verwarren met een wandarmatuur of met de schakelaar die het punt bedient.",[55,26146,26147,26150,26153],{},[73,26148,26149],{},"8. Schakelaar",[73,26151,26152],{},"Algemeen schakelaarsymbool voor een bedieningselement.",[73,26154,26155],{},"Welk lichtpunt hij bedient, verklaart de referentie, niet het teken.",[55,26157,26158,26161,26164],{},[73,26159,26160],{},"9. Verbindings-\u002Faftakdoos",[73,26162,26163],{},"Verbindings- of aftakdoos als topologisch knooppunt.",[73,26165,26166],{},"Niet gelijkstellen aan een verdeelbord of verbruiker.",[55,26168,26169,26172,26175],{},[73,26170,26171],{},"10. Kabel met drie geleiders",[73,26173,26174],{},"Basisteken voor een kabel met drie geleiders; type, doorsnede en plaatsingswijze staan bijkomend bij het kabeldeel.",[73,26176,26177,26178,26181],{},"Drie geleiders zijn nog geen kabeldimensionering en niet hetzelfde als een willekeurige ",[1300,26179,26180],{},"3×","-notatie.",[55,26183,26184,26187,26190],{},[73,26185,26186],{},"11. Zonnepaneel \u002F PV-module",[73,26188,26189],{},"Zonnecel of PV-module als bron in het gedocumenteerde PV-pad.",[73,26191,26192],{},"Niet verwarren met de omvormer; string, beveiliging en aansluitpunt blijven afzonderlijk traceerbaar.",[55,26194,26195,26198,26201],{},[73,26196,26197],{},"12. Omvormer",[73,26199,26200],{},"Omvormer tussen de in het project opgenomen zijden.",[73,26202,26203],{},"Het symbool staat voor de functie; merk en technische grenswaarden documenteer je apart.",[12,26205,26206,26207,26209],{},"Hoe je een teken op het grondplan plaatst, verbindt en in het projectmodel verder gebruikt, beschrijft de hulp ",[30,26208,9308],{"href":9307},". De catalogustekens verschijnen daarna in schema en plan; welke toestellen werkelijk geplaatst zijn, bevestig je ter plaatse.",[41,26211,26213],{"id":26212},"een-leidingsymbool-is-meer-dan-een-lijn","Een leidingsymbool is meer dan een lijn",[12,26215,26216],{},"Een lijn tussen twee toestellen volstaat niet. Het eendraadschema vermeldt minstens type, doorsnede, aantal geleiders en plaatsingswijze (3.1.2.2 a). Tabel 2.23 bevat daarvoor basistekens en voorbeelden, zoals een XVB-Cca-kabel met vijf geleiders van 4 mm² in een ingebouwde buis of vier geïsoleerde H07V-U-geleiders van 1,5 mm² in één buis.",[12,26218,26219,26220,26223,26224,26227],{},"De notatie geeft de werkelijke opbouw weer. ",[1300,26221,26222],{},"3G2,5"," beschrijft drie geleiders, inclusief een groen-gele beschermingsgeleider, van 2,5 mm²; ",[1300,26225,26226],{},"3×2,5"," zegt dat niet over de beschermingsgeleider. Een zichtbare leiding teken je niet als ingebouwd, alleen omdat dat teken eenvoudiger is. De kabeldimensionering volgens belasting, plaatsing, groepering, temperatuur, spanningsval en uitschakelvoorwaarden doe je apart; het symbool documenteert het resultaat.",[41,26229,26231],{"id":26230},"beveiliging-teken-en-kenmerk-horen-samen","Beveiliging: teken en kenmerk horen samen",[12,26233,26234],{},"Tabel 2.23 onderscheidt smeltzekering, automaat en differentieelschakelaar. Bij de automaat geven hoofdletters de uitschakelmechanismen aan: M voor maximumstroom, O voor onderspanning, Δ voor de differentiële gevoeligheid. Naast het symbool bepalen de kenmerken het element:",[1450,26236,26237,26240,26243,26246],{},[1453,26238,26239],{},"nominale stroom en karakteristiek voor een automaat (voorbeeld uit de tabel: 20 A, curve C);",[1453,26241,26242],{},"type, aanspreekstroom en nominale stroom voor een differentieel (voorbeeld: 300 mA, type A, 40 A);",[1453,26244,26245],{},"correcte functieaanduiding bij gecombineerde uitschakelmechanismen;",[1453,26247,26248],{},"werkelijk aanwezige verbindingen bij aarding, geen decoratief aardingsteken.",[12,26250,26251],{},"\"30 mA\" zegt niets over type A, F of B en niets over selectiviteit in de tijd. \"20 A\" zonder kabelgegevens en karakteristiek is evenmin volledig. De waarden komen van het geplaatste toestel en passen bij de kring; een voorbeeldplan is geen bron.",[41,26253,26255],{"id":26254},"dezelfde-referentie-op-beide-documenten","Dezelfde referentie op beide documenten",[12,26257,26258,26259,26262],{},"Elke elementaire kring krijgt op het eendraadschema een hoofdletter. Lichtpunten, stopcontacten en sturingseenheden krijgen een volgnummer vanaf de voorgeschakelde overstroombeveiliging; het situatieplan gebruikt dezelfde referenties (3.1.2.1 a). Een lichtpunt ",[1300,26260,26261],{},"C4"," betekent dus in beide documenten hetzelfde element.",[12,26264,26265],{},"Een schakelaar draagt de letter van zijn kring en het nummer van het lichtpunt of toestel dat hij bedient. Zo blijft de functie zichtbaar, ook als meerdere schakelaars in dezelfde ruimte zitten. Een meervoudige, geschakelde of datacontactdoos is iets anders dan een gewoon stopcontact; is het onderscheid relevant, dan gebruik je het passende teken.",[41,26267,26269],{"id":26268},"geen-officieel-symbool-beschikbaar-zo-gebruik-je-een-legende","Geen officieel symbool beschikbaar: zo gebruik je een legende",[12,26271,26272],{},"De legenderegel heb je vooral nodig voor nieuwe toestellen, fabrikantspecifieke functies of materieel dat tabel 2.23 niet apart noemt. Zo pak je het aan:",[1602,26274,26275,26278,26281,26284,26287],{},[1453,26276,26277],{},"zoek eerst een algemeen teken dat samen met een technische benaming volstaat;",[1453,26279,26280],{},"kies anders een eenvoudig teken dat niet met een bestaand teken te verwarren is;",[1453,26282,26283],{},"leg betekenis en eventuele afkorting vast in de legende;",[1453,26285,26286],{},"gebruik hetzelfde teken consequent op elke pagina;",[1453,26288,26289],{},"noteer technische eigenschappen bijkomend op het schema of in het dossier van de installatie.",[12,26291,26292],{},"Een merklogo is geen goede legende, omdat het noch elektrische functie noch aansluitwijze verklaart. Een eigen symbool zonder legende voldoet niet aan 3.1.2.1 a, ook als de tekenaar het zelf herkent.",[41,26294,26296],{"id":26295},"fouten-die-de-leesbaarheid-ondermijnen","Fouten die de leesbaarheid ondermijnen",[1450,26298,26299,26302,26305,26308,26311,26314,26317],{},[1453,26300,26301],{},"Symbolen uit andere normen of software worden gebruikt zonder ze met tabel 2.23 of de legende af te stemmen.",[1453,26303,26304],{},"Eén generiek stopcontactteken moet tegelijk enkel, meervoudig, data en geschakeld betekenen.",[1453,26306,26307],{},"Kabeltype, doorsnede, aantal geleiders of plaatsingswijze ontbreekt.",[1453,26309,26310],{},"Een differentieel toont alleen 30 mA, zonder type en nominale stroom.",[1453,26312,26313],{},"Eendraadschema en situatieplan gebruiken verschillende referenties voor hetzelfde element.",[1453,26315,26316],{},"Een PV-installatie wordt herleid tot één paneelteken, zonder omvormer en noodzakelijke kenmerken.",[1453,26318,26319],{},"Decoratieve varianten maken het basisteken of de legende onherkenbaar.",[41,26321,26323],{"id":26322},"controleer-de-uiteindelijke-pdf","Controleer de uiteindelijke pdf",[12,26325,26326],{},"Een correct gekozen teken kan door schaal of pagina-indeling toch onbruikbaar worden. Bekijk de export op normale leesgrootte: snijdt de paginarand waarden of legende af, kruisen lijnen de referentie, blijven gewone en geschakelde stopcontacten onderscheidbaar en hoort elke tekst duidelijk bij het juiste toestel?",[12,26328,26329],{},"Laat betekenis nooit alleen van kleur afhangen, want afdrukken, kopieën en controledocumenten zijn vaak zwart-wit. Vorm, tekst en kringreferentie dragen de informatie. De legende staat op elke betrokken pagina of is ondubbelzinnig als deel van dezelfde documentenset aangeduid, en afkortingen blijven op alle pagina's gelijk.",[12,26331,26332],{},"Vergelijk ten slotte aantallen en referenties tussen eendraadschema en situatieplan. Die vergelijking vindt dubbele codes, ontbrekende verbruikers en gekopieerde symbolen vroeg; de technische controle volgt daarna.",[12,26334,26335],{},"Controleer bij een meertalig dossier ook of de legende in de gebruikte documenttaal begrijpelijk blijft. Een vertaalde toestelnaam verandert de elektrische betekenis of technische afkorting niet.",[41,26337,26339],{"id":26338},"een-herhaalbare-werkwijze-van-opname-tot-legende","Een herhaalbare werkwijze van opname tot legende",[12,26341,26342],{},"Begin niet met tekenen, maar met een toestellijst. Noteer per werkelijk punt ruimte, kring, volgnummer, functie en de kenmerken die later naast het teken komen. Pas daarna kies je het basisteken uit tabel 2.23. Zo bepaalt de werkelijke functie het teken en niet omgekeerd. Een vaste ventilator, een stopcontact en een aansluitdoos kunnen op dezelfde kring liggen en blijven toch drie verschillende onderdelen.",[12,26344,26345],{},"Daarna controleer je in vier korte stappen:",[1602,26347,26348,26354,26360,26366],{},[1453,26349,26350,26353],{},[15,26351,26352],{},"Basisteken:"," klopt de familie, bijvoorbeeld beveiliging, stopcontact, verlichting, bron of vast toestel?",[1453,26355,26356,26359],{},[15,26357,26358],{},"Kenmerken:"," staan poolaantal, nominale stroom, differentiële gevoeligheid, leidingtype, aantal geleiders en doorsnede waar ze voor het begrip nodig zijn?",[1453,26361,26362,26365],{},[15,26363,26364],{},"Referentie:"," draagt het punt op het situatieplan exact dezelfde kringletter en hetzelfde volgnummer als op het eendraadschema?",[1453,26367,26368,26371],{},[15,26369,26370],{},"Legende:"," is elke projectspecifieke combinatie één keer gedefinieerd en op elk betrokken blad terug te vinden?",[12,26373,26374,26375,26378,26379,8635,26382,26385,26386,26389],{},"Een klein voorbeeld: kring ",[1300,26376,26377],{},"K"," vertrekt na een aangeduide differentieelschakelaar en een beveiliging van 20 A, loopt via een gedocumenteerde 3G2,5-kabel en voedt drie vaste aansluitingen. De beveiliging krijgt haar waarden, de kabel zijn kenmerken en elke aansluiting een eigen referentie ",[1300,26380,26381],{},"K1",[1300,26383,26384],{},"K3",". Eén keukensymbool vervangt die informatie niet. Wordt ",[1300,26387,26388],{},"K2"," later een ander toestel, dan blijft de referentie behouden; symbool, functienaam en technische kenmerken werk je op beide plannen bij.",[41,26391,26393],{"id":26392},"grensgevallen-helder-documenteren","Grensgevallen helder documenteren",[12,26395,26396],{},"Bepaal bij gecombineerde apparatuur eerst welke elektrische functies voor controle en onderhoud zichtbaar moeten zijn. Een meervoudig stopcontact mag als groep verschijnen als aantal en schakeling eenduidig blijven. Een slimme actor met meerdere uitgangen heeft een basisteken, een legendecode en een verwijzing naar de technische fiche nodig; voor domotica biedt tabel 2.23 het tweedelige teken van de sturingseenheid met basissymbool en sturingswijze. De legende verklaart een ontbrekend tabelteken, maar verbergt nooit een leiding, beveiligingsfunctie of bron.",[12,26398,26399],{},"Beheer projectspecifieke tekens met versies, net als andere installatiegegevens. Wijzig je een teken, dan noteer je datum en betrokken referenties en controleer je alle bladen. Een verouderde legende hoort niet naast de actuele pdf in de overdrachtsmap. Twijfel je over de weergave, stem ze dan vóór de uitvoering af met de verantwoordelijke elektrotechnicus en zo nodig het erkend organisme.",[12,26401,7641,26402,26406],{},[30,26403,26405],{"href":15357,"rel":26404},[2532],"officiële publicatie van AREI Boek 1"," is de primaire bron; controleer daar de versie die voor je documentdatum geldt. Pictogrammen van fabrikanten en tekens uit buitenlandse normen vervangen tabel 2.23 en de Belgische planregels niet.",[41,26408,26410],{"id":26409},"wat-de-planelec-symbolencatalogus-doet","Wat de PlanElec-symbolencatalogus doet",[12,26412,26413],{},"PlanElec biedt in de editor een symbolencatalogus voor de Belgische planningscontext en gebruikt elke ingevoerde component in eendraadschema en situatieplan. Beide documenten exporteer je als pdf, en de indicatieve AREI\u002FRGIE-zelfcontrole toont je fouten in de ondersteunde regels die uit projectgegevens beslisbaar zijn.",[12,26415,26416],{},"De taken zijn duidelijk verdeeld: de catalogus zorgt voor een consistente weergave, jij controleert vóór export toesteltype, waarden, kringreferenties en ruimtelijke toewijzing, en de officiële beoordeling doet het erkend organisme bij de keuring.",[41,26418,6947],{"id":6946},[1450,26420,26421,26426,26431,26436,26442,26448],{},[1453,26422,26423],{},[30,26424,26425],{"href":5957},"Eendraadschema en situatieplan: verschil en samenhang",[1453,26427,26428],{},[30,26429,26430],{"href":7514},"Eendraadschema maken: stap-voor-stap AREI-gids",[1453,26432,26433],{},[30,26434,26435],{"href":25849},"Wissel- en kruisschakelaar in het eendraadschema",[1453,26437,26438],{},[30,26439,26441],{"href":26440},"\u002Fblog\u002Fkabeldoorsnede-automaat","Kabeldoorsnede en automaat correct combineren",[1453,26443,26444],{},[30,26445,26447],{"href":26446},"\u002Fblog\u002Fwat-is-een-situatieschema","Wat is een situatieplan?",[1453,26449,26450],{},[30,26451,26452],{"href":15350},"Smart home en AREI: waar let je op bij domotica?",[12,26454,26455],{},[30,26456,26457],{"href":6989},"Open PlanElec voor symbolen, eendraadschema, situatieplan en pdf →",[12,26459,26460],{},[17563,26461,26462],{},"Regelbasis: AREI Boek 1 V06, hoofdstuk 2.13 (tabel 2.23) en onderafdelingen 3.1.2.1 tot 3.1.2.3. Redactie en controle: PlanElec-team, 5 oktober 2026.",{"title":1467,"searchDepth":1468,"depth":1468,"links":26464},[26465,26466,26467,26468,26469,26470,26471,26472,26473,26474,26475,26476,26477,26478],{"id":25858,"depth":1468,"text":25859},{"id":25880,"depth":1468,"text":25881},{"id":25910,"depth":1468,"text":25911},{"id":26035,"depth":1468,"text":26036},{"id":26212,"depth":1468,"text":26213},{"id":26230,"depth":1468,"text":26231},{"id":26254,"depth":1468,"text":26255},{"id":26268,"depth":1468,"text":26269},{"id":26295,"depth":1468,"text":26296},{"id":26322,"depth":1468,"text":26323},{"id":26338,"depth":1468,"text":26339},{"id":26392,"depth":1468,"text":26393},{"id":26409,"depth":1468,"text":26410},{"id":6946,"depth":1468,"text":6947},"2026-08-29","Welke symbolen tabel 2.23 voorziet voor Belgische huishoudelijke installaties, wanneer je een eigen teken via de legende invoert en welke technische gegevens naast elk symbool op schema en plan horen.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-arei-electrical-symbols-editorial.jpg","\u002Fblog\u002Farei-electrical-symbols.nl",{"title":25852,"description":26480},"arei-elektrische-symbolen-overzicht","blog\u002Farei-electrical-symbols.nl",[3275,3276,26488,17697,3273,6216,26489,1513],"elektrische symbolen","legende","nsLcB1Q05-d-MbIXm1aN7rmJEigbO0ja5ub5GouCFeg",{"id":26492,"title":26493,"articleId":26494,"body":26495,"category":16481,"date":26479,"description":27108,"extension":1496,"image":26513,"lastUpdated":15381,"locale":1497,"meta":27109,"navigation":1499,"ogImage":27110,"path":27111,"publishDate":26479,"readTime":7016,"refreshInterval":11097,"seo":27112,"seoTitle":27113,"slug":27114,"stem":27115,"tags":27116,"__hash__":27118,"kind":1515,"href":27119},"blog\u002Fblog\u002Fnew-build-single-line-checklist.nl.md","Eendraadschema voor nieuwbouw: AREI-checklist tot aan de keuring","new-build-single-line-checklist",{"type":9,"value":26496,"toc":27088},[26497,26501,26508,26514,26517,26521,26624,26628,26631,26648,26651,26654,26658,26661,26684,26687,26691,26694,26714,26717,26721,26724,26727,26747,26750,26754,26757,26760,26780,26787,26791,26794,26797,26817,26820,26824,26827,26830,26833,26837,26844,26847,26864,26867,26871,26874,26877,26897,26900,26904,26907,26910,26914,26993,26997,27000,27003,27007,27010,27013,27017,27020,27032,27036,27039,27042,27044,27078,27083],[41,26498,26500],{"id":26499},"wat-moet-een-eendraadschema-voor-nieuwbouw-bevatten","Wat moet een eendraadschema voor nieuwbouw bevatten?",[12,26502,26503,26504,26507],{},"Een eendraadschema voor een Belgische nieuwbouw toont de ",[15,26505,26506],{},"werkelijk uitgevoerde"," installatie: een hoofding met nummer, versie, datum, adres en verantwoordelijke, spanning en aard van de stroom, elk verdeelbord, alle differentieel- en overstroombeveiligingen met hun kenmerken, type, doorsnede, aantal geleiders en plaatsingswijze van de leidingen, schakelaars, dozen, contactdozen, lichtpunten, vaste toestellen en bronnen. Het situatieplan toont dezelfde elementen met dezelfde referentie op hun plaats. De basis is AREI\u002FRGIE Boek 1 versie 06, van toepassing sinds 1 april 2026, vooral afdeling 3.1.2.",[12,26509,26510],{},[22,26511],{"alt":26512,"src":26513},"Elektriciens controleren de installatie in een nieuwbouwwoning.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-new-build-single-line-checklist-editorial.webp",[12,26515,26516],{},"Eendraadschema en situatieplan worden opgesteld door de verantwoordelijke van de uitvoering van het werk (onderafdeling 3.1.2.1 a). Vóór de gelijkvormigheidscontrole kloppen ze met de werkelijke toestand, niet met het eerste ontwerp. Deze checklist brengt je daar in tien stappen. Ze behandelt het gebruikelijke AC-systeem; geaarde DC-systemen, die versie 06 nieuw regelt, zijn een apart vakgebied waarvoor je AC-geleiderrollen en -symbolen niet zomaar overneemt.",[41,26518,26520],{"id":26519},"verplichte-gegevens-in-één-oogopslag","Verplichte gegevens in één oogopslag",[49,26522,26523,26534],{},[52,26524,26525],{},[55,26526,26527,26529,26532],{},[58,26528,13712],{},[58,26530,26531],{},"Waar gevraagd",[58,26533,990],{},[68,26535,26536,26547,26557,26565,26574,26584,26594,26603,26613],{},[55,26537,26538,26541,26544],{},[73,26539,26540],{},"Nummer, versie en versiedatum",[73,26542,26543],{},"afdeling 3.1.2",[73,26545,26546],{},"eendraadschema en situatieplan",[55,26548,26549,26552,26555],{},[73,26550,26551],{},"Naam, hoedanigheid en btw-nummer van de verantwoordelijke",[73,26553,26554],{},"onderafdeling 3.1.2.1 a",[73,26556,26546],{},[55,26558,26559,26561,26563],{},[73,26560,4815],{},[73,26562,26554],{},[73,26564,26546],{},[55,26566,26567,26570,26572],{},[73,26568,26569],{},"Spanning en aard van de stroom",[73,26571,26554],{},[73,26573,3273],{},[55,26575,26576,26579,26581],{},[73,26577,26578],{},"Hoofdletter per elementaire stroombaan, volgnummer per punt",[73,26580,26554],{},[73,26582,26583],{},"eendraadschema, referentie op situatieplan",[55,26585,26586,26589,26592],{},[73,26587,26588],{},"Type, doorsnede, aantal geleiders en plaatsingswijze van de leidingen",[73,26590,26591],{},"onderafdeling 3.1.2.2 a",[73,26593,3273],{},[55,26595,26596,26599,26601],{},[73,26597,26598],{},"Type en kenmerken van differentieel- en overstroombeveiligingen",[73,26600,26591],{},[73,26602,3273],{},[55,26604,26605,26608,26611],{},[73,26606,26607],{},"Schakelaars, verbindings- en aftakdozen, contactdozen, lichtpunten, vaste toestellen, bronnen",[73,26609,26610],{},"onderafdelingen 3.1.2.2 a en 3.1.2.3 a",[73,26612,26546],{},[55,26614,26615,26618,26621],{},[73,26616,26617],{},"Symbolen volgens tabel 2.23 of een eenduidige legende",[73,26619,26620],{},"hoofdstuk 2.13, onderafdeling 3.1.2.1 a",[73,26622,26623],{},"beide documenten",[41,26625,26627],{"id":26626},"_1-leg-hoofding-en-verantwoordelijkheid-vast","1. Leg hoofding en verantwoordelijkheid vast",[12,26629,26630],{},"Geef de documentenset een eenduidige identiteit voor je de eerste kring tekent:",[1450,26632,26633,26636,26639,26642,26645],{},[1453,26634,26635],{},"documentnummer, versie en versiedatum;",[1453,26637,26638],{},"adres van de installatie;",[1453,26640,26641],{},"naam en hoedanigheid van de verantwoordelijke van de uitvoering, btw-nummer indien van toepassing;",[1453,26643,26644],{},"velden voor datum en handtekeningen;",[1453,26646,26647],{},"spanning en aard van de stroom op het eendraadschema.",[12,26649,26650],{},"Eendraadschema en situatieplan dragen dezelfde versie. Een bestandsnaam volstaat niet, want afdrukken en samengevoegde pdf's verliezen hem. Ook de exportdatum is niet de datum waarop de installatie werd opgenomen.",[12,26652,26653],{},"Handtekening en visum van het erkend organisme komen pas in de controleprocedure, wanneer de installatie conform is (onderafdeling 3.1.2.1 a). Een werkversie bevat dus geen vooraf ingevulde goedkeuring en geen vermelding “AREI-conform”.",[41,26655,26657],{"id":26656},"_2-leg-de-voeding-vast","2. Leg de voeding vast",[12,26659,26660],{},"Het schema begint bij de echte voeding, niet bij een sjabloon. Noteer:",[1450,26662,26663,26666,26669,26672,26675,26678,26681],{},[1453,26664,26665],{},"een- of driefasige voeding;",[1453,26667,26668],{},"nominale spanning en aard van de stroom;",[1453,26670,26671],{},"nul- en beschermingsgeleider;",[1453,26673,26674],{},"aansluiting en meteropstelling;",[1453,26676,26677],{},"kaliber van de aansluitbeveiliging en de hoofdlastscheider;",[1453,26679,26680],{},"netvorm en aardingsconcept, voor zover ontwerp en bescherming ze nodig hebben;",[1453,26682,26683],{},"bijkomende bronnen zoals een PV-omvormer of transformator.",[12,26685,26686],{},"Of een aansluiting een 3×400 V-net met nulgeleider of een 3×230 V-net is, zie je aan geen enkel stopcontact. Een verkeerde aanname werkt door in poolaantal, nulgeleider, bedrading van de differentieelschakelaars en verbruikers. Vergelijk daarom aansluitcontract, bordopbouw en meting; bij twijfel bevestigt de netbeheerder de aansluitgegevens.",[41,26688,26690],{"id":26689},"_3-neem-elk-verdeelbord-op-als-deel-van-de-beveiligingsketen","3. Neem elk verdeelbord op als deel van de beveiligingsketen",[12,26692,26693],{},"Teken hoofd- en onderverdeelborden met hun voeding en koppeling. Het pad van het voedingspunt tot elke eindstroombaan is volledig traceerbaar. Afhankelijk van de installatie hoort daarbij:",[1450,26695,26696,26699,26702,26705,26708,26711],{},[1453,26697,26698],{},"hoofdschakelaar en voorgeschakelde beveiliging;",[1453,26700,26701],{},"differentieelschakelaars met type, aanspreekstroom, nominale stroom en relevante karakteristiek;",[1453,26703,26704],{},"smeltveiligheden of automaten met kaliber en curve;",[1453,26706,26707],{},"rails, koppelingen en onderverdelingen die de structuur verklaren;",[1453,26709,26710],{},"reserveautomaten als reserve, zonder verzonnen kabel of verbruiker;",[1453,26712,26713],{},"een eenduidige naam voor elk bord en vertrek.",[12,26715,26716],{},"De reeks 300 mA en 30 mA bewijst op zich geen selectiviteit. Golfvormtype, verhoogde immuniteit en tijdvertraging zijn afzonderlijke eigenschappen. Kortsluitvoorwaarden, uitschakeltijden en coördinatie volgens de fabrikant horen bij het technische ontwerp.",[41,26718,26720],{"id":26719},"_4-geef-elke-eindstroombaan-een-vaste-referentie","4. Geef elke eindstroombaan een vaste referentie",[12,26722,26723],{},"Elke elementaire stroombaan krijgt een hoofdletter. Lichtpunten, contactdozen en bedieningstoestellen nummer je in de volgorde waarin ze vanaf de voorgeschakelde overstroombeveiliging in de kring voorkomen (onderafdeling 3.1.2.1 a). Dezelfde code staat op het bordetiket.",[12,26725,26726],{},"Per vertrek beantwoordt de opname:",[1450,26728,26729,26732,26735,26738,26741,26744],{},[1453,26730,26731],{},"Welk gebruik en welke verbruikers horen erbij?",[1453,26733,26734],{},"Is het een licht-, stopcontact-, gemengde of toegewezen toestelkring?",[1453,26736,26737],{},"Welke vaste toestellen zijn aangesloten?",[1453,26739,26740],{},"Zijn er verbindings- of aftakdozen?",[1453,26742,26743],{},"Welke differentieelschakelaar beveiligt de kring?",[1453,26745,26746],{},"Kloppen schema, bordetiket en situatieplan?",[12,26748,26749],{},"“Keuken” is geen bruikbare naam wanneer verlichting, werkstopcontacten, vaatwasser en kookplaat elk een eigen kring hebben. Namen helpen bij de oriëntatie; eenduidig is pas de elektrische referentie.",[41,26751,26753],{"id":26752},"_5-vermeld-alle-leidinggegevens","5. Vermeld alle leidinggegevens",[12,26755,26756],{},"Onderafdeling 3.1.2.2 a vraagt type, doorsnede, aantal geleiders en plaatsingswijze. Leg die vast per leidingdeel. Na een aftak- of verbindingsdoos kunnen kabel of plaatsingswijze veranderen; één kabeltekst aan het begin van de kring verbergt dat.",[12,26758,26759],{},"Het ontwerp achter het schema gaat verder. Controleer afzonderlijk:",[1450,26761,26762,26765,26768,26771,26774,26777],{},[1453,26763,26764],{},"bedrijfsstroom, kaliber van de beveiliging en stroombelastbaarheid;",[1453,26766,26767],{},"plaatsingswijze, groepering, omgevingstemperatuur en isolatie;",[1453,26769,26770],{},"leidinglengte en spanningsval;",[1453,26772,26773],{},"kortsluit- en foutlusvoorwaarden;",[1453,26775,26776],{},"minimumdoorsneden en bijzondere kringregels;",[1453,26778,26779],{},"de vermelde beschermingsgeleider tegenover de werkelijk geplaatste leiding.",[12,26781,26782,26783,26786],{},"Tabel 4.11 geeft voor huishoudelijke installaties het hoogste kaliber van smeltveiligheid of automaat per doorsnede, bijvoorbeeld een automaat van 20 A voor 2,5 mm². Dat is een bovengrens, geen volledige kabelberekening. Een keurig label ",[1300,26784,26785],{},"XVB 3G2,5"," is waardeloos als op de werf een andere leiding ligt.",[41,26788,26790],{"id":26789},"_6-neem-verbruikers-dozen-en-bediening-op","6. Neem verbruikers, dozen en bediening op",[12,26792,26793],{},"Het eendraadschema bevat schakelaars, verbindings- en aftakdozen, contactdozen, lichtpunten en vaste machines en toestellen (onderafdeling 3.1.2.2 a). Gebruik de symbolen van tabel 2.23. Ontbreekt daar een teken, dan definieer je een eenduidig symbool in de legende.",[12,26795,26796],{},"Maak zichtbaar wat technisch telt:",[1450,26798,26799,26802,26805,26808,26811,26814],{},[1453,26800,26801],{},"enkelvoudige of meervoudige contactdoos;",[1453,26803,26804],{},"contactdoos met aardingscontact, geschakelde of bijzondere contactdoos;",[1453,26806,26807],{},"lichtpunt en werkelijke schakelfunctie;",[1453,26809,26810],{},"drukknop, relais, bewegingsmelder of domoticasturing;",[1453,26812,26813],{},"vast aangesloten toestel of gewone stopcontactlast;",[1453,26815,26816],{},"verbindingsdoos of aftakdoos.",[12,26818,26819],{},"Een algemeen toestelsymbool met duidelijke tekst is beter dan een verzonnen pictogram. Functie, referentie en aansluiting tellen.",[41,26821,26823],{"id":26822},"_7-teken-bronnen-en-bijzondere-delen","7. Teken bronnen en bijzondere delen",[12,26825,26826],{},"PV-installatie, omvormer, batterij, generator en transformator horen in de elektrische structuur van het eendraadschema; het situatieplan toont hun plaats. Voor een huishoudelijke laagspannings-PV-installatie bevat het dossier bovendien bedienings- en onderhoudsinstructies, veiligheidsinstructies en de technische referenties en kenmerken van het geïnstalleerde materieel, zoals merk, model en vermogen (afdeling 9.1.2).",[12,26828,26829],{},"Een PV-pijl bij het hoofdbord beschrijft aansluitpunt noch beveiligingsketen. Teken welke bron kan injecteren, waar ze koppelt en welke componenten ertussen zitten. Of een batterij naar het net kan terugleveren, haal je uit de fabrikantgegevens in plaats van te gokken.",[12,26831,26832],{},"Zijn er veiligheids- of kritische installaties, dan komen er een lijst en een plan van die installaties bij; hun bronnen, kringen en verbruikers zijn op het eendraadschema duidelijk geïdentificeerd (onderafdeling 3.1.2.1 a).",[41,26834,26836],{"id":26835},"_8-houd-het-situatieplan-synchroon","8. Houd het situatieplan synchroon",[12,26838,26839,26840,26843],{},"Elk bord, elke doos, contactdoos, lamp, bediening, elk vast toestel en elke bron van het eendraadschema staat op het situatieplan op zijn plaats (onderafdeling 3.1.2.3 a). De referentie ",[1300,26841,26842],{},"C3"," betekent in beide documenten hetzelfde element. Schakelaars dragen de letter van hun kring en het nummer van het punt dat ze bedienen.",[12,26845,26846],{},"Controleer in beide richtingen:",[1602,26848,26849,26852,26855,26858,26861],{},[1453,26850,26851],{},"elk element van het schema op het situatieplan terugvinden;",[1453,26853,26854],{},"elk plansymbool op het eendraadschema terugvinden;",[1453,26856,26857],{},"letter en nummer vergelijken;",[1453,26859,26860],{},"verdieping, ruimte en bordtoewijzing nakijken;",[1453,26862,26863],{},"verborgen dozen en buitenelementen meenemen.",[12,26865,26866],{},"Onbekende kabelroutes teken je niet. Het situatieplan toont de ligging van de vereiste componenten; extra kabel- of aardingsplannen maak je alleen met betrouwbare gegevens.",[41,26868,26870],{"id":26869},"_9-leg-de-werkelijke-toestand-vast-vóór-de-keuring","9. Leg de werkelijke toestand vast vóór de keuring",[12,26872,26873],{},"Vóór ingebruikname ondergaat de nieuwe installatie de gelijkvormigheidscontrole (hoofdstuk 6.4). Het erkend organisme meet de aardingsweerstand en het isolatieniveau en bevestigt in het verslag dat differentieelschakelaars en aardingsweerstand, en overstroombeveiligingen en leidingdelen op elkaar afgestemd zijn, en dat de installatie volgens eendraadschema en situatieplan is uitgevoerd. Het controleert ook de continuïteit van beschermings- en equipotentiale verbindingen (onderafdeling 6.4.6.4).",[12,26875,26876],{},"Zoek daarom vlak voor de afspraak naar echte afwijkingen, niet naar tikfouten:",[1450,26878,26879,26882,26885,26888,26891,26894],{},[1453,26880,26881],{},"Werd een andere automaat of differentieelschakelaar geplaatst?",[1453,26883,26884],{},"Is een kabeldoorsnede of leidingtype gewijzigd?",[1453,26886,26887],{},"Kwam er een contactdoos, lamp of doos bij?",[1453,26889,26890],{},"Werd een kring naar een andere differentieelschakelaar verhuisd?",[1453,26892,26893],{},"Kloppen bordetiketten en referenties?",[1453,26895,26896],{},"Horen alle bladen bij dezelfde versie?",[12,26898,26899],{},"Pas installatie en documenten samen aan. Een technische fout los je op, je retoucheert hem niet weg.",[41,26901,26903],{"id":26902},"_10-organiseer-dossier-en-latere-wijzigingen","10. Organiseer dossier en latere wijzigingen",[12,26905,26906],{},"Het dossier van een huishoudelijke installatie bevat eendraadschema, situatieplan, de verslagen van de gelijkvormigheidscontrole, eventueel bewijsstukken over het materieel en later de documenten bij wijzigingen. De eigenaar bewaart het dossier in twee exemplaren en geeft het door aan een nieuwe eigenaar (afdeling 9.1.2).",[12,26908,26909],{},"Na de keuring houd je het schema bij. Belangrijke wijzigingen of uitbreidingen vragen aangepaste schema's en plannen; bij een niet-belangrijke wijziging volstaat een gedateerde en ondertekende bondige beschrijving, en het situatieplan toont altijd de actuele toestand (onderafdeling 3.1.2.1 a). Bewaar de gekeurde versie en elke latere versie traceerbaar.",[41,26911,26913],{"id":26912},"eindcheck","Eindcheck",[1450,26915,26918,26927,26933,26939,26945,26951,26957,26963,26969,26975,26981,26987],{"className":26916},[26917],"contains-task-list",[1453,26919,26922,26926],{"className":26920},[26921],"task-list-item",[26923,26924],"input",{"disabled":1499,"type":26925},"checkbox"," documentnummer, versie, datum, adres en verantwoordelijke volledig",[1453,26928,26930,26932],{"className":26929},[26921],[26923,26931],{"disabled":1499,"type":26925}," spanning, aard van de stroom en werkelijke aansluiting vermeld",[1453,26934,26936,26938],{"className":26935},[26921],[26923,26937],{"disabled":1499,"type":26925}," alle borden en bronnen opgenomen",[1453,26940,26942,26944],{"className":26941},[26921],[26923,26943],{"disabled":1499,"type":26925}," differentieel- en overstroombeveiliging met kenmerken vermeld",[1453,26946,26948,26950],{"className":26947},[26921],[26923,26949],{"disabled":1499,"type":26925}," elke eindstroombaan eenduidig aangeduid",[1453,26952,26954,26956],{"className":26953},[26921],[26923,26955],{"disabled":1499,"type":26925}," kabeltype, doorsnede, aantal geleiders en plaatsingswijze volledig",[1453,26958,26960,26962],{"className":26959},[26921],[26923,26961],{"disabled":1499,"type":26925}," contactdozen, lichtpunten, dozen, schakelaars en vaste toestellen aanwezig",[1453,26964,26966,26968],{"className":26965},[26921],[26923,26967],{"disabled":1499,"type":26925}," symbolen volgens tabel 2.23 of eenduidig in de legende",[1453,26970,26972,26974],{"className":26971},[26921],[26923,26973],{"disabled":1499,"type":26925}," referenties gelijk aan bord en situatieplan",[1453,26976,26978,26980],{"className":26977},[26921],[26923,26979],{"disabled":1499,"type":26925}," werfwijzigingen in beide documenten verwerkt",[1453,26982,26984,26986],{"className":26983},[26921],[26923,26985],{"disabled":1499,"type":26925}," bijkomende stukken voor PV, veiligheids- of bijzondere installaties toegevoegd",[1453,26988,26990,26992],{"className":26989},[26921],[26923,26991],{"disabled":1499,"type":26925}," ontwerpberekeningen en metingen buiten het schema afgerond",[41,26994,26996],{"id":26995},"ontwerp-werf-en-ingebruikname-afstemmen","Ontwerp, werf en ingebruikname afstemmen",[12,26998,26999],{},"Een nieuwbouw verandert bijna altijd tussen offerte en ingebruikname. Houd daarom een open afwijkingenlijst bij: geplande referentie, uitgevoerde aanpassing, wie besliste, betrokken plannen en ontbrekend bewijs. Typisch zijn een verplaatst bord, een extra buitenstopcontact, een ander vermogen van de warmtepomp of een later toegevoegde PV-omvormer. Pas als elke regel afgehandeld of uitdrukkelijk als niet uitgevoerd gemarkeerd is, wordt het ontwerpschema een as-built schema.",[12,27001,27002],{},"Loop daarna met etiketten en meetdocumenten door de installatie. Schakel kringen niet op basis van veronderstelde ruimtenamen. Vergelijk de markering in het bord met de referentie op het schema en het punt op het situatieplan. Veranderen geleiders, beveiligingen of instellingen tijdens de ingebruikname, dan werk je de documentatie bij; een vroege pdf-export is geen eindversie.",[41,27004,27006],{"id":27005},"voorbeeld-een-nieuwe-eindstroombaan-voor-de-droogkast","Voorbeeld: een nieuwe eindstroombaan voor de droogkast",[12,27008,27009],{},"Voor een vast aangesloten droogkast volstaat “wasplaats” niet. Het dossier toont uit welk bord en achter welke beveiligingen de kring vertrekt, welke referentie hij draagt, welke leiding met hoeveel geleiders en welke doorsnede er ligt en welk toestel aan het einde hangt. Wasmachine, droogkast en vaatwasser krijgen elk een eigen kring (onderafdeling 5.2.1.2) en hangen achter een differentieelschakelaar met hoge of zeer hoge gevoeligheid (onderafdeling 4.2.4.3 b). Op het situatieplan staat dezelfde referentie op de werkelijke aansluitplaats. Handleiding, toestelwaarden en instellingen bewaar je als technische documentatie.",[12,27011,27012],{},"Controleer daarna de raakvlakken: is het traject van de beschermingsgeleider traceerbaar? Komt de aansluitwijze overeen met de tekening? Werd een aparte voeding op de werf toch een gedeelde leiding? Ontbreekt er een aftakdoos op het schema? Die vragen voorkomen dat formeel volledige bladen een verouderde ontwerpstaat tonen.",[41,27014,27016],{"id":27015},"een-beheerste-documentenset-overdragen","Een beheerste documentenset overdragen",[12,27018,27019],{},"Benoem de einduitgave eenduidig met project, adres, revisie en exportdatum. Bundel eendraadschema, situatieplan, keuringsverslag en technische documenten in een geordend dossier. Werkversies en vervangen revisies markeer je apart als historiek. Zo weet de eigenaar welke bestanden actueel zijn en dat latere wijzigingen opnieuw gedocumenteerd worden.",[12,27021,7641,27022,27027,27028,39],{},[30,27023,27026],{"href":27024,"rel":27025},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[2532],"officiële FOD-pagina over de controle van huishoudelijke installaties"," noemt de minimaal voor te leggen plannen en vat hun inhoud samen. De gedetailleerde bepalingen staan in ",[30,27029,27031],{"href":15357,"rel":27030},[2532],"AREI Boek 1, versie 06",[41,27033,27035],{"id":27034},"voorbereiden-met-planelec","Voorbereiden met PlanElec",[12,27037,27038],{},"PlanElec beheert grondplan, elektrische topologie en bordgegevens in één project. Eendraadschema en situatieplan ontstaan uit hetzelfde model, dragen dezelfde referenties en gaan de deur uit als pdf of als samengesteld installatiedossier met voorblad en documentenlijst. De AREI\u002FRGIE-zelfcontrole toetst de ondersteunde regels aan je projectgegevens en toont open punten voordat de keurder ze vindt.",[12,27040,27041],{},"De rollen zijn duidelijk verdeeld: PlanElec structureert en controleert de documentatie. Aansluitcontrole, kabelberekening, werfopname en metingen blijven het werk van de vakmensen ter plaatse, en de officiële gelijkvormigheidscontrole doet het erkend organisme.",[41,27043,6947],{"id":6946},[1450,27045,27046,27051,27056,27061,27067,27072],{},[1453,27047,27048],{},[30,27049,27050],{"href":5957},"Eendraadschema en situatieplan samen gebruiken",[1453,27052,27053],{},[30,27054,27055],{"href":25786},"AREI-symbolen uitgelegd",[1453,27057,27058],{},[30,27059,27060],{"href":17361},"Elektrische keuring voorbereiden",[1453,27062,27063],{},[30,27064,27066],{"href":27065},"\u002Fblog\u002Fhoofdschakelaar-verplicht-arei","Is een hoofdschakelaar verplicht volgens het AREI?",[1453,27068,27069],{},[30,27070,27071],{"href":22651},"Materiaallijst van een elektrische installatie opstellen",[1453,27073,27074],{},[30,27075,27077],{"href":27076},"\u002Fblog\u002Frookmelder-verplicht-belgie","Rookmelder verplicht in België: de regels per gewest",[12,27079,27080],{},[30,27081,27082],{"href":6989},"Start een nieuwbouwproject in PlanElec →",[12,27084,27085],{},[17563,27086,27087],{},"Regelbasis: AREI Boek 1 V06, vooral hoofdstuk 2.13, afdeling 3.1.2, tabel 4.11, onderafdeling 4.2.4.3, onderafdeling 5.2.1.2, hoofdstuk 6.4 en afdeling 9.1.2. De officiële tekst en de uitgevoerde installatie zijn doorslaggevend.",{"title":1467,"searchDepth":1468,"depth":1468,"links":27089},[27090,27091,27092,27093,27094,27095,27096,27097,27098,27099,27100,27101,27102,27103,27104,27105,27106,27107],{"id":26499,"depth":1468,"text":26500},{"id":26519,"depth":1468,"text":26520},{"id":26626,"depth":1468,"text":26627},{"id":26656,"depth":1468,"text":26657},{"id":26689,"depth":1468,"text":26690},{"id":26719,"depth":1468,"text":26720},{"id":26752,"depth":1468,"text":26753},{"id":26789,"depth":1468,"text":26790},{"id":26822,"depth":1468,"text":26823},{"id":26835,"depth":1468,"text":26836},{"id":26869,"depth":1468,"text":26870},{"id":26902,"depth":1468,"text":26903},{"id":26912,"depth":1468,"text":26913},{"id":26995,"depth":1468,"text":26996},{"id":27005,"depth":1468,"text":27006},{"id":27015,"depth":1468,"text":27016},{"id":27034,"depth":1468,"text":27035},{"id":6946,"depth":1468,"text":6947},"Wat een eendraadschema voor nieuwbouw moet bevatten: hoofding, voeding, beveiligingen, leidingen, verbruikers, bronnen en de afstemming met het situatieplan volgens AREI Boek 1 V06.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-new-build-single-line-checklist-editorial.jpg","\u002Fblog\u002Fnew-build-single-line-checklist.nl",{"title":26493,"description":27108},"Eendraadschema nieuwbouw: AREI-checklist tot keuring","eendraadschema-nieuwbouw-checklist","blog\u002Fnew-build-single-line-checklist.nl",[3275,3276,27117,3273,8185,3274,12085,1513],"nieuwbouw","niCXggFt7k_2JLjFYtruJ7cASTpBsqskc85vmM_ljzk","\u002Fblog\u002Feendraadschema-nieuwbouw-checklist",{"id":27121,"title":27122,"articleId":27123,"body":27124,"category":1493,"date":26479,"description":27620,"extension":1496,"image":27141,"lastUpdated":15381,"locale":1497,"meta":27621,"navigation":1499,"ogImage":27622,"path":27623,"publishDate":26479,"readTime":4035,"refreshInterval":11097,"seo":27624,"seoTitle":4037,"slug":27625,"stem":27626,"tags":27627,"__hash__":27629,"kind":1515,"href":5957},"blog\u002Fblog\u002Fsingle-line-vs-situation-plan.nl.md","Eendraadschema vs. situatieplan: verschil en samenhang","single-line-vs-situation-plan",{"type":9,"value":27125,"toc":27604},[27126,27130,27136,27142,27145,27149,27237,27241,27244,27247,27251,27254,27280,27283,27286,27290,27293,27309,27312,27315,27319,27342,27352,27356,27359,27382,27385,27389,27392,27395,27398,27402,27470,27474,27477,27480,27483,27487,27490,27514,27517,27534,27538,27549,27552,27559,27562,27566,27569,27572,27574,27594,27599],[41,27127,27129],{"id":27128},"het-verschil-in-één-zin","Het verschil in één zin",[12,27131,27132,27135],{},[15,27133,27134],{},"Het eendraadschema toont hoe voeding, beveiligingen, leidingen en verbruikers elektrisch verbonden zijn; het situatieplan toont waar die onderdelen in het gebouw zitten."," Dezelfde kringletter en hetzelfde volgnummer leggen de brug tussen beide.",[12,27137,27138],{},[22,27139],{"alt":27140,"src":27141},"Projectdocumenten en digitale toestellen op een werktafel.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-single-line-vs-situation-plan-editorial.webp",[12,27143,27144],{},"Voor een nieuwe huishoudelijke installatie en voor belangrijke wijzigingen of uitbreidingen heb je beide documenten nodig (AREI Boek 1 V06, onderafdeling 3.1.2.1 a). Ze vervangen elkaar niet: een grondplan verklaart geen differentieel, automaat of kabeldoorsnede, en een elektrische boomstructuur vertelt niet aan welke wand een stopcontact zit.",[41,27146,27148],{"id":27147},"beide-documenten-in-één-oogopslag","Beide documenten in één oogopslag",[49,27150,27151,27161],{},[52,27152,27153],{},[55,27154,27155,27157,27159],{},[58,27156,2971],{},[58,27158,3764],{},[58,27160,3836],{},[68,27162,27163,27174,27184,27194,27205,27215,27226],{},[55,27164,27165,27168,27171],{},[73,27166,27167],{},"Wat toont het?",[73,27169,27170],{},"elektrische structuur van voedingspunt tot verbruiker",[73,27172,27173],{},"plaats van de onderdelen op de plattegrond",[55,27175,27176,27179,27181],{},[73,27177,27178],{},"AREI-inhoud",[73,27180,26591],{},[73,27182,27183],{},"onderafdeling 3.1.2.3 a",[55,27185,27186,27188,27191],{},[73,27187,10281],{},[73,27189,27190],{},"niet op schaal",[73,27192,27193],{},"plan in de zin van hoofdstuk 2.12: op schaal, zonder voorgeschreven verhouding",[55,27195,27196,27199,27202],{},[73,27197,27198],{},"Beveiligingen",[73,27200,27201],{},"type en kenmerken van differentieel- en overstroombeveiliging",[73,27203,27204],{},"plaats van het verdeelbord",[55,27206,27207,27209,27212],{},[73,27208,21519],{},[73,27210,27211],{},"type, doorsnede, aantal geleiders en plaatsingswijze",[73,27213,27214],{},"plaats van verbindings- en aftakdozen",[55,27216,27217,27220,27223],{},[73,27218,27219],{},"Codering",[73,27221,27222],{},"letter per kring, nummer per punt",[73,27224,27225],{},"dezelfde combinatie op de werkelijke plaats",[55,27227,27228,27231,27234],{},[73,27229,27230],{},"Bij niet-belangrijke wijziging",[73,27232,27233],{},"gedateerde en ondertekende korte beschrijving volstaat",[73,27235,27236],{},"wijziging altijd intekenen",[41,27238,27240],{"id":27239},"gemeenschappelijke-identificatie","Gemeenschappelijke identificatie",[12,27242,27243],{},"Afdeling 3.1.2 verlangt dat alle schema's, plannen en documenten eenduidig nummer, versie en versiedatum dragen. Op huishoudelijke schema's en plannen staan daarnaast naam, hoedanigheid en eventueel btw-nummer van de verantwoordelijke voor de uitvoering en het adres van de installatie (3.1.2.1 a). Spanning en aard van de stroom vermeld je op het eendraadschema.",[12,27245,27246],{},"Stelt het erkend organisme bij de controle de conformiteit vast, dan dateren en ondertekenen het en de verantwoordelijke schema en situatieplan; samen met het controleverslag gaan ze in het dossier van de installatie. Een pdf die je vóór de controle exporteert, is dus je goed voorbereide ontwerp; goedgekeurd wordt hij pas door het visum van het erkend organisme.",[41,27248,27250],{"id":27249},"inhoud-van-het-eendraadschema","Inhoud van het eendraadschema",[12,27252,27253],{},"Volgens 3.1.2.2 a bevat het huishoudelijke eendraadschema minstens:",[1450,27255,27256,27259,27262,27265,27268,27271,27274,27277],{},[1453,27257,27258],{},"type, doorsnede en aantal geleiders van de leidingen;",[1453,27260,27261],{},"plaatsingswijze van de leidingen;",[1453,27263,27264],{},"type en kenmerken van de differentieelbeveiligingen;",[1453,27266,27267],{},"type en kenmerken van de overstroombeveiligingen;",[1453,27269,27270],{},"schakelaars, verbindings- en aftakdozen;",[1453,27272,27273],{},"stopcontacten en lichtpunten;",[1453,27275,27276],{},"vaste machines en toestellen;",[1453,27278,27279],{},"bronnen zoals transformator, zonnecel, omvormer of batterij.",[12,27281,27282],{},"Het schema beantwoordt elektrische vragen: welk differentieel ligt vóór kring D, welke automaat beschermt de kabel, hoeveel geleiders met welke doorsnede lopen naar de aftakdoos en welke verbruikers volgen? Of de doos links of rechts van de deur zit, toont het niet.",[12,27284,27285],{},"Elke elementaire kring krijgt een hoofdletter. Lichtpunten, stopcontacten en sturingseenheden worden vanaf de voorgeschakelde overstroombeveiliging in volgorde genummerd. Die volgorde beschrijft de kring; ze is geen looproute door de kamers.",[41,27287,27289],{"id":27288},"inhoud-van-het-situatieplan","Inhoud van het situatieplan",[12,27291,27292],{},"Onderafdeling 3.1.2.3 a vraagt de plaats van de onderdelen die op het eendraadschema staan:",[1450,27294,27295,27298,27301,27304,27306],{},[1453,27296,27297],{},"schakel- en verdeelborden;",[1453,27299,27300],{},"verbindings- en aftakdozen;",[1453,27302,27303],{},"stopcontacten, lichtpunten en schakelaars;",[1453,27305,27276],{},[1453,27307,27308],{},"bronnen zoals zonnecel, omvormer, batterij of transformator.",[12,27310,27311],{},"De basis is een leesbaar grondplan met verdiepingen en duidelijk herkenbare ruimtes. Hoofdstuk 2.12 definieert een plan als voorstelling op schaal van de plaats van de installatiedelen; een bepaalde verhouding zoals 1:50 schrijft het AREI niet voor. Beslissend is een ondubbelzinnige positie: zit een stopcontact aan één wand of werkblad, dan teken je het daar en niet ergens midden in de kamer. Verborgen aftakdozen verdienen extra aandacht, omdat latere werken ze anders niet terugvinden.",[12,27313,27314],{},"Een volledig kabeltracéplan is het situatieplan niet. Onderafdeling 3.1.2.3 a vraagt de plaats van de opgesomde elementen; onbekende leidingroutes verzin je niet. Voor de ligging van ondergrondse leidingen kent Boek 1 eigen verplichtingen (afdeling 9.1.5).",[41,27316,27318],{"id":27317},"dezelfde-code-maakt-beide-documenten-bruikbaar","Dezelfde code maakt beide documenten bruikbaar",[12,27320,27321,27322,27324,27325,27328,27329,27332,27333,27335,27336,27338,27339,27341],{},"Stel dat kring ",[1300,27323,23013],{}," drie stopcontacten en één lichtpunt voedt. Op het eendraadschema heten die punten in elektrische volgorde ",[1300,27326,27327],{},"B1"," tot en met ",[1300,27330,27331],{},"B4",". Het situatieplan zet elke code op de juiste plek. Een schakelaar voor lichtpunt ",[1300,27334,27331],{}," draagt de letter ",[1300,27337,23013],{}," en het nummer ",[1300,27340,574],{}," van het bediende punt (3.1.2.1 a).",[12,27343,27344,27345,27347,27348,27351],{},"Zo volgen keurder en elektricien de weg van de beveiliging naar het aansluitpunt en van de kamer terug naar het bord. Ontbreekt ",[1300,27346,25534],{}," op het grondplan, dan is zijn plaats onbekend. Staat er in de kamer een extra ",[1300,27349,27350],{},"B5"," zonder tegenhanger op het eendraadschema, dan beschrijven de documenten niet dezelfde installatie.",[41,27353,27355],{"id":27354},"werk-vanuit-één-opname","Werk vanuit één opname",[12,27357,27358],{},"Eerst een schema maken en weken later een grondplan uit het geheugen tekenen, levert tegenstrijdigheden op. Werk beide documenten uit dezelfde opname uit:",[1602,27360,27361,27364,27367,27370,27373,27376,27379],{},[1453,27362,27363],{},"verdiepingen, ruimtes, borden en bronnen vastleggen;",[1453,27365,27366],{},"beveiligingsketen en eindkringen in het bord opnemen;",[1453,27368,27369],{},"elk stopcontact, elke verbruiker en elke doos aan de juiste kring koppelen;",[1453,27371,27372],{},"referenties één keer toekennen en in beide weergaven gebruiken;",[1453,27374,27375],{},"kabel- en toestelgegevens aan het elektrische pad toevoegen;",[1453,27377,27378],{},"de posities ter plaatse controleren;",[1453,27380,27381],{},"beide documenten met dezelfde versie en peildatum exporteren.",[12,27383,27384],{},"Een bordlabel helpt bij de toewijzing, maar bewijst ze niet. In een bestaande installatie identificeer je kringen vakkundig en spanningsloos. Vermoedens over onzichtbare verbindingen horen niet als vaststaand gegeven op de plannen.",[41,27386,27388],{"id":27387},"wijzigingen-en-versies","Wijzigingen en versies",[12,27390,27391],{},"Bij een niet-belangrijke wijziging volstaat in plaats van een nieuw eendraadschema een korte beschrijving met naam, hoedanigheid en adres van de verantwoordelijke, gedateerd en ondertekend. Het situatieplan werk je bij elke wijziging of uitbreiding bij, zodat het altijd de bestaande toestand toont. Een belangrijke wijziging of uitbreiding, bijvoorbeeld een extra kring in een huishoudelijke installatie (voorbeeld uit hoofdstuk 2.11), vraagt nieuwe of bijgewerkte schema's en plannen.",[12,27393,27394],{},"Installatiedelen waarvan de uitvoering vóór 1 oktober 1981 begon en die op het eendraadschema staan, krijgen de vermelding \"oude installatie\". Die vermelding plaatst het bestaande deel; ze is geen conformiteitsbewijs en geen vrijstelling. De afwijkingen voor oude installaties beoordeel je apart.",[12,27396,27397],{},"Beheer beide documenten als één set. Een situatieplan versie 4 naast een eendraadschema versie 2 maakt onduidelijk wat bij elkaar hoort. Bewaar eerder geviseerde versies in het dossier, zodat de geschiedenis traceerbaar blijft.",[41,27399,27401],{"id":27400},"veelvoorkomende-inconsistenties","Veelvoorkomende inconsistenties",[49,27403,27404,27413],{},[52,27405,27406],{},[55,27407,27408,27411],{},[58,27409,27410],{},"Verschil",[58,27412,11428],{},[68,27414,27415,27430,27438,27446,27454,27462],{},[55,27416,27417,27427],{},[73,27418,27419,27420,27423,27424],{},"schema bevat ",[1300,27421,27422],{},"C1–C6",", plan slechts ",[1300,27425,27426],{},"C1–C5",[73,27428,27429],{},"één element is niet terug te vinden of niet elektrisch beschreven",[55,27431,27432,27435],{},[73,27433,27434],{},"andere kringletter op hetzelfde punt",[73,27436,27437],{},"plaats en beveiliging zijn niet betrouwbaar te koppelen",[55,27439,27440,27443],{},[73,27441,27442],{},"PV-omvormer alleen op het situatieplan",[73,27444,27445],{},"bron en beveiligingsketen ontbreken in het schema",[55,27447,27448,27451],{},[73,27449,27450],{},"aftakdoos alleen op het eendraadschema",[73,27452,27453],{},"bij onderhoud is de werkelijke plaats onbekend",[55,27455,27456,27459],{},[73,27457,27458],{},"doorsnede op het grondplan, niet op het stroompad",[73,27460,27461],{},"het gegeven hoort bij geen enkele leiding eenduidig",[55,27463,27464,27467],{},[73,27465,27466],{},"verschillend adres of versienummer",[73,27468,27469],{},"de documenten horen mogelijk bij verschillende toestanden",[41,27471,27473],{"id":27472},"hoe-de-keuring-beide-documenten-gebruikt","Hoe de keuring beide documenten gebruikt",[12,27475,27476],{},"In het verslag van de gelijkvormigheidscontrole van een huishoudelijke installatie verklaart het erkend organisme onder meer dat de installatie is uitgevoerd overeenkomstig de eendraadschema's en situatieplannen (onderafdeling 6.4.6.4). De plannen moeten dus niet alleen bestaan, ze moeten kloppen. Het schema maakt beveiligingen en leidingen traceerbaar; het situatieplan leidt naar de aangeduide punten ter plaatse. Visuele controle, beproevingen en metingen vullen de documentcontrole aan.",[12,27478,27479],{},"Een onderling consistent paar kan toch een technisch probleem bevatten, bijvoorbeeld een te kleine doorsnede. Omgekeerd is een technisch correcte installatie met tegenstrijdige plannen niet goed gedocumenteerd. Houd daarom drie stappen apart: de documenten zijn volledig, het ontwerp is vakkundig gecontroleerd, de uitgevoerde installatie is officieel gekeurd. Elke stap heeft zijn eigen bewijs.",[12,27481,27482],{},"Na de controle krijgt de eigenaar de geviseerde plannen met het verslag voor het dossier; het erkend organisme bewaart vijf jaar een kopie (3.1.2.1 a). De eigenaar houdt zijn eigen dossier toch actueel en stelt het ter beschikking bij latere werken (9.1.2).",[41,27484,27486],{"id":27485},"een-praktische-afstemming-vóór-vrijgave","Een praktische afstemming vóór vrijgave",[12,27488,27489],{},"Vergelijk niet alleen twee pagina's naast elkaar, maar werk kring per kring. Noteer eerst de lijst van kringletters. Volg daarna elke kring van beveiliging tot laatste verbruiker en stel in beide documenten dezelfde vragen: welke punten bestaan, welke referentie dragen ze, waar zitten ze en welke vaste functie hebben ze? Een verschil noteer je als open taak in plaats van het te verbergen achter een vage lokaalnaam.",[12,27491,27492,27493,27496,27497,27500,27501,27504,27505,27507,27508,27510,27511,27513],{},"Voor kring ",[1300,27494,27495],{},"H"," bevat de lijst bijvoorbeeld plafondlicht ",[1300,27498,27499],{},"H1",", wandlicht ",[1300,27502,27503],{},"H2"," en hun schakelaars. Het eendraadschema toont hoe die punten elektrisch achter beveiliging en leiding liggen; het situatieplan plaatst ",[1300,27506,27499],{}," in de hal en ",[1300,27509,27503],{}," buiten. Ontbreekt ",[1300,27512,27503],{}," op één blad, dan is het andere niet vanzelf juist: opname en uitgevoerde installatie beslissen, daarna corrigeer je beide documenten.",[12,27515,27516],{},"Controleer ook over alle kringen heen:",[1450,27518,27519,27522,27525,27528,27531],{},[1453,27520,27521],{},"Elk bord en elke vaste bron van het eendraadschema heeft een vindbare plaats.",[1453,27523,27524],{},"Elke relevante verbindings- en aftakdoos draagt overal dezelfde aanduiding.",[1453,27526,27527],{},"Een vast toestel staat niet alleen als lokaaltekst op de plattegrond.",[1453,27529,27530],{},"Een vervolgverwijzing tussen bladen eindigt bij de juiste kring, niet bij een groep met een gelijkaardige naam.",[1453,27532,27533],{},"Hoofding, adres, bladnummer, datum en versie vormen zichtbaar één set.",[41,27535,27537],{"id":27536},"voorbeeld-een-kleine-uitbreiding-verwerken","Voorbeeld: een kleine uitbreiding verwerken",[12,27539,27540,27541,27544,27545,27548],{},"Komt er in de werkkamer een stopcontact bij, bepaal dan eerst aan welke kring het werkelijk hangt. Is het het volgende punt in kring ",[1300,27542,27543],{},"D",", dan krijgt het bijvoorbeeld ",[1300,27546,27547],{},"D6","; die code voeg je toe op de elektrische positie in het eendraadschema en op de ruimtelijke positie in het situatieplan. Kabel en beveiliging leid je niet af van het naburige stopcontact, maar controleer je aan de echte aansluiting. Datum en versie van beide bladen verhoog je samen.",[12,27550,27551],{},"Of werk belangrijk of niet-belangrijk is, vraagt een vakkundige beoordeling. De korte beschrijving is geen verzamelbak voor jarenlange kleine ingrepen buiten de plannen. Zodra toewijzing of actuele toestand onduidelijk wordt, consolideer je de documenten in een nieuwe versie.",[12,27553,7641,27554,27558],{},[30,27555,27557],{"href":27024,"rel":27556},[2532],"officiële FOD-pagina over controle van huishoudelijke installaties"," vat inhoud en samenhang van beide documenten samen. Het actuele Boek 1 blijft beslissend; de voorbeelden daar dienen ter oriëntatie en vervangen de opname van je installatie niet.",[12,27560,27561],{},"Bewaar na elke gezamenlijke revisie één vaste exportset. Geef losse conceptbladen een duidelijk ontwerpkenmerk en haal ze uit de overdrachtsmap zodra de eindversie klaar is. Zo combineert niemand per ongeluk het actuele eendraadschema met een ouder situatieplan.",[41,27563,27565],{"id":27564},"wat-planelec-daarbij-doet","Wat PlanElec daarbij doet",[12,27567,27568],{},"PlanElec brengt posities op het grondplan en elektrische topologie samen in één project. Elk toestel bestaat één keer: wijs je het aan een kring toe, dan dragen eendraadschema en situatieplan dezelfde referentie. Beide exporteer je als pdf uit dezelfde opgeslagen projectstand, en de indicatieve AREI\u002FRGIE-zelfcontrole toont je fouten in de ondersteunde regels die uit je invoer beslisbaar zijn.",[12,27570,27571],{},"De rollen zijn duidelijk verdeeld: PlanElec houdt plan en schema consistent; de opname ter plaatse, meetwaarden en de bevestiging van verborgen leidingen levert de vakman. Het visum op de plannen en het officiële controleverslag komen van het erkend organisme.",[41,27573,6947],{"id":6946},[1450,27575,27576,27580,27584,27589],{},[1453,27577,27578],{},[30,27579,26447],{"href":26446},[1453,27581,27582],{},[30,27583,25787],{"href":25786},[1453,27585,27586],{},[30,27587,27588],{"href":27119},"Eendraadschema voor nieuwbouw: checklist",[1453,27590,27591],{},[30,27592,27593],{"href":25796},"Situatieplan stap voor stap tekenen",[12,27595,27596],{},[30,27597,27598],{"href":6989},"Open PlanElec voor beide plannen en pdf-export →",[12,27600,27601],{},[17563,27602,27603],{},"Regelbasis: AREI Boek 1 V06, hoofdstuk 2.12, afdeling 3.1.2, onderafdeling 6.4.6.4 en afdeling 9.1.2. Redactie en controle: PlanElec-team, 5 oktober 2026.",{"title":1467,"searchDepth":1468,"depth":1468,"links":27605},[27606,27607,27608,27609,27610,27611,27612,27613,27614,27615,27616,27617,27618,27619],{"id":27128,"depth":1468,"text":27129},{"id":27147,"depth":1468,"text":27148},{"id":27239,"depth":1468,"text":27240},{"id":27249,"depth":1468,"text":27250},{"id":27288,"depth":1468,"text":27289},{"id":27317,"depth":1468,"text":27318},{"id":27354,"depth":1468,"text":27355},{"id":27387,"depth":1468,"text":27388},{"id":27400,"depth":1468,"text":27401},{"id":27472,"depth":1468,"text":27473},{"id":27485,"depth":1468,"text":27486},{"id":27536,"depth":1468,"text":27537},{"id":27564,"depth":1468,"text":27565},{"id":6946,"depth":1468,"text":6947},"Het eendraadschema toont de elektrische structuur, het situatieplan de fysieke plaats. Zo verbind je beide AREI-documenten via dezelfde kringreferenties tot een controleerbaar dossier.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-single-line-vs-situation-plan-editorial.jpg","\u002Fblog\u002Fsingle-line-vs-situation-plan.nl",{"title":27122,"description":27620},"eendraadschema-vs-situatieschema","blog\u002Fsingle-line-vs-situation-plan.nl",[3275,3276,3273,6216,3274,27628,6270,1513],"stroomkring","JBYtfASjde4oFKW0vUakpQIrXj2hw_uQnvr4r5okxHY",{"id":27631,"title":27632,"articleId":27633,"body":27634,"category":16481,"date":26479,"description":28081,"extension":1496,"image":27651,"lastUpdated":15381,"locale":1497,"meta":28082,"navigation":1499,"ogImage":28083,"path":28084,"publishDate":26479,"readTime":7670,"refreshInterval":11097,"seo":28085,"seoTitle":28086,"slug":28087,"stem":28088,"tags":28089,"__hash__":28093,"kind":1515,"href":28094},"blog\u002Fblog\u002Fheat-pump-single-line-diagram.nl.md","Warmtepomp op het eendraadschema: kring en gegevens correct tekenen","heat-pump-single-line-diagram",{"type":9,"value":27635,"toc":28060},[27636,27646,27652,27655,27659,27662,27688,27691,27695,27698,27701,27710,27713,27719,27731,27735,27738,27764,27771,27775,27778,27781,27798,27804,27808,27811,27831,27842,27846,27856,27873,27878,27882,27886,27889,27893,27896,27900,27903,27907,27910,27914,27917,27937,27940,27944,27947,27950,27970,27973,27977,27980,27983,27986,27990,27993,27996,28016,28019,28022,28025,28029,28032,28038,28042,28047,28051],[12,27637,27638,27641,27642,27645],{},[15,27639,27640],{},"Op het eendraadschema teken je een warmtepomp zoals ze elektrisch werkelijk is aangesloten: elke aftakking met kringreferentie, overstroombeveiliging, differentieelschakelaar, leiding en elektrisch aansluitvermogen – voor buitenunit, binnenunit en bijverwarming afzonderlijk wanneer ze afzonderlijk gevoed worden."," Eén vak met “8 kW” volstaat niet. Naast een buitenunit kunnen een binnenmodule, elektrische bijverwarming, circulatiepomp, regeling en sanitair-warmwaterboiler aanwezig zijn, met een gedeelde voeding of elk een eigen kring. Het eendraadschema toont de ",[15,27643,27644],{},"werkelijk uitgevoerde elektrische structuur",", niet het vereenvoudigde hydraulische verkoopschema.",[12,27647,27648],{},[22,27649],{"alt":27650,"src":27651},"Een elektricien controleert de aansluiting van een gesloten warmtepomp.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-heat-pump-single-line-diagram-editorial.webp",[12,27653,27654],{},"AREI Boek 1 V06 legt geen universeel warmtepompsymbool, automaat of differentieeltype per merk vast. De algemene regels voor kringen, bescherming, leidingen en documentatie gelden samen met de elektrische installatievoorschriften van het exacte toestel. Een sterk schema maakt die combinatie controleerbaar.",[41,27656,27658],{"id":27657},"verzamel-eerst-de-elektrische-brongegevens","Verzamel eerst de elektrische brongegevens",[12,27660,27661],{},"Controleer vóór het tekenen het verdeelbord, de typeplaten en alle relevante installatiehandleidingen. Noteer per elektrisch gevoed onderdeel:",[1450,27663,27664,27667,27670,27673,27676,27679,27682,27685],{},[1453,27665,27666],{},"toestelreferentie en functie;",[1453,27668,27669],{},"voedingsspanning, één- of driefasige aansluiting;",[1453,27671,27672],{},"nominale stroom en door de fabrikant gevraagde maximale beveiliging;",[1453,27674,27675],{},"aanwezigheid van inverter- of frequentieregeling;",[1453,27677,27678],{},"voorgeschreven differentieelbeveiliging en informatie over mogelijke DC-componenten;",[1453,27680,27681],{},"kabeltype, aantal geleiders, doorsnede en werkelijk traject;",[1453,27683,27684],{},"lokale werkschakelaar of scheidingsinrichting, indien geplaatst;",[1453,27686,27687],{},"afzonderlijke voeding voor elektrische weerstand, regeling, pomp of boiler.",[12,27689,27690],{},"Een thermisch vermogen van bijvoorbeeld 8 kW is niet hetzelfde als het elektrisch opgenomen vermogen of het aansluitvermogen. Op het elektrische schema gebruik je alleen de passende elektrische gegevens.",[41,27692,27694],{"id":27693},"eén-kring-of-meerdere-takken","Eén kring of meerdere takken?",[12,27696,27697],{},"Een monoblock heeft vaak één voedingspunt. Bij een split-installatie worden buiten- en binnenunit vaak afzonderlijk gevoed. Een ingebouwde weerstand werkt via dezelfde aansluiting of vraagt een afzonderlijke, zwaarder belaste kring. De regeling wordt vanuit de binnenunit gevoed of heeft een eigen beveiliging.",[12,27699,27700],{},"Teken daarom niet blind:",[27702,27703,27708],"pre",{"className":27704,"code":27706,"language":27707,"meta":1467},[27705],"language-text","Verdeelbord → automaat → warmtepomp\n","text",[1300,27709,27706],{"__ignoreMap":1467},[12,27711,27712],{},"Een mogelijke werkelijke structuur is:",[27702,27714,27717],{"className":27715,"code":27716,"language":27707,"meta":1467},[27705],"Hoofdverdeelbord\n├─ kring WP1 → beveiliging → leiding → buitenunit\u002Finverter\n├─ kring WP2 → beveiliging → leiding → binnenunit\u002Fregeling\n└─ kring WP3 → beveiliging → leiding → elektrische bijverwarming\n",[1300,27718,27716],{"__ignoreMap":1467},[12,27720,27721,702,27724,933,27727,27730],{},[1300,27722,27723],{},"WP1",[1300,27725,27726],{},"WP2",[1300,27728,27729],{},"WP3"," zijn slechts voorbeelden. In het project sluit je aan bij de bestaande kringlogica: AREI 3.1.2.1 a duidt elementaire kringen aan met een hoofdletter, en het situatieplan neemt letter en volgnummer van het eendraadschema over.",[41,27732,27734],{"id":27733},"gegevens-bij-elke-aftakking","Gegevens bij elke aftakking",[12,27736,27737],{},"Van verdeelbord tot verbruiker is de keten leesbaar. Vermeld minstens:",[1602,27739,27740,27743,27746,27749,27752,27755,27758,27761],{},[1453,27741,27742],{},"kringreferentie;",[1453,27744,27745],{},"type, aantal polen en nominale stroom van de overstroombeveiliging;",[1453,27747,27748],{},"voorgeschakelde differentieelschakelaar met aanspreekstroom en type;",[1453,27750,27751],{},"kabel- of draadtype, aantal geleiders en doorsnede;",[1453,27753,27754],{},"faseverdeling bij een meerfasige aansluiting;",[1453,27756,27757],{},"ondubbelzinnige naam, bijvoorbeeld “warmtepomp buitenunit”;",[1453,27759,27760],{},"relevant elektrisch vermogen of nominale stroom;",[1453,27762,27763],{},"vaste scheider, contactor of vermogenssturing als die werkelijk deel uitmaakt van de installatie.",[12,27765,27766,27767,27770],{},"Voor huishoudelijke installaties beperkt AREI-tabel 4.11 (onderafdeling 4.4.1.4) de nominale stroom van de automaat per doorsnede, bijvoorbeeld tot 20 A bij 2,5 mm² en 25 A bij 4 mm². De ",[30,27768,27769],{"href":26440},"kabeldoorsnede bij een automaat"," volgt toch niet alleen uit het toestelvermogen: lengte, plaatsingswijze, bundeling, omgevingstemperatuur, spanningsval, kortsluitvoorwaarden en fabrikantvoorschriften horen bij de dimensionering.",[41,27772,27774],{"id":27773},"differentieelschakelaar-geen-universele-keuze","Differentieelschakelaar: geen universele keuze",[12,27776,27777],{},"Reglementair is de indeling duidelijk: een warmtepomp is een vast toestel. AREI 4.2.4.3 b vraagt de groep met hoge of zeer hoge gevoeligheid (30 mA) alleen voor bepaalde kringen – stopcontacten die niet voor vaste toestellen bestemd zijn, verlichting, bad en douche, en was-, droog- en vaatwasmachines. Vaste toestellen zoals elektrische verwarmingsinstallaties mogen rechtstreeks achter de differentieelschakelaar aan het voedingspunt (maximaal 300 mA) worden aangesloten. Bedraagt de aardingsweerstand meer dan 30 ohm, dan vult minstens één differentieelschakelaar van maximaal 100 mA per kring of groep die bescherming aan.",[12,27779,27780],{},"Welk type nodig is, bepaalt het toestel. Een compressor met vermogenselektronica kan andere foutstroomvormen veroorzaken dan een zuiver resistieve belasting. Dat maakt type B niet automatisch verplicht voor elke warmtepomp en type A evenmin automatisch geschikt. Controleer samenhangend:",[1450,27782,27783,27786,27789,27792,27795],{},[1453,27784,27785],{},"de handleiding van het exacte model en de geïnstalleerde optiekaarten;",[1453,27787,27788],{},"eventuele ingebouwde detectie van gladde gelijkfoutstromen;",[1453,27790,27791],{},"het aardingsstelsel en de ontworpen uitschakelvoorwaarden;",[1453,27793,27794],{},"selectiviteit en verdeling tegenover bovenliggende differentieelschakelaars;",[1453,27796,27797],{},"normale lekstromen van andere toestellen op dezelfde beveiliging.",[12,27799,12598,27800,27803],{},[30,27801,27802],{"href":17466},"differentieel type A versus type B"," komen foutstroomvorm, verhoogde immuniteit en selectiviteit afzonderlijk aan bod. Op het schema staat wat werkelijk geplaatst is, niet wat een algemene vuistregel suggereert.",[41,27805,27807],{"id":27806},"symbool-en-legende","Symbool en legende",[12,27809,27810],{},"Tabel 2.23 van AREI Boek 1 V06 is uitdrukkelijk niet-limitatief. Ontbreekt daar een passend teken, dan laat 3.1.2.1 a elk ander duidelijk identificeerbaar symbool toe dat in de legende is gedefinieerd. Je kunt bijvoorbeeld onderscheiden:",[1450,27812,27813,27819,27825],{},[1453,27814,27815,27818],{},[1300,27816,27817],{},"WP-B",": warmtepomp buitenunit;",[1453,27820,27821,27824],{},[1300,27822,27823],{},"WP-I",": warmtepomp binnenunit;",[1453,27826,27827,27830],{},[1300,27828,27829],{},"BV",": elektrische bijverwarming.",[12,27832,27833,27834,27837,27838,27841],{},"Gebruik hetzelfde symbool en dezelfde betekenis doorheen het volledige dossier, en laat ",[1300,27835,27836],{},"WP"," nergens anders “waterpomp” betekenen. De ",[30,27839,27840],{"href":25786},"AREI-symbolengids"," legt uit wanneer een eigen legende nodig is.",[41,27843,27845],{"id":27844},"samenhang-met-het-situatieplan","Samenhang met het situatieplan",[12,27847,27848,27849,27852,27853,27855],{},"Het eendraadschema toont ",[15,27850,27851],{},"hoe"," de warmtepomp gevoed en beschermd wordt. Het situatieplan toont ",[15,27854,19457],{}," de vaste elektrische onderdelen zich bevinden. Plaats, afhankelijk van de installatie:",[1450,27857,27858,27861,27864,27867,27870],{},[1453,27859,27860],{},"buiten- en binnenunit;",[1453,27862,27863],{},"werkschakelaar of lokale scheider;",[1453,27865,27866],{},"regelkast of onderverdeelbord;",[1453,27868,27869],{},"vaste elektrische weerstand;",[1453,27871,27872],{},"relevante vaste kabeltrajecten wanneer die voor onderhoud of veiligheid tellen.",[12,27874,27875,27876,39],{},"Elk element krijgt dezelfde kringreferentie als op het eendraadschema. Een hydraulisch principe- of leidingplan vult het dossier aan, maar vervangt geen van beide elektrische plannen. Zie ook ",[30,27877,25544],{"href":5957},[41,27879,27881],{"id":27880},"fouten-die-een-schema-onbetrouwbaar-maken","Fouten die een schema onbetrouwbaar maken",[1396,27883,27885],{"id":27884},"alleen-warmtepomp-8-kw-vermelden","Alleen “warmtepomp 8 kW” vermelden",[12,27887,27888],{},"Dat is vaak thermisch vermogen. Zonder voedingswijze, beveiliging en leiding kan niemand de elektrische tak reconstrueren.",[1396,27890,27892],{"id":27891},"de-bijverwarming-vergeten","De bijverwarming vergeten",[12,27894,27895],{},"Een elektrische weerstand verhoogt de aansluitpiek sterk en heeft vaak een afzonderlijke voeding. Behoort ze tot de vaste installatie, dan staat ze op het schema.",[1396,27897,27899],{"id":27898},"een-generieke-beveiliging-kopiëren","Een generieke beveiliging kopiëren",[12,27901,27902],{},"Een voorbeeldschema van een ander model bewijst niet dat hetzelfde differentieeltype, dezelfde karakteristiek of dezelfde doorsnede geschikt is.",[1396,27904,27906],{"id":27905},"ontwerp-en-as-built-verwarren","Ontwerp en as-built verwarren",[12,27908,27909],{},"Tijdens de montage wijzigen fase, leidingtraject of toestelvariant soms. Schema, bordetiketten en dossier werk je bij na controle ter plaatse.",[41,27911,27913],{"id":27912},"controle-vóór-oplevering","Controle vóór oplevering",[12,27915,27916],{},"Loop minstens deze punten na:",[1450,27918,27919,27922,27925,27928,27931,27934],{},[1453,27920,27921],{},"stemmen typeplaat en toestelnaam overeen met het schema?",[1453,27923,27924],{},"zijn buitenunit, binnenunit en elektrische hulpcomponenten volledig?",[1453,27926,27927],{},"komen pooltal, nominale stroom en differentieelgegevens overeen met de geplaatste toestellen?",[1453,27929,27930],{},"zijn leidinggegevens en faseverdeling traceerbaar?",[1453,27932,27933],{},"zijn kringreferenties gelijk op bord, eendraadschema en situatieplan?",[1453,27935,27936],{},"zitten fabrikantdocumentatie en latere wijzigingen in het installatiedossier?",[12,27938,27939],{},"Deze controle toetst de documentatie. De elektrische berekening en uitvoering doet de vakpersoon, de keuring het erkende organisme.",[41,27941,27943],{"id":27942},"wanneer-pas-je-het-schema-opnieuw-aan","Wanneer pas je het schema opnieuw aan?",[12,27945,27946],{},"Niet alleen de vervanging van de volledige warmtepomp telt. Herbekijk de documenten wanneer een weerstand wordt bijgeplaatst, een hoger elektrisch vermogen wordt geactiveerd, een éénfasig toestel door een driefasige variant wordt vervangen of een externe regeling vast wordt aangesloten. Een wijziging aan differentieelschakelaar, automaat, kabel of faserichting hoort eveneens in de as-built versie.",[12,27948,27949],{},"Vergelijk bij zo'n ingreep systematisch:",[1450,27951,27952,27955,27958,27961,27964,27967],{},[1453,27953,27954],{},"oude en nieuwe elektrische aansluitgegevens;",[1453,27956,27957],{},"bestaande kabel en werkelijk beschikbare geleiders;",[1453,27959,27960],{},"geplaatste beveiliging tegenover de nieuwe fabrikantvoorwaarden;",[1453,27962,27963],{},"faseverdeling en belasting van het verdeelbord;",[1453,27965,27966],{},"gewijzigde locaties op het situatieplan;",[1453,27968,27969],{},"documentversie en bijbehorende handleidingen.",[12,27971,27972],{},"Een buiten dienst gestelde kring die fysiek blijft liggen, is in de documentatie als zodanig herkenbaar. Een schema dat een afgekoppeld toestel nog als actief toont, misleidt evenveel als een nieuwe bijverwarming die nergens voorkomt. Vermeld niet alleen de commerciële familienaam: modelvariant, elektrische optie en voedingswijze bepalen of de oude tekening nog bruikbaar is.",[41,27974,27976],{"id":27975},"praktijkvoorbeeld-buitenunit-binnenmodule-en-bijverwarming","Praktijkvoorbeeld: buitenunit, binnenmodule en bijverwarming",[12,27978,27979],{},"Een installatie heeft een driefasige buitenunit, een afzonderlijk gevoede binnenmodule en elektrische bijverwarming. Teken niet meteen één algemeen blok. Controleer bij het geleverde model en de echte bekabeling of er drie eindkringen bestaan of dat onderdelen intern vanuit de buitenunit gevoed worden. Alleen werkelijk gescheiden kringen krijgen een eigen beveiligingsketen, leidinggegevens en referentie.",[12,27981,27982],{},"Noteer per echte tak de maximale elektrische opname uit de bindende fabrikantdocumentatie, niet het thermische verwarmingsvermogen uit een verkoopbrochure. Geef fasen, nulgeleider en beschermingsgeleider aan volgens de geplaatste kabel. Naast een driefasige buitenunit kan een eenfasige regelaar of binnenmodule staan; de gezamenlijke functie “warmtepomp” maakt dat onderscheid niet zichtbaar. Controleer vooral de bijverwarming, omdat aansluitvermogen en trappen veel hoger kunnen liggen dan het compressorverbruik.",[12,27984,27985],{},"Plaats buitenunit, binnenmodule, vaste scheidingsmogelijkheid en afzonderlijk gevoede bijverwarming op hun werkelijke plaats op het situatieplan. Besturings-, bus- of sensorleidingen teken je niet als vermogenskring. Zijn ze belangrijk voor onderhoud, leg ze dan uit in legende of technische documentatie, los van de netvoeding.",[41,27987,27989],{"id":27988},"inbedrijfstelling-en-bedrijfsmodi-meenemen","Inbedrijfstelling en bedrijfsmodi meenemen",[12,27991,27992],{},"Vergelijk de getekende aftakking na ingebruikname met typeplaten, klemmen, installateursinstellingen en testgegevens. Vermogensbegrenzing, blokkeercontact of energiemanagement beïnvloeden de werking, maar vervangen de dimensionering en beoordeling van beveiligingen niet. Documenteer alleen instellingen die werkelijk zijn toegepast, tegen onbedoelde wijziging beschermd zijn en voor de ontwerpgrondslag meetellen.",[12,27994,27995],{},"Controleer bedrijfsgevallen die tijdens normaal verwarmen gemakkelijk verborgen blijven:",[1450,27997,27998,28001,28004,28007,28010,28013],{},[1453,27999,28000],{},"ontdooien met gelijktijdige bijverwarming;",[1453,28002,28003],{},"nood- of hygiënebedrijf via de elektrische weerstand;",[1453,28005,28006],{},"start- en omvormergedrag volgens de fabrikant;",[1453,28008,28009],{},"aparte voeding voor lekbak- of traceverwarming;",[1453,28011,28012],{},"veilig scheiden voor onderhoud;",[1453,28014,28015],{},"herstart na netonderbreking of lastafschakeling.",[12,28017,28018],{},"Deze lijst legt geen universele automaat, differentieelschakelaar of kabeldoorsnede vast. Ze toont welke gegevens de ontwerper met de exacte handleiding en plaatsingsvoorwaarden oplost. Metingen en uitschakelvoorwaarden controleert de vakpersoon ter plaatse.",[12,28020,28021],{},"Leg ook vast welke component na uitschakeling van de hoofdkring nog spanning kan voeren. Een regelmodule, communicatievoeding of afzonderlijk hulpapparaat kan een andere voeding hebben, en een onderhoudsschema toont die hulpvoeding. Geef scheidingspunten alleen als gezamenlijk werkend aan wanneer bekabeling en fabrikantconcept dat bevestigen. Zo voorkomt het dossier dat een schijnbaar volledig uitgeschakeld systeem ongemerkt uit een tweede kring gevoed blijft.",[12,28023,28024],{},"Neem dat onderscheid ook over op de labels in het verdeelbord. Eén verzamelnaam voor meerdere aftakkingen maakt onderhoud en plancontrole moeilijk. Gebruik korte functienamen en dezelfde referenties op schema, situatieplan en toestel. Controleer na het etiketteren door gericht vrijschakelen of elke aanduiding werkelijk het verwachte onderdeel betreft. Dat resultaat hoort bij de as-built afstemming, niet bij een ongecontroleerde ontwerpaanname.",[41,28026,28028],{"id":28027},"koppeling-met-pv-batterij-en-lastbeheer","Koppeling met PV, batterij en lastbeheer",[12,28030,28031],{},"Een warmtepomp reageert misschien op zelfverbruikssturing, maar staat daardoor niet elektrisch “achter de PV-omvormer” wanneer de werkelijke AC-topologie anders is. Teken energiepaden volgens de echte aansluiting en beschrijf communicatie- of smart-gridcontacten apart. Bij noodvoeding stel je vast of de warmtepomp echt door het noodstroombord wordt gevoed en of start- en vermogensgrenzen dat toelaten. Een instelling in een app bewijst de bekabeling niet.",[12,28033,7641,28034,28037],{},[30,28035,26405],{"href":15357,"rel":28036},[2532]," vormt het algemene kader voor schema en beveiliging. Modelgebonden ingangswaarden, externe beveiligingseisen en aansluitvarianten komen uit de actuele handleiding van exact het geplaatste toestel.",[41,28039,28041],{"id":28040},"documenteren-met-planelec","Documenteren met PlanElec",[12,28043,9364,28044,28046],{},[30,28045,1337],{"href":6989}," koppel je warmtepomponderdelen aan hun werkelijke kringen, leg je beveiligings- en leidinggegevens vast en exporteer je eendraadschema en situatieplan als pdf. De warmtepomp is er opgenomen als vast aangesloten toestel dat achter de hoofddifferentieelschakelaar mag zitten. De AREI\u002FRGIE-zelfcontrole meldt onder meer wanneer een automaat met B-karakteristiek een last met hoge aanloopstroom zoals een warmtepomp voedt – uitdrukkelijk als praktijkaanbeveling, niet als AREI-voorschrift. Voor projectspecifieke tekens blijft een heldere legende nodig. De rollen zijn duidelijk: de zelfcontrole toont je bevindingen binnen de ondersteunde regels, de fabrikantgoedkeuring komt uit de toesteldocumentatie en de keuring doet het erkende organisme.",[41,28048,28050],{"id":28049},"bronnen-en-geldigheidsstand","Bronnen en geldigheidsstand",[12,28052,28053,28054,28059],{},"De inhoud steunt op de officiële publicatie van ",[30,28055,28058],{"href":28056,"rel":28057},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[2532],"AREI\u002FRGIE Boek 1",", vooral tabel 2.23, deel 3 over elektrische plannen (3.1.2.1), onderafdeling 4.2.4.3 b over differentieelschakelaars in huishoudelijke installaties en tabel 4.11, aangevuld met de elektrische installatiehandleiding van het concrete warmtepompmodel. Gecontroleerde stand: Boek 1 V06, 5 oktober 2026.",{"title":1467,"searchDepth":1468,"depth":1468,"links":28061},[28062,28063,28064,28065,28066,28067,28068,28074,28075,28076,28077,28078,28079,28080],{"id":27657,"depth":1468,"text":27658},{"id":27693,"depth":1468,"text":27694},{"id":27733,"depth":1468,"text":27734},{"id":27773,"depth":1468,"text":27774},{"id":27806,"depth":1468,"text":27807},{"id":27844,"depth":1468,"text":27845},{"id":27880,"depth":1468,"text":27881,"children":28069},[28070,28071,28072,28073],{"id":27884,"depth":1486,"text":27885},{"id":27891,"depth":1486,"text":27892},{"id":27898,"depth":1486,"text":27899},{"id":27905,"depth":1486,"text":27906},{"id":27912,"depth":1468,"text":27913},{"id":27942,"depth":1468,"text":27943},{"id":27975,"depth":1468,"text":27976},{"id":27988,"depth":1468,"text":27989},{"id":28027,"depth":1468,"text":28028},{"id":28040,"depth":1468,"text":28041},{"id":28049,"depth":1468,"text":28050},"Zo documenteer je buiten- en binnenunit, bijverwarming, beveiligingen, leiding en fabrikantgegevens van een warmtepomp op het eendraadschema volgens AREI Boek 1 V06.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-heat-pump-single-line-diagram-editorial.jpg","\u002Fblog\u002Fheat-pump-single-line-diagram.nl",{"title":27632,"description":28081},"Warmtepomp op het eendraadschema correct tekenen","warmtepomp-eendraadschema","blog\u002Fheat-pump-single-line-diagram.nl",[28090,3764,3275,12945,28091,28092,1513],"Warmtepomp","Buitenunit","Bijverwarming","is41ETw_FpyVjbRN2NafFPax3OBmyEVHI8hIh3RN2J4","\u002Fblog\u002Fwarmtepomp-eendraadschema",{"id":28096,"title":28097,"articleId":28098,"body":28099,"category":16481,"date":26479,"description":28579,"extension":1496,"image":28112,"lastUpdated":15381,"locale":1497,"meta":28580,"navigation":1499,"ogImage":28581,"path":28582,"publishDate":26479,"readTime":7016,"refreshInterval":11097,"seo":28583,"seoTitle":4037,"slug":28584,"stem":28585,"tags":28586,"__hash__":28591,"kind":1515,"href":28592},"blog\u002Fblog\u002Fpv-ev-charger-single-line-diagram.nl.md","Zonnepanelen en laadpaal combineren op het eendraadschema","pv-ev-charger-single-line-diagram",{"type":9,"value":28100,"toc":28562},[28101,28107,28113,28116,28120,28128,28189,28200,28204,28207,28227,28230,28234,28237,28243,28246,28250,28253,28276,28283,28287,28290,28293,28316,28323,28327,28330,28347,28350,28354,28357,28363,28366,28383,28386,28390,28393,28396,28400,28403,28406,28426,28430,28437,28440,28460,28463,28466,28470,28473,28476,28479,28483,28486,28489,28506,28509,28513,28520,28523,28526,28529,28533,28538,28542,28559],[12,28102,28103,28106],{},[15,28104,28105],{},"Zonnepanelen en laadpaal zijn op het eendraadschema twee afzonderlijke takken van hetzelfde verdeelbord."," De omvormer injecteert aan zijn AC-zijde; een gewone laadpaal neemt energie af via een eigen eindkring. Een energiemanager meet en regelt beide, maar schakelt ze niet in serie. Zo teken je ze ook: twee aftakkingen, duidelijke stroomrichtingen, beveiligingen op de juiste plaats en het lastbeheer als sturing.",[12,28108,28109],{},[22,28110],{"alt":28111,"src":28112},"Een elektricien controleert een laadpaal naast een elektrische auto, met zonnepanelen op het dak op de achtergrond.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-ev-charger-single-line-diagram-editorial.webp",[12,28114,28115],{},"Een sterk gecombineerd schema toont bronnen, mogelijke stroomrichtingen, beveiligingsgrenzen en meetpunten. Wat alleen de berekening, de fabrikant of de netbeheerder kan bevestigen, haal je eerst als bewijs op en teken je pas daarna in.",[41,28117,28119],{"id":28118},"voorbeeldopdracht-voortzetten-ev1-aan-db1-toevoegen","Voorbeeldopdracht voortzetten: EV1 aan DB1 toevoegen",[12,28121,28122,28123,28127],{},"In de gezamenlijke fictieve opdracht uit de ",[30,28124,28126],{"href":28125},"\u002Fblog\u002Fzonnepanelen-schema","PV-gids"," blijven S1 en S2 via INV1 verbonden met DB1. EV1 is een nieuw unidirectioneel laadpunt aan de parkeerplaats. Teken de laadtak tot zijn werkelijke aansluitpunt in DB1; EV1 staat niet in serie met INV1. De namen verduidelijken het voorbeeld en zijn geen verplichte referenties.",[49,28129,28130,28143],{},[52,28131,28132],{},[55,28133,28134,28137,28140],{},[58,28135,28136],{},"Aanvulling op de opdracht",[58,28138,28139],{},"Te controleren bewijs",[58,28141,28142],{},"Gevolg voor de documenten",[68,28144,28145,28156,28167,28178],{},[55,28146,28147,28150,28153],{},[73,28148,28149],{},"EV1 en aansluitkabel",[73,28151,28152],{},"Handleiding, opname en dimensionering",[73,28154,28155],{},"Eigen laadtak, leiding en locatie",[55,28157,28158,28161,28164],{},[73,28159,28160],{},"Bijbehorende beveiliging",[73,28162,28163],{},"Ontwerp en bewijs van ingebouwde\u002Fexterne toestellen",[73,28165,28166],{},"Werkelijke functies zonder dubbeltelling",[55,28168,28169,28172,28175],{},[73,28170,28171],{},"Meting of lastbeheer",[73,28173,28174],{},"Meetpunt, fasen en fabrikantconfiguratie",[73,28176,28177],{},"Besturing gescheiden van vermogenspaden",[55,28179,28180,28183,28186],{},[73,28181,28182],{},"DB1 met PV en laadpunt",[73,28184,28185],{},"Herziene stroom- en beveiligingsbeoordeling",[73,28187,28188],{},"Gemeenschappelijke bordversie bijwerken",[12,28190,10081,28191,28195,28196,28199],{},[30,28192,28194],{"href":28193},"\u002Fblog\u002Fzonnepanelen-situatieschema","PV-situatieplan"," plaatst dezelfde referenties ruimtelijk. Met de ",[30,28197,28198],{"href":11068},"installatiehandleiding"," controleer je de ingevoerde elektrische verbindingen in het model. De stroombelastbaarheid van leidingen en toestellen bewijs je met dimensionering en datasheet, niet met een schermwaarde van het lastbeheer.",[41,28201,28203],{"id":28202},"drie-niveaus-afzonderlijk-inventariseren","Drie niveaus afzonderlijk inventariseren",[12,28205,28206],{},"Breng eerst deze niveaus in kaart:",[1602,28208,28209,28215,28221],{},[1453,28210,28211,28214],{},[15,28212,28213],{},"Net en hoofdverdeling:"," aansluiting, meter, hoofdbeveiliging, aarding en betrokken borden.",[1453,28216,28217,28220],{},[15,28218,28219],{},"PV-productie:"," panelen of strings, DC-componenten, omvormer, AC-beveiliging en aansluitpunt.",[1453,28222,28223,28226],{},[15,28224,28225],{},"Laadverbruiker:"," afzonderlijke kring, overstroombeveiliging, differentieelschakelaar, leiding, laadpunt en eventuele vermogenssturing.",[12,28228,28229],{},"Levert de fabrikant een ander toegelaten systeemconcept, bijvoorbeeld een bidirectionele lader of een geïntegreerd hybride toestel, dan teken je precies die topologie. Model-, firmware- en systeemdocumentatie horen dan in het dossier.",[41,28231,28233],{"id":28232},"gebruikelijke-gemeenschappelijke-ac-structuur","Gebruikelijke gemeenschappelijke AC-structuur",[12,28235,28236],{},"Een conventionele opstelling ziet er vereenvoudigd zo uit:",[27702,28238,28241],{"className":28239,"code":28240,"language":27707,"meta":1467},[27705],"Distributienet ↔ meter ↔ hoofdverdeelbord\n                           ├─ PV-AC-tak ↔ AC-beveiliging ↔ omvormer ↔ PV-DC-zijde\n                           └─ laadtak → beveiliging → leiding → laadpaal → voertuig\n                                      └─ meting\u002Flaststuring, indien geplaatst\n",[1300,28242,28240],{"__ignoreMap":1467},[12,28244,28245],{},"De dubbele pijl toont een mogelijke energierichting; de beveiligingsgegevens staan nog altijd bij het toestel. Een unidirectionele laadpaal blijft een verbruiker, ook wanneer de sturing “laden op zonne-overschot” heet. Teken hem dus niet als producent.",[41,28247,28249],{"id":28248},"de-pv-tak-volledig-weergeven","De PV-tak volledig weergeven",[12,28251,28252],{},"Voor huishoudelijke laagspannings-PV tot en met 10 kVA vult hoofdstuk 7.112 van AREI Boek 1 V06 de algemene regels aan met specifieke maatregelen: markering van de gelijkstroomgeleiders en de actieve wisselstroomgeleiders, waarschuwingsborden (“Niet onderbreken bij belasting”, “Elektrische installatie altijd onder spanning”) en de aarding van de metalen moduleramen, tenzij de fabrikant dat verbiedt (afdeling 7.112.2). Maak de geïnstalleerde keten traceerbaar:",[1450,28254,28255,28258,28261,28264,28267,28270,28273],{},[1453,28256,28257],{},"PV-generator en relevante string- of moduleopbouw;",[1453,28259,28260],{},"DC-leidingen met polariteit en doorsnede;",[1453,28262,28263],{},"DC-scheiding en beschermingen wanneer geplaatst of in de omvormer geïntegreerd;",[1453,28265,28266],{},"exact omvormermodel en maximaal AC-vermogen;",[1453,28268,28269],{},"AC-leiding, overstroombeveiliging, differentieelschakelaar en overige ontworpen bescherming;",[1453,28271,28272],{},"duidelijk aansluitpunt in het bord;",[1453,28274,28275],{},"bijbehorende waarschuwingen en identificatie.",[12,28277,28278,28279,28282],{},"De gids ",[30,28280,28281],{"href":28125},"zonnepanelen op het eendraadschema"," behandelt deze tak uitgebreider. Vul concrete fabrikantgegevens in, geen generiek vak “PV-beveiliging”.",[41,28284,28286],{"id":28285},"de-laadpaal-als-afzonderlijke-kring","De laadpaal als afzonderlijke kring",[12,28288,28289],{},"AREI 7.22.3 vraagt een toegekende stroombaan, dus een afzonderlijke kring, voor elk verbindingspunt van een laadinrichting; een laadinrichting via een stopcontact op de vaste installatie aansluiten is verboden. Bij actieve bescherming met automatische onderbreking beschermt volgens 7.22.4.1 b een eigen differentieelschakelaar van ten hoogste 30 mA elke afzonderlijke wisselstroomkring. Daarnaast moet de bescherming blijven werken bij isolatiefouten met een storende gelijkstroomcomponent: via een daarvoor gebouwde differentieelschakelaar of via een differentieelschakelaar in coördinatie met een detectietoestel voor DC-foutstroom dat de laadpaal uitschakelt. Volgens 7.22.4.2 krijgt elke afzonderlijke kring ook zijn eigen overstroombeveiliging. Die toestellen mogen in het bord, in de laadpaal of in een combinatie van beide zitten.",[12,28291,28292],{},"Vermeld dus minstens:",[1450,28294,28295,28298,28301,28304,28307,28310,28313],{},[1453,28296,28297],{},"kringreferentie en fasen;",[1453,28299,28300],{},"overstroombeveiliging met aantal polen en nominale stroom;",[1453,28302,28303],{},"differentieelschakelaar met type, aanspreekstroom en eventuele gecoördineerde DC-detectie;",[1453,28305,28306],{},"kabeltype, geleideraantal en doorsnede;",[1453,28308,28309],{},"laadpaal en aantal aansluitpunten;",[1453,28311,28312],{},"nominaal vermogen of maximale laadstroom;",[1453,28314,28315],{},"vaste stuur-, meet- of afschakelcomponenten.",[12,28317,28318,28319,28322],{},"Staat de laadpaal in open lucht, dan vraagt 7.22.5.1 voor het materieel minstens IP44. De toegelaten combinatie volgt uit AREI, productnormen en de handleiding van het concrete toestel samen. ",[30,28320,28321],{"href":17466},"Differentieel type A versus type B"," geeft je de achtergrond; de goedkeuring van het concrete model haal je uit de fabrikantdocumentatie.",[41,28324,28326],{"id":28325},"energiemanagement-correct-positioneren","Energiemanagement correct positioneren",[12,28328,28329],{},"Laden op PV-overschot of het begrenzen van netafname vraagt meting en regeling. Een systeem kan een energiemeter, stroomtransformatoren, controller, dataverbinding en regelbare laadpaal bevatten. Plaats de elektrisch relevante vaste delen op hun echte positie:",[1450,28331,28332,28335,28338,28341,28344],{},[1453,28333,28334],{},"meetpunt aan de aansluiting of het betrokken bord;",[1453,28336,28337],{},"stroomtransformatoren met correcte faserichting;",[1453,28339,28340],{},"voeding van de energiemanager;",[1453,28342,28343],{},"contactor of stuurcontact als dit elektrisch schakelt of vrijgeeft;",[1453,28345,28346],{},"datalijn voor zover nodig om de functie te begrijpen.",[12,28348,28349],{},"Een gestippelde lijn onderscheidt communicatie van energiegeleiders; definieer ze in de legende. “100% zonnestroom” hoort niet op het schema: productie, woningverbruik, laadvermogen en regeling veranderen voortdurend.",[41,28351,28353],{"id":28352},"fasen-en-vermogensbalans","Fasen en vermogensbalans",[12,28355,28356],{},"Teken de werkelijke fasebezetting van omvormer en laadpaal. Een eenfasige omvormer en een driefasige lader worden niet dezelfde tak omdat een meter saldeert. Softwarematige stroombegrenzing stuurt de werking; doorsnede en overstroombeveiliging bewijs je nog altijd afzonderlijk.",[12,28358,7641,28359,28362],{},[30,28360,28361],{"href":26440},"combinatie van kabeldoorsnede en automaat"," bepaal je daarom voor de PV-tak en de laadkring elk volledig.",[12,28364,28365],{},"Controleer bij het ontwerp onder meer:",[1450,28367,28368,28371,28374,28377,28380],{},[1453,28369,28370],{},"aansluitvermogen en toegelaten fasebelasting;",[1453,28372,28373],{},"gelijktijdige productie en afname;",[1453,28375,28376],{},"belasting van rails en bovenliggende toestellen bij alle mogelijke stroomrichtingen;",[1453,28378,28379],{},"kortsluit-, selectiviteits- en spanningsvalvoorwaarden;",[1453,28381,28382],{},"meetbereik en fabrikantgrenzen van de sturing.",[12,28384,28385],{},"Het schema legt de gekozen uitvoering vast; het is niet de berekening zelf.",[41,28387,28389],{"id":28388},"bidirectioneel-laden-is-een-ander-systeem","Bidirectioneel laden is een ander systeem",[12,28391,28392],{},"Kan de laadpaal energie uit het voertuig terugleveren aan de installatie of het net, dan is ze niet langer alleen verbruiker. AREI 7.22.5.4 vraagt dan dat je voldoet aan de voorschriften voor decentrale productie-eenheden – voor de bescherming tegen elektrische schokken, tegen overstroom en voor de veiligheidsonderbreking – en dat de waarschuwing “Opgelet: mogelijke teruglevering van elektrische energie in de installatie” op de laadinrichting en op de gevoede verdeelborden hangt. Synergrid vermeldt dat bidirectionele of technisch bidirectioneel geschikte laadinfrastructuur onder C10\u002F11 en C10\u002F26-homologatie valt; een zuiver unidirectionele lader niet.",[12,28394,28395],{},"Toon stroomrichtingen en scheidings- en beschermingsfuncties exact volgens het goedgekeurde systeemconcept. Het schema van een gewone wallbox past niet op Vehicle-to-Home of Vehicle-to-Grid.",[41,28397,28399],{"id":28398},"situatieplan-en-dossier","Situatieplan en dossier",[12,28401,28402],{},"Lokaliseer panelen, omvormer, relevante scheiders, verdeelborden, vaste meetapparatuur, laadpaal en bijbehorende parkeerplaats. Gebruik dezelfde kringreferenties als op het eendraadschema. Datasheets, toestelverklaringen, instellingen en latere wijzigingen horen in het installatiedossier.",[12,28404,28405],{},"Bij je eindcontrole check je minstens:",[1450,28407,28408,28411,28414,28417,28420,28423],{},[1453,28409,28410],{},"overeenstemming tussen schema, bordlabels en as-built installatie;",[1453,28412,28413],{},"volledige traceerbaarheid van beide takken tot hun gemeenschappelijke punt;",[1453,28415,28416],{},"correcte pijlrichting voor elk energiepad;",[1453,28418,28419],{},"bescherming aan de juiste zijde en zonder fictieve dubbels;",[1453,28421,28422],{},"lastbeheer als regeling, niet als beveiliging;",[1453,28424,28425],{},"duidelijke aanduiding van uni- of bidirectionele laadfunctie.",[41,28427,28429],{"id":28428},"latere-uitbreidingen-correct-verwerken","Latere uitbreidingen correct verwerken",[12,28431,28432,28433,39],{},"Een gecombineerd energiesysteem verandert vaak na de eerste oplevering. Een andere omvormer, extra panelen, een tweede laadconnector, een thuisbatterij of een nieuwe meetmethode verwerk je niet door alleen een toestelnaam te wijzigen. Volg elke gewijzigde tak opnieuw tot het gemeenschappelijke verdeelbord. Hoe je een thuisbatterij als bron in de installatie integreert, lees je in ",[30,28434,28436],{"href":28435},"\u002Fblog\u002Fthuisbatterij-arei","Thuisbatterij en AREI",[12,28438,28439],{},"Leg bij een uitbreiding minstens vast:",[1450,28441,28442,28445,28448,28451,28454,28457],{},[1453,28443,28444],{},"bijkomende bron of nieuw aansluitpunt;",[1453,28446,28447],{},"gewijzigde maximale AC-waarde en mogelijke stroomrichting;",[1453,28449,28450],{},"nieuwe of anders gecoördineerde beveiligingen;",[1453,28452,28453],{},"nieuwe sensorpositie en fasekoppeling van de lastregeling;",[1453,28455,28456],{},"aangepaste leiding, bordkring en fysieke labels;",[1453,28458,28459],{},"softwarelimieten altijd samen met toestelversie en bewaarde instellingen.",[12,28461,28462],{},"Een batterij of bidirectioneel voertuig is geen onzichtbare appfunctie. Zodra energie vanuit een bijkomende bron de vaste installatie kan bereiken, staan bron, scheiding, bescherming en waarschuwing in de technische documentatie. Bewaar de vervangen planversie en markeer ondubbelzinnig welke versie de actuele toestand weergeeft. Werk ook het situatieplan bij: een verplaatste meter of een nieuw toestel raakt meer dan alleen het eendraadschema.",[12,28464,28465],{},"Leg bij overdracht bovendien vast wie de vermogensregeling mag wijzigen en waar de actuele instellingen bewaard worden. Zo blijft een latere interventie controleerbaar.",[41,28467,28469],{"id":28468},"praktijkvoorbeeld-een-tweede-laadpunt-bij-bestaande-pv","Praktijkvoorbeeld: een tweede laadpunt bij bestaande PV",[12,28471,28472],{},"Een gebouw heeft al een PV-omvormer en een unidirectionele wallbox; nu komt er een tweede aansluitpunt bij. Kopieer niet gewoon het eerste symbool. Bepaal of het om een tweede toestel, één station met twee aansluitpunten of een andere fabrikantarchitectuur gaat en waar overstroombeveiliging en differentieelschakelaar werkelijk zitten. AREI 7.22.4.2 laat bij meerdere verbindingspunten die niet tegelijk gebruikt worden een gemeenschappelijke overstroombeveiliging toe, op voorwaarde dat elk punt de vereiste bescherming behoudt – bijvoorbeeld wanneer de nominale stroom van de gemeenschappelijke beveiliging niet hoger is dan de laagste nominale stroom van de verbindingspunten. Die uitzondering geldt alleen voor de overstroombeveiliging, niet voor gedeelde differentieelschakelaars of leidingen.",[12,28474,28475],{},"Werk vervolgens aansluitvermogen, fasetoewijzing en lastbeheer bij. Beide punten mogen de beschikbare stroom dynamisch verdelen, maar het schema toont nog steeds elk aansluitpunt, de echte elektrische onderverdeling en de maximaal toegelaten belasting. Stroomsensoren horen bij de gemeten geleiders en de juiste richting. De as-built bekabeling bewijs je met opname en toesteldocumentatie, niet met een softwarescherm met twee parkeerplaatsen.",[12,28477,28478],{},"Controleer ook de PV-tak opnieuw. Verandert alleen het verbruik, dan blijven modules en omvormer gelijk, maar het gemeenschappelijke bord en de mogelijke stroomrichtingen kunnen een nieuwe beoordeling vragen. Komt er tegelijk een hybride omvormer of batterij bij, dan ontstaat een bijkomende bron of bedrijfsmodus met eigen traceerbare beveiliging, scheiding en documentatie.",[41,28480,28482],{"id":28481},"bouw-een-bewijsreeks-voor-ingebruikname","Bouw een bewijsreeks voor ingebruikname",[12,28484,28485],{},"Koppel elk belangrijk grenspunt op het schema aan bewijs: typeplaat of fiche voor vermogenswaarden, fabrikantschema voor geïntegreerde beveiligingen, meetverslag voor de uitgevoerde installatie en configuratie-export voor relevante begrenzingen. Markeer aannames als open. Een differentieeltype of DC-foutstroomdetectie teken je pas als aanwezig wanneer toestel en inbouw dat aantonen.",[12,28487,28488],{},"Doorloop bij de eindcontrole meerdere energietoestanden:",[1602,28490,28491,28494,28497,28500,28503],{},[1453,28492,28493],{},"'s nachts laden zonder PV-productie;",[1453,28495,28496],{},"PV-productie bij lage gebouwbelasting;",[1453,28498,28499],{},"PV en laden tegen een dynamische importlimiet;",[1453,28501,28502],{},"uitval van meting of communicatie van het lastbeheer;",[1453,28504,28505],{},"bij bidirectionele techniek, energie die uit het voertuig terugvloeit.",[12,28507,28508],{},"Voor elke toestand moeten stroompad, limiet, bescherming en veilige terugval uit ontwerp en fabrikantconcept verklaarbaar zijn. Het eendraadschema toont niet elke softwarebeslissing, wel elke elektrisch relevante component en elke mogelijke bronrichting.",[41,28510,28512],{"id":28511},"houd-netprocedure-en-producthomologatie-apart","Houd netprocedure en producthomologatie apart",[12,28514,28515,28516,39],{},"AREI-documentatie, Synergrid-typehomologatie en de aansluitprocedure van de bevoegde distributienetbeheerder beantwoorden verschillende vragen. Een deskundig ontworpen beveiligingsconcept bewijst geen C10\u002F26-vermelding; een vermeld product bewijst geen correcte installatie in dit gebouw. Synergrid stelt momenteel dat zuiver unidirectionele laders onder C10\u002F11 ed.2.4 geen C10\u002F26-homologatie nodig hebben; andere technische of netvoorwaarden kunnen wel gelden. Wat je doet als het toestel niet op de lijst staat, lees je in ",[30,28517,28519],{"href":28518},"\u002Fblog\u002Fsynergrid-c10-26-lijst-omvormer","Synergrid-lijst C10\u002F26",[12,28521,28522],{},"Bewaar toestelmodel, firmware, uni- of bidirectionele capaciteit, communicatie met de netbeheerder en de echte inbedrijfstellingsinstellingen bij de planrevisie. Zo blijft zichtbaar op welke technische toestand een goedkeuring of controle betrekking had.",[12,28524,28525],{},"Noteer bij een latere firmwarewijziging of alleen de bediening verandert, of ook maximale stroom, terugvoedingsmogelijkheid of beveiligingsgedrag. In het tweede geval beoordeelt de vakpersoon ontwerp, netvoorwaarden en documentatie opnieuw. Een automatische update mag de technische basis niet ongemerkt verschuiven.",[12,28527,28528],{},"Label in het verdeelbord PV- en laadaftakking met dezelfde referenties als op het plan. Bij mogelijke terugvoeding hangen de vereiste waarschuwingen op de werkelijk betrokken plaatsen; een melding alleen in de app volstaat niet. Vergelijk vóór overdracht elk bordlabel, toesteltype en de mogelijke energierichting met de eindversie van het schema.",[41,28530,28532],{"id":28531},"uitwerken-in-planelec","Uitwerken in PlanElec",[12,28534,12598,28535,28537],{},[30,28536,1337],{"href":6989}," leg je PV- en laadtak vast in één projectmodel: strings per MPPT, omvormer, AC-scheiding en bronbeveiliging aan de ene kant, de wallbox met eigen kring aan de andere. Eendraadschema en situatieplan ontstaan uit dezelfde gegevens en exporteer je als pdf. De AREI\u002FRGIE-zelfcontrole meldt onder meer wanneer een wallbox geen eigen kring, geen differentieelschakelaar van 30 mA of geen passende bescherming tegen DC-foutstromen heeft, en toont ontbrekende stringkoppelingen. De rollen zijn duidelijk: de zelfcontrole toont je bevindingen binnen de ondersteunde regels; beveiligingscoördinatie en netgoedkeuring regel je met berekening en netbeheerder, de keuring doet het erkende organisme.",[41,28539,28541],{"id":28540},"officiële-bronnen","Officiële bronnen",[1450,28543,28544,28551],{},[1453,28545,28546,28550],{},[30,28547,28549],{"href":28056,"rel":28548},[2532],"AREI\u002FRGIE Boek 1 bij de FOD Economie",": hoofdstukken 7.22 en 7.112 en delen 3 en 9, gecontroleerd volgens V06.",[1453,28552,28553,28558],{},[30,28554,28557],{"href":28555,"rel":28556},"https:\u002F\u002Fwww.synergrid.be\u002Fnl\u002Fhomologatie\u002Felektriciteit\u002Fdecentrale-productie-eenheden",[2532],"Synergrid: homologatie van decentrale productie-eenheden",": C10\u002F11 ed.2.4, C10\u002F26 en de afbakening voor bidirectioneel laden.",[12,28560,28561],{},"Inhoudelijk nagekeken op 5 oktober 2026. Controleer vóór uitvoering altijd de actuele aansluitvoorwaarden en de fabrikantversie.",{"title":1467,"searchDepth":1468,"depth":1468,"links":28563},[28564,28565,28566,28567,28568,28569,28570,28571,28572,28573,28574,28575,28576,28577,28578],{"id":28118,"depth":1468,"text":28119},{"id":28202,"depth":1468,"text":28203},{"id":28232,"depth":1468,"text":28233},{"id":28248,"depth":1468,"text":28249},{"id":28285,"depth":1468,"text":28286},{"id":28325,"depth":1468,"text":28326},{"id":28352,"depth":1468,"text":28353},{"id":28388,"depth":1468,"text":28389},{"id":28398,"depth":1468,"text":28399},{"id":28428,"depth":1468,"text":28429},{"id":28468,"depth":1468,"text":28469},{"id":28481,"depth":1468,"text":28482},{"id":28511,"depth":1468,"text":28512},{"id":28531,"depth":1468,"text":28532},{"id":28540,"depth":1468,"text":28541},"Zo teken je PV-omvormer, laadpaal, afzonderlijke kringen, beveiligingen, energiemeting en mogelijke terugvoeding correct in één gemeenschappelijk eendraadschema.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-ev-charger-single-line-diagram-editorial.jpg","\u002Fblog\u002Fpv-ev-charger-single-line-diagram.nl",{"title":28097,"description":28579},"zonnepanelen-laadpaal-eendraadschema","blog\u002Fpv-ev-charger-single-line-diagram.nl",[28587,28588,3764,3275,28589,28590,1513],"Zonnepanelen","Laadpaal","Energiemanagement","Terugvoeding","J0OXi5vzs0PnYhkrJctfkTHHn-Tfh6J7NM_E1pk335I","\u002Fblog\u002Fzonnepanelen-laadpaal-eendraadschema",{"id":28594,"title":28595,"articleId":28596,"body":28597,"category":16481,"date":26479,"description":29048,"extension":1496,"image":28610,"lastUpdated":15381,"locale":1497,"meta":29049,"navigation":1499,"ogImage":29050,"path":29051,"publishDate":26479,"readTime":7670,"refreshInterval":11097,"seo":29052,"seoTitle":29053,"slug":29054,"stem":29055,"tags":29056,"__hash__":29060,"kind":1515,"href":28193},"blog\u002Fblog\u002Fpv-situation-plan.nl.md","Zonnepanelen op het situatieplan: modules, omvormer en kabeltraject","pv-situation-plan",{"type":9,"value":28598,"toc":29025},[28599,28605,28611,28614,28618,28625,28689,28695,28699,28702,28725,28728,28732,28735,28752,28759,28763,28766,28783,28786,28790,28793,28796,28802,28805,28809,28812,28829,28834,28838,28841,28844,28858,28864,28868,28872,28875,28878,28881,28885,28888,28892,28895,28899,28902,28922,28925,28929,28949,28953,28956,28959,28963,28966,28969,28972,28976,28979,28982,28986,28989,28992,28995,28998,29005,29009,29014,29018],[12,28600,28601,28604],{},[15,28602,28603],{},"Op het situatieplan teken je waar de vaste delen van de PV-installatie werkelijk zitten: modulevelden, omvormer, vaste scheiders, het verdeelbord met de PV-aftakking en de kabeltrajecten daartussen."," AREI 3.1.2.3 a vraagt dat het situatieplan de ligging toont van de bronnen – uitdrukkelijk fotovoltaïsch paneel, omvormer en batterij – die op het eendraadschema staan. Het eendraadschema verklaart de elektrische keten, het situatieplan maakt ze ter plaatse vindbaar. Voor onderhoud, verbouwing en controle moet duidelijk zijn op welk dakvlak de modules liggen, waar de omvormer hangt en hoe de installatie het bord bereikt.",[12,28606,28607],{},[22,28608],{"alt":28609,"src":28610},"Zonnepaneelinstallateurs bekijken de positie van de dakpanelen.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-situation-plan-editorial.webp",[12,28612,28613],{},"Een situatieplan is geen stabiliteitsplan van het dak en evenmin een volledig DC-schema. Het vult het eendraadschema aan zonder alle elektrische details te herhalen.",[41,28615,28617],{"id":28616},"gemeenschappelijke-voorbeeldopdracht-db1-inv1-s1-en-s2","Gemeenschappelijke voorbeeldopdracht: DB1, INV1, S1 en S2",[12,28619,28620,28621,28624],{},"De fictieve opdracht uit de ",[30,28622,28623],{"href":28125},"PV-documentatiegids"," gebruikt DB1 voor het hoofdbord, INV1 in de technische ruimte en S1\u002FS2 voor de strings op het oost- en westdak. Dit zijn redactionele referenties, geen geëxporteerd voorbeeldproject. Voor jouw opdracht gebruik je de werkelijke benamingen.",[49,28626,28627,28640],{},[52,28628,28629],{},[55,28630,28631,28634,28637],{},[58,28632,28633],{},"Referentie",[58,28635,28636],{},"Terugvinden op het situatieplan",[58,28638,28639],{},"Vergelijken met het eendraadschema",[68,28641,28642,28653,28664,28675],{},[55,28643,28644,28647,28650],{},[73,28645,28646],{},"S1 \u002F S2",[73,28648,28649],{},"Dakvlak en gedocumenteerde gebouwinvoer",[73,28651,28652],{},"Bevestigde string en ingang MPPT1 \u002F MPPT2",[55,28654,28655,28658,28661],{},[73,28656,28657],{},"INV1",[73,28659,28660],{},"Werkelijke montageplaats in de technische ruimte",[73,28662,28663],{},"Modelreferentie en DC-\u002FAC-aansluitingen",[55,28665,28666,28669,28672],{},[73,28667,28668],{},"DB1",[73,28670,28671],{},"Hoofdbord op een duidelijke locatie",[73,28673,28674],{},"Aansluitpunt van de PV-tak",[55,28676,28677,28680,28683],{},[73,28678,28679],{},"EV1, latere uitbreiding",[73,28681,28682],{},"Laadpunt aan de parkeerplaats",[73,28684,28685,28686],{},"Afzonderlijke laadtak in het ",[30,28687,28688],{"href":28592},"combinatieartikel",[12,28690,28691,28692,28694],{},"Een nog niet opgenomen kabeldeel zet je als open in de werklijst, in plaats van het een schijnbaar exact tracé te geven. Vóór overdracht vergelijkt het bedrijf dezelfde referenties op installatie, schema en plan. De ",[30,28693,28198],{"href":11068}," behandelt toewijzing en afgeleid schema; de ruimtelijke opname ter plaatse levert de vakpersoon.",[41,28696,28698],{"id":28697},"werk-vanuit-een-actuele-as-built-basis","Werk vanuit een actuele as-built basis",[12,28700,28701],{},"Werk met een herkenbaar grondplan met verdiepingen, lokalen, toegangen en belangrijke buitenzones. Voor een dakinstallatie helpt een dakaanzicht of een extra gevelaanzicht. Neem ter plaatse op:",[1450,28703,28704,28707,28710,28713,28716,28719,28722],{},[1453,28705,28706],{},"exacte modulevelden en oriëntatie;",[1453,28708,28709],{},"positie van centrale of micro-omvormers;",[1453,28711,28712],{},"vaste DC- en AC-scheiders voor zover aanwezig;",[1453,28714,28715],{},"hoofd- of onderverdeelbord waarop de installatie aansluit;",[1453,28717,28718],{},"vaste doorvoeren en belangrijke kabeltrajecten;",[1453,28720,28721],{},"meter- of meetkast wanneer nodig voor de identificatie;",[1453,28723,28724],{},"batterij, backup-omschakeling of andere bron indien onderdeel van het systeem.",[12,28726,28727],{},"Neem het offerteplan niet zonder controle over. Dakbezetting, omvormerlocatie en kabelroute veranderen vaak tijdens de uitvoering.",[41,28729,28731],{"id":28730},"wat-op-het-dakplan-thuishoort","Wat op het dakplan thuishoort",[12,28733,28734],{},"Teken het moduleveld zo dat de locatie ondubbelzinnig is. Afhankelijk van schaal en omvang toon je:",[1450,28736,28737,28740,28743,28746,28749],{},[1453,28738,28739],{},"afzonderlijke modules of duidelijk begrensde modulegroepen;",[1453,28741,28742],{},"het juiste dakvlak, bijgebouw, gevelvlak of terrein;",[1453,28744,28745],{},"stringreferenties wanneer die de koppeling met het eendraadschema leggen;",[1453,28747,28748],{},"vaste DC-verzamel- of schakelkasten;",[1453,28750,28751],{},"relevante dakranden, toegangen of brandcompartimenten voor zover ze de elektrische ligging verklaren.",[12,28753,28754,28755,28758],{},"Niet elke stekker onder ieder paneel hoort op het situatieplan. Stringschakeling, polariteit, geleidergegevens en beschermingsketen staan op het ",[30,28756,28757],{"href":28125},"PV-eendraadschema",". Op beide documenten gebruik je dezelfde string- en toestelcodes.",[41,28760,28762],{"id":28761},"de-omvormer-precies-plaatsen","De omvormer precies plaatsen",[12,28764,28765],{},"Maak de werkelijke montagepositie herkenbaar en onderscheid waar nodig:",[1450,28767,28768,28771,28774,28777,28780],{},[1453,28769,28770],{},"centrale stringomvormer;",[1453,28772,28773],{},"meerdere omvormers;",[1453,28775,28776],{},"micro-omvormers bij de modules;",[1453,28778,28779],{},"hybride omvormer en afzonderlijke batterij;",[1453,28781,28782],{},"bijbehorende vaste scheidings- of schakeltoestellen.",[12,28784,28785],{},"Alleen “garage” schrijven is in een grote ruimte vaak te vaag. Zet het symbool aan de juiste wand of in de juiste technische zone. Bij buitenmontage vermeld je de gevelzijde duidelijk.",[41,28787,28789],{"id":28788},"kabeltrajecten-functioneel-tekenen","Kabeltrajecten functioneel tekenen",[12,28791,28792],{},"Een bruikbaar plan toont hoe de vaste verbinding van het moduleveld naar de omvormer en verder naar het verdeelbord loopt. Teken vooral gebouwdoorvoeren, kokers, stijgzones en verdiepingswissels die later uit het zicht verdwijnen.",[12,28794,28795],{},"DC- en AC-traject onderscheid je met lijnsoort of tekst, niet alleen met kleur. Ook een zwart-witafdruk moet leesbaar blijven. Bijvoorbeeld:",[27702,28797,28800],{"className":28798,"code":28799,"language":27707,"meta":1467},[27705],"PV-DC  ─ ─ ─  gelijkstroomtraject vanaf het moduleveld\nPV-AC  ─────  wisselstroomtraject naar het verdeelbord\nDATA   ·····  vaste meet- of communicatielijn\n",[1300,28801,28799],{"__ignoreMap":1467},[12,28803,28804],{},"Definieer de lijnen in de legende. Ze beschrijven geen kabeltype of plaatsingswijze; die gegevens staan bij de juiste kring op het eendraadschema.",[41,28806,28808],{"id":28807},"symbolen-en-projectlegende","Symbolen en projectlegende",[12,28810,28811],{},"Tabel 2.23 van AREI Boek 1 V06 is uitdrukkelijk een niet-limitatieve symbolenlijst. Ontbreekt daar een passend symbool, dan laat 3.1.2.1 a elk ander ondubbelzinnig symbool toe dat in de legende van eendraadschema en situatieplan is vastgelegd. Let op:",[1450,28813,28814,28817,28820,28823,28826],{},[1453,28815,28816],{},"voldoende grootte in de uiteindelijke pdf;",[1453,28818,28819],{},"een ander teken of bijschrift voor omvormer en batterij;",[1453,28821,28822],{},"vaste referenties op elke pagina;",[1453,28824,28825],{},"onderscheid dat niet alleen van kleur afhangt;",[1453,28827,28828],{},"scheiding tussen elektrisch toestel en bouwkundig object.",[12,28830,7641,28831,28833],{},[30,28832,27840],{"href":25786}," bespreekt de legende en technische bijschriften uitgebreider.",[41,28835,28837],{"id":28836},"gedeelde-referenties-met-het-eendraadschema","Gedeelde referenties met het eendraadschema",[12,28839,28840],{},"AREI 3.1.2.1 a legt voor beide plannen één referentielogica vast: op het situatieplan dragen de onderdelen de letter van hun kring en het volgnummer van het eendraadschema. De AC-aftakking van de omvormer draagt op het situatieplan dus dezelfde code als op het eendraadschema. Komen string- of toestelreferenties op beide voor, dan zijn ook die gelijk.",[12,28842,28843],{},"Controleer in twee richtingen:",[1602,28845,28846,28849,28852,28855],{},[1453,28847,28848],{},"Elk vast PV-element op het situatieplan vind je terug op het eendraadschema of in de legende.",[1453,28850,28851],{},"Elk ruimtelijk relevant PV-onderdeel van het eendraadschema heeft een vindbare positie.",[1453,28853,28854],{},"Namen van verdeelborden en verdiepingen komen overeen.",[1453,28856,28857],{},"Adres, datum en documentversie zijn gelijk.",[12,28859,28860,28861,28863],{},"Lees ",[30,28862,25544],{"href":5957}," voor de precieze taakverdeling.",[41,28865,28867],{"id":28866},"bijzondere-opstellingen","Bijzondere opstellingen",[1396,28869,28871],{"id":28870},"micro-omvormers","Micro-omvormers",[12,28873,28874],{},"Bij veel identieke toestellen is een gegroepeerd symbool met aantal, type en modulegroep leesbaarder dan overlappende tekens. De elektrische parallelschakeling blijft op het eendraadschema zichtbaar.",[1396,28876,11940],{"id":28877},"thuisbatterij",[12,28879,28880],{},"Plaats batterij, omvormer, vaste scheiders en een eventuele backupverdeler. Een batterij is geen PV-module en krijgt een eigen symbool. Afstanden en opstellingsvoorwaarden komen uit ontwerp en fabrikantdocumentatie; het plan registreert de uitgevoerde positie.",[1396,28882,28884],{"id":28883},"bijgebouw-of-vrijstaande-installatie","Bijgebouw of vrijstaande installatie",[12,28886,28887],{},"Toon het traject tussen de gebouwen, de invoer en de betrokken onderverdeelborden. Een pijl “naar woning” zonder exact eindpunt maakt elk later werk moeilijker.",[1396,28889,28891],{"id":28890},"bestaande-installatie","Bestaande installatie",[12,28893,28894],{},"AREI 8.2.2 punt 7 laat voor bestaande huishoudelijke PV-installaties tot 10 kVA die onder die bestaande-installatieregel vallen toe dat je in plaats van een situatieplan volgens 3.1.2.3 a over een schriftelijke beschrijving beschikt, eventueel aangevuld met foto's. Voor nieuwbouw en belangrijke wijzigingen geldt die afwijking niet; daar teken je een actueel situatieplan. Of een concrete bestaande installatie eronder valt, beoordeelt de vakpersoon.",[41,28896,28898],{"id":28897},"dossier-en-fotos","Dossier en foto's",[12,28900,28901],{},"Foto's zijn nuttig voor verborgen trajecten, daken en typeplaten; de gestructureerde plannen blijven de basis. Bewaar minstens:",[1450,28903,28904,28907,28910,28913,28916,28919],{},[1453,28905,28906],{},"definitief situatieplan en eendraadschema;",[1453,28908,28909],{},"module- en omvormergegevens;",[1453,28911,28912],{},"beschikbare string- en meetinformatie;",[1453,28914,28915],{},"handleidingen en toestelverklaringen;",[1453,28917,28918],{},"verslagen van een erkend organisme;",[1453,28920,28921],{},"latere wijzigingen met een nieuwe documentversie.",[12,28923,28924],{},"De eigenaar houdt het dossier beschikbaar en laat het bij wijzigingen bijwerken. Voor PV tot 10 kVA vraagt 7.112.2 uitdrukkelijk dat de elementen uit afdeling 9.1.2 ter inzage blijven voor iedere betrokkene.",[41,28926,28928],{"id":28927},"controle-vóór-export","Controle vóór export",[1450,28930,28931,28934,28937,28940,28943,28946],{},[1453,28932,28933],{},"Staan modulevelden, omvormers en vaste extra toestellen op hun echte plaats?",[1453,28935,28936],{},"Zijn DC- en AC-route herkenbaar en in de legende uitgelegd?",[1453,28938,28939],{},"Komen kring-, string- en bordreferenties overeen met het eendraadschema?",[1453,28941,28942],{},"Blijven symbolen en tekst leesbaar op het gekozen papierformaat?",[1453,28944,28945],{},"Toont het plan de as-built toestand en niet het oorspronkelijke voorstel?",[1453,28947,28948],{},"Dragen beide plannen hetzelfde adres, dezelfde datum en versie?",[41,28950,28952],{"id":28951},"een-plan-over-meerdere-bladen-organiseren","Een plan over meerdere bladen organiseren",[12,28954,28955],{},"Passen dak, technische ruimte en verdeelborden niet leesbaar op één blad, gebruik dan benoemde deelplannen. Een overzicht toont de relatie tussen gebouw, dakvlakken en borden; detailbladen vergroten modulevelden en technische zones. Geef elk blad een nummer en gebruik duidelijke vervolgverwijzingen, bijvoorbeeld “PV-DC verder op blad LP02”.",[12,28957,28958],{},"Elke uitsnede houdt voldoende oriëntatie: verdieping, lokaal, noordpijl of herkenbare gevelzijde. Dezelfde toestelcode staat alleen op meerdere plaatsen als er echt meerdere toestellen zijn. Een compacte referentietabel koppelt symbool, toestel-ID, kring en blad. Zo blijft een groot project controleerbaar zonder onleesbaar kleine symbolen of lijnen over de hele pagina. Bij een latere uitbreiding pas je ook de bladindex aan, anders lijkt een oud detailblad nog actueel.",[41,28960,28962],{"id":28961},"praktijkvoorbeeld-twee-dakvlakken-en-één-omvormer-in-de-technische-ruimte","Praktijkvoorbeeld: twee dakvlakken en één omvormer in de technische ruimte",[12,28964,28965],{},"Een woning heeft modules op oost- en westdak, twee DC-strings en één omvormer in de technische ruimte. Teken twee afzonderlijk geïdentificeerde modulevelden in plaats van één pictogram midden op het dak. Geef aan welke stringreferentie bij welk vlak hoort en waar de DC-kabels het gebouw binnenkomen. Een gedeeld traject naar de technische ruimte teken je alleen wanneer de kabels dat traject ook echt delen.",[12,28967,28968],{},"Geef de omvormer een vaste toestelcode en zijn echte wandpositie. Zitten DC-scheiding, overspanningsbeveiliging of andere vaste onderdelen extern, lokaliseer die dan ook en koppel hun identificatie aan het eendraadschema. Geïntegreerde functies blijven bij het toestel; losse kasten verzin je niet. Het AC-traject eindigt bij het juiste bord en de juiste kring; een lijn naar het dichtstbijzijnde lokaal biedt geen traceerbaarheid.",[12,28970,28971],{},"Controleer de oriëntatie van elk dakdetail. Dakvlak, goot, nok, noordrichting en herkenbare gebouwranden maken veld en invoerpunt ter plaatse vindbaar. Het situatieplan is geen montageplan met elke haak, maar toont wel alle verschillen die tellen voor elektrische toewijzing, veilig werk en latere foutopsporing.",[41,28973,28975],{"id":28974},"verborgen-of-ontoegankelijke-trajecten-eerlijk-opnemen","Verborgen of ontoegankelijke trajecten eerlijk opnemen",[12,28977,28978],{},"Waar een bestaande installatie de route verbergt, teken je ook geen geometrisch exacte route. Markeer het deel als verborgen of als overgenomen uit bewaarde documentatie en houd de bron van die informatie bij. Foto's van invoerpunten, labels, doorvoeren en technische ruimte beperken de onzekerheid. Een stippellijn krijgt die betekenis alleen als de legende ze definieert.",[12,28980,28981],{},"Onderscheid drie bewijsniveaus: ter plaatse gezien, bevestigd door betrouwbare technische stukken en nog uit te zoeken. Open punten horen in de werklijst, niet als schijnbaar zekere lijn in de eindversie. Vóór de controle beslist de verantwoordelijke vakpersoon of meer onderzoek of toegang nodig is.",[41,28983,28985],{"id":28984},"dakwijzigingen-volledig-verwerken","Dakwijzigingen volledig verwerken",[12,28987,28988],{},"Na modulevervanging, uitbreiding of een nieuwe omvormer controleer je meer dan de zichtbare dakzone. Werk veld- en stringcodes, kabelroute, invoerpunt, toestelplaats, DC- en AC-referenties en technische documenten bij. Ook bij vervanging binnen een bestaande string leg je het werkelijke aantal en nominaal vermogen vast – precies die gegevens noemt 7.112.4 ook voor het controleverslag. Worden strings anders verdeeld, dan dragen eendraadschema en situatieplan dezelfde nieuwe toestand.",[12,28990,28991],{},"Archiveer de vervangen versie afzonderlijk met datum. Zo blijft duidelijk of een foto of keuringsverslag bij de oude of de actuele opstelling hoort. Een cloudportaal van de omvormer toont productiegegevens; ruimtelijke opname en planrevisie blijven jouw werk.",[12,28993,28994],{},"Kijk bij de revisie ook naar de leesbaarheid op papier. Een extra veld bedekt geen bestaande referenties, en een nieuw kabeltraject krijgt niet dezelfde lijnstijl als een bouwkundige rand. Verplaats detailkaders gecontroleerd, pas de bladindex aan en controleer alle verwijzingen opnieuw. Zo blijft ook een uitgebreide installatie op normale afdrukgrootte bruikbaar.",[12,28996,28997],{},"Neem ten slotte de veldcodes over op duurzame labels waar dat technisch voorzien is. Controleer dat het label bij het juiste traject of toestel hoort en bij normaal onderhoud leesbaar blijft. Een code op het plan heeft pas waarde wanneer je ter plaatse ziet op welk moduleveld of welke omvormer ze slaat.",[12,28999,7641,29000,29004],{},[30,29001,29003],{"href":27024,"rel":29002},[2532],"officiële FOD-pagina over huishoudelijke controles"," noemt energiebronnen op beide plannen en PV-technische documentatie in het dossier. Het vereiste detail volgt de installatie en het actuele officiële Boek 1 V06, niet een algemeen daksjabloon.",[41,29006,29008],{"id":29007},"tekenen-met-planelec","Tekenen met PlanElec",[12,29010,9364,29011,29013],{},[30,29012,1337],{"href":6989}," plaats je PV-componenten op het situatieplan, leg je de elektrische structuur vast op het eendraadschema en exporteer je beide als pdf. Een modulesymbool staat daarbij voor een volledige string en wordt aan precies één string van de gekoppelde omvormer toegewezen; ontbrekende, dubbele en ongeldige stringkoppelingen meldt de zelfcontrole. Beide plannen gebruiken dezelfde projectgegevens, zodat referenties niet uit elkaar lopen. De rollen zijn duidelijk: de AREI\u002FRGIE-zelfcontrole toont je bevindingen binnen de ondersteunde regels, de vergelijking met de installatie doe je ter plaatse en de keuring doet het erkende organisme.",[41,29015,29017],{"id":29016},"bronnen-en-versie","Bronnen en versie",[12,29019,29020,29021,29024],{},"Basis is de officiële publicatie van ",[30,29022,28058],{"href":28056,"rel":29023},[2532],": tabel 2.23, deel 3 (3.1.2.1 en 3.1.2.3), hoofdstuk 7.112, de beperkte bestaande-installatieregel in deel 8 (8.2.2 punt 7) en het dossier in deel 9. Gecontroleerd volgens V06 op 5 oktober 2026.",{"title":1467,"searchDepth":1468,"depth":1468,"links":29026},[29027,29028,29029,29030,29031,29032,29033,29034,29040,29041,29042,29043,29044,29045,29046,29047],{"id":28616,"depth":1468,"text":28617},{"id":28697,"depth":1468,"text":28698},{"id":28730,"depth":1468,"text":28731},{"id":28761,"depth":1468,"text":28762},{"id":28788,"depth":1468,"text":28789},{"id":28807,"depth":1468,"text":28808},{"id":28836,"depth":1468,"text":28837},{"id":28866,"depth":1468,"text":28867,"children":29035},[29036,29037,29038,29039],{"id":28870,"depth":1486,"text":28871},{"id":28877,"depth":1486,"text":11940},{"id":28883,"depth":1486,"text":28884},{"id":28890,"depth":1486,"text":28891},{"id":28897,"depth":1468,"text":28898},{"id":28927,"depth":1468,"text":28928},{"id":28951,"depth":1468,"text":28952},{"id":28961,"depth":1468,"text":28962},{"id":28974,"depth":1468,"text":28975},{"id":28984,"depth":1468,"text":28985},{"id":29007,"depth":1468,"text":29008},{"id":29016,"depth":1468,"text":29017},"Zo plaats je PV-modules, omvormer, vaste scheiders, verdeelborden en kabeltrajecten op het situatieplan en houd je de referenties gelijk aan het eendraadschema.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-situation-plan-editorial.jpg","\u002Fblog\u002Fpv-situation-plan.nl",{"title":28595,"description":29048},"Zonnepanelen op het situatieplan: modules en omvormer","zonnepanelen-situatieschema","blog\u002Fpv-situation-plan.nl",[28587,7208,29057,29058,3275,29059,1513],"PV-modules","Omvormer","Kabeltraject","EXxccXM7eHUmcDq2dnBPicQq1-c2HbL6X_Tq9NUO3Ew",{"id":29062,"title":29063,"articleId":29064,"body":29065,"category":1493,"date":29598,"description":29599,"extension":1496,"image":29087,"lastUpdated":15381,"locale":1497,"meta":29600,"navigation":1499,"ogImage":29601,"path":29602,"publishDate":29598,"readTime":14340,"refreshInterval":1503,"seo":29603,"seoTitle":29604,"slug":29605,"stem":29606,"tags":29607,"__hash__":29614,"kind":1515,"href":28518},"blog\u002Fblog\u002Fsynergrid-c10-26-list.nl.md","Synergrid-lijst C10\u002F26: staat mijn omvormer op de lijst – en wat als niet?","synergrid-c10-26-list",{"type":9,"value":29066,"toc":29580},[29067,29082,29088,29092,29099,29109,29113,29166,29172,29176,29183,29288,29292,29299,29303,29357,29361,29369,29373,29414,29418,29424,29450,29453,29457,29465,29469,29472,29480,29483,29486,29493,29497,29500,29503,29506,29510,29513,29516,29519,29521,29531,29537,29543,29549,29551,29566,29569],[12,29068,29069,29072,29073,29076,29077,29081],{},[15,29070,29071],{},"Kort antwoord:"," De Synergrid-lijst C10\u002F26 is het Belgische register van omvormers, hybride omvormers en batterijsystemen die gehomologeerd zijn volgens het technisch voorschrift C10\u002F11. De netbeheerders (Fluvius, ORES, RESA, Sibelga) aanvaarden bij de aanmelding in de regel alleen toestellen van de lijst – en wel in de vermelde ",[15,29074,29075],{},"firmwareversie",". Staat een toestel niet op de lijst, dan is een individueel conformiteitsbewijs tegen C10\u002F11 nodig; of dat volstaat, beslist de bevoegde netbeheerder. Of jouw toestel op de lijst staat, controleer je gratis met de ",[30,29078,29080],{"href":29079},"\u002Ftools\u002Fsynergrid-c10-26-omvormer-check","Synergrid C10\u002F26-check van PlanElec",", die werkt met een gedateerde versie van de officiële lijst.",[12,29083,29084],{},[22,29085],{"alt":29086,"src":29087},"Een zonnepaneelinstallateur bekijkt documenten naast een omvormer.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-synergrid-c10-26-list-editorial.webp",[41,29089,29091],{"id":29090},"wat-is-de-synergrid-lijst-c1026","Wat is de Synergrid-lijst C10\u002F26?",[12,29093,29094,29095,29098],{},"Synergrid is de federatie van de Belgische elektriciteits- en gasnetbeheerders. Het voorschrift ",[15,29096,29097],{},"C10\u002F11"," legt vast aan welke technische eisen decentrale productie-eenheden (PV-omvormers, thuisbatterijen, WKK, wind) op het laagspanningsnet moeten voldoen: beveiligingsfuncties bij netstoringen, frequentie- en spanningsgedrag, vermogensregeling.",[12,29100,7641,29101,29104,29105,29108],{},[15,29102,29103],{},"lijst C10\u002F26"," is daarvan de praktische uitkomst: fabrikanten laten hun toestellen tegen C10\u002F11 testen, geslaagde toesteltypes worden gepubliceerd met referentienummer, firmwareversie en technische kenmerken. Synergrid actualiseert de lijst doorlopend als Excel-bestand; de huidige versie verwijst naar ",[15,29106,29107],{},"C10\u002F11 editie 2.4 (15\u002F10\u002F2025)",". Ze bevat enkele duizenden actieve toestellen; de exacte omvang en de datum van de geïmporteerde gegevens toont de check je rechtstreeks boven de resultatentabel.",[41,29110,29112],{"id":29111},"waarom-de-lijst-telt-bij-aanmelding-en-keuring","Waarom de lijst telt bij aanmelding en keuring",[49,29114,29115,29124],{},[52,29116,29117],{},[55,29118,29119,29121],{},[58,29120,11137],{},[58,29122,29123],{},"Rol van de C10\u002F26-lijst",[68,29125,29126,29136,29146,29156],{},[55,29127,29128,29133],{},[73,29129,29130],{},[15,29131,29132],{},"Aanmelding bij de netbeheerder",[73,29134,29135],{},"Fluvius, ORES, RESA en Sibelga vragen het omvormertype en verwachten een toestel van de lijst",[55,29137,29138,29143],{},[73,29139,29140],{},[15,29141,29142],{},"Conformiteitskeuring",[73,29144,29145],{},"Het erkende organisme keurt de installatie volgens het AREI; voor PV tot 10 kVA vermeldt het verslag aantal, type, serienummer en maximaal AC-vermogen van de omvormers (7.112.4)",[55,29147,29148,29153],{},[73,29149,29150],{},[15,29151,29152],{},"Vrijgave van de injectie",[73,29154,29155],{},"Zonder aanvaard bewijs voor het toestel geeft de netbeheerder de injectie in de regel niet vrij",[55,29157,29158,29163],{},[73,29159,29160],{},[15,29161,29162],{},"Firmware-update of vervanging",[73,29164,29165],{},"Een nieuwe firmwareversie of een vervangtoestel heeft opnieuw een passende regel op de lijst nodig",[12,29167,29168,29169,39],{},"Voor PV-installaties tot 10 kVA in woningen geldt daarnaast AREI-hoofdstuk 7.112 met de eisen aan de elektrische installatie zelf – beide moeten kloppen. Hoe het eendraadschema er daarvoor uitziet, lees je in ",[30,29170,29171],{"href":28125},"Zonnepanelen in het eendraadschema",[41,29173,29175],{"id":29174},"zo-lees-je-een-regel-van-de-lijst","Zo lees je een regel van de lijst",[12,29177,29178,29179,29182],{},"Elke regel beschrijft ",[15,29180,29181],{},"één combinatie van model en firmware",". De belangrijkste kolommen:",[49,29184,29185,29194],{},[52,29186,29187],{},[55,29188,29189,29192],{},[58,29190,29191],{},"Kolom",[58,29193,752],{},[68,29195,29196,29209,29219,29229,29239,29249,29259,29268,29278],{},[55,29197,29198,29206],{},[73,29199,29200,29202,29203,17566],{},[15,29201,28633],{}," (bv. ",[1300,29204,29205],{},"GLV052-09-0003",[73,29207,29208],{},"Synergrid-homologatienummer van het toestel – vult merk en model in de aanmelding aan (niet altijd model-eenduidig)",[55,29210,29211,29216],{},[73,29212,29213],{},[15,29214,29215],{},"Merk \u002F serie \u002F model",[73,29217,29218],{},"Fabrikantaanduiding, exact zoals op het kenplaatje",[55,29220,29221,29226],{},[73,29222,29223],{},[15,29224,29225],{},"Firmware",[73,29227,29228],{},"Geteste softwareversie; de homologatie geldt alleen voor deze versie",[55,29230,29231,29236],{},[73,29232,29233],{},[15,29234,29235],{},"Pac,r (W)",[73,29237,29238],{},"Nominaal actief vermogen aan de AC-uitgang",[55,29240,29241,29246],{},[73,29242,29243],{},[15,29244,29245],{},"Smax (VA)",[73,29247,29248],{},"Maximaal schijnbaar vermogen – bepalend voor de vermogensklasse; eenfasige productie-eenheden beperken de netbeheerders doorgaans tot ongeveer 5 kVA (juiste drempel bij de netbeheerder nagaan)",[55,29250,29251,29256],{},[73,29252,29253],{},[15,29254,29255],{},"Fasen",[73,29257,29258],{},"Eenfasig of driefasig",[55,29260,29261,29265],{},[73,29262,29263],{},[15,29264,19339],{},[73,29266,29267],{},"Zon, opslag, WKK, wind, noodstroom",[55,29269,29270,29275],{},[73,29271,29272],{},[15,29273,29274],{},"Beperkingen",[73,29276,29277],{},"Voorwaarden waaronder het toestel is toegelaten (zie verder)",[55,29279,29280,29285],{},[73,29281,29282],{},[15,29283,29284],{},"Gehomologeerd sinds",[73,29286,29287],{},"Datum van de definitieve (of voorlopige) homologatie",[1396,29289,29291],{"id":29290},"waarom-de-firmwareversie-telt","Waarom de firmwareversie telt",[12,29293,29294,29295,29298],{},"De beveiligingsfuncties volgens C10\u002F11 zijn software. Een toestel met een andere firmware dan de vermelde geldt bij de aanmelding als ",[15,29296,29297],{},"niet gehomologeerd"," – ook al staat het model zelf op de lijst. Lees de firmwareversie af op het toestel of in de app van de fabrikant en vergelijk ze met de regel op de lijst.",[1396,29300,29302],{"id":29301},"beperkingen-juist-interpreteren","Beperkingen juist interpreteren",[49,29304,29305,29315],{},[52,29306,29307],{},[55,29308,29309,29312],{},[58,29310,29311],{},"Beperking op de lijst",[58,29313,29314],{},"Wat ze betekent",[68,29316,29317,29327,29337,29347],{},[55,29318,29319,29324],{},[73,29320,29321],{},[15,29322,29323],{},"Enkel in module \u003C 800 W",[73,29325,29326],{},"Alleen toegelaten als onderdeel van een stekkerklare productie-eenheid (balkoncentrale, plug-in batterij)",[55,29328,29329,29334],{},[73,29330,29331],{},[15,29332,29333],{},"Enkel voor kleine productie-installaties",[73,29335,29336],{},"Niet voor grotere installaties met uitgebreide eisen",[55,29338,29339,29344],{},[73,29340,29341],{},[15,29342,29343],{},"Enkel hoogspanningsaansluiting",[73,29345,29346],{},"Niet voor huisaansluitingen op het laagspanningsnet",[55,29348,29349,29354],{},[73,29350,29351],{},[15,29352,29353],{},"Enkel als noodstroomsysteem",[73,29355,29356],{},"Enkel gehomologeerd voor noodstroomvoorziening, niet voor injectie in het net – het toestel voedt bij netuitval een afgescheiden deel van de installatie",[41,29358,29360],{"id":29359},"plug-in-zonnepanelen-en-stekkerklare-batterij-dezelfde-lijst","Plug-in zonnepanelen en stekkerklare batterij: dezelfde lijst",[12,29362,29363,29364,29368],{},"Ook micro-omvormers en plug-in batterijen tot 800 W – zoals Marstek, Zendure, Anker Solix, HomeWizard of Hoymiles – hebben een regel op de C10\u002F26-lijst nodig, meestal met de beperking “enkel in module \u003C 800 W”. Een toestel dat in Duitsland of Nederland wordt verkocht, is daarmee niet automatisch toegelaten in België: de Belgische netbeveiligingsinstellingen volgens C10\u002F11 verschillen, en de fabrikant moet de Belgische variant apart laten homologeren. Controleer dus vóór aankoop of precies jouw model op de lijst staat. Ook een gelist plug-in toestel meld je aan bij de netbeheerder, en de elektrische installatie zelf blijft onder het AREI vallen. Zoek je specifiek een batterij, gebruik dan de ",[30,29365,29367],{"href":29366},"\u002Ftools\u002Fthuisbatterij-synergrid-check","Synergrid C10\u002F26-check voor thuisbatterijen",": dezelfde lijst, toegespitst op batterijen en hybride omvormers.",[41,29370,29372],{"id":29371},"veelgemaakte-fouten-in-de-praktijk","Veelgemaakte fouten in de praktijk",[1602,29374,29375,29388,29394,29400,29406],{},[1453,29376,29377,29380,29381,933,29384,29387],{},[15,29378,29379],{},"Modelnaam zonder suffix gecontroleerd"," – ",[1300,29382,29383],{},"SUN2000-8KTL-M0",[1300,29385,29386],{},"SUN2000-8KTL-M1"," zijn verschillende regels.",[1453,29389,29390,29393],{},[15,29391,29392],{},"Firmware niet vergeleken"," – het toestel staat op de lijst, maar is met een oudere versie geïnstalleerd.",[1453,29395,29396,29399],{},[15,29397,29398],{},"Verlopen homologatie over het hoofd gezien"," – Synergrid schrapt regels; het toestel verschijnt dan onder “expired”.",[1453,29401,29402,29405],{},[15,29403,29404],{},"Import uit het buitenland"," – zelfde naam, andere landvariant zonder Belgische homologatie.",[1453,29407,29408,29411,29412,39],{},[15,29409,29410],{},"Batterij vergeten"," – ook de batterijomvormer heeft een regel op de lijst nodig, niet alleen de PV-omvormer. Meer in ",[30,29413,28436],{"href":28435},[41,29415,29417],{"id":29416},"toestel-meteen-in-je-browser-controleren","Toestel meteen in je browser controleren",[12,29419,7641,29420,29423],{},[30,29421,29422],{"href":29079},"Synergrid C10\u002F26-check"," laadt een gedateerde versie van de officiële lijst en maakt ze doorzoekbaar:",[1602,29425,29426,29432,29438,29444],{},[1453,29427,29428,29431],{},[15,29429,29430],{},"Merk typen"," – de suggesties tonen hoeveel modellen per merk op de lijst staan.",[1453,29433,29434,29437],{},[15,29435,29436],{},"Model verfijnen"," – typ verder tot het exacte model verschijnt; verlopen regels zijn gemarkeerd.",[1453,29439,29440,29443],{},[15,29441,29442],{},"Resultaat lezen"," – de tabel toont firmware, Smax, Pac, fasen, toepassing, beperkingen en de Synergrid-referentie; je sorteert en filtert op fasen, segment en status.",[1453,29445,29446,29449],{},[15,29447,29448],{},"Geen treffer?"," – de check stelt technisch vergelijkbare, gehomologeerde toestellen uit dezelfde vermogensklasse voor.",[12,29451,29452],{},"Filters en sortering staan in de URL. Je stuurt de link rechtstreeks naar klanten of collega's, en zij zien exact dezelfde selectie.",[41,29454,29456],{"id":29455},"wat-de-check-doet-en-wat-de-officiële-lijst-doet","Wat de check doet – en wat de officiële lijst doet",[12,29458,29459,29460,29464],{},"De check is jouw snelle toegang tot de lijst; de officiële verklaring blijft de actuele ",[30,29461,29463],{"href":28555,"rel":29462},[2532],"officiële lijst op synergrid.be",". Bij afwijkingen geldt de officiële lijst. De elektrische installatie zelf – beveiliging, differentieelschakelaar, kabeldoorsnede, scheidingsschakelaar – beoordeelt de check niet; daarvoor is er in PlanElec de AREI\u002FRGIE-zelfcontrole op het eendraadschema.",[41,29466,29468],{"id":29467},"verdedigbare-toestelcontrole-stap-voor-stap","Verdedigbare toestelcontrole, stap voor stap",[12,29470,29471],{},"Vertrek van het typeplaatje van het werkelijk geplande toestel, niet van een webshoptitel. Noteer fabrikant, volledig modelsuffix, productreferentie, schijnbaar vermogen en firmware. Hybride families bevatten vaak verschillende vermogens, regiovarianten of firmwaretakken. Alleen merk of eerste naamdeel matchen volstaat niet.",[12,29473,29474,29475,29479],{},"Open de actuele ",[30,29476,29478],{"href":28555,"rel":29477},[2532],"Synergrid-homologatiepagina"," en de officiële lijst waarnaar ze verwijst. Vergelijk elk veld en lees de beperkingen over bedrijfsmodus, externe beveiliging, injectiebegrenzing, opslaggebruik of componentcombinaties. Voor plug-and-play gebruik je de eigen Synergrid-informatie en de exacte lijstregel; een gewone inschrijving als productie-eenheid dekt niet vanzelf elke insteekconfiguratie.",[12,29481,29482],{},"Bewaar bij het project de officiële regel of referentie, de lijstdatum, de firmware op het toestel en de controledatum. Controleer opnieuw vóór indienststelling en aanmelding, want toestel, firmware of officiële gegevens kunnen wijzigen tussen offerte en plaatsing. Ontbreekt de regel, dan verduidelijk je de Belgische homologatie met fabrikant of invoerder en vraag je de bevoegde netbeheerder welk bewijs hij aanvaardt. De PlanElec-zoekfunctie is jouw leeshulp; het attest komt uit de officiële bron.",[12,29484,29485],{},"Houd drie beslissingen apart. C10\u002F26-typehomologatie gaat over de netinterface van het product. Het erkende organisme beoordeelt de elektrische installatie volgens het AREI. De distributienetbeheerder behandelt aanmelding en aansluitvoorwaarden. Een positief antwoord op één vlak verleent de andere twee niet automatisch.",[12,29487,29488,29489,29492],{},"Documenteer in het eendraadschema de exacte omvormer met beveiliging, scheiding en kabelgegevens. Situatieplan, fabrikantverklaringen, indienststellingsgegevens en keuringsverslag horen in het dossier. Zie ",[30,29490,29491],{"href":28125},"PV-installatie documenteren",". Deze tekst is nagekeken op 5 oktober 2026; voor aankoop of indienststelling gebruik je altijd de live officiële lijst.",[1396,29494,29496],{"id":29495},"gelijkaardige-regels-zijn-niet-uitwisselbaar","Gelijkaardige regels zijn niet uitwisselbaar",[12,29498,29499],{},"Vergelijk naast de modeltekst ook elektrische variant, firmwarebereik, Smax en opmerkingen. Een schermafbeelding is geen blijvend bewijs: bewaar ook de officiële bestandsnaam of referentie en de controledatum. Een systeem met omvormer, batterij en externe netbeveiliging kan meerdere samenhangende bewijzen vragen. Controleer elke netgekoppelde functie en de toegelaten combinatie.",[12,29501,29502],{},"Na een firmware-update beoordeel je de bestaande documentatie opnieuw. Dat het toestel werkt, bewijst niet dat precies deze softwareversie onder de gepubliceerde regel valt. Ook CE-markering is geen C10\u002F26-homologatie: ze betreft een andere verantwoordelijkheid van de fabrikant en vervangt lijstregel noch installatiekeuring.",[12,29504,29505],{},"Bij een nul-injectieconfiguratie documenteer je ook de vereiste componenten en instellingen volgens fabrikant en netbeheerder. Een exportbegrenzing verandert de indeling als netgekoppelde eenheid niet automatisch. Twijfelgevallen laat je vóór bestelling schriftelijk verduidelijken. Zo blijkt een technisch werkend toestel niet pas bij de aanmelding buiten de officiële referentie te vallen.",[1396,29507,29509],{"id":29508},"bewijs-bij-overdracht","Bewijs bij overdracht",[12,29511,29512],{},"Geef naast de link een korte controlenota door: wie vergeleek wanneer welke officiële lijst met welk typeplaatje en welke firmware? Welke beperking werd gelezen en welk onderdeel vervult ze? Zo hercontroleert de volgende projectmedewerker vóór indienststelling gericht.",[12,29514,29515],{},"Bij een vervangtoestel begint de toets opnieuw. Gelijk vermogen of hetzelfde merk vervangt de exacte referentie niet. Een eerdere positieve aanmelding bewijst evenmin dat een later model gedekt is. Werk daarom eendraadschema, toestelstukken en aanmeldgegevens samen bij en laat de elektrische wijziging volgens haar echte omvang beoordelen.",[12,29517,29518],{},"Een gedateerde leverbon helpt bij uiterlijk gelijkaardige varianten. Kloppen leverbon, typeplaatje en officiële regel niet met elkaar, dan los je dat vóór de aanmelding op in plaats van het verschil met een veronderstelling te overbruggen.",[41,29520,1394],{"id":1393},[12,29522,29523,29526,29527,29530],{},[15,29524,29525],{},"Moet ik de Synergrid-referentie in de aanmelding vermelden?","\nDe netbeheerders vragen in de eerste plaats merk, model en firmwareversie. De GLV-referentie is een nuttige aanvulling, maar niet altijd model-eenduidig: Synergrid kent dezelfde referentie soms aan meerdere modellen toe. Vermeld daarom referentie ",[15,29528,29529],{},"én"," modelaanduiding.",[12,29532,29533,29536],{},[15,29534,29535],{},"Mijn toestel staat op de lijst, maar de regel is “expired” – wat nu?","\nDe homologatie is ingetrokken of verlopen. Voor nieuwe installaties is het toestel dan niet meer toegelaten; bestaande installaties blijven doorgaans ongemoeid. Bij twijfel vraag je het na bij de netbeheerder.",[12,29538,29539,29542],{},[15,29540,29541],{},"Geldt de lijst ook voor Wallonië en Brussel?","\nJa. C10\u002F11 en C10\u002F26 zijn Synergrid-voorschriften en gelden nationaal voor alle distributienetbeheerders.",[12,29544,29545,29548],{},[15,29546,29547],{},"Hoe vaak verandert de lijst?","\nSynergrid publiceert regelmatig nieuwe versies. De check toont de datum van de geïmporteerde gegevens, zodat je altijd weet op welke stand je resultaat steunt.",[41,29550,15334],{"id":15333},[1450,29552,29553,29558,29562],{},[1453,29554,29555],{},[30,29556,29557],{"href":28125},"Zonnepanelen in het eendraadschema documenteren",[1453,29559,29560],{},[30,29561,28436],{"href":28435},[1453,29563,29564],{},[30,29565,17455],{"href":17361},[29567,29568],"hr",{},[12,29570,29571],{},[17563,29572,29573,29574,29576,29577],{},"Plan je PV-installatie met ",[15,29575,1337],{}," in het eendraadschema – omvormer, strings, beveiligingen en situatieplan in één project. ",[30,29578,29579],{"href":6989},"Start nu →",{"title":1467,"searchDepth":1468,"depth":1468,"links":29581},[29582,29583,29584,29588,29589,29590,29591,29592,29596,29597],{"id":29090,"depth":1468,"text":29091},{"id":29111,"depth":1468,"text":29112},{"id":29174,"depth":1468,"text":29175,"children":29585},[29586,29587],{"id":29290,"depth":1486,"text":29291},{"id":29301,"depth":1486,"text":29302},{"id":29359,"depth":1468,"text":29360},{"id":29371,"depth":1468,"text":29372},{"id":29416,"depth":1468,"text":29417},{"id":29455,"depth":1468,"text":29456},{"id":29467,"depth":1468,"text":29468,"children":29593},[29594,29595],{"id":29495,"depth":1486,"text":29496},{"id":29508,"depth":1486,"text":29509},{"id":1393,"depth":1468,"text":1394},{"id":15333,"depth":1468,"text":15334},"2026-08-26","Wat de Synergrid-lijst C10\u002F26 is, waarom netbeheerders ze eisen, hoe je referentie, firmware, Smax en beperkingen juist leest – en hoe je een toestel meteen in je browser controleert.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-synergrid-c10-26-list-editorial.jpg","\u002Fblog\u002Fsynergrid-c10-26-list.nl",{"title":29063,"description":29599},"Synergrid-lijst C10\u002F26: staat mijn omvormer erop?","synergrid-c10-26-lijst-omvormer","blog\u002Fsynergrid-c10-26-list.nl",[29608,29609,12121,29610,29611,28877,29612,29613],"synergrid","c10\u002F26","zonnepanelen","pv","plug-in zonnepanelen","aanmelding netbeheerder","9NwYWomCdwgyEUIa3pH26XWbnGJC4JYb-E4TUsw9pVQ",{"id":29616,"title":6968,"articleId":29617,"body":29618,"category":6162,"date":30245,"description":30246,"extension":1496,"image":3257,"lastUpdated":7012,"locale":1497,"meta":30247,"navigation":1499,"ogImage":3260,"path":30248,"publishDate":30245,"readTime":7016,"refreshInterval":1486,"seo":30249,"seoTitle":4037,"slug":30250,"stem":30251,"tags":30252,"__hash__":30253,"kind":1515,"href":4891},"blog\u002Fblog\u002Ftrikker-alternatief.nl.md","planelec-vs-trikker",{"type":9,"value":29619,"toc":30220},[29620,29626,29630,29636,29640,29788,29835,29846,29850,29853,29857,29860,29868,29871,29896,29901,29905,29911,29948,29951,29955,29961,29985,29988,29993,29997,30008,30018,30022,30039,30043,30046,30052,30056,30059,30064,30068,30071,30077,30081,30084,30090,30094,30097,30103,30115,30119,30124,30128,30134,30140,30150,30154,30158,30164,30168,30183,30187,30190,30194,30197,30201,30207,30211],[12,29621,29622,29625],{},[15,29623,29624],{},"PlanElec is een browsergebaseerd alternatief voor Trikker voor elektrische planning in België."," Grondplan, toestellen, stroomkringen en verdeelkast vormen één project waaruit het eendraadschema en het situatieplan ontstaan. De PlanElec-assistent voert je opdrachten in dat project uit en laat elke wijziging nakijken door de AREI-zelfcontrole. De plattegrondherkenning maakt van een Trikker-pdf of scan een bewerkbaar grondplan, en kastfoto’s worden een voorstel voor de kastindeling. Bestaande .trik-bestanden importeer je als projecten in PlanElec Pro, één voor één of als heel archief, of je opent ze zonder account in het gratis PlanElec Sketch. Wie van een tekenprogramma komt, begint desgewenst meteen met het eendraadschema. Automatische planningsvoorstellen, gestructureerde PV-documentatie en PDF-export met versies maken de werkwijze compleet. Sinds 2 november 2026 lopen de betalende formules, Pro uitproberen blijft € 0. Materiaallijst en KNX-documentatie zijn beschikbaar als pilot met een duidelijk omschreven omvang.",[12,29627,29628],{},[22,29629],{"alt":6190,"src":3257},[12,29631,29632,29635],{},[15,29633,29634],{},"Redactie en controle: het PlanElec-team, 10 september 2026; platform- en AI-gegevens bijgewerkt op 3 oktober 2026, redactioneel herwerkt op 5 oktober 2026; Trikker-prijzen en -platformen opnieuw gecontroleerd, dicteren en de planningsaanpak „Eerst het eendraadschema tekenen” toegevoegd op 12 oktober 2026; openen van .trik-bestanden in PlanElec Sketch toegevoegd op 15 oktober 2026; de Schemalezer van Trikker, de overname van Sketch naar Pro en de offline-pilot toegevoegd op 19 oktober 2026; beschrijven en dicteren in de Schemalezer, pdf-aanmaak in Trikker 2.0 en de start van de formules van PlanElec bijgewerkt op 26 oktober 2026; import van .trik-bestanden in Pro toegevoegd op 30 oktober 2026; overname van het situatieplan uit .trik-bestanden in Sketch en Pro toegevoegd op 1 november 2026; Trikker-prijzen opnieuw gecontroleerd en de formules van PlanElec bij de start van de betalende formules bijgewerkt op 2 november 2026."," Een vergelijking vanuit het perspectief van PlanElec: gegevens over Trikker komen uit de hieronder gelinkte fabrikantenbronnen, PlanElec-gegevens uit de gedocumenteerde productomvang en openbare voorbeelden.",[41,29637,29639],{"id":29638},"planelec-en-trikker-in-één-oogopslag","PlanElec en Trikker in één oogopslag",[49,29641,29642,29652],{},[52,29643,29644],{},[55,29645,29646,29648,29650],{},[58,29647,4902],{},[58,29649,1337],{},[58,29651,3269],{},[68,29653,29654,29664,29674,29684,29695,29705,29715,29726,29737,29747,29758,29768,29779],{},[55,29655,29656,29658,29661],{},[73,29657,5580],{},[73,29659,29660],{},"Browser op Windows, macOS en Linux; tabletgebruik in de browser",[73,29662,29663],{},"Windows; macOS sinds 30-09-2026 in bèta van Trikker 2.0; webversie aangekondigd",[55,29665,29666,29668,29671],{},[73,29667,4940],{},[73,29669,29670],{},"Pro uitproberen € 0; sinds 2 november 2026 vanaf € 12 per object of € 24\u002Fmaand, eindprijzen zonder btw (vrijstellingsregeling kleine ondernemingen); de prijs blijft zolang het abonnement zonder onderbreking loopt",[73,29672,29673],{},"€ 45\u002Fmaand of € 360\u002Fjaar excl. btw; € 54,45 of € 435,60 incl. btw",[55,29675,29676,29678,29681],{},[73,29677,10587],{},[73,29679,29680],{},"Projecttoegang met je eigen account op meerdere apparaten",[73,29682,29683],{},"Licentie per computer",[55,29685,29686,29689,29692],{},[73,29687,29688],{},"Eendraadschema en situatieplan",[73,29690,29691],{},"Vanuit een gedeeld projectmodel",[73,29693,29694],{},"Gekoppelde symbolen en kringreferenties",[55,29696,29697,29699,29702],{},[73,29698,6435],{},[73,29700,29701],{},"Tekenen, afbeelding, PDF en DXF als achtergrond; verdiepingen en kalibratie",[73,29703,29704],{},"Tekenen en CAD-achtergrond, waaronder DWG\u002FDXF",[55,29706,29707,29709,29712],{},[73,29708,4589],{},[73,29710,29711],{},"PlanElec-assistent in het hele project, opdrachten in je eigen woorden, getypt of gedicteerd",[73,29713,29714],{},"Geen assistent voor het hele project beschreven; in de Schemalezer (bèta) beschrijf je de installatie getypt of gedicteerd (NL, FR, EN), en daaruit ontstaat een eendraadschema",[55,29716,29717,29720,29723],{},[73,29718,29719],{},"Plan-\u002Fscanherkenning",[73,29721,29722],{},"Muren, ruimtes, deuren\u002Framen, ondersteunde toestelsymbolen en schaal uit pdf, scan of afbeelding",[73,29724,29725],{},"Schemalezer (bèta, voor licentiehouders): eendraadschema en situatieplan uit pdf, png of jpg, ook scan, foto of handschets, worden een Trikker-schema",[55,29727,29728,29731,29734],{},[73,29729,29730],{},"Trikker-projecten overnemen",[73,29732,29733],{},".trik-bestanden als projecten importeren, één voor één of als archief (tot 500; eendraadschema, stroomkringen, toestellen, situatieplan); zonder account openen in PlanElec Sketch; grondplan herkennen uit de Trikker-pdf-export",[73,29735,29736],{},"Eigen bestandsformaat (.trik)",[55,29738,29739,29741,29744],{},[73,29740,16882],{},[73,29742,29743],{},"Zichtbare DIN-modules als controleerbaar indelingsvoorstel",[73,29745,29746],{},"Niet beschreven in de fabrikantinformatie",[55,29748,29749,29752,29755],{},[73,29750,29751],{},"Controle van elke AI-wijziging",[73,29753,29754],{},"AREI-zelfcontrole na elke actie van de assistent, ongedaan maken in één stap",[73,29756,29757],{},"Schemalezer: een tweede AI-agent controleert elke kring; onzekere kringen verschijnen bij de punten ter controle",[55,29759,29760,29762,29765],{},[73,29761,4733],{},[73,29763,29764],{},"Gedetailleerde, fabrikantneutrale BOM in pilotfase",[73,29766,29767],{},"Materiaallijst uit het schema",[55,29769,29770,29773,29776],{},[73,29771,29772],{},"Nadruk",[73,29774,29775],{},"Grondplan, AI-ondersteunde invoer, planningsvoorstellen, topologie, kast en documenten",[73,29777,29778],{},"Eendraadschema en situatieplan tekenen",[55,29780,29781,29783,29785],{},[73,29782,6521],{},[73,29784,6524],{},[73,29786,29787],{},"Tijdelijk offline; activering en herhaalde licentiecontrole vereisen internet; in de bèta 2.0 wordt de pdf op servers van Trikker gemaakt",[12,29789,29790,29791,702,29795,702,29798,29802,29803,29806,29807,29810,29811,29814,29815,1812,29819,29822,29823,29827,29828,1812,29832,39],{},"Bronnen: ",[30,29792,29794],{"href":5386,"rel":29793},[2532],"Trikker-prijzen en licentievoorwaarden",[30,29796,16526],{"href":16524,"rel":29797},[2532],[30,29799,29801],{"href":5372,"rel":29800},[2532],"Trikker-productoverzicht",". Prijzen en platformen (Windows, macOS-bèta van Trikker 2.0) laatst gecontroleerd op ",[15,29804,29805],{},"2 november 2026"," aan de hand van de fabrikantinformatie en het Trikker-nieuws, aankondiging van de webversie op ",[15,29808,29809],{},"2 oktober 2026",", AI-gegevens op de Trikker-startpagina en in de aankondiging van Trikker 2.0 op ",[15,29812,29813],{},"3 oktober 2026",", de Schemalezer aan de hand van de ",[30,29816,29818],{"href":6041,"rel":29817},[2532],"aankondiging van 13 oktober 2026",[15,29820,29821],{},"19 oktober 2026",", beschrijven en dicteren in de Schemalezer aan de hand van de ",[30,29824,29826],{"href":6036,"rel":29825},[2532],"aankondiging van de update"," en de pdf-aanmaak aan de hand van de ",[30,29829,29831],{"href":2530,"rel":29830},[2532],"online handleiding Trikker 2.0-bèta",[15,29833,29834],{},"26 oktober 2026",[12,29836,29837,29838,29842,29843,29845],{},"Sinds 30 september 2026 is Trikker 2.0 in bèta beschikbaar voor Windows en macOS (",[30,29839,29841],{"href":16515,"rel":29840},[2532],"aankondiging","). Sinds 13 oktober 2026 biedt Trikker klanten met een actieve licentie de Schemalezer in bèta aan: AI leest een eendraadschema en het situatieplan in, ook als scan, foto of handschets, en maakt er een Trikker-schema van met symbolen op het plan, gekoppeld aan hun kring. Het resultaat moet je volgens Trikker nakijken; staan er geen symbolen op het plan, dan neemt Trikker het alleen als achtergrond over. Sinds een update beschrijf je de installatie op de werf ook getypt of gedicteerd, in het Nederlands, Frans of Engels (spraakherkenning in Chrome, Edge en Safari). Daaruit bouwt de Schemalezer kring per kring een eendraadschema volgens het AREI op; niet genoemde waarden vult hij aan volgens de gangbare praktijk, onzekere kringen komen bij de punten ter controle, en de punten plaats je zelf op het plan. In de bèta 2.0 wordt de pdf van de plannen volgens de online handleiding op de servers van Trikker gemaakt; vóór het afdrukken bevestig je die melding. Een webversie voor iPad en Android is aangekondigd, maar zonder datum; de FAQ vermeldt nog steeds één licentie per computer. Wat de bèta brengt, lees je in ons artikel ",[30,29844,5951],{"href":5950},". Ontbrekende informatie van de fabrikant over een functie betekent niet dat Trikker die onmogelijk ondersteunt.",[41,29847,29849],{"id":29848},"waar-planelec-meer-afdekt","Waar PlanElec meer afdekt",[12,29851,29852],{},"Het belangrijkste verschil zit in de samenhang van de planning. Een nieuwe stroomkring is meer dan een symbool: beveiliging, toestellen, leidinggegevens, locatie en documenten moeten overeenstemmen. PlanElec bewaart die informatie in het projectmodel en leidt daar weergaven en documenten uit af. Precies op dat model werken ook de AI-functies.",[1396,29854,29856],{"id":29855},"de-planelec-assistent-werkt-in-het-hele-project","De PlanElec-assistent werkt in het hele project",[12,29858,29859],{},"Je beschrijft de taak in je eigen woorden, bijvoorbeeld „plaats drie stopcontacten in de keuken”, en de PlanElec-assistent voert ze uit in het project. Hij werkt niet alleen in het schema, maar met meer dan 100 planningsopdrachten in het volledige projectmodel: grondplan en situatieplan, ruimtes, toestellen, stroomkringen, schakelketens, kabels, verdeelkast, automatisering\u002FKNX, PV-strings en lichtsturing. Je opent hem met de botknop in de kopbalk of met ⌘J \u002F Ctrl+J; hij antwoordt in jouw taal en is beschikbaar voor alle aangemelde gebruikers in de studio.",[12,29861,29862,29863,29865,29866,39],{},"Opdrachten typ of dicteer je. Met ",[15,29864,6787],{}," in de invoerbalk spreek je in het Nederlands, Frans, Duits of Engels; de spraakherkenning kent Belgische vaktermen zoals AREI of XVB. De herkende tekst controleer en corrigeer je in het invoerveld, en hij wordt pas verstuurd als jij klikt. Hoe de opname verwerkt wordt, lees je in ",[30,29867,15837],{"href":7681},[12,29869,29870],{},"Drie regels maken het werk met de assistent controleerbaar:",[1450,29872,29873,29879,29888],{},[1453,29874,29875,29878],{},[15,29876,29877],{},"Gecontroleerd:"," na elke wijziging controleert PlanElec het hele project met dezelfde AREI-zelfcontrole die ook het rapport gebruikt, en meldt nieuwe bevindingen.",[1453,29880,29881,29884,29885,29887],{},[15,29882,29883],{},"Omkeerbaar:"," elke wijziging is precies één stap, die je op de actiekaart met ",[15,29886,6795],{}," terugdraait.",[1453,29889,29890,29893,29894,39],{},[15,29891,29892],{},"Bevestigd:"," eenduidige, omkeerbare opdrachten voert de assistent meteen uit. Risicovolle acties start hij pas na ",[15,29895,6637],{},[12,29897,29898,29899,39],{},"Elke actie verschijnt als actiekaart en in de projectgeschiedenis met opdrachtgever; in een team ziet iedereen wie wat heeft gevraagd. Vakvragen beantwoordt de assistent met onderbouwde bronnen uit de PlanElec-hulp en de volledige AREI-tekst. Het taalmodel van de assistent draait in de EU-regio; de AI-aanbieder slaat je aanvragen niet op en traint er niet mee. ",[30,29900,6560],{"href":6559},[1396,29902,29904],{"id":29903},"trikker-bestanden-trik-openen-in-planelec-sketch","Trikker-bestanden (.trik) openen in PlanElec Sketch",[12,29906,29907,29908,29910],{},"PlanElec Sketch is de gratis PlanElec-tool voor eendraadschema en situatieplan: zonder account, rechtstreeks in de browser. Kies daar ",[15,29909,4704],{},", en eendraadschema en situatieplan van je .trik-bestand worden een bewerkbare tekening.",[1450,29912,29913,29919,29924,29930,29936,29943],{},[1453,29914,29915,29918],{},[15,29916,29917],{},"Het eendraadschema wordt overgenomen:"," voeding, beveiligingstoestellen, kabels, onderverdelingen, stroomkringen en verbruikers als Sketch-symbolen.",[1453,29920,29921,29923],{},[15,29922,4876],{}," verdiepingen met naam, muren met hun dikte, ruimtes met naam, deuren met draairichting, ramen, garagepoorten, trappen, vrije teksten en rechthoeken.",[1453,29925,29926,29929],{},[15,29927,29928],{},"Niets verdwijnt ongemerkt."," Symbolen zonder tegenhanger in Sketch, of op een plaats die Sketch niet toelaat, blijven als notitie op het schema staan. Verwante symbolen worden benaderd en ontbrekende waarden aangevuld met standaardwaarden. Een importverslag vermeldt elk van die afwijkingen met de plaats in het Trikker-bestand.",[1453,29931,29932,29935],{},[15,29933,29934],{},"Gelezen in je browser:"," het bestand wordt in je browser omgezet. Om de import te verbeteren bewaart PlanElec ingelezen bestanden 90 dagen versleuteld; met het vinkje bij het openen kun je dat weigeren.",[1453,29937,29938,1934,29940,29942],{},[15,29939,5842],{},[15,29941,3363],{}," zet je de tekening voort in een PlanElec-project. Eendraadschema, verdeelborden, stroomkringen, kabels, projectgegevens en het situatieplan worden overgenomen; wat niet meekomt, toont de overnamepagina voordat het project wordt aangemaakt.",[1453,29944,29945,29947],{},[15,29946,5886],{}," wat niet wordt overgenomen, staat in het importrapport. Controleer het overgenomen schema en het plan altijd.",[12,29949,29950],{},"Heb je een plan alleen als pdf, dan helpt de plattegrondherkenning uit het volgende deel.",[1396,29952,29954],{"id":29953},"grondplan-herkennen-uit-een-trikker-pdf-of-scan","Grondplan herkennen uit een Trikker-pdf of scan",[12,29956,29957,29958,29960],{},"Je bestaande Trikker-plannen zijn een goed vertrekpunt. Een .trik-bestand importeer je als project (",[30,29959,2514],{"href":2513},"); het situatieplan komt daarbij mee in het grondplan. Een plan dat je als pdf exporteert, leest PlanElec ook:",[1602,29962,29963,29966,29971,29975,29980],{},[1453,29964,29965],{},"Exporteer het plan in Trikker als pdf; Trikker 2.0 biedt daarvoor een rechtstreekse PDF-export.",[1453,29967,16650,29968,29970],{},[15,29969,3903],{},". Ondersteund zijn PDF, PNG, JPEG en WebP.",[1453,29972,16656,29973,16659],{},[15,29974,6843],{},[1453,29976,29977,29978,16665],{},"Controleer het voorstel: bevestig de schaal, vergelijk ruimtes en oppervlaktes en verschuif in ",[15,29979,10357],{},[1453,29981,16668,29982,29984],{},[15,29983,6847],{}," over in een lege verdieping. De originele pagina blijft als onderlegger staan; ⌘Z \u002F Ctrl+Z draait de volledige overname terug.",[12,29986,29987],{},"PlanElec neemt muren, ruimtes met oppervlakte, deuren en ramen, ondersteunde toestelsymbolen (stopcontact, dubbel stopcontact, spatwaterdicht stopcontact, schakelaar, lichtpunt) en de schaal over. De schaal haalt PlanElec uit maatlijnen; de PDF-schaal neemt het alleen over als de maatlijnen die bevestigen. Je kunt ook zelf twee punten meten; zonder bevestigde schaal blijft de overname geblokkeerd. In het plan gedrukte oppervlaktes dienen als controle, afwijkingen worden gemarkeerd. Symbolen die PlanElec niet eenduidig kan toewijzen, worden gemarkeerd en niet overgenomen. Het symboolvocabulaire is afgestemd op Belgische plannen en Trikker-exports.",[12,29989,29990,29991,39],{},"Stroomkringen, schakelketens en eendraadschema plan je daarna in PlanElec, met de automatische planning en de assistent. ",[30,29992,16677],{"href":3377},[1396,29994,29996],{"id":29995},"meteen-met-het-eendraadschema-beginnen","Meteen met het eendraadschema beginnen",[12,29998,29999,30000,8808,30003,933,30005,30007],{},"Bij het aanmaken van een project kies je onder ",[15,30001,30002],{},"Planningsaanpak",[15,30004,6826],{},[15,30006,6830],{},". De tweede aanpak is bedoeld voor wie overstapt van klassieke tekenprogramma’s: het eendraadschema opent groot, hoofdverdeler en installatiekop staan klaar als aanname, en je plaatst symbolen rechtstreeks in het schema. Zolang er geen plattegrond getekend is, blokkeren ruimtelijke controles het schema en het zelfcontrolerapport niet; alle andere controles blijven gelden. Het situatieplan blijft dan buiten het dossier.",[12,30009,30010,30011,30013,30014,708,30016,39],{},"Voor nieuwe huishoudelijke installaties en belangrijke wijzigingen vraagt het AREI eendraadschema’s en situatieplannen (onderafdeling 3.1.2.1 a). Het grondplan teken of herken je daarom later in hetzelfde project; de planningsaanpak wissel je in de projectinstellingen zonder gegevensverlies. Trikker-projectbestanden importeer je ongeacht de planningsaanpak met ",[15,30012,2514],{},"; zonder account open je een .trik-bestand in PlanElec Sketch en neem je het van daaruit over met ",[15,30015,3363],{},[30,30017,8240],{"href":8239},[1396,30019,30021],{"id":30020},"verdeelkast-invullen-vanuit-fotos","Verdeelkast invullen vanuit foto’s",[12,30023,30024,30025,1934,30027,30029,30030,30032,30033,30035,30036,30038],{},"Bij bestaande installaties begint de opname vaak voor de geopende verdeelkast. In de kasteditor laad je bij ",[15,30026,6857],{},[15,30028,13837],{}," je opnames op en start je ",[15,30031,6861],{},". PlanElec herkent zichtbare DIN-modules met rij, startpositie, breedte en type; meerdere foto’s van dezelfde module voeg je samen of splits je. Bij ",[15,30034,13914],{}," beoordeel je het voorstel en zet je het met ",[15,30037,14097],{}," in een lege verdeelkast. Bedrading en elektrische verbindingen toont een foto niet – die leg je vast in de planning.",[1396,30040,30042],{"id":30041},"automatische-planning-van-kamer-tot-verdeelkast","Automatische planning van kamer tot verdeelkast",[12,30044,30045],{},"Kamers start je met een voorgestelde standaarduitrusting, je past stopcontacten en lichtpunten aan en verdeelt spots in een raster. PlanElec ondersteunt schakelketens, automatische kringtoewijzing, kabelvoorstellen, faseverdeling en kabelroutes langs muren. Alle resultaten blijven bewerkbaar; je stemt elk voorstel vakinhoudelijk af.",[12,30047,30048,30049,39],{},"Ook de verdeelkast hoort bij die werkwijze. Beveiligingen en stroomkringen plaats je automatisch of handmatig op DIN-rails. De elektrische topologie vormt de basis voor het eendraadschema. Als kamers en toestellen tijdens een renovatie herhaaldelijk veranderen, werk je verder met dezelfde projectgegevens. ",[30,30050,30051],{"href":6871},"Automatische planning ontdekken",[1396,30053,30055],{"id":30054},"meerdere-verdiepingen-en-weergaven-naast-elkaar","Meerdere verdiepingen en weergaven naast elkaar",[12,30057,30058],{},"PlanElec verwerkt afbeeldingen, PDF- en DXF-achtergronden, meerdere PDF-pagina's en uitsneden voor afzonderlijke verdiepingen. Bij de import bevestig je eenheid, schaal en uitlijning; onduidelijke afmetingen kalibreer je met twee punten. Op het herkende of getekende grondplan bouw je daarna de elektrische planning op.",[12,30060,30061,30062,39],{},"In de gedeelde werkruimte controleer je situatieplan en eendraadschema samen; op smalle schermen wissel je tussen de weergaven. De 3D-weergave is beschikbaar voor alle gebruikers; op kleine schermen of zonder WebGL werk je verder in de 2D-weergaven. ",[30,30063,16677],{"href":3377},[1396,30065,30067],{"id":30066},"zonnepanelen-als-gestructureerde-installatie","Zonnepanelen als gestructureerde installatie",[12,30069,30070],{},"Voor PV gaat PlanElec verder dan één omvormersymbool: strings worden aan MPPT's gekoppeld, met modules, DC-beveiliging, kabeldeeltrajecten en frame-PE. Dezelfde PV-gegevens komen terug in eendraadschema, situatieplan en de materiaallijst in pilotfase. Ontbrekende stringkoppelingen of fabrikantgegevens blijven zichtbaar.",[12,30072,30073,30074,30076],{},"De openbare Synergrid-C10\u002F26-check controleert een concreet omvormermodel; hij beoordeelt het toestel, niet de volledige installatie. Het ",[30,30075,20219],{"href":20218}," licht de productomvang toe.",[1396,30078,30080],{"id":30079},"lichtsturing-en-knx-documentatie","Lichtsturing en KNX-documentatie",[12,30082,30083],{},"Rechtstreekse schakelingen, aftakdozen, retourdraden en ondersteunde relais-\u002FShelly-kanalen documenteer je met een expliciete kabelvoorvertoning. De stuurgroep beschrijft de functie, de kabelvoorvertoning de fysieke bedrading; toestelconfiguratie en klemmenplanning zijn aparte werkstappen.",[12,30085,30086,30087,39],{},"De KNX-pilot omvat voeding, schakel- en rolluikactoren, drukknoppen en kanaaltoewijzing op het eendraadschema. Ontbrekende voeding, open lasttoewijzingen en overbelasting blokkeren de definitieve export. ETS-programmering en groepsadressen doe je verder in ETS; volledige buslijnplanning valt buiten de omvang. ",[30,30088,30089],{"href":37},"KNX-omvang en grenzen",[1396,30091,30093],{"id":30092},"van-afzonderlijk-plan-naar-traceerbaar-pdf-dossier","Van afzonderlijk plan naar traceerbaar PDF-dossier",[12,30095,30096],{},"Eendraadschema, situatieplan, kast-PDF en oriënterend zelfcontrolerapport zijn centraal als PDF beschikbaar. Geselecteerde documenten bundel je met voorblad, inhoudsopgave, paginanummers, installateursgegevens en bedrijfslogo. Materiaal-, kring- en kabellijsten zijn beschikbaar als pilot: fabrikantneutraal, zonder prijzen en zonder goedkeuring als bestellijst.",[12,30098,30099,30100,39],{},"Exports met versies krijgen een privéarchief en een intrekbare QR-toegangslink. Daarmee toon je herkomst en bestandsintegriteit van elk document aan; een elektronische handtekening of keuringsbewijs is de QR-link niet – over de keuring beslist het erkend organisme. ",[30,30101,30102],{"href":2451},"Documentexport begrijpen",[12,30104,30105,30108,30109,30111,30112,39],{},[15,30106,30107],{},"Bekijk het resultaat vóór registratie:"," ons ",[30,30110,6985],{"href":6984}," toont plannen, lijsten en een rapport rechtstreeks uit het product. Het voorbeeldproject is fictief en niet bedoeld om in te dienen. FR-, DE- en EN-voorbeelden staan op de ",[30,30113,30114],{"href":20218},"functiepagina",[1396,30116,30118],{"id":30117},"samenwerken-in-team-en-op-meerdere-toestellen","Samenwerken in team en op meerdere toestellen",[12,30120,30121,30122,39],{},"Organisaties bundelen bedrijfsprojecten en leden. Projecten en organisaties deel je via een uitnodiging per e-mail; rollen bepalen wie beheert, bewerkt of leest. De live synchronisatie stemt geopende sessies op elkaar af, ook je eigen sessies op meerdere toestellen, toont wie er nog aanwezig is en haalt bevestigde wijzigingen na een verbindingsonderbreking in. Het uitnodigen van extra personen maakt deel uit van Pro; Pro uitproberen geldt voor één persoon zonder organisatie. Een vooraf online geopend project bewerk je als pilot ook zonder verbinding verder; export, uploads en AI-functies hebben internet nodig. ",[30,30123,6564],{"href":6563},[41,30125,30127],{"id":30126},"welk-programma-past-bij-je-volgende-project","Welk programma past bij je volgende project?",[12,30129,30130,30133],{},[15,30131,30132],{},"PlanElec past vooral als je"," in de browser werkt, meerdere apparaten gebruikt, documenten in het Nederlands, Frans, Duits of Engels maakt en grondplan, elektrische planning en export samen wilt bewerken. Bestaande pdf-plannen en kastfoto’s worden je vertrekpunt, routineopdrachten neemt de assistent over. Voor nieuwe renovatie- of PV-projecten loont een proef van het hele proces tot PDF.",[12,30135,30136,30139],{},[15,30137,30138],{},"Trikker blijft een logische keuze als je"," bestaande Trikker-projecten met hun situatieplan verder bewerkt, oude schema’s met de Schemalezer (bèta) wilt inlezen of een installatie ter plaatse wilt beschrijven of dicteren en er een schema van wilt maken, DWG-achtergronden direct wilt gebruiken of voortbouwt op een vertrouwde Windows-tekenwerkwijze. Ook beperkte internettoegang kan doorslaggevend zijn.",[12,30141,30142,30143,30147,30148,39],{},"Trikker koppelt schema en situatieplan eveneens via symbolen; een eerlijke vergelijking stelt ze niet voor als losstaande tekeningen. Het voordeel van PlanElec is de doorlopende verbinding van ruimteplanning, AI-ondersteunde invoer, planningsvoorstellen, elektrische topologie, verdeelkast en documenten. Hoe goed dat bij je bedrijf past, toont een eigen voorbeeldproject. Een overzicht van alles wat PlanElec kan, staat in ",[30,30144,30146],{"href":30145},"\u002Fblog\u002Fwat-kan-je-met-planelec","Wat je met PlanElec kunt doen","; meer programma’s naast elkaar zet ",[30,30149,6974],{"href":6973},[41,30151,30153],{"id":30152},"veelgestelde-vragen-over-het-trikker-alternatief","Veelgestelde vragen over het Trikker-alternatief",[1396,30155,30157],{"id":30156},"is-planelec-gratis","Is PlanElec gratis?",[12,30159,30160,30161,30163],{},"Gedeeltelijk. Sinds 2 november 2026 lopen de betalende formules. Pro uitproberen kost blijvend € 0: je plant zonder project- of kringgrens, de exports dragen afgeschermde gegevens. Eenmalig gebruik kost € 12 per pand, Pro € 24 per maand of € 240 per jaar. Voor de AI-functies geldt een persoonlijk AI-tegoed; hoeveel daarvan verbruikt is, toont het gebruikersmenu als percentage. Wie zich vóór 2 november heeft geregistreerd, gebruikt Pro tot en met 1 december 2026 gratis, zonder betaalgegevens; daarna loopt het account zonder boeking verder als Pro uitproberen aan € 0, en je projecten blijven. De ",[30,30162,6274],{"href":4449}," noemt Pro uitproberen, Eenmalig gebruik en Pro; PlanElec Sketch blijft gratis. Je PDF-exports download je en bewaar je buiten de toepassing.",[1396,30165,30167],{"id":30166},"kan-ik-trikker-bestanden-importeren","Kan ik Trikker-bestanden importeren?",[12,30169,30170,30171,30173,30174,30176,30177,30179,30180,30182],{},"Ja. Met ",[15,30172,2514],{}," maak je projecten aan uit een .trik-bestand of een heel archief: het eendraadschema met verdeelborden, kringen en kabels komt mee, en ook het situatieplan met verdiepingen, muren met hun dikte, ruimtes, deuren, ramen, garagepoorten en trappen; wat niet past, staat in het rapport. Zonder account open je één bestand in het gratis PlanElec Sketch en zet je het schema voort met ",[15,30175,3363],{},". Heb je een plan alleen als pdf, zet het dan in PlanElec bij Projectstukken en start ",[15,30178,6843],{},". Muren, ruimtes, deuren en ramen, ondersteunde toestelsymbolen en schaal komen binnen als bewerkbaar grondplan. Stroomkringen en schema plan je daarna in PlanElec, met de assistent en de automatische planning. Wil je zoals vroeger met het schema beginnen, kies dan bij het aanmaken ",[15,30181,6830],{},". Lopende dossiers werk je af in Trikker.",[1396,30184,30186],{"id":30185},"welke-ai-functies-biedt-planelec","Welke AI-functies biedt PlanElec?",[12,30188,30189],{},"Drie: de PlanElec-assistent, die opdrachten in het hele project uitvoert en vakvragen met bronnen beantwoordt; de plattegrondherkenning uit pdf, scan of afbeelding; en de herkenning van DIN-modules op kastfoto’s. Elk voorstel controleer je vóór de overname, elke wijziging van de assistent kijkt de zelfcontrole na, en je draait ze in één stap terug. Opdrachten aan de assistent kun je typen of dicteren.",[1396,30191,30193],{"id":30192},"is-planelec-geschikt-voor-mac-en-ipad","Is PlanElec geschikt voor Mac en iPad?",[12,30195,30196],{},"Ja. PlanElec werkt zonder installatie in de browser, ook op Mac en tablet. Trikker biedt sinds versie 2.0 een Mac-bèta; een web- en iPad-versie is daar aangekondigd. Voor uitgebreide tekeningen werk je het best op een groot scherm met muis of trackpad. Zonder verbinding bewerk je een vooraf geopend project als pilot verder; export en AI-functies hebben internet nodig.",[1396,30198,30200],{"id":30199},"is-de-arei-zelfcontrole-hetzelfde-als-een-keuring","Is de AREI-zelfcontrole hetzelfde als een keuring?",[12,30202,30203,30204,39],{},"Nee – ze hebben elk een eigen rol. De zelfcontrole beoordeelt de ondersteunde regels die op basis van je ingevoerde gegevens te controleren zijn en toont ontbrekende gegevens en beperkingen in de dekking; dat geldt ook voor de controle na elke actie van de assistent. Een conformiteitsattest is ze niet. Vakinhoudelijke planning, omstandigheden ter plaatse en metingen zijn jouw verantwoordelijkheid, de officiële keuring doet het erkend organisme. ",[30,30205,30206],{"href":2457},"Ondersteunde controles en grenzen",[41,30208,30210],{"id":30209},"beoordeel-planelec-op-een-volledige-werkwijze","Beoordeel PlanElec op een volledige werkwijze",[12,30212,30213,30214,30217,30218,39],{},"Bekijk eerst het ",[30,30215,30216],{"href":6984},"pilotdossier"," en probeer daarna een eigen klein project: een Trikker-plan als pdf laten herkennen of het grondplan tekenen, toestellen en kringen plannen, een opdracht aan de assistent geven, kast en schema controleren, zelfcontrole lezen en PDF exporteren. Zo beoordeel je precies het werk waarvoor je een Trikker-alternatief zoekt. ",[30,30219,6990],{"href":6989},{"title":1467,"searchDepth":1468,"depth":1468,"links":30221},[30222,30223,30236,30237,30244],{"id":29638,"depth":1468,"text":29639},{"id":29848,"depth":1468,"text":29849,"children":30224},[30225,30226,30227,30228,30229,30230,30231,30232,30233,30234,30235],{"id":29855,"depth":1486,"text":29856},{"id":29903,"depth":1486,"text":29904},{"id":29953,"depth":1486,"text":29954},{"id":29995,"depth":1486,"text":29996},{"id":30020,"depth":1486,"text":30021},{"id":30041,"depth":1486,"text":30042},{"id":30054,"depth":1486,"text":30055},{"id":30066,"depth":1486,"text":30067},{"id":30079,"depth":1486,"text":30080},{"id":30092,"depth":1486,"text":30093},{"id":30117,"depth":1486,"text":30118},{"id":30126,"depth":1468,"text":30127},{"id":30152,"depth":1468,"text":30153,"children":30238},[30239,30240,30241,30242,30243],{"id":30156,"depth":1486,"text":30157},{"id":30166,"depth":1486,"text":30167},{"id":30185,"depth":1486,"text":30186},{"id":30192,"depth":1486,"text":30193},{"id":30199,"depth":1486,"text":30200},{"id":30209,"depth":1468,"text":30210},"2026-08-22","PlanElec vs. Trikker voor België: AI-assistent, plattegrondherkenning uit Trikker-pdf’s, eendraadschema, situatieplan, PV, KNX en PDF-dossier vergeleken.",{},"\u002Fblog\u002Ftrikker-alternatief.nl",{"title":6968,"description":30246},"trikker-alternatief","blog\u002Ftrikker-alternatief.nl",[3269,1337,4892,3273,3274,7023,3275,5083,197],"SAuU1nLeKtVInRIakJVbWmTf3nPpiscASwrz1GBVhCw",{"id":30255,"title":9308,"body":30256,"category":4028,"description":30487,"extension":1496,"guideId":30488,"image":30489,"locale":1497,"meta":30490,"navigation":1499,"order":1503,"path":30491,"publishedAt":30492,"readTime":3262,"seo":30493,"seoTitle":4037,"slug":30494,"stem":30495,"tags":30496,"updatedAt":30501,"__hash__":30502,"kind":2491,"href":9307,"date":30492},"help\u002Fhelp\u002Fplace-and-connect-symbols.nl.md",{"type":9,"value":30257,"toc":30478},[30258,30265,30270,30277,30281,30287,30301,30304,30308,30317,30328,30331,30335,30341,30363,30367,30377,30395,30400,30404,30407,30410,30413,30436,30439,30443,30457,30463,30467,30473],[12,30259,30260,30261,30264],{},"Een symbool in het grondplan beschrijft eerst zijn ",[15,30262,30263],{},"fysieke plaats",". Pas de koppeling met de elektrische topologie maakt er een toegewezen verbruiker of toestel van voor stroomkring, schema en documenten.",[12,30266,30267],{},[30,30268],{"id":30269},"place",[422,30271],{":height":30272,":width":30273,"alt":30274,"caption":30275,"src":30276},"51","948","Gereedschapspalet met de beschikbare elektrische symbolen voor de gekozen ruimte.","Het palet is het startpunt voor plaatsing; positie, oriëntatie en symboolvariant moeten nog worden gecontroleerd.","\u002Fhelp\u002Fworkflows\u002Fnl-device-palette.png",[41,30278,30280],{"id":30279},"symbolen-uit-het-palet-plaatsen","Symbolen uit het palet plaatsen",[12,30282,30283,30284,30286],{},"Open in ",[15,30285,6435],{}," het gereedschapspalet en kies bijvoorbeeld een stopcontact, schakelaar, lichtpunt, vast toestel, doos of verdeelkast. De gereedschapsiconen staan in het palet; bij aanwijzen toont de toepassing de naam.",[1602,30288,30289,30292,30295,30298],{},[1453,30290,30291],{},"Kies het gereedschap voor het symbool.",[1453,30293,30294],{},"Plaats wandgebonden toestellen aan de juiste kant van de muur. Stopcontacten en schakelaars klikken op de muur vast.",[1453,30296,30297],{},"Plaats vrije lichtpunten of spots in de ruimte.",[1453,30299,30300],{},"Controleer na het plaatsen positie, oriëntatie en symboolvariant.",[12,30302,30303],{},"Een symbool kan alleen worden geplaatst waar de editor een geldige positie herkent. De preview toont vóór het bevestigen de echte geometrie. Corrigeer eerst muur of ruimte wanneer het symbool niet op de beoogde plaats vastklikt.",[41,30305,30307],{"id":30306},"gemeenschappelijke-afdekramen-maken","Gemeenschappelijke afdekramen maken",[12,30309,30310,30311,30313,30314,30316],{},"Een installatiegroep is een fysieke combinatie met een gemeenschappelijk twee- tot vijfvoudig afdekraam. Zij is ",[15,30312,17871],{}," schakelketen en ",[15,30315,17871],{}," stroomkring.",[12,30318,30319,30320,30323,30324,30327],{},"Sleep geschikte toestellen aan dezelfde muurzijde bij elkaar of start het raamgereedschap. In het paneel ",[15,30321,30322],{},"Installatiegroep"," kiest u horizontaal of verticaal en sluit u af met ",[15,30325,30326],{},"Gereed",". Verplaatst u één lid, dan verplaatst de combinatie mee.",[12,30329,30330],{},"Schakelaars, standaardstopcontacten, Ethernet- en coax-aansluitingen kunnen worden gegroepeerd. IP44-stopcontacten blijven vanwege hun afdichtende raam uitgesloten. Passieve data-aansluitingen worden hierdoor geen 230-V-verbruikers.",[41,30332,30334],{"id":30333},"gemeenschappelijk-afdekraam-aanpassen-of-opheffen","Gemeenschappelijk afdekraam aanpassen of opheffen",[12,30336,30337,30338,30340],{},"Het afdekraam ontstaat midden tussen de gegroepeerde toestellen; het toestel waarmee u begon, springt niet naar een andere plek. Direct na het groeperen verschijnt een melding met ",[15,30339,6795],{},", waarmee u de groepering in één stap terugdraait.",[12,30342,30343,30344,30347,30348,30351,30352,933,30355,30358,30359,30362],{},"Klik op het gemeenschappelijke afdekraam om het te bewerken. In het paneel ",[15,30345,30346],{},"Gemeenschappelijk afdekraam"," wijzigt u de ",[15,30349,30350],{},"Richting van het afdekraam"," (horizontaal of verticaal) en de volgorde met ",[15,30353,30354],{},"Vorige positie",[15,30356,30357],{},"Volgende positie",". Met ",[15,30360,30361],{},"Groep opheffen"," in de toestelbalk van een gegroepeerd toestel valt het raam weer uiteen: de toestellen komen naast elkaar te staan en zijn weer afzonderlijk te bewerken.",[41,30364,30366],{"id":30365},"symboolgrootte-van-het-project-aanpassen","Symboolgrootte van het project aanpassen",[12,30368,30369,30370,30372,30373,30376],{},"Zijn de symbolen van stopcontacten, schakelaars en lampen te groot voor uw plan? Open in de linkerbalk het menu ",[15,30371,12951],{}," en kies bij ",[15,30374,30375],{},"Symboolgrootte"," een stap tussen 50 % en 150 %. De standaard is 100 %.",[1450,30378,30379,30386,30389],{},[1453,30380,30381,30382,30385],{},"Het is een ",[15,30383,30384],{},"projectinstelling",": ze geldt voor het hele project en ook voor de export van het situatieschema, niet alleen voor de huidige weergave.",[1453,30387,30388],{},"Ze schaalt de compacte wandsymbolen en de gemeenschappelijke afdekramen. Posities, opgeslagen toestelmaten en het 3D-model blijven ongewijzigd.",[1453,30390,30391,30392,30394],{},"Elke wijziging is één stap die u met ",[15,30393,6795],{}," kunt terugnemen.",[12,30396,30397],{},[30,30398],{"id":30399},"topology",[41,30401,30403],{"id":30402},"met-de-elektrische-topologie-verbinden","Met de elektrische topologie verbinden",[12,30405,30406],{},"Open de eigenschappen van het geplaatste toestel en koppel het aan een typecompatibele knoop in de elektrische topologie. Varianten van stopcontacten, schakelaars en lichtpunten worden als passende families behandeld. Verbindings- en aftakdozen zijn alleen elektrisch werkzaam wanneer ze werkelijk gekoppeld zijn.",[12,30408,30409],{},"Controleer daarna de lijst met niet-verbonden onderdelen. Daarin staan symbolen die wel in het grondplan liggen, maar nog niet bij het elektrische model horen.",[12,30411,30412],{},"Houd dit onderscheid aan:",[1450,30414,30415,30421,30426,30431],{},[1453,30416,30417,30420],{},[15,30418,30419],{},"Positie",": waar bevindt het toestel zich?",[1453,30422,30423,30425],{},[15,30424,30322],{},": welke inzetten delen een afdekraam?",[1453,30427,30428,30430],{},[15,30429,20094],{},": welke elektrische knoop hoort bij het toestel?",[1453,30432,30433,30435],{},[15,30434,12945],{},": via welk beveiligingstoestel wordt die knoop gevoed?",[12,30437,30438],{},"Een verandering aan het afdekraam verandert geen schakelfunctie of stroomkring. Voor de bediening van verlichting bewerkt u daarna de schakelketen; voor de voeding wijst u toestellen aan een stroomkring toe.",[41,30440,30442],{"id":30441},"controle-vóór-de-volgende-stap","Controle vóór de volgende stap",[1450,30444,30445,30448,30451,30454],{},[1453,30446,30447],{},"Elk symbool staat op de werkelijk bedoelde plaats.",[1453,30449,30450],{},"Wandgebonden toestellen zijn aan de juiste muurzijde uitgelijnd.",[1453,30452,30453],{},"Raamcombinaties volgen de geplande montage, niet een veronderstelde bedrading.",[1453,30455,30456],{},"Alle elektrische toestellen zijn met de passende topologieknoop gekoppeld.",[12,30458,30459,30460,39],{},"Volgende stap: ",[30,30461,30462],{"href":2445},"schakelketens, stroomkringen en kabelroutes bewerken",[41,30464,30466],{"id":30465},"de-elektrische-installatie-verder-plannen","De elektrische installatie verder plannen",[12,30468,30469,30470,30472],{},"U kunt bestaande toestellen ook in ",[15,30471,12532],{}," aan een stroomkring toewijzen, hun beveiligingspad volgen en onderverdelers vormen na een voorbeeld. Behuizing en moduleplaatsen mogen voorlopig openstaan. De voorgestelde volgorde is een houvast; bestaande projecten en andere zinvolle startpunten blijven mogelijk.",[12,30474,30475,39],{},[30,30476,30477],{"href":11068},"Geïllustreerde handleiding voor installatieplanning",{"title":1467,"searchDepth":1468,"depth":1468,"links":30479},[30480,30481,30482,30483,30484,30485,30486],{"id":30279,"depth":1468,"text":30280},{"id":30306,"depth":1468,"text":30307},{"id":30333,"depth":1468,"text":30334},{"id":30365,"depth":1468,"text":30366},{"id":30402,"depth":1468,"text":30403},{"id":30441,"depth":1468,"text":30442},{"id":30465,"depth":1468,"text":30466},"Plaats toestellen op de juiste positie, vorm gemeenschappelijke afdekramen en verbind elektrische symbolen met de passende topologie.","place-and-connect-symbols","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fplace-and-connect-symbols-nl.webp",{},"\u002Fhelp\u002Fplace-and-connect-symbols.nl","2026-08-21",{"title":9308,"description":30487},"elektrische-symbolen-plaatsen-en-verbinden","help\u002Fplace-and-connect-symbols.nl",[26488,30497,30498,15393,30499,30500],"stopcontacten","schakelaars","afdekramen","topologie","2026-10-13","eIp7GR6yqYNCIRAfVLgwKBmDW5GTjAkC_pfYGCqk5FA",{"id":30504,"title":3378,"body":30505,"category":4028,"description":31066,"extension":1496,"guideId":31067,"image":31068,"locale":1497,"meta":31069,"navigation":1499,"order":31070,"path":31071,"publishedAt":30492,"readTime":7670,"seo":31072,"seoTitle":4037,"slug":31073,"stem":31074,"tags":31075,"updatedAt":9347,"__hash__":31079,"kind":2491,"href":3377,"date":30492},"help\u002Fhelp\u002Ffloorplan-import-calibration.nl.md",{"type":9,"value":30506,"toc":31056},[30507,30514,30518,30525,30529,30549,30587,30638,30641,30646,30650,30657,30683,30686,30691,30695,30705,30708,30713,30717,30746,30749,30780,30783,30787,30797,30800,30814,30819,30824,30828,30831,30905,30910,30915,30919,30925,30955,30961,30972,30987,31045,31049,31052],[12,30508,30509,30510,30513],{},"Een geïmporteerd plan is in PlanElec een ",[15,30511,30512],{},"referentielaag",". Je hebt een aangemaakte verdieping nodig en een bestand in PNG, JPEG, WebP, PDF of DXF. Na import en kalibratie ligt het plan op schaal onder je tekening; muren, ruimtes en elektrische symbolen teken je erbovenop als bewerkbare PlanElec-gegevens. Daardoor blijft de export leesbaar, ook als je het oorspronkelijke plan later verbergt of vervangt. Wil je muren en ruimtes niet zelf overtekenen, dan laat je ze door AI als voorstel herkennen uit een PDF of afbeelding; de sectie \"Het grondplan automatisch laten herkennen\" legt uit hoe.",[12,30515,30516],{},[30,30517],{"id":4041},[422,30519],{":height":30520,":width":30521,"alt":30522,"caption":30523,"src":30524},"614","768","Dialoog om grondplannen toe te voegen met bestandskeuze en importwachtrij.","Controleer vóór het uploaden bestandstype, verdiepingstoewijzing en eventueel de gekozen pagina’s of uitsneden.","\u002Fhelp\u002Fworkflows\u002Fnl-import-plan.png",[41,30526,30528],{"id":30527},"hoe-importeer-ik-een-planreferentie","Hoe importeer ik een planreferentie?",[12,30530,30531,30532,30534,30535,30538,30539,30542,30543,30545,30546,30548],{},"Kies in de modus ",[15,30533,10326],{}," in de gereedschapsbalk ",[15,30536,30537],{},"Grondplannen"," en daarin ",[15,30540,30541],{},"Plattegrond toevoegen",". Op een lege verdieping opent ook ",[15,30544,12477],{}," in het startvenster ",[15,30547,10330],{}," hetzelfde importvenster – voor afbeeldingen, PDF en DXF.",[1602,30550,30551,30561,30564,30567,30581],{},[1453,30552,30553,30554,30557,30558,30560],{},"Sleep de bestanden in het venster ",[15,30555,30556],{},"Plattegronden toevoegen"," of gebruik ",[15,30559,2678],{},". PNG, JPEG, WebP, PDF en DXF kun je samen selecteren.",[1453,30562,30563],{},"Kies bij een PDF de pagina's die je nodig hebt; bij een DXF bevestig je de tekeneenheid en schakel je overbodige lagen uit.",[1453,30565,30566],{},"Markeer indien nodig de uitsneden (zie hieronder).",[1453,30568,30569,30570,30573,30574,30577,30578,39],{},"Controleer in de ",[15,30571,30572],{},"Importwachtrij"," de verdiepingskoppeling en rond af met ",[15,30575,30576],{},"Lagen uploaden",". Een mislukt bestand probeer je afzonderlijk opnieuw met ",[15,30579,30580],{},"Opnieuw proberen",[1453,30582,7985,30583,30586],{},[15,30584,30585],{},"Instellen"," voor een laag om de lagenwerkbank te openen.",[49,30588,30589,30598],{},[52,30590,30591],{},[55,30592,30593,30596],{},[58,30594,30595],{},"Limiet per doorloop",[58,30597,2590],{},[68,30599,30600,30607,30615,30622,30630],{},[55,30601,30602,30604],{},[73,30603,12951],{},[73,30605,30606],{},"tot 20",[55,30608,30609,30612],{},[73,30610,30611],{},"Totale grootte",[73,30613,30614],{},"tot 100 MB",[55,30616,30617,30619],{},[73,30618,9805],{},[73,30620,30621],{},"tot 25 MB en 50 pagina's",[55,30623,30624,30627],{},[73,30625,30626],{},"DXF",[73,30628,30629],{},"tot 30 MB",[55,30631,30632,30635],{},[73,30633,30634],{},"DWG",[73,30636,30637],{},"wordt niet geïmporteerd",[12,30639,30640],{},"DXF wordt in de browser als referentiebeeld verwerkt. Model Space en de gekozen lagen tellen mee.",[12,30642,30643],{},[30,30644],{"id":30645},"sections",[41,30647,30649],{"id":30648},"meerdere-plattegronden-op-één-blad-splitsen","Meerdere plattegronden op één blad splitsen",[12,30651,30652,30653,30656],{},"Architectenplannen dragen vaak gelijkvloers, verdieping en zolder op dezelfde pagina. Trek in de stap ",[15,30654,30655],{},"Uitsneden markeren"," een rechthoek rond elke plattegrond – uit elke rechthoek ontstaat een eigen plattegrond die je aan een eigen verdieping koppelt.",[1450,30658,30659,30665,30671,30677],{},[1453,30660,30661,30664],{},[15,30662,30663],{},"Zonder markering"," wordt de volledige pagina overgenomen.",[1453,30666,30667,30670],{},[15,30668,30669],{},"Geef elke uitsnede een naam"," in de lijst onder het voorbeeld. Alle uitsneden van één blad dragen dezelfde bestandsnaam; pas de naam maakt ze in de wachtrij en de lijst met plattegronden herkenbaar.",[1453,30672,30673,30676],{},[15,30674,30675],{},"Doorsneden, gevelaanzichten en titelblokken blijven ongemarkeerd."," Alleen wat een rechthoek draagt, wordt overgenomen.",[1453,30678,30679,30682],{},[15,30680,30681],{},"De uitsnede wordt bij het rasteren toegepast."," Daardoor wordt hij scherper afgebeeld dan hetzelfde gebied binnen een volledig ingelezen pagina.",[12,30684,30685],{},"Een rechthoek kun je na het trekken verplaatsen en aan de hoeken van formaat veranderen. Met de pijlen boven het voorbeeld blader je door de gekozen pagina's; markeringen gelden per pagina.",[12,30687,30688],{},[30,30689],{"id":30690},"sources",[41,30692,30694],{"id":30693},"het-bronbestand-blijft-in-het-project","Het bronbestand blijft in het project",[12,30696,30697,30698,1725,30701,30704],{},"Het geüploade bestand wordt mee bewaard en onderaan het paneel ",[15,30699,30700],{},"Plattegronden",[15,30702,30703],{},"Bronbestanden"," getoond. Meerdere plattegronden van één blad verwijzen naar hetzelfde bestand; het wordt maar één keer opgeslagen.",[12,30706,30707],{},"Zo snijd je later een extra uitsnede uit zonder het bestand opnieuw te zoeken – bijvoorbeeld als bij de eerste import een verdieping vergeten werd. Voor een inventarisatie of keuring blijft het architectenplan bovendien als basis van de documentatie bij het project.",[12,30709,30710],{},[30,30711],{"id":30712},"calibrate",[41,30714,30716],{"id":30715},"schaal-rotatie-en-positie-instellen","Schaal, rotatie en positie instellen",[12,30718,30719,30720,30723,30724,702,30727,702,30729,933,30731,30733,30734,30736,30737,30739,30740,30742,30743,30745],{},"De lagenwerkbank ",[15,30721,30722],{},"Laag instellen"," leidt je door de stappen ",[15,30725,30726],{},"Bijsnijden",[15,30728,8524],{},[15,30730,10281],{},[15,30732,30419],{},". Komt de plattegrond uit een gemarkeerde uitsnede, dan begint ze bij ",[15,30735,8524],{}," – het gebied is bij de import al bepaald. ",[15,30738,30726],{}," blijft beschikbaar voor correcties aan de rand. Zolang de werkbank open is, kun je verschuiven en zoomen, maar zijn de tekengereedschappen vergrendeld. Wijzigingen blijven een ontwerp tot je ",[15,30741,2695],{}," kiest; ",[15,30744,9648],{}," verwerpt ze.",[12,30747,30748],{},"Een afbeeldings- of PDF-laag kalibreer je met een gekende afstand:",[1602,30750,30751,30763,30769,30772,30775],{},[1453,30752,30753,30754,30756,30757,30759,30760,7763],{},"Open de stap ",[15,30755,10281],{}," of kies in de gereedschapsbalk ",[15,30758,12399],{}," (bij een al gekalibreerde laag ",[15,30761,30762],{},"Opnieuw kalibreren",[1453,30764,7985,30765,30768],{},[15,30766,30767],{},"Referentielengte instellen"," en zet twee punten op een afstand waarvan je de werkelijke lengte kent, bijvoorbeeld tussen twee maatlijnen.",[1453,30770,30771],{},"Vul de lengte in meter in en controleer het voorbeeld.",[1453,30773,30774],{},"Lijn de referentierand indien nodig horizontaal of verticaal uit.",[1453,30776,30777,30778,39],{},"Bevestig pas na controle met ",[15,30779,2695],{},[12,30781,30782],{},"Bij een DXF neemt PlanElec de schaal over uit de tekeneenheid. Vermeldt het bestand geen eenheid, dan leidt PlanElec ze af uit de afmetingen of vraagt het je één keer. De bron van de schaal blijft zichtbaar in de werkbank. Kalibreer toch manueel als een gekende maat niet klopt.",[41,30784,30786],{"id":30785},"verder-tekenen-op-de-onderlegger","Verder tekenen op de onderlegger",[12,30788,30789,30790,1628,30793,30796],{},"Stel indien nodig de dekking en uitsnede van de laag in. Teken daarna gesloten buiten- en binnenmuren met ",[15,30791,30792],{},"Polygoon",[15,30794,30795],{},"Rechthoek",". PlanElec leidt uit de gesloten muurlijnen ruimtes af; toestellen en kabelwegen gebruiken deze bewerkbare muurstructuur, niet de pixels van de onderlegger.",[12,30798,30799],{},"Controleer vóór de verdere elektrische planning:",[1450,30801,30802,30805,30808,30811],{},[1453,30803,30804],{},"Komen een of meer gekende maten overeen met de ingestelde schaal?",[1453,30806,30807],{},"Ligt het plan juist gedraaid en op de gewenste positie?",[1453,30809,30810],{},"Zijn alleen relevante lagen zichtbaar, zonder dat maatlijnen of titelblokken het werk hinderen?",[1453,30812,30813],{},"Zijn buiten- en binnenmuren als PlanElec-muren overgetekend?",[12,30815,30816,30817,39],{},"Bij meerdere verdiepingen stel je elke verdieping afzonderlijk in. Verdiepingen op elkaar uitlijnen is een aparte stap en vervangt de kalibratie van een geïmporteerde laag niet; zie ",[30,30818,14807],{"href":8598},[12,30820,30821],{},[30,30822],{"id":30823},"recognize",[41,30825,30827],{"id":30826},"het-grondplan-automatisch-laten-herkennen","Het grondplan automatisch laten herkennen",[12,30829,30830],{},"In plaats van over te tekenen kun je muren en ruimtes uit een plan laten herkennen. Het resultaat is een voorstel dat je nakijkt voordat het in de verdieping wordt overgenomen.",[49,30832,30833,30841],{},[52,30834,30835],{},[55,30836,30837,30839],{},[58,30838,2971],{},[58,30840,4311],{},[68,30842,30843,30858,30866,30874,30886,30897],{},[55,30844,30845,30848],{},[73,30846,30847],{},"Waar start ik?",[73,30849,30850,30851,30853,30854,1934,30856],{},"Op een lege verdieping met ",[15,30852,10335],{}," in het startvenster, of bij een bewaard bestand in het paneel ",[15,30855,3903],{},[15,30857,6843],{},[55,30859,30860,30863],{},[73,30861,30862],{},"Welke bestanden?",[73,30864,30865],{},"PDF, PNG, JPEG en WebP; geen DXF",[55,30867,30868,30871],{},[73,30869,30870],{},"Wat wordt herkend?",[73,30872,30873],{},"Muren, ruimtes met oppervlakte, deuren en ramen, en ondersteunde toestelsymbolen zoals stopcontacten, schakelaars en lichtpunten",[55,30875,30876,30879],{},[73,30877,30878],{},"Waar kijk ik het na?",[73,30880,1051,30881,30883,30884],{},[15,30882,10211],{},": ruimtes, openingen, toestellen, vragen en ",[15,30885,10281],{},[55,30887,30888,30891],{},[73,30889,30890],{},"Wat heb ik nodig?",[73,30892,30893,30894,30896],{},"Bewerkingsrechten in het project, een lege doelverdieping en een bevestigde schaal – zonder ",[15,30895,10567],{}," blijft de overname geblokkeerd",[55,30898,30899,30902],{},[73,30900,30901],{},"Wat wordt niet overgenomen?",[73,30903,30904],{},"Stroomkringen, het eendraadschema en symbolen die niet toe te wijzen zijn",[12,30906,30907,30908],{},"Voor de herkenning wordt de pagina naar een externe AI-aanbieder verzonden; elke run verbruikt je AI-tegoed. Vindt de herkenning geen bruikbaar grondplan, dan ligt het plan klaar als sjabloon om over te tekenen en ga je verder zoals hierboven beschreven. De volledige werkwijze met de correctie-editor staat in ",[30,30909,10196],{"href":3381},[12,30911,30912],{},[30,30913],{"id":30914},"delete",[41,30916,30918],{"id":30917},"plattegrond-verwijderen-hoe-kan-ik-een-plan-of-onderlegger-verwijderen","Plattegrond verwijderen: hoe kan ik een plan of onderlegger verwijderen?",[12,30920,30921,30922,30924],{},"Een geïmporteerde plattegrond (afbeelding, ingelezen planpagina of DXF, ook grondplan, plan of onderlegger genoemd) verwijder je in het paneel ",[15,30923,30700],{},". Jouw getekende muren, ruimtes en elektrische punten blijven behouden; alleen de referentielaag verdwijnt.",[1602,30926,30927,30941,30946],{},[1453,30928,8785,30929,8345,30931,30933,30934,30937,30938,30940],{},[15,30930,10326],{},[15,30932,30537],{}," in de gereedschapsbalk (groep ",[15,30935,30936],{},"Gebouw en verdiepingen",") het paneel ",[15,30939,30700],{}," van de huidige verdieping.",[1453,30942,30943,30944,39],{},"Kies in de kaart van de gewenste plattegrond het rode prullenbakicoon naast ",[15,30945,30585],{},[1453,30947,30948,30949,1934,30952,39],{},"Bevestig het dialoogvenster ",[15,30950,30951],{},"Afbeelding verwijderen?",[15,30953,30954],{},"Verwijderen",[12,30956,30957,30958,30960],{},"De laag wordt verwijderd en 7 dagen bewaard voor herstel of ongedaan maken. Meteen daarna haal je ze terug met ",[15,30959,6795],{}," (pijl rechtsboven of Ctrl+Z, Mac: Cmd+Z). Een aparte prullenbak met herstelknop heeft het paneel niet. Was de verwijderde plattegrond actief, dan wordt de volgende plattegrond van de verdieping actief.",[12,30962,30963,30964,30967,30968,30971],{},"Wil je de onderlegger alleen tijdelijk niet zien, verberg hem dan met het oogicoon (",[15,30965,30966],{},"Laag verbergen",") of verlaag de ",[15,30969,30970],{},"Dekking"," in plaats van hem te verwijderen.",[12,30973,30974,30976,30977,30979,30980,30982,30983,30986],{},[15,30975,30703],{}," blijven bij het verwijderen van een laag in het project; in het paneel ",[15,30978,30700],{}," is er geen verwijderknop voor. Elk geüpload plan staat bovendien in het paneel ",[15,30981,3903],{},". Daar kun je een projectstuk met ",[15,30984,30985],{},"Definitief verwijderen"," wissen; die stap is onomkeerbaar.",[49,30988,30989,30998],{},[52,30990,30991],{},[55,30992,30993,30996],{},[58,30994,30995],{},"Wat moet weg?",[58,30997,12845],{},[68,30999,31000,31010,31023,31034],{},[55,31001,31002,31005],{},[73,31003,31004],{},"Alleen de plattegrond van een verdieping",[73,31006,11169,31007,31009],{},[15,31008,30700],{}," → prullenbakicoon",[55,31011,31012,31015],{},[73,31013,31014],{},"De volledige verdieping met alle gegevens",[73,31016,31017,31018,11172,31020],{},"Verdiepingenbalk → ",[15,31019,14408],{},[15,31021,31022],{},"… verwijderen",[55,31024,31025,31028],{},[73,31026,31027],{},"Het volledige project uit de lijst",[73,31029,31030,31031],{},"Projectmenu → ",[15,31032,31033],{},"Archiveren",[55,31035,31036,31039],{},[73,31037,31038],{},"Helemaal opnieuw beginnen",[73,31040,31041],{},[30,31042,31044],{"href":31043},"\u002Fhelp\u002Faan-de-slag#start-over","Opnieuw beginnen",[41,31046,31048],{"id":31047},"wat-de-import-niet-doet","Wat de import niet doet",[12,31050,31051],{},"Een manuele import legt alleen een referentielaag onder je tekening. Ruimtes ontstaan pas uit de muren die je erop tekent of uit een nagekeken herkenningsvoorstel dat je overneemt. Import noch herkenning bepalen een elektrische installatie of leveren een officiële opmeting op. Controleer maten, muurverloop en de werkelijke uitvoering voordat je symbolen plaatst of documenten exporteert.",[12,31053,30459,31054,39],{},[30,31055,19713],{"href":9307},{"title":1467,"searchDepth":1468,"depth":1468,"links":31057},[31058,31059,31060,31061,31062,31063,31064,31065],{"id":30527,"depth":1468,"text":30528},{"id":30648,"depth":1468,"text":30649},{"id":30693,"depth":1468,"text":30694},{"id":30715,"depth":1468,"text":30716},{"id":30785,"depth":1468,"text":30786},{"id":30826,"depth":1468,"text":30827},{"id":30917,"depth":1468,"text":30918},{"id":31047,"depth":1468,"text":31048},"Gebruik een afbeelding, PDF of DXF als schaalvaste referentie, richt de laag uit en teken er het bewerkbare grondplan op – of laat muren en ruimtes door AI voorstellen.","floorplan-import-calibration","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Ffloorplan-import-calibration-nl.webp",{},5,"\u002Fhelp\u002Ffloorplan-import-calibration.nl",{"title":3378,"description":31066},"grondplan-importeren-en-kalibreren","help\u002Ffloorplan-import-calibration.nl",[31076,9805,30626,31077,13571,31078],"grondplan importeren","kalibreren","lagenwerkbank","tHTuVs61SzhJRy3h4VlU4zvpuQrgjln6KInu5aNuhk0",{"id":31081,"title":2446,"body":31082,"category":2475,"description":31212,"extension":1496,"guideId":31213,"image":31214,"locale":1497,"meta":31215,"navigation":1499,"order":31216,"path":31217,"publishedAt":30492,"readTime":4035,"seo":31218,"seoTitle":4037,"slug":31219,"stem":31220,"tags":31221,"updatedAt":31226,"__hash__":31227,"kind":2491,"href":2445,"date":30492},"help\u002Fhelp\u002Fswitch-chains-circuits-cable-routes.nl.md",{"type":9,"value":31083,"toc":31206},[31084,31097,31102,31106,31112,31115,31118,31123,31130,31134,31143,31146,31149,31154,31161,31164,31179,31182,31185,31189,31203],[12,31085,31086,31087,2725,31090,2725,31093,31096],{},"Deze drie gereedschappen beantwoorden andere vragen: ",[15,31088,31089],{},"welke schakelaar bedient welk lichtpunt?",[15,31091,31092],{},"Welke stroomkring voedt welk toestel?",[15,31094,31095],{},"Waar loopt de kabel ruimtelijk?"," Bewerk ze na elkaar zodat het plan technisch traceerbaar blijft.",[12,31098,31099],{},[30,31100],{"id":31101},"switch-chains",[41,31103,31105],{"id":31104},"schakelaars-en-lichtpunten-als-keten-verbinden","Schakelaars en lichtpunten als keten verbinden",[12,31107,31108,31109,31111],{},"Kies in het grondplan ",[15,31110,25720],{},". Dit gereedschap verbindt schakelaars en de lichtpunten die zij bedienen in een logische volgorde. Voor vrije schakelaars en lichtpunten in een ruimte kan PlanElec een voorstel maken; controleer het altijd tegen de bedoelde bediening.",[12,31113,31114],{},"Bij een manuele keten kiest u de betrokken toestellen bewust. Een geldige keten bevat minstens één schakelaar en één lichtpunt. Een toestel kan niet tegelijk in meerdere schakelketens zitten. Over verschillende verdiepingen blijft de keten projectbreed verbonden; per verdieping ziet u alleen de lokale delen en vervolgmarkeringen.",[12,31116,31117],{},"Schakelfunctie en poolaantal zijn verschillende instellingen. De toepassing kan een enkelpolige, wissel- of kruisschakeling uit de keten afleiden; het poolaantal kiest u uitdrukkelijk. Een serieschakelaar is één fysiek toestel met twee aparte kanalen: wijs elk lichtpunt bewust aan kanaal A of B toe.",[12,31119,31120],{},[30,31121],{"id":31122},"circuits",[422,31124],{":height":31125,":width":31126,"alt":31127,"caption":31128,"src":31129},"149","576","Paneel voor stroomkringtoewijzing met een geselecteerde doelstroomkring.","Het paneel past de geselecteerde toestellen samen toe; de elektrische toewijzing bepaalt nog geen echte kabelroute.","\u002Fhelp\u002Fworkflows\u002Fnl-circuit-assignment.png",[41,31131,31133],{"id":31132},"toestellen-aan-een-bestaande-stroomkring-toewijzen","Toestellen aan een bestaande stroomkring toewijzen",[12,31135,7985,31136,31139,31140,31142],{},[15,31137,31138],{},"Stroomkring toewijzen",". Selecteer in het paneel eerst de doelstroomkring of automaat en daarna de toestellen, eventueel via de verdiepingskeuze. Met ",[15,31141,30326],{}," neemt PlanElec de selectie samen over.",[12,31144,31145],{},"Nog niet gekoppelde toestellen worden daarbij als verbruikers onder de gekozen automaat aangemaakt en met hun grondsymbool verbonden. Voor een toestel dat al aan een andere automaat hangt, vraagt de toepassing eerst een uitdrukkelijke bevestiging. Annuleren wijzigt geen projectdata; u kunt de volledige bevestiging in één stap ongedaan maken.",[12,31147,31148],{},"De stroomkringtoewijzing beschrijft de elektrische verbondenheid. Zij bepaalt nog geen werkelijk traject door muren, schachten of verdiepingen.",[12,31150,31151],{},[30,31152],{"id":31153},"cable-routes",[422,31155],{":height":31156,":width":31157,"alt":31158,"caption":31159,"src":31160},"182","720","Paneel voor kabelroutes met automatisch leggen en handmatige routepunten.","De route is een planningshulp; verloop, lengte en uitvoerbaarheid moeten aan het beoogde installatietraject worden getoetst.","\u002Fhelp\u002Fworkflows\u002Fnl-cable-routing.png",[41,31162,13194],{"id":31163},"kabelroute-plannen-en-bijwerken",[12,31165,31166,31167,31170,31171,31174,31175,31178],{},"Open in het situatieschema ",[15,31168,31169],{},"Koppelen en leidingen → Kabeltracé",". Als kabels in de topologie bestaan, kunt u voor de actieve verdieping ",[15,31172,31173],{},"Alles automatisch routeren"," gebruiken of, na selectie van één kabel, ",[15,31176,31177],{},"Automatisch routeren",". De automatische route volgt zo veel mogelijk de getekende muren; toets die aan de beoogde uitvoering.",[12,31180,31181],{},"Selecteer een kabellijn om manueel te bewerken. Klik op een segment om een routepunt toe te voegen en meteen te verslepen; dubbelklik om een routepunt te verwijderen. Escape heft de selectie op of verlaat de modus. De getoonde lengte wordt gebruikt in materiaallijsten, spanningsvalberekening en exporten, dus controleer elk uitzonderlijk traject.",[12,31183,31184],{},"Voor een kabel tussen verdiepingen kiest u in het kabelroutepaneel uitdrukkelijk een bestaande trap, schacht of stijgweg. PlanElec verzint geen verticale verbinding. Ontbreekt een nodige verbinding of betrouwbare hoogte, dan blijft de route onvolledig in plaats van een schijnlengte te tonen.",[41,31186,31188],{"id":31187},"eindcontrole","Eindcontrole",[1450,31190,31191,31194,31197,31200],{},[1453,31192,31193],{},"Controleer de schakelketen op de gewenste bediening, niet alleen op nabijheid.",[1453,31195,31196],{},"Controleer stroomkring, beveiliging en topologie van elk toestel.",[1453,31198,31199],{},"Controleer kabelroute en lengte aan de geplande installatieweg.",[1453,31201,31202],{},"Behandel automatische voorstellen als bewerkbare planhulp, niet als uitvoeringsvrijgave.",[12,31204,31205],{},"Daarna kunt u verdeelkast en eendraadschema verder controleren en de ondersteunde zelfcontrole uitvoeren.",{"title":1467,"searchDepth":1468,"depth":1468,"links":31207},[31208,31209,31210,31211],{"id":31104,"depth":1468,"text":31105},{"id":31132,"depth":1468,"text":31133},{"id":31163,"depth":1468,"text":13194},{"id":31187,"depth":1468,"text":31188},"Houd lichtbediening, stroomkringtoewijzing en het fysieke kabeltraject apart en gebruik voor elke stap het juiste gereedschap.","switch-chains-circuits-cable-routes","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fswitch-chains-circuits-cable-routes-nl.webp",{},7,"\u002Fhelp\u002Fswitch-chains-circuits-cable-routes.nl",{"title":2446,"description":31212},"schakelketens-stroomkringen-en-kabelroutes","help\u002Fswitch-chains-circuits-cable-routes.nl",[31222,31223,27628,31224,31225,13573],"schakelketen","wisselschakeling","automaat","kabelroute","2026-08-30","YoYJDX7GmU5aus2ssY41fQd1GRQzhSoZAGkdi6ExF-0",{"id":31229,"title":2458,"body":31230,"category":32278,"description":32279,"extension":1496,"guideId":32280,"image":32281,"locale":1497,"meta":32282,"navigation":1499,"order":20288,"path":32283,"publishedAt":32284,"readTime":14340,"seo":32285,"seoTitle":4037,"slug":32286,"stem":32287,"tags":32288,"updatedAt":32291,"__hash__":32292,"kind":2491,"href":2457,"date":32284},"help\u002Fhelp\u002Fself-check-coverage.nl.md",{"type":9,"value":31231,"toc":32262},[31232,31235,31238,31244,31250,31257,31261,31276,31279,31282,31504,31506,31560,31564,31632,31636,31702,31706,31785,31789,31829,31833,31886,31890,32171,32173,32176,32179,32182,32185,32188,32191,32195,32198,32204,32210,32216,32222,32226,32229,32252,32256,32259],[12,31233,31234],{},"In PlanElec zitten twee verschillende dingen die makkelijk verward worden.",[12,31236,31237],{},"AREI-verwijzingen worden pas na de gedocumenteerde bron- en vakinhoudelijke vrijgave publiek gelinkt. Praktijkregels en plausibiliteitscontroles maken geen regeltekstclaim.",[12,31239,7641,31240,31243],{},[15,31241,31242],{},"automatische zelfcontrole"," dekt daarvan slechts een deel. Deze pagina zegt precies welk deel dat is. Wij vermelden de regels die getoetst worden én de gebieden waar de toepassing geen uitspraak doet, omdat een onvolledige controle die zich als volledig voordoet gevaarlijker is dan helemaal geen controle.",[31245,31246,31247],"blockquote",{},[12,31248,31249],{},"De zelfcontrole is een voorbereiding. Het officiële oordeel komt uitsluitend van een erkend controleorganisme.",[422,31251],{":height":31252,":width":31253,"alt":31254,"caption":31255,"src":31256},"485","384","Het AREI-zelfcontrolepaneel met een onvolledige bevinding en open punten.","Het rapport toont ondersteunde controles en open punten als voorbereiding; een ontbrekende projectwaarde wordt niet als geslaagd beschouwd.","\u002Fhelp\u002Fworkflows\u002Fnl-self-check.png",[41,31258,31260],{"id":31259},"wat-automatisch-getoetst-wordt","Wat automatisch getoetst wordt",[12,31262,31263,31264,31267,31268,31271,31272,31275],{},"De toepassing kent op dit moment ",[15,31265,31266],{},"59 controles",". Daarvan verwijzen er ",[15,31269,31270],{},"30"," naar een concreet AREI-artikel; de overige ",[15,31273,31274],{},"29"," zijn praktijkregels of plausibiliteitscontroles die wij als zodanig aanduiden en die geen reglementaire verplichting zijn.",[12,31277,31278],{},"Een controle levert pas een resultaat op wanneer de nodige projectgegevens ingevuld zijn. Ontbreken die, dan markeert het rapport de controle als onvolledig — nooit als geslaagd.",[1396,31280,1802],{"id":31281},"beveiliging",[49,31283,31284,31299],{},[52,31285,31286],{},[55,31287,31288,31291,31294,31296],{},[58,31289,31290],{},"Controle",[58,31292,31293],{},"Wat er getoetst wordt",[58,31295,11425],{},[58,31297,31298],{},"Ernst",[68,31300,31301,31314,31327,31340,31353,31366,31378,31391,31404,31417,31429,31441,31454,31466,31479,31492],{},[55,31302,31303,31306,31309,31312],{},[73,31304,31305],{},"Hoofddifferentieelschakelaar",[73,31307,31308],{},"Aan het hoofd van de installatie moet een differentieelschakelaar van hoogstens 300 mA aanwezig zijn.",[73,31310,31311],{},"AREI 4.2.4.3",[73,31313,2704],{},[55,31315,31316,31319,31322,31325],{},[73,31317,31318],{},"Max. stroomkringen per hooggevoelige differentieel",[73,31320,31321],{},"Hoogstens 8 eindstroomkringen per hooggevoelige differentieelschakelaar (≤ 30 mA).",[73,31323,31324],{},"AREI 4.2.4.3.b",[73,31326,2704],{},[55,31328,31329,31332,31335,31338],{},[73,31330,31331],{},"Nominale waarden van rolluikactoren",[73,31333,31334],{},"Rolluikactoren op DIN-rail vragen een automaat of differentieelautomaat stroomopwaarts; beveiligings- en motorlast blijven binnen de gecatalogiseerde ingangs- en kanaalwaarden.",[73,31336,31337],{},"Praktijkregel",[73,31339,2704],{},[55,31341,31342,31345,31348,31351],{},[73,31343,31344],{},"Beveiliging van laadpunten (EV-laden)",[73,31346,31347],{},"Een laadpunt vraagt een eigen stroomkring, een toegewijde differentieelschakelaar en buiten minstens IP44.",[73,31349,31350],{},"AREI 7.22.4",[73,31352,2704],{},[55,31354,31355,31358,31361,31363],{},[73,31356,31357],{},"Selectiviteit van differentieelschakelaars (praktijkaanbeveling)",[73,31359,31360],{},"Praktijkadvies: stem gevoeligheid en tijd af tussen boven- en ondergeschikte differentieelschakelaars (IEC 60364-5-53).",[73,31362,31337],{},[73,31364,31365],{},"Informatie",[55,31367,31368,31371,31374,31376],{},[73,31369,31370],{},"30mA-differentieel voor stopcontactkringen",[73,31372,31373],{},"Alle stopcontactkringen moeten door een differentieelschakelaar van 30 mA beschermd zijn.",[73,31375,31324],{},[73,31377,2704],{},[55,31379,31380,31383,31386,31389],{},[73,31381,31382],{},"Overspanningsbeveiliging (SPD)",[73,31384,31385],{},"Een overspanningsbeveiliging (SPD) wordt beoordeeld op aanwezigheid; het AREI legt geen algemene plicht op.",[73,31387,31388],{},"AREI 4.5.1",[73,31390,31365],{},[55,31392,31393,31396,31399,31402],{},[73,31394,31395],{},"Hoofdschakelaar min. 40 A",[73,31397,31398],{},"Een hoofdschakelaar moet aanwezig zijn en in huishoudelijke installaties minstens 40 A bedragen.",[73,31400,31401],{},"AREI 5.3.5.1.b",[73,31403,2704],{},[55,31405,31406,31409,31412,31415],{},[73,31407,31408],{},"Hoofddifferentieel min. 40 A",[73,31410,31411],{},"De differentieelschakelaar aan het voedingspunt moet minstens 40 A nominale stroom hebben.",[73,31413,31414],{},"AREI 5.3.5.3.a",[73,31416,2704],{},[55,31418,31419,31422,31425,31427],{},[73,31420,31421],{},"Verdeelbordindeling",[73,31423,31424],{},"Verdeelkast: bezetting binnen het aantal modules, een differentieelschakelaar per rij en een reserve van ongeveer 20 %.",[73,31426,31337],{},[73,31428,11482],{},[55,31430,31431,31434,31437,31439],{},[73,31432,31433],{},"Ingebouwde wandverwarming: differentieel 100 mA",[73,31435,31436],{},"In wanden ingebouwde verwarmingsweerstanden boven 25 V AC vragen een afzonderlijke differentieelschakelaar van 100 mA.",[73,31438,31324],{},[73,31440,2704],{},[55,31442,31443,31446,31449,31452],{},[73,31444,31445],{},"Poolconfiguratie van huishoudelijke installatie",[73,31447,31448],{},"Eenpolige automaten zijn in Belgische woningen met sterschakeling niet toegelaten; gebruik 1P+N.",[73,31450,31451],{},"AREI 4.4.4.2",[73,31453,11482],{},[55,31455,31456,31459,31462,31464],{},[73,31457,31458],{},"Uitschakelkarakteristiek tegenover belastingstype",[73,31460,31461],{},"Praktijkadvies: de karakteristiek B, C of D van de automaat moet passen bij het type belasting.",[73,31463,31337],{},[73,31465,11482],{},[55,31467,31468,31471,31474,31477],{},[73,31469,31470],{},"Beveiligingsorgaan en koppeling van de voedingsleiding",[73,31472,31473],{},"Een voedingsleiding naar een onderverdeling begint aan een eigen beveiligingsorgaan in het voedende bord en is eenduidig aan de onderverdeling gekoppeld.",[73,31475,31476],{},"AREI 4.4.2.2",[73,31478,2704],{},[55,31480,31481,31484,31487,31490],{},[73,31482,31483],{},"Uitschakelvermogen tegenover kortsluitstroom",[73,31485,31486],{},"Het uitschakelvermogen van elke automaat moet de verwachte kortsluitstroom aankunnen; enkel gecontroleerd bij ingevulde waarde.",[73,31488,31489],{},"AREI 5.3.5.5",[73,31491,2704],{},[55,31493,31494,31497,31500,31502],{},[73,31495,31496],{},"Overstroombeveiliging van de voedingsleiding van een onderverdeling",[73,31498,31499],{},"Wordt een onderverdeling alleen via een differentieelschakelaar gevoed, dan moet de voorgeschakelde beveiliging de voedingsleiding beveiligen volgens tabel 4.11 of via de som van de afgaande kringen; ontbrekende gegevens maken de controle onvolledig.",[73,31501,31476],{},[73,31503,2704],{},[1396,31505,21575],{"id":22648},[49,31507,31508,31520],{},[52,31509,31510],{},[55,31511,31512,31514,31516,31518],{},[58,31513,31290],{},[58,31515,31293],{},[58,31517,11425],{},[58,31519,31298],{},[68,31521,31522,31535,31548],{},[55,31523,31524,31527,31530,31533],{},[73,31525,31526],{},"Hoofdequipotentiale verbinding",[73,31528,31529],{},"Er moet een hoofdequipotentiaalverbinding (aardingsrail) aanwezig zijn.",[73,31531,31532],{},"AREI 4.2.3.2",[73,31534,2704],{},[55,31536,31537,31540,31543,31546],{},[73,31538,31539],{},"Aardingselektrode (aardingslus\u002Faardpen)",[73,31541,31542],{},"Bij een TT- of IT-net moet een aardingselektrode gedocumenteerd zijn.",[73,31544,31545],{},"AREI 4.2.3",[73,31547,2704],{},[55,31549,31550,31553,31556,31558],{},[73,31551,31552],{},"Plausibiliteit van aarding en netaansluiting",[73,31554,31555],{},"Plausibiliteitscontrole: een openbare huishoudelijke 3×230 V-aansluiting met een opgeslagen TN-stelsel vraagt nazicht.",[73,31557,31337],{},[73,31559,11482],{},[1396,31561,31563],{"id":31562},"kabels-en-dimensionering","Kabels en dimensionering",[49,31565,31566,31578],{},[52,31567,31568],{},[55,31569,31570,31572,31574,31576],{},[58,31571,31290],{},[58,31573,31293],{},[58,31575,11425],{},[58,31577,31298],{},[68,31579,31580,31593,31606,31619],{},[55,31581,31582,31585,31588,31591],{},[73,31583,31584],{},"Kabeldoorsnede",[73,31586,31587],{},"De kabeldoorsnede moet passen bij de nominale stroom van de beveiliging.",[73,31589,31590],{},"AREI 5.2.2",[73,31592,2704],{},[55,31594,31595,31598,31601,31604],{},[73,31596,31597],{},"Spanningsval (ΔU)",[73,31599,31600],{},"Spanningsval berekend uit kabellengte: richtwaarde 3 % voor verlichting en 5 % voor andere eindstroomkringen.",[73,31602,31603],{},"AREI 5.2.5",[73,31605,2704],{},[55,31607,31608,31611,31614,31617],{},[73,31609,31610],{},"CPR-brandklasse van kabels",[73,31612,31613],{},"Afzonderlijk geplaatste kabels moeten de eigenschap F1 hebben of minstens CPR-klasse Eca halen; klasse Fca is niet toegestaan.",[73,31615,31616],{},"AREI 5.2.7.2",[73,31618,2704],{},[55,31620,31621,31624,31627,31630],{},[73,31622,31623],{},"Bekabeling in holle wanden: Cca\u002FPreflex",[73,31625,31626],{},"Kabels in bouwkundige holle ruimtes lopen in een mantelbuis (Preflex) of halen minstens CPR-klasse Cca.",[73,31628,31629],{},"AREI 4.3.3.5.b",[73,31631,2704],{},[1396,31633,31635],{"id":31634},"belasting-van-stroomkringen","Belasting van stroomkringen",[49,31637,31638,31650],{},[52,31639,31640],{},[55,31641,31642,31644,31646,31648],{},[58,31643,31290],{},[58,31645,31293],{},[58,31647,11425],{},[58,31649,31298],{},[68,31651,31652,31665,31677,31690],{},[55,31653,31654,31657,31660,31663],{},[73,31655,31656],{},"Domotica: kanaalbelasting",[73,31658,31659],{},"Vergelijkt de stroom berekend uit gedocumenteerde belastingsvermogens met de ingevoerde kanaalstroom. Ontbrekend vermogen of ontbrekende belastbaarheid is een gegevenshiaat. Geen controle van inschakelstroom, arbeidsfactor of interne beveiliging. (AREI 4.4.1.1)",[73,31661,31662],{},"AREI 4.4.1.1",[73,31664,2704],{},[55,31666,31667,31670,31673,31675],{},[73,31668,31669],{},"Domotica: bekende busstroom",[73,31671,31672],{},"Vergelijkt bekende toestel- en catalogusstromen met de geplande buscapaciteit. Ontwerpwaarschuwing op basis van de profielcatalogus, geen numerieke AREI-grens; beschermingsdoel AREI 4.4.1.1.",[73,31674,31337],{},[73,31676,11482],{},[55,31678,31679,31682,31685,31688],{},[73,31680,31681],{},"Max. contactpunten per eindstroomkring",[73,31683,31684],{},"Hoogstens 8 stopcontacten en vaste toestellen per eindstroomkring; zuivere lichtpunten tellen niet mee.",[73,31686,31687],{},"AREI 5.3.5.2b",[73,31689,2704],{},[55,31691,31692,31695,31698,31700],{},[73,31693,31694],{},"Faseonbalans",[73,31696,31697],{},"Praktijkadvies: de onbalans tussen de fasen blijft best onder 30 %.",[73,31699,31337],{},[73,31701,11482],{},[1396,31703,31705],{"id":31704},"ruimtes-en-zones","Ruimtes en zones",[49,31707,31708,31720],{},[52,31709,31710],{},[55,31711,31712,31714,31716,31718],{},[58,31713,31290],{},[58,31715,31293],{},[58,31717,11425],{},[58,31719,31298],{},[68,31721,31722,31735,31747,31760,31773],{},[55,31723,31724,31727,31730,31733],{},[73,31725,31726],{},"30mA-beveiliging voor vochtige ruimten",[73,31728,31729],{},"Stopcontacten in vochtige ruimtes moeten door een differentieelschakelaar van 30 mA beschermd zijn.",[73,31731,31732],{},"AREI 7.1.4.3",[73,31734,2704],{},[55,31736,31737,31740,31743,31745],{},[73,31738,31739],{},"30mA-differentieel voor badkamerkringen",[73,31741,31742],{},"Alle stroomkringen in badkamers en vochtige ruimtes moeten door een differentieelschakelaar van 30 mA beschermd zijn.",[73,31744,31732],{},[73,31746,2704],{},[55,31748,31749,31752,31755,31758],{},[73,31750,31751],{},"Badkamerzones 0\u002F1\u002F2: toegelaten materieel",[73,31753,31754],{},"In badkamervolumes 0, 1 en 2 is enkel bepaald materieel toegelaten; verdeelkasten zijn er verboden.",[73,31756,31757],{},"AREI 7.1.5.2",[73,31759,2704],{},[55,31761,31762,31765,31768,31771],{},[73,31763,31764],{},"Zwembadvolumes 0\u002F1\u002F2: materieel in de te controleren volumes",[73,31766,31767],{},"Materieel in de zwembadvolumes 0, 1 en 2 wordt gemeld als controlepunt; de eisen van AREI 7.2.3 e.v. moeten vakkundig worden nagekeken.",[73,31769,31770],{},"AREI 7.2.2",[73,31772,31365],{},[55,31774,31775,31778,31781,31783],{},[73,31776,31777],{},"Rookmelderdekking (aanbeveling)",[73,31779,31780],{},"Niet-bindend advies op basis van de gewestelijke woningregels; het AREI zelf schrijft rookmelders voor woningen niet voor.",[73,31782,31337],{},[73,31784,11482],{},[1396,31786,31788],{"id":31787},"topologie-en-besturing","Topologie en besturing",[49,31790,31791,31803],{},[52,31792,31793],{},[55,31794,31795,31797,31799,31801],{},[58,31796,31290],{},[58,31798,31293],{},[58,31800,11425],{},[58,31802,31298],{},[68,31804,31805,31817],{},[55,31806,31807,31810,31813,31815],{},[73,31808,31809],{},"Stuurwegen van elektrische rolluiken",[73,31811,31812],{},"Plausibiliteitscontrole: directe schakelaars, actoringangen, centrale bedieningen en aandrijvingstypes vormen samen een samenhangend besturingstraject.",[73,31814,31337],{},[73,31816,2704],{},[55,31818,31819,31822,31825,31827],{},[73,31820,31821],{},"Projectintegriteit",[73,31823,31824],{},"Verwijzingen tussen schema, situatieplan en verdeelkast moeten naar bestaande objecten wijzen.",[73,31826,31337],{},[73,31828,2704],{},[1396,31830,31832],{"id":31831},"fotovoltaïsche-installatie","Fotovoltaïsche installatie",[49,31834,31835,31847],{},[52,31836,31837],{},[55,31838,31839,31841,31843,31845],{},[58,31840,31290],{},[58,31842,31293],{},[58,31844,11425],{},[58,31846,31298],{},[68,31848,31849,31862,31874],{},[55,31850,31851,31854,31857,31860],{},[73,31852,31853],{},"Conformiteit van PV-installatie",[73,31855,31856],{},"PV-installatie: anti-eilandbedrijf, aarding van de modulekaders, waarschuwingsborden en kenmerking van DC- en AC-geleiders.",[73,31858,31859],{},"AREI 7.112.2",[73,31861,2704],{},[55,31863,31864,31867,31870,31872],{},[73,31865,31866],{},"PV-stringdimensionering",[73,31868,31869],{},"Controleert strings aan de hand van de gedocumenteerde fabrieksgrenzen van de omvormer en de modules.",[73,31871,31337],{},[73,31873,2704],{},[55,31875,31876,31879,31882,31884],{},[73,31877,31878],{},"Somstroom in verdeelborden met meerdere voedingsbronnen",[73,31880,31881],{},"Bij een verdeelkast met eigen opwekking worden net- en bronstroom per fase opgeteld op gemeenschappelijk belaste secties.",[73,31883,31337],{},[73,31885,2704],{},[1396,31887,31889],{"id":31888},"volledigheid-van-het-dossier","Volledigheid van het dossier",[49,31891,31892,31904],{},[52,31893,31894],{},[55,31895,31896,31898,31900,31902],{},[58,31897,31290],{},[58,31899,31293],{},[58,31901,11425],{},[58,31903,31298],{},[68,31905,31906,31919,31931,31942,31953,31964,31976,31988,32000,32012,32024,32035,32048,32060,32072,32084,32097,32110,32122,32135,32147,32159],{},[55,31907,31908,31911,31914,31917],{},[73,31909,31910],{},"Domotica: bedienpunten op het schema",[73,31912,31913],{},"Controleert bij huishoudelijke installaties of bestaande bedienpunten voorkomen in de werkelijke schema-invoer. Ontbrekende toewijzingen kunnen in de kanaalmatrix of via het voedingspad van de module worden aangevuld. Geen volledige symbool- of ZLS-controle. (AREI 3.1.2.1.a)",[73,31915,31916],{},"AREI 3.1.2.1",[73,31918,2704],{},[55,31920,31921,31924,31927,31929],{},[73,31922,31923],{},"Beveiliging van de domoticavoeding",[73,31925,31926],{},"Ontwerpcontrole: voedingsbeveiliging, busvoeding en unieke, volledige kanaaltoewijzingen moeten gedocumenteerd zijn. Een bevinding blokkeert de definitieve export; dit is geen bijkomende AREI-verplichting.",[73,31928,31337],{},[73,31930,2704],{},[55,31932,31933,31936,31938,31940],{},[73,31934,31935],{},"Unieke lasttoewijzing",[73,31937,31926],{},[73,31939,31337],{},[73,31941,2704],{},[55,31943,31944,31947,31949,31951],{},[73,31945,31946],{},"Busvoeding",[73,31948,31926],{},[73,31950,31337],{},[73,31952,2704],{},[55,31954,31955,31958,31960,31962],{},[73,31956,31957],{},"Actuatorconfiguratie",[73,31959,31926],{},[73,31961,31337],{},[73,31963,2704],{},[55,31965,31966,31969,31972,31974],{},[73,31967,31968],{},"Toestellen per lijn",[73,31970,31971],{},"Ontwerpwaarschuwing op basis van de profielcatalogus: Toestellen per lijn. Grenzen en toewijzingen komen uit de profielcatalogus, niet uit het AREI.",[73,31973,31337],{},[73,31975,11482],{},[55,31977,31978,31981,31984,31986],{},[73,31979,31980],{},"Lijnen per systeem",[73,31982,31983],{},"Ontwerpwaarschuwing op basis van de profielcatalogus: Lijnen per systeem. Grenzen en toewijzingen komen uit de profielcatalogus, niet uit het AREI.",[73,31985,31337],{},[73,31987,11482],{},[55,31989,31990,31993,31996,31998],{},[73,31991,31992],{},"Kanaalbelasting volgens profiel",[73,31994,31995],{},"Ontwerpwaarschuwing op basis van de profielcatalogus: Kanaalbelasting volgens profiel. Grenzen en toewijzingen komen uit de profielcatalogus, niet uit het AREI.",[73,31997,31337],{},[73,31999,11482],{},[55,32001,32002,32005,32008,32010],{},[73,32003,32004],{},"Kanaaltype en belasting",[73,32006,32007],{},"Ontwerpwaarschuwing op basis van de profielcatalogus: Kanaaltype en belasting. Grenzen en toewijzingen komen uit de profielcatalogus, niet uit het AREI.",[73,32009,31337],{},[73,32011,11482],{},[55,32013,32014,32017,32020,32022],{},[73,32015,32016],{},"Lijntoewijzing",[73,32018,32019],{},"Ontwerpwaarschuwing op basis van de profielcatalogus: Lijntoewijzing. Grenzen en toewijzingen komen uit de profielcatalogus, niet uit het AREI.",[73,32021,31337],{},[73,32023,11482],{},[55,32025,32026,32028,32031,32033],{},[73,32027,875],{},[73,32029,32030],{},"Ontwerpwaarschuwing op basis van de profielcatalogus: Lijnkoppelaar. Grenzen en toewijzingen komen uit de profielcatalogus, niet uit het AREI.",[73,32032,31337],{},[73,32034,11482],{},[55,32036,32037,32040,32043,32046],{},[73,32038,32039],{},"Spanningsklassen per buslijn",[73,32041,32042],{},"Controleert SELV samen met FELV of LV op dezelfde buslijn (AREI 4.2.5.5.c). Waarschuwt voor een logische tegenstrijdigheid; bewijst geen fysieke verbindingen of bronkwaliteit.",[73,32044,32045],{},"AREI 4.2.5.5.c",[73,32047,11482],{},[55,32049,32050,32053,32056,32058],{},[73,32051,32052],{},"KNX-adresconflicten",[73,32054,32055],{},"Controleert dat fysieke adressen en groepsadressen uniek en geldig zijn. Planningscontrole van de KNX-adresruimte, geen AREI-vereiste.",[73,32057,31337],{},[73,32059,11482],{},[55,32061,32062,32065,32068,32070],{},[73,32063,32064],{},"Ontbrekende KNX-adressen",[73,32066,32067],{},"Wijst na de start van de adressering op KNX-toestellen zonder fysiek adres en kanalen zonder groepsadres. Ter info, geen exportblokkade.",[73,32069,31337],{},[73,32071,31365],{},[55,32073,32074,32077,32080,32082],{},[73,32075,32076],{},"Volledige verbindingen",[73,32078,32079],{},"Elk element in het schema moet aangesloten zijn; losse knooppunten wijzen op een onvolledig model.",[73,32081,31337],{},[73,32083,11482],{},[55,32085,32086,32089,32092,32095],{},[73,32087,32088],{},"Min. aantal verlichtingskringen",[73,32090,32091],{},"Praktijkadvies: minstens twee verlichtingsstroomkringen per wooneenheid.",[73,32093,32094],{},"AREI 5.3.5.2.b",[73,32096,2704],{},[55,32098,32099,32102,32105,32108],{},[73,32100,32101],{},"Afzonderlijke stroomkringen voor grootverbruikers",[73,32103,32104],{},"Grote toestellen zoals wasmachine, droogkast, vaatwasser, kookplaat en oven vragen elk een eigen stroomkring.",[73,32106,32107],{},"AREI 5.2.1.2",[73,32109,2704],{},[55,32111,32112,32115,32118,32120],{},[73,32113,32114],{},"Installatiedossier (AREI 9.1.2)",[73,32116,32117],{},"Het installatiedossier vraagt een eendraadschema, een situatieplan en een volledige cartouche; PV vraagt bijkomende documenten.",[73,32119,31337],{},[73,32121,11482],{},[55,32123,32124,32127,32130,32133],{},[73,32125,32126],{},"Plaatsing van verbindings-\u002Faftakdozen",[73,32128,32129],{},"Structurele aftakdozen moeten precies één keer en consistent in het schema voorkomen.",[73,32131,32132],{},"AREI 3.1.2.3",[73,32134,11482],{},[55,32136,32137,32140,32143,32145],{},[73,32138,32139],{},"Verbruikers geplaatst op het situatieplan",[73,32141,32142],{},"Verbruikers uit het eendraadschema moeten via hun koppeling op het situatieplan geplaatst zijn.",[73,32144,31337],{},[73,32146,11482],{},[55,32148,32149,32152,32155,32157],{},[73,32150,32151],{},"Niet-gekoppelde elektrische grondplansymbolen",[73,32153,32154],{},"Toestellen op het grondplan zonder koppeling aan de elektrische topologie worden als informatie gemeld.",[73,32156,31337],{},[73,32158,31365],{},[55,32160,32161,32164,32167,32169],{},[73,32162,32163],{},"Plausibiliteit van schakelgroepen",[73,32165,32166],{},"Plausibiliteitscontrole: een schakelgroep bevat minstens één schakelaar en minstens één geschakelde belasting.",[73,32168,31337],{},[73,32170,11482],{},[41,32172,444],{"id":18467},[12,32174,32175],{},"Dit onderdeel bevat AREI-controles, verplichte ontwerpcontroles en profielwaarschuwingen. Het bevestigt niet de volledige zeerlaagspanningsinstallatie, fabrikantconformiteit of fysieke busaanleg. Het brontype van de busvoeding kan niet in het model worden vastgelegd (AREI 4.2.5.3.a).",[12,32177,32178],{},"Niet automatisch gecontroleerde onderdelen (geen geslaagde controles):",[12,32180,32181],{},"Uitgeschakeld: niet elk intern ZLS-onderdeel kan worden vastgelegd en op het schema worden weergegeven. De beweerde algemene wijziging van juni 2023 is hier niet aangetoond. Alleen de gedocumenteerde controle van bedienpunten is actief.",[12,32183,32184],{},"Uitgeschakeld: geen bewijs voor een algemene verplichting tot een afzonderlijke busstroombaan met 30 mA; type A is een algemene eis voor differentieelbeveiliging.",[12,32186,32187],{},"Uitgeschakeld: naburige kabels, afstand en isolatiebewijs kunnen niet worden vastgelegd. Het reglement staat meerdere scheidingsmaatregelen toe.",[12,32189,32190],{},"Geen automatische symboolcontrole: tabel 2.23 J schrijft het symbool voor de sturingseenheid voor (AREI 3.1.2.1.a). De gebruiker kan ontbrekende catalogus- of rendergeometrie niet herstellen.",[41,32192,32194],{"id":32193},"wat-de-zelfcontrole-niet-beoordeelt","Wat de zelfcontrole niet beoordeelt",[12,32196,32197],{},"Deze onderdelen van Boek 1 blijven bewust buiten de automatische toetsing:",[12,32199,32200,32203],{},[15,32201,32202],{},"Bijzondere installaties en ruimtes (Deel 7)."," Van de veertien hoofdstukken raakt PlanElec er drie, en die telkens gedeeltelijk: ruimtes met bad of douche (7.1), voeding van elektrische wegvoertuigen (7.22) en huishoudelijke fotovoltaïsche installaties (7.112). Niet gedekt zijn zwembaden (7.2), sauna's (7.3), werf- en buiteninstallaties (7.4), enge geleidende ruimtes (7.6), campings (7.8), jachthavens (7.9), foorinstallaties (7.11), fonteinen (7.100), stationerende voertuigen (7.101), explosieve atmosferen (7.102) en industriële accumulatorbatterijen (7.103).",[12,32205,32206,32209],{},[15,32207,32208],{},"De gelijkstroomzijde."," Het model kent geen afzonderlijke rollen voor de geleiders L+, L-, M, PEM en PEL. Daardoor zijn geleiderkeuze, kleurstelling, gecombineerde beschermingsgeleiders, DC-differentieelgevoeligheid, de bescherming van de M-geleider en permanente isolatiebewaking bij een IT-stelsel niet toetsbaar. Voor PV blijft dat handwerk.",[12,32211,32212,32215],{},[15,32213,32214],{},"De overgangsbepalingen van artikel 59 en 69."," Of een uitzondering voor een bestaande installatie geldt, hangt af van gegevens die niet uit een eendraadschema af te leiden zijn — onder meer de PEN-doorsnede, het werkelijke begin van de uitvoering ter plaatse en de aanwezigheid van een bewakingstoestel. PlanElec houdt wel rekening met de versoepelingen van Deel 8 door bepaalde bevindingen bij bestaande delen als aanwijzing te tonen in plaats van als fout, maar beslist de uitzondering niet zelf.",[12,32217,32218,32221],{},[15,32219,32220],{},"Controles van installaties (Deel 6) en de gedragsvoorschriften (Deel 9)"," vallen buiten het bereik van een planningsinstrument. Enkel de samenstelling van het installatiedossier wordt getoetst.",[41,32223,32225],{"id":32224},"wat-software-principieel-niet-kan-vaststellen","Wat software principieel niet kan vaststellen",[12,32227,32228],{},"Ook na verdere uitbreiding van het model blijven deze punten afhankelijk van meting, inzage of visuele controle ter plaatse:",[1450,32230,32231,32234,32237,32240,32243,32246,32249],{},[1453,32232,32233],{},"de werkelijke bedrading, de doorverbinding en de polariteit van de geleiders;",[1453,32235,32236],{},"de uitschakelkarakteristieken en de DC-geschiktheid van de effectief geplaatste toestellen;",[1453,32238,32239],{},"de isolatiemeting en de werking van een permanent isolatiebewakingstoestel;",[1453,32241,32242],{},"de mechanische en chemische weerstand en de corrosietoestand van de aarding;",[1453,32244,32245],{},"de doeltreffendheid van de automatische uitschakeling en de reële aardingsimpedantie;",[1453,32247,32248],{},"de geschiktheid en de certificering van omvormers, batterijen en PV-componenten;",[1453,32250,32251],{},"de zone-indeling, de risicobeoordeling en de omstandigheden ter plaatse.",[41,32253,32255],{"id":32254},"wat-dit-betekent-voor-uw-keuring","Wat dit betekent voor uw keuring",[12,32257,32258],{},"Gebruik de zelfcontrole om vermijdbare fouten vroeg te vinden: een ontbrekende differentieelschakelaar, een doorsnede die niet bij de beveiliging past, te veel contactpunten op één kring, een onvolledig dossier. Dat zijn precies de bevindingen die anders pas bij de keuring boven water komen.",[12,32260,32261],{},"Reken er niet op voor de gevallen hierboven. Daar blijven uw vakkennis en het oordeel van het controleorganisme doorslaggevend.",{"title":1467,"searchDepth":1468,"depth":1468,"links":32263},[32264,32274,32275,32276,32277],{"id":31259,"depth":1468,"text":31260,"children":32265},[32266,32267,32268,32269,32270,32271,32272,32273],{"id":31281,"depth":1486,"text":1802},{"id":22648,"depth":1486,"text":21575},{"id":31562,"depth":1486,"text":31563},{"id":31634,"depth":1486,"text":31635},{"id":31704,"depth":1486,"text":31705},{"id":31787,"depth":1486,"text":31788},{"id":31831,"depth":1486,"text":31832},{"id":31888,"depth":1486,"text":31889},{"id":18467,"depth":1468,"text":444},{"id":32193,"depth":1468,"text":32194},{"id":32224,"depth":1468,"text":32225},{"id":32254,"depth":1468,"text":32255},"compliance","De volledige lijst van de regels die PlanElec automatisch toetst — en een even expliciete lijst van wat de zelfcontrole niet beoordeelt.","self-check-coverage","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fself-check-coverage.webp",{},"\u002Fhelp\u002Fself-check-coverage.nl","2026-08-17",{"title":2458,"description":32279},"wat-controleert-de-zelfcontrole","help\u002Fself-check-coverage.nl",[3275,3276,13572,17499,32289,32290],"dekking","validatie","2026-10-14","Wh2R171olqX6QzjGbiRyL7ZZe8ljqEhTcG2vGNnHJuQ",{"id":32294,"title":15341,"articleId":32295,"body":32296,"category":1493,"date":32895,"description":32896,"extension":1496,"image":32308,"lastUpdated":15381,"locale":1497,"meta":32897,"navigation":1499,"ogImage":32898,"path":32899,"publishDate":32895,"readTime":3262,"refreshInterval":11097,"seo":32900,"seoTitle":4037,"slug":32901,"stem":32902,"tags":32903,"__hash__":32907,"kind":1515,"href":15202},"blog\u002Fblog\u002Fvoltage-drop-cable-sizing.nl.md","voltage-drop-cable-sizing",{"type":9,"value":32297,"toc":32869},[32298,32304,32309,32313,32316,32319,32323,32333,32339,32343,32352,32372,32384,32391,32395,32398,32543,32546,32550,32553,32632,32635,32642,32646,32650,32653,32658,32668,32672,32675,32680,32688,32692,32699,32706,32710,32713,32717,32749,32751,32755,32758,32762,32765,32769,32772,32776,32783,32787,32790,32793,32796,32799,32803,32806,32810,32813,32817,32824,32828,32863],[12,32299,32300,32303],{},[15,32301,32302],{},"Hoe lang je kabel mag zijn, bepaalt de spanningsval: een koperkabel van 2,5 mm² met 16 A op 230 V bereikt de gebruikelijke 5% na ongeveer 54 m, een verlichtingskring in 1,5 mm² met 10 A de 3% voor verlichting al na ongeveer 31 m."," Daarboven heb je een grotere doorsnede, een kortere route of een onderverdeler dichter bij de belasting nodig. De automaat beantwoordt die vraag niet: hij beschermt de leiding tegen overbelasting, maar zegt niets over de spanning die aan het toestel aankomt. Controleer dus altijd allebei: past de leiding bij de beveiliging, en blijft de spanningsval binnen de streefwaarde? De strengste van de twee eisen bepaalt de doorsnede.",[12,32305,32306],{},[22,32307],{"alt":20685,"src":32308},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-voltage-drop-cable-sizing-editorial.webp",[41,32310,32312],{"id":32311},"wanneer-speelt-spanningsval-een-rol","Wanneer speelt spanningsval een rol?",[12,32314,32315],{},"Typische gevallen zijn lange leidingen naar garage, tuinhuis of bijgebouw, buitenverlichting, voedingen van onderverdelers, warmtepompen en laadpunten. Naast de afstand tellen stroom, een- of driefasig systeem, geleidermateriaal, doorsnede, nominale spanning en arbeidsfactor mee.",[12,32317,32318],{},"Reken altijd het volledige elektrische pad vanaf de verdeler. Bestaat het uit meerdere leidingdelen, bijvoorbeeld de voeding van een onderverdeler plus de eindkring, dan tellen de spanningsvallen op. Wie alleen het laatste stuk naar het toestel rekent, onderschat het resultaat.",[41,32320,32322],{"id":32321},"wat-het-arei-voorschrijft","Wat het AREI voorschrijft",[12,32324,32325,32326,933,32329,32332],{},"Afdeling 5.2.5 van AREI Boek 1 („Spanningsval”) bepaalt dat de spanningsval beperkt moet blijven tot de waarden die in de regels van goed vakmanschap beschreven zijn. Een vast percentage staat er niet in. De gangbare ",[15,32327,32328],{},"3% voor verlichting",[15,32330,32331],{},"5% voor andere eindkringen"," komen uit de normenreeks IEC\u002FNBN HD 60364-5-52 en zijn de gebruikelijke invulling van die regels van goed vakmanschap.",[12,32334,32335,32336,39],{},"Onderafdeling 5.2.1.2 b vraagt daarnaast dat de spanningsval onder normale bedrijfsvoorwaarden verenigbaar is met de bedrijfszekere werking van de gevoede toestellen. De tweede controle, doorsnede tegenover beveiliging, regelt Tabel 4.11 in onderafdeling 4.4.1.4 voor huishoudelijke installaties. Ze begrenst de beveiliging per geleiderdoorsnede, maar bewijst niet de stroombelastbaarheid bij elke plaatsingswijze. De volledige tabel met de kolommen voor smeltzekering en automaat vind je in ",[30,32337,32338],{"href":26440},"welke kabeldoorsnede bij welke automaat hoort",[41,32340,32342],{"id":32341},"de-formule","De formule",[12,32344,32345,32347,32348,32351],{},[1300,32346,15117],{}," is de ",[15,32349,32350],{},"enkele leidinglengte",", niet heen en terug samen:",[1450,32353,32354,32360,32366],{},[1453,32355,32356,32357],{},"eenfasig: ",[1300,32358,32359],{},"ΔU = 2 × ρ × L × I × cos φ \u002F S",[1453,32361,32362,32363],{},"driefasig: ",[1300,32364,32365],{},"ΔU = √3 × ρ × L × I × cos φ \u002F S",[1453,32367,32368,32369],{},"percentage: ",[1300,32370,32371],{},"ΔU% = ΔU \u002F Un × 100",[12,32373,32374,32376,32377,32379,32380,32383],{},[1300,32375,15113],{}," is de soortelijke weerstand, ",[1300,32378,22878],{}," de stroom en ",[1300,32381,32382],{},"S"," de doorsnede in mm². PlanElec rekent met 0,0175 Ω·mm²\u002Fm voor koper en 0,029 Ω·mm²\u002Fm voor aluminium, standaard met cos φ 0,95 en met de nominale spanning van de kring: 230 V voor eenfasige eindkringen, voor driefasige kringen de spanning tussen de fasegeleiders (230 V of 400 V). Het weerstandsmodel houdt geen rekening met reactantie of temperatuurcorrectie en is daarmee een degelijke voorstudie voor woningen en kleine bedrijfsinstallaties.",[12,32385,32386,32387,32390],{},"Herschreven naar de lengte krijg je de grootste toegelaten enkele lengte voor een gekozen grenswaarde: ",[1300,32388,32389],{},"L_max = ΔU_max × S \u002F (2 × ρ × I × cos φ)"," voor eenfasige kringen.",[41,32392,32394],{"id":32393},"maximale-kabellengte-per-doorsnede","Maximale kabellengte per doorsnede",[12,32396,32397],{},"De tabel rekent met koper, cos φ 0,95 en de volle nominale stroom van de automaat als belasting. Is de werkelijke belasting lager, dan mag de leiding navenant langer zijn.",[49,32399,32400,32417],{},[52,32401,32402],{},[55,32403,32404,32406,32409,32411,32414],{},[58,32405,12945],{},[58,32407,32408],{},"Doorsnede",[58,32410,14878],{},[58,32412,32413],{},"Grenswaarde",[58,32415,32416],{},"Max. enkele lengte",[68,32418,32419,32434,32447,32460,32475,32488,32502,32516,32530],{},[55,32420,32421,32424,32426,32428,32431],{},[73,32422,32423],{},"Verlichting, 230 V",[73,32425,15135],{},[73,32427,22921],{},[73,32429,32430],{},"3%",[73,32432,32433],{},"ca. 31 m",[55,32435,32436,32438,32440,32442,32444],{},[73,32437,32423],{},[73,32439,15135],{},[73,32441,22924],{},[73,32443,32430],{},[73,32445,32446],{},"ca. 19 m",[55,32448,32449,32451,32453,32455,32457],{},[73,32450,32423],{},[73,32452,15138],{},[73,32454,22924],{},[73,32456,32430],{},[73,32458,32459],{},"ca. 32 m",[55,32461,32462,32465,32467,32469,32472],{},[73,32463,32464],{},"Stopcontacten\u002Ftoestellen, 230 V",[73,32466,15138],{},[73,32468,22924],{},[73,32470,32471],{},"5%",[73,32473,32474],{},"ca. 54 m",[55,32476,32477,32479,32481,32483,32485],{},[73,32478,32464],{},[73,32480,15138],{},[73,32482,22933],{},[73,32484,32471],{},[73,32486,32487],{},"ca. 43 m",[55,32489,32490,32493,32495,32497,32499],{},[73,32491,32492],{},"Toestelkring, 230 V",[73,32494,22938],{},[73,32496,22943],{},[73,32498,32471],{},[73,32500,32501],{},"ca. 55 m",[55,32503,32504,32507,32509,32511,32513],{},[73,32505,32506],{},"Kookplaat\u002Flaadpunt, 230 V",[73,32508,22948],{},[73,32510,22951],{},[73,32512,32471],{},[73,32514,32515],{},"ca. 65 m",[55,32517,32518,32521,32523,32525,32527],{},[73,32519,32520],{},"Driefasig 3N~400\u002F230 V",[73,32522,15138],{},[73,32524,22924],{},[73,32526,32471],{},[73,32528,32529],{},"ca. 108 m",[55,32531,32532,32534,32536,32538,32540],{},[73,32533,32520],{},[73,32535,22948],{},[73,32537,22951],{},[73,32539,32471],{},[73,32541,32542],{},"ca. 130 m",[12,32544,32545],{},"De waarden gelden voor één leidingdeel vanaf de verdeler. Hangt de eindkring aan een onderverdeler, trek dan eerst de spanningsval van de voeding af.",[41,32547,32549],{"id":32548},"welke-spanning-geldt-voor-jouw-stroomkring","Welke spanning geldt voor jouw stroomkring?",[12,32551,32552],{},"De meest gemaakte denkfout bij spanningsval is het verwarren van netvorm en stroomkring. De 400 V van een driefasige aansluiting staat alleen tussen twee fasegeleiders. Een gewone stopcontact- of verlichtingskring hangt ook in zo'n woning tussen fasegeleider en nulgeleider en ziet 230 V.",[49,32554,32555,32570],{},[52,32556,32557],{},[55,32558,32559,32562,32564,32567],{},[58,32560,32561],{},"Net op de aansluiting",[58,32563,12945],{},[58,32565,32566],{},"Nominale spanning",[58,32568,32569],{},"Factor",[68,32571,32572,32585,32597,32609,32621],{},[55,32573,32574,32577,32580,32583],{},[73,32575,32576],{},"1×230 V",[73,32578,32579],{},"eenfasig",[73,32581,32582],{},"230 V",[73,32584,326],{},[55,32586,32587,32590,32593,32595],{},[73,32588,32589],{},"3×230 V zonder N",[73,32591,32592],{},"eenfasig, L–L",[73,32594,32582],{},[73,32596,326],{},[55,32598,32599,32601,32604,32606],{},[73,32600,32589],{},[73,32602,32603],{},"driefasig",[73,32605,32582],{},[73,32607,32608],{},"√3",[55,32610,32611,32614,32617,32619],{},[73,32612,32613],{},"3N~400\u002F230 V",[73,32615,32616],{},"eenfasig, L–N",[73,32618,32582],{},[73,32620,326],{},[55,32622,32623,32625,32627,32630],{},[73,32624,32613],{},[73,32626,32603],{},[73,32628,32629],{},"400 V",[73,32631,32608],{},[12,32633,32634],{},"Omdat factor en referentiespanning samen veranderen, is het verschil groot: dezelfde 16 A over 30 m met 2,5 mm² geeft eenfasig 2,78%, als driefasige kring op 400 V daarentegen 1,38%. Wie een eenfasige kring per ongeluk driefasig berekent, krijgt een ongeveer twee keer zo gunstig resultaat en kiest de doorsnede te klein.",[12,32636,32637,32638,39],{},"In een net zonder nulgeleider ligt een eenfasige kring tussen twee fasegeleiders. Ook daar is het 230 V, en omdat beide geleiders de volle stroom voeren, blijft factor 2 gelden. Welke netvorm jij hebt, lees je in ",[30,32639,32641],{"href":32640},"\u002Fblog\u002Feenfasig-driefasig-belgie","Eenfasig of driefasig in België",[41,32643,32645],{"id":32644},"twee-uitgewerkte-voorbeelden","Twee uitgewerkte voorbeelden",[1396,32647,32649],{"id":32648},"verlichting-in-een-tuinhuis","Verlichting in een tuinhuis",[12,32651,32652],{},"Een koperen leiding van 45 m voedt op 230 V een zuivere verlichtingsbelasting van 8 A. Met 1,5 mm² en cos φ 0,95 volgt:",[12,32654,32655],{},[1300,32656,32657],{},"ΔU = 2 × 0,0175 × 45 × 8 × 0,95 \u002F 1,5 = 7,98 V",[12,32659,23446,32660,32663,32664,32667],{},[15,32661,32662],{},"3,47%"," en dus meer dan de 3% voor verlichting. Met 2,5 mm² daalt het verlies tot ",[15,32665,32666],{},"4,79 V of 2,08%",". Voor dit criterium is 2,5 mm² de eerste passende standaarddoorsnede.",[1396,32669,32671],{"id":32670},"stopcontactkring-in-een-garage","Stopcontactkring in een garage",[12,32673,32674],{},"Een koperen leiding van 30 m voert op 230 V 16 A. Met 2,5 mm² is de spanningsval:",[12,32676,32677],{},[1300,32678,32679],{},"ΔU = 2 × 0,0175 × 30 × 16 × 0,95 \u002F 2,5 = 6,38 V",[12,32681,23446,32682,32685,32686,39],{},[15,32683,32684],{},"2,78%",". Voor een andere eindkring geldt 5%, dus 2,5 mm² haalt het criterium spanningsval. Of de leiding bij haar werkelijke plaatsingswijze voldoende belastbaar is, controleer je apart; dat leggen we uit in ",[30,32687,22256],{"href":25275},[41,32689,32691],{"id":32690},"gratis-online-berekenen","Gratis online berekenen",[12,32693,15594,32694,32698],{},[30,32695,32697],{"href":32696},"\u002Ftools\u002Fkabeldoorsnede-berekenen","spanningsval- en kabeldoorsnedetool"," controleer je een gekozen doorsnede of zoek je een voorlopige maat, gratis en zonder registratie. De tool dekt de drie Belgische netvormen (1×230 V, 3×230 V en 3N~400\u002F230 V), onderscheidt een- en driefasige kringen en neemt de belasting in A, W, kW of kVA voor koper en aluminium. Het resultaat vergelijkt de standaarddoorsneden en toont spanningsval en beveiliging apart.",[12,32700,32701,32702,32705],{},"De berekening loopt rechtstreeks in de browser, schuifregelaar en resultaat reageren zonder vertraging; dezelfde rekenkern is ook als PlanElec-API beschikbaar. De tool is gebouwd voor de ",[15,32703,32704],{},"voorstudie",". Plaatsingswijze, groepering, omgevingstemperatuur, isolatietype, reactantie, kortsluitvastheid, uitschakelvoorwaarden, klemmen en fabrikantgegevens horen bij de verdere vakkundige dimensionering.",[41,32707,32709],{"id":32708},"wat-doe-je-bij-te-veel-spanningsval","Wat doe je bij te veel spanningsval?",[12,32711,32712],{},"De meest directe hefboom is een grotere doorsnede. Vaak is een kortere route of een onderverdeler dicht bij de belasting de betere oplossing. Aluminium loont bij lange voedingsleidingen, maar vraagt passende aansluittechniek en een eigen dimensionering. Bij een laadpunt of warmtepomp verlaagt een driefasige voeding bij hetzelfde totale vermogen de stroom per fase sterk. Lastmanagement houdt bovendien aansluiting en beveiliging binnen het toegelaten bereik.",[41,32714,32716],{"id":32715},"veelgemaakte-fouten","Veelgemaakte fouten",[1450,32718,32719,32725,32731,32737,32743],{},[1453,32720,32721,32724],{},[15,32722,32723],{},"Altijd met 3% rekenen."," 3% geldt voor verlichting, 5% voor andere eindkringen.",[1453,32726,32727,32730],{},[15,32728,32729],{},"Alleen de automatentabel bekijken."," Lengte en werkelijke belasting staan daar niet in.",[1453,32732,32733,32736],{},[15,32734,32735],{},"Heen en terug invoeren."," Gevraagd is de enkele afstand; de factor 2 zit al in de eenfasige formule.",[1453,32738,32739,32742],{},[15,32740,32741],{},"Voorliggende delen vergeten."," De spanningsvallen van alle deeltrajecten tellen op.",[1453,32744,32745,32748],{},[15,32746,32747],{},"Spanningsval voor de hele dimensionering houden."," Plaatsingswijze en kortsluitgedrag zijn aparte controles.",[41,32750,1394],{"id":1393},[1396,32752,32754],{"id":32753},"voer-ik-de-kabellengte-enkel-of-dubbel-in","Voer ik de kabellengte enkel of dubbel in?",[12,32756,32757],{},"Enkel: de afstand van de verdeler tot de verbruiker. Bij eenfasige wisselstroom verrekent de factor 2 de teruggeleider, driefasig reken je met √3.",[1396,32759,32761],{"id":32760},"mag-een-verlichtingskring-in-15-mm","Mag een verlichtingskring in 1,5 mm²?",[12,32763,32764],{},"Ja. Tabel 5.1 bij onderafdeling 5.2.1.2 laat 1,5 mm² toe voor kringen zonder stopcontacten, volgens Tabel 4.11 beveiligd met hoogstens een automaat van 16 A of een smeltzekering van 10 A. Een lange leiding kan door de spanningsval toch 2,5 mm² of meer vragen.",[1396,32766,32768],{"id":32767},"is-een-grotere-doorsnede-altijd-beter","Is een grotere doorsnede altijd beter?",[12,32770,32771],{},"Ze verlaagt het verlies, maar kost meer, neemt plaats in en moet in de klemmen passen. Kies de eerste maat die alle relevante controles doorstaat.",[1396,32773,32775],{"id":32774},"wat-heeft-de-keuring-nog-nodig","Wat heeft de keuring nog nodig?",[12,32777,32778,32779,32782],{},"De tool levert een navolgbare spanningsvalberekening. Het ",[30,32780,32781],{"href":17361},"elektrisch dossier voor de keuring"," bevat daarnaast het eendraadschema, het situatieplan en de metingen ter plaatse; de beoordeling doet het erkend organisme.",[41,32784,32786],{"id":32785},"van-voorberekening-naar-controleerbare-ontwerpnota","Van voorberekening naar controleerbare ontwerpnota",[12,32788,32789],{},"Een goed rekenblad bewaart meer dan het eindpercentage. Noteer verdeler en kring, elk kabelsegment, de enkele trajectlengte, geleidermateriaal, faseaansluiting, nominale spanning, ontwerpstroom en de bron van die stroom: typeplaatje, fabrikantstudie of uitdrukkelijk gekozen scenario. Ook een aangenomen arbeidsfactor blijft zichtbaar als aanname gemarkeerd.",[12,32791,32792],{},"Leg daarna het aanvaardingscriterium met bron vast. Omdat afdeling 5.2.5 naar de regels van goed vakmanschap verwijst, kan een projectwaarde volgen uit de toepasselijke norm, een bestek, een eis van de netbeheerder of de toestelgrenzen. De 3 en 5% uit dit artikel zijn het gebruikelijke vertrekpunt; gevoelige apparatuur kan een engere spanningsband aan de klemmen vragen.",[12,32794,32795],{},"Houd daarna de controles apart. Spanningsval beantwoordt één vraag. De geleider moet ook voldoende stroombelastbaar zijn bij de echte plaatsingswijze, passen bij overbelasting- en kortsluitbeveiliging, uitschakelvoorwaarden en thermische belasting halen en mechanisch in klemmen en kabelwegen passen. Meerdere afzonderlijk aanvaardbare deeltrajecten kunnen samen toch te veel spanningsval geven. Hoofdvoeding, voeding van de onderverdeler en eindkring horen daarom samen in de balans.",[12,32797,32798],{},"Vergelijk na de uitvoering het gedocumenteerde traject en de geleider met de werf. Metingen tonen netspanningscondities of overgangsweerstanden die een zuiver weerstandsmodel niet voorspelt. Wijzigen traject, materiaal of fase, dan werk je eendraadschema en kabellijst bij. Zo'n nota overtuigt installateur en keuringsorganisme meer dan een schermafbeelding met een groen vinkje.",[1396,32800,32802],{"id":32801},"wijzigingen-bijhouden","Wijzigingen bijhouden",[12,32804,32805],{},"Bewaar invoer en resultaat per ontwerpversie. Wijzigt de kabellengte door het echte traject, de aansluiting van een- naar driefasig of de belasting door een ander toestel, dan reken je opnieuw en noteer je de bron. Vergelijk percentage, eindspanning en de opgetelde deeltrajecten. Een grotere geleider verbetert de spanningsval, maar beantwoordt geen open vraag over beveiliging, klemmen of plaatsing.",[1396,32807,32809],{"id":32808},"het-resultaat-correct-formuleren","Het resultaat correct formuleren",[12,32811,32812],{},"Schrijf niet „kabel is conform”, maar bijvoorbeeld: „Voor de gedocumenteerde belasting, lengte, nominale spanning en het vermelde projectcriterium geeft het weerstandsmodel deze spanningsval.” Vermeld de punten die nog open staan. Zo kan een ontwerper het resultaat narekenen, invoer wijzigen en de overige dimensioneringsbewijzen aansluiten. Een scenarioberekening voor een nog onbekende belasting markeer je als zodanig en vervang je zodra het echte toestel vastligt. Noteer ook of de lengte uit het plan, een meting of een voorzichtige aanname komt.",[41,32814,32816],{"id":32815},"spanningsval-rechtstreeks-in-je-project-controleren","Spanningsval rechtstreeks in je project controleren",[12,32818,12598,32819,32821,32822,39],{},[30,32820,1337],{"href":6989}," teken je kabelroutes op het grondplan; de lengte gaat mee in de stroomkring. De zelfcontrole berekent daaruit voor elke eindkring de spanningsval tegenover de richtwaarden 3% en 5% en meldt overschrijdingen samen met de controle van doorsnede tegenover beveiliging. Welke regels ze dekt, lees je in ",[30,32823,10087],{"href":2457},[41,32825,32827],{"id":32826},"gerelateerde-artikelen","Gerelateerde artikelen",[1450,32829,32830,32834,32838,32844,32850,32854,32858],{},[1453,32831,32832],{},[30,32833,21004],{"href":26440},[1453,32835,32836],{},[30,32837,32641],{"href":32640},[1453,32839,32840],{},[30,32841,32843],{"href":32842},"\u002Fblog\u002Flaadpaal-arei","Laadpaal installeren volgens het AREI",[1453,32845,32846],{},[30,32847,32849],{"href":32848},"\u002Fblog\u002Feigen-stroomkring-verplicht-toestellen","Toegewijde kringen voor toestellen",[1453,32851,32852],{},[30,32853,21427],{"href":21435},[1453,32855,32856],{},[30,32857,25806],{"href":15398},[1453,32859,32860],{},[30,32861,32862],{"href":28094},"Een warmtepomp op het eendraadschema tekenen",[12,32864,15354,32865,32868],{},[30,32866,15359],{"href":15357,"rel":32867},[2532],", in het bijzonder afdeling 3.2.2 (soorten systemen), onderafdelingen 4.4.1.4 en 5.2.1.2 en afdeling 5.2.5.",{"title":1467,"searchDepth":1468,"depth":1468,"links":32870},[32871,32872,32873,32874,32875,32876,32880,32881,32882,32883,32889,32893,32894],{"id":32311,"depth":1468,"text":32312},{"id":32321,"depth":1468,"text":32322},{"id":32341,"depth":1468,"text":32342},{"id":32393,"depth":1468,"text":32394},{"id":32548,"depth":1468,"text":32549},{"id":32644,"depth":1468,"text":32645,"children":32877},[32878,32879],{"id":32648,"depth":1486,"text":32649},{"id":32670,"depth":1486,"text":32671},{"id":32690,"depth":1468,"text":32691},{"id":32708,"depth":1468,"text":32709},{"id":32715,"depth":1468,"text":32716},{"id":1393,"depth":1468,"text":1394,"children":32884},[32885,32886,32887,32888],{"id":32753,"depth":1486,"text":32754},{"id":32760,"depth":1486,"text":32761},{"id":32767,"depth":1486,"text":32768},{"id":32774,"depth":1486,"text":32775},{"id":32785,"depth":1468,"text":32786,"children":32890},[32891,32892],{"id":32801,"depth":1486,"text":32802},{"id":32808,"depth":1486,"text":32809},{"id":32815,"depth":1468,"text":32816},{"id":32826,"depth":1468,"text":32827},"2026-08-02","Bereken de spanningsval van je kabel en zie meteen vanaf welke lengte een grotere doorsnede nodig is. Formule, lengtetabel en gratis rekentool voor België.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-voltage-drop-cable-sizing-editorial.jpg","\u002Fblog\u002Fvoltage-drop-cable-sizing.nl",{"title":15341,"description":32896},"spanningsval-berekenen-kabeldoorsnede","blog\u002Fvoltage-drop-cable-sizing.nl",[15394,32904,32905,32906],"kabeldoorsnede","rekentool","arei","ZOXy5Yfg7eva64k29WALF-szr8HSVrkaCfokLwe7Kms",{"id":32909,"title":32910,"articleId":32911,"body":32912,"category":1493,"date":33359,"description":33360,"extension":1496,"image":32929,"lastUpdated":15381,"locale":1497,"meta":33361,"navigation":1499,"ogImage":33362,"path":33363,"publishDate":33359,"readTime":21425,"refreshInterval":11097,"seo":33364,"seoTitle":33365,"slug":33366,"stem":33367,"tags":33368,"__hash__":33374,"kind":1515,"href":32640},"blog\u002Fblog\u002Fsingle-phase-vs-three-phase.nl.md","Eenfasig of driefasig? Netvorm en gebouwaansluiting in België","single-phase-vs-three-phase",{"type":9,"value":32913,"toc":33341},[32914,32918,32924,32930,32941,32945,33013,33017,33020,33024,33027,33065,33068,33071,33075,33104,33113,33117,33124,33127,33131,33134,33138,33141,33145,33148,33151,33155,33158,33172,33175,33179,33182,33185,33189,33227,33231,33237,33243,33249,33253,33256,33259,33261,33311,33313,33336],[41,32915,32917],{"id":32916},"kort-antwoord-bekijk-net-en-aansluiting-apart","Kort antwoord: bekijk net en aansluiting apart",[12,32919,32920,32923],{},[15,32921,32922],{},"Of je eenfasig of driefasig nodig hebt, beslis je in België in twee stappen."," Eerst bepaal je het laagspanningsnet in je straat: 230 V zonder nulleider (3×230 V) of 400\u002F230 V met nulleider (3N~400\u002F230 V). Daarna kies je de gebouwaansluiting: eenfasig of driefasig. Eenfasig volstaat voor veel woningen; een laadpaal van 11 of 22 kW of een driefasig groot toestel vraagt een passende driefasige aansluiting. Wat op jouw adres beschikbaar is, bevestigt de netbeheerder.",[12,32925,32926],{},[22,32927],{"alt":32928,"src":32929},"Een elektricien bekijkt een gesloten meterkast.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-single-phase-vs-three-phase-editorial.webp",[12,32931,32932,32933,32936,32937,32940],{},"“Eenfasig = 1×230 V” beschrijft dus de aansluiting, niet het straatnet. Een eenfasige 230 V-aansluiting komt ofwel ",[15,32934,32935],{},"fase–nul"," uit een 400\u002F230 V-net, ofwel ",[15,32938,32939],{},"fase–fase"," uit een 3×230 V-net. ORES vermeldt uitdrukkelijk dat een eenfasige aansluiting niet altijd een nulleider heeft.",[41,32942,32944],{"id":32943},"de-vier-combinaties","De vier combinaties",[49,32946,32947,32963],{},[52,32948,32949],{},[55,32950,32951,32954,32957,32960],{},[58,32952,32953],{},"Straatnet",[58,32955,32956],{},"Gebouwaansluiting",[58,32958,32959],{},"Geleiders aan de aansluiting",[58,32961,32962],{},"Technische notatie",[68,32964,32965,32978,32989,33002],{},[55,32966,32967,32970,32972,32975],{},[73,32968,32969],{},"400\u002F230 V met N",[73,32971,32579],{},[73,32973,32974],{},"L + N",[73,32976,32977],{},"1×230 V, L–N",[55,32979,32980,32982,32984,32987],{},[73,32981,32969],{},[73,32983,32603],{},[73,32985,32986],{},"L1 + L2 + L3 + N",[73,32988,32613],{},[55,32990,32991,32994,32996,32999],{},[73,32992,32993],{},"230 V zonder N",[73,32995,32579],{},[73,32997,32998],{},"twee fasegeleiders",[73,33000,33001],{},"1×230 V, L–L",[55,33003,33004,33006,33008,33011],{},[73,33005,32993],{},[73,33007,32603],{},[73,33009,33010],{},"drie fasegeleiders",[73,33012,32589],{},[41,33014,33016],{"id":33015},"hoe-verspreid-is-3230-v","Hoe verspreid is 3×230 V?",[12,33018,33019],{},"Het 3×230 V-net is in België dagelijkse praktijk. Fluvius had eind 2024 nog 18.101 km 230 V-laagspanningsnet in dienst, vooral in stedelijke en westelijke regio's. Sibelga meldt dat ongeveer 80 % van het Brusselse grondgebied met 230 V wordt bevoorraad. Een huishouden daar is daarom niet automatisch driefasig aangesloten: als standaard voor een gemiddeld huishouden noemt Sibelga 9,2 kVA, eenfasig 230 V bij 40 A.",[41,33021,33023],{"id":33022},"vermogen-bij-dezelfde-stroomsterkte","Vermogen bij dezelfde stroomsterkte",[12,33025,33026],{},"Het beschikbare vermogen hangt af van spanning, aantal fasen en aansluitstroom. Voor 40 A geeft ORES:",[49,33028,33029,33040],{},[52,33030,33031],{},[55,33032,33033,33036],{},[58,33034,33035],{},"Aansluiting",[58,33037,33039],{"align":33038},"right","Schijnbaar vermogen bij 40 A",[68,33041,33042,33050,33058],{},[55,33043,33044,33047],{},[73,33045,33046],{},"Eenfasig 230 V",[73,33048,33049],{"align":33038},"9,2 kVA",[55,33051,33052,33055],{},[73,33053,33054],{},"Driefasig 3×230 V",[73,33056,33057],{"align":33038},"15,9 kVA",[55,33059,33060,33062],{},[73,33061,32520],{},[73,33063,33064],{"align":33038},"27,7 kVA",[12,33066,33067],{},"Zo reken je het na: eenfasig is het schijnbaar vermogen spanning maal stroom (230 V × 40 A ≈ 9,2 kVA). Bij symmetrische driefasige belasting vermenigvuldig je lijnspanning, stroom en √3 (230 V × 40 A × 1,73 ≈ 15,9 kVA; 400 V × 40 A × 1,73 ≈ 27,7 kVA). Die waarden geven de technische grootteorde. Je contractueel vermogen bepalen de aansluitautomaat en de netbeheerder; het werkelijk bruikbare vermogen van een toestel hangt ook af van de arbeidsfactor.",[12,33069,33070],{},"Bij ongelijke verdeling telt elke fasegeleider afzonderlijk. Een groot totaalvermogen helpt niet als veel eenfasige verbruikers op dezelfde fase hangen.",[41,33072,33074],{"id":33073},"wat-dit-betekent-voor-laadpaal-warmtepomp-en-zonnepanelen","Wat dit betekent voor laadpaal, warmtepomp en zonnepanelen",[1450,33076,33077,33086,33095],{},[1453,33078,33079,33082,33083,39],{},[15,33080,33081],{},"Laadpaal:"," 3,7 of 7,4 kW lukt vaak eenfasig. Voor 11 of 22 kW heb je normaal een passende driefasige aansluiting nodig. Niet elke lader werkt op 3×230 V; Sibelga vermeldt beperkingen voor laden aan 11\u002F22 kW. Ontwerp en verplichtingen lees je in ",[30,33084,33085],{"href":32842},"laadpaal en AREI",[1453,33087,33088,33091,33092,39],{},[15,33089,33090],{},"Warmtepomp en kookplaat:"," het typeplaatje beslist. Een toestel voor 3N~400 V werkt niet zomaar op 3×230 V zonder nulleider. Hoe je de warmtepomp in het schema tekent, lees je in ",[30,33093,33094],{"href":28094},"warmtepomp in het eendraadschema",[1453,33096,33097,33100,33101,39],{},[15,33098,33099],{},"Zonnepanelen:"," het toegelaten omvormervermogen en de faseverdeling legt de netbeheerder vast voor de concrete aansluiting; een Belgische eenheidsgrens bestaat niet. Meer in ",[30,33102,33103],{"href":28125},"een PV-installatie documenteren",[12,33105,33106,33107,933,33110,39],{},"Controleer vóór de aankoop van een groot toestel dus altijd beide: ",[15,33108,33109],{},"een- of driefasig",[15,33111,33112],{},"230 V zonder N of 400\u002F230 V met N",[41,33114,33116],{"id":33115},"beveiliging-en-differentieel-op-een-3230-v-net","Beveiliging en differentieel op een 3×230 V-net",[12,33118,33119,33120,33123],{},"Op een 3×230 V-net zijn beide actieve geleiders van een 230 V-kring fasegeleiders. AREI Boek 1 eist in onderafdeling 4.4.4.2 voor eenfasige en tweefasige kringen in huishoudelijke installaties een overstroomdetectie op ",[15,33121,33122],{},"beide actieve geleiders",". Uitzondering: een differentieelstroominrichting op hetzelfde niveau bevat ook een overstroomdetectie op één lijngeleider en onderbreekt beide actieve geleiders. In de praktijk plan je op 3×230 V dus automaten met twee beveiligde polen. Voor driefasige kringen zonder verdeelde nulleider regelt onderafdeling 4.4.4.3 wanneer één lijngeleider zonder eigen overstroomdetectie mag blijven.",[12,33125,33126],{},"Een differentieelschakelaar heeft geen nulleider nodig als “referentie”. Hij vergelijkt de stromen in alle actieve geleiders die erdoor lopen. Op 3×230 V meet en schakelt hij dus alle betrokken fasegeleiders samen en beschermt hij er even doeltreffend als op 3N~400\u002F230 V.",[41,33128,33130],{"id":33129},"fasen-zinvol-verdelen","Fasen zinvol verdelen",[12,33132,33133],{},"Bij een driefasige aansluiting verdeel je de eenfasige verbruikers zo gelijk mogelijk over de fasen. Het AREI legt daarvoor geen vast percentage op. Een waarschuwingsdrempel zoals 30 % is een ontwerphulp, geen AREI-eis. Bij een eenfasige aansluiting valt er niets te verdelen. Documenteer de toewijzing in de verdeelkast en controleer ze na elke wijziging.",[41,33135,33137],{"id":33136},"zo-herken-je-je-aansluiting","Zo herken je je aansluiting",[12,33139,33140],{},"Bekijk meter, aansluitautomaat en inkomende geleiders zonder verzegelde delen van de netbeheerder te openen. ORES toont voorbeeldfoto's van eenfasig 230 V, 3×230 V en 3×400 V + N. Alleen zichtbare draden tellen misleidt snel, omdat beschermingsgeleider, interne bedrading of oude installaties meetellen. Bindend bevestigen netbeheerder of elektricien de netvorm.",[41,33142,33144],{"id":33143},"van-lastenlijst-naar-aansluitbeslissing","Van lastenlijst naar aansluitbeslissing",[12,33146,33147],{},"Maak een lastenlijst vóór je meer aansluitvermogen aanvraagt. Scheid continue belasting, kort samenvallende pieken en stuurbare verbruikers. Kookplaat, warmtepomp, doorstromer, laadpaal en omvormer hebben verschillende profielen. De som van alle naamplaten is daarom niet automatisch het nodige aansluitvermogen; grote toestellen zonder berekening wegstrepen mag evenmin. Lastmanagement beperkt pieken als het past bij toestel, meter en netbeheerderprocedure.",[12,33149,33150],{},"Noteer per toestel vier gegevens: toegelaten voedingsspanning, nodige nulleider, aantal fasen en maximale stroom per fase. Voeg aanloopstroom, arbeidsfactor en fabrikantvoorwaarden toe waar ze ertoe doen. “Driefasig” alleen volstaat niet: een motor of lader voor 3N~400 V kan een nulleider of een andere interne schakeling vragen dan een verbruiker voor 3×230 V. Beveiliging, kabeldoorsnede, uitschakelvoorwaarden en draaizin regelt de elektricien.",[41,33152,33154],{"id":33153},"verzwaren-of-omschakelen-bij-de-netbeheerder","Verzwaren of omschakelen bij de netbeheerder",[12,33156,33157],{},"Kosten en termijnen bepaalt de bevoegde netbeheerder; een Belgisch forfait bestaat niet. Ze hangen af van het gevraagde vermogen, de straatinfrastructuur, de meteropstelling en de nodige aanpassing van de binneninstallatie. Bereid je aanvraag zo voor:",[1602,33159,33160,33163,33166,33169],{},[1453,33161,33162],{},"Leg EAN of aansluitreferentie, huidige beveiliging en gewenst vermogen klaar.",[1453,33164,33165],{},"Voeg toestelgegevens en geplande ingebruikname toe.",[1453,33167,33168],{},"Vraag uitdrukkelijk naar beschikbare spanning, aantal fasen en nulleider op het adres.",[1453,33170,33171],{},"Bespreek met de elektricien wat er verandert aan meteropstelling, voedingskabel, hoofdverdeelbord, differentieelschakelaars en faseverdeling.",[12,33173,33174],{},"Pas dan vergelijk je netofferte en binnenwerken zinvol. Na een belangrijke wijziging werk je eendraadschema en situatieplan bij; of een nieuwe keuring nodig is, hangt af van omvang en aard van de wijziging.",[41,33176,33178],{"id":33177},"de-voeding-in-het-eendraadschema","De voeding in het eendraadschema",[12,33180,33181],{},"Leg aan het voedingspunt spanning, stroomsoort en aansluitconfiguratie vast. Toon hoofdbeveiliging en alle actieve geleiders ondubbelzinnig. Op een 3×230 V-net teken je geen nulleider; bij 3N~400\u002F230 V verschijnt hij waar hij werkelijk verdeeld wordt. Na een omschakeling controleer je kastbezetting, beveiligingen, kabels en eindkringen en breng je de plannen naar de uitgevoerde toestand. Bewaar de vorige versie en maak een nieuwe, gedateerde versie aan.",[12,33183,33184],{},"In PlanElec documenteer je straatnet (met of zonder nulleider) en gebouwaansluiting (een- of driefasig) als aparte gegevens; daaruit volgen de geldige fasetoewijzingen voor je kringen. De AREI\u002FRGIE-zelfcontrole waarschuwt bij eenpolige automaten in woningen (4.4.4.2), bij een fase-onevenwicht boven 30 % als praktijkaanbeveling en bij onwaarschijnlijke combinaties van een 3×230 V-aansluiting met het opgeslagen aardingsstelsel. Beschikbare netvorm en aansluitvermogen bevestigt de netbeheerder; de keuring doet het erkende controleorganisme.",[41,33186,33188],{"id":33187},"veelgemaakte-beslisfouten","Veelgemaakte beslisfouten",[1450,33190,33191,33197,33203,33209,33215,33221],{},[1453,33192,33193,33196],{},[15,33194,33195],{},"Alleen de meter lezen:"," het scherm verklaart netvorm en geleiderconfiguratie niet volledig.",[1453,33198,33199,33202],{},[15,33200,33201],{},"3×230 V gelijkstellen aan 3N~400\u002F230 V:"," beide zijn driefasig, maar leveren het toestel andere spanningen en geleiders.",[1453,33204,33205,33208],{},[15,33206,33207],{},"kVA en kW gelijkstellen:"," arbeidsfactor en toestel bepalen het werkelijk vermogen.",[1453,33210,33211,33214],{},[15,33212,33213],{},"Laadvermogen als aansluitvermogen nemen:"," dan ontbreken de andere gelijktijdige verbruikers en het lastmanagement.",[1453,33216,33217,33220],{},[15,33218,33219],{},"Plannen na een omschakeling laten liggen:"," voeding, beveiligingsketen en fasetoewijzing kloppen anders niet meer met de werkelijkheid.",[1453,33222,33223,33226],{},[15,33224,33225],{},"Verzegelde delen openen:"," de aansluiting herken je via zichtbare gegevens, netbeheerder of vakman.",[41,33228,33230],{"id":33229},"drie-typische-uitgangssituaties","Drie typische uitgangssituaties",[12,33232,33233,33236],{},[15,33234,33235],{},"Bestaand met 1×230 V:"," controleer eerst de werkelijke beveiliging en of er een nulleider is. Een laadpaal met beperkt eenfasig vermogen en lastmanagement is vaak haalbaar; voertuig, lader, huislast en netbeheerder beslissen. Een hoog kW-getal in een folder bewijst geen beschikbaar vermogen.",[12,33238,33239,33242],{},[15,33240,33241],{},"Bestaand met 3×230 V:"," verdeel eenfasige verbruikers over de faseparen en controleer elk driefasig toestel uitdrukkelijk op werking zonder nulleider. Een toestel dat intern 230 V tegen N nodig heeft, past niet alleen omdat het datablad “driefasig” vermeldt.",[12,33244,33245,33248],{},[15,33246,33247],{},"Bestaand met 3N~400\u002F230 V:"," eenfasige verbruikers hangen tussen fase en nulleider, driefasige toestellen op de door de fabrikant voorziene schakeling. Ook een hoog berekend aansluitvermogen heft de stroomgrens per fase en de eisen aan beveiliging en kabeldoorsnede niet op.",[41,33250,33252],{"id":33251},"meting-en-ingebruikname","Meting en ingebruikname",[12,33254,33255],{},"De definitieve toewijzing leid je niet alleen uit documenten af. Een vakman meet de werkelijke spanningsconfiguratie, zonder zones van de netbeheerder onbevoegd te openen, en controleert draaizin, nulleider en beschermingsgeleider. Na wijzigingen volgen de voorgeschreven controles en metingen van de betrokken delen.",[12,33257,33258],{},"Bij stuurbare grote verbruikers volg je ook het gedrag tijdens de werking. Lastmanagement moet bij communicatieverlies of foute meetwaarden naar een veilige, gedocumenteerde toestand gaan. De ingestelde grens past bij de aansluitbeveiliging en houdt rekening met pieken, niet alleen met gemiddelden. Gewijzigde instellingen documenteer je zoals elke andere ontwerprelevante wijziging.",[41,33260,17377],{"id":17376},[1450,33262,33263,33270,33277,33284,33291,33298,33305],{},[1453,33264,33265],{},[30,33266,33269],{"href":33267,"rel":33268},"https:\u002F\u002Fwww.ores.be\u002Fparticulier\u002Freconnaitre-informations-techniques\u002F",[2532],"ORES: technische aansluitgegevens herkennen",[1453,33271,33272],{},[30,33273,33276],{"href":33274,"rel":33275},"https:\u002F\u002Fwww.sibelga.be\u002Fnl\u002Faansluitingen-meters\u002Fmijn-aansluiting\u002Felektrisch-vermogen",[2532],"Sibelga: elektrisch vermogen en aansluiting",[1453,33278,33279],{},[30,33280,33283],{"href":33281,"rel":33282},"https:\u002F\u002Fwww.sibelga.be\u002Fnl\u002Faansluitingen-meters\u002Felektrisch-laden\u002Fladen-in-een-woning",[2532],"Sibelga: een laadpaal thuis installeren",[1453,33285,33286],{},[30,33287,33290],{"href":33288,"rel":33289},"https:\u002F\u002Fover.fluvius.be\u002Fsites\u002Ffluvius\u002Ffiles\u002F2025-06\u002Finvesteringsplan-2026-2035-versie-publieke-consultatie.pdf",[2532],"Fluvius: investeringsplan 2026–2035",[1453,33292,33293],{},[30,33294,33297],{"href":33295,"rel":33296},"https:\u002F\u002Fdownload.schneider-electric.com\u002Ffiles?p_File_Id=905251744&p_File_Name=ECT114.pdf&p_Reference=ECT114&p_enDocType=Cahier+Technique",[2532],"Schneider Electric: werkingsprincipe van differentieels, ook voor driefasige kringen zonder nulleider",[1453,33299,33300,33304],{},[30,33301,33303],{"href":15357,"rel":33302},[2532],"FOD Economie: AREI Boek 1, versie 06",", onderafdelingen 4.4.4.2 en 4.4.4.3",[1453,33306,33307],{},[30,33308,33310],{"href":28056,"rel":33309},[2532],"FOD Economie: huidige officiële RGIE-publicatie van Boek 1",[41,33312,32827],{"id":32826},[1450,33314,33315,33320,33325,33330],{},[1453,33316,33317],{},[30,33318,33319],{"href":15202},"Spanningsval berekenen en kabeldoorsnede kiezen",[1453,33321,33322],{},[30,33323,33324],{"href":32842},"Een laadpaal installeren in België",[1453,33326,33327],{},[30,33328,33329],{"href":28125},"Een PV-installatie aanmelden en documenteren",[1453,33331,33332],{},[30,33333,33335],{"href":33334},"\u002Fblog\u002Faarding-tt-tns-belgie","Aarding TT of TN-S in België",[12,33337,33338],{},[30,33339,33340],{"href":6989},"Netvorm en gebouwaansluiting apart documenteren in PlanElec →",{"title":1467,"searchDepth":1468,"depth":1468,"links":33342},[33343,33344,33345,33346,33347,33348,33349,33350,33351,33352,33353,33354,33355,33356,33357,33358],{"id":32916,"depth":1468,"text":32917},{"id":32943,"depth":1468,"text":32944},{"id":33015,"depth":1468,"text":33016},{"id":33022,"depth":1468,"text":33023},{"id":33073,"depth":1468,"text":33074},{"id":33115,"depth":1468,"text":33116},{"id":33129,"depth":1468,"text":33130},{"id":33136,"depth":1468,"text":33137},{"id":33143,"depth":1468,"text":33144},{"id":33153,"depth":1468,"text":33154},{"id":33177,"depth":1468,"text":33178},{"id":33187,"depth":1468,"text":33188},{"id":33229,"depth":1468,"text":33230},{"id":33251,"depth":1468,"text":33252},{"id":17376,"depth":1468,"text":17377},{"id":32826,"depth":1468,"text":32827},"2026-07-27","1×230 V, 3×230 V of 3N~400\u002F230 V: zo onderscheid je het Belgische straatnet, de nulleider en het aantal fasen en plan je beveiliging, laadpaal en warmtepomp correct.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-single-phase-vs-three-phase-editorial.jpg","\u002Fblog\u002Fsingle-phase-vs-three-phase.nl",{"title":32910,"description":33360},"Eenfasig of driefasig? Gebouwaansluiting in België","eenfasig-driefasig-belgie","blog\u002Fsingle-phase-vs-three-phase.nl",[3275,3276,32579,32603,1513,33369,33370,33371,33372,33373,29610,3273],"Fluvius","ORES","Sibelga","laadpaal","warmtepomp","ewte7sULy9qnjSf7MhtwoOiX4J46ez5s_Sow44vuHTQ",{"id":33376,"title":33377,"articleId":33378,"body":33379,"category":1493,"date":33940,"description":33941,"extension":1496,"image":33401,"lastUpdated":33942,"locale":1497,"meta":33943,"navigation":1499,"ogImage":33944,"path":33945,"publishDate":33940,"readTime":21425,"refreshInterval":11097,"seo":33946,"seoTitle":33947,"slug":33948,"stem":33949,"tags":33950,"__hash__":33957,"kind":1515,"href":33958},"blog\u002Fblog\u002Frenovation-electrical-plans.nl.md","Renovatie en AREI: wanneer heb je nieuwe elektrische plannen nodig?","renovation-electrical-plans",{"type":9,"value":33380,"toc":33914},[33381,33385,33396,33402,33405,33409,33508,33512,33544,33547,33551,33554,33560,33563,33567,33574,33581,33584,33588,33591,33611,33615,33618,33638,33641,33645,33649,33652,33655,33659,33662,33665,33669,33672,33675,33679,33682,33686,33690,33693,33697,33700,33704,33707,33711,33734,33737,33741,33747,33750,33754,33757,33783,33786,33790,33793,33826,33829,33856,33860,33871,33873,33909],[41,33382,33384],{"id":33383},"wanneer-leidt-een-renovatie-tot-nieuwe-plannen-en-een-keuring","Wanneer leidt een renovatie tot nieuwe plannen en een keuring?",[12,33386,33387,33388,33391,33392,33395],{},"De elektrische omvang beslist, niet het woord “renovatie”. Een ",[15,33389,33390],{},"belangrijke wijziging of uitbreiding"," vraagt een bijgewerkt eendraadschema en situatieplan en ondergaat vóór ingebruikname een gelijkvormigheidscontrole. Die controle is beperkt tot de toegevoegde of gewijzigde delen; een ongewijzigd deel wordt alleen meegenomen voor de eigenschappen die door de wijziging veranderen (AREI\u002FRGIE Boek 1 V06, onderafdeling 6.4.7.3). Een ",[15,33393,33394],{},"niet-belangrijke wijziging"," vraagt geen nieuw eendraadschema: een gedateerde en ondertekende bondige beschrijving volstaat, en het situatieplan toont de wijziging toch (onderafdeling 3.1.2.1 a).",[12,33397,33398],{},[22,33399],{"alt":33400,"src":33401},"Elektriciens nemen een bestaande woninginstallatie op.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-renovation-electrical-plans-editorial.webp",[12,33403,33404],{},"Een lijst die elk verplaatst stopcontact automatisch als “belangrijk” of “niet belangrijk” indeelt, staat niet in het AREI. Leg de indeling daarom vóór de werken vast met je elektricien en vraag bij twijfel het controleorganisme.",[41,33406,33408],{"id":33407},"welk-werk-leidt-tot-wat","Welk werk leidt tot wat?",[49,33410,33411,33423],{},[52,33412,33413],{},[55,33414,33415,33417,33419,33421],{},[58,33416,8306],{},[58,33418,6532],{},[58,33420,31290],{},[58,33422,3189],{},[68,33424,33425,33439,33453,33466,33480,33494],{},[55,33426,33427,33430,33433,33436],{},[73,33428,33429],{},"Belangrijke wijziging of uitbreiding",[73,33431,33432],{},"eendraadschema en situatieplan opstellen of bijwerken",[73,33434,33435],{},"gelijkvormigheidscontrole van gewijzigde en toegevoegde delen vóór ingebruikname",[73,33437,33438],{},"3.1.2.1 a, 6.4.7.3",[55,33440,33441,33444,33447,33450],{},[73,33442,33443],{},"Wijziging beïnvloedt een ongewijzigd deel",[73,33445,33446],{},"invloed documenteren",[73,33448,33449],{},"ongewijzigd deel wordt voor de gewijzigde eigenschappen mee gecontroleerd en in het verslag vermeld",[73,33451,33452],{},"6.4.7.3",[55,33454,33455,33458,33461,33464],{},[73,33456,33457],{},"Niet-belangrijke wijziging",[73,33459,33460],{},"gedateerde, ondertekende bondige beschrijving; situatieplan toont de toestand",[73,33462,33463],{},"geen gelijkvormigheidscontrole vóór ingebruikname voorgeschreven",[73,33465,17637],{},[55,33467,33468,33471,33474,33477],{},[73,33469,33470],{},"Belangrijke wijziging van een oude installatie (vóór 1\u002F10\u002F1981)",[73,33472,33473],{},"zoals hierboven; oude delen op het schema aangeduid als “oude installatie”",[73,33475,33476],{},"volledige installatie achter minstens één differentieelschakelaar ≤ 300 mA aan het begin",[73,33478,33479],{},"3.1.2.1 a, 4.2.4.3 b",[55,33481,33482,33485,33488,33491],{},[73,33483,33484],{},"Volledige vernieuwing van de installatie",[73,33486,33487],{},"volledige plannenset zoals bij een nieuwe installatie",[73,33489,33490],{},"gelijkvormigheidscontrole vóór ingebruikname",[73,33492,33493],{},"hoofdstuk 6.4",[55,33495,33496,33499,33502,33505],{},[73,33497,33498],{},"Gelijkwaardige vervanging van een toestel",[73,33500,33501],{},"type en kenmerken van de vervanging noteren",[73,33503,33504],{},"indeling door de elektricien zodra ligging, leiding, beveiliging of functie wijzigt",[73,33506,33507],{},"geen aparte regel",[41,33509,33511],{"id":33510},"een-praktische-beslisroute","Een praktische beslisroute",[1602,33513,33514,33520,33526,33532,33538],{},[1453,33515,33516,33519],{},[15,33517,33518],{},"Is het werk zuiver niet-elektrisch?"," Schilderwerk of een nieuwe vloer verandert de elektrische installatie niet.",[1453,33521,33522,33525],{},[15,33523,33524],{},"Wordt alleen een toestel gelijkwaardig vervangen?"," Documenteer de vervanging en controleer of eigenschappen en beveiligingsconcept gelijk blijven.",[1453,33527,33528,33531],{},[15,33529,33530],{},"Komen er nieuwe leidingen, kringen, bronnen of een nieuw bord?"," Behandel het project als mogelijke belangrijke wijziging of uitbreiding tot de elektricien het heeft ingedeeld.",[1453,33533,33534,33537],{},[15,33535,33536],{},"Veranderen spanning, aansluiting, aarding of beveiligingsketen?"," Dan reikt het effect verder dan het nieuwe onderdeel.",[1453,33539,33540,33543],{},[15,33541,33542],{},"Welke bestaande delen zijn betrokken?"," Baken ze af op basis van kringen, bord en werkelijke leidingloop.",[12,33545,33546],{},"Een nieuwe onderverdeling, een extra kring voor laadpaal of warmtepomp, een nieuw verdeelbord of een gewijzigde aansluiting leg je daarom vroeg aan je elektricien voor. Een afdekplaat, lamp of schakelaar die zonder wijziging van de elektrische eigenschappen gelijkwaardig wordt vervangen, ligt dichter bij onderhoud.",[41,33548,33550],{"id":33549},"bestaat-er-een-contaminatieregel","Bestaat er een “contaminatieregel”?",[12,33552,33553],{},"Nee. Het populaire begrip beweert dat elke kleine wijziging het hele huis volgens het huidige reglement keuringsplichtig maakt. Zo staat het niet in Boek 1. De controle van een belangrijke wijziging omvat de gewijzigde en toegevoegde delen; een ongewijzigd deel wordt alleen gecontroleerd voor de eigenschappen die door de wijziging verschuiven (onderafdeling 6.4.7.3).",[12,33555,33556,33557,33559],{},"Eén regel met effect op de hele installatie bestaat wel, en ze geldt voor oude installaties: bij een belangrijke wijziging of uitbreiding van een oude huishoudelijke installatie zoals bedoeld in deel 8 beschermt minstens één differentieelschakelaar van ten hoogste 300 mA aan het begin de ",[15,33558,21014],{}," installatie (onderafdeling 4.2.4.3 b). Neem die differentieelschakelaar mee in de planning van elke grotere renovatie van een woning met een oude installatie.",[12,33561,33562],{},"Baken het werk duidelijk af: noteer welke kringen, leidingdelen, beveiligingen en ruimten erbij betrokken zijn. Markeer bestaande delen, het nieuwe deel en gemeenschappelijke beveiligings- of voedingspunten. Die documentatie maakt de controleomvang begrijpelijk; wat het erkend organisme controleert, bepaalt het zelf.",[41,33564,33566],{"id":33565},"wat-deel-8-werkelijk-doet","Wat deel 8 werkelijk doet",[12,33568,33569,33570,33573],{},"Deel 8 bevat concrete afwijkingen voor ",[15,33571,33572],{},"bestaande delen",", afhankelijk van de periode van uitvoering. Voor oude huishoudelijke installaties waarvan de uitvoering vóór 1 oktober 1981 begon, geldt afdeling 8.2.1; voor installaties die volgens het vroegere AREI werden gekeurd, afdeling 8.2.2. Elke afwijking heeft een precieze toepassing en vaak voorwaarden. Nieuwe of belangrijk gewijzigde delen ontwerp je volgens de huidige eisen.",[12,33575,33576,33577,33580],{},"Belangrijk voor de documenten: voor bestaande delen van oude installaties staat afdeling 8.2.1 nr. 7 een ",[15,33578,33579],{},"vereenvoudigd"," eendraadschema toe met adres, nominale spanning, doorsnede van de voedingskabel van het hoofdbord, aard en doorsnede van de vertrekken en de differentieel- en andere beveiligingen met hun kenmerken, en een vereenvoudigd situatieplan met stopcontacten, schakelaars, lichtpunten en vaste toestellen.",[12,33582,33583],{},"Noteer per bestaand deel de bouwperiode, bestaande keuringsverslagen, leiding- en beveiligingsgegevens en latere wijzigingen. Een woning uit de jaren 1960 bevat vaak onderdelen uit meerdere decennia. Het bouwjaar van de woning bewijst dus niet welke afwijking voor een bepaalde kring geldt.",[41,33585,33587],{"id":33586},"woning-met-bestaande-plannen","Woning met bestaande plannen",[12,33589,33590],{},"Bestaan er een actueel eendraadschema en situatieplan:",[1602,33592,33593,33599,33605],{},[1453,33594,33595,33598],{},[15,33596,33597],{},"Plannen bijwerken:"," nieuwe kringen en gewijzigde posities intekenen.",[1453,33600,33601,33604],{},[15,33602,33603],{},"Oud en nieuw onderscheiden:"," gewijzigde en ongewijzigde delen herkenbaar maken.",[1453,33606,33607,33610],{},[15,33608,33609],{},"Versie verhogen:"," nummer, versie en versiedatum aanpassen en de bijgewerkte plannen aan het erkend organisme voorleggen.",[41,33612,33614],{"id":33613},"woning-zonder-plannen","Woning zonder plannen",[12,33616,33617],{},"Veel oudere woningen hebben geen documenten. Dan geldt:",[1602,33619,33620,33626,33632],{},[1453,33621,33622,33625],{},[15,33623,33624],{},"Nieuwe en belangrijk gewijzigde delen"," krijgen een volledig eendraadschema en situatieplan (onderafdeling 3.1.2.1 a).",[1453,33627,33628,33631],{},[15,33629,33630],{},"Bestaande delen van vóór 1981"," die op het schema staan, markeer je als “oude installatie”; voor die delen volstaat de vereenvoudigde set volgens afdeling 8.2.1 nr. 7.",[1453,33633,33634,33637],{},[15,33635,33636],{},"Het dossier"," volgens afdeling 9.1.2 bevat de schema's en plannen van de installatie. Ontbreken ze bij het controlebezoek bij verkoop, dan noteert het erkend organisme dat als inbreuk; zijn korte beschrijving en ruwe schets vervangen geen eendraadschema (onderafdeling 8.4.2.2 d).",[12,33639,33640],{},"Wie toch renoveert, neemt de bestaande installatie dus het best meteen mee op. Die opname hoort als aparte post in de offerte.",[41,33642,33644],{"id":33643},"documentatie-bij-renovatie","Documentatie bij renovatie",[1396,33646,33648],{"id":33647},"opnemen-zonder-gevaarlijke-aannames","Opnemen zonder gevaarlijke aannames",[12,33650,33651],{},"Begin met bestaande keuringsverslagen, plannen, facturen en etiketten en vergelijk ze met het echte bord. Voor de opname schakelt een vakman kringen gecontroleerd uit en volgt welke punten werkelijk uitvallen; werken aan spanningvoerende delen en in het bord horen in bekwame handen. Vermoede leidingtrajecten markeer je als vermoeden, niet als feit.",[12,33653,33654],{},"Maak een lijst per kring: code, gevoede ruimten, zichtbaar leidingtype en doorsnede, beveiliging, differentieelschakelaar, gekende dozen en vast aangesloten toestellen. Houd onbekende waarden gescheiden van bevestigde. Foto's leggen etiketten en toestand vast; meting en schema vervangen ze niet.",[1396,33656,33658],{"id":33657},"verdeel-de-renovatie-in-werkpakketten","Verdeel de renovatie in werkpakketten",[12,33660,33661],{},"Scheid veiligheidsgebreken, noodzakelijke aanpassingen voor de nieuwe werken en gewenste comfortuitbreidingen. Zo zie je wat vóór ingebruikname geregeld moet zijn en wat later kan. Bekijk gemeenschappelijke punten eerst: hoofdbord, aarding, voeding en gedeelde differentieelschakelaars verbinden meerdere ruimten. Een nieuwe keukenleiding is ruimtelijk lokaal, maar raakt elektrisch het bord en zijn beveiligingsketen.",[12,33663,33664],{},"Documenteer per pakket de begintoestand, de geplande wijziging, de betrokken bestaande kenmerken en de eindtoestand. Leg de indeling als belangrijk of niet-belangrijk vast voor er gepleisterd wordt. Controleomvang, metingen en bereikbare controlepunten bepalen planning en afspraak.",[1396,33666,33668],{"id":33667},"maak-de-uitgevoerde-toestand","Maak de uitgevoerde toestand",[12,33670,33671],{},"Neem geplande posities niet ongecontroleerd over in de eindversie. Vergelijk stopcontacten, schakelaars, lichtpunten, dozen en vaste toestellen ruimte per ruimte en koppel daarna elke kring aan beveiliging, kabelgegevens en bordpositie. Oude delen waarvan de uitvoering vóór 1 oktober 1981 begon, dragen op het eendraadschema de vermelding “oude installatie” wanneer ze worden weergegeven.",[12,33673,33674],{},"Schema's en plannen dragen nummer, versie en versiedatum. Een korte wijzigingsnotitie noemt de bewerkte ruimten of kringen. Bewaar eerdere goedgekeurde versies; ze tonen wanneer welk bestaand deel ontstond. De actuele plannen liggen ter plaatse klaar voor toezicht, controle, onderhoud, herstelling en verbouwing (onderafdeling 3.1.2.1 d).",[1396,33676,33678],{"id":33677},"verslag-en-opmerkingen-behandelen","Verslag en opmerkingen behandelen",[12,33680,33681],{},"Bezorg het erkend organisme de gevraagde plannen en documenten in leesbare vorm. Een vaststelling verdwijnt niet door een mooiere tekening: meetwaarde, foute uitvoering of ongeschikt materieel worden technisch opgelost. Daarna breng je installatie en documenten weer op dezelfde stand. Keuringsverslag, ondertekende plannen, meetgegevens en fabrikantdocumenten gaan in het dossier.",[41,33683,33685],{"id":33684},"drie-voorbeelden-voor-de-afbakening","Drie voorbeelden voor de afbakening",[1396,33687,33689],{"id":33688},"de-badkamer-wordt-volledig-vernieuwd","De badkamer wordt volledig vernieuwd",[12,33691,33692],{},"Nieuwe leidingen, stopcontacten, verlichting en beschermingsmaatregelen neem je op als nieuwe werken. Documenteer ook welke voeding en welke bordtak de badkamer voeden. De elektricien controleert badkamerzones, bescherming, leidingen en equipotentiale verbindingen op basis van de werkelijke uitvoering. Andere ruimten worden niet automatisch mee gecontroleerd; gemeenschappelijke of beïnvloede eigenschappen horen er wel bij.",[1396,33694,33696],{"id":33695},"een-bestaande-kring-wordt-hersteld","Een bestaande kring wordt hersteld",[12,33698,33699],{},"Vervang een defect toestel gelijkwaardig, noteer type en kenmerken en laat het veilige herstel controleren. Zodra ligging, leiding, beveiliging of functie veranderen, deelt de elektricien de werken opnieuw in. Het woord “herstelling” verbergt geen echte uitbreiding.",[1396,33701,33703],{"id":33702},"het-verdeelbord-wordt-vervangen","Het verdeelbord wordt vervangen",[12,33705,33706],{},"Een nieuw bord raakt veel gemeenschappelijke beveiligings- en toewijzingsgegevens. Vóór de demontage worden alle vertrekken eenduidig opgenomen. Na de werken kloppen etiketten, differentieelgroepen, fasen, leidingen en schema's met de uitgevoerde bezetting. Onbekende oude kringen worden vóór aansluiting opgehelderd, niet onder algemene namen verder gezet.",[41,33708,33710],{"id":33709},"vragen-voor-het-vooroverleg","Vragen voor het vooroverleg",[1450,33712,33713,33716,33719,33722,33725,33728,33731],{},[1453,33714,33715],{},"Welke delen worden nieuw, verplaatst, vervangen of ongewijzigd gelaten?",[1453,33717,33718],{},"Welke bestaande gegevens zijn aangetoond, welke moeten gemeten of geopend worden?",[1453,33720,33721],{},"Welke gemeenschappelijke beveiligings- of voedingspunten zijn betrokken?",[1453,33723,33724],{},"Is het werk een belangrijke wijziging of uitbreiding, en wie bevestigt dat?",[1453,33726,33727],{},"Is de installatie een oude installatie die na de wijziging een differentieelschakelaar aan het begin nodig heeft?",[1453,33729,33730],{},"Welke plannen, beschrijvingen, metingen en fabrikantdocumenten zijn nodig?",[1453,33732,33733],{},"Wanneer vinden controle en vrijgave van de documenten plaats in de planning?",[12,33735,33736],{},"In bewoonde woningen plan je ook veilige tussentoestanden. Onafgewerkte kringen blijven duidelijk buiten dienst en gelabeld. Tijdelijke voedingen worden vakkundig uitgevoerd en apart gedocumenteerd. Na elke fase noteer je welke delen al overeenkomen met het as-built plan en welke nog werkversie zijn.",[41,33738,33740],{"id":33739},"inspanning-en-kosten-plannen","Inspanning en kosten plannen",[12,33742,33743,33744,39],{},"De kosten hangen af van opname, ontbrekende documentatie, aantal kringen, metingen, omvang van de werken en controleorganisme. Algemene prijsvorken online vervangen geen offerte. Vraag aparte posten voor opname, ontwerp, uitvoering, eerste keuring en eventuele herstelling; hoe je zulke offertes vergelijkt, lees je in ",[30,33745,21628],{"href":33746},"\u002Fblog\u002Fkosten-elektriciteitsplan",[12,33748,33749],{},"PlanElec kost in Early Access 0 EUR. Voor de periode na de start van de tarieven, die we tijdig vooraf aankondigen, zijn de tarieven gepubliceerd: Free blijft gratis, eenmalig gebruik kost 12 EUR per pand en Pro 24 EUR per maand (de prijs blijft zolang het abonnement zonder onderbreking loopt), telkens exclusief btw.",[41,33751,33753],{"id":33752},"wat-planelec-bijdraagt-bij-renovaties","Wat PlanElec bijdraagt bij renovaties",[12,33755,33756],{},"PlanElec verbindt grondplan, topologie, verdeelbord, eendraadschema en situatieplan in één project. Daarmee kun je:",[1450,33758,33759,33765,33771,33777],{},[1453,33760,33761,33762,33764],{},"de ",[15,33763,14349],{}," opnemen en documenteren;",[1453,33766,33767,33770],{},[15,33768,33769],{},"nieuwe kringen"," toevoegen en met de oriënterende AREI\u002FRGIE-zelfcontrole toetsen aan de ondersteunde regels;",[1453,33772,33773,33776],{},[15,33774,33775],{},"oud en nieuw"," in hetzelfde model traceerbaar bijhouden;",[1453,33778,33779,33780,33782],{},"eendraadschema en situatieplan met uniforme codes als ",[15,33781,1979],{}," exporteren.",[12,33784,33785],{},"Materiaallijst en werkdossier staan klaar als pilotfuncties met aangegeven grenzen. De rollen zijn duidelijk: PlanElec levert de gestructureerde documentatie, de elektricien ontwerpt en voert uit, en het erkend organisme doet de officiële beoordeling.",[41,33787,33789],{"id":33788},"checklist-voor-renoveerders","Checklist voor renoveerders",[12,33791,33792],{},"Vóór de start:",[1450,33794,33796,33802,33808,33814,33820],{"className":33795},[26917],[1453,33797,33799,33801],{"className":33798},[26921],[26923,33800],{"disabled":1499,"type":26925}," Is het werk een belangrijke wijziging of uitbreiding?",[1453,33803,33805,33807],{"className":33804},[26921],[26923,33806],{"disabled":1499,"type":26925}," Bestaande elektrische plannen en keuringsverslagen opgezocht?",[1453,33809,33811,33813],{"className":33810},[26921],[26923,33812],{"disabled":1499,"type":26925}," Oude installatie? Plan dan de differentieelschakelaar aan het begin in.",[1453,33815,33817,33819],{"className":33816},[26921],[26923,33818],{"disabled":1499,"type":26925}," Budget voor opname, documentatie en keuring voorzien?",[1453,33821,33823,33825],{"className":33822},[26921],[26923,33824],{"disabled":1499,"type":26925}," Elektricien vroeg betrokken?",[12,33827,33828],{},"Na de renovatie:",[1450,33830,33832,33838,33844,33850],{"className":33831},[26917],[1453,33833,33835,33837],{"className":33834},[26921],[26923,33836],{"disabled":1499,"type":26925}," Eendraadschema en situatieplan op de werkelijke toestand?",[1453,33839,33841,33843],{"className":33840},[26921],[26923,33842],{"disabled":1499,"type":26925}," Alle nieuwe kringen op het eendraadschema?",[1453,33845,33847,33849],{"className":33846},[26921],[26923,33848],{"disabled":1499,"type":26925}," Controleorganisme ingeschakeld?",[1453,33851,33853,33855],{"className":33852},[26921],[26923,33854],{"disabled":1499,"type":26925}," Verslag en vastgestelde gebreken met de elektricien afgehandeld?",[41,33857,33859],{"id":33858},"officiële-bron","Officiële bron",[1450,33861,33862,33868],{},[1453,33863,33864],{},[30,33865,33867],{"href":28056,"rel":33866},[2532],"FOD Economie: RGIE\u002FAREI Boek 1, versie 06",[1453,33869,33870],{},"Bijzonder relevant: afdeling 3.1.2, onderafdeling 4.2.4.3 b, onderafdeling 6.4.7.3, afdelingen 8.2.1 en 8.4.2 en afdeling 9.1.2.",[41,33872,32827],{"id":32826},[1450,33874,33875,33881,33887,33893,33899,33904],{},[1453,33876,33877],{},[30,33878,33880],{"href":33879},"\u002Fnl\u002Fblog\u002Foud-arei-part-8","Oude elektriciteit in België: AREI Part 8 uitgelegd",[1453,33882,33883],{},[30,33884,33886],{"href":33885},"\u002Fnl\u002Fblog\u002Felektroplan-kosten","Wat kost een elektriciteitsplan? Kostenfactoren 2026",[1453,33888,33889],{},[30,33890,33892],{"href":33891},"\u002Fnl\u002Fblog\u002Fwat-controleert-inspecteur-keuring","Wat controleert de inspecteur bij de keuring?",[1453,33894,33895],{},[30,33896,33898],{"href":33897},"\u002Fnl\u002Fblog\u002Felektrisch-dossier-woningverkoop","Elektrisch dossier bij woningverkoop",[1453,33900,33901],{},[30,33902,27071],{"href":33903},"\u002Fnl\u002Fblog\u002Fmateriaallijst-elektrische-installatie",[1453,33905,33906],{},[30,33907,33908],{"href":23521},"Eendraadschema voor nieuwbouw: de AREI-checklist tot aan de keuring",[12,33910,33911],{},[30,33912,33913],{"href":6989},"Documenteer de renovatietoestand in PlanElec →",{"title":1467,"searchDepth":1468,"depth":1468,"links":33915},[33916,33917,33918,33919,33920,33921,33922,33923,33929,33934,33935,33936,33937,33938,33939],{"id":33383,"depth":1468,"text":33384},{"id":33407,"depth":1468,"text":33408},{"id":33510,"depth":1468,"text":33511},{"id":33549,"depth":1468,"text":33550},{"id":33565,"depth":1468,"text":33566},{"id":33586,"depth":1468,"text":33587},{"id":33613,"depth":1468,"text":33614},{"id":33643,"depth":1468,"text":33644,"children":33924},[33925,33926,33927,33928],{"id":33647,"depth":1486,"text":33648},{"id":33657,"depth":1486,"text":33658},{"id":33667,"depth":1486,"text":33668},{"id":33677,"depth":1486,"text":33678},{"id":33684,"depth":1468,"text":33685,"children":33930},[33931,33932,33933],{"id":33688,"depth":1486,"text":33689},{"id":33695,"depth":1486,"text":33696},{"id":33702,"depth":1486,"text":33703},{"id":33709,"depth":1468,"text":33710},{"id":33739,"depth":1468,"text":33740},{"id":33752,"depth":1468,"text":33753},{"id":33788,"depth":1468,"text":33789},{"id":33858,"depth":1468,"text":33859},{"id":32826,"depth":1468,"text":32827},"2026-07-20","Welke renovatie nieuwe plannen en een gelijkvormigheidscontrole vraagt: belangrijke en niet-belangrijke wijzigingen, gewijzigde en ongewijzigde delen, oude installaties volgens deel 8 en de dossierplicht.","2026-10-19",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-renovation-electrical-plans-editorial.jpg","\u002Fblog\u002Frenovation-electrical-plans.nl",{"title":33377,"description":33941},"Renovatie en AREI: wanneer nieuwe elektrische plannen?","renovatie-arei-elektrische-plannen","blog\u002Frenovation-electrical-plans.nl",[3275,3276,33951,33952,33953,33954,14349,33955,14349,3273,6216,1513,33956],"renovatie","verbouwing","elektrische plannen","herkeuring","Part 8","elektrische keuring","fILATthA82Yp8-zTaLC4ZSlWHLM5u-mKP4qaLaHVwoY","\u002Fblog\u002Frenovatie-arei-elektrische-plannen",{"id":33960,"title":33961,"articleId":33962,"body":33963,"category":1493,"date":33940,"description":34432,"extension":1496,"image":33975,"lastUpdated":33942,"locale":1497,"meta":34433,"navigation":1499,"ogImage":34434,"path":34435,"publishDate":33940,"readTime":4035,"refreshInterval":1503,"seo":34436,"seoTitle":34437,"slug":34438,"stem":34439,"tags":34440,"__hash__":34442,"kind":1515,"href":30145},"blog\u002Fblog\u002Fwhat-can-you-do-with-planelec.nl.md","Wat kun je met PlanElec doen? Van grondplan tot installatiedossier","planelec-capabilities-overview",{"type":9,"value":33964,"toc":34415},[33965,33971,33976,33980,34066,34069,34073,34076,34080,34083,34092,34095,34099,34102,34119,34124,34128,34131,34154,34160,34164,34167,34170,34173,34177,34180,34185,34189,34257,34260,34265,34269,34272,34276,34279,34289,34295,34299,34319,34321,34327,34373,34376,34380,34383,34386,34389,34393,34396,34399,34402],[12,33966,33967,33970],{},[15,33968,33969],{},"Met PlanElec plan je een Belgische elektrische installatie in één project: van grondplan via verbruikers, kabels, kringen en verdeelkast tot eendraadschema, situatieplan, AREI\u002FRGIE-zelfcontrole en pdf-dossier."," Je modelleert de ruimtelijke en elektrische structuur één keer en haalt daar plannen, lijsten en controlebevindingen uit. De PlanElec-assistent voert opdrachten in je eigen woorden uit, en de herkenning maakt van pdf’s, scans en kastfoto’s bewerkbare voorstellen. PlanElec is in de eerste plaats gemaakt voor elektro-installateurs en ontwerpers en staat ook open voor geëngageerde bouwheren en eigenaars.",[12,33972,33973],{},[22,33974],{"alt":6190,"src":33975},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-capabilities-overview-editorial.webp",[41,33977,33979],{"id":33978},"de-workflow-in-één-oogopslag","De workflow in één oogopslag",[49,33981,33982,33993],{},[52,33983,33984],{},[55,33985,33986,33988,33991],{},[58,33987,11137],{},[58,33989,33990],{},"Wat je in PlanElec doet",[58,33992,3006],{},[68,33994,33995,34005,34015,34025,34035,34045,34056],{},[55,33996,33997,33999,34002],{},[73,33998,13615],{},[73,34000,34001],{},"Gebouw, verdiepingen en metadata aanmaken",[73,34003,34004],{},"Gedeelde basis voor plannen en titelblokken",[55,34006,34007,34009,34012],{},[73,34008,6435],{},[73,34010,34011],{},"Muren en ruimtes tekenen, een referentiebeeld kalibreren of een plan herkennen",[73,34013,34014],{},"Ruimtelijk model",[55,34016,34017,34019,34022],{},[73,34018,10587],{},[73,34020,34021],{},"Stopcontacten, schakelaars, lichtpunten, vaste aansluitingen en verdeelkast plaatsen",[73,34023,34024],{},"Situatieplan en verbruikersbasis",[55,34026,34027,34029,34032],{},[73,34028,20094],{},[73,34030,34031],{},"Kringen, beveiligingen, kabels en aftakkingen verbinden",[73,34033,34034],{},"Elektrisch model",[55,34036,34037,34039,34042],{},[73,34038,1721],{},[73,34040,34041],{},"Modules op DIN-rails schikken en beveiligingsketens controleren",[73,34043,34044],{},"Bewerkbare kastplanning",[55,34046,34047,34050,34053],{},[73,34048,34049],{},"Schema en controle",[73,34051,34052],{},"Eendraadschema nakijken en de AREI\u002FRGIE-zelfcontrole uitvoeren",[73,34054,34055],{},"Bevindingen en documenteerbaar schema",[55,34057,34058,34060,34063],{},[73,34059,956],{},[73,34061,34062],{},"Losse pdf’s of een selecteerbaar installatiedossier maken",[73,34064,34065],{},"Projectdocumenten voor controle en afstemming",[12,34067,34068],{},"Bij elke stap kun je de PlanElec-assistent inschakelen: hij werkt in het volledige projectmodel en laat elke wijziging door de zelfcontrole nakijken.",[41,34070,34072],{"id":34071},"eén-projectmodel-in-plaats-van-losse-tekeningen","Eén projectmodel in plaats van losse tekeningen",[12,34074,34075],{},"In klassieke workflows staat dezelfde informatie in meerdere bestanden: in het grondplan, het schema, de kastschets en een tabel. PlanElec bewaart ruimtes, toestellen, elektrische verbindingen, kringen, kabels en beveiligingen in één gekoppeld model. Verplaats je een toestel, dan verandert zijn positie op het situatieplan. Wijzig je zijn elektrische verbinding, dan veranderen topologie en eendraadschema mee. Je controleert elk resultaat, maar je onderhoudt geen losstaande tekeningen meer.",[41,34077,34079],{"id":34078},"grondplan-en-situatieplan-opbouwen","Grondplan en situatieplan opbouwen",[12,34081,34082],{},"In de grondplaneditor teken je buiten- en binnenmuren als veelhoek, rechthoek of losse wandsegmenten. Gesloten vlakken worden ruimtes die je benoemt en indeelt. Deuren, ramen, trappen, maten, badkamerzones en meerdere verdiepingen horen erbij. Een bestaand plan importeer je als beeld-, pdf- of DXF-onderlegger, draai je en kalibreer je met een gekende afstand.",[12,34084,34085,34086,34088,34089,39],{},"Sneller gaat het met ",[15,34087,6843],{},": uit een pdf, scan of foto (ook een Trikker-pdf-export) stelt PlanElec muren, ruimtes met oppervlakte, deuren, ramen en ondersteunde toestelsymbolen voor. De schaal leest PlanElec uit maatlijnen of de pdf-schaal, of je meet zelf twee punten. Je corrigeert het voorstel en neemt het over in een lege verdieping; zonder bevestigde schaal blijft de overname geblokkeerd. Details lees je in ",[30,34090,34091],{"href":5184},"Grondplan en verdeelkast herkennen met AI",[12,34093,34094],{},"Daarna plaats je elektrische symbolen op muren of vrij in de ruimte: stopcontacten en schakelaars, lichtpunten en spots, vaste aansluitingen en bijzondere toestellen zoals een warmtepomp of laadpaal, verbindings- en aftakdozen en verdeelkasten. Het situatieplan gebruikt precies die posities. Een 3D-weergave is beschikbaar voor alle gebruikers; op kleine schermen of zonder WebGL werk je verder in de 2D-weergaven.",[41,34096,34098],{"id":34097},"plannen-met-de-planelec-assistent","Plannen met de PlanElec-assistent",[12,34100,34101],{},"Je beschrijft een opdracht in je eigen woorden, in het Nederlands, Frans, Duits of Engels, en de assistent voert ze uit. Hij werkt met meer dan 100 planningscommando’s in het volledige projectmodel: grondplan, ruimtes, toestellen, kringen, schakelketens, kabels, verdeelkast, automatisering\u002FKNX, PV-strings en lichtsturing.",[1450,34103,34104,34109,34114],{},[1453,34105,34106,34108],{},[15,34107,29877],{}," na elke wijziging controleert PlanElec het project met de AREI\u002FRGIE-zelfcontrole.",[1453,34110,34111,34113],{},[15,34112,29883],{}," elke wijziging is één aparte ongedaanmaakstap en staat in de projectgeschiedenis met opdrachtgever.",[1453,34115,34116,34118],{},[15,34117,29892],{}," eenduidige, omkeerbare opdrachten voert hij meteen uit; risicovolle acties start hij pas na jouw bevestiging. Projecten verwijdert hij nooit.",[12,34120,34121,34122,39],{},"Vakvragen beantwoordt de assistent met onderbouwde bronnen uit de PlanElec-hulp en de volledige AREI\u002FRGIE-tekst. Het taalmodel draait in de EU-regio; de AI-aanbieder bewaart je vragen niet en traint er niet mee. Meer in ",[30,34123,4372],{"href":4371},[41,34125,34127],{"id":34126},"terugkerend-planwerk-automatisch-voorbereiden","Terugkerend planwerk automatisch voorbereiden",[12,34129,34130],{},"PlanElec neemt routinewerk van je over. Elke automatische stap levert een voorstel dat je apart controleert:",[1450,34132,34133,34136,34139,34142,34145,34148,34151],{},[1453,34134,34135],{},"voorstellen voor stopcontacten, verlichting, standaarduitrusting en spotrasters;",[1453,34137,34138],{},"automatische schakelketens voor vrije schakelaars en lichtpunten in een ruimte;",[1453,34140,34141],{},"kabelsegmenten uit de topologie en routes langs de muren;",[1453,34143,34144],{},"automatische groepering en toewijzing van verbruikers aan kringen;",[1453,34146,34147],{},"aparte behandeling van ondersteunde bijzondere toestellen; een laadpaal krijgt een eigen beveiligingsketen;",[1453,34149,34150],{},"lastverdeling over meerdere verdeelkasten en fasebalancering over L1, L2 en L3;",[1453,34152,34153],{},"automatische plaatsing van beveiligingen op DIN-rails met 20 procent vrije ruimte.",[12,34155,34156,34157,34159],{},"De automatische toewijzing plaatst standaardkringen achter differentieelschakelaars van 30 mA en hangt maximaal acht eindstroomkringen aan zo’n differentieelschakelaar. Dat volgt de grens uit AREI Boek 1, onderafdeling 4.2.4.3.b, voor differentieelstroombeschermingsinrichtingen met hoge of zeer hoge gevoeligheid. Elk voorstel kun je verschuiven en opnieuw toewijzen; kabelroutes en lengtes vul je aan of overschrijf je met de hand. De gids ",[30,34158,12586],{"href":6871}," toont de werkwijze in detail.",[41,34161,34163],{"id":34162},"verdeelkast-en-eendraadschema-samen-plannen","Verdeelkast en eendraadschema samen plannen",[12,34165,34166],{},"In de verdeelkasteditor schik je hoofdschakelaar, differentieelschakelaars, automaten en ondersteunde accessoires op echte modulerasters. Beveiligingen plaats je automatisch en verschuif of verbind je daarna met de hand. Bij meerdere fasen toont PlanElec de gemodelleerde lasten en waarschuwt bij duidelijke onbalans. Kastvoorstellen houden rekening met ingevoerde modulebreedtes, reserve en accessoires; bij open gegevens zijn ze een schatting, geen thermische vrijgave.",[12,34168,34169],{},"Voor bestaande installaties laad je foto’s van de verdeelkast op: PlanElec herkent zichtbare DIN-modules met rij, startpositie, breedte en type. Je controleert het voorstel en neemt het over in een lege verdeelkast. Verborgen bedrading is op een foto niet zichtbaar; de elektrische verbindingen leg je vast in de planning.",[12,34171,34172],{},"Het eendraadschema bouwt PlanElec op uit de elektrische topologie. Verbruikerstakken, beveiligingen, aftakkingen en kabelgegevens blijven daardoor verbonden met het projectmodel. Wijzig je een toewijzing, dan wordt het schema opnieuw opgebouwd uit de actuele stand. Ontbrekende of foute koppelingen blijven zichtbaar in plaats van in een tekening te verdwijnen.",[41,34174,34176],{"id":34175},"pv-knx-en-domotica-documenteren","PV, KNX en domotica documenteren",[12,34178,34179],{},"Bij fotovoltaïek wijs je strings toe aan de MPPT’s van de omvormer en documenteer je panelen, DC-beveiliging, kabeldeeltrajecten en aarding van de frames. Dezelfde gegevens gaan naar eendraadschema, situatieplan en materiaallijst. Ontbrekende stringtoewijzingen of fabrikantgegevens blijven zichtbaar.",[12,34181,34182,34183,39],{},"De KNX-documentatie is beschikbaar in pilotomvang: KNX-voeding, schakel- en rolluikactoren, kanaaltoewijzing en drukknoppen verschijnen in het eendraadschema, en ontbrekende voeding, beveiliging of overbelasting blokkeren de finale export. ETS-projectering en groepsadressen blijven in ETS. Met een actief automatiseringsprofiel exporteer je bovendien kanaal- en klemmenplan, ruimtefuncties, topologie en hoeveelheden apart of als domotica-overdrachtsdossier. Meer daarover in ",[30,34184,1031],{"href":1030},[41,34186,34188],{"id":34187},"welke-documenten-kun-je-exporteren","Welke documenten kun je exporteren?",[49,34190,34191,34201],{},[52,34192,34193],{},[55,34194,34195,34198],{},[58,34196,34197],{},"Output",[58,34199,34200],{},"Status vandaag",[68,34202,34203,34211,34218,34225,34233,34241,34249],{},[55,34204,34205,34208],{},[73,34206,34207],{},"Eendraadschema als pdf met meerdere pagina’s",[73,34209,34210],{},"Beschikbaar",[55,34212,34213,34216],{},[73,34214,34215],{},"Situatieplan als pdf",[73,34217,34210],{},[55,34219,34220,34223],{},[73,34221,34222],{},"Indicatief AREI\u002FRGIE-zelfcontrolerapport",[73,34224,34210],{},[55,34226,34227,34230],{},[73,34228,34229],{},"Verdeelkast-pdf",[73,34231,34232],{},"Beschikbaar zodra er verdeelkastgegevens zijn",[55,34234,34235,34238],{},[73,34236,34237],{},"Selecteerbaar installatiedossier",[73,34239,34240],{},"Beschikbaar met voorblad, inhoudsoverzicht, paginanummering en geversioneerde archivering",[55,34242,34243,34246],{},[73,34244,34245],{},"Kring-, kabel- en gedetailleerde materiaallijst",[73,34247,34248],{},"Pilot: fabrikantneutraal, zonder prijzen, standaardaannames zichtbaar",[55,34250,34251,34254],{},[73,34252,34253],{},"Domoticadocumenten",[73,34255,34256],{},"Met actief automatiseringsprofiel; ontwerp met watermerk, finaal bij vervulde gereedheid",[12,34258,34259],{},"Alle professionele documenten dragen je vrijgegeven installateursgegevens en optioneel je logo. Het dossier archiveer je geversioneerd op de server: elke pagina draagt dezelfde dossier-UUID, een QR-sticker van 40 mm leidt naar de gearchiveerde versie, en een SHA-256-controle bewijst herkomst en ongeschondenheid van het bestand. Die archivering bevestigt het bestand, niet de AREI\u002FRGIE-conformiteit van de installatie.",[12,34261,34262,34263,39],{},"De materiaallijst splitst gemodelleerde samenstellingen op in hoeveelheden en toont ze per categorie of ruimte. Kabelhoeveelheden zijn nettolengtes zonder automatisch snijverlies. Bekende, gedeeltelijke en ontbrekende gegevens zijn gemarkeerd als „Known”, „Partial” en „Missing”. Gebruik de lijst als basis voor controle en offerte; een bestelvrijgave is ze niet. De status van elk document en de downloadstappen staan in ",[30,34264,6882],{"href":2451},[41,34266,34268],{"id":34267},"wat-controleert-planelec-volgens-het-areirgie","Wat controleert PlanElec volgens het AREI\u002FRGIE?",[12,34270,34271],{},"De softwarematige zelfcontrole toetst een gedocumenteerd deel van de regels die uit de ingevoerde projectgegevens beslisbaar zijn. Ze toont bevindingen voor ondersteunde domeinen en markeert gekende dekkingslacunes en onvolledige controles uitdrukkelijk. Een foutloze run betekent: binnen de ondersteunde regels vindt PlanElec in jouw gegevens geen fout. Het rapport is je zelfcontrole, geen conformiteitsattest; de officiële beoordeling doet een erkend controleorganisme.",[1396,34273,34275],{"id":34274},"hoe-groot-is-die-dekking-precies","Hoe groot is die dekking precies?",[12,34277,34278],{},"Een installateur vroeg het ons rechtstreeks: dekt PlanElec heel Boek 1, met alle uitzonderingen, of de meest voorkomende gevallen? Het antwoord: de meest voorkomende gevallen, en die duidelijk afgebakend.",[12,34280,7641,34281,34284,34285,34288],{},[15,34282,34283],{},"geïntegreerde regeltekst"," is volledig: Boek 1, versie 06, delen 1 tot en met 9, van toepassing sinds 1 april 2026. De ",[15,34286,34287],{},"automatische controlelogica"," richt zich op beschermingsmaatregelen, aarding, kabeldimensionering en volledigheid van het dossier in een huishoudelijke wisselstroominstallatie. Van de veertien hoofdstukken over bijzondere installaties in deel 7 raakt ze er drie gedeeltelijk: ruimten met bad of douche (7.1), laadpunten voor elektrische voertuigen (7.22) en huishoudelijke PV-installaties (7.112). Niet inbegrepen zijn de gelijkstroomzijde met de geleiders L+, L-, M, PEM en PEL en de overgangsuitzonderingen van de artikelen 59 en 69 van het wijzigingsbesluit van 6 oktober 2025.",[12,34290,7641,34291,34294],{},[30,34292,34293],{"href":2457},"volledige lijst van wat de zelfcontrole wel en niet toetst"," staat in de kennisbank.",[41,34296,34298],{"id":34297},"voor-wie-is-planelec","Voor wie is PlanElec?",[1450,34300,34301,34307,34313],{},[1453,34302,34303,34306],{},[15,34304,34305],{},"Elektro-installateurs"," krijgen één doorlopende weg van opname tot plannen, lijsten en dossier.",[1453,34308,34309,34312],{},[15,34310,34311],{},"Ontwerpers"," modelleren ruimtelijke en elektrische samenhang samen en passen varianten traceerbaar aan.",[1453,34314,34315,34318],{},[15,34316,34317],{},"Geëngageerde bouwheren en eigenaars"," bereiden een bestaande installatie of een ontwerp gestructureerd voor en stemmen het resultaat vóór de uitvoering af met een gekwalificeerde elektricien.",[41,34320,16940],{"id":16939},[12,34322,34323,34324,34326],{},"Tijdens de Early Access gebruik je PlanElec voor 0 EUR, inclusief de AI-functies binnen je persoonlijke AI-tegoed. Er zijn geen kosten en geen facturen. Het toekomstige tariefmodel staat op de ",[30,34325,6274],{"href":4449},", alle prijzen excl. 21 % btw:",[49,34328,34329,34339],{},[52,34330,34331],{},[55,34332,34333,34335,34337],{},[58,34334,6315],{},[58,34336,4940],{},[58,34338,1288],{},[68,34340,34341,34352,34363],{},[55,34342,34343,34346,34349],{},[73,34344,34345],{},"Free",[73,34347,34348],{},"0 EUR, blijvend",[73,34350,34351],{},"Volledige planning zonder project- of kringlimiet; exports met afgeschermde vlakken",[55,34353,34354,34357,34360],{},[73,34355,34356],{},"Eenmalig gebruik",[73,34358,34359],{},"12 EUR per object, eenmalig",[73,34361,34362],{},"Alle documenten zonder afscherming voor één bevestigd objectadres",[55,34364,34365,34367,34370],{},[73,34366,5247],{},[73,34368,34369],{},"24 EUR per maand of 240 EUR per jaar; de prijs blijft zolang het abonnement loopt",[73,34371,34372],{},"Alle projecten en documenten zonder afscherming, drie bewerkingsplaatsen",[12,34374,34375],{},"De startdatum van de betalende formules kondigen we tijdig vooraf aan. Wie zich vóór de start registreert, gebruikt PlanElec vanaf de start de eerste volledige kalendermaand gratis.",[41,34377,34379],{"id":34378},"praktische-werkwijze-voor-de-vakkundige-vrijgave","Praktische werkwijze voor de vakkundige vrijgave",[12,34381,34382],{},"Behandel elke automatische stap als een voorstel met een aangeduide beoordelaar. Leg eerst gebouwgeometrie en ruimtes vast en plaats daarna alleen materieel dat echt gepland is. Controleer schakelketens en verbindingsdozen vóór de kringtoewijzing, want topologiefouten werken door in kabelsegmenten en eendraadschema. Vervang standaardwaarden door echte geleider- en beveiligingsgegevens.",[12,34384,34385],{},"In de verdeelkast controleer je fasen, voorbeveiliging, differentieelgroepen, modulereserve en de elektrische paden tussen de toestellen. Het raster schikt de modules; gemeten foutvoorwaarden, de verwachte kortsluitstroom, de plaatsingswijze en fabrikantgrenzen beoordeel jij als vakman.",[12,34387,34388],{},"Vóór de export voer je de zelfcontrole uit en lees je bevindingen en dekkingsmeldingen. Groen betekent: de ondersteunde controles vinden in jouw gegevens geen probleem. Vergelijk daarna situatieplan en eendraadschema met de uitvoering en vul metingen en fabrikantdocumenten aan. De keuring doet een erkend controleorganisme.",[41,34390,34392],{"id":34391},"overdracht-in-team-en-een-nette-revisie","Overdracht in team en een nette revisie",[12,34394,34395],{},"Leg per project vast wie grondplan, topologie, verdeelkast en vergelijking met de werkelijke toestand vrijgeeft. Open velden draag je over als open, in plaats van ze te vullen met aannemelijk klinkende aannames. Zo ziet de volgende persoon of een kabellengte gemeten, uit het grondplan berekend of manueel overschreven is. Dezelfde discipline geldt voor toestelvermogen, fasetoewijzing en beveiligingscomponenten.",[12,34397,34398],{},"Een voorbeeld: in een keuken komt een vaatwasserkring bij. De wijziging begint bij het toestel op het grondplan, daarna volgen elektrische verbinding, kring, beveiliging, kabelgegevens en plaats in de verdeelkast. Situatieplan en eendraadschema ontstaan opnieuw uit dezelfde stand; je controleert dat de nieuwe referentie in beide documenten gelijk is. In plaats van het oude dossier stilletjes te vervangen, archiveer je een nieuwe versie en noteer je welke kringen erbij kwamen en wat ter plaatse bevestigd moet worden.",[12,34400,34401],{},"Bij projecten met meerdere verdeelkasten modelleer je de relaties tussen bron en onderverdeling uitdrukkelijk. Controleer welke verdeelkast een kring werkelijk voedt en of de documenten dezelfde hiërarchie tonen. Niet-ondersteunde installatiedelen benoem je bij de overdracht, zodat niemand ze voor automatisch gecontroleerd houdt.",[12,34403,34404,34405,34407,34408,34411,34412,39],{},"Dit overzicht is op 5 oktober 2026 getoetst aan het ",[30,34406,20219],{"href":20218},", de prijspagina en de bereikbare editor- en exportstappen. Bij twijfel geldt de status die het product zelf toont. Verder lees je in het ",[30,34409,34410],{"href":10161},"helpcentrum",", of je ",[30,34413,34414],{"href":15328},"registreert je gratis",{"title":1467,"searchDepth":1468,"depth":1468,"links":34416},[34417,34418,34419,34420,34421,34422,34423,34424,34425,34428,34429,34430,34431],{"id":33978,"depth":1468,"text":33979},{"id":34071,"depth":1468,"text":34072},{"id":34078,"depth":1468,"text":34079},{"id":34097,"depth":1468,"text":34098},{"id":34126,"depth":1468,"text":34127},{"id":34162,"depth":1468,"text":34163},{"id":34175,"depth":1468,"text":34176},{"id":34187,"depth":1468,"text":34188},{"id":34267,"depth":1468,"text":34268,"children":34426},[34427],{"id":34274,"depth":1486,"text":34275},{"id":34297,"depth":1468,"text":34298},{"id":16939,"depth":1468,"text":16940},{"id":34378,"depth":1468,"text":34379},{"id":34391,"depth":1468,"text":34392},"Grondplan, AI-assistent, automatische kring- en kastplanning, eendraadschema, situatieplan, zelfcontrole en pdf-dossier: het functieoverzicht met status en grenzen.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-capabilities-overview-editorial.jpg","\u002Fblog\u002Fwhat-can-you-do-with-planelec.nl",{"title":33961,"description":34432},"Wat kun je met PlanElec? Van grondplan tot dossier","wat-kan-je-met-planelec","blog\u002Fwhat-can-you-do-with-planelec.nl",[1337,34441,6216,3273,14346,6872,16577,3275,3276],"elektrische planning","gE-XqxJ5Qskedju-UIsr1TJFHauzFvkpAJK_vpm7FEw",{"id":34444,"title":34445,"body":34446,"category":4028,"description":35560,"extension":1496,"guideId":35561,"image":35562,"locale":1497,"meta":35563,"navigation":1499,"order":3263,"path":35564,"publishedAt":33940,"readTime":7016,"seo":35565,"seoTitle":4037,"slug":35566,"stem":35567,"tags":35568,"updatedAt":3255,"__hash__":35571,"kind":2491,"href":8239,"date":33940},"help\u002Fhelp\u002Fgetting-started.nl.md","Aan de slag: van nieuw project tot je eerste pdf",{"type":9,"value":34447,"toc":35541},[34448,34457,34462,34467,34471,34536,34539,34544,34548,34551,34611,34625,34630,34634,34637,34702,34708,34728,34731,34738,34742,34745,34820,34826,34848,34851,34891,34894,34898,34902,34921,34926,34933,34937,34964,34971,34975,34979,34985,34992,35001,35008,35012,35056,35072,35076,35080,35087,35160,35163,35168,35172,35179,35183,35186,35209,35214,35218,35221,35230,35299,35308,35323,35329,35334,35338,35341,35445,35449,35473,35483,35487,35490,35502,35507,35511,35525,35532],[12,34449,34450,34451,34453,34454,34456],{},"Voor je eerste project heb je een PlanElec-account en een recente browser nodig. Je maakt het project in de studio aan met ",[15,34452,2664],{},", kiest een van twee planningsaanpakken en werkt vanuit de plattegrond of het eendraadschema door tot de modus ",[15,34455,956],{},". Daar download je elk document eerst als concept. Alle onderdelen werken op hetzelfde projectmodel: grondplan, installatie, verdeelkast, eendraadschema en documenten hoef je nooit apart bij te werken. De AREI-zelfcontrole toont je openstaande punten binnen de ondersteunde regels; de officiële keuring doet het erkend organisme.",[31245,34458,34459],{},[12,34460,34461],{},"Gebruik je PlanElec als eigenaar of bouwheer? Laat keuzes en documenten vóór uitvoering en keuring nakijken door een gekwalificeerde elektricien.",[12,34463,34464],{},[30,34465],{"id":34466},"project",[41,34468,34470],{"id":34469},"hoe-maak-ik-een-nieuw-project-aan","Hoe maak ik een nieuw project aan?",[1602,34472,34473,34485,34497,34506,34513,34531],{},[1453,34474,12348,34475,34478,34479,34481,34482,34484],{},[15,34476,34477],{},"Projecten"," en klik op de plusknop ",[15,34480,2664],{},". Je vindt ",[15,34483,2664],{}," ook in het projectmenu, dat je opent met de blauwe PlanElec-knop linksboven.",[1453,34486,34487,34488,1748,34490,34492,34493,34496],{},"Vul in het venster ",[15,34489,2664],{},[15,34491,13957],{}," van minstens twee tekens in. De ",[15,34494,34495],{},"Beschrijving"," is optioneel.",[1453,34498,1683,34499,8808,34501,933,34503,34505],{},[15,34500,30002],{},[15,34502,6826],{},[15,34504,6830],{}," (zie de volgende sectie).",[1453,34507,34508,34509,34512],{},"Kies bij de plattegrondaanpak onder ",[15,34510,34511],{},"Hoe wil je starten?"," je vertrekpunt.",[1453,34514,1683,34515,34518,34519,702,34522,702,34525,1628,34528,39],{},[15,34516,34517],{},"Projecttype"," de aanleiding: ",[15,34520,34521],{},"Nieuwbouw",[15,34523,34524],{},"Bestaande installatie documenteren",[15,34526,34527],{},"Uitbreiding",[15,34529,34530],{},"Renovatie",[1453,34532,1857,34533,34535],{},[15,34534,1937],{},". PlanElec maakt het project aan en opent het in de studio.",[12,34537,34538],{},"Ontbreekt de naam, dan springt het venster terug naar het naamveld en zegt het waarom. De keuzes in het venster wijzigen alleen de begeleiding; alle editorfuncties blijven in elke aanpak beschikbaar.",[12,34540,34541],{},[30,34542],{"id":34543},"planning-path",[41,34545,34547],{"id":34546},"plattegrond-of-eendraadschema-welke-aanpak-past-bij-jou","Plattegrond of eendraadschema: welke aanpak past bij jou?",[12,34549,34550],{},"Beide aanpakken maken hetzelfde projecttype aan. Alleen het startpunt verschilt.",[49,34552,34553,34570],{},[52,34554,34555],{},[55,34556,34557,34559,34561,34567],{},[58,34558,30002],{},[58,34560,66],{},[58,34562,34563,34564,34566],{},"Wat er na ",[15,34565,1937],{}," gebeurt",[58,34568,34569],{},"Goed om te weten",[68,34571,34572,34591],{},[55,34573,34574,34579,34582,34588],{},[73,34575,34576,34578],{},[15,34577,6826],{}," (Aanbevolen)",[73,34580,34581],{},"Wie ruimtes en toestellen ruimtelijk wil vastleggen",[73,34583,34584,34585,34587],{},"De modus ",[15,34586,10326],{}," opent; afhankelijk van je vertrekpunt start de begeleiding of een sjabloon",[73,34589,34590],{},"Het eendraadschema wordt opgebouwd uit de ingevoerde ruimtes, toestellen en stroomkringen",[55,34592,34593,34597,34600,34608],{},[73,34594,34595],{},[15,34596,6830],{},[73,34598,34599],{},"Wie overstapt van klassieke tekenprogramma's",[73,34601,34584,34602,34604,34605,34607],{},[15,34603,8591],{}," opent met een gemaximaliseerd ",[15,34606,3764],{},"; hoofdverdeler en installatiekop staan klaar als aanname",[73,34609,34610],{},"Je plaatst symbolen rechtstreeks in het schema. Zonder getekende plattegrond blijft het situatieplan buiten het dossier en blokkeren ruimtelijke controles het schema en het zelfcontrolerapport niet. Alle andere controles blijven gelden",[12,34612,34613,34614,957,34616,34618,34619,34621,34622,34624],{},"Je wisselt later van aanpak via het projectmenu, ",[15,34615,12981],{},[15,34617,12984],{},". Wisselen verandert alleen het startpunt en de exportinstellingen; schema, plattegrond en verdeelbord blijven ongewijzigd. Trikker-bestanden (",[1300,34620,2505],{},") worden projecten zonder dat je met een leeg project begint: ",[30,34623,2514],{"href":2513},". Projectbestanden uit andere planningsprogramma's importeert PlanElec niet.",[12,34626,34627],{},[30,34628],{"id":34629},"entry-modes",[41,34631,34633],{"id":34632},"begeleid-met-een-sjabloon-of-zonder-begeleiding-starten","Begeleid, met een sjabloon of zonder begeleiding starten?",[12,34635,34636],{},"Bij de plattegrondaanpak biedt het venster vier vertrekpunten:",[49,34638,34639,34649],{},[52,34640,34641],{},[55,34642,34643,34646],{},[58,34644,34645],{},"Vertrekpunt",[58,34647,34648],{},"Wat het doet",[68,34650,34651,34672,34682,34692],{},[55,34652,34653,34658],{},[73,34654,34655,34578],{},[15,34656,34657],{},"Begeleid opbouwen",[73,34659,34660,34661,34664,34665,34668,34669,39],{},"Start de workflow ",[15,34662,34663],{},"Installatie vastleggen"," en opent de coach in het paneel ",[15,34666,34667],{},"Workflow",". Die leidt je van het gebouw tot ",[15,34670,34671],{},"Schema controleren en bevestigen",[55,34673,34674,34679],{},[73,34675,34676],{},[15,34677,34678],{},"Met een sjabloon starten",[73,34680,34681],{},"Laadt een voorbereid startproject en start eveneens de begeleiding.",[55,34683,34684,34689],{},[73,34685,34686],{},[15,34687,34688],{},"Begin met het situatieschema",[73,34690,34691],{},"Je plaatst eerst de verbruikers en plant daarna de installatie; de kast en moduleplaatsen blijven voorlopig open. Start eveneens de begeleiding.",[55,34693,34694,34699],{},[73,34695,34696],{},[15,34697,34698],{},"Zonder begeleiding",[73,34700,34701],{},"Opent meteen de vrije editor met alle gereedschappen, zonder coach.",[12,34703,14642,34704,34707],{},[15,34705,34706],{},"Startproject kiezen"," staan drie sjablonen klaar:",[1450,34709,34710,34716,34722],{},[1453,34711,34712,34715],{},[15,34713,34714],{},"Klein appartement",": vijf ruimtes, standaardverbruikers en een hoofdverdeler met twee rijen.",[1453,34717,34718,34721],{},[15,34719,34720],{},"Eengezinswoning",": meerdere verdiepingen, typische woonkringen en een hoofdverdeler met drie rijen.",[1453,34723,34724,34727],{},[15,34725,34726],{},"Inventarisatie bestaande installatie",": een compact vertrekpunt voor een oudere bestaande installatie.",[12,34729,34730],{},"Een sjabloon is een voorbeeld, geen ontwerp voor jouw woning. Pas ruimtes, toestellen en verdelers aan de echte installatie aan. De coach markeert stappen die al in het project staan. Je kunt een stap overslaan of de workflow beëindigen; je projectgegevens blijven daarbij behouden.",[12,34732,34733,34736],{},[30,34734],{"id":34735},"floorplan",[30,34737],{"id":11521},[41,34739,34741],{"id":34740},"de-plattegrond-tekenen-uploaden-of-door-ai-laten-herkennen","De plattegrond tekenen, uploaden of door AI laten herkennen",[12,34743,34744],{},"De studio is opgedeeld in modi die je in de linkerbalk kiest. Elke modus brengt passende gereedschappen en panelen mee:",[49,34746,34747,34756],{},[52,34748,34749],{},[55,34750,34751,34754],{},[58,34752,34753],{},"Modus",[58,34755,1551],{},[68,34757,34758,34767,34776,34785,34794,34803,34811],{},[55,34759,34760,34764],{},[73,34761,34762],{},[15,34763,10326],{},[73,34765,34766],{},"Muren, ruimtes, deuren, vensters, trappen, plansjablonen en kalibratie",[55,34768,34769,34773],{},[73,34770,34771],{},[15,34772,8575],{},[73,34774,34775],{},"Inrichting als oriëntatie op het plan",[55,34777,34778,34782],{},[73,34779,34780],{},[15,34781,8591],{},[73,34783,34784],{},"Toestellen, schakelketens, stroomkringen, kabeltracés, installatie",[55,34786,34787,34791],{},[73,34788,34789],{},[15,34790,444],{},[73,34792,34793],{},"Busleidingen, verdeelkast en kanalen van de automatisering",[55,34795,34796,34800],{},[73,34797,34798],{},[15,34799,1182],{},[73,34801,34802],{},"Lichtplanning en lichtstudie",[55,34804,34805,34809],{},[73,34806,34807],{},[15,34808,8445],{},[73,34810,11118],{},[55,34812,34813,34817],{},[73,34814,34815],{},[15,34816,956],{},[73,34818,34819],{},"Documenten controleren, downloaden en archiveren",[12,34821,34822,34823,34825],{},"Op een lege verdieping vraagt PlanElec ",[15,34824,10330],{}," en biedt het drie wegen:",[1450,34827,34828,34834,34841],{},[1453,34829,34830,34833],{},[15,34831,34832],{},"Grondplan tekenen",": je maakt ruimtes rechtstreeks op het situatieplan aan.",[1453,34835,34836,34838,34839,39],{},[15,34837,12477],{},": een pdf, afbeelding of DXF dient als sjabloon om over te tekenen. Pagina's, uitsneden en schaal stel je in zoals beschreven in ",[30,34840,3378],{"href":3377},[1453,34842,34843,34845,34846],{},[15,34844,10335],{},": uit een pdf of afbeelding komen muren en ruimtes als voorstel. Je controleert het ontwerp en meet een bekende afstand na voordat je het overneemt. De pagina wordt daarvoor naar een externe AI-aanbieder verzonden. Werkwijze en grenzen lees je in ",[30,34847,10196],{"href":3381},[12,34849,34850],{},"Zelf tekenen gaat zo:",[1602,34852,34853,34863,34870,34883,34886],{},[1453,34854,30531,34855,34857,34858,1628,34860,34862],{},[15,34856,10326],{}," het gereedschap ",[15,34859,30792],{},[15,34861,30795],{},". Exacte maten tik je tijdens het tekenen in: Tab wisselt van veld, Enter bevestigt.",[1453,34864,34865,34866,34869],{},"Sluit de omtrek. PlanElec herkent gesloten vlakken als ruimtes; met ",[15,34867,34868],{},"Ruimte splitsen"," deel je een ruimte op.",[1453,34871,34872,34873,702,34876,933,34879,34882],{},"Plaats ",[15,34874,34875],{},"Deur",[15,34877,34878],{},"Venster",[15,34880,34881],{},"Trap"," op hun werkelijke plaats.",[1453,34884,34885],{},"Selecteer een ruimte en kies het ruimtetype, bijvoorbeeld keuken, badkamer of technische ruimte. De latere toestelaanbevelingen hangen daarvan af.",[1453,34887,34888,34889,39],{},"Voeg verdiepingen toe. Elke verdieping bewerk je apart; hoe je ze op elkaar uitlijnt, lees je in ",[30,34890,14807],{"href":8598},[12,34892,34893],{},"Succescriterium: elke ruimte is gesloten, benoemd en getypeerd. Dan is het tijd om toestellen te plaatsen.",[12,34895,34896],{},[30,34897],{"id":20349},[41,34899,34901],{"id":34900},"toestellen-plaatsen-en-verbinden","Toestellen plaatsen en verbinden",[1602,34903,34904,34909,34912,34918],{},[1453,34905,11537,34906,34908],{},[15,34907,8591],{},". Onderaan verschijnt het palet met ruimteaanbevelingen en de toestellencatalogus.",[1453,34910,34911],{},"Plaats stopcontacten, schakelaars, lichtpunten, vaste aansluitingen, aftakdozen en de verdeelkast. Wandgebonden symbolen klikken aan de muur vast.",[1453,34913,34914,34915,34917],{},"Koppel schakelaars en lichtpunten met het gereedschap ",[15,34916,25720],{},". Voor vrije schakelaars en lichten in een ruimte stelt PlanElec een keten voor; controleer de volgorde voor je die overneemt.",[1453,34919,34920],{},"Controleer de lijst met onverbonden en niet-geplaatste componenten. Een symbool op de plattegrond hoort pas bij het elektrische model als de koppeling met de topologie klopt.",[12,34922,34923,34924,39],{},"Palet, iconen en topologie in detail: ",[30,34925,9308],{"href":9307},[12,34927,34928,34931],{},[30,34929],{"id":34930},"automatic-planning",[30,34932],{"id":20002},[41,34934,34936],{"id":34935},"stroomkringen-installatie-en-verdeelkast-plannen","Stroomkringen, installatie en verdeelkast plannen",[1602,34938,34939,34948,34956,34961],{},[1453,34940,10367,34941,30358,34943,34945,34946,39],{},[15,34942,12532],{},[15,34944,19624],{}," plant PlanElec stroomkringen en beveiligingen voor de open verbruikers. Controleer het voorbeeld met doelverdeler, stroomkringen en beveiligingen en klik op ",[15,34947,19633],{},[1453,34949,34950,34951,34953,34954,39],{},"Losse toestellen wijs je toe met ",[15,34952,31138],{},", kabelwegen leg je vast met ",[15,34955,13142],{},[1453,34957,10367,34958,34960],{},[15,34959,1721],{},". De automatische indeling plaatst hoofdschakelaars, differentieelschakelaars en automaten na een voorbeeld op de DIN-rails en houdt reserve vrij.",[1453,34962,34963],{},"Controleer beveiligingsketen, faseverdeling, moduleplaatsen en de getoonde waarschuwingen.",[12,34965,34966,34967,933,34969,39],{},"Elke automatische stap is een bewerkbaar voorstel. Controleer daarna de koppeling met verdeler en stroomkring, beveiligingen, kabelgegevens, aftakdozen en berekende kabellengtes. Meer in ",[30,34968,14227],{"href":6871},[30,34970,14194],{"href":11068},[12,34972,34973],{},[30,34974],{"id":20416},[41,34976,34978],{"id":34977},"eendraadschema-en-zelfcontrole-nakijken","Eendraadschema en zelfcontrole nakijken",[12,34980,34981,34982,34984],{},"Het eendraadschema wordt uit dezelfde topologie opgebouwd. Open het paneel ",[15,34983,3764],{}," en controleer kringnamen, beveiligingen, kabelgegevens, plaatsingswijze en symbolen. Klopt een koppeling niet, corrigeer dan de verbruiker, stroomkring of het kabeldeel in het model, niet alleen de tekening.",[12,34986,10502,34987,34989,34990],{},[15,34988,12809],{}," toont de bevindingen van de AREI-zelfcontrole. Die dekt een gedocumenteerd deel van de regels die op basis van de ingevoerde gegevens te beslissen zijn. Een run zonder fouten betekent: geen fouten binnen deze ondersteunde regels. Metingen, omstandigheden ter plaatse en niet-gemodelleerde regels vallen erbuiten. De precieze dekking lees je in ",[30,34991,2458],{"href":2457},[12,34993,34994,34996,34998],{},[30,34995],{"id":13570},[30,34997],{"id":10176},[30,34999],{"id":35000},"first-pdf",[422,35002],{":height":35003,":width":35004,"alt":35005,"caption":35006,"src":35007},"222","870","Exportweergave met één documentkaart voor het eendraadschema, voorbeeld, ontwerp en vergrendelde definitieve overdracht.","De status van de kaart beschrijft de beschikbare werkstand; een vergrendelde definitieve overdracht komt pas vrij na geslaagde exportgereedheid.","\u002Fhelp\u002Fworkflows\u002Fnl-document-selection.png",[41,35009,35011],{"id":35010},"hoe-kom-ik-tot-mijn-eerste-pdf","Hoe kom ik tot mijn eerste pdf?",[1602,35013,35014,35021,35032,35041,35046],{},[1453,35015,11537,35016,35018,35019,10358],{},[15,35017,956],{},". Het paneel ",[15,35020,6532],{},[1453,35022,35023,35024,35027,35028,35031],{},"Controleer onder ",[15,35025,35026],{},"Eén gegevensbron voor alle documenten"," de projectgegevens en vul ze aan met ",[15,35029,35030],{},"Metadata bewerken",": klant, installatieadres, installateur, erkenningsnummer en EAN.",[1453,35033,35034,35035,35037,35038,35040],{},"Open bij ",[15,35036,3764],{}," het ",[15,35039,8796],{}," en controleer pagina's en titelblok.",[1453,35042,1857,35043,35045],{},[15,35044,9513],{},". Je krijgt een pdf met conceptmarkering voor een visuele controle.",[1453,35047,35048,35049,35051,35052,35055],{},"Lees de status van de kaart: bij ",[15,35050,9583],{}," staat het volgende punt als link, bijvoorbeeld ",[15,35053,35054],{},"Eendraadschema nakijken en bevestigen",". Een klik brengt je erheen.",[12,35057,35058,35059,1628,35061,35063,35064,35066,35067,35069,35070,39],{},"Pas als een kaart ",[15,35060,9576],{},[15,35062,9579],{}," toont, wordt ",[15,35065,8036],{}," actief; aandachtspunten bevestig je vóór de archivering. Die versie archiveert PlanElec met versiebeheer op de server. Wat daarbij bewaard wordt en hoe je de QR-code verifieert, lees je in ",[30,35068,9359],{"href":8233},". Alle documenten, statussen en het dossier staan in ",[30,35071,6882],{"href":2451},[12,35073,35074],{},[30,35075],{"id":2491},[41,35077,35079],{"id":35078},"waar-vind-ik-hulp-in-de-studio","Waar vind ik hulp in de studio?",[12,35081,35082,35083,35086],{},"Het vraagteken ",[15,35084,35085],{},"Hulp"," in de kopbalk opent een menu met deze onderdelen:",[49,35088,35089,35097],{},[52,35090,35091],{},[55,35092,35093,35095],{},[58,35094,3751],{},[58,35096,8107],{},[68,35098,35099,35109,35119,35129,35141,35151],{},[55,35100,35101,35106],{},[73,35102,35103],{},[15,35104,35105],{},"Snelle hulp",[73,35107,35108],{},"Verschijnt in de weergaven plattegrond, installatie, verdeelkast en eendraadschema met vijf korte stappen.",[55,35110,35111,35116],{},[73,35112,35113],{},[15,35114,35115],{},"Studio-rondleiding starten",[73,35117,35118],{},"Toont na elkaar het projectmenu, de modusbalk, de gereedschapsbalk, het palet, de panelen, de weergave, de verdiepingen, de status, het zoeken en de assistent.",[55,35120,35121,35126],{},[73,35122,35123],{},[15,35124,35125],{},"Praktijktutorial openen",[73,35127,35128],{},"Acht hoofdstukken om mee te doen: Plattegrond tekenen, Toestellen en verdeelbord plaatsen, Dak maken, Dakvlakken met PV beleggen, Verdeelkast genereren, PV aansluiten, Kabels aanmaken en leggen, Controleren en exporteren.",[55,35130,35131,35136],{},[73,35132,35133],{},[15,35134,35135],{},"Begeleide opbouw opnieuw starten",[73,35137,34660,35138,35140],{},[15,35139,34663],{}," opnieuw en opent de coach.",[55,35142,35143,35148],{},[73,35144,35145],{},[15,35146,35147],{},"Bijpassende handleiding openen",[73,35149,35150],{},"Opent het kennisbankartikel over de huidige weergave in een nieuw tabblad.",[55,35152,35153,35157],{},[73,35154,35155],{},[15,35156,8005],{},[73,35158,35159],{},"Opent de handleiding over typische problemen, los van de huidige weergave.",[12,35161,35162],{},"De rondleiding en de tutorial zijn alleen in de studio beschikbaar.",[12,35164,35165],{},[30,35166],{"id":35167},"assistant",[41,35169,35171],{"id":35170},"de-ai-assistent-om-hulp-vragen","De AI-assistent om hulp vragen",[12,35173,1051,35174,35176,35177],{},[15,35175,7061],{}," schrijf je de PlanElec-assistent in het Nederlands, Frans, Duits of Engels. Hij beantwoordt vakvragen met bronnen uit de hulp en de volledige AREI-tekst en voert planningsopdrachten in het project uit, bijvoorbeeld voor ruimtes, toestellen, stroomkringen of de verdeelkast. Eenduidige, omkeerbare wijzigingen voert hij meteen uit; riskantere acties bevestig je eerst. Elke wijziging is een aparte stap om ongedaan te maken en staat in de projectgeschiedenis. Elke run verbruikt je AI-tegoed. Meer in ",[30,35178,19103],{"href":6559},[41,35180,35182],{"id":35181},"checklist-vóór-je-eerste-download","Checklist vóór je eerste download",[12,35184,35185],{},"Controleer vóór je eerste download of:",[1450,35187,35188,35191,35194,35197,35200,35203,35206],{},[1453,35189,35190],{},"alle verdiepingen en ruimtes bestaan, benoemd en getypeerd zijn;",[1453,35192,35193],{},"elektrische symbolen op de juiste plaats staan;",[1453,35195,35196],{},"verbruikers verbonden zijn met topologie, stroomkring en verdeler;",[1453,35198,35199],{},"kabelgegevens en berekende of manuele lengtes nagekeken zijn;",[1453,35201,35202],{},"verdeelkast en beveiligingsketen overeenkomen met de geplande opbouw;",[1453,35204,35205],{},"project-, klant-, installateurs- en installatiegegevens volledig zijn;",[1453,35207,35208],{},"de bevindingen van de zelfcontrole bekeken en beoordeeld zijn.",[12,35210,35211],{},[30,35212],{"id":35213},"autosave",[41,35215,35217],{"id":35216},"opslaan-wordt-het-project-automatisch-opgeslagen","Opslaan: wordt het project automatisch opgeslagen?",[12,35219,35220],{},"Ja. PlanElec slaat elke wijziging in de studio automatisch op, ongeveer 1,5 seconde na de laatste bewerking en bij doorlopend werken uiterlijk na enkele seconden. Dat geldt voor het hele project: plattegrond (grondplan), ruimtes, toestellen, stroomkringen en alle andere projectgegevens. Er is geen knop om op te slaan; je hoeft niets handmatig te bewaren.",[12,35222,35223,35224,1628,35227,35229],{},"De opslagstatus staat in de ronde statusaanduiding in de statusbalk rechtsonder in de studio. Klik erop voor de details: opslagstatus, tijdstip van de laatste opslag, verbinding (",[15,35225,35226],{},"Online",[15,35228,6521],{},") en de laatste volledige serverstand.",[49,35231,35232,35241],{},[52,35233,35234],{},[55,35235,35236,35239],{},[58,35237,35238],{},"Aanduiding",[58,35240,752],{},[68,35242,35243,35252,35261,35271,35280,35289],{},[55,35244,35245,35249],{},[73,35246,35247],{},[15,35248,7880],{},[73,35250,35251],{},"Alle wijzigingen staan op de server.",[55,35253,35254,35258],{},[73,35255,35256],{},[15,35257,7943],{},[73,35259,35260],{},"De laatste wijziging wordt doorgestuurd.",[55,35262,35263,35268],{},[73,35264,35265],{},[15,35266,35267],{},"Niet opgeslagen",[73,35269,35270],{},"Wijzigingen wachten op de volgende automatische opslag.",[55,35272,35273,35277],{},[73,35274,35275],{},[15,35276,7914],{},[73,35278,35279],{},"De wijzigingen zijn in deze browser bewaard; de serverback-up volgt nog.",[55,35281,35282,35286],{},[73,35283,35284],{},[15,35285,6521],{},[73,35287,35288],{},"Geen verbinding. Wijzigingen worden lokaal opgeslagen.",[55,35290,35291,35296],{},[73,35292,35293],{},[15,35294,35295],{},"Opslaan mislukt",[73,35297,35298],{},"De server heeft de wijziging niet aanvaard; de details vermelden de reden.",[12,35300,35301,35304,35305,35307],{},[15,35302,35303],{},"Zonder internetverbinding"," werk je gewoon verder. PlanElec bewaart de wijzigingen in deze browser en stuurt ze automatisch door zodra de verbinding terug is. Sluit je het tabblad, dan verstuurt PlanElec openstaande wijzigingen nog bij het sluiten; wat daarbij niet aankomt, haalt de studio in wanneer je het project opnieuw opent in dezelfde browser. Wis daarom geen browsergegevens zolang de aanduiding niet ",[15,35306,7880],{}," toont.",[12,35309,35310,35313,35314,1725,35316,35319,35320,39],{},[15,35311,35312],{},"Bij een conflict",", bijvoorbeeld wanneer hetzelfde project intussen op een ander toestel werd gewijzigd, meldt de statusaanduiding dat. PlanElec bewaart jouw lokale stand dan als concept. Je vindt het in het paneel ",[15,35315,34477],{},[15,35317,35318],{},"Herstelde concepten"," en opent het met ",[15,35321,35322],{},"Concept als projectkopie openen",[12,35324,35325,35326,35328],{},"Eén stap terugzetten doe je met ",[15,35327,6795],{},": via de pijl rechtsboven in de studio of met Ctrl+Z (Mac: Cmd+Z).",[12,35330,35331],{},[30,35332],{"id":35333},"start-over",[41,35335,35337],{"id":35336},"opnieuw-beginnen-van-nul-starten-of-delen-verwijderen","Opnieuw beginnen: van nul starten of delen verwijderen",[12,35339,35340],{},"Wil je helemaal opnieuw beginnen, maak dan een nieuw project aan en archiveer het oude. Wil je alleen delen weggooien, verwijder dan gericht toestellen, ruimtes, een plattegrond (onderlegger) of een verdieping. Een knop „alles wissen” die een volledig project in één keer leegmaakt, bestaat niet.",[49,35342,35343,35355],{},[52,35344,35345],{},[55,35346,35347,35349,35352],{},[58,35348,14382],{},[58,35350,35351],{},"Weg in de studio",[58,35353,35354],{},"Terugzetten",[68,35356,35357,35369,35388,35403,35417,35431],{},[55,35358,35359,35362,35366],{},[73,35360,35361],{},"Volledig opnieuw beginnen",[73,35363,31030,35364],{},[15,35365,2664],{},[73,35367,35368],{},"Het bestaande project blijft ongewijzigd bewaard.",[55,35370,35371,35374,35378],{},[73,35372,35373],{},"Oud project uit de lijst halen",[73,35375,31030,35376],{},[15,35377,31033],{},[73,35379,35380,11172,35382,11172,35385],{},[15,35381,34477],{},[15,35383,35384],{},"Archief tonen",[15,35386,35387],{},"Herstellen",[55,35389,35390,35393,35399],{},[73,35391,35392],{},"Alle toestellen van een ruimte weg, muren houden",[73,35394,35395,35396],{},"Rechtsklik op de ruimte → ",[15,35397,35398],{},"Toestellen verwijderen",[73,35400,35401],{},[15,35402,6795],{},[55,35404,35405,35408,35413],{},[73,35406,35407],{},"Ruimte met muren en toestellen verwijderen",[73,35409,35395,35410],{},[15,35411,35412],{},"Ruimte verwijderen",[73,35414,35415],{},[15,35416,6795],{},[55,35418,35419,35422,35426],{},[73,35420,35421],{},"Plattegrond (afbeelding, PDF, DXF) verwijderen",[73,35423,35424,31009],{},[15,35425,30700],{},[73,35427,35428,35430],{},[15,35429,6795],{},"; de laag wordt 7 dagen bewaard",[55,35432,35433,35436,35442],{},[73,35434,35435],{},"Volledige verdieping verwijderen",[73,35437,31017,35438,11172,35440],{},[15,35439,14408],{},[15,35441,31022],{},[73,35443,35444],{},"Het dialoogvenster waarschuwt voor definitief verwijderen.",[1396,35446,35448],{"id":35447},"een-nieuw-project-aanmaken-en-het-oude-archiveren","Een nieuw project aanmaken en het oude archiveren",[1602,35450,35451,35454,35465],{},[1453,35452,35453],{},"Open het projectmenu met de blauwe PlanElec-knop linksboven.",[1453,35455,7985,35456,35458,35459,35461,35462,35464],{},[15,35457,2664],{},". Je kunt ook in de linkerbalk het paneel ",[15,35460,34477],{}," openen en daar het plusicoon ",[15,35463,2664],{}," kiezen.",[1453,35466,35467,35468,35470,35471,39],{},"Ga terug naar het oude project en kies in het projectmenu ",[15,35469,31033],{},". Bevestig met ",[15,35472,31033],{},[12,35474,35475,35476,7940,35478,933,35480,35482],{},"Een gearchiveerd project verdwijnt uit de lijst en blijft bewaard in het archief. Je haalt het terug in het paneel ",[15,35477,34477],{},[15,35479,35384],{},[15,35481,35387],{},". Archiveren kan wie bewerkingsrechten heeft. Volledige projecten definitief verwijderen kan niet via de interface.",[1396,35484,35486],{"id":35485},"ruimtes-leegmaken-of-verwijderen","Ruimtes leegmaken of verwijderen",[12,35488,35489],{},"Klik in de plattegrond met de rechtermuisknop op een ruimte; op een touchscreen houd je de ruimte ingedrukt.",[1450,35491,35492,35497],{},[1453,35493,35494,35496],{},[15,35495,35398],{}," verwijdert alle toestellen in de ruimte. De muren blijven.",[1453,35498,35499,35501],{},[15,35500,35412],{}," verwijdert de muren en alle toestellen van de ruimte. Binnenmuren die de ruimte met andere ruimtes deelt, blijven behouden.",[12,35503,35504,35505,39],{},"Beide acties vragen eerst om bevestiging en vormen één stap voor ",[15,35506,6795],{},[1396,35508,35510],{"id":35509},"een-verdieping-verwijderen","Een verdieping verwijderen",[12,35512,35513,35514,35516,35517,35520,35521,35524],{},"Open in de verdiepingenbalk rechtsboven het menu ",[15,35515,14408],{}," (icoon met drie puntjes) en kies ",[15,35518,35519],{},"‹naam van de verdieping› verwijderen …",". Het dialoogvenster ",[15,35522,35523],{},"Verdieping verwijderen?"," vermeldt de betrokken toestellen, trappen, schakelketens, kabelwegen en plattegrondlagen. De verdieping en alle bijbehorende gegevens worden verwijderd; bijbehorende plattegrondlagen worden nog zeven dagen bewaard. De laatste overblijvende verdieping kun je niet verwijderen.",[12,35526,35527,35528,39],{},"Hoe je alleen een geïmporteerde plattegrond verwijdert, lees je in de ",[30,35529,35531],{"href":35530},"\u002Fhelp\u002Fgrondplan-importeren-en-kalibreren#delete","handleiding over het importeren van plannen",[12,35533,35534,35535,35537,35538,39],{},"Een gekwalificeerde elektricien kijkt invoer en exports na vóór de uitvoering; de bindende beoordeling doet het erkend organisme. Loopt er iets vast, dan helpt ",[30,35536,8005],{"href":8224},". Nog geen account? ",[30,35539,35540],{"href":15328},"Maak gratis een account aan",{"title":1467,"searchDepth":1468,"depth":1468,"links":35542},[35543,35544,35545,35546,35547,35548,35549,35550,35551,35552,35553,35554,35555],{"id":34469,"depth":1468,"text":34470},{"id":34546,"depth":1468,"text":34547},{"id":34632,"depth":1468,"text":34633},{"id":34740,"depth":1468,"text":34741},{"id":34900,"depth":1468,"text":34901},{"id":34935,"depth":1468,"text":34936},{"id":34977,"depth":1468,"text":34978},{"id":35010,"depth":1468,"text":35011},{"id":35078,"depth":1468,"text":35079},{"id":35170,"depth":1468,"text":35171},{"id":35181,"depth":1468,"text":35182},{"id":35216,"depth":1468,"text":35217},{"id":35336,"depth":1468,"text":35337,"children":35556},[35557,35558,35559],{"id":35447,"depth":1486,"text":35448},{"id":35485,"depth":1486,"text":35486},{"id":35509,"depth":1486,"text":35510},"Maak een project aan, kies de plattegrond of het eendraadschema als vertrekpunt, gebruik begeleiding, een sjabloon of AI-grondplanherkenning en maak je eerste conceptpdf.","getting-started","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fgetting-started-nl.webp",{},"\u002Fhelp\u002Fgetting-started.nl",{"title":34445,"description":35560},"aan-de-slag","help\u002Fgetting-started.nl",[34466,35569,3274,35570,14346,3273,13570],"grondplan","verbruikers","c2fZT9FXYVERmhfsdm1q05Xu3fR4gwjU3KtVit9diIA",{"id":35573,"title":14227,"body":35574,"category":2475,"description":35849,"extension":1496,"guideId":34930,"image":35850,"locale":1497,"meta":35851,"navigation":1499,"order":1468,"path":35852,"publishedAt":33940,"readTime":4035,"seo":35853,"seoTitle":4037,"slug":35854,"stem":35855,"tags":35856,"updatedAt":35859,"__hash__":35860,"kind":2491,"href":6871,"date":33940},"help\u002Fhelp\u002Fautomatic-planning.nl.md",{"type":9,"value":35575,"toc":35838},[35576,35579,35585,35589,35595,35602,35606,35609,35612,35629,35632,35636,35639,35642,35648,35653,35657,35660,35663,35668,35671,35685,35688,35692,35696,35699,35719,35722,35727,35731,35734,35737,35739,35743,35747,35750,35753,35767,35770,35776,35780,35783,35820,35823,35828,35830,35834],[12,35577,35578],{},"De automatische functies van PlanElec zijn bedoeld als bewerkbare voorstellen. Ze nemen repetitief werk over, maar kunnen niet weten welke toestellen werkelijk worden geïnstalleerd, hoe een kabel op de werf loopt of welke productspecificaties uw elektricien kiest.",[12,35580,35581,35582,39],{},"Werk daarom steeds volgens hetzelfde patroon: ",[15,35583,35584],{},"voorstel maken → preview controleren → toepassen → technisch nakijken",[12,35586,35587],{},[30,35588],{"id":34930},[422,35590],{":height":35591,":width":31157,"alt":35592,"caption":35593,"src":35594},"594","Actieblad van een ruimte met voorstellen voor automatische planning.","De voorstellen blijven bewerkbaar en beslissen noch over de aantallen, noch over de definitieve posities.","\u002Fhelp\u002Fworkflows\u002Fnl-room-automation.png",[12,35596,35597,35600],{},[30,35598],{"id":35599},"consumers",[30,35601],{"id":20349},[41,35603,35605],{"id":35604},"verbruikers-en-lichtpunten-voorstellen","Verbruikers en lichtpunten voorstellen",[12,35607,35608],{},"In het grondplan zijn hulpmiddelen beschikbaar voor automatische stopcontacten, verlichting, standaarduitrusting en spotrasters. De voorstellen gebruiken de getekende ruimtes en geometrie als basis.",[12,35610,35611],{},"Voor een bruikbaar resultaat:",[1602,35613,35614,35617,35620,35623,35626],{},[1453,35615,35616],{},"teken gesloten en correct benoemde ruimtes;",[1453,35618,35619],{},"stel waar nodig het gewenste aantal of patroon in;",[1453,35621,35622],{},"bekijk de voorgestelde posities;",[1453,35624,35625],{},"verplaats, voeg toe of verwijder punten volgens het echte ontwerp;",[1453,35627,35628],{},"controleer bijzondere zones en vaste toestellen afzonderlijk.",[12,35630,35631],{},"PlanElec voegt niet stilzwijgend ontbrekende toestellen toe. U blijft verantwoordelijk voor het programma van eisen en de uiteindelijke plaatsing.",[1396,35633,35635],{"id":35634},"schakelketens-automatisch-opbouwen","Schakelketens automatisch opbouwen",[12,35637,35638],{},"Voor vrije schakelaars en lichtpunten binnen één ruimte kan PlanElec een schakelketen voorstellen. Het startpunt is normaal de vrije schakelaar die het dichtst bij een deur ligt; daarna worden nabijgelegen vrije punten gekoppeld.",[12,35640,35641],{},"Controleer altijd welke schakelaar welk licht bedient en pas de volgorde manueel aan wanneer de werkelijke bediening anders is.",[12,35643,35644,35645,39],{},"Ligt de positie van een doos al vast, dan is geen voorstel nodig: de PlanElec-assistent plaatst stopcontacten, schakelaars en datadozen precies op die plek op basis van één zin met muur, hoek, afstand en hoogte. Hoe dat werkt, staat in ",[30,35646,6560],{"href":35647},"\u002Fnl\u002Fhelp\u002Fstudio-activiteit-assistent",[12,35649,35650],{},[30,35651],{"id":35652},"cables",[41,35654,35656],{"id":35655},"kabelspecificaties-en-routes-genereren","Kabelspecificaties en routes genereren",[12,35658,35659],{},"Zodra de elektrische topologie bestaat, kan PlanElec voor iedere ouder-kindverbinding een kabelsegment aanmaken. Een echte verbindings- of aftakdoos splitst de verbinding in afzonderlijke segmenten. Een doos die alleen in de buurt staat, wordt niet automatisch elektrisch in het pad opgenomen.",[12,35661,35662],{},"De automatische routering zoekt per verdieping een korte route langs de getekende muren. Zijn start en einde niet via dezelfde wandcomponent bereikbaar, dan gebruikt de router een directe fallback.",[12,35664,31166,35665,35667],{},[15,35666,31169],{}," in de bovenste werkbalk.",[12,35669,35670],{},"Na het routeren:",[1450,35672,35673,35676,35679,35682],{},[1453,35674,35675],{},"controleer of de route overeenkomt met de beoogde uitvoering;",[1453,35677,35678],{},"voeg of verplaats routepunten waar nodig;",[1453,35680,35681],{},"controleer kabeltype, doorsnede en installatiewijze;",[1453,35683,35684],{},"vul een manuele lengte in wanneer de berekende route de werkelijkheid niet voldoende benadert.",[12,35686,35687],{},"De berekende lengte voedt de materiaallijst, spanningsvalberekening en validatie. Ze is een nettolengte zonder automatisch snijverlies of reservepercentage.",[12,35689,35690],{},[30,35691],{"id":31122},[41,35693,35695],{"id":35694},"verbruikers-automatisch-aan-stroomkringen-toewijzen","Verbruikers automatisch aan stroomkringen toewijzen",[12,35697,35698],{},"De automatische stroomkringtoewijzing maakt een voorstel op basis van de vastgelegde verbruikers en productregels. Onder meer deze keuzes worden ondersteund:",[1450,35700,35701,35704,35707,35710,35713,35716],{},[1453,35702,35703],{},"standaard licht- en stopcontactpunten worden per ruimte gegroepeerd;",[1453,35705,35706],{},"maximaal acht aansluitpunten worden per standaardkring voorzien;",[1453,35708,35709],{},"onder andere kookplaat, oven, wasmachine, droogkast, vaatwasser, boiler, warmtepomp en sauna krijgen een toegewijde automaat;",[1453,35711,35712],{},"standaardgroepen worden achter 30 mA-differentieelschakelaars geplaatst;",[1453,35714,35715],{},"een wallbox krijgt een afzonderlijke 30 mA-RCD en een driefasige automaat; bij gedocumenteerde ingebouwde 6 mA-DC-detectie stelt PlanElec extern type A voor, anders type B;",[1453,35717,35718],{},"bij meerdere verdeelkasten kan de toewijzing over boards worden verdeeld.",[12,35720,35721],{},"Bekijk de preview voor u bevestigt. Controleer vooral gemengde kringen, bijzondere toestellen, bestaande handmatige toewijzingen en de toepasbaarheid van de defaults op het concrete project.",[12,35723,35724],{},[30,35725],{"id":35726},"phases",[41,35728,35730],{"id":35729},"lasten-over-fasen-verdelen","Lasten over fasen verdelen",[12,35732,35733],{},"Voor een driefasig of delta-net kan PlanElec lasten over L1, L2 en L3 verdelen. De faseweergave toont de berekende last per fase en waarschuwt bij een duidelijke onbalans.",[12,35735,35736],{},"Dit blijft een modelberekening op basis van de ingevoerde vermogens. Werkelijke gelijktijdigheid, metingen en netvoorwaarden moeten buiten de software worden beoordeeld.",[422,35738],{":height":31156,":width":31157,"alt":31158,"caption":31159,"src":31160},[12,35740,35741],{},[30,35742],{"id":20002},[41,35744,35746],{"id":35745},"de-verdeelkast-automatisch-vullen","De verdeelkast automatisch vullen",[12,35748,35749],{},"Automatisch vullen plaatst de bestaande hoofdschakelaar, RCD's en MCB's op vrije DIN-railplaatsen. De standaardvolgorde is hoofd-RCD, groeps-RCD's en vervolgens automaten. De functie houdt standaard ongeveer twintig procent railruimte vrij.",[12,35751,35752],{},"Het verschil met stroomkringtoewijzing is belangrijk:",[1450,35754,35755,35761],{},[1453,35756,35757,35760],{},[15,35758,35759],{},"Stroomkringtoewijzing"," maakt en koppelt de elektrische beveiligingsstructuur.",[1453,35762,35763,35766],{},[15,35764,35765],{},"Automatisch vullen"," rangschikt die bestaande modules fysiek in de kast.",[12,35768,35769],{},"Na automatisch vullen controleert u de gekozen kastgrootte, TE-breedtes, reservecapaciteit, beschermingsketens en verbindingspaden. Expliciete paden via verbindingsdozen worden bij opnieuw vullen bewaard.",[12,35771,35772,35774],{},[30,35773],{"id":20416},[30,35775],{"id":10495},[41,35777,35779],{"id":35778},"eindcontrole-van-een-automatisch-voorstel","Eindcontrole van een automatisch voorstel",[12,35781,35782],{},"Loop na elke automatische actie deze punten na:",[1602,35784,35785,35791,35797,35803,35809,35815],{},[1453,35786,35787,35790],{},[15,35788,35789],{},"Volledigheid:"," zijn alle werkelijke verbruikers, dozen en verdeelkasten gemodelleerd?",[1453,35792,35793,35796],{},[15,35794,35795],{},"Topologie:"," klopt elke ouder-kindverbinding en is niets onverbonden?",[1453,35798,35799,35802],{},[15,35800,35801],{},"Beveiliging:"," passen RCD, MCB, poolconfiguratie en kabel bij de toepassing?",[1453,35804,35805,35808],{},[15,35806,35807],{},"Ruimte:"," zijn routes en posities uitvoerbaar op de werf?",[1453,35810,35811,35814],{},[15,35812,35813],{},"Fasen:"," is de verdeling aannemelijk met de ingevoerde vermogens?",[1453,35816,35817,35819],{},[15,35818,5862],{}," blijven situatieplan en eendraadschema na de wijzigingen leesbaar?",[12,35821,35822],{},"De AREI\u002FRGIE-zelfcontrole helpt bij de ondersteunde, op basis van projectdata beslisbare regels. Ze is geen conformiteitsverklaring en vervangt de beoordeling door een elektricien of een officiële keuring niet.",[12,35824,35825,35826,39],{},"Ga daarna verder met ",[30,35827,6882],{"href":2451},[41,35829,30466],{"id":30465},[12,35831,30469,35832,30472],{},[15,35833,12532],{},[12,35835,35836,39],{},[30,35837,30477],{"href":11068},{"title":1467,"searchDepth":1468,"depth":1468,"links":35839},[35840,35843,35844,35845,35846,35847,35848],{"id":35604,"depth":1468,"text":35605,"children":35841},[35842],{"id":35634,"depth":1486,"text":35635},{"id":35655,"depth":1468,"text":35656},{"id":35694,"depth":1468,"text":35695},{"id":35729,"depth":1468,"text":35730},{"id":35745,"depth":1468,"text":35746},{"id":35778,"depth":1468,"text":35779},{"id":30465,"depth":1468,"text":30466},"Gebruik PlanElec-voorstellen voor verbruikers, schakelketens, kabelroutes, stroomkringen, fasen en de verdeelkast zonder de technische controle over te slaan.","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fautomatic-planning-nl.webp",{},"\u002Fhelp\u002Fautomatic-planning.nl",{"title":14227,"description":35849},"automatische-planning","help\u002Fautomatic-planning.nl",[6872,35570,31225,27628,35857,14346,35858],"faseverdeling","DIN-rail","2026-10-10","idKeb-dk-R_eJWnJh3j-BSdtMtFr5vfeyccYRh-RpJ8",{"id":35862,"title":2452,"body":35863,"category":10176,"description":36450,"extension":1496,"guideId":36451,"image":36452,"locale":1497,"meta":36453,"navigation":1499,"order":1486,"path":36454,"publishedAt":33940,"readTime":7016,"seo":36455,"seoTitle":4037,"slug":36456,"stem":36457,"tags":36458,"updatedAt":9347,"__hash__":36461,"kind":2491,"href":2451,"date":33940},"help\u002Fhelp\u002Fdocument-exports.nl.md",{"type":9,"value":35864,"toc":36437},[35865,35874,35878,35880,35884,35969,35981,35985,35989,35998,36062,36083,36091,36095,36116,36163,36166,36172,36176,36219,36222,36226,36230,36233,36238,36242,36245,36250,36263,36267,36290,36293,36300,36304,36318,36323,36327,36368,36371,36377,36381,36400,36405,36409,36429],[12,35866,35867,35868,35870,35871,35873],{},"Alle documenten maak je in de studio in de modus ",[15,35869,956],{},", paneel ",[15,35872,6532],{},". Je hebt een opgeslagen project nodig met inhoud voor het betreffende document, bijvoorbeeld een topologie voor het eendraadschema. Elk document download je eerst als pdf-concept; zodra aan de exportgereedheid is voldaan, maak je een afgifteversie die PlanElec ongewijzigd en met versiebeheer op de server archiveert. Geselecteerde documenten bundel je tot een installatiedossier met voorblad, documentoverzicht en doorlopende paginanummering, bijvoorbeeld als dossier voor de oplevering of de keuring. Alle uitvoer komt uit hetzelfde projectmodel en draagt dezelfde project- en installateursgegevens. Het zelfcontrolerapport toont je openstaande punten binnen de ondersteunde AREI-regels; de keuring doet het erkend organisme.",[12,35875,35876],{},[30,35877],{"id":10176},[422,35879],{":height":35003,":width":35004,"alt":35005,"caption":35006,"src":35007},[41,35881,35883],{"id":35882},"welke-documenten-zijn-er-en-wat-is-hun-status","Welke documenten zijn er en wat is hun status?",[49,35885,35886,35896],{},[52,35887,35888],{},[55,35889,35890,35892,35894],{},[58,35891,990],{},[58,35893,3606],{},[58,35895,20465],{},[68,35897,35898,35909,35920,35932,35943,35958],{},[55,35899,35900,35904,35906],{},[73,35901,35902],{},[15,35903,3764],{},[73,35905,9414],{},[73,35907,35908],{},"Pdf van meerdere pagina's uit de elektrische topologie met titelblok; altijd zwart-wit.",[55,35910,35911,35915,35917],{},[73,35912,35913],{},[15,35914,3836],{},[73,35916,9414],{},[73,35918,35919],{},"Pdf van verdiepingen, ruimtes en geplaatste symbolen met legende. Valt weg uit het dossier als een project met de aanpak \"Eerst het eendraadschema tekenen\" geen getekende plattegrond heeft.",[55,35921,35922,35926,35929],{},[73,35923,35924],{},[15,35925,9429],{},[73,35927,35928],{},"beschikbaar, indicatief",[73,35930,35931],{},"Resultaat van de ondersteunde regels die met de projectgegevens te beoordelen zijn. Niet beschikbaar als de zelfcontrole voor het project uitstaat.",[55,35933,35934,35938,35940],{},[73,35935,35936],{},[15,35937,9465],{},[73,35939,9414],{},[73,35941,35942],{},"Selecteerbaar zodra de verdeelkast gegevens bevat.",[55,35944,35945,35953,35955],{},[73,35946,35947,702,35949,702,35951],{},[15,35948,9439],{},[15,35950,4733],{},[15,35952,9456],{},[73,35954,7696],{},[73,35956,35957],{},"Fabrikantneutrale, modelgebaseerde lijsten als pdf en CSV; geen prijzen, geen bestelvrijgave. De vakinhoudelijke veldtest staat nog open vóór de algemene vrijgave.",[55,35959,35960,35964,35966],{},[73,35961,35962],{},[15,35963,9474],{},[73,35965,9414],{},[73,35967,35968],{},"Geselecteerde documenten met gebrand voorblad, documentoverzicht, doorlopende paginanummering en archivering met versiebeheer op de server. Alle pagina's dragen hetzelfde dossierkenmerk. De veldtest met echte klantprojecten staat nog open.",[12,35970,35971,35972,702,35975,1628,35978,35980],{},"Afhankelijk van het project verschijnen nog andere items, zoals ",[15,35973,35974],{},"Aderlijst",[15,35976,35977],{},"Klemmenplan verdeler",[15,35979,11898],{},". Een actueel PV-opbrengstrapport wordt vast in het dossier opgenomen. Behandel deze uitvoer net als de lijsten als werkdocument dat je vakinhoudelijk nakijkt. Met een actief automatiseringsprofiel verschijnt onder de documenten ook een domoticagedeelte; die documenten vallen buiten de serverarchivering.",[12,35982,35983],{},[30,35984],{"id":7774},[41,35986,35988],{"id":35987},"wat-betekenen-concept-correcties-nodig-en-klaar-voor-afgifte","Wat betekenen Concept, Correcties nodig en Klaar voor afgifte?",[12,35990,35991,35992,702,35994,933,35996,39],{},"Elke documentkaart toont een status en de knoppen ",[15,35993,8796],{},[15,35995,9513],{},[15,35997,8036],{},[49,35999,36000,36011],{},[52,36001,36002],{},[55,36003,36004,36006,36008],{},[58,36005,3606],{},[58,36007,752],{},[58,36009,36010],{},"Wat je kunt doen",[68,36012,36013,36025,36037,36050],{},[55,36014,36015,36019,36022],{},[73,36016,36017],{},[15,36018,12638],{},[73,36020,36021],{},"Het document heeft nog geen inhoud; voorbeeld en download zijn vergrendeld.",[73,36023,36024],{},"Inhoud in het project aanvullen",[55,36026,36027,36031,36034],{},[73,36028,36029],{},[15,36030,9583],{},[73,36032,36033],{},"Minstens één punt blokkeert de afgifteversie. Het eerste punt staat als link onder de status.",[73,36035,36036],{},"Concept downloaden; via de link naar de correctie springen",[55,36038,36039,36043,36046],{},[73,36040,36041],{},[15,36042,9576],{},[73,36044,36045],{},"Niets staat nog open.",[73,36047,36048],{},[15,36049,8036],{},[55,36051,36052,36056,36059],{},[73,36053,36054],{},[15,36055,9579],{},[73,36057,36058],{},"Geen blokkering, wel aandachtspunten zoals ontbrekende projectgegevens.",[73,36060,36061],{},"Afgifteversie maken en de aandachtspunten uitdrukkelijk bevestigen",[12,36063,36064,36065,702,36067,702,36070,702,36073,702,36076,933,36079,36082],{},"Typische open punten zijn ",[15,36066,35054],{},[15,36068,36069],{},"Plaatsingswijzen aanvullen en bevestigen",[15,36071,36072],{},"Ontbrekende toestellen op het situatieschema plaatsen",[15,36074,36075],{},"Ontbrekende modules op de DIN-rails plaatsen",[15,36077,36078],{},"Stroombaanaanduidingen aanvullen",[15,36080,36081],{},"Bevindingen van de zelfcontrole nakijken",". Een concept draagt de markering CONCEPT en is geen gearchiveerde afgifteversie.",[12,36084,36085,36088],{},[30,36086],{"id":36087},"metadata",[30,36089],{"id":36090},"branding",[41,36092,36094],{"id":36093},"projectgegevens-installateursgegevens-en-logo-controleren","Projectgegevens, installateursgegevens en logo controleren",[12,36096,36097,36098,36100,36101,36103,36104,36106,36107,36109,36110,933,36113,39],{},"Bovenaan het paneel ",[15,36099,6532],{}," vat ",[15,36102,35026],{}," project, klant, installatie, installateur en EAN samen. Met ",[15,36105,35030],{}," vul je ze aan; dezelfde velden vind je in het projectmenu onder ",[15,36108,12981],{},", secties ",[15,36111,36112],{},"Klant & installatie",[15,36114,36115],{},"Betrokkenen",[49,36117,36118,36127],{},[52,36119,36120],{},[55,36121,36122,36124],{},[58,36123,13712],{},[58,36125,36126],{},"Waar het vandaan komt",[68,36128,36129,36139,36149],{},[55,36130,36131,36134],{},[73,36132,36133],{},"Klant, installatieadres, EAN",[73,36135,36136,36137],{},"Projectinstellingen, sectie ",[15,36138,36112],{},[55,36140,36141,36144],{},[73,36142,36143],{},"Installateur, erkenningsnummer, contact, controleorganisme",[73,36145,36136,36146,36148],{},[15,36147,36115],{},"; lege velden voor bedrijfsnaam, ondernemingsnummer en adres neemt PlanElec over uit het profiel van de projecteigenaar",[55,36150,36151,36154],{},[73,36152,36153],{},"Bedrijfslogo",[73,36155,36156,36157,702,36160,36162],{},"Accountmenu ",[15,36158,36159],{},"Mijn profiel",[15,36161,36153],{},": PNG of JPG, max. 500 KB, min. 200 × 80 px en max. 2000 × 800 px",[12,36164,36165],{},"Eendraadschema, situatieplan, zelfcontrolerapport en het voorblad van het dossier gebruiken bij de export dezelfde momentopname van deze gegevens, logo inbegrepen. Kan het logo niet geladen worden, dan wordt het document toch gemaakt, alleen zonder logo. Ontbrekende gegevens zoals klantnaam, installatieadres, installateur of erkenningsnummer, en een ongeldige EAN verschijnen als aandachtspunt: concepten blijven mogelijk, een afgifteversie vraagt dat je die aandachtspunten uitdrukkelijk bevestigt.",[12,36167,36168,36170],{},[30,36169],{"id":20416},[30,36171],{"id":11611},[41,36173,36175],{"id":36174},"hoe-exporteer-ik-één-document","Hoe exporteer ik één document?",[1602,36177,36178,36184,36192,36205,36211],{},[1453,36179,11537,36180,35018,36182,10358],{},[15,36181,956],{},[15,36183,6532],{},[1453,36185,9826,36186,35037,36188,36191],{},[15,36187,9631],{},[15,36189,36190],{},"Planformaat"," A4 of A3. Eendraadschema en situatieplan gebruiken dat formaat; tabellen en voorblad blijven A4.",[1453,36193,36194,36195,2725,36198,1628,36201,36204],{},"Kies indien nodig bij ",[15,36196,36197],{},"Kleuren van stroombanen",[15,36199,36200],{},"Kleur",[15,36202,36203],{},"Zwart-wit",". Dat geldt voor het situatieplan en de kastweergave.",[1453,36206,36207,36208,36210],{},"Open op de documentkaart het ",[15,36209,8796],{}," en controleer pagina's, titelblok en paginaranden.",[1453,36212,1857,36213,36215,36216,39],{},[15,36214,9513],{}," en open het bestand buiten PlanElec voor een visuele controle. Voor de lijsten is er ook ",[15,36217,36218],{},"CSV",[12,36220,36221],{},"Controleer bij het eendraadschema vooral of elk verbruikerspad bij de juiste automaat en differentieelschakelaar uitkomt, of kabeltype, doorsnede en labels aanwezig zijn en of reservemodules niet als actieve stroomkring verschijnen. Grote schema's worden over meerdere pagina's verdeeld.",[12,36223,36224],{},[30,36225],{"id":11521},[41,36227,36229],{"id":36228},"waar-let-ik-op-bij-het-situatieplan","Waar let ik op bij het situatieplan?",[12,36231,36232],{},"Het situatieplan toont ruimtes, openingen en elektrische symbolen op hun plaats. Controleer elke verdieping op overlappende labels, ontbrekende toestellen en leesbaarheid in het gekozen formaat. Situatieplan en eendraadschema delen het titelblok en de projectnotities; corrigeer die gegevens in het project, niet in een afzonderlijke pdf.",[12,36234,36235],{},[30,36236],{"id":36237},"self-check",[41,36239,36241],{"id":36240},"wat-toont-het-arei-zelfcontrolerapport","Wat toont het AREI-zelfcontrolerapport?",[12,36243,36244],{},"Het rapport vat de bevindingen samen die PlanElec met de ingevoerde gegevens en de ondersteunde regels kan beoordelen. Het vermeldt wanneer een controle onvolledig is of een deel van de installatie buiten de huidige dekking valt. Voor PV bevat het een installatieoverzicht dat uitdrukkelijk als planningsregister is aangeduid.",[12,36246,36247,36248],{},"Een rapport zonder fouten betekent: geen fouten binnen de ondersteunde regels die met de gegevens te controleren zijn. Metingen, fabrikantenbewijzen, omstandigheden ter plaatse en niet-gemodelleerde regels vallen erbuiten. Welke regels gecontroleerd worden, lees je in ",[30,36249,2458],{"href":2457},[12,36251,36252,36255,36258,36261],{},[30,36253],{"id":36254},"lists",[30,36256],{"id":36257},"circuit-list",[30,36259],{"id":36260},"cable-list",[30,36262],{"id":11986},[41,36264,36266],{"id":36265},"kring-materiaal-en-kabellijst-juist-lezen-pilot","Kring-, materiaal- en kabellijst juist lezen (pilot)",[1450,36268,36269,36274,36282],{},[1453,36270,7641,36271,36273],{},[15,36272,9439],{}," helpt je toewijzingen en beveiligingsketen te controleren.",[1453,36275,7641,36276,36278,36279,36281],{},[15,36277,4733],{}," open je met ",[15,36280,22430],{},", per categorie of per ruimte. Bijdragen zonder ruimte blijven zichtbaar. Manueel ingevoerde posities zijn als zodanig gemarkeerd en worden nooit met berekende regels samengevoegd.",[1453,36283,7641,36284,36278,36286,36289],{},[15,36285,9456],{},[15,36287,36288],{},"Kabellijst openen",". Ze toont segmenten en nettolengtes; een manuele lengte overschrijft de berekende.",[12,36291,36292],{},"De materiaallijst gebruikt fabrikantneutrale standaardaannames. Ze bevat geen prijzen, geen concrete fabrikantartikelen en geen automatische werfreserve; huishoudtoestellen tellen als aansluiting. De kaart wijst daarop met de melding dat de lijst modelhoeveelheden bevat en geen vrijgegeven bestellijst is. Gebruik ze als controleerbaar vertrekpunt voor een offerte.",[12,36294,36295,36297],{},[30,36296],{"id":20002},[30,36298],{"id":36299},"cabinet-pdf",[41,36301,36303],{"id":36302},"de-verdeelkast-indeling-exporteren","De verdeelkast-indeling exporteren",[12,36305,7641,36306,36308,36309,1725,36311,2725,36314,36317],{},[15,36307,9465],{}," is selecteerbaar zodra de verdeelkast in het project gegevens bevat; een schakelaar of vrijgave is daarvoor niet nodig. Bij meerdere verdelers kies je in het ",[15,36310,9631],{},[15,36312,36313],{},"Exportomvang",[15,36315,36316],{},"Alle verdelers"," of één verdeler. De omvang geldt voor de kastopbouw, het eendraadschema, de aderlijst en het klemmenplan; één verdeler behoudt zijn bladnummer uit het volledige schema. Controleer rijen, moduleplaatsen, labels en reserve tegen de geplande opbouw.",[12,36319,36320],{},[30,36321],{"id":36322},"dossier",[41,36324,36326],{"id":36325},"een-installatiedossier-samenstellen","Een installatiedossier samenstellen",[1602,36328,36329,36334,36348,36351,36357],{},[1453,36330,36331,36332,39],{},"Vul de projectgegevens aan met ",[15,36333,35030],{},[1453,36335,36336,36337,36340,36341,36343,36344,36347],{},"Vink onder ",[15,36338,36339],{},"Dossier samenstellen"," alleen de documenten aan die bij de huidige werkstand horen. Het ",[15,36342,9631],{}," toont ze onder ",[15,36345,36346],{},"Opgenomen documenten"," in een vaste volgorde.",[1453,36349,36350],{},"Controleer planformaat, kleuren en de overige opties.",[1453,36352,36353,36354,36356],{},"Open het ",[15,36355,8796],{}," van het dossier en controleer voorblad, documentoverzicht, volgorde, titelblokken en doorlopende paginanummering.",[1453,36358,1857,36359,36361,36362,36364,36365,36367],{},[15,36360,9513],{}," voor een werkversie of op ",[15,36363,8036],{}," zodra ",[15,36366,12613],{}," klaar is.",[12,36369,36370],{},"Een volledig dossier bevat eendraadschema, situatieplan en zelfcontrolerapport; het overzicht zegt je of je selectie volledig is of een gedeeltelijke uitvoer. Bij \"Eerst het eendraadschema tekenen\" zonder plattegrond geldt het dossier zonder situatieplan als volledig.",[12,36372,36373,36375],{},[30,36374],{"id":9604},[30,36376],{"id":9717},[41,36378,36380],{"id":36379},"een-afgifteversie-maken-en-archiveren","Een afgifteversie maken en archiveren",[12,36382,36383,36385,36386,36388,36389,1934,36391,702,36393,702,36395,933,36397,36399],{},[15,36384,8036],{}," gaat uit van de opgeslagen projectstand. Zijn er aandachtspunten, dan toont PlanElec ze eerst; met ",[15,36387,9644],{}," blijven ze deel van de bewaarde versie. De versie verschijnt daarna onder ",[15,36390,9733],{},[15,36392,9805],{},[15,36394,9808],{},[15,36396,9811],{},[15,36398,9994],{},". Haar QR-code verwijst naar precies die archiefversie. Concepten blijven lokale downloads.",[12,36401,36402,36403,39],{},"Latere projectwijzigingen veranderen een gearchiveerde versie niet; voor een nieuwe stand maak je een nieuwe versie. De archivering bevestigt herkomst en bestandsintegriteit. Ze is geen elektrische keuring, geen conformiteitsattest en geen elektronische handtekening. Hoe ontvangers een document via de QR-code verifiëren en hoe je een link intrekt, lees je in ",[30,36404,9359],{"href":8233},[41,36406,36408],{"id":36407},"laatste-controle-vóór-delen","Laatste controle vóór delen",[1450,36410,36411,36414,36417,36420,36423,36426],{},[1453,36412,36413],{},"Kloppen project, klant, adres, installateur, logo en revisie op alle documenten?",[1453,36415,36416],{},"Zijn alle verdiepingen, stroomkringen, symbolen en kabellabels leesbaar?",[1453,36418,36419],{},"Passen planformaat en paginavolgorde bij het gebruik?",[1453,36421,36422],{},"Heb je automatisch geplande toewijzingen en lengtes vakinhoudelijk gecontroleerd?",[1453,36424,36425],{},"Zijn open bevindingen of dekkingslacunes in het zelfcontrolerapport zichtbaar en begrepen?",[1453,36427,36428],{},"Bevat het dossier alleen de documentversies die je echt hebt nagekeken?",[12,36430,36431,36432,36434,36435,39],{},"Laat de documentatie nakijken door de verantwoordelijke elektricien; de officiële keuring doet een erkend organisme. Het projectmodel opbouwen begint bij ",[30,36433,8240],{"href":8239},"; loopt er iets mis, kijk dan bij ",[30,36436,8005],{"href":8224},{"title":1467,"searchDepth":1468,"depth":1468,"links":36438},[36439,36440,36441,36442,36443,36444,36445,36446,36447,36448,36449],{"id":35882,"depth":1468,"text":35883},{"id":35987,"depth":1468,"text":35988},{"id":36093,"depth":1468,"text":36094},{"id":36174,"depth":1468,"text":36175},{"id":36228,"depth":1468,"text":36229},{"id":36240,"depth":1468,"text":36241},{"id":36265,"depth":1468,"text":36266},{"id":36302,"depth":1468,"text":36303},{"id":36325,"depth":1468,"text":36326},{"id":36379,"depth":1468,"text":36380},{"id":36407,"depth":1468,"text":36408},"Download eendraadschema, situatieplan, zelfcontrolerapport, verdeelkast-indeling en planningslijsten als concept, bundel ze tot een installatiedossier en archiveer afgifteversies met versiebeheer.","document-exports","\u002Fimages\u002Fhelp\u002Fcovers-2026-11-01\u002Fdocument-exports-nl.webp",{},"\u002Fhelp\u002Fdocument-exports.nl",{"title":2452,"description":36450},"documenten-exporteren","help\u002Fdocument-exports.nl",[16577,3273,6216,13572,36459,21225,21231,36460],"stroomkringen","installatiedossier","CXVV4AZeD8gYQO2QOr0zK4vR1-zPLmBX04goAsPmtKs",{"id":36463,"title":36464,"articleId":36465,"body":36466,"category":1493,"date":36840,"description":36841,"extension":1496,"image":36478,"lastUpdated":15381,"locale":1497,"meta":36842,"navigation":1499,"ogImage":36843,"path":36844,"publishDate":36840,"readTime":21425,"refreshInterval":1503,"seo":36845,"seoTitle":4037,"slug":36846,"stem":36847,"tags":36848,"__hash__":36850,"kind":1515,"href":19564},"blog\u002Fblog\u002Fgetting-started-guide.nl.md","Aan de slag met PlanElec: van grondplan tot eerste export","getting-started-guide",{"type":9,"value":36467,"toc":36817},[36468,36474,36479,36483,36490,36493,36497,36502,36514,36517,36521,36524,36527,36535,36539,36542,36545,36548,36552,36555,36561,36565,36574,36577,36581,36584,36590,36594,36599,36604,36608,36611,36615,36618,36622,36625,36629,36632,36636,36639,36642,36646,36698,36702,36705,36708,36712,36715,36718,36722,36725,36729,36732,36735,36739,36765,36769,36804],[12,36469,36470,36473],{},[15,36471,36472],{},"Je eerste PlanElec-project doorloopt acht stappen: project aanmaken, grondplan tekenen of herkennen, toestellen plaatsen, verbruikers koppelen, kabelroutes controleren, verdeelkast vullen, eendraadschema en zelfcontrole nakijken, documenten exporteren."," Alles gebeurt in één gedeeld projectmodel. Het belangrijkste principe om mee te starten: een symbool op het grondplan bepaalt waar een toestel zit. Pas de elektrische toewijzing maakt het deel van het eendraadschema.",[12,36475,36476],{},[22,36477],{"alt":6190,"src":36478},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-getting-started-guide-editorial.webp",[41,36480,36482],{"id":36481},"_1-project-gebouw-en-verdiepingen-aanmaken","1. Project, gebouw en verdiepingen aanmaken",[12,36484,36485,36486,36489],{},"Na het inloggen open je het projectoverzicht en kies je ",[15,36487,36488],{},"Project aanmaken",". Je start met de begeleide workflow, een sjabloon of een leeg project. Neem voor je eerste project de begeleiding: die leidt de volgende stap af uit de echte projectstand, en je kunt ze op elk moment pauzeren zonder projectgegevens te verliezen.",[12,36491,36492],{},"Maak daarna het gebouw en de verdiepingen aan. Open de projectmetadata en vul projectnaam, installatieadres en installateur in. PlanElec gebruikt die gegevens later in titelblokken, het zelfcontrolerapport en het dossier.",[41,36494,36496],{"id":36495},"_2-grondplan-en-ruimtes-opbouwen","2. Grondplan en ruimtes opbouwen",[12,36498,18308,36499,36501],{},[15,36500,6435],{}," teken je buiten- en binnenmuren als veelhoek of rechthoek. Heb je al een plan, dan importeer je het als referentiebeeld en kalibreer je het met een gekende afstand.",[12,36503,36504,36505,36507,36508,36510,36511,39],{},"Sneller gaat het met herkenning: zet een pdf, scan of foto (pdf, png, jpeg of webp) bij ",[15,36506,3903],{}," en start in de voorvertoning ",[15,36509,6843],{},". PlanElec stelt muren, ruimtes met oppervlakte, deuren, ramen en ondersteunde toestelsymbolen voor. Je bevestigt de schaal, corrigeert het voorstel en neemt het over in een lege verdieping. Hoe dat precies werkt, lees je in ",[30,36512,36513],{"href":5184},"Grondplan herkennen uit pdf of foto",[12,36515,36516],{},"Zodra muren een gesloten vlak vormen, herkent PlanElec een ruimte. Geef elke ruimte een naam en categorie, bijvoorbeeld Keuken, Technische ruimte of Slaapkamer 1. Een nette ruimte-indeling betaalt zich later terug: bij uitrustingsvoorstellen, bij het groeperen van verbruikers, in de materiaalweergave per ruimte en bij de vaktechnische controle. Werk per verdieping en controleer de geometrie voordat je veel toestellen plaatst; grote aanpassingen zijn eenvoudiger zolang het plan nog leeg is.",[41,36518,36520],{"id":36519},"_3-elektrische-toestellen-plaatsen","3. Elektrische toestellen plaatsen",[12,36522,36523],{},"Open het symbolenpalet en zet stopcontacten, schakelaars, lichtpunten, vaste aansluitingen, verbindingsdozen en de verdeelkast op hun geplande plaats. Wandtoestellen klikken vast aan de muur, lichtpunten staan vrij in de ruimte.",[12,36525,36526],{},"Voor geschikte ruimtes stelt PlanElec stopcontacten, verlichting, een standaarduitrusting of een spotraster voor. Jij beslist op basis van deuren, ramen, inbouw, gebruik en natte zones wat blijft. De voorstellen zijn een bewerkbaar vertrekpunt; het ontwerp maak jij.",[12,36528,36529,36530,36532,36533,39],{},"Je kunt ook aan de ",[15,36531,7677],{}," in je eigen woorden vragen wat je nodig hebt, bijvoorbeeld „Plaats drie stopcontacten in de keuken”. Je opent hem met de botknop in de kopbalk of met ⌘J \u002F Ctrl+J. Elke wijziging van de assistent is één aparte ongedaanmaakstap, en PlanElec controleert het project daarna met de AREI\u002FRGIE-zelfcontrole. Meer daarover in ",[30,36534,4372],{"href":4371},[41,36536,36538],{"id":36537},"_4-schakelaars-verbruikers-en-topologie-koppelen","4. Schakelaars, verbruikers en topologie koppelen",[12,36540,36541],{},"Koppel schakelaars aan de lichtpunten die ze echt bedienen. Voor vrije schakelaars en lichtpunten in een ruimte stelt PlanElec een schakelketen voor. De lijst met onverbonden componenten toont daarna wat nog ontbreekt.",[12,36543,36544],{},"Wijs de verbruikers vervolgens toe aan de juiste verdeelkast en kring. De automatische toewijzing groepeert gewone licht- en stopcontactpunten en behandelt ondersteunde bijzondere toestellen zoals kookplaat, wasmachine of laadpaal apart. Met meerdere verdeelkasten verdeelt de toewijzing over meerdere kasten de lasten; bij driefasige installaties verdeelt de fasebalancering over L1, L2 en L3 en waarschuwt ze bij duidelijke onbalans. Controleer in de voorvertoning beveiligingen, fase en kabelgegevens en neem pas dan over.",[12,36546,36547],{},"Verbindings- en aftakdozen koppel je als echte topologieknooppunten wanneer een kabel in aparte segmenten moet worden opgesplitst. Nabijheid volstaat niet: PlanElec voegt een doos niet automatisch in een elektrisch pad in.",[41,36549,36551],{"id":36550},"_5-kabelroutes-controleren","5. Kabelroutes controleren",[12,36553,36554],{},"Voor gekoppelde toestellen berekent PlanElec een kabelroute langs de muren. Controleer begin, einde en verloop en voeg zo nodig manuele tussenpunten toe. Een manueel ingevulde lengte gaat voor op de berekende.",[12,36556,36557,36558,36560],{},"Kabeltype, doorsnede, plaatsingswijze en lengte moeten bij de echte installatie passen. De berekende nettolengtes gaan naar de kabellijst en het materiaaloverzicht; snijverlies en werfreserve tel je zelf bij. De handleiding ",[30,36559,12586],{"href":6871}," legt de automatisering voor verbruikers, kabels, kringen en verdeelkast samen uit.",[41,36562,36564],{"id":36563},"_6-verdeelkast-vullen","6. Verdeelkast vullen",[12,36566,36567,36568,36570,36571,36573],{},"Open het onderdeel ",[15,36569,1721],{},", kies behuizing, rijen en poolconfiguratie en start ",[15,36572,14217],{},". PlanElec plaatst hoofdschakelaar, differentieelschakelaars en automaten in de voorziene volgorde op de DIN-rails en houdt standaard 20 procent railruimte vrij.",[12,36575,36576],{},"Controleer daarna modulebreedtes, beveiligingsgroepen en de verbindingen van hoofdschakelaar naar differentieelschakelaar en verder naar de automaten. Ontbrekende verbindingen vul je aan met het verbindingswerktuig, modules verschuif je met de hand. Bij meerfasige installaties controleer je ook het fase-overzicht. Sta je voor een bestaande verdeelkast, dan herkent PlanElec op kastfoto’s de zichtbare DIN-modules en neemt ze na jouw controle over in een lege verdeelkast.",[41,36578,36580],{"id":36579},"_7-eendraadschema-en-zelfcontrole-nakijken","7. Eendraadschema en zelfcontrole nakijken",[12,36582,36583],{},"PlanElec bouwt het eendraadschema op uit de elektrische topologie. Controleer of verbruikerstakken, beveiligingen, kabelgegevens en aftakkingen volledig verschijnen. Klopt een toewijzing niet, dan corrigeer je de relatie in het gedeelde projectmodel, niet alleen in de tekening, en kijk je het schema daarna opnieuw na.",[12,36585,36586,36587,36589],{},"De AREI\u002FRGIE-zelfcontrole meldt bevindingen in de regeldomeinen die PlanElec met je projectdata kan beoordelen. Ze is indicatief: een foutloze run betekent dat de ondersteunde regels in jouw gegevens geen fout vinden. Welke regels dat zijn, lees je in ",[30,36588,10087],{"href":2457},". De keuring van de uitgevoerde installatie doet het erkende controleorganisme.",[41,36591,36593],{"id":36592},"_8-documenten-exporteren","8. Documenten exporteren",[12,36595,18308,36596,36598],{},[15,36597,956],{}," maak je het eendraadschema, het situatieplan en het indicatieve zelfcontrolerapport als pdf. Zodra er verdeelkastgegevens zijn, staat ook de verdeelkast-pdf klaar. Het selecteerbare installatiedossier bundelt de documenten met voorblad, inhoudsoverzicht en doorlopende paginanummering. Kring-, materiaal- en kabellijst zijn beschikbaar als pilot: fabrikantneutraal, zonder prijzen en met zichtbare standaardaannames.",[12,36600,36601,36602,39],{},"Controleer vóór het doorsturen metadata, leesbaarheid, paginavolgorde en open bevindingen. De status van elk document staat in ",[30,36603,6882],{"href":2451},[41,36605,36607],{"id":36606},"zo-wordt-je-eerste-doorloop-betrouwbaar","Zo wordt je eerste doorloop betrouwbaar",[12,36609,36610],{},"Werk bij je eerste project met een klein, echt deel: één verdieping met verdeelkast, twee stopcontactkringen, verlichting en één vast toestel. Zo zie je snel welke informatie ruimtelijk, elektrisch of documentair is. Een stopcontactsymbool op het grondplan beantwoordt waar iets zit. Kring, beveiliging en kabel beantwoorden hoe het gevoed wordt. De export brengt beide samen; metingen die je niet hebt ingevoerd, staan er ook niet in.",[1396,36612,36614],{"id":36613},"eerst-inventariseren","Eerst inventariseren",[12,36616,36617],{},"Noteer aansluitingstype en spanning, bestaande verdeelkasten, ruimtes, verdiepingen en alle zichtbare elektrische punten. Verzegelde delen blijven dicht, en de netvorm leid je niet enkel af uit het aantal draden. Bij een bestaande installatie helpen foto’s van de labels en een zorgvuldige opname door een vakman meer dan aannames. Onbekende gegevens markeer je als open, in plaats van een aannemelijk kabeltype of een beveiligingswaarde in te vullen.",[1396,36619,36621],{"id":36620},"toestellen-en-kringen-apart-beoordelen","Toestellen en kringen apart beoordelen",[12,36623,36624],{},"Plaats eerst de verdeelkast en de echte toestellen. Koppel schakelaars aan de lichtpunten die ze werkelijk bedienen en wijs daarna verbruikers toe aan kringen. Bij elk automatisch voorstel controleer je of de voorgestelde groep vaktechnisch klopt. PlanElec geeft begeleiding en voorstellen; de goedkeuring van het elektrisch ontwerp geef jij als vakman. Kabellengte, plaatsingswijze, bundeling, omgeving, spanningsval, kortsluitstroom en fabrikantvoorwaarden horen bij jouw controle voor zover ze niet in het project zijn vastgelegd.",[1396,36626,36628],{"id":36627},"drie-weergaven-gelijk-houden","Drie weergaven gelijk houden",[12,36630,36631],{},"Gebruik dezelfde kringreferenties in de verdeelkast, het eendraadschema en het situatieplan. Verplaats je een toestel, splits je een kring of wijzig je een beveiliging, controleer dan alle drie de weergaven. Een goede tussentest: kan iemand anders vanaf een symbool op het situatieplan via de referentie de juiste kring vinden en terug naar de verdeelkast? Zo ja, dan is het project klaar om te documenteren.",[1396,36633,36635],{"id":36634},"de-export-als-controlestap-gebruiken","De export als controlestap gebruiken",[12,36637,36638],{},"Maak eerst voorvertoningen. Controleer paginaovergangen, afgesneden labels, legende, installatieadres, verantwoordelijke, planversie en datum. Open de pdf’s daarna opnieuw en vergelijk ze met het actuele project. Eendraadschema, situatieplan, verdeelkast-pdf en dossier draaien in de normale workflow. De materiaallijst is een pilot met zichtbare dekkingsgrenzen en dient voor de planning, niet als bestelvrijgave.",[12,36640,36641],{},"De AREI-zelfcontrole is indicatief. Een foutloos resultaat betekent: de ondersteunde regels die uit jouw gegevens beslisbaar zijn, melden geen fout. Metingen, fabrikantgegevens, plaatselijke omstandigheden en niet-gemodelleerde regels controleer je ter plaatse. Laat ontwerp, uitgevoerde installatie en documenten vóór ingebruikname nakijken door een gekwalificeerde elektricien; de keuring doet daarna het erkende controleorganisme.",[41,36643,36645],{"id":36644},"als-iets-niet-klopt","Als iets niet klopt",[49,36647,36648,36656],{},[52,36649,36650],{},[55,36651,36652,36654],{},[58,36653,4416],{},[58,36655,15957],{},[68,36657,36658,36666,36674,36682,36690],{},[55,36659,36660,36663],{},[73,36661,36662],{},"Toestel ontbreekt in het schema",[73,36664,36665],{},"de elektrische toewijzing, niet alleen de positie",[55,36667,36668,36671],{},[73,36669,36670],{},"Kring zonder punten op het plan",[73,36672,36673],{},"niet-geplaatste of verkeerd gerefereerde toestellen",[55,36675,36676,36679],{},[73,36677,36678],{},"Beveiliging lijkt onlogisch",[73,36680,36681],{},"eerst kabelgegevens en ontwerp uitklaren, dan pas aanpassen",[55,36683,36684,36687],{},[73,36685,36686],{},"Export toont oude gegevens",[73,36688,36689],{},"projectmetadata, actuele versie en laatst opgeslagen toestand",[55,36691,36692,36695],{},[73,36693,36694],{},"Zelfcontrole is onvolledig",[73,36696,36697],{},"open gegevens aanvullen; onvolledig betekent nooit geslaagd",[41,36699,36701],{"id":36700},"opslaan-varianten-en-samenwerken","Opslaan, varianten en samenwerken",[12,36703,36704],{},"Geef project en verdiepingen stabiele, duidelijke namen. Voordat je een grote automatische planning of herstructurering uitprobeert, controleer je de opgeslagen toestand en maak je zo nodig een vergelijkingsexport. Een ontwerpvariant is nog geen uitgevoerde installatie: duid daarom duidelijk aan welke variant gepland, verworpen of ter plaatse uitgevoerd is.",[12,36706,36707],{},"Werken meerdere mensen aan het project, spreek dan af wie grondplan, elektrische toewijzing, verdeelkast en eindcontrole beheert. Gedeelde kringreferenties hernoemt niemand stilletjes. Een korte wijzigingsnotitie met datum, betrokken zone en verantwoordelijke voorkomt dat een nieuwe ruimtelijke versie samen met een oude elektrische versie wordt geëxporteerd.",[41,36709,36711],{"id":36710},"voorbeeld-één-ruimte-volledig-uitwerken","Voorbeeld: één ruimte volledig uitwerken",[12,36713,36714],{},"Neem een keuken als oefening. Teken en benoem de ruimte, plaats algemene stopcontacten, verlichting en de vaste toestellen die echt gepland zijn. Koppel schakelaars aan hun lichtpunten en houd zware lasten apart waar jouw ontwerp dat vraagt. Kabel- en automaatwaarden leid je niet af uit de naam van een toestel: vul bevestigde gegevens in en laat onbekende kabellengtes open.",[12,36716,36717],{},"Controleer daarna de referenties op het situatieplan, het pad van elke verbruiker in het eendraadschema en de bezetting van de verdeelkast. Ga na of extra bronnen of buitenzones de scope raken. Exporteer beide schema’s en volg steekproefsgewijs drie toestellen in beide richtingen. Werkt die keten, dan neem je de volgende ruimte onder handen.",[41,36719,36721],{"id":36720},"privacy-en-projectgegevens","Privacy en projectgegevens",[12,36723,36724],{},"Gebruik in oefenprojecten geen echte klantgegevens. Een echt dossier heeft naam, installatieadres en verantwoordelijken nodig; deel ze alleen binnen de bevoegde projectkring. Controleer vóór verzending of een voorvertoning interne notities, oude varianten of onvolledige gegevens bevat. De ontvanger heeft de vrijgegeven documentversie nodig, niet je volledige werkstand.",[41,36726,36728],{"id":36727},"wanneer-je-eerste-project-klaar-is","Wanneer je eerste project klaar is",[12,36730,36731],{},"Een project is klaar als de ruimtelijke punten met het gebouw overeenstemmen, de elektrische toewijzingen traceerbaar zijn, verdeelkast en plannen dezelfde referenties gebruiken, open gegevens zichtbaar blijven en een vakman de relevante keuzes heeft nagekeken. De pdf is het resultaat van dat werk, niet het bewijs ervan. De keuring daarna beoordeelt de uitgevoerde installatie.",[12,36733,36734],{},"Archiveer tot slot de vrijgegeven pdf’s en noteer de bijbehorende projectversie. Wordt later een toestel verplaatst of een kring toegevoegd, dan vertrek je van die toestand. Zo blijft het verschil tussen vorige keuring, nieuwe planning en latere werkelijke toestand zichtbaar.",[41,36736,36738],{"id":36737},"checklist-vóór-de-eerste-download","Checklist vóór de eerste download",[1450,36740,36741,36744,36747,36750,36753,36756,36759,36762],{},[1453,36742,36743],{},"Gebouw, verdiepingen en ruimtes zijn volledig aangemaakt en benoemd.",[1453,36745,36746],{},"Alle elektrische toestellen staan op de juiste plaats.",[1453,36748,36749],{},"Verbruikers zijn gekoppeld aan topologie, kring en verdeelkast.",[1453,36751,36752],{},"Kabelroutes en lengtes zijn gecontroleerd.",[1453,36754,36755],{},"Beveiligingsketen en kastbezetting zijn aannemelijk.",[1453,36757,36758],{},"Eendraadschema en situatieplan zijn visueel nagekeken.",[1453,36760,36761],{},"Projectmetadata zijn volledig voor de beoogde documentversie.",[1453,36763,36764],{},"Bevindingen en dekkingslacunes van de zelfcontrole zijn begrepen en beoordeeld.",[41,36766,36768],{"id":36767},"verder-lezen-en-officiële-bron","Verder lezen en officiële bron",[1450,36770,36771,36776,36780,36786,36790,36794,36798],{},[1453,36772,36773],{},[30,36774,36775],{"href":7514},"Een eendraadschema maken",[1453,36777,36778],{},[30,36779,23716],{"href":25796},[1453,36781,36782],{},[30,36783,36785],{"href":36784},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Een verdeelkast plannen",[1453,36787,36788],{},[30,36789,18803],{"href":23781},[1453,36791,36792],{},[30,36793,19570],{"href":19569},[1453,36795,36796],{},[30,36797,16418],{"href":16417},[1453,36799,36800],{},[30,36801,36803],{"href":28056,"rel":36802},[2532],"FOD Economie: officiële AREI\u002FRGIE-boeken, Boek 1 V06",[12,36805,36806,36807,36809,36810,36812,36813,36816],{},"PlanElec brengt je van grondplan tot dossier. De uitvoering is de verantwoordelijkheid van de gekwalificeerde elektricien, de officiële beoordeling doet een erkend controleorganisme. Meer handleidingen vind je in het ",[30,36808,34410],{"href":10161},", het volledige aanbod in het ",[30,36811,20219],{"href":20218},". Tijdens de Early Access ",[30,36814,36815],{"href":15328},"registreer"," je gratis.",{"title":1467,"searchDepth":1468,"depth":1468,"links":36818},[36819,36820,36821,36822,36823,36824,36825,36826,36827,36833,36834,36835,36836,36837,36838,36839],{"id":36481,"depth":1468,"text":36482},{"id":36495,"depth":1468,"text":36496},{"id":36519,"depth":1468,"text":36520},{"id":36537,"depth":1468,"text":36538},{"id":36550,"depth":1468,"text":36551},{"id":36563,"depth":1468,"text":36564},{"id":36579,"depth":1468,"text":36580},{"id":36592,"depth":1468,"text":36593},{"id":36606,"depth":1468,"text":36607,"children":36828},[36829,36830,36831,36832],{"id":36613,"depth":1486,"text":36614},{"id":36620,"depth":1486,"text":36621},{"id":36627,"depth":1486,"text":36628},{"id":36634,"depth":1486,"text":36635},{"id":36644,"depth":1468,"text":36645},{"id":36700,"depth":1468,"text":36701},{"id":36710,"depth":1468,"text":36711},{"id":36720,"depth":1468,"text":36721},{"id":36727,"depth":1468,"text":36728},{"id":36737,"depth":1468,"text":36738},{"id":36767,"depth":1468,"text":36768},"2026-07-14","Stap voor stap door PlanElec: project en verdiepingen aanmaken, grondplan tekenen of herkennen, verbruikers koppelen, verdeelkast vullen en pdf’s exporteren.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-getting-started-guide-editorial.jpg","\u002Fblog\u002Fgetting-started-guide.nl",{"title":36464,"description":36841},"aan-de-slag-met-planelec","blog\u002Fgetting-started-guide.nl",[35566,36849,35569,35570,14346,3273,13570],"onboarding","sbcyzGZSNAke81_l_vGXtkEYOnV9_qD2uVDPD6FjazM",{"id":36852,"title":36853,"articleId":36854,"body":36855,"category":19087,"date":37198,"description":37199,"extension":1496,"image":36876,"lastUpdated":37200,"locale":1497,"meta":37201,"navigation":1499,"ogImage":37202,"path":37203,"publishDate":37198,"readTime":37204,"refreshInterval":11097,"seo":37205,"seoTitle":37206,"slug":37207,"stem":37208,"tags":37209,"__hash__":37217,"kind":1515,"href":32848},"blog\u002Fblog\u002Fdedicated-circuits-appliances.nl.md","Eigen stroomkring verplicht: welke toestellen hebben een eigen automaat nodig?","dedicated-circuits-appliances",{"type":9,"value":36856,"toc":37180},[36857,36861,36871,36877,36953,36958,36961,36965,36968,36972,36992,36996,36999,37002,37005,37009,37015,37019,37022,37079,37086,37090,37096,37098,37102,37105,37109,37112,37116,37119,37123,37126,37130,37133,37137,37140,37142,37167,37175],[41,36858,36860],{"id":36859},"welke-toestellen-hebben-een-eigen-stroomkring-nodig","Welke toestellen hebben een eigen stroomkring nodig?",[12,36862,36863,36866,36867,36870],{},[15,36864,36865],{},"In een woning krijgen twee groepen toestellen een eigen kring:"," elk toestel met vaste standplaats vanaf ",[15,36868,36869],{},"2600 W"," nominaal vermogen en, ongeacht het vermogen, de wasmachine, de afwasmachine, de droogkast, het elektrisch fornuis, de elektrische kookplaat en de elektrische oven. \"Vaste standplaats\" geldt ook voor een toestel dat je af en toe verschuift, bijvoorbeeld een vrijstaand fornuis bij het poetsen; een radiator op wieltjes is een verplaatsbaar toestel en valt erbuiten (AREI Boek 1, deel 2, definities). Vaste elektrische verwarming voed je via één of meer afzonderlijke kringen. Zo staat het in AREI Boek 1, onderafdeling 5.2.1.2.",[12,36872,36873],{},[22,36874],{"alt":36875,"src":36876},"Een elektricien controleert de aansluitingen van wasapparaten.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-dedicated-circuits-appliances-editorial.webp",[49,36878,36879,36889],{},[52,36880,36881],{},[55,36882,36883,36885,36887],{},[58,36884,1093],{},[58,36886,2132],{},[58,36888,20865],{},[68,36890,36891,36902,36912,36922,36932,36942],{},[55,36892,36893,36896,36899],{},[73,36894,36895],{},"Wasmachine, afwasmachine, droogkast",[73,36897,36898],{},"elk afzonderlijk een toegekende stroombaan",[73,36900,36901],{},"5.2.1.2",[55,36903,36904,36907,36910],{},[73,36905,36906],{},"Elektrisch fornuis (kookplaat en oven in één)",[73,36908,36909],{},"één toegekende stroombaan",[73,36911,36901],{},[55,36913,36914,36917,36920],{},[73,36915,36916],{},"Aparte kookplaat en inbouwoven",[73,36918,36919],{},"elk een eigen toegekende stroombaan",[73,36921,36901],{},[55,36923,36924,36927,36930],{},[73,36925,36926],{},"Vaste elektrische verwarming",[73,36928,36929],{},"één of meer afzonderlijke kringen",[73,36931,36901],{},[55,36933,36934,36937,36940],{},[73,36935,36936],{},"Boiler, warmtepomp, sauna en andere toestellen",[73,36938,36939],{},"eigen kring vanaf 2600 W bij vaste standplaats",[73,36941,36901],{},[55,36943,36944,36947,36950],{},[73,36945,36946],{},"Laadpaal \u002F laadinrichting",[73,36948,36949],{},"een toegekende stroombaan per verbindingspunt; aansluiten via een stopcontact is verboden",[73,36951,36952],{},"7.22.3",[12,36954,36955,36956,39],{},"De regel legt de structuur vast: één toestel, één kring. Automaat en doorsnede kies je daarna op basis van het toestel. Daarvoor tellen typeplaatje, netstelsel, plaatsingswijze, bundeling, kabellengte, spanningsval en fabrikantvoorschrift. De maxima per doorsnede staan in tabel 4.11 van onderafdeling 4.4.1.4; de werkwijze lees je in ",[30,36957,24305],{"href":26440},[12,36959,36960],{},"\"Eigen automaat\" is dus de vuistregel voor de grote huishoudtoestellen, geen letterlijke eis voor elk geval. Bij een laadpaal mag de overstroombeveiliging in de laadinrichting zelf zitten, in plaats van in het verdeelbord (7.22.3). Bij vaste elektrische verwarming mogen meerdere toestellen één kring delen, want het AREI laat \"één of meerdere\" kringen toe (5.2.1.2).",[41,36962,36964],{"id":36963},"geldt-dit-ook-voor-een-bestaande-installatie","Geldt dit ook voor een bestaande installatie?",[12,36966,36967],{},"De regel geldt voor nieuwe installaties en voor nieuwe of gewijzigde delen. In bestaande delen van een oude huishoudelijke installatie (aangevat vóór 1 oktober 1981) en van een installatie die volgens het oud AREI gekeurd werd, mag een stroombaan die niet aan het toestel is toegekend in dienst blijven (AREI Boek 1, deel 8, afdelingen 8.2.1 en 8.2.2, punt 5). Een wasmachine op de stopcontactkring is in zo'n installatie dus niet automatisch een gebrek. Leg je een nieuwe kring aan of vervang je het toestel door een krachtiger model, dan volg je 5.2.1.2.",[41,36969,36971],{"id":36970},"wat-een-eigen-kring-oplevert","Wat een eigen kring oplevert",[1602,36973,36974,36980,36986],{},[1453,36975,36976,36979],{},[15,36977,36978],{},"Geen overbelasting door buren:"," Een krachtig toestel draait vaak lang dicht bij zijn nominale stroom. Op een eigen kring deelt het die belasting met niemand.",[1453,36981,36982,36985],{},[15,36983,36984],{},"Beschikbaarheid:"," Schakelt de automaat uit, dan valt alleen dit toestel weg, niet de halve keuken.",[1453,36987,36988,36991],{},[15,36989,36990],{},"Passende leiding:"," Doorsnede en beveiliging passen precies bij één toestel in plaats van bij een mengeling.",[41,36993,36995],{"id":36994},"de-regel-per-toestel-toepassen","De regel per toestel toepassen",[12,36997,36998],{},"Begin bij het typeplaatje en de installatiehandleiding. Noteer het vermogen, eenfasige of driefasige aansluiting, de toegelaten aansluitwijze en bijzondere beveiligingseisen van de fabrikant. Een combifornuis (kookplaat en oven in één toestel) is één kring; een aparte kookplaat en een inbouwoven krijgen elk een eigen kring. Een warmtepomp kan aparte voedingen vragen voor buitenunit, binnenunit en bijverwarming. Plan zulke gevallen afzonderlijk.",[12,37000,37001],{},"Voor een warmtepomp of boiler onder 2600 W regelt het AREI niet uitdrukkelijk een aparte kring. Volg minstens de 2600 W-regel; in de praktijk kies je bijna altijd een eigen kring.",[12,37003,37004],{},"Op het eendraadschema krijgt elke toestelkring een eigen referentie met beveiliging, leidinggegevens en eindtoestel. Het situatieplan toont dezelfde referentie op de plaats van het toestel. Wordt het toestel later vervangen door een krachtiger model, dan controleer je het ontwerp opnieuw.",[41,37006,37008],{"id":37007},"wasplaats-en-technische-ruimte","Wasplaats en technische ruimte",[12,37010,37011,37012,39],{},"Wasmachine en droogkast krijgen elk een eigen kring, een boiler vanaf 2600 W ook. Voorzie daarnaast een gewone stopcontactkring voor strijkijzer en klein materiaal, zodat die niet aan de toestelstopcontacten hangen. Hoeveel stopcontacten zo'n kring mag dragen, lees je in ",[30,37013,37014],{"href":25635},"hoeveel stopcontacten per stroomkring?",[41,37016,37018],{"id":37017},"welke-differentieel-hoort-bij-welke-toestelkring","Welke differentieel hoort bij welke toestelkring?",[12,37020,37021],{},"Een eigen kring zegt nog niet welke differentieel ervoor staat. Dat regelt onderafdeling 4.2.4.3 b: stopcontacten, verlichting, badkamers en ook wasmachine, droogkast en afwasmachine komen achter een differentieel met hoge of zeer hoge gevoeligheid (hoogstens 30 mA), met ten hoogste acht eindstroombanen per differentieel. Vaste toestellen mogen daarentegen op een bijkomende differentieel aan het begin van de installatie.",[49,37023,37024,37035],{},[52,37025,37026],{},[55,37027,37028,37030,37033],{},[58,37029,1093],{},[58,37031,37032],{},"Differentieel",[58,37034,20865],{},[68,37036,37037,37048,37058,37068],{},[55,37038,37039,37042,37045],{},[73,37040,37041],{},"Wasmachine, droogkast, afwasmachine",[73,37043,37044],{},"hoge of zeer hoge gevoeligheid (hoogstens 30 mA), net als stopcontacten en licht",[73,37046,37047],{},"4.2.4.3 b",[55,37049,37050,37053,37056],{},[73,37051,37052],{},"Fornuis, kookplaat, oven, vaste verwarming",[73,37054,37055],{},"mag op een bijkomende differentieel aan het begin van de installatie (bijvoorbeeld 300 mA)",[73,37057,37047],{},[55,37059,37060,37063,37066],{},[73,37061,37062],{},"Weerstandsverwarming in wanden (boven 25 V wisselspanning)",[73,37064,37065],{},"eigen differentieel van hoogstens 100 mA",[73,37067,37047],{},[55,37069,37070,37073,37076],{},[73,37071,37072],{},"Laadinrichting",[73,37074,37075],{},"elke kring afzonderlijk hoogstens 30 mA, met bescherming tegen gelijkstroomfouten",[73,37077,37078],{},"7.22.4.1 b",[12,37080,37081,37082,39],{},"Het \"mag\" bij fornuis en verwarming is een toelating, geen verbod op 30 mA. Meer over de indeling lees je in ",[30,37083,37085],{"href":37084},"\u002Fblog\u002F30ma-aardlek-per-stopcontact","heb ik een 30mA-differentieel per stopcontact nodig?",[41,37087,37089],{"id":37088},"zo-controleert-planelec-toestelkringen","Zo controleert PlanElec toestelkringen",[12,37091,37092,37093,39],{},"Voor grote toestellen uit de toestelcatalogus – waaronder fornuis, oven, wasmachine, droogkast, afwasmachine en laadpaal – meldt de AREI\u002FRGIE-zelfcontrole een fout zodra het toestel zijn kring deelt met andere verbruikers. Is er nog geen automaat toegewezen, dan toont ze de ontbrekende invoer. De catalogus markeert bovendien boiler, warmtepomp en sauna altijd als toestel met eigen kring, ook onder 2600 W; dat is strenger dan het AREI. De 2600 W-grens voor andere toestellen lees je af van het typeplaatje. De keuring van de installatie doet het erkende controleorganisme. Welke regels de zelfcontrole dekt, lees je in ",[30,37094,37095],{"href":2457},"wat controleert de zelfcontrole",[41,37097,1394],{"id":1393},[1396,37099,37101],{"id":37100},"heeft-een-koelkast-of-diepvriezer-een-eigen-stroomkring-nodig","Heeft een koelkast of diepvriezer een eigen stroomkring nodig?",[12,37103,37104],{},"Nee. Een koelkast is een toestel met vaste standplaats, maar de verplichting geldt pas vanaf 2600 W nominaal vermogen (5.2.1.2). Gewone koelkasten en diepvriezers liggen daar ver onder.",[1396,37106,37108],{"id":37107},"mogen-wasmachine-en-droogkast-samen-op-één-kring","Mogen wasmachine en droogkast samen op één kring?",[12,37110,37111],{},"Nee. Het AREI voedt de wasmachine, de afwasmachine en de droogkast elk afzonderlijk door een toegekende stroombaan (5.2.1.2). Twee toestellen op één kring voldoen daar niet aan.",[1396,37113,37115],{"id":37114},"heeft-een-inductiekookplaat-altijd-een-eigen-kring-nodig","Heeft een inductiekookplaat altijd een eigen kring nodig?",[12,37117,37118],{},"Ja, ongeacht het vermogen. De elektrische kookplaat staat uitdrukkelijk in de lijst van 5.2.1.2. Een aparte inbouwoven krijgt eveneens een eigen kring; alleen een fornuis met kookplaat en oven in één toestel deelt één kring.",[1396,37120,37122],{"id":37121},"heeft-een-airco-een-eigen-kring-nodig","Heeft een airco een eigen kring nodig?",[12,37124,37125],{},"Alleen vanaf 2600 W nominaal vermogen bij een toestel met vaste standplaats (5.2.1.2). Daaronder bepaalt de installatiehandleiding van de fabrikant wat nodig is.",[1396,37127,37129],{"id":37128},"moet-ik-mijn-oude-installatie-aanpassen-als-ik-een-wasmachine-op-de-stopcontactkring-heb","Moet ik mijn oude installatie aanpassen als ik een wasmachine op de stopcontactkring heb?",[12,37131,37132],{},"Niet automatisch. In bestaande delen van oude installaties of van installaties die volgens het oud AREI gekeurd werden, mag zo'n kring in dienst blijven (afdelingen 8.2.1 en 8.2.2, punt 5). Bij een nieuwe of gewijzigde kring of een krachtiger toestel geldt 5.2.1.2 wel.",[1396,37134,37136],{"id":37135},"welke-differentieel-hoort-bij-de-wasmachine-en-welke-bij-het-fornuis","Welke differentieel hoort bij de wasmachine en welke bij het fornuis?",[12,37138,37139],{},"De wasmachine hoort achter een differentieel van hoogstens 30 mA; het fornuis mag op een bijkomende differentieel aan het begin van de installatie (4.2.4.3 b). Zie de tabel hierboven.",[41,37141,32827],{"id":32826},[1450,37143,37144,37149,37154,37159,37163],{},[1453,37145,37146],{},[30,37147,37148],{"href":26440},"Welke kabeldoorsnede bij welke automaat?",[1453,37150,37151],{},[30,37152,37153],{"href":37084},"Heb ik een 30mA-differentieel per stopcontact nodig?",[1453,37155,37156],{},[30,37157,37158],{"href":25635},"Hoeveel stopcontacten per stroomkring?",[1453,37160,37161],{},[30,37162,17455],{"href":17361},[1453,37164,37165],{},[30,37166,32862],{"href":28094},[12,37168,37169,37170,37174],{},"Officiële bron: ",[30,37171,37173],{"href":15357,"rel":37172},[2532],"AREI Boek 1",", versie 06 (tot 31 oktober 2026) en versie 07 (vanaf 1 november 2026; deze onderdelen blijven inhoudelijk ongewijzigd, in 4.2.4.3 b vervalt alleen de verzegeling van de differentieel): deel 2 (definities), onderafdelingen 4.2.4.3, 4.4.1.4 en 5.2.1.2, afdelingen 7.22.3 en 7.22.4 en deel 8, afdelingen 8.2.1 en 8.2.2.",[12,37176,37177],{},[30,37178,37179],{"href":6989},"Plan je toestelkringen in PlanElec en controleer ze zelf →",{"title":1467,"searchDepth":1468,"depth":1468,"links":37181},[37182,37183,37184,37185,37186,37187,37188,37189,37197],{"id":36859,"depth":1468,"text":36860},{"id":36963,"depth":1468,"text":36964},{"id":36970,"depth":1468,"text":36971},{"id":36994,"depth":1468,"text":36995},{"id":37007,"depth":1468,"text":37008},{"id":37017,"depth":1468,"text":37018},{"id":37088,"depth":1468,"text":37089},{"id":1393,"depth":1468,"text":1394,"children":37190},[37191,37192,37193,37194,37195,37196],{"id":37100,"depth":1486,"text":37101},{"id":37107,"depth":1486,"text":37108},{"id":37114,"depth":1486,"text":37115},{"id":37121,"depth":1486,"text":37122},{"id":37128,"depth":1486,"text":37129},{"id":37135,"depth":1486,"text":37136},{"id":32826,"depth":1468,"text":32827},"2026-07-13","Wasmachine, fornuis, droogkast en toestellen met vaste standplaats vanaf 2600 W: het AREI schrijft een eigen stroomkring voor. Met vindplaatsen en differentieel.","2026-10-16",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-dedicated-circuits-appliances-editorial.jpg","\u002Fblog\u002Fdedicated-circuits-appliances.nl","6 min",{"title":36853,"description":37199},"Eigen stroomkring verplicht: welke toestellen?","eigen-stroomkring-verplicht-toestellen","blog\u002Fdedicated-circuits-appliances.nl",[3275,3276,37210,37211,37212,37213,37214,37215,37216,31224,32904,1513,33956],"eigen stroomkring","dedicated circuit","wasmachine","droogkast","kookplaat","vaatwasser","boiler","AWActwUzVZeSwONbmj3405C-FJn8ssPnCGoH1m30CBk",{"id":37219,"title":37220,"articleId":37221,"body":37222,"category":19087,"date":37414,"description":37415,"extension":1496,"image":37238,"lastUpdated":33942,"locale":1497,"meta":37416,"navigation":1499,"ogImage":37417,"path":37418,"publishDate":37414,"readTime":19590,"refreshInterval":11097,"seo":37419,"seoTitle":37420,"slug":37421,"stem":37422,"tags":37423,"__hash__":37429,"kind":1515,"href":37430},"blog\u002Fblog\u002Fsurge-protection-spd-mandatory.nl.md","Is overspanningsbeveiliging (SPD) verplicht volgens het AREI?","surge-protection-spd-mandatory",{"type":9,"value":37223,"toc":37405},[37224,37228,37234,37239,37242,37246,37253,37309,37312,37316,37319,37325,37328,37332,37335,37339,37342,37356,37364,37368,37380,37382,37397],[41,37225,37227],{"id":37226},"kort-antwoord-beschermingsdoel-ja-verplicht-spd-type-nee","Kort antwoord: beschermingsdoel ja, verplicht SPD-type nee",[12,37229,37230,37233],{},[15,37231,37232],{},"Het AREI vraagt dat personen en goederen volgens de regels van goed vakmanschap beschermd worden tegen de schadelijke gevolgen van overspanningen"," – bijvoorbeeld door atmosferische verschijnselen of schakeloverspanningen (AREI Boek 1, afdeling 4.5.1). Een bepaald toestel zoals “SPD type 2 in het hoofdbord” schrijft Boek 1 voor woningen niet voor. Of en welke overspanningsbeveiliging (SPD, Surge Protection Device) je plaatst, beslis je met de risicobeoordeling van het project en de gegevens van de fabrikant.",[12,37235,37236],{},[22,37237],{"alt":17042,"src":37238},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-surge-protection-spd-mandatory-editorial.webp",[12,37240,37241],{},"Uitdrukkelijk geregeld in hoofdstuk 4.5 zijn alleen twee zaken: overspanningsbeveiligingen worden zo ontworpen en geplaatst dat hun werking geen gevaar voor personen en goederen vormt (4.5.1). En in IT-netten wordt indien nodig aan het begin van de installatie een overspanningsbegrenzer tussen de aardverbinding en de nulgeleider of een fasegeleider aangesloten (4.5.3).",[41,37243,37245],{"id":37244},"wat-een-spd-doet","Wat een SPD doet",[12,37247,37248,37249,37252],{},"Een SPD leidt korte ",[15,37250,37251],{},"overspanningspieken"," naar de aarde af voor ze toestellen bereiken. Zulke pieken ontstaan door blikseminslag in de buurt, schakelhandelingen in het net of andere storingen en treffen vooral gevoelige elektronica: computers, televisies, warmtepompen en omvormers.",[49,37254,37255,37268],{},[52,37256,37257],{},[55,37258,37259,37262,37265],{},[58,37260,37261],{},"SPD-type",[58,37263,37264],{},"Bescherming tegen",[58,37266,37267],{},"Gebruikelijke plaats",[68,37269,37270,37283,37296],{},[55,37271,37272,37277,37280],{},[73,37273,37274],{},[15,37275,37276],{},"Type 1",[73,37278,37279],{},"Deelbliksemstromen",[73,37281,37282],{},"Aan het begin van de installatie, typisch bij uitwendige bliksembeveiliging",[55,37284,37285,37290,37293],{},[73,37286,37287],{},[15,37288,37289],{},"Type 2",[73,37291,37292],{},"Indirecte overspanningen",[73,37294,37295],{},"In het hoofdbord – de gebruikelijke keuze in woningen",[55,37297,37298,37303,37306],{},[73,37299,37300],{},[15,37301,37302],{},"Type 3",[73,37304,37305],{},"Restoverspanningen",[73,37307,37308],{},"Dicht bij het toestel, als fijnbeveiliging achter een type 2",[12,37310,37311],{},"De types komen uit de productnormen, niet uit het AREI.",[41,37313,37315],{"id":37314},"waar-de-spd-in-het-bord-zit","Waar de SPD in het bord zit",[12,37317,37318],{},"Een type 2 zit in het verdeelbord. Twee opstellingen zijn gangbaar:",[27702,37320,37323],{"className":37321,"code":37322,"language":27707},[27705],"Net → hoofdschakelaar → hoofddifferentieel (300 mA) → SPD type 2 → groepsdifferentiëlen → automaten\nNet → hoofdschakelaar → SPD type 2 met eigen voorbeveiliging → hoofddifferentieel (300 mA) → …\n",[1300,37324,37322],{"__ignoreMap":1467},[12,37326,37327],{},"Welke opstelling past, bepalen fabrikantvoorschrift, netsysteem en installatieconcept. Voorbeveiliging, lengte van de aansluitgeleiders en coördinatie met andere SPD's volgen de datasheet; “typisch 20 A” is geen AREI-regel. In het eendraadschema documenteer je de werkelijk geplaatste SPD met type, aansluitwijze en beschermingsgegevens.",[41,37329,37331],{"id":37330},"geldt-dit-ook-voor-bestaande-installaties","Geldt dit ook voor bestaande installaties?",[12,37333,37334],{},"Het AREI kent geen algemene plicht om na te rusten in de zin van “elk huishouden krijgt een type 2”. Afdeling 4.5.1 formuleert een beschermingsdoel. Bij een bestaande installatie beoordeelt de elektrotechnicus bliksembeveiliging, voeding, kabeltracés, gevoelige verbruikers en het concept van de fabrikant – en documenteert de beslissing. Bij een verbouwing gelden voor het gewijzigde deel de regels die op het moment van de werken van toepassing zijn.",[41,37336,37338],{"id":37337},"spd-bij-zonnepanelen","SPD bij zonnepanelen",[12,37340,37341],{},"Bij PV beoordeel je de AC- en de DC-zijde apart:",[1450,37343,37344,37350],{},[1453,37345,37346,37349],{},[15,37347,37348],{},"AC-zijde:"," overspanningsbeveiliging in het verdeelbord zoals hierboven.",[1453,37351,37352,37355],{},[15,37353,37354],{},"DC-zijde:"," hoofdstuk 7.112 schrijft voor huishoudelijke PV-installaties geen DC-SPD uitdrukkelijk voor. Een DC-SPD aan de omvormer is toch gangbare praktijk, zeker bij lange DC-kabels over het dak; bepalend zijn de regels van goed vakmanschap en de fabrikantgegevens.",[31245,37357,37358],{},[12,37359,37360,37363],{},[15,37361,37362],{},"Tip:"," Veel omvormers hebben al een ingebouwde DC-SPD. Een blik in de datasheet bespaart je een extra toestel.",[41,37365,37367],{"id":37366},"spd-documenteren-in-planelec","SPD documenteren in PlanElec",[12,37369,12598,37370,37372,37373,37376,37377,37379],{},[30,37371,1337],{"href":6989}," plaats je de SPD als module in het verdeelbord. De AREI\u002FRGIE-zelfcontrole beoordeelt of er overspanningsbeveiliging aanwezig is en meldt het resultaat als ",[15,37374,37375],{},"informatie"," – in lijn met de regelgeving, want een algemene SPD-plicht bestaat niet. In het eendraadschema en de bijbehorende pdf tekent PlanElec de SPD voorlopig nog niet; type, aansluitwijze en beveiligingsgegevens vul je daar tot dan zelf aan. De volledige controle-omvang vind je in ",[30,37378,10087],{"href":2457},". Dimensionering, afleidvermogen en coördinatie leg je vast volgens risicobeoordeling en datasheet; kosten neem je over uit een actuele projectofferte.",[41,37381,17442],{"id":17441},[1450,37383,37384,37389,37393],{},[1453,37385,37386],{},[30,37387,37388],{"href":37084},"30 mA-differentieel per stopcontact?",[1453,37390,37391],{},[30,37392,17461],{"href":17460},[1453,37394,37395],{},[30,37396,29171],{"href":28125},[12,37398,37399],{},[17563,37400,37401,37402,19074],{},"Regelgrond: AREI Boek 1, versie 06, hoofdstuk 4.5 (afdelingen 4.5.1 en 4.5.3) en hoofdstuk 7.112. De officiële tekst van de ",[30,37403,19073],{"href":15357,"rel":37404},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":37406},[37407,37408,37409,37410,37411,37412,37413],{"id":37226,"depth":1468,"text":37227},{"id":37244,"depth":1468,"text":37245},{"id":37314,"depth":1468,"text":37315},{"id":37330,"depth":1468,"text":37331},{"id":37337,"depth":1468,"text":37338},{"id":37366,"depth":1468,"text":37367},{"id":17441,"depth":1468,"text":17442},"2026-07-06","Het AREI vraagt bescherming tegen overspanningen (afdeling 4.5.1), maar schrijft geen bepaald SPD-type voor. Wat dat betekent voor jouw verdeelbord, bestaande installaties en PV.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-surge-protection-spd-mandatory-editorial.jpg","\u002Fblog\u002Fsurge-protection-spd-mandatory.nl",{"title":37220,"description":37415},"Is overspanningsbeveiliging (SPD) verplicht (AREI)?","overspanningsbeveiliging-verplicht-arei","blog\u002Fsurge-protection-spd-mandatory.nl",[3275,3276,37424,37425,37426,37427,37289,37428,14346,1513,33956],"overspanningsbeveiliging","SPD","Surge Protection Device","bliksembeveiliging","nieuwe installatie","rxInxWJxqPNhkrpeFsDMLA6Cc6TNygSbdewh1kIV9cM","\u002Fblog\u002Foverspanningsbeveiliging-verplicht-arei",{"id":37432,"title":37433,"articleId":37434,"body":37435,"category":1493,"date":37936,"description":37937,"extension":1496,"image":37465,"lastUpdated":15381,"locale":1497,"meta":37938,"navigation":1499,"ogImage":37939,"path":37940,"publishDate":37936,"readTime":7670,"refreshInterval":11097,"seo":37941,"seoTitle":37942,"slug":37943,"stem":37944,"tags":37945,"__hash__":37949,"kind":1515,"href":37950},"blog\u002Fblog\u002Fproperty-sale-electrical-dossier.nl.md","Elektrisch dossier bij woningverkoop 2026: regels en documenten","property-sale-electrical-dossier",{"type":9,"value":37436,"toc":37918},[37437,37441,37460,37466,37469,37474,37478,37485,37493,37550,37553,37557,37560,37563,37567,37574,37635,37638,37641,37645,37648,37651,37671,37674,37678,37689,37692,37695,37699,37702,37705,37709,37712,37716,37769,37772,37776,37779,37782,37786,37789,37793,37796,37799,37803,37848,37852,37855,37858,37872,37876,37879,37881,37908,37913],[41,37438,37440],{"id":37439},"wat-bij-verkoop-elektrisch-geldt","Wat bij verkoop elektrisch geldt",[12,37442,37443,37444,37447,37448,37451,37452,37455,37456,37459],{},"Verkoop je een appartement of huis in België, dan geef je de koper het ",[15,37445,37446],{},"dossier van de elektrische installatie"," met eendraadschema, situatieplan en keuringsverslagen (AREI Boek 1, afdeling 9.1.2). Dateert de installatie geheel of gedeeltelijk van vóór ",[15,37449,37450],{},"1 oktober 1981"," en werd dat oude deel nooit gekeurd, dan laat je vóór de verkoop bovendien een ",[15,37453,37454],{},"controlebezoek"," door een erkend organisme uitvoeren (afdeling 8.4.2). Datum en overhandiging van het verslag staan in de verkoopakte. Is het verslag negatief, dan heeft de koper ",[15,37457,37458],{},"18 maanden vanaf de verkoopakte"," om de inbreuken te laten verhelpen en opnieuw te laten controleren – bij een organisme naar keuze.",[12,37461,37462],{},[22,37463],{"alt":37464,"src":37465},"Een elektricien bespreekt projectdocumenten met een eigenaar.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-property-sale-electrical-dossier-editorial.webp",[12,37467,37468],{},"Twee vragen horen dus apart: brengt de verkoop een bijzondere keuringsplicht mee? En welke documenten horen los daarvan in het dossier? Deze gids beantwoordt beide volgens AREI Boek 1, versie 06, van toepassing sinds 1 april 2026. Hij behandelt de elektrische kant; gewestelijke en notariële verplichtingen bespreek je met je notaris.",[12,37470,37471],{},[15,37472,37473],{},"Redactie en controle: PlanElec-team, 5 oktober 2026.",[41,37475,37477],{"id":37476},"wanneer-geldt-de-verkoopkeuring","Wanneer geldt de verkoopkeuring?",[12,37479,37480,37481,37484],{},"Afdeling 8.4.2 geldt voor de verkoop van een wooneenheid met een ",[15,37482,37483],{},"oude huishoudelijke installatie",", dus een installatie waarvan de aanleg vóór 1 oktober 1981 begon, in twee gevallen (8.4.2.1):",[1450,37486,37487,37490],{},[1453,37488,37489],{},"De installatie werd sinds 1 oktober 1981 niet belangrijk gewijzigd of uitgebreid.",[1453,37491,37492],{},"Ze werd wel belangrijk gewijzigd of uitgebreid, maar het deel van vóór 1981 onderging geen controlebezoek.",[49,37494,37495,37505],{},[52,37496,37497],{},[55,37498,37499,37501,37503],{},[58,37500,8306],{},[58,37502,10234],{},[58,37504,20865],{},[68,37506,37507,37518,37529,37539],{},[55,37508,37509,37512,37515],{},[73,37510,37511],{},"Oude installatie van vóór 1981, oud deel nooit gekeurd",[73,37513,37514],{},"Verkoper laat een controlebezoek uitvoeren; datum en overhandiging van het verslag in de verkoopakte",[73,37516,37517],{},"8.4.2.2 a",[55,37519,37520,37523,37526],{},[73,37521,37522],{},"Koper breekt af of vernieuwt de installatie volledig",[73,37524,37525],{},"Vermelding in de akte in plaats van een controlebezoek; koper verwittigt de Algemene Directie Energie; nieuwe installatie volgens hoofdstuk 6.4",[73,37527,37528],{},"8.4.2.2 a en b",[55,37530,37531,37534,37537],{},[73,37532,37533],{},"Gerechtelijke verkoop zonder mogelijke keuring",[73,37535,37536],{},"Vermelding in akte of proces-verbaal van openbare verkoop dat er geen controle plaatsvond",[73,37538,37517],{},[55,37540,37541,37544,37547],{},[73,37542,37543],{},"Installatie met gelijkvormigheidscontrole (volgens oud of huidig AREI)",[73,37545,37546],{},"Geen verkoopkeuring volgens 8.4.2; dossier overdragen, periodieke termijn uit het laatste verslag naleven",[73,37548,37549],{},"9.1.2, 6.5.2, 8.1.2",[12,37551,37552],{},"Niet als wooneenheid gelden onder meer kloosters, ziekenhuizen, gevangenissen, rusthuizen, internaten, hotels en onderwijsinstellingen. Bij mede-eigendom geldt de plicht alleen voor de privatieve delen; garages, parkeerplaatsen of bergingen die via de meter van de mede-eigendom gevoed worden, vallen erbuiten. Ook onteigende wooneenheden zijn uitgezonderd (8.4.2.1).",[41,37554,37556],{"id":37555},"ontbrekende-plannen-stoppen-de-keuring-niet","Ontbrekende plannen stoppen de keuring niet",[12,37558,37559],{},"Liggen er bij het controlebezoek bij verkoop geen eendraadschema en situatieplan, dan voert het organisme de keuring toch uit. De keurder maakt een korte beschrijving van de borden met adres, nominale spanning, doorsnede van de voedingskabel, vertrekken, differentiëlen en beveiligingen, en een ruwe handschets met contactdozen, schakelaars, lichtpunten en vaste toestellen. Die documenten tonen alleen wat gecontroleerd werd; ze vervangen de plannen niet. Het ontbreken van de plannen staat als inbreuk in het verslag (8.4.2.2 d).",[12,37561,37562],{},"Actuele plannen zijn dus je beste voorbereiding: ze maken kringen, beveiligingen en aansluitpunten eenduidig en besparen de koper een inbreuk die alleen op ontbrekende documenten berust.",[41,37564,37566],{"id":37565},"wat-hoort-in-het-dossier-van-de-installatie","Wat hoort in het dossier van de installatie?",[12,37568,37569,37570,37573],{},"De eigenaar van een woninginstallatie bezit het dossier in ",[15,37571,37572],{},"twee exemplaren"," en geeft het bij verkoop aan de nieuwe eigenaar; een huurder krijgt een kopie (afdeling 9.1.2). Het dossier bevat:",[49,37575,37576,37584],{},[52,37577,37578],{},[55,37579,37580,37582],{},[58,37581,3183],{},[58,37583,990],{},[68,37585,37586,37593,37600,37607,37614,37621,37628],{},[55,37587,37588,37590],{},[73,37589,343],{},[73,37591,37592],{},"Eendraadschema('s) van de installatie",[55,37594,37595,37597],{},[73,37596,326],{},[73,37598,37599],{},"Situatieplan(nen)",[55,37601,37602,37604],{},[73,37603,577],{},[73,37605,37606],{},"Verslag(en) van de gelijkvormigheidscontrole (hoofdstuk 6.4)",[55,37608,37609,37611],{},[73,37610,574],{},[73,37612,37613],{},"In voorkomend geval verslag(en) van controlebezoeken (hoofdstuk 6.5)",[55,37615,37616,37618],{},[73,37617,1219],{},[73,37619,37620],{},"In voorkomend geval bewijzen dat het materieel de vereiste veiligheidswaarborgen biedt",[55,37622,37623,37625],{},[73,37624,1233],{},[73,37626,37627],{},"Bij belangrijke wijzigingen of uitbreidingen dezelfde documenten als onder 1, 2, 3 en 5",[55,37629,37630,37632],{},[73,37631,546],{},[73,37633,37634],{},"Korte beschrijvingen van alle niet-belangrijke wijzigingen of uitbreidingen",[12,37636,37637],{},"Voor een huishoudelijke PV-installatie volgens hoofdstuk 7.112 komen daar de gebruiksaanwijzing (werking en onderhoud), veiligheidsinstructies en de technische referenties van het materieel bij, zoals merk, model en vermogen.",[12,37639,37640],{},"Het keuringsverslag stelt alleen het erkend organisme op. Facturen, technische fiches en uitvoeringsdocumenten van je elektricien vullen het dossier aan, maar een verklaring van de installateur komt niet in de plaats van het verslag.",[41,37642,37644],{"id":37643},"wat-tonen-eendraadschema-en-situatieplan","Wat tonen eendraadschema en situatieplan?",[12,37646,37647],{},"Het eendraadschema geeft de elektrische structuur weer: borden, beveiligingen, kringen, geleidergegevens en aanduidingen (3.1.2.2). Het situatieplan toont waar het materieel in het gebouw zit (3.1.2.3). Beide tonen de huidige toestand; oude bouwplannen of een schema van vóór een verbouwing volstaan niet als de installatie intussen anders is uitgevoerd. Voor oude installaties van vóór 1981 laat deel 8 vereenvoudigde plannen met een vastgelegde minimale inhoud toe (8.2.1 nr. 7).",[12,37649,37650],{},"Vóór de keuring loont een gestructureerde vergelijking:",[1602,37652,37653,37656,37659,37662,37665,37668],{},[1453,37654,37655],{},"elk bord en elk vertrek eenduidig benoemen;",[1453,37657,37658],{},"nominale waarden en types van differentiëlen en overstroombeveiliging noteren;",[1453,37660,37661],{},"geleidertype en doorsnede laten nagaan in plaats van schatten;",[1453,37663,37664],{},"contactdozen, lichtpunten, schakelaars en vast aangesloten toestellen lokaliseren;",[1453,37666,37667],{},"aarding, aardingsonderbreker en equipotentiale verbindingen opnemen;",[1453,37669,37670],{},"plannen vergelijken met labels en werkelijke installatie.",[12,37672,37673],{},"Onzichtbare leidingtracés zet je niet als vaststaand feit op het plan. Onzekerheden laat je vóór de keuring door een vakman verduidelijken.",[41,37675,37677],{"id":37676},"wat-gebeurt-er-bij-een-negatief-verkoopverslag","Wat gebeurt er bij een negatief verkoopverslag?",[12,37679,37680,37681,37684,37685,37688],{},"Een negatief verslag verhindert de verkoop niet. De verkoper vermeldt in de verkoopakte dat de koper zijn identiteit en de datum van de akte schriftelijk moet meedelen aan het organisme dat het verslag opstelde. Daarna laat de koper binnen ",[15,37682,37683],{},"18 maanden vanaf de dag van de verkoopakte"," een nieuw controlebezoek uitvoeren. Het erkend organisme daarvoor ",[15,37686,37687],{},"kiest hij vrij","; een ander organisme verwittigt het eerste (8.4.2.2 a). Worden ook bij het nieuwe bezoek inbreuken vastgesteld, dan gelden de voorschriften voor niet-conforme oude installaties (8.4.2.3, 9.1.4).",[12,37690,37691],{},"De 18 maanden gelden alleen voor dit verkoopgeval. Na een negatief periodiek controlebezoek komt hetzelfde organisme binnen een jaar terug (6.5.7.2 b.7), en bij een nieuwe installatie blijft het betrokken deel buiten gebruik tot het opnieuw gecontroleerd is (9.1.3.1). Lees dus in het verslag welk controletype en welke termijn bedoeld zijn.",[12,37693,37694],{},"Een termijn is geen toestemming om een zichtbaar gevaarlijke situatie te laten bestaan: onmiddellijke gevaren laat je meteen verhelpen of je stelt het betrokken deel buiten gebruik.",[41,37696,37698],{"id":37697},"hoe-lang-is-een-keuringsverslag-geldig","Hoe lang is een keuringsverslag geldig?",[12,37700,37701],{},"Voor woninginstallaties is na de gelijkvormigheidscontrole ten minste om de 25 jaar een controlebezoek voorzien (6.5.2); de precieze datum staat in het verslag. Daaruit volgt geen algemeen „25 jaar geldig voor elke verkoop”. Belangrijke wijzigingen, een verzwaring van de aansluiting of een eerder negatief verslag creëren eigen keuringsaanleidingen, en het verslag moet bij de huidige installatie passen.",[12,37703,37704],{},"Kijk daarom naar type verslag, datum, resultaat, adres, omvang van de installatie en latere wijzigingen. Een oud positief document volstaat niet als het een andere uitvoering beschrijft.",[41,37706,37708],{"id":37707},"kosten-en-planning-realistisch-inschatten","Kosten en planning realistisch inschatten",[12,37710,37711],{},"Het AREI legt geen prijzen vast voor plannen, keuring of herstel en ook geen wachttijden. Inspanning en planning hangen af van installatie, aanbieder, regio en vastgestelde werken. Vraag concrete offertes en stem de timing af met notaris, organisme en elektricien. De beste voorbereiding begint met drie vragen: wat zit er in het dossier? Wanneer wordt de akte verleden? Welke keuringsaanleiding is er?",[41,37713,37715],{"id":37714},"rollen-van-verkoper-koper-notaris-en-organisme","Rollen van verkoper, koper, notaris en organisme",[49,37717,37718,37728],{},[52,37719,37720],{},[55,37721,37722,37725],{},[58,37723,37724],{},"Betrokkene",[58,37726,37727],{},"Rol bij de verkoop",[68,37729,37730,37738,37745,37753,37761],{},[55,37731,37732,37735],{},[73,37733,37734],{},"Verkoper",[73,37736,37737],{},"Laat in het geval van 8.4.2 het controlebezoek uitvoeren, overhandigt verslag en dossier",[55,37739,37740,37742],{},[73,37741,4853],{},[73,37743,37744],{},"Controleert, stelt het verslag op en beschrijft inbreuken",[55,37746,37747,37750],{},[73,37748,37749],{},"Notaris",[73,37751,37752],{},"Neemt de voorgeschreven vermeldingen op in de verkoopakte",[55,37754,37755,37758],{},[73,37756,37757],{},"Koper",[73,37759,37760],{},"Meldt identiteit en aktedatum aan het organisme, laat inbreuken verhelpen en opnieuw controleren",[55,37762,37763,37766],{},[73,37764,37765],{},"Elektricien",[73,37767,37768],{},"Neemt de installatie op, verhelpt gebreken en werkt de plannen bij",[12,37770,37771],{},"Hou die rollen ook in de communicatie gescheiden. Is onduidelijk wie een document opstelde of welke omvang het dekt, verduidelijk dat dan vóór de overdracht.",[41,37773,37775],{"id":37774},"wijzigingen-tussen-keuring-en-verkoopakte","Wijzigingen tussen keuring en verkoopakte",[12,37777,37778],{},"De keuring is een momentopname. Komen er nadien kringen bij, wordt de aansluiting verzwaard, een laadpaal of PV-installatie geplaatst of worden beveiligingen vervangen, dan geeft het verslag de toestand bij de overdracht niet meer volledig weer. Een bijgewerkt schema alleen bewijst niet dat de wijziging gekeurd is. Documenteer datum, omvang en verantwoordelijke van de werken en vraag het organisme of een nieuwe keuring nodig is.",[12,37780,37781],{},"Bij een PV-installatie horen de bijkomende gegevens uit 9.1.2 in het dossier, niet alleen een symbool op het eendraadschema. Komt de geplaatste omvormer niet overeen met de plannen of ontbreken fabrikantdocumenten, dan dicht je die leemte met bewijzen, niet met een vermoeden.",[41,37783,37785],{"id":37784},"het-verslag-correct-lezen","Het verslag correct lezen",[12,37787,37788],{},"Lees niet alleen de conclusie. Controleer identificatie van de installatie, aansluitgegevens, gecontroleerde omvang, meetwaarden, inbreuken, opmerkingen, toepasselijke afwijkingen en de datum van de nieuwe keuring. Een opmerking is geen inbreuk; omgekeerd wordt een negatieve conclusie niet positief omdat enkele meetwaarden in orde zijn. Bij tegenstrijdigheden tussen verslag en installatie is het organisme je aanspreekpunt.",[41,37790,37792],{"id":37791},"bestaande-toestand-gedeeltelijke-en-volledige-renovatie-onderscheiden","Bestaande toestand, gedeeltelijke en volledige renovatie onderscheiden",[12,37794,37795],{},"Deel 8 bevat afwijkingen voor bepaalde oude installatiedelen – geen verworven rechten voor het hele gebouw. Wordt slechts één ruimte of bord gewijzigd, dan baken je de wijziging duidelijk af: voor het gewijzigde deel gelden de huidige voorschriften, ongewijzigde delen behouden hun regels voor bestaande installaties. De uitzondering op de verkoopkeuring bij volledige vernieuwing geldt alleen als verkoper en koper dat in de akte vastleggen; voor de nieuwe installatie volgt dan de gelijkvormigheidscontrole van hoofdstuk 6.4.",[12,37797,37798],{},"Bewaar oude en nieuwe planversies met datum in plaats van de vroegere toestand te overschrijven, en duid aan welk verslag bij welke versie hoort. Zo ziet de koper welke delen gekeurd zijn en welke werken daarna volgden. Foto's en facturen vullen het verloop aan; plannen en verslag vervangen ze niet.",[41,37800,37802],{"id":37801},"checklist-voor-de-overdracht","Checklist voor de overdracht",[1450,37804,37806,37812,37818,37824,37830,37836,37842],{"className":37805},[26917],[1453,37807,37809,37811],{"className":37808},[26921],[26923,37810],{"disabled":1499,"type":26925}," Keuringsaanleiding en mogelijke uitzondering met notaris en organisme verduidelijkt",[1453,37813,37815,37817],{"className":37814},[26921],[26923,37816],{"disabled":1499,"type":26925}," Bestaande verslagen volledig en aan het adres gekoppeld",[1453,37819,37821,37823],{"className":37820},[26921],[26923,37822],{"disabled":1499,"type":26925}," Eendraadschema en situatieplan komen overeen met de werkelijke toestand",[1453,37825,37827,37829],{"className":37826},[26921],[26923,37828],{"disabled":1499,"type":26925}," Wijzigingen, PV-installatie en technische documenten aangevuld",[1453,37831,37833,37835],{"className":37832},[26921],[26923,37834],{"disabled":1499,"type":26925}," Borden en kringen leesbaar aangeduid",[1453,37837,37839,37841],{"className":37838},[26921],[26923,37840],{"disabled":1499,"type":26925}," Inbreuken, termijnen en verantwoordelijkheden uit het verslag begrepen",[1453,37843,37845,37847],{"className":37844},[26921],[26923,37846],{"disabled":1499,"type":26925}," Dossier aan de koper overhandigd, tweede exemplaar of kopie bewaard",[41,37849,37851],{"id":37850},"dossiercontrole-vóór-opdracht-en-overdracht","Dossiercontrole vóór opdracht en overdracht",[12,37853,37854],{},"Leg vóór de keuring alle documenten naast elkaar en orden ze volgens adres, meter of EAN, bord en datum. Ga na of het jongste plan echt de verkochte wooneenheid beschrijft. Een verslag voor gemeenschappelijke delen, een oud huisnummer of een plan van vóór de verbouwing geldt niet stilzwijgend als actueel bewijs. Noteer tegenstrijdigheden en verduidelijk met notaris en organisme welke documenten voor de verkoop relevant zijn.",[12,37856,37857],{},"Na de keuring zet je elke vaststelling met plaats, planreferentie, verantwoordelijke partij en termijn in een takenlijst. Correcties voert een vakman uit en documenteert hij; pas bijgewerkte plannen en zo nodig de nieuwe keuring sluiten het geheel af.",[12,37859,7641,37860,37865,37866,37871],{},[30,37861,37864],{"href":37862,"rel":37863},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Flivre-1-du-reglement-general",[2532],"FOD-FAQ voor notarissen en vastgoedsector"," licht verkoopkeuring, dossierinhoud en rollen toe; het ",[30,37867,37870],{"href":37868,"rel":37869},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations\u002Ftypes-de-controle-des",[2532],"FOD-overzicht van de controletypes"," bakent de aanleiding af.",[41,37873,37875],{"id":37874},"wat-planelec-bijdraagt","Wat PlanElec bijdraagt",[12,37877,37878],{},"Met PlanElec neem je de installatie op in de editor, exporteer je eendraadschema en situatieplan als PDF en voer je de AREI\u002FRGIE-zelfcontrole uit. Het installatiedossier bundelt de documenten met voorblad, inhoudsopgave en doorlopende paginanummering – een nette basis voor het dossier van de installatie. De rollen zijn duidelijk: PlanElec levert consistente plannen en toont bevindingen in de ondersteunde regels; metingen en het officiële verslag levert het erkend organisme.",[41,37880,6947],{"id":6946},[1450,37882,37883,37888,37893,37898,37902],{},[1453,37884,37885],{},[30,37886,37887],{"href":17361},"Elektrische keuring in België voorbereiden",[1453,37889,37890],{},[30,37891,37892],{"href":17460},"Wat controleert de keurder?",[1453,37894,37895],{},[30,37896,37897],{"href":7514},"Stap voor stap een eendraadschema maken",[1453,37899,37900],{},[30,37901,33377],{"href":33958},[1453,37903,37904],{},[30,37905,37907],{"href":37906},"\u002Fblog\u002Foud-arei-part-8","Oudere installaties en AREI Part 8: regels voor bestaande installaties",[12,37909,37910],{},[30,37911,37912],{"href":6989},"Open PlanElec voor eendraadschema, situatieplan en zelfcontrole →",[12,37914,37915],{},[17563,37916,37917],{},"Regelgrond: AREI Boek 1 V06, in het bijzonder deel 8 afdeling 8.4.2 en hoofdstuk 9.1. Bepalend zijn de officiële versie, het concrete keuringsverslag en de beoordeling door notaris en erkend organisme.",{"title":1467,"searchDepth":1468,"depth":1468,"links":37919},[37920,37921,37922,37923,37924,37925,37926,37927,37928,37929,37930,37931,37932,37933,37934,37935],{"id":37439,"depth":1468,"text":37440},{"id":37476,"depth":1468,"text":37477},{"id":37555,"depth":1468,"text":37556},{"id":37565,"depth":1468,"text":37566},{"id":37643,"depth":1468,"text":37644},{"id":37676,"depth":1468,"text":37677},{"id":37697,"depth":1468,"text":37698},{"id":37707,"depth":1468,"text":37708},{"id":37714,"depth":1468,"text":37715},{"id":37774,"depth":1468,"text":37775},{"id":37784,"depth":1468,"text":37785},{"id":37791,"depth":1468,"text":37792},{"id":37801,"depth":1468,"text":37802},{"id":37850,"depth":1468,"text":37851},{"id":37874,"depth":1468,"text":37875},{"id":6946,"depth":1468,"text":6947},"2026-06-29","Welke elektrische keuring bij verkoop in België verplicht is, wat in het dossier van de installatie hoort en wanneer 18 maanden gelden – nauwkeurig volgens AREI Boek 1 V06, met vindplaatsen.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-property-sale-electrical-dossier-editorial.jpg","\u002Fblog\u002Fproperty-sale-electrical-dossier.nl",{"title":37433,"description":37937},"Elektrisch dossier bij woningverkoop 2026: regels","elektrisch-dossier-woningverkoop","blog\u002Fproperty-sale-electrical-dossier.nl",[3275,3276,37946,6270,37947,3273,3274,37948,1513,33956],"woningverkoop","keuringsverslag","notaris","S_0AkodhSvh2_fAXlc4RLTfmcSxwjDEoLKm-jN6xXK0","\u002Fblog\u002Felektrisch-dossier-woningverkoop",{"id":37952,"title":37953,"articleId":37954,"body":37955,"category":1493,"date":38754,"description":38755,"extension":1496,"image":37965,"lastUpdated":15381,"locale":1497,"meta":38756,"navigation":1499,"ogImage":38757,"path":38758,"publishDate":38754,"readTime":4035,"refreshInterval":11097,"seo":38759,"seoTitle":38760,"slug":38761,"stem":38762,"tags":38763,"__hash__":38768,"kind":1515,"href":38769},"blog\u002Fblog\u002Ftop-10-arei-violations.nl.md","10 belangrijke AREI-controlepunten: herkennen, vermijden en oplossen","top-10-arei-violations",{"type":9,"value":37956,"toc":38691},[37957,37960,37966,37970,38118,38120,38124,38130,38134,38137,38141,38144,38148,38162,38166,38169,38171,38175,38180,38183,38186,38189,38192,38195,38206,38209,38212,38214,38218,38223,38226,38229,38232,38235,38238,38252,38255,38258,38260,38264,38269,38272,38275,38278,38281,38284,38295,38298,38301,38303,38307,38312,38315,38318,38321,38324,38327,38344,38347,38350,38352,38356,38361,38364,38367,38370,38373,38376,38379,38436,38447,38450,38453,38456,38458,38462,38467,38470,38473,38476,38479,38482,38493,38496,38499,38501,38505,38510,38513,38516,38519,38522,38525,38536,38539,38542,38544,38548,38553,38556,38559,38562,38565,38568,38582,38585,38588,38590,38594,38599,38602,38605,38608,38611,38614,38625,38628,38631,38633,38637,38640,38653,38655,38660,38681],[12,37958,37959],{},"Deze tien punten bepalen bij de keuring van een Belgische woninginstallatie bijzonder vaak het resultaat: differentieelbescherming, plannen, aarding, hoofdschakelaar, badkamer, doorsnede en beveiliging, aantal kringen per differentieel, aanduiding, mechanische bescherming van leidingen en overspanningsbeveiliging. Per punt vind je de regel uit AREI Boek 1 versie 06, de reden erachter en de juiste correctie. De volgorde is een vakinhoudelijke checklist, geen statistiek – een betrouwbare officiële rangorde bestaat niet. Je concrete keuringsverslag blijft bepalend.",[12,37961,37962],{},[22,37963],{"alt":37964,"src":37965},"Een elektricien controleert een Belgisch stopcontact met een stopcontacttester.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-top-10-arei-violations-editorial.webp",[12,37967,37968],{},[15,37969,37473],{},[49,37971,37972,37987],{},[52,37973,37974],{},[55,37975,37976,37978,37981,37984],{},[58,37977,3183],{},[58,37979,37980],{},"Controlepunt",[58,37982,37983],{},"Kernregel",[58,37985,37986],{},"Vindplaats Boek 1",[68,37988,37989,38002,38014,38026,38039,38052,38065,38078,38090,38104],{},[55,37990,37991,37993,37996,37999],{},[73,37992,343],{},[73,37994,37995],{},"Differentieelschakelaar",[73,37997,37998],{},"300 mA aan de oorsprong; ten hoogste 30 mA voor de voorgeschreven kringen",[73,38000,38001],{},"4.2.4.3b, 5.3.5.3 a",[55,38003,38004,38006,38008,38011],{},[73,38005,326],{},[73,38007,29688],{},[73,38009,38010],{},"Actueel, in het dossier, in overeenstemming met de installatie",[73,38012,38013],{},"3.1.2, 9.1.2",[55,38015,38016,38018,38020,38023],{},[73,38017,577],{},[73,38019,21575],{},[73,38021,38022],{},"Onder 100 Ω; boven 30 Ω strengere opbouw van de differentiëlen",[73,38024,38025],{},"4.2.3.2, 4.2.4.3b",[55,38027,38028,38030,38033,38036],{},[73,38029,574],{},[73,38031,38032],{},"Hoofdschakelaar",[73,38034,38035],{},"Minstens 40 A in woninginstallaties",[73,38037,38038],{},"5.3.5.1 b",[55,38040,38041,38043,38046,38049],{},[73,38042,1219],{},[73,38044,38045],{},"Badkamer en douche",[73,38047,38048],{},"Volumes 0, 1 en 2 met vastgelegd materieel",[73,38050,38051],{},"hoofdstuk 7.1",[55,38053,38054,38056,38059,38062],{},[73,38055,1233],{},[73,38057,38058],{},"Doorsnede en beveiliging",[73,38060,38061],{},"Hoogste nominale stroom per doorsnede volgens tabel 4.11",[73,38063,38064],{},"4.4.1.4",[55,38066,38067,38069,38072,38075],{},[73,38068,546],{},[73,38070,38071],{},"Kringen per differentieel",[73,38073,38074],{},"Ten hoogste acht eindkringen per 30 mA-differentieel",[73,38076,38077],{},"4.2.4.3b",[55,38079,38080,38082,38084,38087],{},[73,38081,560],{},[73,38083,35238],{},[73,38085,38086],{},"Elke kring duidelijk aangeduid",[73,38088,38089],{},"3.1.3.1",[55,38091,38092,38095,38098,38101],{},[73,38093,38094],{},"9",[73,38096,38097],{},"Mechanische bescherming van leidingen",[73,38099,38100],{},"Leidingen passend bij plaatsingswijze en belasting",[73,38102,38103],{},"5.2.1.5, 5.2.2",[55,38105,38106,38109,38112,38115],{},[73,38107,38108],{},"10",[73,38110,38111],{},"Overspanningsbeveiliging",[73,38113,38114],{},"Beschermingsdoel volgens de regels van goed vakmanschap",[73,38116,38117],{},"4.5.1",[29567,38119],{},[41,38121,38123],{"id":38122},"_1-ontbrekende-of-verkeerde-differentieelschakelaar","1. Ontbrekende of verkeerde differentieelschakelaar",[12,38125,38126,38129],{},[15,38127,38128],{},"AREI-vindplaats:"," art. 4.2.4.3b (differentieel aan de oorsprong en groepsdifferentiëlen met hoge gevoeligheid) \u002F art. 5.3.5.3 a (type)",[1396,38131,38133],{"id":38132},"wat-de-keurder-controleert","Wat de keurder controleert",[12,38135,38136],{},"Aan de oorsprong van elke woninginstallatie zit minstens één differentieelschakelaar van ten hoogste 300 mA. Onmiddellijk daarna volgt minstens één differentieel met hoge of zeer hoge gevoeligheid (ten hoogste 30 mA) voor contactdozen, verlichting, ruimten met bad of douche en wasmachine, droogkast en vaatwasser. Differentiëlen in woninginstallaties zijn minstens van type A; die aan de oorsprong heeft een nominale stroom van minstens 40 A.",[1396,38138,38140],{"id":38139},"waarom-het-telt","Waarom het telt",[12,38142,38143],{},"De differentieel detecteert lekstromen, bijvoorbeeld wanneer stroom via een lichaam naar de aarde loopt, en schakelt de kring uit. Ontbreekt hij of is hij verkeerd toegewezen, dan blijft een isolatiefout levensgevaarlijk.",[1396,38145,38147],{"id":38146},"zo-los-je-het-op","Zo los je het op",[1450,38149,38150,38153,38156,38159],{},[1453,38151,38152],{},"Ontbrekende differentiëlen bijplaatsen en de voorgeschreven kringen juist toewijzen.",[1453,38154,38155],{},"Ten hoogste acht eindkringen per differentieel met hoge gevoeligheid (art. 4.2.4.3b).",[1453,38157,38158],{},"Het type afleiden uit het lekstroomspectrum, de fabrikantdocumenten en het bijzondere hoofdstuk. Voor laadpunten eist hoofdstuk 7.22 per AC-kring een eigen differentieel van ten hoogste 30 mA en bescherming bij fouten met gelijkstroomcomponent; voor omvormers geldt de documentatie van de concrete variant.",[1453,38160,38161],{},"Of een vertraagde of selectieve differentieel nodig is, volgt uit de afstemming in het project, niet uit een algemene regel.",[1396,38163,38165],{"id":38164},"aanpak","Aanpak",[12,38167,38168],{},"Toestel, aantal polen, plaats in het bord, bekabeling en metingen bepalen de offerte.",[29567,38170],{},[41,38172,38174],{"id":38173},"_2-ontbrekende-of-verouderde-elektrische-plannen","2. Ontbrekende of verouderde elektrische plannen",[12,38176,38177,38179],{},[15,38178,38128],{}," afdeling 3.1.2 (schema's en plannen), art. 9.1.2 nr. 1 (eendraadschema) en nr. 2 (situatieplan)",[1396,38181,38133],{"id":38182},"wat-de-keurder-controleert-1",[12,38184,38185],{},"Bij het dossier van een woninginstallatie horen een eendraadschema en een situatieplan die de installatie tonen zoals ze gebouwd is. Bij de gelijkvormigheidscontrole bevestigt het verslag uitdrukkelijk dat de installatie volgens die plannen is uitgevoerd (6.4.6.4, b.4). Vaak ontbreken de plannen volledig of tonen ze de toestand van vóór latere wijzigingen.",[1396,38187,38140],{"id":38188},"waarom-het-telt-1",[12,38190,38191],{},"Zonder actuele plannen kan noch de keurder noch een elektricien de installatie veilig beoordelen, en in een noodgeval weet niemand welke beveiliging welke zone voedt.",[1396,38193,38147],{"id":38194},"zo-los-je-het-op-1",[1450,38196,38197,38200,38203],{},[1453,38198,38199],{},"Eendraadschema en situatieplan opstellen of bijwerken naar de werkelijke toestand.",[1453,38201,38202],{},"Alle kringen, zekeringen, differentiëlen en verbruikers documenteren.",[1453,38204,38205],{},"Latere niet-belangrijke wijzigingen kort beschrijven en bij het dossier voegen (9.1.2 nr. 7).",[1396,38207,38165],{"id":38208},"aanpak-1",[12,38210,38211],{},"Uitgangsgegevens en het nodige opsporen van kringen bepalen de inspanning. De opname ter plaatse doet de vakman; software structureert het resultaat.",[29567,38213],{},[41,38215,38217],{"id":38216},"_3-gebrekkige-aarding","3. Gebrekkige aarding",[12,38219,38220,38222],{},[15,38221,38128],{}," art. 4.2.3.2 (aardingsinstallaties), art. 4.2.4.3b (aardingswaarde en opbouw van de differentiëlen)",[1396,38224,38133],{"id":38225},"wat-de-keurder-controleert-2",[12,38227,38228],{},"De aarding maakt deel uit van het beschermingsconcept. In woninginstallaties ligt de aardingsweerstand onder 100 Ω (4.2.3.2). Een meetwaarde boven 30 Ω betekent niet automatisch een gebrekkige aarding: volgens art. 4.2.4.3b vraagt ze een strengere opbouw van de differentiëlen. Er is een tekortkoming als de aarding ontbreekt of beschadigd is, de waarde 100 Ω bereikt of de opbouw die bij de meetwaarde hoort ontbreekt. Losse verbindingen en gecorrodeerde aardingsgeleiders worden ook beoordeeld.",[1396,38230,38140],{"id":38231},"waarom-het-telt-2",[12,38233,38234],{},"Zonder doeltreffende aarding kunnen metalen behuizingen bij een fout onder spanning staan, zonder dat de beveiliging betrouwbaar uitschakelt.",[1396,38236,38147],{"id":38237},"zo-los-je-het-op-2",[1450,38239,38240,38243,38246,38249],{},[1453,38241,38242],{},"De aardingsweerstand vakkundig laten meten.",[1453,38244,38245],{},"Boven 30 Ω de opbouw volgens art. 4.2.4.3b toepassen: minstens twee differentiëlen met hoge of zeer hoge gevoeligheid, elk met ten hoogste 16 enkelvoudige of meervoudige contactdozen, en voor de overige kringen minstens één differentieel van ten hoogste 100 mA per kring of groep.",[1453,38247,38248],{},"Vakkundig beslissen of de aardingsinstallatie verbeterd wordt, de beveiligingsopbouw aangepast wordt of allebei.",[1453,38250,38251],{},"Alle aardverbindingen nakijken en aardingsgeleiders op corrosie controleren.",[1396,38253,38165],{"id":38254},"aanpak-2",[12,38256,38257],{},"Meetwaarde, bestaande toestand, bodem en vakwerk bepalen de oplossing.",[29567,38259],{},[41,38261,38263],{"id":38262},"_4-ontbrekende-hoofdschakelaar","4. Ontbrekende hoofdschakelaar",[12,38265,38266,38268],{},[15,38267,38128],{}," art. 5.3.5.1 b (hoofdschakelaar)",[1396,38270,38133],{"id":38271},"wat-de-keurder-controleert-3",[12,38273,38274],{},"Elk hoofdbord heeft een hoofdschakelaar die alle fasegeleiders en in voorkomend geval de nulgeleider tegelijk uitschakelt. In woninginstallaties heeft hij een nominale stroom van minstens 40 A en is hij afgestemd op de installatie. Die functie mag ook een overstroombeveiliging van de netbeheerder vervullen, als die voor scheiding is ontworpen.",[1396,38276,38140],{"id":38277},"waarom-het-telt-3",[12,38279,38280],{},"Bij brand, waterschade of een ongeval moet de hele installatie met één handeling spanningsloos zijn.",[1396,38282,38147],{"id":38283},"zo-los-je-het-op-3",[1450,38285,38286,38289,38292],{},[1453,38287,38288],{},"Een omnipolaire hoofdschakelaar van minstens 40 A plaatsen, bij een driefasige installatie met nulgeleider vierpolig.",[1453,38290,38291],{},"Het bord zo plaatsen dat de schakelaar zonder hulpmiddelen vlot bereikbaar is (5.3.5.1 c).",[1453,38293,38294],{},"Bestaande installaties: volgens deel 8 mogen bestaande hoofdschakelaars vanaf 25 A in de daar genoemde gevallen in gebruik blijven (8.2.1 nr. 4, 8.2.2 nr. 4).",[1396,38296,38165],{"id":38297},"aanpak-3",[12,38299,38300],{},"Dimensionering, aantal polen, plaats en aanpassing van het bord worden per project bekeken.",[29567,38302],{},[41,38304,38306],{"id":38305},"_5-volumes-in-de-badkamer-niet-nageleefd","5. Volumes in de badkamer niet nageleefd",[12,38308,38309,38311],{},[15,38310,38128],{}," hoofdstuk 7.1 (ruimten met bad en\u002Fof douche)",[1396,38313,38133],{"id":38314},"wat-de-keurder-controleert-4",[12,38316,38317],{},"Hoofdstuk 7.1 deelt bad en douche in volumes in. Volume 0 is de binnenkant van het bad of van een douchebak van minstens 10 cm diep; bij een ondiepere douchebak of zonder douchebak reikt het tot 10 cm boven de vloer binnen 1,20 m rond het vaste wateruitlaatpunt. Volume 1 loopt bij een douche tot 1,20 m rond het midden van het vaste wateruitlaatpunt en tot 2,25 m hoogte; bij een bad vormt de buitenrand de grens. Volume 2 bestaat alleen bij een bad: nog eens 0,60 m rond volume 1. Typische inbreuken zijn laagspanningscontactdozen in volume 0 of 1, aftakdozen in volume 0 en verdeelborden in volume 0, 1 of 2.",[1396,38319,38140],{"id":38320},"waarom-het-telt-4",[12,38322,38323],{},"Water verlaagt de lichaamsweerstand sterk. De volumes houden materieel zo ver van bad en douche als het beschermingsniveau vraagt.",[1396,38325,38147],{"id":38326},"zo-los-je-het-op-4",[1450,38328,38329,38332,38335,38338,38341],{},[1453,38330,38331],{},"In volume 1 alleen ZLVS-contactdozen en ZLVS-bediening met een bron buiten volume 0 en 1, plus vast aangesloten, daarvoor geschikte toestellen (7.1.5.2 c).",[1453,38333,38334],{},"In volume 2 laagspanningscontactdozen alleen met een differentieel met zeer hoge gevoeligheid of afzonderlijk via een scheidingstransformator tot 100 W (7.1.5.2 d).",[1453,38336,38337],{},"In volume 1 en 2 minstens bescherming tegen opspattend water (uitwendige invloed AD4, tabel 7.3); voor stopcontacten op laagspanning in volume 2 laat de voetnoot van de tabel IPXX toe.",[1453,38339,38340],{},"Alle badkamerkringen via een differentieel van ten hoogste 30 mA (art. 4.2.4.3b).",[1453,38342,38343],{},"Bestaande badkamers waarvan de uitvoering vóór 1 maart 2025 begon, mogen onder voorwaarden de vroegere volume-indeling gebruiken (6.5.8.1 nr. 3).",[1396,38345,38165],{"id":38346},"aanpak-4",[12,38348,38349],{},"Plaats, leidingtracé, afwerking en materieel bepalen de omvang.",[29567,38351],{},[41,38353,38355],{"id":38354},"_6-kabeldoorsnede-te-klein-voor-de-zekering","6. Kabeldoorsnede te klein voor de zekering",[12,38357,38358,38360],{},[15,38359,38128],{}," art. 4.4.1.4 met tabel 4.11 (kaliber per doorsnede) \u002F art. 5.2.1.2 (keuze van de leidingen)",[1396,38362,38133],{"id":38363},"wat-de-keurder-controleert-5",[12,38365,38366],{},"De beveiliging moet bij de doorsnede van de geleider passen. Een klassieke fout: een automaat van 20 A op een leiding van 1,5 mm², die maar met 16 A beveiligd mag worden. Kringen met contactdozen hebben bovendien minstens 2,5 mm² nodig (5.2.1.2).",[1396,38368,38140],{"id":38369},"waarom-het-telt-5",[12,38371,38372],{},"Voert een leiding meer stroom dan ze aankan, dan warmt ze op en kan ze brand veroorzaken. De beveiliging mag dus nooit groter zijn dan voor de doorsnede toegelaten.",[1396,38374,38147],{"id":38375},"zo-los-je-het-op-5",[12,38377,38378],{},"Hoogste nominale stroom voor woninginstallaties volgens tabel 4.11:",[49,38380,38381,38394],{},[52,38382,38383],{},[55,38384,38385,38388,38391],{},[58,38386,38387],{},"Doorsnede koper",[58,38389,38390],{},"Max. smeltzekering",[58,38392,38393],{},"Max. automaat",[68,38395,38396,38404,38412,38420,38428],{},[55,38397,38398,38400,38402],{},[73,38399,15135],{},[73,38401,22921],{},[73,38403,22924],{},[55,38405,38406,38408,38410],{},[73,38407,15138],{},[73,38409,22924],{},[73,38411,22933],{},[55,38413,38414,38416,38418],{},[73,38415,22938],{},[73,38417,22933],{},[73,38419,22943],{},[55,38421,38422,38424,38426],{},[73,38423,22948],{},[73,38425,22951],{},[73,38427,22954],{},[55,38429,38430,38432,38434],{},[73,38431,22959],{},[73,38433,22962],{},[73,38435,22965],{},[1450,38437,38438,38444],{},[1453,38439,38440,38441],{},"De beveiliging verlagen tot de toegelaten waarde ",[15,38442,38443],{},"of",[1453,38445,38446],{},"de leiding vervangen door een grotere doorsnede.",[12,38448,38449],{},"De tabel geeft maximumwaarden. Plaatsingswijze, bundeling en omgevingstemperatuur kunnen een grotere doorsnede vereisen (4.4.1.4).",[1396,38451,38165],{"id":38452},"aanpak-5",[12,38454,38455],{},"Beveiliging verlagen en leiding vervangen zijn technisch verschillende oplossingen met een heel verschillende inspanning.",[29567,38457],{},[41,38459,38461],{"id":38460},"_7-te-veel-kringen-per-differentieelschakelaar","7. Te veel kringen per differentieelschakelaar",[12,38463,38464,38466],{},[15,38465,38128],{}," art. 4.2.4.3b (ten hoogste acht eindkringen per differentieel met hoge gevoeligheid); art. 5.3.5.2 b (ten hoogste acht contactdozen per eindkring)",[1396,38468,38133],{"id":38469},"wat-de-keurder-controleert-6",[12,38471,38472],{},"Op een differentieel met hoge of zeer hoge gevoeligheid hangen ten hoogste acht eindkringen. In oudere installaties hangt vaak alles aan één toestel. Deel 8 laat in bestaande oude installaties meer kringen toe (8.2.1 nr. 16, 8.2.2 nr. 10); voor nieuwe en belangrijk gewijzigde delen geldt de grens.",[1396,38474,38140],{"id":38475},"waarom-het-telt-6",[12,38477,38478],{},"Veel kringen op één differentieel tellen de lekstromen op en verhogen het risico op ongewenst uitschakelen. Bij een fout zit bovendien meteen een groot deel van de woning zonder stroom.",[1396,38480,38147],{"id":38481},"zo-los-je-het-op-6",[1450,38483,38484,38487,38490],{},[1453,38485,38486],{},"Bijkomende differentiëlen van 30 mA plaatsen.",[1453,38488,38489],{},"Kringen zinvol verdelen, bijvoorbeeld per verdieping of functie.",[1453,38491,38492],{},"Per eindkring ten hoogste acht enkelvoudige of meervoudige contactdozen.",[1396,38494,38165],{"id":38495},"aanpak-6",[12,38497,38498],{},"Plaats in het bord, verdeling, dimensionering en metingen horen in de offerte.",[29567,38500],{},[41,38502,38504],{"id":38503},"_8-ontbrekende-aanduiding-van-de-kringen","8. Ontbrekende aanduiding van de kringen",[12,38506,38507,38509],{},[15,38508,38128],{}," art. 3.1.3.1 (aanduiding van kringen)",[1396,38511,38133],{"id":38512},"wat-de-keurder-controleert-7",[12,38514,38515],{},"Alle beveiligingen in het bord zijn duidelijk aangeduid, en de aanduiding toont welke ruimte of welk toestel de kring voedt.",[1396,38517,38140],{"id":38518},"waarom-het-telt-7",[12,38520,38521],{},"Zonder aanduiding schakelt in een noodgeval niemand snel de juiste kring uit, en onderhoud wordt giswerk.",[1396,38523,38147],{"id":38524},"zo-los-je-het-op-7",[1450,38526,38527,38530,38533],{},[1453,38528,38529],{},"Alle beveiligingen voorzien van duurzame, leesbare labels.",[1453,38531,38532],{},"Benoemen per ruimte en functie, bijvoorbeeld „Keuken stopcontacten”, „Badkamer licht”.",[1453,38534,38535],{},"Aanduiding afstemmen op het eendraadschema: dezelfde referentie in het bord, op het schema en op het situatieplan.",[1396,38537,38165],{"id":38538},"aanpak-7",[12,38540,38541],{},"Het labelen zelf gaat snel; onbekende kringen veilig identificeren is vakwerk.",[29567,38543],{},[41,38545,38547],{"id":38546},"_9-leidingen-zonder-voldoende-bescherming","9. Leidingen zonder voldoende bescherming",[12,38549,38550,38552],{},[15,38551,38128],{}," art. 5.2.2 (plaatsingswijzen) \u002F art. 5.2.1.5 (mechanische sterkte, doorvoeringen)",[1396,38554,38133],{"id":38555},"wat-de-keurder-controleert-8",[12,38557,38558],{},"Elke leiding moet geschikt zijn voor haar plaatsingswijze (5.2.2) en zo geplaatst worden dat ze haar mechanische sterkte behoudt. Is ze bijzonder blootgesteld aan mechanische beschadiging, dan is ze gewapend of bijzonder beschermd (5.2.1.5). Typische inbreuken: leidingtypes die niet geschikt zijn voor opbouw of vrije plaatsing, los hangende leidingen in de kelder of onbeschermde vloerdoorvoeringen.",[1396,38560,38140],{"id":38561},"waarom-het-telt-8",[12,38563,38564],{},"Beschadigde isolatie door nagels, schroeven of knaagdieren leidt tot kortsluiting en brand.",[1396,38566,38147],{"id":38567},"zo-los-je-het-op-8",[1450,38569,38570,38573,38576,38579],{},[1453,38571,38572],{},"Leidingtype en plaatsingswijze toetsen aan de toegelaten plaatsingswijzen in 5.2.2; ongeschikte leidingen in buizen of goten plaatsen of vervangen.",[1453,38574,38575],{},"Bedreigde leidingen mechanisch beschermen.",[1453,38577,38578],{},"Vloerdoorvoeringen beschermen ter hoogte van de afgewerkte vloer; buizen steken daar minstens 10 cm boven de vloer uit (5.2.1.5).",[1453,38580,38581],{},"Doorvoeringen tussen ruimten met sterk verschillende vochtigheid uitvoeren tegen condenswater.",[1396,38583,38165],{"id":38584},"aanpak-8",[12,38586,38587],{},"Leiding, omgeving, beschermingswijze en bouwkundige ingreep bepalen de uitvoering.",[29567,38589],{},[41,38591,38593],{"id":38592},"_10-overspanningsbeveiliging-niet-beoordeeld","10. Overspanningsbeveiliging niet beoordeeld",[12,38595,38596,38598],{},[15,38597,38128],{}," art. 4.5.1 (principe van de overspanningsbeveiliging)",[1396,38600,38133],{"id":38601},"wat-de-keurder-controleert-9",[12,38603,38604],{},"Art. 4.5.1 eist dat personen en goederen volgens de regels van goed vakmanschap beschermd zijn tegen de schadelijke gevolgen van overspanningen, bijvoorbeeld door atmosferische verschijnselen of schakelhandelingen. Een bepaald type overspanningsbeveiliging schrijft de tekst niet voor. Bepalend is dat de vakman het risico beoordeelt en de gekozen oplossing documenteert.",[1396,38606,38140],{"id":38607},"waarom-het-telt-9",[12,38609,38610],{},"Overspanningen door blikseminslag of netstoringen vernielen gevoelige elektronica. Een overspanningsbeveiliging (SPD) leidt ze af naar de aarde.",[1396,38612,38147],{"id":38613},"zo-los-je-het-op-9",[1450,38615,38616,38619,38622],{},[1453,38617,38618],{},"Het risico vakkundig beoordelen: bliksemafleider, voeding, leidinglengtes, PV en laadpunt.",[1453,38620,38621],{},"Type, plaats en voorbeveiliging vastleggen volgens risicobeoordeling en fabrikantgegevens; bij een uitwendige bliksembeveiliging komt een bliksemstroomafleider (type 1) in aanmerking.",[1453,38623,38624],{},"De SPD op het eendraadschema documenteren en de statusindicatie regelmatig nakijken.",[1396,38626,38165],{"id":38627},"aanpak-9",[12,38629,38630],{},"Keuze, afstemming, aansluiting en aanpassing van het bord zijn projectspecifiek.",[29567,38632],{},[41,38634,38636],{"id":38635},"besluit-in-twee-rondes-naar-de-keuring","Besluit: in twee rondes naar de keuring",[12,38638,38639],{},"Overloop de tien punten in twee rondes: eerst documenten en referenties, daarna de werkelijke toestand, meetwaarden en beveiligingsfuncties samen met je elektricien. Een gecorrigeerde tekening bewijst niet dat een fysiek gebrek verholpen is; omgekeerd hoort elke uitgevoerde correctie terug op schema en situatieplan. Markeer elk open punt met bron en verantwoordelijke en bewaar de gedateerde versie samen met keuringsverslag, meetbewijzen en fabrikantdocumenten.",[12,38641,38642,38643,1875,38647,38652],{},"PlanElec meldt in de AREI\u002FRGIE-zelfcontrole bevindingen over de ondersteunde regels, zoals toewijzing aan differentiëlen en beveiliging, nog voor het organisme langskomt. De fysieke toestand en de meetwaarden beoordeelt het erkend organisme ter plaatse. Bronnen zijn ",[30,38644,38646],{"href":28056,"rel":38645},[2532],"AREI Boek 1 V06",[30,38648,38651],{"href":38649,"rel":38650},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fthemas\u002Fenergie\u002Fbronnen-en-dragers-van-energie\u002Felektriciteit\u002Fveiligheid-en-controle-van\u002Fcontrole-van-huishoudelijke",[2532],"officiële informatie over de controle van huishoudelijke installaties","; ze onderbouwen verplichtingen, geen frequentierangorde.",[29567,38654],{},[12,38656,38657],{},[15,38658,38659],{},"Verwante artikels:",[1450,38661,38662,38668,38672,38676],{},[1453,38663,38664],{},[30,38665,38667],{"href":38666},"\u002Fblog\u002Felektrokeuring-afgekeurd","Elektrische keuring afgekeurd – wat nu?",[1453,38669,38670],{},[30,38671,37388],{"href":37084},[1453,38673,38674],{},[30,38675,21004],{"href":26440},[1453,38677,38678],{},[30,38679,38680],{"href":15255},"Welke kabels mag ik gebruiken in de badkamer?",[12,38682,38683,2725,38686],{},[15,38684,38685],{},"Plan met PlanElec en gebruik de zelfcontrole als voorbereiding op de technische en officiële keuring.",[30,38687,38690],{"href":38688,"rel":38689},"https:\u002F\u002Fplanelec.be",[2532],"Nu starten →",{"title":1467,"searchDepth":1468,"depth":1468,"links":38692},[38693,38699,38705,38711,38717,38723,38729,38735,38741,38747,38753],{"id":38122,"depth":1468,"text":38123,"children":38694},[38695,38696,38697,38698],{"id":38132,"depth":1486,"text":38133},{"id":38139,"depth":1486,"text":38140},{"id":38146,"depth":1486,"text":38147},{"id":38164,"depth":1486,"text":38165},{"id":38173,"depth":1468,"text":38174,"children":38700},[38701,38702,38703,38704],{"id":38182,"depth":1486,"text":38133},{"id":38188,"depth":1486,"text":38140},{"id":38194,"depth":1486,"text":38147},{"id":38208,"depth":1486,"text":38165},{"id":38216,"depth":1468,"text":38217,"children":38706},[38707,38708,38709,38710],{"id":38225,"depth":1486,"text":38133},{"id":38231,"depth":1486,"text":38140},{"id":38237,"depth":1486,"text":38147},{"id":38254,"depth":1486,"text":38165},{"id":38262,"depth":1468,"text":38263,"children":38712},[38713,38714,38715,38716],{"id":38271,"depth":1486,"text":38133},{"id":38277,"depth":1486,"text":38140},{"id":38283,"depth":1486,"text":38147},{"id":38297,"depth":1486,"text":38165},{"id":38305,"depth":1468,"text":38306,"children":38718},[38719,38720,38721,38722],{"id":38314,"depth":1486,"text":38133},{"id":38320,"depth":1486,"text":38140},{"id":38326,"depth":1486,"text":38147},{"id":38346,"depth":1486,"text":38165},{"id":38354,"depth":1468,"text":38355,"children":38724},[38725,38726,38727,38728],{"id":38363,"depth":1486,"text":38133},{"id":38369,"depth":1486,"text":38140},{"id":38375,"depth":1486,"text":38147},{"id":38452,"depth":1486,"text":38165},{"id":38460,"depth":1468,"text":38461,"children":38730},[38731,38732,38733,38734],{"id":38469,"depth":1486,"text":38133},{"id":38475,"depth":1486,"text":38140},{"id":38481,"depth":1486,"text":38147},{"id":38495,"depth":1486,"text":38165},{"id":38503,"depth":1468,"text":38504,"children":38736},[38737,38738,38739,38740],{"id":38512,"depth":1486,"text":38133},{"id":38518,"depth":1486,"text":38140},{"id":38524,"depth":1486,"text":38147},{"id":38538,"depth":1486,"text":38165},{"id":38546,"depth":1468,"text":38547,"children":38742},[38743,38744,38745,38746],{"id":38555,"depth":1486,"text":38133},{"id":38561,"depth":1486,"text":38140},{"id":38567,"depth":1486,"text":38147},{"id":38584,"depth":1486,"text":38165},{"id":38592,"depth":1468,"text":38593,"children":38748},[38749,38750,38751,38752],{"id":38601,"depth":1486,"text":38133},{"id":38607,"depth":1486,"text":38140},{"id":38613,"depth":1486,"text":38147},{"id":38627,"depth":1486,"text":38165},{"id":38635,"depth":1468,"text":38636},"2026-06-20","Tien controlepunten waarop Belgische woninginstallaties bij de keuring vaak struikelen – met grenswaarden, AREI-vindplaatsen en de juiste correctie per punt.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-top-10-arei-violations-editorial.jpg","\u002Fblog\u002Ftop-10-arei-violations.nl",{"title":37953,"description":38755},"10 belangrijke AREI-controlepunten herkennen en oplossen","10-meest-voorkomende-arei-overtredingen","blog\u002Ftop-10-arei-violations.nl",[32906,38764,38765,17499,17497,22648,38766,38767],"overtredingen","elektrokeuring","belgie","tekortkomingen","56Ln6bG54X2kSrUr_kL-Hpx8mR6brTc2Yr_FeXn81f4","\u002Fblog\u002F10-meest-voorkomende-arei-overtredingen",{"id":38771,"title":38772,"articleId":38773,"body":38774,"category":1493,"date":39283,"description":39284,"extension":1496,"image":38787,"lastUpdated":15381,"locale":1497,"meta":39285,"navigation":1499,"ogImage":39286,"path":39287,"publishDate":39283,"readTime":3262,"refreshInterval":11097,"seo":39288,"seoTitle":38667,"slug":39289,"stem":39290,"tags":39291,"__hash__":39294,"kind":1515,"href":38666},"blog\u002Fblog\u002Finspection-failed-what-now.nl.md","Elektrische keuring afgekeurd – wat nu? Stap voor stap naar de nieuwe controle","inspection-failed-what-now",{"type":9,"value":38775,"toc":39257},[38776,38782,38788,38791,38797,38801,38804,38808,38811,38815,38863,38867,38870,38874,38877,38881,38884,38888,38891,39001,39005,39009,39012,39023,39027,39030,39034,39041,39055,39059,39066,39070,39073,39077,39080,39083,39100,39103,39107,39110,39113,39117,39120,39127,39131,39134,39138,39141,39153,39157,39160,39164,39187,39190,39194,39201,39225,39228,39230,39234,39249],[12,38777,38778,38781],{},[15,38779,38780],{},"Na een negatieve keuring verhelp je elke inbreuk uit het verslag, breng je eendraadschema en situatieplan in lijn met de uitvoering en laat je de installatie opnieuw controleren."," De termijn hangt af van het controletype: bij een nieuwe installatie mag het betrokken deel pas na herstel en een nieuwe controle in gebruik. Na een periodiek controlebezoek komt hetzelfde organisme binnen een jaar terug. Na een verkoopkeuring heeft de koper 18 maanden vanaf de verkoopakte en kiest hij het organisme vrij.",[12,38783,38784],{},[22,38785],{"alt":38786,"src":38787},"Elektriciens bereiden materiaal voor een herstelling voor.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-inspection-failed-what-now-editorial.webp",[12,38789,38790],{},"Een negatief verslag zegt op zich niet of er alleen documenten ontbreken of dat er een veiligheidsrisico is. De afzonderlijke vaststellingen zijn bepalend. Deze gids toont je hoe je ze leest, prioriteert, laat corrigeren en netjes aantoont.",[12,38792,38793,38796],{},[15,38794,38795],{},"Redactie en controle: PlanElec-team, 5 oktober 2026",", getoetst aan AREI Boek 1, versie 06, van toepassing sinds 1 april 2026.",[41,38798,38800],{"id":38799},"wat-staat-er-in-het-negatieve-verslag","Wat staat er in het negatieve verslag?",[12,38802,38803],{},"Het verslag van het erkend organisme vermeldt de vastgestelde inbreuken op Boek 1, kringen met een onvoldoende isolatieniveau en de conclusie. Bij het controlebezoek van een woninginstallatie maakt het bovendien onderscheid tussen inbreuken, opmerkingen en toepasselijke afwijkingen voor bestaande installaties (onderafdeling 6.5.7.2, b.5). Een opmerking is geen inbreuk – kijk dus goed onder welke rubriek een vaststelling staat.",[1396,38805,38807],{"id":38806},"codes-en-prioriteiten-correct-lezen","Codes en prioriteiten correct lezen",[12,38809,38810],{},"Interne codes en prioriteitsklassen verschillen per organisme en verslagmodel. Uit „C1”, „C2” of „C3” volgt dus geen algemene Belgische termijn; de legende van jouw verslag is bepalend. Is een vaststelling onduidelijk, vraag het organisme dan schriftelijk om regelverwijzing, betrokken kring en verwacht bewijs. Een vermelding van onmiddellijk gevaar krijgt voorrang, ongeacht de code: schakel het betrokken deel niet op eigen houtje opnieuw in.",[41,38812,38814],{"id":38813},"termijnen-per-controletype","Termijnen per controletype",[49,38816,38817,38829],{},[52,38818,38819],{},[55,38820,38821,38824,38827],{},[58,38822,38823],{},"Controletype",[58,38825,38826],{},"Wat nu geldt",[58,38828,37986],{},[68,38830,38831,38842,38853],{},[55,38832,38833,38836,38839],{},[73,38834,38835],{},"Gelijkvormigheidscontrole van een nieuwe installatie of belangrijke wijziging",[73,38837,38838],{},"Betrokken deel mag niet in gebruik genomen worden; na herstel een nieuwe gelijkvormigheidscontrole",[73,38840,38841],{},"9.1.3.1",[55,38843,38844,38847,38850],{},[73,38845,38846],{},"Periodiek controlebezoek",[73,38848,38849],{},"Inbreuken onverwijld verhelpen; nieuw bezoek door hetzelfde organisme binnen een jaar",[73,38851,38852],{},"9.1.3.2, 6.5.7.2 b.6, b.7",[55,38854,38855,38858,38861],{},[73,38856,38857],{},"Verkoopkeuring van een oude woninginstallatie",[73,38859,38860],{},"Koper laat ten laatste 18 maanden na de verkoopakte opnieuw controleren; vrije keuze van het organisme",[73,38862,37517],{},[1396,38864,38866],{"id":38865},"bij-een-periodieke-keuring","Bij een periodieke keuring",[12,38868,38869],{},"Het verslag vermeldt in de conclusie de datum waarvoor het aanvullende bezoek door hetzelfde organisme moet plaatsvinden (6.5.7.2, b.6). Zijn er bij dat tweede bezoek nog steeds inbreuken, dan stuurt het organisme een kopie van het verslag naar de Algemene Directie Energie (b.7). Tot dan voer je de werken onverwijld uit en neem je alle passende maatregelen zodat de inbreuken geen gevaar vormen zolang de installatie in gebruik blijft.",[1396,38871,38873],{"id":38872},"bij-een-nieuwe-installatie","Bij een nieuwe installatie",[12,38875,38876],{},"Bij een nieuwe installatie of een belangrijke wijziging blijft het betrokken deel buiten gebruik tot de inbreuken verholpen en opnieuw gecontroleerd zijn (9.1.3.1). De netaansluiting stem je daarnaast af met de bevoegde netbeheerder; die stelt het vermogen van een nieuwe installatie pas ter beschikking als er een positief verslag is (6.4.6.2).",[1396,38878,38880],{"id":38879},"bij-verkoop-van-vastgoed","Bij verkoop van vastgoed",[12,38882,38883],{},"Na een negatieve verkoopkeuring meldt de koper zijn identiteit en de datum van de verkoopakte schriftelijk aan het oorspronkelijke organisme. Ten laatste 18 maanden na die datum laat hij nagaan of de inbreuken verholpen zijn. Het organisme kiest hij vrij; een ander organisme verwittigt het eerste (8.4.2.2 a). Bepalend is de datum van de authentieke akte, niet die van een onderhandse koopovereenkomst.",[41,38885,38887],{"id":38886},"tien-controledomeinen-die-je-in-het-verslag-terugvindt","Tien controledomeinen die je in het verslag terugvindt",[12,38889,38890],{},"Deze domeinen duiken geregeld op in verslagen. Ze zijn geen statistische rangschikking, maar wel een goede kaart voor je vaststellingen.",[49,38892,38893,38904],{},[52,38894,38895],{},[55,38896,38897,38899,38902],{},[58,38898,3183],{},[58,38900,38901],{},"Controledomein",[58,38903,20865],{},[68,38905,38906,38916,38925,38935,38945,38954,38963,38972,38982,38991],{},[55,38907,38908,38910,38913],{},[73,38909,343],{},[73,38911,38912],{},"Differentieel ontbreekt of past niet: 300 mA aan de oorsprong, ten hoogste 30 mA voor de voorgeschreven kringen, minstens type A",[73,38914,38915],{},"4.2.4.3 b, 5.3.5.3 a",[55,38917,38918,38920,38923],{},[73,38919,326],{},[73,38921,38922],{},"Eendraadschema of situatieplan ontbreekt of komt niet overeen met de installatie",[73,38924,38013],{},[55,38926,38927,38929,38932],{},[73,38928,577],{},[73,38930,38931],{},"Aardingswaarde en opbouw van de differentiëlen passen niet bij elkaar (onder 100 Ω; boven 30 Ω strengere opbouw)",[73,38933,38934],{},"4.2.3.2, 4.2.4.3 b",[55,38936,38937,38939,38942],{},[73,38938,574],{},[73,38940,38941],{},"Kringen in het bord niet duidelijk aangeduid",[73,38943,38944],{},"3.1.3",[55,38946,38947,38949,38952],{},[73,38948,1219],{},[73,38950,38951],{},"Leidingen onvoldoende mechanisch beschermd voor plaatsingswijze en belasting",[73,38953,38103],{},[55,38955,38956,38958,38961],{},[73,38957,1233],{},[73,38959,38960],{},"Volumes en beschermingseisen in de badkamer niet nageleefd",[73,38962,38051],{},[55,38964,38965,38967,38970],{},[73,38966,546],{},[73,38968,38969],{},"Hoofdschakelaar ontbreekt of is te klein (woning minstens 40 A)",[73,38971,38038],{},[55,38973,38974,38976,38979],{},[73,38975,560],{},[73,38977,38978],{},"Beveiliging en doorsnede niet op elkaar afgestemd",[73,38980,38981],{},"4.4.1.4, tabel 4.11",[55,38983,38984,38986,38989],{},[73,38985,38094],{},[73,38987,38988],{},"Overspanningsbeveiliging niet vakkundig beoordeeld",[73,38990,38117],{},[55,38992,38993,38995,38998],{},[73,38994,38108],{},[73,38996,38997],{},"Gewestelijke rookmelderplicht wordt verward met AREI-verplichtingen – beide rechtsdomeinen apart nagaan",[73,38999,39000],{},"gewestelijk woonrecht, niet AREI",[41,39002,39004],{"id":39003},"stap-voor-stap-na-de-negatieve-keuring","Stap voor stap na de negatieve keuring",[1396,39006,39008],{"id":39007},"stap-1-lees-het-verslag-regel-per-regel","Stap 1: lees het verslag regel per regel",[12,39010,39011],{},"Overloop elke vaststelling afzonderlijk en noteer:",[1450,39013,39014,39017,39020],{},[1453,39015,39016],{},"Onder welke rubriek staat ze: inbreuk, opmerking of afwijking?",[1453,39018,39019],{},"Waar zit het probleem precies: ruimte, bord, kring?",[1453,39021,39022],{},"Wat wordt precies aangekaart en welke regel is betrokken?",[1396,39024,39026],{"id":39025},"stap-2-bepaal-prioriteiten","Stap 2: bepaal prioriteiten",[12,39028,39029],{},"Eerst komen alle vaststellingen die het verslag aanduidt als onmiddellijk gevaar, reden voor uitschakeling of hindernis voor ingebruikname. Daarna plan je de overige inbreuken volgens hun samenhang: eerst oorzaak en beveiligingsconcept, dan uitvoering, meting en documentatie.",[1396,39031,39033],{"id":39032},"stap-3-schakel-een-elektricien-in","Stap 3: schakel een elektricien in",[12,39035,39036,39037,39040],{},"Je kunt het verslag ordenen, documenten verzamelen en de plannen vergelijken met de zichtbare installatie. Werken in het bord, aan beveiligingen, aan de aarding of aan vaste leidingen horen bij een ",[15,39038,39039],{},"elektricien",", bijvoorbeeld:",[1450,39042,39043,39046,39049,39052],{},[1453,39044,39045],{},"differentieelschakelaar bijplaatsen of vervangen",[1453,39047,39048],{},"aarding verbeteren of de opbouw van de differentiëlen afstemmen op de aardingswaarde",[1453,39050,39051],{},"leidingen mechanisch beschermen of opnieuw plaatsen",[1453,39053,39054],{},"hoofdschakelaar plaatsen",[1396,39056,39058],{"id":39057},"stap-4-breng-de-plannen-in-lijn-met-de-uitvoering","Stap 4: breng de plannen in lijn met de uitvoering",[12,39060,39061,39062,39065],{},"Eendraadschema en situatieplan tonen ",[15,39063,39064],{},"de toestand na de correctie",". Neem geen vermoedelijke doorsneden of beveiligingswaarden over; onbekende kenmerken verduidelijk je vóór de export of markeer je uitdrukkelijk als open.",[1396,39067,39069],{"id":39068},"stap-5-plan-de-nieuwe-controle","Stap 5: plan de nieuwe controle",[12,39071,39072],{},"Wie controleert, hangt af van het controletype: na een periodiek bezoek komt hetzelfde organisme, na een verkoopkeuring kiest de koper vrij. Verduidelijk aan de hand van het verslag de omvang voor je boekt.",[41,39074,39076],{"id":39075},"een-vaststelling-vertalen-in-een-controleerbare-maatregel","Een vaststelling vertalen in een controleerbare maatregel",[12,39078,39079],{},"Het verslag beschrijft een resultaat, niet automatisch de oorzaak. „Isolatieweerstand onvoldoende” kan wijzen op een beschadigde geleider, vocht of een aangesloten toestel. Ter vergelijking: bij de meting moet elke kring minstens 500 kΩ halen bij een proefspanning van 500 V (6.4.5.1). „Plan komt niet overeen” gaat van een ontbrekend stopcontact tot een verkeerde volgorde van beveiligingen. Laat dus eerst oorzaak en omvang bepalen voor een onderdeel wordt vervangen.",[12,39081,39082],{},"Voor elke vaststelling helpen vijf vragen:",[1602,39084,39085,39088,39091,39094,39097],{},[1453,39086,39087],{},"Welk installatiedeel werd werkelijk gecontroleerd?",[1453,39089,39090],{},"Welke regel of beveiligingsfunctie is betrokken?",[1453,39092,39093],{},"Welke diagnose of meting bevestigt de oorzaak?",[1453,39095,39096],{},"Welke correctie neemt de oorzaak weg, niet alleen het symptoom?",[1453,39098,39099],{},"Welk bewijs toont het organisme de afgewerkte correctie?",[12,39101,39102],{},"Meerdere inbreuken hangen vaak samen. Een gewijzigde verdeling beïnvloedt eendraadschema, labels, beveiligingen en meetwaarden. Een nieuwe aardingsmaatregel is afgerond voordat plannen worden afgewerkt en opnieuw wordt gemeten. Plan daarom één consistente eindtoestand in plaats van een reeks tegenstrijdige tussenstanden.",[41,39104,39106],{"id":39105},"documentatiegebrek-en-uitvoeringsgebrek-scheiden","Documentatiegebrek en uitvoeringsgebrek scheiden",[12,39108,39109],{},"Een ontbrekend plan los je niet op door een ongecontroleerd plan te tekenen. Breng eerst de installatie in kaart – openen en meten doet de vakman. Daarna koppel je elk symbool aan de werkelijke kring en ga je na of bordlabels, eendraadschema en situatieplan dezelfde referentie gebruiken.",[12,39111,39112],{},"Omgekeerd herstelt een mooiere tekening geen uitvoeringsgebrek. Is een beveiliging ongeschikt, de aarding onvoldoende of een leiding mechanisch bedreigd, dan wordt de installatie gecorrigeerd en zo nodig opnieuw gemeten; daarna volgt het plan de uitgevoerde toestand. Zo vindt het organisme bij de nieuwe controle actuele documenten én een gecorrigeerde installatie.",[41,39114,39116],{"id":39115},"bijzonder-geval-verkoop","Bijzonder geval: verkoop",[12,39118,39119],{},"Bewaar als koper verslag, verkoopakte en installatiedossier samen. De 18 maanden lopen vanaf de dag van de verkoopakte. De termijn is geen uitstel voor zichtbare gevaren: onveilige installatiedelen laat je meteen door een vakman beoordelen en zo nodig buiten gebruik stellen.",[12,39121,39122,39123,39126],{},"Wordt het gebouw afgebroken of de installatie volledig vernieuwd, dan geldt een aparte weg: verkoper en koper leggen dat vast in de akte, de koper verwittigt de Algemene Directie Energie en voor de nieuwe installatie geldt de gelijkvormigheidscontrole van hoofdstuk 6.4 (8.4.2.2 a en b). De ",[30,39124,37864],{"href":37862,"rel":39125},[2532]," beantwoordt verdere verkoopvragen.",[41,39128,39130],{"id":39129},"kosten-realistisch-plannen","Kosten realistisch plannen",[12,39132,39133],{},"Tarieven en herstelkosten hangen af van controletype, organisme, verplaatsing, aantal borden, meetwerk en het werkelijke gebrek. Het actuele tarief vraag je rechtstreeks aan het organisme. Een goede herstelofferte vermeldt diagnose, materiaal, werkuren, metingen, aanpassing van de plannen en de nieuwe controle afzonderlijk – zo zie je of een verborgen leidingherstelling of een aanpassing van het bord is meegerekend.",[41,39135,39137],{"id":39136},"een-sterk-dossier-voor-de-nieuwe-controle","Een sterk dossier voor de nieuwe controle",[12,39139,39140],{},"Houd een tabel bij met één rij per vaststelling: tekst uit het verslag, betrokken kring, maatregel, verantwoordelijke, einddatum en bewijs. Foto's vullen het dossier aan; metingen vervangen ze niet. Werk de plannen bij na de werkelijke uitvoering en controleer daarna labels en referenties nog een keer.",[12,39142,10081,39143,39146,39147,39152],{},[30,39144,37870],{"href":37868,"rel":39145},[2532]," licht gevolgen en termijnen toe; de ",[30,39148,39151],{"href":39149,"rel":39150},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Forganismes-de-controle-agrees",[2532],"lijst van erkende organismen"," is eveneens officieel.",[41,39154,39156],{"id":39155},"wijzigingen-tot-de-nieuwe-controle-onder-controle-houden","Wijzigingen tot de nieuwe controle onder controle houden",[12,39158,39159],{},"Leg na het herstel een gedocumenteerde stand vast: gedateerde plannen, bordlabels, meetdocumenten en foto's van werken die later verborgen zitten. Elke verdere wijziging vóór de afspraak toets je aan die stand en verwerk je in de documenten. Anders maakt één extra leiding precies de overeenstemming ongedaan die elektricien en ontwerper net hebben bereikt. Vraag alle bewoners om tot de keuring geen voorlopige aansluitingen of eigen aanpassingen uit te voeren. Moet er toch iets veranderen, dan krijgt de verantwoordelijke vakman het verslag, de actuele plannen en een duidelijke beschrijving van de wijziging.",[41,39161,39163],{"id":39162},"laatste-check-vóór-de-nieuwe-afspraak","Laatste check vóór de nieuwe afspraak",[1450,39165,39166,39169,39172,39175,39178,39181,39184],{},[1453,39167,39168],{},"Elke vaststelling is gekoppeld aan een afgeronde maatregel.",[1453,39170,39171],{},"Correcties die een meting vereisen, zijn vakkundig gemeten en gedocumenteerd.",[1453,39173,39174],{},"Kringaanduidingen kloppen in het bord en op beide plannen.",[1453,39176,39177],{},"Nieuwe of verwijderde toestellen staan bijgewerkt op het situatieplan.",[1453,39179,39180],{},"Nominale waarden en leidinggegevens op het eendraadschema komen overeen met de uitvoering.",[1453,39182,39183],{},"Organisme en controletype zijn bevestigd.",[1453,39185,39186],{},"Verslag, plannen, EAN-code en fabrikantdocumenten liggen klaar.",[12,39188,39189],{},"Zo gaat elke afgewerkte herstelling met een duidelijk bewijs naar de nieuwe controle. Plan tijd in voor vragen en eventueel een tweede diagnose: een vaststelling is pas afgehandeld als oorzaak, uitvoering en bewijs op elkaar aansluiten.",[41,39191,39193],{"id":39192},"hoe-planelec-helpt","Hoe PlanElec helpt",[12,39195,39196,39197,39200],{},"PlanElec maakt ondersteunde ontwerpfouten ",[15,39198,39199],{},"vóór de nieuwe controle"," zichtbaar en houdt je documenten consistent:",[1450,39202,39203,39209,39214,39219],{},[1453,39204,39205,39208],{},[15,39206,39207],{},"AREI\u002FRGIE-zelfcontrole"," meldt bevindingen over differentieelbescherming en beveiliging in de ondersteunde regels",[1453,39210,39211,39213],{},[15,39212,3764],{}," geeft de ingevoerde topologie gestructureerd weer",[1453,39215,39216,39218],{},[15,39217,3836],{}," gebruikt de Belgische symbolenbibliotheek",[1453,39220,39221,39224],{},[15,39222,39223],{},"Kringreferenties"," zijn identiek in schema en plan",[12,39226,39227],{},"De rollen blijven duidelijk: PlanElec toont je of ontwerp en documenten in de ondersteunde regels kloppen; metingen en het oordeel over de installatie levert het erkend organisme.",[29567,39229],{},[12,39231,39232],{},[15,39233,38659],{},[1450,39235,39236,39241,39245],{},[1453,39237,39238],{},[30,39239,39240],{"href":38769},"10 belangrijke AREI-controlepunten",[1453,39242,39243],{},[30,39244,37388],{"href":37084},[1453,39246,39247],{},[30,39248,21004],{"href":26440},[12,39250,39251,2725,39254],{},[15,39252,39253],{},"Breng je documenten in lijn met de uitvoering en ga met een geordend dossier naar de nieuwe controle.",[30,39255,38690],{"href":38688,"rel":39256},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":39258},[39259,39262,39267,39268,39275,39276,39277,39278,39279,39280,39281,39282],{"id":38799,"depth":1468,"text":38800,"children":39260},[39261],{"id":38806,"depth":1486,"text":38807},{"id":38813,"depth":1468,"text":38814,"children":39263},[39264,39265,39266],{"id":38865,"depth":1486,"text":38866},{"id":38872,"depth":1486,"text":38873},{"id":38879,"depth":1486,"text":38880},{"id":38886,"depth":1468,"text":38887},{"id":39003,"depth":1468,"text":39004,"children":39269},[39270,39271,39272,39273,39274],{"id":39007,"depth":1486,"text":39008},{"id":39025,"depth":1486,"text":39026},{"id":39032,"depth":1486,"text":39033},{"id":39057,"depth":1486,"text":39058},{"id":39068,"depth":1486,"text":39069},{"id":39075,"depth":1468,"text":39076},{"id":39105,"depth":1468,"text":39106},{"id":39115,"depth":1468,"text":39116},{"id":39129,"depth":1468,"text":39130},{"id":39136,"depth":1468,"text":39137},{"id":39155,"depth":1468,"text":39156},{"id":39162,"depth":1468,"text":39163},{"id":39192,"depth":1468,"text":39193},"2026-06-16","Is je elektrische keuring negatief? Zo lees je het verslag, bepaal je de geldende AREI-termijn, plan je veilige correcties en bereid je de nieuwe controle voor.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-inspection-failed-what-now-editorial.jpg","\u002Fblog\u002Finspection-failed-what-now.nl",{"title":38772,"description":39284},"elektrokeuring-afgekeurd","blog\u002Finspection-failed-what-now.nl",[17499,38765,39292,39293,33954,32906,38766],"afgekeurd","inbreuken","NYSS5vvioJTBvjhXE318WiTQoIA1YFLy9jTRqJV-Qe8",{"id":39296,"title":39297,"articleId":39298,"body":39299,"category":19087,"date":39548,"description":39549,"extension":1496,"image":39312,"lastUpdated":15381,"locale":1497,"meta":39550,"navigation":1499,"ogImage":39551,"path":39552,"publishDate":39548,"readTime":19590,"refreshInterval":11097,"seo":39553,"seoTitle":4037,"slug":39554,"stem":39555,"tags":39556,"__hash__":39561,"kind":1515,"href":15350},"blog\u002Fblog\u002Fsmart-home-domotica-arei.nl.md","Smart Home en AREI: Waar moet je op letten bij domotica?","smart-home-domotica-arei",{"type":9,"value":39300,"toc":39540},[39301,39307,39313,39317,39320,39334,39337,39341,39348,39355,39359,39454,39458,39461,39465,39472,39483,39487,39495,39508,39510,39515,39532],[12,39302,39303,39306],{},[15,39304,39305],{},"Het AREI regelt smarthome-toestellen niet als aparte categorie, wel de vaste elektrische installatie waarin ze worden ingebouwd."," Wifi-relais, slimme stekkers of DIN-railmodules mogen, zolang de installatie erachter aan de voorschriften voldoet en de modules geschikt zijn voor hun inbouw. DIN-railmodules en elke gewijzigde vaste bedrading horen op het eendraadschema en het situatieplan.",[12,39308,39309],{},[22,39310],{"alt":39311,"src":39312},"Een elektricien legt een wanddrukknop uit aan een klant in de woonkamer.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-smart-home-domotica-arei-editorial.webp",[41,39314,39316],{"id":39315},"wat-mag","Wat mag?",[12,39318,39319],{},"Smarthome-toestellen zoals wifi-relais (Shelly, Sonoff), slimme tussenstekkers (TP-Link, Hue Smart Plug) of slimme lampen (Philips Hue, IKEA TRADFRI) kun je gebruiken zolang de vaste installatie klopt:",[1450,39321,39322,39325,39328,39331],{},[1453,39323,39324],{},"Leidingen zijn correct gedimensioneerd en beveiligd.",[1453,39326,39327],{},"Automaten en differentieelschakelaars zijn aanwezig en correct aan de kringen toegewezen.",[1453,39329,39330],{},"De installatie is geaard.",[1453,39332,39333],{},"Vast ingebouwde modules dragen een CE-markering en worden gebruikt binnen de door de fabrikant verklaarde bestemming en installatievoorwaarden.",[12,39335,39336],{},"Een slim relais dat een verbruiker schakelt, is een bedieningsinrichting. Elektronische schakelingen zijn daarvoor uitdrukkelijk toegelaten als ze voldoen aan de toepasselijke normen of een gelijkwaardig veiligheidsniveau bieden (AREI onderafdeling 5.3.3.2.b). Zit het module in een inbouwdoos, dan moet die voldoende ruim zijn om de verbindingen gemakkelijk onder te brengen (onderafdeling 5.2.6.1).",[41,39338,39340],{"id":39339},"din-railmodules-in-de-verdeelkast","DIN-railmodules in de verdeelkast",[12,39342,39343,39344,39347],{},"Een aparte categorie zijn ",[15,39345,39346],{},"DIN-railmodules"," zoals Shelly Pro, Shelly Pro 3EM of Sonoff-DIN-modules. Ze zitten rechtstreeks in de verdeelkast op de DIN-rail en maken dus deel uit van de vaste installatie.",[12,39349,39350,39351,39354],{},"Daarom ",[15,39352,39353],{},"verschijnen DIN-railmodules op het eendraadschema",". Volgens AREI onderafdeling 3.1.2.2.a toont het eendraadschema onder meer differentieel- en overstroombeveiligingen, schakelaars en vaste machines en toestellen; volgens afdeling 9.1.2 hoort het schema bij het dossier van de installatie dat de eigenaar bewaart. Teken de modules er zoals elk ander module in de verdeelkast.",[41,39356,39358],{"id":39357},"overzicht-smarthome-types-en-arei","Overzicht: smarthome-types en AREI",[49,39360,39361,39377],{},[52,39362,39363],{},[55,39364,39365,39368,39371,39374],{},[58,39366,39367],{},"Smarthome-type",[58,39369,39370],{},"Inbouwplaats",[58,39372,39373],{},"Deel van de vaste installatie?",[58,39375,39376],{},"Op het eendraadschema?",[68,39378,39379,39393,39405,39417,39428,39442],{},[55,39380,39381,39384,39387,39390],{},[73,39382,39383],{},"Wifi-relais (Shelly 1, Sonoff)",[73,39385,39386],{},"Inbouwdoos achter de schakelaar",[73,39388,39389],{},"Ja, zodra het vast bedraad is",[73,39391,39392],{},"Ja, als de vaste bedrading wijzigt (bv. nulgeleider naar de schakelaar getrokken); anders ongewijzigd schema",[55,39394,39395,39398,39401,39403],{},[73,39396,39397],{},"Slimme tussenstekker",[73,39399,39400],{},"In bestaand stopcontact",[73,39402,4110],{},[73,39404,4110],{},[55,39406,39407,39410,39413,39415],{},[73,39408,39409],{},"Slimme lamp",[73,39411,39412],{},"In bestaande fitting",[73,39414,4110],{},[73,39416,4110],{},[55,39418,39419,39422,39424,39426],{},[73,39420,39421],{},"DIN-railmodule (Shelly Pro)",[73,39423,1721],{},[73,39425,4131],{},[73,39427,4131],{},[55,39429,39430,39433,39436,39439],{},[73,39431,39432],{},"Slimme thermostaat (Nest, tado)",[73,39434,39435],{},"Wandmontage",[73,39437,39438],{},"Ja, als hij vast op 230 V is aangesloten",[73,39440,39441],{},"De voedende kring wel; toestellen op batterijen niet",[55,39443,39444,39447,39450,39452],{},[73,39445,39446],{},"Slim deurslot (batterij)",[73,39448,39449],{},"Deurkozijn",[73,39451,4110],{},[73,39453,4110],{},[41,39455,39457],{"id":39456},"bedienen-schakelen-en-scheiden","Bedienen, schakelen en scheiden",[12,39459,39460],{},"Niet elke slimme functie heeft een klassieke wandschakelaar nodig. Bepalend zijn de functie van het toestel en de regels voor bedienen, schakelen, scheiden, noodbediening en onderhoud. Het slimme relais is de bedieningsinrichting van de verbruiker (5.3.3.2). Een app of cloudverbinding is geen scheidingsinrichting, tenzij product en kring daar uitdrukkelijk voor ontworpen zijn. De handleiding van de fabrikant en het vakkundige ontwerp van de vaste bedrading leggen dat vast.",[41,39462,39464],{"id":39463},"wat-controleert-de-keuring","Wat controleert de keuring?",[12,39466,39467,39468,39471],{},"Bij de gelijkvormigheidscontrole controleert het erkend organisme de ",[15,39469,39470],{},"elektrische installatie",", niet de smarthome-logica:",[1450,39473,39474,39477,39480],{},[1453,39475,39476],{},"Bekabeling, beveiligingen en aarding worden gecontroleerd.",[1453,39478,39479],{},"DIN-railmodules moeten op het eendraadschema staan, relais in schakelaardozen wanneer de vaste bedrading ervoor gewijzigd werd.",[1453,39481,39482],{},"App, scènes en automatiseringsregels vallen buiten de keuring.",[41,39484,39486],{"id":39485},"smarthome-componenten-documenteren-met-planelec","Smarthome-componenten documenteren met PlanElec",[12,39488,39489,39490,39492,39493,39],{},"PlanElec documenteert DIN-railmodules in de verdeelkast samen met hun beveiligingen en kringen. Ondersteunde relais- en Shelly-kanalen plan je in de lichtsturing met een expliciete kabelvoorvertoning. Met een actief automatiseringsprofiel plan je kanalen, bedieningspunten en klemmen in het onderdeel ",[15,39491,444],{}," en exporteer je kanaal- en klemmenplan als overdrachtsdossier. De AREI\u002FRGIE-zelfcontrole controleert de elektrische kant; automatiseringslogica, cyberveiligheid en draadloze beschikbaarheid liggen bij fabrikant en integrator. Hoe bussystemen zoals KNX op het eendraadschema komen, lees je in ",[30,39494,1031],{"href":1030},[12,39496,39497,39498,933,39502,39507],{},"Officiële bronnen: ",[30,39499,39501],{"href":15357,"rel":39500},[2532],"FOD Economie: AREI Boek 1 V06",[30,39503,39506],{"href":39504,"rel":39505},"https:\u002F\u002Fsingle-market-economy.ec.europa.eu\u002Fsingle-market\u002Fce-marking_en",[2532],"Europese Commissie: CE-markering",". CE is de verklaring van de fabrikant onder toepasselijk EU-recht; de conformiteit van de Belgische installatie beoordeelt de keuring.",[29567,39509],{},[12,39511,39512],{},[15,39513,39514],{},"Gerelateerde artikels:",[1450,39516,39517,39522,39527],{},[1453,39518,39519],{},[30,39520,39521],{"href":32848},"Eigen stroomkring: welke toestellen hebben er een nodig?",[1453,39523,39524],{},[30,39525,39526],{"href":38769},"De 10 meest voorkomende AREI-overtredingen",[1453,39528,39529],{},[30,39530,39531],{"href":17449},"AREI-reglementen 2026: wat is er veranderd?",[12,39533,39534,2725,39537],{},[15,39535,39536],{},"Plan je smart home met nette elektrische documentatie.",[30,39538,39539],{"href":15328},"Start gratis",{"title":1467,"searchDepth":1468,"depth":1468,"links":39541},[39542,39543,39544,39545,39546,39547],{"id":39315,"depth":1468,"text":39316},{"id":39339,"depth":1468,"text":39340},{"id":39357,"depth":1468,"text":39358},{"id":39456,"depth":1468,"text":39457},{"id":39463,"depth":1468,"text":39464},{"id":39485,"depth":1468,"text":39486},"2026-06-09","Moet een smarthome-installatie aan het AREI voldoen? De vaste elektrische installatie wel. Wat mag, wat op het eendraadschema hoort en wat de keuring controleert.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-smart-home-domotica-arei-editorial.jpg","\u002Fblog\u002Fsmart-home-domotica-arei.nl",{"title":39297,"description":39549},"domotica-arei","blog\u002Fsmart-home-domotica-arei.nl",[39557,18467,32906,39558,39559,39560,17499],"smart-home","shelly","din-rail","huisautomatisering","Jb9rDKMaIxqOiTuF0YWb2kCADvi3wu8SM4EADXVn0Eo",{"id":39563,"title":39564,"articleId":39565,"body":39566,"category":1493,"date":39944,"description":39945,"extension":1496,"image":39579,"lastUpdated":15381,"locale":1497,"meta":39946,"navigation":1499,"ogImage":39947,"path":39948,"publishDate":39944,"readTime":7016,"refreshInterval":11097,"seo":39949,"seoTitle":39950,"slug":39951,"stem":39952,"tags":39953,"__hash__":39956,"kind":1515,"href":28435},"blog\u002Fblog\u002Fhome-battery-arei.nl.md","Thuisbatterij en AREI: Batterijopslag correct integreren in de elektroinstallatie","home-battery-arei",{"type":9,"value":39567,"toc":39929},[39568,39574,39580,39584,39587,39590,39594,39597,39600,39603,39606,39610,39613,39626,39655,39658,39662,39665,39668,39671,39675,39681,39684,39687,39691,39694,39697,39702,39707,39710,39714,39738,39742,39745,39749,39775,39778,39782,39785,39788,39791,39794,39797,39801,39804,39878,39881,39885,39888,39891,39895,39898,39901,39906,39921],[12,39569,39570,39573],{},[15,39571,39572],{},"Voor een huishoudelijke thuisbatterij heeft het AREI geen eigen hoofdstuk – de algemene voorschriften van Boek 1 over bescherming tegen elektrische schokken, overstroom, scheiding en overspanning zijn van toepassing."," Het concrete ontwerp volgt uit AC- of DC-koppeling, omvormer, netparallel bedrijf, backup, fabrikantgegevens en de aansluitprocedure van de netbeheerder. Deze gids geeft je een documenteerbaar controlepad van beveiligingsconcept over eendraadschema tot aanmelding.",[12,39575,39576],{},[22,39577],{"alt":39578,"src":39579},"Twee installateurs plaatsen een gesloten thuisbatterij.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-home-battery-arei-editorial.webp",[41,39581,39583],{"id":39582},"functie-en-reglementaire-context","Functie en reglementaire context",[12,39585,39586],{},"Een batterij slaat overschot op en levert het later. Hoeveel netafname of kosten je werkelijk bespaart, hangt af van gemeten verbruik en PV, bruikbare capaciteit, rendement, sturing, tarief, veroudering en bedrijfswijze. Een vaste besparing of terugverdientijd onderbouw je alleen met tijdreeksen en een gedateerd tariefmodel.",[12,39588,39589],{},"Reglementair is het beeld duidelijk: hoofdstuk 7.103 regelt industriële accumulatorenbatterijen en sluit batterijen en laadtoestellen in huishoudelijke installaties uitdrukkelijk uit (afdeling 7.103.1). Voor de thuisbatterij gelden dus de algemene delen van Boek 1: bescherming tegen elektrische schokken, overstroom, keuze van materieel, scheiding en documentatie. Bij gekoppelde PV geldt hoofdstuk 7.112 voor het huishoudelijke PV-deel tot 10 kVA; het batterijdeel zelf valt daar niet onder.",[41,39591,39593],{"id":39592},"ac-aansluiting-beveiliging-en-leiding","AC-aansluiting, beveiliging en leiding",[12,39595,39596],{},"De batterij- of hybride omvormer is in het ontwerp een bron. Stroomkring, overstroombeveiliging, doorsnede, type differentieelschakelaar en schakelvermogen volgen uit toestelgegevens, aardingssysteem, plaatsingsvoorwaarden, fabrikant en AREI. “Altijd 20 A op 2,5 mm²” of “driefasig altijd type B” zijn vuistregels die geen controle doorstaan. Ingebouwde foutstroombewaking telt alleen zover de documenten van het exacte model en de regels dat toestaan.",[12,39598,39599],{},"Waar de aftakking in het bord komt – vóór of achter welke differentieelschakelaar – leg je vast op basis van beveiligingsconcept, aardingssysteem en fabrikantgegevens. Een standaardpositie bestaat niet.",[12,39601,39602],{},"Het project vraagt een traceerbaar scheidingsconcept. Welke polen, geïntegreerde functies en extra scheiders nodig zijn, hangt af van topologie, fabrikantbewijs en voorschriften. Teken de echte scheiders in het schema; hun geschiktheid bewijs je met de toestelgegevens. Voor overspanningsbeveiliging legt AREI 4.5.1 het beginsel vast dat personen en goederen tegen de schadelijke gevolgen van overspanningen worden beschermd, onder meer door atmosferische verschijnselen of schakelingen. Een bepaald type schrijft die afdeling niet voor; toesteltype, plaats en voorbeveiliging kies je per project.",[12,39604,39605],{},"Plaats, temperatuur, afstanden, ventilatie en brandvoorwaarden volgen uit technologie, handleiding en de risicoanalyse van het project. Eén grens van 35 °C of dezelfde celchemie voor alle producten bestaat niet. Bewaar producttype, bedrijfsgrenzen en montage-instructies in het dossier.",[41,39607,39609],{"id":39608},"ac-en-dc-koppeling-tekenen","AC- en DC-koppeling tekenen",[12,39611,39612],{},"Scheid AC, DC en bedrijfsstanden. Toon per pad bron, omzetting, beveiliging, scheiding en bestemming. Bij DC-koppeling delen PV en batterij een hybride omvormer, maar houden ze eigen elektrische grenzen en fabrikantvoorwaarden. Bij AC-koppeling voedt een aparte batterijomvormer de AC-zijde. Het vermogen van alle bronnen blijft zichtbaar in de beoordeling van aansluiting en verdeelbord.",[12,39614,39615,39616,702,39619,1628,39622,39625],{},"Markeer elke waarde als ",[15,39617,39618],{},"bekend",[15,39620,39621],{},"uit fabrikantbewijs",[15,39623,39624],{},"te controleren",". Noteer minstens:",[1450,39627,39628,39631,39634,39637,39640,39643,39646,39649,39652],{},[1453,39629,39630],{},"actief en schijnbaar vermogen en maximale stroom per modus;",[1453,39632,39633],{},"faseaantal en voorgenomen faseverdeling;",[1453,39635,39636],{},"batterijspanningsgebied en bruikbare capaciteit;",[1453,39638,39639],{},"kabeltype, geleiders, doorsnede en plaatsingswijze per segment;",[1453,39641,39642],{},"overstroom-, foutstroom- en overspanningsbeveiliging met kenmerken;",[1453,39644,39645],{},"AC- en DC-scheidingspunten;",[1453,39647,39648],{},"meter, sturing of begrenzer voor vermogensbeheer;",[1453,39650,39651],{},"firmware of variant waarop de Synergrid-vermelding betrekking heeft;",[1453,39653,39654],{},"onderscheid tussen netparallel en eilandbedrijf.",[12,39656,39657],{},"Een omvormerwissel kan beveiliging, aansluitvermogen, homologatie en melding wijzigen terwijl de batterijcapaciteit gelijk blijft. Werk het dossier daarom bij op componentniveau, niet alleen op merknaam.",[41,39659,39661],{"id":39660},"backup-is-een-afzonderlijk-ontwerp","Backup is een afzonderlijk ontwerp",[12,39663,39664],{},"Een product dat “backup” vermeldt, voedt bij netuitval niet automatisch de volledige woning. Omschakeling, veilige netscheiding, behandeling van de nulgeleider, aarding in eilandbedrijf, gekozen lasten, aanloopstromen en gedrag bij lege batterij ontwerp je uitdrukkelijk. Commerciële termen zoals EPS, backup en whole-home backup zijn geen onderling verwisselbare reglementaire categorieën.",[12,39666,39667],{},"Maak een lastlijst voor het noodgedeelte. Verlichting, communicatie, koeling en verwarming hebben andere prioriteiten en startstromen. Duid op het situatieplan aan welke kringen tijdens noodbedrijf gevoed worden, en bepaal of een afzonderlijk onderbord of selectieve omschakeling nodig is. Een bevoegde vakpersoon zorgt ervoor dat geen gevaarlijke terugvoeding naar een afgeschakeld distributienet kan ontstaan.",[12,39669,39670],{},"Voor het PV-deel van een gekoppelde installatie noemt afdeling 7.112.2 waarschuwingsborden met “Niet onderbreken bij belasting” en “Elektrische installatie altijd onder spanning”. Een vaste batterijsticker op twee voorgeschreven plaatsen volgt daar niet uit; positie en tekst van waarschuwingen leid je af uit het echte installatieconcept.",[41,39672,39674],{"id":39673},"synergrid-keuring-en-regionale-melding","Synergrid, keuring en regionale melding",[12,39676,39677,39678,39680],{},"Synergrid stelt dat elektriciteitsproductie-eenheden die parallel met het Belgische distributienet werken of daartoe technisch in staat zijn, aan C10\u002F11 ed.2.4 moeten voldoen. Batterij- en hybride omvormers vallen onder de C10\u002F26-typehomologatie. Controleer exact model, variant en firmware in de actuele lijst, bijvoorbeeld met de ",[30,39679,29367],{"href":29366},"; een bekende merknaam volstaat niet.",[12,39682,39683],{},"Fluvius vermeldt in Vlaanderen dat opslagsystemen gemeld worden en koppelt de aansluiting onder meer aan AREI-keuring en technische Synergrid-bepalingen. Wallonië en Brussel hebben eigen bevoegde operatoren en procedures. Een Vlaamse vermogensgrens, formulier of volgorde neem je dus niet ongecontroleerd over voor een ander aansluitadres. Controleer dit vóór bestelling en opnieuw vóór indiening.",[12,39685,39686],{},"Het dossier omvat bijgewerkte schema's, technische fiches, installatie- en beschermingsinstructies, Synergrid-bewijs, instellingen van de netinterface, controleverslag en bevestiging van de regionale melding. Noteer wie uitvoerde en welke parameters bij ingebruikname werden bevestigd.",[41,39688,39690],{"id":39689},"materiaalkeuze-en-economie-scheiden","Materiaalkeuze en economie scheiden",[12,39692,39693],{},"Vergelijk gedateerde fabrikantgegevens en de exacte homologatie, geen snel verouderende merkenlijst. Noteer AC-vermogen, fasen, spanningsgebied, bruikbare capaciteit, beveiligingsfuncties, firmware, parallel- en backupgedrag en uitbreidingsvoorwaarden.",[12,39695,39696],{},"Een bewerkbaar economisch scenario is:",[12,39698,39699],{},[1300,39700,39701],{},"jaareffect = vermeden afname + gewaardeerde diensten − extra verliezen − lopende kosten",[12,39703,39704],{},[1300,39705,39706],{},"scenarioduur = investering \u002F voorzichtig geraamd netto jaareffect",[12,39708,39709],{},"Dit zijn scenario's, geen voorspellingen. Gebruik gemeten profielen, bruikbare in plaats van nominale capaciteit, laad- en ontlaadverlies, vermogenslimieten, degradatie, garantie en een transparant tariefpad. Premies en netkosten zijn regionaal en tijdsgevoelig; controleer ze vlak vóór je beslissing.",[41,39711,39713],{"id":39712},"actuele-primaire-bronnen","Actuele primaire bronnen",[1450,39715,39716,39723,39730],{},[1453,39717,39718,39722],{},[30,39719,39721],{"href":28056,"rel":39720},[2532],"FOD Economie: AREI Boek 1 versie 06",", inclusief de DC-wijzigingen die sinds 1 april 2026 gelden; afdelingen 4.5.1, 7.103.1 en 7.112.2.",[1453,39724,39725,39729],{},[30,39726,39728],{"href":28555,"rel":39727},[2532],"Synergrid: homologatie decentrale productie",", C10\u002F11 ed.2.4 en C10\u002F26 voor netparallelle of technisch capabele batterij- en hybride omvormers.",[1453,39731,39732,39737],{},[30,39733,39736],{"href":39734,"rel":39735},"https:\u002F\u002Fwww.fluvius.be\u002Fnl\u002Fgroene-energie\u002Fthuisbatterij\u002Fopslagsysteem-aanmelden",[2532],"Fluvius: opslagsysteem aanmelden",", primaire regionale bron voor Vlaanderen.",[41,39739,39741],{"id":39740},"thuisbatterij-en-planelec","Thuisbatterij en PlanElec",[12,39743,39744],{},"PlanElec verbindt grondplan, elektrische topologie, verdeelbord en exports in één project; voor PV zijn strings, omvormer en bronbeveiliging gestructureerd uitgewerkt. Het datamodel kan meerdere bronnen al in het stroompad meenemen. Thuisbatterijen zijn wel nog geen volledig gepubliceerde workflow met eigen palet, eigenschappen, weergave en export. Voor de batterij betekent dat: beveiligings- en scheidingsconcept, backupzone en melding documenteer je op basis van de fabrikantstukken, en een batterijsymbool op het plan is nog geen gecontroleerd batterijontwerp. De rollen zijn duidelijk: de AREI\u002FRGIE-zelfcontrole toont je bevindingen binnen de ondersteunde regels, de keuring doet het erkende organisme.",[41,39746,39748],{"id":39747},"projectcheck-vóór-uitvoering","Projectcheck vóór uitvoering",[1602,39750,39751,39754,39757,39760,39763,39766,39769,39772],{},[1453,39752,39753],{},"Beschrijf netparallel bedrijf, nul-injectie en backup afzonderlijk.",[1453,39755,39756],{},"Noteer exact omvormermodel, firmware en actuele Synergrid-status.",[1453,39758,39759],{},"Teken AC- en DC-koppeling met alle energiepaden.",[1453,39761,39762],{},"Leid beveiliging en scheiding af uit fabrikantbewijs en AREI.",[1453,39764,39765],{},"Kopieer kabel- en plaatsgegevens niet uit een voorbeeld.",[1453,39767,39768],{},"Controleer de gevolgen voor bestaande PV, meter, aansluiting en faseverdeling.",[1453,39770,39771],{},"Stem keuring en melding af met de operator van het adres.",[1453,39773,39774],{},"Bewaar na ingebruikname instellingen, schema's, verslag en meldingsbevestiging.",[12,39776,39777],{},"Veelgemaakte documentatiefouten zijn AC- en DC-varianten verwarren, C10\u002F26 alleen op merk controleren, de omschakeling uit een backupschema weglaten en na een omvormerwissel het oude schema bewaren. Ook een fabrikantvoorbeeld van automaat of differentieelschakelaar neem je niet als universele regel over. Een duidelijk gemarkeerd open punt is altijd beter dan een aannemelijke maar verzonnen waarde.",[41,39779,39781],{"id":39780},"van-ontwerp-naar-ingebruikname","Van ontwerp naar ingebruikname",[12,39783,39784],{},"Maak vóór de werken een ontwerpversie met expliciete aannames. Geef elk toestel een stabiele referentie die terugkomt in eendraadschema, situatieplan, instellingenlijst en handleidingen. Noteer welke bescherming de installateur nog moet berekenen of bevestigen. Zo beoordeel je een latere productwijziging gericht: veranderde alleen de behuizing, of ook stroom, foutstroombewaking, scheidingsfunctie en homologatie?",[12,39786,39787],{},"Controleer bij levering typeplaat, firmware en compatibiliteitslijst. Een offerte met een productfamilie bewijst niet dat de geleverde variant dezelfde eigenschappen heeft. Leg afwijkingen vast vóór aansluiting. Werk na uitvoering de ontwerpwaarden bij naar de werkelijk geïnstalleerde waarden en bewaar een gedateerde export. De eigenaar weet daarna welke delen bij noodbedrijf gevoed blijven, hoe een normale uitschakeling verloopt en welke handelingen alleen een vakpersoon mag uitvoeren.",[12,39789,39790],{},"Bij latere uitbreiding telt niet alleen extra kWh. Meer batterijmodules beïnvloeden laad- of ontlaadstromen, beveiliging, kabelbelasting, warmteontwikkeling en garantievoorwaarden. Een software-update kan instellingen of homologatievoorwaarden raken. Behandel uitbreiding en firmwarewijziging daarom als gecontroleerde wijziging met fabrikantbewijs, niet als administratieve notitie.",[12,39792,39793],{},"Maak bij oplevering één gedateerde instellingenfiche. Noteer exact model, variant en firmware, toegelaten netparallelle en eilandmodi, werkelijk ingestelde vermogensgrenzen, gebruikte beveiligingstoestellen en de versie van schema's en handleidingen. Koppel elke waarde aan typeplaat, fabrikantdocument of meetverslag in plaats van aan een productfamilie uit de offerte.",[12,39795,39796],{},"Vergelijk bij een latere software-update, uitbreiding of vervanging eerst met die basis. Controleer gericht of foutstroombewaking, scheidingsfunctie, behandeling van de nulgeleider, homologatie en regionale melding ongewijzigd blijven. Zo beschouw je een wijziging niet ten onrechte als louter administratief, en geeft de verantwoordelijke vakpersoon precies aan welke nieuwe beoordeling, meting of documentversie nodig is.",[41,39798,39800],{"id":39799},"voorbeeld-van-een-gegevensblad-per-energiepad","Voorbeeld van een gegevensblad per energiepad",[12,39802,39803],{},"Gebruik voor elk segment dezelfde velden:",[49,39805,39806,39815],{},[52,39807,39808],{},[55,39809,39810,39812],{},[58,39811,9870],{},[58,39813,39814],{},"Voorbeeld van de status, niet van de waarde",[68,39816,39817,39825,39833,39841,39849,39856,39864,39871],{},[55,39818,39819,39822],{},[73,39820,39821],{},"Van \u002F naar",[73,39823,39824],{},"bekende componentreferenties",[55,39826,39827,39830],{},[73,39828,39829],{},"Bedrijfsmodus",[73,39831,39832],{},"netparallel, laden, ontladen of eiland",[55,39834,39835,39838],{},[73,39836,39837],{},"Spanning en stroom",[73,39839,39840],{},"uit typeplaat of nog te meten\u002Fberekenen",[55,39842,39843,39846],{},[73,39844,39845],{},"Geleider",[73,39847,39848],{},"type, aantal, doorsnede en plaatsingswijze",[55,39850,39851,39853],{},[73,39852,1802],{},[73,39854,39855],{},"toestelreferentie en ingestelde kenmerken",[55,39857,39858,39861],{},[73,39859,39860],{},"Scheiding",[73,39862,39863],{},"fysiek toestel en bedieningsplaats",[55,39865,39866,39868],{},[73,39867,3189],{},[73,39869,39870],{},"fabrikantfiche, berekening of controlebevinding",[55,39872,39873,39875],{},[73,39874,3606],{},[73,39876,39877],{},"bevestigd, aannemelijk of ontbrekend",[12,39879,39880],{},"Die laatste status voorkomt dat een leeg veld stilletjes als nul gelezen wordt. Ze richt ook de vakcontrole: alleen ontbrekende of tegenstrijdige informatie vraagt nader onderzoek.",[41,39882,39884],{"id":39883},"wat-een-zelfcontrole-ziet-en-wat-ter-plaatse-blijft","Wat een zelfcontrole ziet – en wat ter plaatse blijft",[12,39886,39887],{},"Een projectmodel kent de ingevoerde gegevens. Een beschadigde kabel, losse verbinding, verkeerde klem, ontoereikende ventilatie, feitelijke aardingswaarde of niet-geregistreerde firmware zie je ter plaatse. Of fabrikantinstellingen correct zijn toegepast, bevestigt de inbedrijfstelling. Gebruik softwaremeldingen daarom als voorbereidende lijst en combineer ze met vakinspectie, metingen en officiële controle waar vereist.",[12,39889,39890],{},"Een groene uitkomst voor een ondersteunde regel zegt niets over regels die niet uit de beschikbare gegevens beslisbaar zijn. Ontbrekende informatie blijft zichtbaar als ontbrekend. Vooral bij meerdere bronnen is een duidelijke waarschuwing dat beoordeling nog niet mogelijk is waardevoller dan een onvolledige positieve conclusie.",[41,39892,39894],{"id":39893},"beslissen-zonder-rendementsclaim","Beslissen zonder rendementsclaim",[12,39896,39897],{},"Maak minstens drie economische scenario's: voorzichtig, midden en gunstig. Varieer eigen verbruik, tarief, verlies, degradatie en vervangingskosten afzonderlijk. Gebruik geen historische premie alsof ze vandaag geldt en behandel een toekomstig energietarief als aanname. Vergelijk daarnaast niet-financiële doelen zoals beperkte noodvoeding of vermogensbeheer, met hun technische randvoorwaarden.",[12,39899,39900],{},"Een batterij kan bij een bepaald profiel zinvol zijn zonder dat er een universele terugverdientijd bestaat. Omgekeerd bewijst een aantrekkelijke simulatie niet dat aansluiting, beveiliging en gebruik toegelaten zijn. Houd de economische beslissing en de elektrische conformiteitsbeoordeling als twee aparte sporen in hetzelfde dossier.",[12,39902,39903],{},[15,39904,39905],{},"Gerelateerde artikelen:",[1450,39907,39908,39912,39916],{},[1453,39909,39910],{},[30,39911,39531],{"href":17449},[1453,39913,39914],{},[30,39915,39521],{"href":32848},[1453,39917,39918],{},[30,39919,39920],{"href":26440},"Kabeldoorsnede en automaat: de juiste combinatie",[12,39922,39923,2725,39926],{},[15,39924,39925],{},"Leg je projectgegevens gestructureerd vast in PlanElec – beveiliging, uitvoering en melding stem je af met vakpersoon en netbeheerder.",[30,39927,38690],{"href":38688,"rel":39928},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":39930},[39931,39932,39933,39934,39935,39936,39937,39938,39939,39940,39941,39942,39943],{"id":39582,"depth":1468,"text":39583},{"id":39592,"depth":1468,"text":39593},{"id":39608,"depth":1468,"text":39609},{"id":39660,"depth":1468,"text":39661},{"id":39673,"depth":1468,"text":39674},{"id":39689,"depth":1468,"text":39690},{"id":39712,"depth":1468,"text":39713},{"id":39740,"depth":1468,"text":39741},{"id":39747,"depth":1468,"text":39748},{"id":39780,"depth":1468,"text":39781},{"id":39799,"depth":1468,"text":39800},{"id":39883,"depth":1468,"text":39884},{"id":39893,"depth":1468,"text":39894},"2026-06-02","Zo documenteer je een Belgische thuisbatterij: energiepaden, beveiliging, Synergrid-homologatie, keuring en regionale melding – zonder rendementsbelofte.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-home-battery-arei-editorial.jpg","\u002Fblog\u002Fhome-battery-arei.nl",{"title":39564,"description":39945},"Thuisbatterij en AREI: batterijopslag correct integreren","thuisbatterij-arei","blog\u002Fhome-battery-arei.nl",[39954,28877,32906,29610,29611,3273,39955],"batterijopslag","noodstroom","O65eoIGwKnJ5Nw0fZrSb1JEUmKEsWuKYVwMfdqQIHHU",{"id":39958,"title":39959,"articleId":39960,"body":39961,"category":19087,"date":40194,"description":40195,"extension":1496,"image":39981,"lastUpdated":15381,"locale":1497,"meta":40196,"navigation":1499,"ogImage":40197,"path":40198,"publishDate":40194,"readTime":19590,"refreshInterval":11097,"seo":40199,"seoTitle":40200,"slug":40201,"stem":40202,"tags":40203,"__hash__":40208,"kind":1515,"href":27076},"blog\u002Fblog\u002Fsmoke-detector-mandatory.nl.md","Rookmelder verplicht in België: Vlaanderen, Wallonië, Brussel","smoke-detector-mandatory",{"type":9,"value":39962,"toc":40182},[39963,39967,39976,39982,39986,40036,40039,40046,40049,40056,40059,40066,40070,40076,40079,40093,40096,40100,40127,40131,40142,40144,40159],[41,39964,39966],{"id":39965},"kort-antwoord-ja-in-alle-drie-de-gewesten","Kort antwoord: ja, in alle drie de gewesten",[12,39968,39969,39972,39973,39],{},[15,39970,39971],{},"Ja, rookmelders zijn in België verplicht – in Vlaanderen, Wallonië en Brussel voor alle woningen, gehuurd of door de eigenaar bewoond."," Dat staat in het woonrecht van de gewesten, niet in het AREI. Daarom verschillen startdatum, aantal en plaatsing per gewest. Overal geldt: de melder is CE-gemarkeerd en voldoet aan de norm ",[15,39974,39975],{},"NBN EN 14604",[12,39977,39978],{},[22,39979],{"alt":39980,"src":39981},"Een elektricien monteert een rookmelder aan het plafond van een gang.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-smoke-detector-mandatory-editorial.webp",[41,39983,39985],{"id":39984},"de-regels-per-gewest","De regels per gewest",[49,39987,39988,40001],{},[52,39989,39990],{},[55,39991,39992,39995,39998],{},[58,39993,39994],{},"Gewest",[58,39996,39997],{},"Verplicht voor alle woningen sinds",[58,39999,40000],{},"Minimale uitrusting",[68,40002,40003,40014,40025],{},[55,40004,40005,40008,40011],{},[73,40006,40007],{},"Vlaanderen",[73,40009,40010],{},"1 januari 2020",[73,40012,40013],{},"minstens 1 melder per bouwlaag, ook in rechtstreeks toegankelijke kelders en zolders",[55,40015,40016,40019,40022],{},[73,40017,40018],{},"Wallonië",[73,40020,40021],{},"1 juli 2006 (bestaande woningen)",[73,40023,40024],{},"1 melder per woonlaag, 2 bij meer dan 80 m² per laag",[55,40026,40027,40030,40033],{},[73,40028,40029],{},"Brussel",[73,40031,40032],{},"1 januari 2025 (huurwoningen al sinds 1 juli 2005)",[73,40034,40035],{},"melders langs de vluchtweg van slaapkamer naar voordeur",[1396,40037,40007],{"id":40038},"vlaanderen",[12,40040,40041,40042,40045],{},"Elke zelfstandige woning – eengezinswoning, appartement of studio – heeft op ",[15,40043,40044],{},"elke bouwlaag minstens één rookmelder",". Kelders en zolders tellen mee als ze rechtstreeks toegankelijk zijn of er een technische installatie staat. In kamerwoningen hangt er bovendien in elke kamer een melder. Aanbevolen is daarnaast een melder in elke ruimte op de kortste vluchtweg van de slaapkamer naar buiten. Bij verhuur koopt en plaatst de verhuurder de melders; zonder melders is er geen conformiteitsattest.",[1396,40047,40018],{"id":40048},"wallonië",[12,40050,40051,40052,40055],{},"Verplicht is ",[15,40053,40054],{},"één melder op elke laag met minstens één woonvertrek",", bij voorkeur in hallen en gangen: in de inkomhal, op de overloop of in de ruimte waar de trap uitkomt. Is een laag groter dan 80 m², dan komen er twee; een appartement op één laag heeft onder 80 m² één melder, daarboven twee. Vanaf vier verplichte melders worden ze onderling gekoppeld of vervangen door een centrale branddetectie-installatie. Bij verhuur draagt de eigenaar plaatsing en vervanging, de huurder het vervangen van de batterij.",[1396,40057,40029],{"id":40058},"brussel",[12,40060,40061,40062,40065],{},"Sinds 1 januari 2025 geldt de plicht voor ",[15,40063,40064],{},"alle woningen"," in het Brussels Hoofdstedelijk Gewest; voor huurwoningen gold ze al sinds 2005. Rookmelders hangen in elke ruimte op de weg van de verste slaapkamer naar de voordeur. Toegelaten zijn melders volgens NBN EN 14604, niet van het ionische type, met een ingebouwde batterij van tien jaar of aangesloten op het net. Vanaf vier melders zijn gekoppelde melders of een centrale installatie verplicht.",[41,40067,40069],{"id":40068},"rookmelders-en-het-arei-wat-de-keuring-controleert","Rookmelders en het AREI: wat de keuring controleert",[12,40071,40072,40075],{},[15,40073,40074],{},"Het AREI regelt rookmelders in woningen niet."," De elektrische keuring controleert de elektrische installatie; een ontbrekende rookmelder op batterij is dus geen AREI-inbreuk. Het dossier van een woning bevat eendraadschema en situatieplan (9.1.2). Het situatieplan toont borden, dozen, stopcontacten, lichtpunten, schakelaars, vaste toestellen en bronnen die op het eendraadschema staan (3.1.2.3 a).",[12,40077,40078],{},"Daaruit volgt een duidelijk onderscheid:",[1450,40080,40081,40087],{},[1453,40082,40083,40086],{},[15,40084,40085],{},"Melders op batterij"," horen niet bij de elektrische installatie en hoeven niet op het situatieplan.",[1453,40088,40089,40092],{},[15,40090,40091],{},"Melders op het net (230 V)"," hangen aan een kring. Als vast toestel staan ze zoals elke andere verbruiker op het eendraadschema en het situatieplan.",[12,40094,40095],{},"Veel installateurs tekenen ook batterijmelders informatief op het situatieplan, zodat de bewoners alle veiligheidsrelevante toestellen op één plaats terugvinden.",[41,40097,40099],{"id":40098},"onderhoud-en-vervanging","Onderhoud en vervanging",[1450,40101,40102,40108,40114,40120],{},[1453,40103,40104,40107],{},[15,40105,40106],{},"Maandelijks:"," de testknop indrukken.",[1453,40109,40110,40113],{},[15,40111,40112],{},"Regelmatig:"," stof verwijderen of opzuigen.",[1453,40115,40116,40119],{},[15,40117,40118],{},"Na 10 jaar:"," de melder vervangen – zo lang gaat hij doorgaans mee.",[1453,40121,40122,40123,40126],{},"Let bij aankoop op ",[15,40124,40125],{},"CE-markering en NBN EN 14604","; in Brussel bovendien op een ingebouwde batterij van tien jaar of een netaansluiting.",[41,40128,40130],{"id":40129},"rookmelders-plannen-in-planelec","Rookmelders plannen in PlanElec",[12,40132,12598,40133,40135,40136,40139,40140,39],{},[30,40134,1337],{"href":6989}," plaats je rookmelders rechtstreeks op het grondplan en het situatieplan. De zelfcontrole geeft daarbij een ",[15,40137,40138],{},"aanbeveling",": ze meldt slaapkamers, gangen en traphallen zonder melder en – als er geen getypeerde ruimten zijn – verdiepingen zonder melder. Omdat het AREI geen rookmelders voorschrijft, verschijnt dat als waarschuwing op basis van het gewestelijke woonrecht, niet als AREI-fout. De controle-omvang vind je in ",[30,40141,10087],{"href":2457},[41,40143,17442],{"id":17441},[1450,40145,40146,40151,40155],{},[1453,40147,40148],{},[30,40149,40150],{"href":17449},"AREI-regelgeving 2026",[1453,40152,40153],{},[30,40154,39526],{"href":38769},[1453,40156,40157],{},[30,40158,38667],{"href":38666},[12,40160,40161],{},[17563,40162,29790,40163,702,40168,702,40173,40178,40179,7763],{},[30,40164,40167],{"href":40165,"rel":40166},"https:\u002F\u002Fwww.vlaanderen.be\u002Fwoningkwaliteitsnormen\u002Frookmelders",[2532],"Rookmelders in Vlaanderen (Vlaanderen.be)",[30,40169,40172],{"href":40170,"rel":40171},"https:\u002F\u002Fwallonie.be\u002Ffr\u002Fdemarches\u002Fdisposer-de-detecteurs-incendie-dans-votre-logement",[2532],"Branddetectoren in Wallonië (wallonie.be)",[30,40174,40177],{"href":40175,"rel":40176},"https:\u002F\u002Fwww.brussel.be\u002Frookmelders-verplicht-brussel",[2532],"Rookmelders verplicht in Brussel (Stad Brussel)","; AREI Boek 1, versie 06, onderafdeling 3.1.2.3 a en afdeling 9.1.2 (",[30,40180,19073],{"href":15357,"rel":40181},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":40183},[40184,40185,40190,40191,40192,40193],{"id":39965,"depth":1468,"text":39966},{"id":39984,"depth":1468,"text":39985,"children":40186},[40187,40188,40189],{"id":40038,"depth":1486,"text":40007},{"id":40048,"depth":1486,"text":40018},{"id":40058,"depth":1486,"text":40029},{"id":40068,"depth":1468,"text":40069},{"id":40098,"depth":1468,"text":40099},{"id":40129,"depth":1468,"text":40130},{"id":17441,"depth":1468,"text":17442},"2026-05-28","Ja, rookmelders zijn in alle drie de gewesten verplicht – geregeld in het gewestelijke woonrecht, niet in het AREI. Aantal, plaatsing en startdata voor Vlaanderen, Wallonië en Brussel.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-smoke-detector-mandatory-editorial.jpg","\u002Fblog\u002Fsmoke-detector-mandatory.nl",{"title":39959,"description":40195},"Rookmelder verplicht in België: regels per gewest","rookmelder-verplicht-belgie","blog\u002Fsmoke-detector-mandatory.nl",[40204,40205,38766,40038,40206,40058,40207],"rookmelder","brandveiligheid","wallonie","veiligheid","n8KmTi7dj0vHmPVn6_d_fWmbzKCn7Z0yxQrXBoQbc-s",{"id":40210,"title":40211,"articleId":40212,"body":40213,"category":1493,"date":41049,"description":41050,"extension":1496,"image":40226,"lastUpdated":15381,"locale":1497,"meta":41051,"navigation":1499,"ogImage":41052,"path":41053,"publishDate":41049,"readTime":4035,"refreshInterval":11097,"seo":41054,"seoTitle":41055,"slug":41056,"stem":41057,"tags":41058,"__hash__":41062,"kind":1515,"href":32842},"blog\u002Fblog\u002Flaadpaal-arei.nl.md","Laadpaal installeren volgens AREI: De complete gids voor België","ev-charger-installation-arei",{"type":9,"value":40214,"toc":41012},[40215,40221,40227,40231,40332,40335,40339,40343,40350,40352,40355,40358,40361,40364,40367,40371,40375,40440,40445,40456,40461,40469,40473,40538,40543,40554,40559,40570,40574,40577,40581,40585,40588,40665,40668,40671,40677,40699,40706,40710,40713,40717,40724,40727,40731,40741,40744,40748,40754,40758,40764,40767,40771,40774,40777,40780,40783,40787,40790,40793,40797,40800,40804,40844,40848,40853,40867,40870,40874,40877,40880,40884,40928,40936,40940,40943,40945,40961,40963,40965,40978,41000,41004],[12,40216,40217,40220],{},[15,40218,40219],{},"Een laadpaal in België valt onder hoofdstuk 7.22 van AREI Boek 1: elk aansluitpunt krijgt een afzonderlijke kring met eigen overstroombeveiliging en eigen differentieelschakelaar van maximaal 30 mA, de beveiliging moet ook werken bij foutstromen met een gelijkstroomcomponent, en aansluiten via een stopcontact is verboden."," Daarbij komen een projectgerichte kabel- en beveiligingskeuze, een bijgewerkt eendraadschema en de afstemming met de netbeheerder. Deze gids neemt je door alle punten. Hoofdstuk 7.22 geldt voor laadinrichtingen waarvan de uitvoering of vervanging vanaf 1 november 2022 is gestart (7.22.1).",[12,40222,40223],{},[22,40224],{"alt":40225,"src":40226},"Een elektricien controleert een gemonteerde laadpaal.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-ev-charger-installation-arei-editorial.webp",[41,40228,40230],{"id":40229},"arei-722-in-één-oogopslag","AREI 7.22 in één oogopslag",[49,40232,40233,40246],{},[52,40234,40235],{},[55,40236,40237,40240,40243],{},[58,40238,40239],{},"Vereiste",[58,40241,40242],{},"Plaats in Boek 1 V06",[58,40244,40245],{},"Wat het betekent voor je laadpaal",[68,40247,40248,40258,40268,40278,40288,40299,40310,40321],{},[55,40249,40250,40253,40255],{},[73,40251,40252],{},"Geen aansluiting via stopcontact",[73,40254,36952],{},[73,40256,40257],{},"Vast aangesloten, niet via een garagestopcontact",[55,40259,40260,40263,40265],{},[73,40261,40262],{},"Afzonderlijke kring per aansluitpunt",[73,40264,36952],{},[73,40266,40267],{},"Twee laadpunten = twee afzonderlijke kringen",[55,40269,40270,40273,40275],{},[73,40271,40272],{},"Differentieelschakelaar ≤ 30 mA per kring",[73,40274,37078],{},[73,40276,40277],{},"Individueel per afzonderlijke wisselstroomkring, geen TN-C",[55,40279,40280,40283,40285],{},[73,40281,40282],{},"Bescherming bij storende gelijkstroomcomponent",[73,40284,37078],{},[73,40286,40287],{},"Differentieelschakelaar type B of type A met geschikte DC-foutstroomdetectie",[55,40289,40290,40293,40296],{},[73,40291,40292],{},"Overstroombeveiliging per kring",[73,40294,40295],{},"7.22.4.2",[73,40297,40298],{},"Gemeenschappelijke beveiliging alleen bij niet gelijktijdig gebruikte aansluitpunten",[55,40300,40301,40304,40307],{},[73,40302,40303],{},"Buiten minstens IP44",[73,40305,40306],{},"7.22.5.1",[73,40308,40309],{},"Geldt voor het materieel van de laadpaal in open lucht",[55,40311,40312,40315,40318],{},[73,40313,40314],{},"Aansluitpunt dicht bij de parkeerplaats",[73,40316,40317],{},"7.22.5.3",[73,40319,40320],{},"Eén aansluitpunt voedt telkens één voertuig",[55,40322,40323,40326,40329],{},[73,40324,40325],{},"Teruglevering mogelijk",[73,40327,40328],{},"7.22.5.4",[73,40330,40331],{},"Regels voor decentrale productie en waarschuwing op laadpaal en verdeelbord",[12,40333,40334],{},"De noodonderbreking van 7.22.5.2 geldt niet voor laadinrichtingen die deel uitmaken van de elektrische installatie van een wooneenheid; voor andere laadinrichtingen in gebouwen is ze verplicht.",[41,40336,40338],{"id":40337},"de-basisvereisten-in-detail","De basisvereisten in detail",[1396,40340,40342],{"id":40341},"eigen-kring","Eigen kring",[12,40344,40345,40346,40349],{},"De laadpaal ",[15,40347,40348],{},"krijgt"," een eigen, afzonderlijke kring per aansluitpunt (7.22.3). Een bestaande kring, zoals de stopcontacten in de garage, komt niet in aanmerking. De bijbehorende beveiligingen mogen in het verdeelbord, in de laadpaal of in een combinatie van beide zitten – zolang elk aansluitpunt elektrisch afzonderlijk beveiligd is.",[1396,40351,37995],{"id":17498},[12,40353,40354],{},"Bij bescherming door automatische onderbreking beschermt een eigen differentieelschakelaar van maximaal 30 mA elke afzonderlijke wisselstroomkring (7.22.4.1 b). Welk type dat moet zijn, hangt af van de laadpaal – meer daarover verderop.",[1396,40356,40357],{"id":31224},"Automaat",[12,40359,40360],{},"Een juist gedimensioneerde automaat beschermt elke afzonderlijke kring individueel tegen overbelasting en kortsluiting (7.22.4.2).",[1396,40362,31382],{"id":40363},"overspanningsbeveiliging-spd",[12,40365,40366],{},"AREI 4.5.1 vraagt algemeen bescherming tegen overspanningen volgens de regels van goed vakmanschap. Een bepaalde SPD schrijft Boek 1 niet voor; of er een nodig is, volgt uit de risicobeoordeling van de hele installatie. Wordt er een geplaatst, dan zit die meestal centraal in het verdeelbord en beschermt hij alle kringen, ook de laadpaalkring, tegen overspanningen door blikseminslag of schakelingen.",[41,40368,40370],{"id":40369},"eenfasig-vs-driefasig-welke-laadpaal","Eenfasig vs. driefasig: welke laadpaal?",[1396,40372,40374],{"id":40373},"eenfasig-37-kw-of-74-kw","Eenfasig – 3,7 kW of 7,4 kW",[49,40376,40377,40389],{},[52,40378,40379],{},[55,40380,40381,40383,40386],{},[58,40382,18883],{},[58,40384,40385],{},"3,7 kW (16 A)",[58,40387,40388],{},"7,4 kW (32 A)",[68,40390,40391,40400,40409,40418,40429],{},[55,40392,40393,40395,40398],{},[73,40394,33035],{},[73,40396,40397],{},"1-fasig, 230V",[73,40399,40397],{},[55,40401,40402,40405,40407],{},[73,40403,40404],{},"Stroomsterkte",[73,40406,22924],{},[73,40408,22951],{},[55,40410,40411,40414,40416],{},[73,40412,40413],{},"Kabeldoorsnede (voorbeeld)",[73,40415,15138],{},[73,40417,22948],{},[55,40419,40420,40423,40426],{},[73,40421,40422],{},"Automaat (voorbeeld)",[73,40424,40425],{},"20 A type C",[73,40427,40428],{},"32 A type C",[55,40430,40431,40434,40437],{},[73,40432,40433],{},"Laadtijd (50 kWh accu, berekend)",[73,40435,40436],{},"~14 uur",[73,40438,40439],{},"~7 uur",[12,40441,40442],{},[15,40443,40444],{},"Voordelen eenfasig:",[1450,40446,40447,40450,40453],{},[1453,40448,40449],{},"goedkoper in installatie",[1453,40451,40452],{},"eenvoudigere bedrading",[1453,40454,40455],{},"volstaat voor veel huishoudens met nachtlading",[12,40457,40458],{},[15,40459,40460],{},"Nadelen eenfasig:",[1450,40462,40463,40466],{},[1453,40464,40465],{},"beperkt laadvermogen",[1453,40467,40468],{},"bij 7,4 kW mogelijke scheefbelasting – stem dat af met de netbeheerder",[1396,40470,40472],{"id":40471},"driefasig-11-kw-of-22-kw","Driefasig – 11 kW of 22 kW",[49,40474,40475,40487],{},[52,40476,40477],{},[55,40478,40479,40481,40484],{},[58,40480,18883],{},[58,40482,40483],{},"11 kW (16 A)",[58,40485,40486],{},"22 kW (32 A)",[68,40488,40489,40498,40508,40518,40528],{},[55,40490,40491,40493,40496],{},[73,40492,33035],{},[73,40494,40495],{},"3-fasig, 400V",[73,40497,40495],{},[55,40499,40500,40502,40505],{},[73,40501,40404],{},[73,40503,40504],{},"3x 16 A",[73,40506,40507],{},"3x 32 A",[55,40509,40510,40512,40515],{},[73,40511,40413],{},[73,40513,40514],{},"2,5 mm² (5G2,5)",[73,40516,40517],{},"6 mm² (5G6)",[55,40519,40520,40522,40525],{},[73,40521,40422],{},[73,40523,40524],{},"20 A 3-polig type C",[73,40526,40527],{},"32 A 3-polig type C",[55,40529,40530,40532,40535],{},[73,40531,40433],{},[73,40533,40534],{},"~5 uur",[73,40536,40537],{},"~2,5 uur",[12,40539,40540],{},[15,40541,40542],{},"Voordelen driefasig:",[1450,40544,40545,40548,40551],{},[1453,40546,40547],{},"duidelijk sneller laden, als het voertuig driefasig laadt",[1453,40549,40550],{},"gelijkmatige lastverdeling",[1453,40552,40553],{},"reserve voor toekomstige voertuigen",[12,40555,40556],{},[15,40557,40558],{},"Nadelen driefasig:",[1450,40560,40561,40564,40567],{},[1453,40562,40563],{},"duurdere installatie",[1453,40565,40566],{},"driefasige aansluiting aan het verdeelbord nodig",[1453,40568,40569],{},"hogere materiaalkosten (grotere doorsnede, duurdere beveiligingen)",[1396,40571,40573],{"id":40572},"keuze-volgens-het-project","Keuze volgens het project",[12,40575,40576],{},"Het juiste laadvermogen volgt uit het project, niet uit een algemene aanbeveling. Beschikbare fasen, aansluitvermogen, hoofdbeveiliging, gelijktijdige huislast, boordlader van het voertuig, dagelijkse energiebehoefte en eventueel lastbeheer beoordeel je samen. Een hoger nominaal vermogen laadt niet sneller wanneer voertuig of aansluiting de stroom begrenzen.",[41,40578,40580],{"id":40579},"kabel-en-automaat-de-juiste-dimensionering","Kabel en automaat: de juiste dimensionering",[1396,40582,40584],{"id":40583},"overzicht-kabeldoorsneden","Overzicht kabeldoorsneden",[12,40586,40587],{},"Voor huishoudelijke installaties legt AREI-tabel 4.11 (onderafdeling 4.4.1.4) de maximale nominale stroom van de automaat per geleiderdoorsnede vast: 20 A bij 2,5 mm², 25 A bij 4 mm², 40 A bij 6 mm². Binnen die bovengrens hangt de werkelijke stroombelastbaarheid af van plaatsingswijze, groepering en omgevingstemperatuur. De tabel toont typische voorbeelden voor korte trajecten in standaardplaatsing:",[49,40589,40590,40606],{},[52,40591,40592],{},[55,40593,40594,40596,40599,40601,40603],{},[58,40595,14875],{},[58,40597,40598],{},"Kabeltype",[58,40600,32408],{},[58,40602,40422],{},[58,40604,40605],{},"Max. automaat volgens tabel 4.11",[68,40607,40608,40621,40635,40650],{},[55,40609,40610,40613,40615,40617,40619],{},[73,40611,40612],{},"3,7 kW (1F, 16A)",[73,40614,26785],{},[73,40616,15138],{},[73,40618,40425],{},[73,40620,22933],{},[55,40622,40623,40626,40629,40631,40633],{},[73,40624,40625],{},"7,4 kW (1F, 32A)",[73,40627,40628],{},"XVB 3G6",[73,40630,22948],{},[73,40632,40428],{},[73,40634,22954],{},[55,40636,40637,40640,40643,40645,40648],{},[73,40638,40639],{},"11 kW (3F, 16A)",[73,40641,40642],{},"XVB 5G2,5",[73,40644,15138],{},[73,40646,40647],{},"20 A 3P type C",[73,40649,22933],{},[55,40651,40652,40655,40658,40660,40663],{},[73,40653,40654],{},"22 kW (3F, 32A)",[73,40656,40657],{},"XVB 5G6",[73,40659,22948],{},[73,40661,40662],{},"32 A 3P type C",[73,40664,22954],{},[12,40666,40667],{},"Curve C is een gangbare keuze, geen AREI-voorschrift; handleiding en selectiviteit zijn bepalend. Bij lange kabeltrajecten (ruwweg meer dan 15 m) verhoog je zo nodig de doorsnede om de spanningsval te beperken: 5.2.1.2 b vraagt dat de spanningsverandering verenigbaar is met een veilige werking, en 5.2.5 beperkt ze tot de waarden volgens de regels van goed vakmanschap. Plan de kabelroute vooraf en reken de spanningsval na.",[1396,40669,40598],{"id":40670},"kabeltype",[12,40672,40673,40674,16018],{},"In België gebruikt men voor vast aangelegde installaties doorgaans ",[15,40675,40676],{},"XVB-kabel",[1450,40678,40679,40684,40689,40694],{},[1453,40680,40681,40683],{},[15,40682,26785],{}," voor eenfasig 16 A",[1453,40685,40686,40688],{},[15,40687,40628],{}," voor eenfasig 32 A",[1453,40690,40691,40693],{},[15,40692,40642],{}," voor driefasig 16 A",[1453,40695,40696,40698],{},[15,40697,40657],{}," voor driefasig 32 A",[12,40700,40701,40702,40705],{},"Bij plaatsing in een installatiebuis (Preflex) komen ",[15,40703,40704],{},"VOB-enkelgeleiders"," (H07V-U) in aanmerking; de buis moet daarvoor voldoende ruim zijn.",[41,40707,40709],{"id":40708},"type-differentieelschakelaar-het-belangrijkste-beveiligingstoestel","Type differentieelschakelaar: het belangrijkste beveiligingstoestel",[12,40711,40712],{},"De keuze van de juiste differentieelschakelaar is bij laadpalen doorslaggevend – en kan flinke kostenverschillen geven. AREI 7.22.4.1 b vraagt dat de bescherming blijft werken bij isolatiefouten met een storende gelijkstroomcomponent: via een daarvoor gebouwde differentieelschakelaar, of via een differentieelschakelaar samen met een gecoördineerd detectietoestel voor DC-foutstroom dat de laadpaal uitschakelt.",[1396,40714,40716],{"id":40715},"type-a-dc-foutstroomdetectie-in-de-laadpaal-rdc-dd","Type A + DC-foutstroomdetectie in de laadpaal (RDC-DD)",[12,40718,40719,40720,40723],{},"Type A alleen dekt gelijkstroomfoutstromen niet af. Documenteert de fabrikant voor de exacte laadpaal een geschikte ingebouwde DC-foutstroomdetectie (typisch 6 mA DC, RDC-DD genoemd), dan kan die met een voorgeschakelde ",[15,40721,40722],{},"differentieelschakelaar type A van 30 mA"," de tweede variant van 7.22.4.1 b vormen. Zonder dat productbewijs neem je die combinatie niet aan.",[12,40725,40726],{},"Het gekozen type A past bij net, pooltal, nominale waarde en de gedocumenteerde voorwaarden van de laadpaal. Een prijsbereik noemen we zonder die gegevens bewust niet.",[1396,40728,40730],{"id":40729},"type-b-als-de-laadpaal-geen-dc-sensor-heeft","Type B (als de laadpaal geen DC-sensor heeft)",[12,40732,40733,40734,40736,40737,40740],{},"Heeft je laadpaal ",[15,40735,17871],{}," ingebouwde DC-foutstroomdetectie, dan heb je een ",[15,40738,40739],{},"differentieelschakelaar type B"," nodig. Die detecteert ook gladde gelijkstroomfoutstromen die bij laders kunnen optreden.",[12,40742,40743],{},"Controleer de fabrikantverklaring over DC-foutstroomdetectie. Of laadpaal en voorgeschakelde differentieelschakelaar samen aan de eisen voldoen, bewijst die verklaring – niet de productnaam.",[1396,40745,40747],{"id":40746},"type-a-si","Type A-SI",[12,40749,2042,40750,40753],{},[15,40751,40752],{},"differentieelschakelaar type A-SI"," is volgens de fabrikant beter bestand tegen bepaalde storingsimpulsen, maar dekt op zichzelf de eis voor gelijkstroomfoutstromen niet af. De gedocumenteerde beveiligingscombinatie is bepalend.",[41,40755,40757],{"id":40756},"overspanningsbeveiliging-spd-centraal-voor-de-hele-installatie","Overspanningsbeveiliging (SPD) – centraal voor de hele installatie",[12,40759,40760,40761,40763],{},"AREI 4.5.1 vraagt algemeen bescherming tegen overspanningen volgens de regels van goed vakmanschap. Een algemene SPD-plicht volgt daar niet uit. Wordt er een ",[15,40762,37425],{}," geplaatst, dan zit die in de praktijk in het verdeelbord en beschermt hij alle aangesloten toestellen, ook de laadpaal, tegen transiënte overspanningen. Het AREI noemt geen concreet \"type 2\" – die typeaanduiding komt uit de productnorm IEC 61643-11.",[12,40765,40766],{},"De voorbeveiliging van de SPD (smeltzekering of automaat) leg je vast volgens de fabrikantvoorschriften.",[41,40768,40770],{"id":40769},"netbeheerder-en-richting-van-de-energiestroom","Netbeheerder en richting van de energiestroom",[12,40772,40773],{},"Meldings-, aansluitings- en capaciteitsvoorwaarden leid je niet algemeen af uit een nominaal vermogen. Controleer vóór bestelling de actuele voorwaarden van de netbeheerder die bevoegd is voor het adres. Houd EAN-code, aansluitingstype, gepland laadvermogen, fasen, lastbeheer en exacte productbeschrijving bij de hand.",[12,40775,40776],{},"Leg uitdrukkelijk vast of energie alleen van net naar voertuig of in beide richtingen kan stromen. Synergrid vermeldt dat bidirectionele of technisch bidirectionele laders onder C10\u002F11 editie 2.4 vallen en een C10\u002F26-typehomologatie vereisen. Zuiver unidirectionele net-naar-voertuigladers vereisen onder die regel geen C10\u002F26; andere meldingen of netbeheerdervoorwaarden kunnen wel gelden. Kan de laadpaal terugleveren, dan vraagt AREI 7.22.5.4 bovendien de regels voor decentrale productie-eenheden en de waarschuwing “Opgelet: mogelijke teruglevering van elektrische energie in de installatie” op laadpaal en verdeelbord.",[12,40778,40779],{},"Leg het antwoord vast met exact model en fabrikantverklaring. Teruglevering alleen via software uitschakelen volstaat niet wanneer het toestel technisch bidirectioneel blijft; Synergrid noemt ook die technische mogelijkheid uitdrukkelijk. Na een wijziging van firmware, bedrijfsmodus of aansluitvermogen controleer je de netvraag opnieuw. Bewaar bevestiging, productgegevens en eventuele homologatiereferentie in het installatiedossier, zodat elektricien, netbeheerder en keuringsorganisme dezelfde variant beoordelen.",[12,40781,40782],{},"Documenteer vóór ingebruikname ook fasetoewijzing, ingestelde stroomgrens, lastbeheer en gedrag bij communicatie-uitval. Die bedrijfsparameters zijn geen elektrische beveiliging, maar bepalen wel het werkelijk gevraagde aansluitvermogen en sluiten aan op het ontwerp.",[1396,40784,40786],{"id":40785},"leg-de-opleverinstellingen-samen-vast","Leg de opleverinstellingen samen vast",[12,40788,40789],{},"Maak voor elektricien, gebruiker en latere controleur een beknopt ingebruiknameblad: exact toestelmodel, geïnstalleerde firmware, een- of driefasige werking, maximale stroom, voorbeveiliging, differentieelconcept, DC-foutstroomdetectie en kabeltype. Bij dynamisch lastbeheer komen meetpunt, communicatiepad, gedrag bij uitval en de werkelijk ingestelde begrenzing erbij. Wijkt een gegeven af van handleiding, schema of bordopschrift, dan los je dat op vóór gebruik.",[12,40791,40792],{},"Bepaal ook wie instellingen mag wijzigen en hoe zo'n wijziging in het dossier terechtkomt. Een later verhoogde laadstroom belast kabel, beveiliging, aansluitcapaciteit en selectiviteit anders dan de beoordeelde configuratie. Bewaar daarom het instellingenbewijs samen met foto's van de labels, technische fiche, conformiteitsdocumenten en keuringsverslag. Een toestelvervanging is meer dan een nieuwe behuizing: beveiligingscombinatie, communicatiemethode, laadwijze en mogelijke teruglevercapaciteit beoordeel je voor het nieuwe model opnieuw. Zo blijft geen elektrisch relevante software- of toestelconfiguratie onzichtbaar naast de plannen bestaan.",[41,40794,40796],{"id":40795},"eendraadschema-bijwerken","Eendraadschema bijwerken",[12,40798,40799],{},"Na de installatie van een laadpaal werk je het eendraadschema van je elektrische installatie bij. De laadpaal verschijnt als eigen aftakking:",[1396,40801,40803],{"id":40802},"wat-moet-in-het-schema-staan","Wat moet in het schema staan?",[1602,40805,40806,40811,40816,40821,40826,40832,40838],{},[1453,40807,40808,40810],{},[15,40809,40342],{}," per aansluitpunt",[1453,40812,40813,40815],{},[15,40814,37995],{}," met type (A of B) en aanspreekstroom",[1453,40817,40818,40820],{},[15,40819,40357],{}," met nominale stroom en pooltal",[1453,40822,40823,40825],{},[15,40824,37425],{}," (overspanningsbeveiliging), voor zover aanwezig",[1453,40827,40828,40831],{},[15,40829,40830],{},"Laadpaalsymbool"," met vermogen en aantal aansluitpunten",[1453,40833,40834,40837],{},[15,40835,40836],{},"Kabelaanduiding"," (bijv. XVB 5G2,5)",[1453,40839,40840,40843],{},[15,40841,40842],{},"Fasetoewijzing"," (bij driefasig: L1\u002FL2\u002FL3)",[1396,40845,40847],{"id":40846},"laadpaal-in-planelec","Laadpaal in PlanElec",[12,40849,12598,40850,40852],{},[15,40851,1337],{}," documenteer je de laadpaal rechtstreeks in het project:",[1450,40854,40855,40858,40861,40864],{},[1453,40856,40857],{},"Het laadpaalsymbool plaats je op het grondplan en koppel je aan zijn kring.",[1453,40859,40860],{},"De AREI\u002FRGIE-zelfcontrole meldt wanneer de laadpaal geen eigen kring heeft, die deelt met andere verbruikers, geen differentieelschakelaar van 30 mA heeft of noch een type B noch een interne DC-detectie voorziet; bij buitenopstelling herinnert ze je aan IP44.",[1453,40862,40863],{},"De fasetoewijzing vul je rechtstreeks in.",[1453,40865,40866],{},"Eendraadschema en situatieplan exporteer je als pdf uit dezelfde projectgegevens.",[12,40868,40869],{},"De rollen zijn duidelijk: de zelfcontrole toont je bevindingen binnen de ondersteunde regels, kabelberekening en netvragen regel je met berekening en netbeheerder, en de keuring doet het erkende organisme.",[41,40871,40873],{"id":40872},"kosten-vergelijken-op-dezelfde-technische-scope","Kosten vergelijken op dezelfde technische scope",[12,40875,40876],{},"Een bruikbare offerte splitst laadpaal, beveiligingstoestellen, kabelroute, grondwerken, aanpassing van het bord, lastbeheer, ontwerp, keuring en eventuele netprocedure uit. De prijs hangt sterk af van toestel, lengte en bereikbaarheid, aansluitvermogen en het bestaande bord. Laat aanbieders daarom dezelfde technische omschrijving begroten; een vaste online prijsvork is geen projectraming.",[12,40878,40879],{},"Vergelijk ook garantievoorwaarden en de gedocumenteerde beveiligingscombinatie, niet alleen de toestelprijs, en bewaar die technische vergelijking bij het projectdossier.",[41,40881,40883],{"id":40882},"veelgemaakte-fouten-vermijden","Veelgemaakte fouten vermijden",[1602,40885,40886,40892,40898,40904,40910,40916,40922],{},[1453,40887,40888,40891],{},[15,40889,40890],{},"Geen eigen kring of aansluiting via stopcontact:"," beide zijn in strijd met AREI 7.22.3 – de laadpaal wordt vast op zijn eigen kring aangesloten.",[1453,40893,40894,40897],{},[15,40895,40896],{},"Verkeerde differentieelschakelaar:"," zonder DC-foutstroomdetectie in de laadpaal is een differentieelschakelaar nodig die gelijkstroomfoutstromen aankan – in de praktijk type B.",[1453,40899,40900,40903],{},[15,40901,40902],{},"Overspanning niet beoordeeld:"," of en hoe een SPD nodig is, beoordeel je voor de volledige installatie en coördineer je volgens de fabrikantvoorschriften.",[1453,40905,40906,40909],{},[15,40907,40908],{},"Geen bijgewerkt eendraadschema:"," elke wijziging aan de installatie hoort in het schema.",[1453,40911,40912,40915],{},[15,40913,40914],{},"Netvoorwaarden niet nagegaan:"," formaliteiten hangen af van netbeheerder en laadfunctie; bidirectionele of technisch bidirectionele toestellen vallen ook onder C10\u002F11 en C10\u002F26.",[1453,40917,40918,40921],{},[15,40919,40920],{},"Te kleine kabeldoorsnede:"," vooral bij lange leidingwegen de spanningsval narekenen.",[1453,40923,40924,40927],{},[15,40925,40926],{},"Buitenopstelling zonder IP44:"," in open lucht vraagt 7.22.5.1 minstens IP44 en bescherming tegen voorzienbare mechanische belasting.",[31245,40929,40930],{},[12,40931,40932,40935],{},[15,40933,40934],{},"Aarding:"," een veilige laadpaal vraagt een intacte aardingsketen – aardelektrode, hoofdpotentiaalvereffening en beschermingsgeleider. Bij oudere installaties zonder correcte aarding wordt die vóór de laadpaal in orde gebracht.",[41,40937,40939],{"id":40938},"conclusie","Conclusie",[12,40941,40942],{},"Een laadpaal in België krijgt per aansluitpunt een afzonderlijke kring met eigen overstroombeveiliging, een differentieelschakelaar ≤ 30 mA met werkzame bescherming tegen gelijkstroomfoutstromen, een projectgerichte kabel- en beveiligingskeuze en bijgewerkte plannen. Goede documentatie maakt de installatie controleerbaar; de beoordeling doet het erkende organisme.",[41,40944,28541],{"id":28540},[1450,40946,40947,40955],{},[1453,40948,40949,40954],{},[30,40950,40953],{"href":40951,"rel":40952},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FRGIE-Annexe-Livre-1-Installations-a-basse-tenstion-et-a-tres-basse-tension-2026.pdf",[2532],"AREI\u002FRGIE Boek 1, editie 2026 – hoofdstuk 7.22",", gecontroleerd volgens V06; tabel 4.11 en afdelingen 4.5.1, 5.2.1.2, 5.2.5.",[1453,40956,40957],{},[30,40958,40960],{"href":28555,"rel":40959},[2532],"Synergrid: C10\u002F26 voor bidirectionele of technisch bidirectionele laadinfrastructuur",[29567,40962],{},[41,40964,32827],{"id":32826},[1450,40966,40967,40972],{},[1453,40968,40969],{},[30,40970,40971],{"href":15202},"Spanningsval berekenen voor een lange laadkabel",[1453,40973,40974],{},[30,40975,40977],{"href":40976},"\u002Fblog\u002Fkostenvergelijking-zelf-vs-elektricien","Kostenvergelijking: zelf tekenen vs. elektricien",[1450,40979,40980,40986,40990,40995],{},[1453,40981,40982],{},[30,40983,40985],{"href":40984},"\u002Fblog\u002Fplanelec-vs-excel-papier","PlanElec vs. Excel\u002Fpapier",[1453,40987,40988],{},[30,40989,37220],{"href":37430},[1453,40991,40992],{},[30,40993,40994],{"href":28518},"Synergrid-lijst C10\u002F26: staat je omvormer op de lijst?",[1453,40996,40997],{},[30,40998,40999],{"href":32640},"Eenfasig of driefasig: netvorm en gebouwaansluiting in België",[41,41001,41003],{"id":41002},"laadpaal-in-het-eendraadschema-documenteren","Laadpaal in het eendraadschema documenteren",[12,41005,9364,41006,41008,41009],{},[15,41007,1337],{}," documenteer je je laadpaal in het eendraadschema en exporteer je het project als pdf. De zelfcontrole toont je open punten vóór de keuring. ",[30,41010,38690],{"href":38688,"rel":41011},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":41013},[41014,41015,41021,41026,41030,41035,41036,41039,41043,41044,41045,41046,41047,41048],{"id":40229,"depth":1468,"text":40230},{"id":40337,"depth":1468,"text":40338,"children":41016},[41017,41018,41019,41020],{"id":40341,"depth":1486,"text":40342},{"id":17498,"depth":1486,"text":37995},{"id":31224,"depth":1486,"text":40357},{"id":40363,"depth":1486,"text":31382},{"id":40369,"depth":1468,"text":40370,"children":41022},[41023,41024,41025],{"id":40373,"depth":1486,"text":40374},{"id":40471,"depth":1486,"text":40472},{"id":40572,"depth":1486,"text":40573},{"id":40579,"depth":1468,"text":40580,"children":41027},[41028,41029],{"id":40583,"depth":1486,"text":40584},{"id":40670,"depth":1486,"text":40598},{"id":40708,"depth":1468,"text":40709,"children":41031},[41032,41033,41034],{"id":40715,"depth":1486,"text":40716},{"id":40729,"depth":1486,"text":40730},{"id":40746,"depth":1486,"text":40747},{"id":40756,"depth":1468,"text":40757},{"id":40769,"depth":1468,"text":40770,"children":41037},[41038],{"id":40785,"depth":1486,"text":40786},{"id":40795,"depth":1468,"text":40796,"children":41040},[41041,41042],{"id":40802,"depth":1486,"text":40803},{"id":40846,"depth":1486,"text":40847},{"id":40872,"depth":1468,"text":40873},{"id":40882,"depth":1468,"text":40883},{"id":40938,"depth":1468,"text":40939},{"id":28540,"depth":1468,"text":28541},{"id":32826,"depth":1468,"text":32827},{"id":41002,"depth":1468,"text":41003},"2026-05-25","AREI-vereisten voor je laadpaal in België: eigen kring per aansluitpunt, differentieelschakelaar en DC-foutstroombeveiliging, kabelontwerp, documentatie en netvoorwaarden.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-ev-charger-installation-arei-editorial.jpg","\u002Fblog\u002Flaadpaal-arei.nl",{"title":40211,"description":41050},"Laadpaal installeren volgens AREI: gids voor België","laadpaal-arei","blog\u002Flaadpaal-arei.nl",[33372,41059,3275,41060,22552,41061,1513,3273],"wallbox","elektrisch voertuig","aardlekbeveiliging","nvTq8vEANwfaqHtNQGRLQbsqHKQ1v0ZZf6rysotx4i4",{"id":41064,"title":41065,"articleId":41066,"body":41067,"category":6162,"date":41335,"description":41336,"extension":1496,"image":41077,"lastUpdated":33942,"locale":1497,"meta":41337,"navigation":1499,"ogImage":41338,"path":41339,"publishDate":41335,"readTime":37204,"refreshInterval":11097,"seo":41340,"seoTitle":41341,"slug":41342,"stem":41343,"tags":41344,"__hash__":41347,"kind":1515,"href":40976},"blog\u002Fblog\u002Fkostenvergelijking-zelf-vs-elektricien.nl.md","Kostenvergelijking: Eendraadschema zelf tekenen vs. elektricien inschakelen","cost-comparison-diy-vs-electrician",{"type":9,"value":41068,"toc":41320},[41069,41072,41078,41082,41164,41170,41174,41177,41181,41186,41191,41194,41198,41201,41205,41208,41212,41219,41223,41232,41235,41239,41259,41262,41266,41289,41293,41296,41299,41303,41306,41309,41314],[12,41070,41071],{},"Zelf tekenen loont wanneer je vertrekgegevens geverifieerd zijn; een elektricien schakel je in wanneer de werkelijke toestand onbekend is of er ontwerp- en uitvoeringswerk aankomt. De doorslag geeft geen prijslijst, maar de vraag wie welke prestatie levert: opname, tekenwerk, technische verantwoordelijkheid en keuring. Voor de Belgische keuring telt uiteindelijk alleen dat eendraadschema en situatieplan de werkelijke toestand tonen.",[12,41073,41074],{},[22,41075],{"alt":41076,"src":41077},"Elektrische planning en projectdocumenten op een tafel.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-cost-comparison-diy-vs-electrician-editorial.webp",[41,41079,41081],{"id":41080},"dezelfde-prestaties-vergelijken","Dezelfde prestaties vergelijken",[49,41083,41084,41096],{},[52,41085,41086],{},[55,41087,41088,41090,41093],{},[58,41089,8023],{},[58,41091,41092],{},"Zelf doen met PlanElec",[58,41094,41095],{},"Opdracht aan een vakman",[68,41097,41098,41109,41120,41131,41142,41153],{},[55,41099,41100,41103,41106],{},[73,41101,41102],{},"Werkelijke toestand opnemen",[73,41104,41105],{},"voor zover gegevens veilig en zonder ingreep vast te stellen zijn",[73,41107,41108],{},"vakkundige identificatie en meting",[55,41110,41111,41114,41117],{},[73,41112,41113],{},"Schema en situatieplan",[73,41115,41116],{},"gestructureerde invoer, beide plannen uit één model, pdf-export",[73,41118,41119],{},"volgens offerte tekening uit aangeleverde of zelf verzamelde gegevens",[55,41121,41122,41125,41128],{},[73,41123,41124],{},"Technisch ontwerp",[73,41126,41127],{},"blijft vakwerk",[73,41129,41130],{},"uitdrukkelijk te bestellen",[55,41132,41133,41136,41139],{},[73,41134,41135],{},"Technische eindcontrole",[73,41137,41138],{},"apart organiseren",[73,41140,41141],{},"inbegrepen als de offerte dat vermeldt",[55,41143,41144,41147,41150],{},[73,41145,41146],{},"Officiële keuring",[73,41148,41149],{},"door een erkend organisme",[73,41151,41152],{},"eveneens door een erkend organisme",[55,41154,41155,41158,41161],{},[73,41156,41157],{},"Kostenbasis",[73,41159,41160],{},"Early Access 0 EUR; daarna vanaf 12 EUR per pand; eigen tijd",[73,41162,41163],{},"projectspecifieke offerte, geen officieel eenheidstarief",[12,41165,41166,41167,7763],{},"Volledige projectgegevens maken zelf doen eenvoudig; een onbekende oude installatie vraagt een professionele opname. Wie het eendraadschema opstelt, regelt het AREI: de verantwoordelijke van de uitvoering van het werk (onderafdeling 3.1.2.1 a van ",[30,41168,27031],{"href":15357,"rel":41169},[2532],[41,41171,41173],{"id":41172},"drie-aanpasbare-scenarios","Drie aanpasbare scenario’s",[12,41175,41176],{},"De formules zijn rekenposten, geen Belgische gemiddelde prijzen. Vul je offertebedragen en tijdswaarden zelf in.",[1396,41178,41180],{"id":41179},"_1-bestaande-installatie-met-goede-documenten","1. Bestaande installatie met goede documenten",[12,41182,41183],{},[1300,41184,41185],{},"extern = opname volgens offerte + tekenwerk + technische controle + keuring",[12,41187,41188],{},[1300,41189,41190],{},"zelf = eigen uren × persoonlijke tijdswaarde + PlanElec-tarief + technische controle + keuring",[12,41192,41193],{},"Zijn grondplan, bord, beveiligingen en toewijzingen geverifieerd, dan bestaat zelf doen vooral uit gegevens invoeren en vergelijken. Onbekende technische waarden blijven als onbekend gemarkeerd in plaats van geschat. Als alternatief controleert en tekent een installateur precies die beperkte dataset.",[1396,41195,41197],{"id":41196},"_2-bestaande-installatie-zonder-betrouwbare-toewijzing","2. Bestaande installatie zonder betrouwbare toewijzing",[12,41199,41200],{},"Hier komt eerst de vraag welke kring welk toestel voedt en welke leiding- en beveiligingsgegevens er werkelijk zijn. Behuizingen openen en meten is geen doe-het-zelfwerk. Zet in je eigen model dus een professionele opname als aparte post. Daarna breng je de vastgestelde gegevens zelf in PlanElec in als je het tekenwerk wilt overnemen.",[1396,41202,41204],{"id":41203},"_3-nieuwe-of-belangrijk-gewijzigde-installatie","3. Nieuwe of belangrijk gewijzigde installatie",[12,41206,41207],{},"Bij nieuwe kringen of bronnen komt het technische ontwerp vóór de tekening. Fabrikantvoorwaarden, eisen van de netbeheerder en de AREI-stand beïnvloeden de keuzes. Vergelijk een totaalofferte daarom niet met louter tekenwerk, maar splits ontwerp, uitvoering, documentatie en keuring. Een belangrijke wijziging wordt vóór ingebruikname gekeurd (onderafdeling 6.4.7.3).",[41,41209,41211],{"id":41210},"welke-documenten-horen-bij-de-vergelijking","Welke documenten horen bij de vergelijking?",[12,41213,7641,41214,41218],{},[30,41215,41217],{"href":38649,"rel":41216},[2532],"officiële FOD-pagina"," noemt eendraadschema en situatieplan als minimale stukken voor een huishoudelijke controle. Het schema bevat leidingtype, doorsnede, aantal geleiders, plaatsingswijze, differentieel- en overstroombeveiliging en schakelaars, dozen, contactdozen, lichtpunten, vaste toestellen en bronnen (onderafdeling 3.1.2.2 a); het situatieplan toont waar die elementen zich bevinden. Beide horen in het dossier van de installatie (afdeling 9.1.2). Dat is de maatstaf voor de vergelijking, niet het programma waarmee de lijnen getekend worden.",[41,41220,41222],{"id":41221},"wat-planelec-vandaag-kan","Wat PlanElec vandaag kan",[12,41224,41225,41226,933,41229,39],{},"PlanElec verbindt grondplan, elektrische topologie en bordplanning. Eendraadschema en situatieplan ontstaan uit één model met dezelfde referenties en gaan als pdf de deur uit. De AREI\u002FRGIE-zelfcontrole toetst de ondersteunde regels die uit je projectgegevens beslisbaar zijn en toont open punten; het is een oriënterende controle, geen conformiteitsattest. Materiaallijst en werkdossier zijn beschikbaar als pilotfuncties met aangegeven grenzen. Een bredere vergelijking van werkwijzen vind je in ",[30,41227,41228],{"href":40984},"PlanElec of Excel en papier: de vergelijking",[30,41230,41231],{"href":6973},"Beste eendraadschema-software: vijf tools vergeleken",[12,41233,41234],{},"De prijzen zijn gepubliceerd: in Early Access kost PlanElec 0 EUR. Na de start van de tarieven, die we tijdig vooraf aankondigen, blijft Free gratis (exports met afdekvlakken), kost eenmalig gebruik 12 EUR per pand en Pro 24 EUR per maand (de prijs blijft zolang het abonnement zonder onderbreking loopt), telkens exclusief btw. Voor één woning is eenmalig gebruik dus de juiste rekenpost in je eigen model. Eigen tijd, vakwerk, werken en de officiële keuring blijven aparte posten.",[41,41236,41238],{"id":41237},"wanneer-een-elektricien-onmisbaar-is","Wanneer een elektricien onmisbaar is",[1450,41240,41241,41244,41247,41250,41253,41256],{},[1453,41242,41243],{},"wanneer de opname metingen of het openen van behuizingen vraagt;",[1453,41245,41246],{},"wanneer geleidergegevens, beveiligingscoördinatie of aarding onduidelijk zijn;",[1453,41248,41249],{},"wanneer nieuwe kringen, PV, opslag, laadpaal of noodstroom gepland worden;",[1453,41251,41252],{},"wanneer een keuringsverslag technische inbreuken vermeldt;",[1453,41254,41255],{},"wanneer fabrikant- of netbeheerdersvoorwaarden beoordeeld moeten worden;",[1453,41257,41258],{},"wanneer je de verantwoordelijkheid voor technische keuzes wilt overdragen.",[12,41260,41261],{},"Zelf tekenen en zelf installeren zijn twee verschillende dingen. PlanElec documenteert; de elektrotechnische bekwaamheid brengt de vakman mee.",[41,41263,41265],{"id":41264},"offertecheck-in-zeven-vragen","Offertecheck in zeven vragen",[1602,41267,41268,41271,41274,41277,41280,41283,41286],{},[1453,41269,41270],{},"Wie verzamelt en verifieert de vertrekgegevens?",[1453,41272,41273],{},"Zitten beide plannen en alle borden erin?",[1453,41275,41276],{},"Horen berekeningen erbij of alleen grafische overname?",[1453,41278,41279],{},"Wie controleert de technische plausibiliteit?",[1453,41281,41282],{},"Hoe worden wijzigingen en correcties aangerekend?",[1453,41284,41285],{},"Staan btw, verplaatsing en keuringskost apart vermeld?",[1453,41287,41288],{},"Welk bewerkbaar bronformaat en welke pdf’s worden opgeleverd?",[41,41290,41292],{"id":41291},"de-beslisregel","De beslisregel",[12,41294,41295],{},"Teken zelf wanneer de vertrekgegevens geverifieerd zijn, het project overzichtelijk blijft en je voor technische vragen een vakkundige controle hebt geregeld. Schakel een installateur in wanneer de werkelijke toestand onbekend is, ontwerpkeuzes open liggen, metingen nodig zijn of iemand de technische coördinatie moet opnemen. Vaak werkt een hybride aanpak het best: bestaande informatie in PlanElec structureren, onbekende punten duidelijk markeren en alleen de punten met elektrotechnische beoordelingsnood laten controleren.",[12,41297,41298],{},"Documenteer de aannames van beide varianten. Sluit de offerte het nagaan van kringen uit, noteer dan wie gecontroleerde toewijzingen levert. Waardeer in je eigen model niet alleen het tarief, maar ook inwerktijd, opname en correcties. Na werken aan de installatie tonen schema en situatieplan opnieuw de werkelijke toestand.",[41,41300,41302],{"id":41301},"resultaat-en-werkstand-overdragen","Resultaat en werkstand overdragen",[12,41304,41305],{},"Vergelijk ook wat na afloop bruikbaar blijft. Een degelijke oplevering bevat de vrijgegeven pdf’s, hun versiegegevens, de bevestigde gegevens erachter en een lijst open punten. Spreek af of bewerkbare projectgegevens worden overgedragen en wie ze bij de volgende wijziging bijwerkt. Zonder die afspraak vraagt de volgende uitbreiding mogelijk een nieuwe opname, welke weg aanvankelijk ook goedkoper was. Wie met PlanElec werkt, houdt het bewerkbare project zelf in handen.",[41,41307,17166],{"id":41308},"besluit",[12,41310,41311,41312,39],{},"Zelf doen past wanneer geverifieerde gegevens beschikbaar zijn en je de technische grenzen kent. Een opdracht aan een elektricien is de betere keuze wanneer opname, ontwerp of technische verantwoordelijkheid nodig zijn. Reken met je echte offertes en je gedocumenteerde tijd; de keuring doet in beide gevallen het erkend organisme. Hoe de prijs van een elektriciteitsplan is opgebouwd, lees je in ",[30,41313,21628],{"href":33746},[12,41315,41316],{},[30,41317,41319],{"href":38688,"rel":41318},[2532],"Open PlanElec in de gratis Early Access →",{"title":1467,"searchDepth":1468,"depth":1468,"links":41321},[41322,41323,41328,41329,41330,41331,41332,41333,41334],{"id":41080,"depth":1468,"text":41081},{"id":41172,"depth":1468,"text":41173,"children":41324},[41325,41326,41327],{"id":41179,"depth":1486,"text":41180},{"id":41196,"depth":1486,"text":41197},{"id":41203,"depth":1486,"text":41204},{"id":41210,"depth":1468,"text":41211},{"id":41221,"depth":1468,"text":41222},{"id":41237,"depth":1468,"text":41238},{"id":41264,"depth":1468,"text":41265},{"id":41291,"depth":1468,"text":41292},{"id":41301,"depth":1468,"text":41302},{"id":41308,"depth":1468,"text":17166},"2026-05-19","Eendraadschema zelf maken met PlanElec of door de elektricien? Drie scenario’s voor een bestaande installatie, een onbekende oude installatie en nieuwbouw, een offertecheck en een duidelijke beslisregel voor België.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-cost-comparison-diy-vs-electrician-editorial.jpg","\u002Fblog\u002Fkostenvergelijking-zelf-vs-elektricien.nl",{"title":41065,"description":41336},"Eendraadschema zelf tekenen of elektricien? Kosten","kostenvergelijking-zelf-vs-elektricien","blog\u002Fkostenvergelijking-zelf-vs-elektricien.nl",[41345,39039,3273,41346,1337,17499,1513],"kosten","zelf tekenen","CVGt0mjfMYiqxW2yJGydyYxcazawhnHz2tRmr-vO0K0",{"id":41349,"title":41350,"articleId":41351,"body":41352,"category":6162,"date":41748,"description":41749,"extension":1496,"image":41364,"lastUpdated":33942,"locale":1497,"meta":41750,"navigation":1499,"ogImage":41751,"path":41752,"publishDate":41748,"readTime":37204,"refreshInterval":11097,"seo":41753,"seoTitle":41754,"slug":41755,"stem":41756,"tags":41757,"__hash__":41760,"kind":1515,"href":40984},"blog\u002Fblog\u002Fplanelec-vs-excel-papier.nl.md","PlanElec vs. Excel & papier: Waarom digitale eendraadschema's beter zijn","planelec-vs-excel-paper",{"type":9,"value":41353,"toc":41733},[41354,41360,41365,41369,41491,41495,41498,41550,41553,41557,41560,41564,41567,41570,41574,41578,41585,41589,41592,41661,41666,41670,41673,41677,41686,41690,41693,41695,41698,41700,41727],[12,41355,41356,41359],{},[15,41357,41358],{},"Volgens het AREI mag je een eendraadschema ook met de hand of in Excel maken; digitaal is geen verplichting. Een planningstool als PlanElec heeft wel drie duidelijke voordelen: eendraadschema en situatieplan komen uit hetzelfde projectmodel, wijzigingen lopen automatisch door in beide plannen, en een AREI\u002FRGIE-zelfcontrole vindt typische ontwerpfouten voordat de keurder ze vindt."," Papier en Excel blijven bruikbaar voor heel kleine werken. Zodra er meerdere kringen, verdiepingen of wijzigingen bij komen, wordt het handmatig afstemmen de eigenlijke foutenbron.",[12,41361,41362],{},[22,41363],{"alt":27140,"src":41364},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-planelec-vs-excel-paper-editorial.webp",[41,41366,41368],{"id":41367},"vergelijking-in-één-oogopslag","Vergelijking in één oogopslag",[49,41370,41371,41385],{},[52,41372,41373],{},[55,41374,41375,41377,41379,41382],{},[58,41376,4902],{},[58,41378,1337],{},[58,41380,41381],{},"Excel\u002FWord",[58,41383,41384],{},"Papier",[68,41386,41387,41401,41415,41428,41441,41455,41467,41480],{},[55,41388,41389,41392,41395,41398],{},[73,41390,41391],{},"Kosten vandaag",[73,41393,41394],{},"Early Access: 0 EUR",[73,41396,41397],{},"Bestaande licentie",[73,41399,41400],{},"Papier en tijd",[55,41402,41403,41406,41409,41412],{},[73,41404,41405],{},"Symbolen volgens AREI tabel 2.23",[73,41407,41408],{},"Symboolbibliotheek voor de Belgische context, met legende",[73,41410,41411],{},"Zelf tekenen of invoegen",[73,41413,41414],{},"Met de hand tekenen",[55,41416,41417,41420,41423,41426],{},[73,41418,41419],{},"Opbouw van het schema",[73,41421,41422],{},"Automatisch uit de elektrische topologie",[73,41424,41425],{},"Manueel",[73,41427,41425],{},[55,41429,41430,41432,41435,41438],{},[73,41431,3836],{},[73,41433,41434],{},"Uit dezelfde projectgegevens, referenties gekoppeld",[73,41436,41437],{},"Apart bestand",[73,41439,41440],{},"Apart blad",[55,41442,41443,41446,41449,41452],{},[73,41444,41445],{},"Wijzigingen",[73,41447,41448],{},"Eén keer in het model, beide plannen volgen",[73,41450,41451],{},"Elke weergave apart bijwerken",[73,41453,41454],{},"Opnieuw tekenen",[55,41456,41457,41459,41462,41465],{},[73,41458,31290],{},[73,41460,41461],{},"AREI\u002FRGIE-zelfcontrole voor ondersteunde regels",[73,41463,41464],{},"Geen",[73,41466,41464],{},[55,41468,41469,41471,41474,41477],{},[73,41470,4653],{},[73,41472,41473],{},"Eendraadschema, situatieplan en dossier met titelblok",[73,41475,41476],{},"Manueel, pagina-einden met de hand",[73,41478,41479],{},"Scan",[55,41481,41482,41484,41487,41489],{},[73,41483,41146],{},[73,41485,41486],{},"Door erkend controleorganisme",[73,41488,41486],{},[73,41490,41486],{},[41,41492,41494],{"id":41493},"wat-vraagt-het-arei-van-eendraadschema-en-situatieplan","Wat vraagt het AREI van eendraadschema en situatieplan?",[12,41496,41497],{},"Het AREI legt inhoud en leesbaarheid vast, niet het werkmiddel. De belangrijkste eisen uit Boek 1:",[49,41499,41500,41509],{},[52,41501,41502],{},[55,41503,41504,41507],{},[58,41505,41506],{},"Eis",[58,41508,20865],{},[68,41510,41511,41519,41527,41534,41542],{},[55,41512,41513,41516],{},[73,41514,41515],{},"Schema’s, plannen en documenten vermelden ondubbelzinnig nummer, versie en datum van de versie",[73,41517,41518],{},"Afdeling 3.1.2",[55,41520,41521,41524],{},[73,41522,41523],{},"De verantwoordelijke voor de uitvoering maakt eendraadschema en situatieplan op; naam, hoedanigheid, eventueel btw-nummer en adres van de installatie staan erop",[73,41525,41526],{},"Onderafdeling 3.1.2.1.a",[55,41528,41529,41532],{},[73,41530,41531],{},"Kringen krijgen een hoofdletter, lichtpunten, contactdozen en bedieningstoestellen een volgnummer; het situatieplan gebruikt dezelfde aanduiding",[73,41533,41526],{},[55,41535,41536,41539],{},[73,41537,41538],{},"Symbolen volgens tabel 2.23; staat een symbool er niet in, dan mag elk ondubbelzinnig symbool dat in de legende is verklaard",[73,41540,41541],{},"Hoofdstuk 2.13, onderafdeling 3.1.2.1.a",[55,41543,41544,41547],{},[73,41545,41546],{},"De eigenaar bewaart het dossier met eendraadschema, situatieplan en keuringsverslag in twee exemplaren",[73,41548,41549],{},"Afdeling 9.1.2",[12,41551,41552],{},"Een netjes getekend plan dat aan deze punten voldoet, is volgens het AREI toegelaten. Bepalend is dat eendraadschema en situatieplan volledig, leesbaar en consistent zijn. Precies daar maken de werkmiddelen het verschil.",[41,41554,41556],{"id":41555},"papier-snel-begonnen-moeilijk-bij-te-houden","Papier: snel begonnen, moeilijk bij te houden",[12,41558,41559],{},"Op papier begin je zonder inwerktijd. De grenzen blijken bij de eerste wijziging: een vergeten stopcontact verschuift de nummering van de kring, en je moet eendraadschema en situatieplan met de hand bijwerken. Bij veel kringen wordt dat snel onoverzichtelijk. Doorgestreepte correcties en een handschrift dat alleen jij kunt lezen, maken het plan voor de keurder moeilijker te controleren. Symbolen uit tabel 2.23 netjes en eenvormig tekenen kost tijd; elk afwijkend symbool heeft een legende nodig.",[41,41561,41563],{"id":41562},"excel-en-word-ordelijk-maar-zonder-elektriciteit-erachter","Excel en Word: ordelijk, maar zonder elektriciteit erachter",[12,41565,41566],{},"Excel brengt orde in lijsten, maar kent geen elektrische samenhang. Symbolen voeg je in als afbeelding of bouw je na met vormen. De hiërarchie van hoofdschakelaar, differentieelschakelaar, automaten en verbruikers bouw je met de hand op en pas je bij elke wijziging aan. Grotere schema’s passen niet op een A4-pagina, en het afdrukvoorbeeld legt pagina-einden waar ze niet horen.",[12,41568,41569],{},"Vooral: Excel controleert niets. Of er te veel kringen aan een differentieelschakelaar hangen of de doorsnede niet past bij de beveiliging, toont geen enkele cel.",[41,41571,41573],{"id":41572},"wat-planelec-anders-doet","Wat PlanElec anders doet",[1396,41575,41577],{"id":41576},"eén-model-twee-plannen","Eén model, twee plannen",[12,41579,41580,41581,933,41583,39],{},"In PlanElec plaats je toestellen op het grondplan en verbind je ze met kring, beveiliging en kabel. Uit die topologie bouwt PlanElec het eendraadschema op met hoofdschakelaar, differentieelschakelaars, automaten en verbruikers; het situatieplan gebruikt dezelfde toestellen en aanduidingen. Voeg je een kring toe, dan volgen beide plannen. Meer daarover in ",[30,41582,36775],{"href":7514},[30,41584,23716],{"href":25796},[1396,41586,41588],{"id":41587},"zelfcontrole-in-plaats-van-buikgevoel","Zelfcontrole in plaats van buikgevoel",[12,41590,41591],{},"De AREI\u002FRGIE-zelfcontrole toetst de projectgegevens aan een gedocumenteerd deel van Boek 1, versie 06 (van toepassing sinds 1 april 2026). Een selectie:",[49,41593,41594,41602],{},[52,41595,41596],{},[55,41597,41598,41600],{},[58,41599,31290],{},[58,41601,20865],{},[68,41603,41604,41611,41618,41625,41632,41640,41647,41654],{},[55,41605,41606,41609],{},[73,41607,41608],{},"Differentieelschakelaar van ten hoogste 300 mA aan de oorsprong",[73,41610,31311],{},[55,41612,41613,41616],{},[73,41614,41615],{},"Maximaal 8 eindstroombanen per differentieelschakelaar tot 30 mA",[73,41617,31324],{},[55,41619,41620,41623],{},[73,41621,41622],{},"Differentieelschakelaar tot 30 mA voor stopcontactkringen",[73,41624,31324],{},[55,41626,41627,41630],{},[73,41628,41629],{},"Hoofdschakelaar van minstens 40 A in huishoudelijke installaties",[73,41631,31401],{},[55,41633,41634,41637],{},[73,41635,41636],{},"Beveiliging passend bij de doorsnede van de geleiders",[73,41638,41639],{},"AREI 4.4.1.4, tabel 4.11",[55,41641,41642,41645],{},[73,41643,41644],{},"Spanningsval uit de kabellengte (richtwaarden 3 % \u002F 5 %)",[73,41646,31603],{},[55,41648,41649,41652],{},[73,41650,41651],{},"Differentieelschakelaar tot 30 mA voor ruimten met bad of douche",[73,41653,31732],{},[55,41655,41656,41659],{},[73,41657,41658],{},"Maximaal 8 enkelvoudige of meervoudige contactdozen per eindstroombaan",[73,41660,32094],{},[12,41662,41663,41664,39],{},"Een foutloze run betekent: de ondersteunde regels vinden in jouw gegevens geen fout. Metingen, omstandigheden ter plaatse en niet-gemodelleerde regels controleer jij als vakman; de keuring doet het erkende controleorganisme. Welke regels erin zitten, lees je in ",[30,41665,10087],{"href":2457},[1396,41667,41669],{"id":41668},"documenten-die-op-elkaar-aansluiten","Documenten die op elkaar aansluiten",[12,41671,41672],{},"PlanElec exporteert eendraadschema en situatieplan als pdf met titelblok, samen met het indicatieve zelfcontrolerapport en een selecteerbaar installatiedossier met voorblad, inhoudsoverzicht en paginanummering. Installateursgegevens en logo staan op alle documenten. De pdf’s zijn de stand die je ter plaatse met de uitvoering vergelijkt; nummer, versie en datum houd je bij voor elke nieuwe versie.",[41,41674,41676],{"id":41675},"wat-kost-de-overstap","Wat kost de overstap?",[12,41678,41679,41680,41682,41683,39],{},"Papier en Excel kosten geen geld, wel tijd bij elke wijziging. PlanElec kost tijdens de Early Access 0 EUR. De toekomstige formules vanaf 12 EUR per object of 24 EUR per maand (de prijs blijft zolang het abonnement zonder onderbreking loopt) excl. btw staan op de ",[30,41681,6274],{"href":4449},"; de startdatum kondigen we tijdig vooraf aan. Vakkundige controle en keuring komen er los van het werkmiddel bij. Hoe zelf tekenen en een elektricien inschakelen zich verhouden, lees je in de ",[30,41684,41685],{"href":40976},"kostenvergelijking",[41,41687,41689],{"id":41688},"wanneer-papier-volstaat","Wanneer papier volstaat",[12,41691,41692],{},"Voor een kleine, niet-belangrijke wijziging volstaat volgens AREI 3.1.2.1.a een korte beschrijving in plaats van een nieuw eendraadschema. Ook een heel klein plan met weinig kringen teken je netjes met de hand, als aanduidingen, symbolen, legende en titelgegevens kloppen. Zodra de installatie groeit of verandert, bespaart het gedeelde model je het dubbele afstemmen.",[41,41694,40939],{"id":40938},[12,41696,41697],{},"Papier en Excel zijn toegelaten, maar ze laten je alleen met het afstemmen tussen eendraadschema en situatieplan en controleren niets. PlanElec brengt grondplan, elektrische topologie en verdeelkast samen in één project, maakt beide plannen uit dezelfde gegevens en meldt typische ontwerpfouten vroeg. De keuring van de installatie blijft de taak van het erkende controleorganisme.",[41,41699,6947],{"id":6946},[1450,41701,41702,41707,41712,41716,41721],{},[1453,41703,41704],{},[30,41705,41706],{"href":6973},"Beste eendraadschema-software 2026",[1453,41708,41709],{},[30,41710,41711],{"href":40976},"Kostenvergelijking: zelf tekenen of een elektricien inschakelen",[1453,41713,41714],{},[30,41715,19565],{"href":19564},[1453,41717,41718],{},[30,41719,41720],{"href":30145},"Wat je met PlanElec kunt doen, van grondplan tot installatiedossier",[1453,41722,41723],{},[30,41724,41726],{"href":15357,"rel":41725},[2532],"FOD Economie: officiële AREI-boeken",[12,41728,41729,41730,39],{},"Met PlanElec plan je grondplan, topologie en verdeelkast in één project en exporteer je eendraadschema en situatieplan als pdf. ",[30,41731,41732],{"href":15328},"Registreer je nu gratis",{"title":1467,"searchDepth":1468,"depth":1468,"links":41734},[41735,41736,41737,41738,41739,41744,41745,41746,41747],{"id":41367,"depth":1468,"text":41368},{"id":41493,"depth":1468,"text":41494},{"id":41555,"depth":1468,"text":41556},{"id":41562,"depth":1468,"text":41563},{"id":41572,"depth":1468,"text":41573,"children":41740},[41741,41742,41743],{"id":41576,"depth":1486,"text":41577},{"id":41587,"depth":1486,"text":41588},{"id":41668,"depth":1486,"text":41669},{"id":41675,"depth":1468,"text":41676},{"id":41688,"depth":1468,"text":41689},{"id":40938,"depth":1468,"text":40939},{"id":6946,"depth":1468,"text":6947},"2026-05-05","Eendraadschema met PlanElec, Excel of op papier: wat het AREI vraagt, waar tekening en spreadsheet tekortschieten en wat PlanElec automatisch controleert.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-planelec-vs-excel-paper-editorial.jpg","\u002Fblog\u002Fplanelec-vs-excel-papier.nl",{"title":41350,"description":41749},"PlanElec vs. Excel & papier voor eendraadschema's","planelec-vs-excel-papier","blog\u002Fplanelec-vs-excel-papier.nl",[1337,41758,41759,6172,3273,3275,17499],"Excel","papier","O6FJW5Jrj54505OBnipErlHoLfojz-YK7A3uvmmHnuI",{"id":41762,"title":41763,"articleId":41764,"body":41765,"category":1493,"date":42021,"description":42022,"extension":1496,"image":41778,"lastUpdated":15381,"locale":1497,"meta":42023,"navigation":1499,"ogImage":42024,"path":42025,"publishDate":42021,"readTime":37204,"refreshInterval":11097,"seo":42026,"seoTitle":42027,"slug":42028,"stem":42029,"tags":42030,"__hash__":42034,"kind":1515,"href":28125},"blog\u002Fblog\u002Fpv-system-documentation.nl.md","Zonnepanelen op het eendraadschema: documentatie voor installateurs","pv-system-documentation",{"type":9,"value":41766,"toc":42012},[41767,41773,41779,41783,41808,41811,41815,41917,41920,41924,41927,41930,41941,41945,41948,41953,41957,41962,41967,41971,41985,41988,41992,42009],[12,41768,41769,41772],{},[15,41770,41771],{},"Een PV-installatie documenteer je op het eendraadschema als één doorlopende keten: strings met MPPT-toewijzing, omvormer met exacte modelreferentie, DC- en AC-leidingen, de werkelijk aanwezige scheidings- en beveiligingsfuncties en een eenduidige aansluiting op het verdeelbord."," Situatieplan en dossier dragen dezelfde referenties. Deze gids ordent het werk van dak tot overdracht. Een universele combinatie van kabeldoorsnede, automaat en differentieelschakelaar geeft hij bewust niet – die volgt uit de concrete installatie.",[12,41774,41775],{},[22,41776],{"alt":41777,"src":41778},"Twee zonnepaneelinstallateurs plaatsen samen een PV-paneel op een Belgisch dak.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-system-documentation-editorial.webp",[41,41780,41782],{"id":41781},"voorbeeldopdracht-pv-toevoegen-laadpunt-voorbereiden","Voorbeeldopdracht: PV toevoegen, laadpunt voorbereiden",[12,41784,41785,41786,41789,41790,41792,41793,41795,41796,41799,41800,41803,41804,41807],{},"Onze ",[15,41787,41788],{},"fictieve redactionele opdracht"," betreft een woning met hoofdverdeelbord ",[15,41791,28668],{},", twee dakvlakken en omvormer ",[15,41794,28657],{}," in de technische ruimte. ",[15,41797,41798],{},"S1"," ligt oostelijk, ",[15,41801,41802],{},"S2"," westelijk. Het bevestigde fabrikantontwerp koppelt S1 aan MPPT1 en S2 aan MPPT2. Later volgt het unidirectionele laadpunt ",[15,41805,41806],{},"EV1",". Deze namen verbinden de drie artikelen; het zijn voorbeeldreferenties, geen verplichte benamingen en geen geëxporteerd PlanElec-project.",[12,41809,41810],{},"Vermogen, aantal modules, beveiligingen en doorsneden blijven open tot je ze voor de opdracht hebt vastgesteld. Twee strings betekenen niet automatisch twee toegelaten MPPT-toewijzingen: ingangsspanning, stroom, parallelschakeling en fabrikantgrenzen controleer je afzonderlijk.",[41,41812,41814],{"id":41813},"opnamematrix-voor-de-installateur","Opnamematrix voor de installateur",[49,41816,41817,41831],{},[52,41818,41819],{},[55,41820,41821,41823,41825,41828],{},[58,41822,13712],{},[58,41824,3189],{},[58,41826,41827],{},"Plaats in het dossier",[58,41829,41830],{},"Vóór afronding oplossen",[68,41832,41833,41847,41861,41875,41889,41903],{},[55,41834,41835,41838,41841,41844],{},[73,41836,41837],{},"S1\u002FS2: modules, aantal en toewijzing",[73,41839,41840],{},"Dakopname, modulefiche, stringontwerp",[73,41842,41843],{},"DC-structuur en ruimtelijke referenties",[73,41845,41846],{},"Werkelijke bezetting en MPPT-grenzen",[55,41848,41849,41852,41855,41858],{},[73,41850,41851],{},"INV1: exacte referentie, AC-gegevens",[73,41853,41854],{},"Kenplaat, fabrikantdocumentatie",[73,41856,41857],{},"Schema en toestelbijlagen",[73,41859,41860],{},"Variant, serienummer, instellingen",[55,41862,41863,41866,41869,41872],{},[73,41864,41865],{},"DC- en AC-leidingen",[73,41867,41868],{},"Opmeting en uitvoeringsgegevens",[73,41870,41871],{},"Leidingspecificaties en tracé",[73,41873,41874],{},"Deeltrajecten, doorsnede en plaatsingswijze",[55,41876,41877,41880,41883,41886],{},[73,41878,41879],{},"Scheiding, beveiliging en aardverbinding",[73,41881,41882],{},"Ontwerp, handleiding en opname",[73,41884,41885],{},"Werkelijke functies op het schema",[73,41887,41888],{},"Ingebouwd of extern, coördinatie",[55,41890,41891,41894,41897,41900],{},[73,41892,41893],{},"Aansluiting op DB1",[73,41895,41896],{},"Opname van het verdeelbord",[73,41898,41899],{},"Eenduidig injectiepunt",[73,41901,41902],{},"Bestaande toestellen en mogelijke stromen",[55,41904,41905,41908,41911,41914],{},[73,41906,41907],{},"Documentversie",[73,41909,41910],{},"Uitvoering en controlebijlagen",[73,41912,41913],{},"Plankop en overdrachtslijst",[73,41915,41916],{},"Verantwoordelijke, datum en open punten",[12,41918,41919],{},"Voor huishoudelijke PV tot 10 kVA somt AREI 7.112.4 precies de gegevens op die later ook in het controleverslag staan: aantal en nominaal vermogen van de modules en aantal, type, serienummer en maximaal AC-vermogen van de omvormers. Wie ze in de matrix correct bijhoudt, heeft ze bij de keuring meteen bij de hand. Afdeling 7.112.2 voegt daar de markering van DC-geleiders en actieve AC-geleiders, de waarschuwingsborden en de aarding van de moduleramen aan toe.",[41,41921,41923],{"id":41922},"schema-en-situatieplan-samen-lezen","Schema en situatieplan samen lezen",[12,41925,41926],{},"Volg S1 en S2 op het schema tot de bevestigde ingangen van INV1, daarna de AC-aansluiting tot DB1. Op het situatieplan staan dezelfde referenties op hun werkelijke plaats. Een dakvlak is geen elektrische string: meerdere strings op één vlak blijven afzonderlijk herkenbaar.",[12,41928,41929],{},"In PlanElec staat een PV-modulesymbool op het situatieplan voor een volledige string en wordt het aan precies één string van de gekoppelde omvormer toegewezen. De gestructureerde PV-zijde toont enkele en parallelle strings per MPPT, Y-aftakking of combiner, gedocumenteerde kabeldeeltrajecten, ingevoerde beveiligings- en scheidingsfuncties, de AC-scheiding en de raam-PE tot de aardverbinding. Ontbrekende fabrikantgrenzen en niet-toegewezen strings blijven zichtbaar tot je ze oplost.",[12,41931,10081,41932,41934,41935,41938,41939,39],{},[30,41933,28194],{"href":28193}," werkt de ruimtelijke opname van deze opdracht uit. De ",[30,41936,41937],{"href":28592},"combinatie met een laadpunt"," behandelt EV1 als afzonderlijke uitbreiding. Hoe je van elektrisch model naar schema gaat, toont de ",[30,41940,28198],{"href":11068},[41,41942,41944],{"id":41943},"beveiligingsfuncties-uit-de-concrete-installatie-overnemen","Beveiligingsfuncties uit de concrete installatie overnemen",[12,41946,41947],{},"De naam van een omvormer bepaalt noch de uitschakelkarakteristiek noch de differentieelbeveiliging. Leg nominale gegevens, aantal polen, functie en plaats van de werkelijk ontworpen toestellen vast. Een ingebouwde functie teken je niet nog eens als verzonnen externe kast. Fabrikantvoorwaarden en het toepasselijke AREI beoordeel je samen; een RCMU-vermelding in de datasheet neemt die beoordeling niet over.",[12,41949,41950,41951,39],{},"Bij een batterij of noodstroomfunctie neem je ook de werkelijk toegelaten bedrijfstoestanden, de scheiding en de gevoede delen op. Een hybride omvormer bewijst nog geen noodstroomvoorziening. Het ontwerp blijft begrijpelijk, ook bij een omgekeerde energierichting. Hoe je een thuisbatterij als bron in de installatie integreert, lees je in ",[30,41952,28436],{"href":28435},[41,41954,41956],{"id":41955},"toestelcontrole-en-netprocedure","Toestelcontrole en netprocedure",[12,41958,15594,41959,41961],{},[30,41960,29422],{"href":29079}," zoek je de exacte omvormerreferentie. Vergelijk de uitkomst met de actuele officiële lijst en de toestelstukken. Een treffer bewijst de vermelding van het toestel, niet de goedkeuring van de uitgevoerde installatie. Geen treffer betekent: de referentie ophelderen – niet zomaar een gelijkende modelnaam kiezen.",[12,41963,41964,41965,39],{},"De officiële Synergrid-pagina beschrijft C10\u002F11, C10\u002F26 en hun toepassingsgebied. De aansluitprocedure regel je met de netbeheerder die bevoegd is voor het projectadres. Algemene meldingstermijnen of vergoedingsbeloften uit voorbeeldartikels neem je niet over in de opdracht. Wat je doet als je omvormer niet op de lijst staat, lees je in ",[30,41966,28519],{"href":28518},[41,41968,41970],{"id":41969},"overdracht-vóór-export-controleren","Overdracht vóór export controleren",[1602,41972,41973,41976,41979,41982],{},[1453,41974,41975],{},"Vergelijk S1, S2, INV1 en DB1 tussen beide plannen en hun bijlagen.",[1453,41977,41978],{},"Los open gegevens op aan de hand van de uitvoering; vul geen typische voorbeeldwaarden in.",[1453,41980,41981],{},"Koppel toestelstukken, meetgegevens en controleverslagen aan de juiste documentversie.",[1453,41983,41984],{},"Werk beide plannen bij na wijzigingen aan strings, omvormer of verdeelbord.",[12,41986,41987],{},"PlanElec maakt eendraadschema, situatieplan en pdf-uitvoer uit dezelfde ingevoerde gegevens. Het AREI\u002FRGIE-zelfcontroleverslag bevat voor PV een installatieregister met omvormeridentiteit, vermogen, MPPT's, strings en modules – uitdrukkelijk als planningsregister, niet als verslag van een controleorganisme. De rollen zijn duidelijk: de zelfcontrole toont je bevindingen binnen de ondersteunde regels, ontwerp en metingen doe je ter plaatse, en de keuring doet het erkende organisme.",[41,41989,41991],{"id":41990},"primaire-bronnen","Primaire bronnen",[1450,41993,41994,42001],{},[1453,41995,41996,42000],{},[30,41997,41999],{"href":28056,"rel":41998},[2532],"FOD Economie: actueel AREI\u002FRGIE, Boek 1"," als basis voor de projectspecifieke beoordeling, in het bijzonder hoofdstuk 7.112 (versie V06).",[1453,42002,42003,42008],{},[30,42004,42007],{"href":42005,"rel":42006},"https:\u002F\u002Fwww.synergrid.be\u002Ffr\u002Fhomologation\u002Felectricite\u002Funites-de-production-decentralisee",[2532],"Synergrid: decentrale productie-eenheden"," voor toestelhomologatie en de verhouding tot de aansluitprocedure.",[12,42010,42011],{},"Redactioneel gecontroleerd op 5 oktober 2026. De links verwijzen naar actuele officiële publicaties; de voor jouw opdracht geldende versie en de fabrikantdocumentatie controleer je in het project.",{"title":1467,"searchDepth":1468,"depth":1468,"links":42013},[42014,42015,42016,42017,42018,42019,42020],{"id":41781,"depth":1468,"text":41782},{"id":41813,"depth":1468,"text":41814},{"id":41922,"depth":1468,"text":41923},{"id":41943,"depth":1468,"text":41944},{"id":41955,"depth":1468,"text":41956},{"id":41969,"depth":1468,"text":41970},{"id":41990,"depth":1468,"text":41991},"2026-04-21","Documenteer PV-uitbreidingen in België correct: stem strings, omvormer, aansluitpunt en open gegevens af tussen eendraadschema, situatieplan en dossier.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-system-documentation-editorial.jpg","\u002Fblog\u002Fpv-system-documentation.nl",{"title":41763,"description":42022},"Zonnepanelen op het eendraadschema: documentatie","zonnepanelen-schema","blog\u002Fpv-system-documentation.nl",[5083,29610,42031,3275,12121,42032,42033,33369],"éénlijnschema","netbeheerder","batterij","nm1TKPS93i2iU2MAnMkiMoq0IR3MjYQoNeIQ7hmcpt8",{"id":42036,"title":42037,"articleId":42038,"body":42039,"category":1493,"date":42854,"description":42855,"extension":1496,"image":42052,"lastUpdated":15381,"locale":1497,"meta":42856,"navigation":1499,"ogImage":42857,"path":42858,"publishDate":42854,"readTime":7670,"refreshInterval":11097,"seo":42859,"seoTitle":42860,"slug":42861,"stem":42862,"tags":42863,"__hash__":42866,"kind":1515,"href":37906},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: bijzondere regels voor bestaande installaties","old-building-arei-part8",{"type":9,"value":42040,"toc":42829},[42041,42048,42053,42057,42059,42063,42066,42103,42106,42109,42111,42115,42121,42124,42149,42152,42154,42158,42161,42399,42402,42404,42408,42411,42479,42482,42485,42487,42491,42495,42498,42502,42505,42516,42525,42529,42597,42600,42602,42606,42609,42623,42627,42642,42644,42648,42652,42666,42670,42684,42688,42696,42700,42703,42705,42709,42712,42716,42719,42721,42725,42785,42787,42789,42816,42818],[12,42042,42043,42044,42047],{},"Een oudere elektrische installatie in België hoeft niet tot in elk detail aan het huidige AREI te voldoen. ",[15,42045,42046],{},"Deel 8 van AREI Boek 1"," – vaak „Part 8” genoemd – somt concrete afwijkingen op die gelden voor bestaande installaties: bijvoorbeeld dunnere leidingen vanaf 1 mm², kringen voor contactdozen en verlichting zonder 30 mA-differentieel of vereenvoudigde plannen. Alles wat deel 8 niet uitdrukkelijk toelaat, moet aan Boek 1 voldoen, en nieuwe of belangrijk gewijzigde delen worden volgens de huidige regels beoordeeld. Dit artikel toont je voor welke installaties deel 8 geldt, wat toegelaten is, wat in elk geval verplicht blijft en hoe je zinvol moderniseert.",[12,42049,42050],{},[22,42051],{"alt":33400,"src":42052},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-old-building-arei-part8-editorial.webp",[12,42054,42055,38796],{},[15,42056,38795],{},[29567,42058],{},[41,42060,42062],{"id":42061},"wat-is-deel-8","Wat is deel 8?",[12,42064,42065],{},"Deel 8 bevat de „bijzondere voorschriften met betrekking tot bestaande elektrische installaties”. Bestaand is een installatie waarvan de aanleg ter plaatse begon vóór de inwerkingtreding van het huidige Boek 1 op 1 juni 2020 en die geen gelijkvormigheidscontrole volgens hoofdstuk 6.4 van het huidige Boek onderging (afdeling 8.1.1). Voor woninginstallaties onderscheidt deel 8 twee groepen, elk met een eigen lijst van afwijkingen:",[49,42067,42068,42079],{},[52,42069,42070],{},[55,42071,42072,42074,42076],{},[58,42073,8711],{},[58,42075,6689],{},[58,42077,42078],{},"Afwijkingen",[68,42080,42081,42092],{},[55,42082,42083,42086,42089],{},[73,42084,42085],{},"Oude huishoudelijke installatie",[73,42087,42088],{},"Aanleg vóór 1 oktober 1981, al dan niet met controlebezoek volgens het oud AREI",[73,42090,42091],{},"8.2.1",[55,42093,42094,42097,42100],{},[73,42095,42096],{},"Huishoudelijke installatie oud AREI",[73,42098,42099],{},"Aanleg vanaf 1 oktober 1981, gelijkvormigheidsonderzoek volgens het oud AREI",[73,42101,42102],{},"8.2.2",[12,42104,42105],{},"Voor installaties die vanaf 1 juni 2020 volgens het huidige Boek 1 zijn aangelegd, staan de afwijkingen voor bestaande delen in onderafdeling 6.5.8.1.",[12,42107,42108],{},"Deel 8 is een afgesloten lijst, geen algemene verworven rechten. Ook volgens deel 8 mag materieel alleen in gebruik blijven als het bij correcte installatie, onderhoud en gebruik de veiligheid van personen niet in gevaar brengt en aangepast is aan de uitwendige invloeden (8.2.1 nr. 1).",[29567,42110],{},[41,42112,42114],{"id":42113},"wanneer-wordt-een-oudere-woning-volgens-de-huidige-regels-beoordeeld","Wanneer wordt een oudere woning volgens de huidige regels beoordeeld?",[12,42116,42117,42118,42120],{},"Zodra je een ",[15,42119,33390],{}," uitvoert. Belangrijk is een wijziging die een bijkomende, nog niet door een gelijkvormigheidscontrole gedekte invloed heeft op de veiligheid van personen of goederen (definitie in deel 2). Een nieuwe kring in het bord is doorgaans belangrijk; een stopcontact vervangen door een gelijkwaardig model niet. Twijfel je, verduidelijk de indeling dan vóór de werken met je elektricien en het organisme.",[12,42122,42123],{},"Voor een belangrijke wijziging geldt:",[1602,42125,42126,42132,42139,42146],{},[1453,42127,10081,42128,42131],{},[15,42129,42130],{},"nieuwe of gewijzigde deel"," wordt vóór ingebruikname volgens het huidige Boek 1 gecontroleerd (6.4.7.3).",[1453,42133,42134,42135,42138],{},"Heeft de wijziging invloed op een ",[15,42136,42137],{},"ongewijzigd deel",", dan wordt dat mee gecontroleerd voor wat de gewijzigde kenmerken betreft (6.4.7.3).",[1453,42140,42141,42142,42145],{},"Bij een belangrijke wijziging van een oude woninginstallatie moet de ",[15,42143,42144],{},"volledige installatie"," beschermd zijn door minstens één differentieel van ten hoogste 300 mA aan de oorsprong (4.2.4.3 b).",[1453,42147,42148],{},"De overige ongewijzigde delen behouden hun afwijkingen volgens deel 8.",[12,42150,42151],{},"Niet-belangrijke wijzigingen aan kringen voor contactdozen en verlichting zonder 30 mA-differentieel blijven uitdrukkelijk door de afwijking gedekt (8.2.1 nr. 16, 8.2.2 nr. 10). Ze horen wel als korte beschrijving in het dossier van de installatie (9.1.2 nr. 7).",[29567,42153],{},[41,42155,42157],{"id":42156},"wat-deel-8-toelaat","Wat deel 8 toelaat",[12,42159,42160],{},"De tabel geeft de belangrijkste afwijkingen voor woninginstallaties. „8.2.1” geldt voor installaties van vóór 1981, „8.2.2” voor installaties volgens het oud AREI; veel afwijkingen in 8.2.2 hangen bovendien af van de datum van aanleg.",[49,42162,42163,42178],{},[52,42164,42165],{},[55,42166,42167,42170,42173,42176],{},[58,42168,42169],{},"Onderwerp",[58,42171,42172],{},"Huidige regel",[58,42174,42175],{},"Afwijking volgens deel 8",[58,42177,20865],{},[68,42179,42180,42193,42206,42220,42234,42248,42262,42275,42289,42303,42317,42331,42344,42358,42372,42385],{},[55,42181,42182,42184,42187,42190],{},[73,42183,32408],{},[73,42185,42186],{},"Minstens 2,5 mm², zonder contactdozen 1,5 mm² (5.2.1.2)",[73,42188,42189],{},"Leidingen vanaf 1 mm² blijven; 1 mm² met smeltzekering van ten hoogste 6 A of automaat van ten hoogste 10 A",[73,42191,42192],{},"8.2.1 nr. 5",[55,42194,42195,42198,42200,42203],{},[73,42196,42197],{},"Aanduiding dunne kringen",[73,42199,332],{},[73,42201,42202],{},"Kringen onder 1,5 mm²: rood bord van minstens 8 × 5 cm op de deur van het bord",[73,42204,42205],{},"8.2.1 nr. 3",[55,42207,42208,42211,42214,42217],{},[73,42209,42210],{},"Brandgedrag van leidingen",[73,42212,42213],{},"Bepaald brandgedrag (4.3.3)",[73,42215,42216],{},"Leidingen zonder bepaald brandgedrag blijven",[73,42218,42219],{},"8.2.1 nr. 5, 8.2.2 nr. 5",[55,42221,42222,42225,42228,42231],{},[73,42223,42224],{},"30 mA-differentieel",[73,42226,42227],{},"Voor contactdozen en verlichting (4.2.4.3 b)",[73,42229,42230],{},"Kringen voor contactdozen en verlichting zonder differentieel met hoge gevoeligheid; meer dan acht kringen per differentieel",[73,42232,42233],{},"8.2.1 nr. 16, 8.2.2 nr. 10",[55,42235,42236,42239,42242,42245],{},[73,42237,42238],{},"Differentieel aan de oorsprong",[73,42240,42241],{},"Minstens 40 A, eigen scheidingsfunctie",[73,42243,42244],{},"Toestellen onder 40 A blijven; scheidingsfunctie via een voorgeschakelde scheidingsschakelaar",[73,42246,42247],{},"8.2.1 nr. 2, 8.2.2 nr. 2",[55,42249,42250,42253,42256,42259],{},[73,42251,42252],{},"Overstroombeveiliging",[73,42254,42255],{},"Energiebegrenzingsklasse 3 (5.3.5.5)",[73,42257,42258],{},"Toestellen zonder die markering blijven (8.2.2: aanleg vóór 31.12.2007)",[73,42260,42261],{},"8.2.1 nr. 3, 8.2.2 nr. 3",[55,42263,42264,42266,42269,42272],{},[73,42265,38032],{},[73,42267,42268],{},"Minstens 40 A (5.3.5.1 b)",[73,42270,42271],{},"Minstens 25 A (8.2.2: aanleg vóór 16.9.1991)",[73,42273,42274],{},"8.2.1 nr. 4, 8.2.2 nr. 4",[55,42276,42277,42280,42283,42286],{},[73,42278,42279],{},"Contactdozen zonder aardingscontact",[73,42281,42282],{},"Aardingscontact verplicht (5.3.5.2 b)",[73,42284,42285],{},"Toegelaten als de leiding geen beschermingsgeleider heeft en een differentieel van ten hoogste 30 mA beschermt",[73,42287,42288],{},"8.2.1 nr. 6 b",[55,42290,42291,42294,42297,42300],{},[73,42292,42293],{},"Contactdozen per kring",[73,42295,42296],{},"Ten hoogste acht (5.3.5.2 b)",[73,42298,42299],{},"Meer dan acht, als het toegelaten vermogen van de leiding niet overschreden wordt",[73,42301,42302],{},"8.2.1 nr. 6 b, 8.2.2 nr. 6",[55,42304,42305,42308,42311,42314],{},[73,42306,42307],{},"Verlichtingskringen",[73,42309,42310],{},"Twee gescheiden kringen bij meer dan twee ruimten (5.3.5.2 b)",[73,42312,42313],{},"Eén enkele verlichtingskring",[73,42315,42316],{},"8.2.1 nr. 14",[55,42318,42319,42322,42325,42328],{},[73,42320,42321],{},"Beschermingsgeleider",[73,42323,42324],{},"In elke leiding (5.2.1.3)",[73,42326,42327],{},"Leidingen zonder beschermingsgeleider blijven als ze geen vaste toestellen van klasse I voeden",[73,42329,42330],{},"8.2.1 nr. 12",[55,42332,42333,42335,42338,42341],{},[73,42334,31526],{},[73,42336,42337],{},"Verplicht (4.2.3.4)",[73,42339,42340],{},"Mag ontbreken",[73,42342,42343],{},"8.2.1 nr. 13",[55,42345,42346,42349,42352,42355],{},[73,42347,42348],{},"Aardingsgeleider",[73,42350,42351],{},"Volgens 5.4.2.2",[73,42353,42354],{},"Koper vanaf 6 mm² blijft",[73,42356,42357],{},"8.2.1 nr. 11",[55,42359,42360,42363,42366,42369],{},[73,42361,42362],{},"Kleuren van geleiders",[73,42364,42365],{},"Groen-geel alleen voor beschermingsgeleiders (5.1.6.2)",[73,42367,42368],{},"Beschermingsgeleiders in een andere kleur blijven; groen-gele actieve geleiders zijn verboden",[73,42370,42371],{},"8.2.1 nr. 10",[55,42373,42374,42376,42379,42382],{},[73,42375,29688],{},[73,42377,42378],{},"Volledige inhoud (3.1.2)",[73,42380,42381],{},"Vereenvoudigde plannen met minimale inhoud (8.2.1); ontbrekende handtekening, btw-nummer of type beveiliging toegelaten (8.2.2)",[73,42383,42384],{},"8.2.1 nr. 7, 8.2.2 nr. 7",[55,42386,42387,42390,42393,42396],{},[73,42388,42389],{},"Verslag gelijkvormigheidscontrole",[73,42391,42392],{},"Hoort in het dossier (9.1.2)",[73,42394,42395],{},"Ontbreken wordt bij het controlebezoek getolereerd",[73,42397,42398],{},"8.2.1 nr. 9, 8.2.2 nr. 9",[12,42400,42401],{},"Bij installaties van vóór 1981 bevat het vereenvoudigde eendraadschema minstens adres, nominale spanning, doorsnede van de voedingskabel van het hoofdbord, aard en doorsnede van de vertrekken en de differentiëlen en beveiligingen met hun kenmerken; het vereenvoudigde situatieplan toont contactdozen, schakelaars, lichtpunten en vaste toestellen. Beide plannen hoeven niet met elkaar overeen te stemmen (8.2.1 nr. 7).",[29567,42403],{},[41,42405,42407],{"id":42406},"wat-ook-volgens-deel-8-verplicht-blijft","Wat ook volgens deel 8 verplicht blijft",[12,42409,42410],{},"Deel 8 bevat voor de volgende punten geen afwijking. Ze worden dus ook bij een oude installatie gecontroleerd:",[49,42412,42413,42422],{},[52,42414,42415],{},[55,42416,42417,42420],{},[58,42418,42419],{},"Verplichting",[58,42421,20865],{},[68,42423,42424,42431,42439,42447,42455,42463,42471],{},[55,42425,42426,42429],{},[73,42427,42428],{},"Differentieel van ten hoogste 300 mA aan de oorsprong",[73,42430,37047],{},[55,42432,42433,42436],{},[73,42434,42435],{},"Differentieel van ten hoogste 30 mA voor ruimten met bad of douche",[73,42437,42438],{},"4.2.4.3 b nr. 3",[55,42440,42441,42444],{},[73,42442,42443],{},"Differentieel van ten hoogste 30 mA voor wasmachine, droogkast en vaatwasser",[73,42445,42446],{},"4.2.4.3 b nr. 4",[55,42448,42449,42452],{},[73,42450,42451],{},"Massa's van toestellen van klasse I verbonden met de beschermingsgeleider",[73,42453,42454],{},"4.2.4.3 a",[55,42456,42457,42460],{},[73,42458,42459],{},"Contactdoos met aardingspen alleen met een echte verbinding naar de aardelektrode",[73,42461,42462],{},"8.2.1 nr. 6",[55,42464,42465,42468],{},[73,42466,42467],{},"Eendraadschema en situatieplan, minstens in vereenvoudigde vorm",[73,42469,42470],{},"8.2.1 nr. 7, 8.4.2.2 d",[55,42472,42473,42476],{},[73,42474,42475],{},"Materieel dat bij normaal gebruik de veiligheid niet in gevaar brengt",[73,42477,42478],{},"8.2.1 nr. 1",[12,42480,42481],{},"Daarnaast zijn er toestanden die geen enkele afwijking dekt, omdat ze onmiddellijk gevaarlijk zijn: blote of beschadigde leidingen, aanraakbare actieve delen, aftakdozen zonder deksel, oververhitte of losse verbindingen, overbrugde zekeringen, een beveiliging die groter is dan voor de geleider toegelaten, en laagspanningscontactdozen in volume 0 of 1 van de badkamer.",[12,42483,42484],{},"Voor bestaande badkamers geldt een eigen regel: ruimten waarvan de aanleg vóór 1 maart 2025 begon, mogen de vroegere volume-indeling gebruiken (6.5.8.1 nr. 3). Bij installaties van vóór 1981 laat deel 8 bovendien toe bepaalde leidingen, vloerverwarming en het ontbreken van de bijkomende equipotentiale verbinding te behouden, als volume 2 tot 1 m wordt uitgebreid (8.2.1 nr. 15.2).",[29567,42486],{},[41,42488,42490],{"id":42489},"controlebezoeken-bij-bestaande-installaties","Controlebezoeken bij bestaande installaties",[1396,42492,42494],{"id":42493},"welke-termijn-geldt","Welke termijn geldt?",[12,42496,42497],{},"Voor een installatie die volgens het oud AREI werd gecontroleerd, vindt het eerste controlebezoek plaats binnen de termijn die in het laatste verslag volgens het oud AREI staat (8.1.2); daarna geldt voor woninginstallaties ten minste om de 25 jaar (6.5.2). Voor oude installaties zonder gelijkvormigheidsonderzoek noemt hoofdstuk 8.4 eigen aanleidingen: vóór een verzwaring van de aansluiting (8.4.1), bij verkoop van een wooneenheid (8.4.2) en in de overige gevallen (8.4.3). Kijk dus altijd naar het laatste verslag en de concrete aanleiding.",[1396,42499,42501],{"id":42500},"bij-verkoop","Bij verkoop",[12,42503,42504],{},"Bij verkoop van een wooneenheid met een oude installatie die sinds 1 oktober 1981 niet belangrijk gewijzigd werd, of waarvan het oude deel nog geen controlebezoek onderging, laat de verkoper een controlebezoek uitvoeren en vermeldt hij de datum van het verslag in de verkoopakte (8.4.2).",[31245,42506,42507],{},[12,42508,42509,42512,42513,42515],{},[15,42510,42511],{},"Termijn van 18 maanden (8.4.2.2 a):"," Is het verslag negatief, dan laat de koper binnen ",[15,42514,37683],{}," nagaan of de inbreuken verholpen zijn. Het erkend organisme kiest hij vrij.",[12,42517,42518,42519,42524],{},"Die 18 maanden zijn niet uitwisselbaar met het nieuwe bezoek na een periodiek controlebezoek, dat hetzelfde organisme binnen een jaar uitvoert (6.5.7.2 b.7). De ",[30,42520,42523],{"href":42521,"rel":42522},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fthemas\u002Fenergie\u002Fbronnen-en-dragers-van-energie\u002Felektriciteit\u002Fveiligheid-en-controle-van\u002Fboek-1-van-het-algemeen",[2532],"FOD-informatie over Boek 1"," licht het verloop bij verkoop toe.",[1396,42526,42528],{"id":42527},"wat-bij-het-controlebezoek-wordt-nagekeken","Wat bij het controlebezoek wordt nagekeken",[49,42530,42531,42540],{},[52,42532,42533],{},[55,42534,42535,42537],{},[58,42536,37980],{},[58,42538,42539],{},"Beoordeling",[68,42541,42542,42550,42558,42566,42574,42581,42589],{},[55,42543,42544,42547],{},[73,42545,42546],{},"Visuele controle van leidingen en verbindingen",[73,42548,42549],{},"Beschadiging, oververhitting, bevestiging",[55,42551,42552,42555],{},[73,42553,42554],{},"Aardingsweerstand",[73,42556,42557],{},"Onder 100 Ω (4.2.3.2); boven 30 Ω strengere opbouw van de differentiëlen (4.2.4.3 b, met de afwijkingen van deel 8)",[55,42559,42560,42563],{},[73,42561,42562],{},"Isolatieweerstand",[73,42564,42565],{},"Minstens 500 kΩ per kring bij 500 V proefspanning (6.4.5.1, tabel 6.1)",[55,42567,42568,42571],{},[73,42569,42570],{},"Differentiëlen",[73,42572,42573],{},"Aanwezigheid, toewijzing en werking",[55,42575,42576,42578],{},[73,42577,42252],{},[73,42579,42580],{},"Beveiliging afgestemd op de doorsnede (4.4.1.4, tabel 4.11)",[55,42582,42583,42586],{},[73,42584,42585],{},"Bescherming tegen direct contact",[73,42587,42588],{},"Afdekkingen, dozen, borden",[55,42590,42591,42594],{},[73,42592,42593],{},"Documentatie",[73,42595,42596],{},"Eendraadschema en situatieplan aanwezig",[12,42598,42599],{},"Het verslag vermeldt inbreuken, opmerkingen en de voor de installatie geldende afwijkingen van deel 8 uitdrukkelijk (6.5.7.2 b.5). Ontbreken de plannen bij een controlebezoek bij verkoop, dan maakt de keurder een korte beschrijving en een handschets, zodat traceerbaar blijft wat gecontroleerd werd; het ontbreken van de plannen wordt toch als inbreuk vermeld (8.4.2.2 d).",[29567,42601],{},[41,42603,42605],{"id":42604},"gedeeltelijke-renovatie-wat-de-zogenaamde-besmettingsregel-echt-betekent","Gedeeltelijke renovatie: wat de zogenaamde besmettingsregel echt betekent",[12,42607,42608],{},"In de praktijk spreekt men vaak van een „besmettingsregel”: nieuwe werken zouden de hele installatie naar de huidige stand dwingen. Dat begrip kent Boek 1 niet. De werkelijke regels zijn preciezer:",[1450,42610,42611,42614,42617,42620],{},[1453,42612,42613],{},"Nieuwe en belangrijk gewijzigde delen volgen het huidige Boek 1 (6.4.7.3).",[1453,42615,42616],{},"Ongewijzigde delen worden mee gecontroleerd voor zover de wijziging hun kenmerken beïnvloedt (6.4.7.3).",[1453,42618,42619],{},"Na een belangrijke wijziging van een oude woninginstallatie beschermt minstens één differentieel van 300 mA aan de oorsprong de volledige installatie (4.2.4.3 b).",[1453,42621,42622],{},"Alle andere afwijkingen van deel 8 blijven voor de ongewijzigde delen bestaan.",[1396,42624,42626],{"id":42625},"praktisch-gevolg","Praktisch gevolg",[1450,42628,42629,42636,42639],{},[1453,42630,42631,42632,42635],{},"Plan nieuwe kringen zo dat oude en nieuwe delen ",[15,42633,42634],{},"duidelijk afgebakend"," zijn, bijvoorbeeld via een eigen onderverdeelbord.",[1453,42637,42638],{},"Duid op het eendraadschema aan wat oud en wat nieuw is.",[1453,42640,42641],{},"Verduidelijk betwiste grenzen vóór de werken met het organisme.",[29567,42643],{},[41,42645,42647],{"id":42646},"stap-voor-stap-moderniseren","Stap voor stap moderniseren",[1396,42649,42651],{"id":42650},"prioriteit-1-verplichtingen-en-gevaren","Prioriteit 1: verplichtingen en gevaren",[1450,42653,42654,42657,42660,42663],{},[1453,42655,42656],{},"Differentieel van ten hoogste 300 mA aan de oorsprong plaatsen als hij ontbreekt",[1453,42658,42659],{},"30 mA-differentieel voor badkamer en wasmachine, droogkast en vaatwasser",[1453,42661,42662],{},"Beschadigde leidingen vervangen, losse verbindingen herstellen, dozen sluiten",[1453,42664,42665],{},"Aarding laten meten en zo nodig verbeteren",[1396,42667,42669],{"id":42668},"prioriteit-2-duidelijk-meer-veiligheid","Prioriteit 2: duidelijk meer veiligheid",[1450,42671,42672,42675,42678,42681],{},[1453,42673,42674],{},"30 mA-differentieel ook voor kringen met contactdozen en verlichting",[1453,42676,42677],{},"Contactdozen met aardingscontact en beschermingsgeleider plaatsen",[1453,42679,42680],{},"Oude smeltzekeringen vervangen door automaten",[1453,42682,42683],{},"Overspanningsbeveiliging vakkundig laten beoordelen (4.5.1)",[1396,42685,42687],{"id":42686},"prioriteit-3-comfort-en-toekomst","Prioriteit 3: comfort en toekomst",[1450,42689,42690,42693],{},[1453,42691,42692],{},"Bord moderniseren met reserve en duidelijke aanduiding",[1453,42694,42695],{},"Laadpaal of PV voorbereiden – een nieuwe kring daarvoor is een belangrijke uitbreiding met gelijkvormigheidscontrole",[1396,42697,42699],{"id":42698},"werken-afbakenen-vóór-je-prijzen-opvraagt","Werken afbakenen vóór je prijzen opvraagt",[12,42701,42702],{},"Laat de bestaande toestand opnemen, scheid verplichtingen van vrijwillige verbeteringen en vraag een gedateerde offerte voor het concrete gebouw. Leidingtracés, afwerking, bereikbaarheid, staat van het bord en omvang van de renovatie bepalen de inspanning sterker dan eender welke prijsvork op het internet.",[29567,42704],{},[41,42706,42708],{"id":42707},"installatiegeschiedenis-verduidelijken-vóór-je-een-afwijking-inroept","Installatiegeschiedenis verduidelijken vóór je een afwijking inroept",[12,42710,42711],{},"Het bouwjaar alleen volstaat niet. Maak een tijdlijn uit vroegere keuringsverslagen, bordlabels, facturen, vergunningen en de zichtbare uitvoering. Bepaal welke delen vóór 1 oktober 1981 bestonden, wat later belangrijk gewijzigd of uitgebreid werd en of die werken gekeurd zijn. Noteer bij elke afwijking die je inroept de juiste vindplaats, de betrokken kring, het bewijs van ouderdom en de resterende veiligheidsvoorwaarden. Ontbreken bewijzen, dan blijft het veld open; kabelkleur of uitzicht is geen betrouwbare datum. Over de toepasbaarheid beslist het organisme op basis van de werkelijke installatie.",[1396,42713,42715],{"id":42714},"opname-ter-plaatse","Opname ter plaatse",[12,42717,42718],{},"Fotografeer en label bord, zekeringen, differentiëlen, aardingsaansluitingen, zichtbare leidingen en aftakdozen, zonder afdekkingen onder spanning te verwijderen. Neem elke herkende kring eerst op als bestaande toestand. Onbekende herkomst, onbekende doorsnede of onleesbare zekeringwaarden blijven uitdrukkelijk open. Daarna scheidt de vakman dringende maatregelen, keuringsplichtige wijzigingen en vrijwillige modernisering. Zo toont je schema de bestaande installatie zoals ze is – niet als nieuwbouw.",[29567,42720],{},[41,42722,42724],{"id":42723},"samenvatting","Samenvatting",[49,42726,42727,42735],{},[52,42728,42729],{},[55,42730,42731,42733],{},[58,42732,2971],{},[58,42734,4311],{},[68,42736,42737,42745,42753,42761,42769,42777],{},[55,42738,42739,42742],{},[73,42740,42741],{},"Moet mijn oude installatie aan het huidige AREI voldoen?",[73,42743,42744],{},"Behalve de afwijkingen van deel 8 wel; nieuwe en belangrijk gewijzigde delen volledig",[55,42746,42747,42750],{},[73,42748,42749],{},"Heb ik een differentieel van 300 mA aan de oorsprong nodig?",[73,42751,42752],{},"Ja. Deel 8 laat alleen toestellen onder 40 A en een voorgeschakelde scheiding toe, geen weglating",[55,42754,42755,42758],{},[73,42756,42757],{},"Heb ik 30 mA-differentiëlen nodig?",[73,42759,42760],{},"Voor badkamer en wasmachine, droogkast, vaatwasser ja; voor contactdozen en licht aanbevolen",[55,42762,42763,42766],{},[73,42764,42765],{},"Zijn contactdozen zonder aardingscontact toegelaten?",[73,42767,42768],{},"In installaties van vóór 1981, als de leiding geen beschermingsgeleider heeft en een 30 mA-differentieel beschermt",[55,42770,42771,42774],{},[73,42772,42773],{},"Hoe vaak wordt er gekeurd?",[73,42775,42776],{},"Volgens de termijn in het laatste verslag, daarna om de 25 jaar; bij oude installaties per aanleiding",[55,42778,42779,42782],{},[73,42780,42781],{},"Wat bij een gedeeltelijke renovatie?",[73,42783,42784],{},"Nieuw deel volgens het huidige Boek 1, ongewijzigd deel behoudt de afwijkingen van deel 8",[29567,42786],{},[41,42788,1448],{"id":1447},[1450,42790,42791,42796,42801,42807,42811],{},[1453,42792,42793],{},[30,42794,42795],{"href":17361},"Elektrische keuring in België: de volledige gids",[1453,42797,42798],{},[30,42799,42800],{"href":17449},"AREI-reglementen 2026: de belangrijkste wijzigingen",[1453,42802,42803],{},[30,42804,42806],{"href":42805},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[1453,42808,42809],{},[30,42810,21980],{"href":36784},[1453,42812,42813],{},[30,42814,42815],{"href":37950},"Elektrisch dossier bij woningverkoop: regels en documenten",[29567,42817],{},[12,42819,42820],{},[17563,42821,42822,42823,42825,42826],{},"Ook in een oudere woning bouw je met ",[15,42824,1337],{}," eendraadschema en situatieplan op vanuit één project en markeer je oude en nieuwe delen netjes. De zelfcontrole toont je bevindingen in de ondersteunde regels; of een afwijking van deel 8 voor jouw installatie geldt, beslist het erkend organisme ter plaatse. ",[30,42827,42828],{"href":6989},"Gratis starten →",{"title":1467,"searchDepth":1468,"depth":1468,"links":42830},[42831,42832,42833,42834,42835,42840,42843,42849,42852,42853],{"id":42061,"depth":1468,"text":42062},{"id":42113,"depth":1468,"text":42114},{"id":42156,"depth":1468,"text":42157},{"id":42406,"depth":1468,"text":42407},{"id":42489,"depth":1468,"text":42490,"children":42836},[42837,42838,42839],{"id":42493,"depth":1486,"text":42494},{"id":42500,"depth":1486,"text":42501},{"id":42527,"depth":1486,"text":42528},{"id":42604,"depth":1468,"text":42605,"children":42841},[42842],{"id":42625,"depth":1486,"text":42626},{"id":42646,"depth":1468,"text":42647,"children":42844},[42845,42846,42847,42848],{"id":42650,"depth":1486,"text":42651},{"id":42668,"depth":1486,"text":42669},{"id":42686,"depth":1486,"text":42687},{"id":42698,"depth":1486,"text":42699},{"id":42707,"depth":1468,"text":42708,"children":42850},[42851],{"id":42714,"depth":1486,"text":42715},{"id":42723,"depth":1468,"text":42724},{"id":1447,"depth":1468,"text":1448},"2026-04-14","Wat geldt voor oudere elektrische installaties in België: deel 8 van het AREI met alle belangrijke afwijkingen, de verplichtingen zonder uitzondering, controlebezoeken en stapsgewijze modernisering.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-old-building-arei-part8-editorial.jpg","\u002Fblog\u002Fold-building-arei-part8.nl",{"title":42037,"description":42855},"Oudere installaties en AREI Part 8: bijzondere regels","oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[42864,3275,33955,14349,33951,17499,42865],"oudere installatie","periodiek","isXZYVoV812SXX3iy4Xr5FwI-7-G-twulhVWpvuEUyY",{"id":42868,"title":42869,"articleId":42870,"body":42871,"category":1493,"date":44196,"description":44197,"extension":1496,"image":42883,"lastUpdated":32291,"locale":1497,"meta":44198,"navigation":1499,"ogImage":44199,"path":44200,"publishDate":44196,"readTime":2482,"refreshInterval":11097,"seo":44201,"seoTitle":4037,"slug":44202,"stem":44203,"tags":44204,"__hash__":44209,"kind":1515,"href":36784},"blog\u002Fblog\u002Fdistribution-board-planning.nl.md","Verdeelkast plannen: Opbouw en dimensionering volgens AREI","distribution-board-planning",{"type":9,"value":42872,"toc":44162},[42873,42879,42884,42888,42890,42900,42904,42915,43001,43004,43008,43011,43079,43082,43086,43089,43093,43096,43208,43217,43221,43228,43232,43238,43244,43248,43323,43331,43335,43342,43346,43413,43416,43419,43422,43426,43430,43437,43441,43493,43497,43503,43506,43517,43520,43524,43527,43531,43608,43612,43718,43722,43825,43829,43931,43937,43941,44043,44047,44050,44061,44064,44068,44071,44074,44077,44081,44084,44087,44090,44093,44097,44102,44106,44123,44125,44157],[12,42874,42875,42878],{},[15,42876,42877],{},"Een verdeelkast (zekeringkast, verdeelbord) plan je in vier stappen: kringen tellen, de beveiligingsketen vastleggen, groepen over rijen verdelen en reserve voorzien."," Het AREI geeft daarvoor vaste ankerpunten: een hoofdschakelaar van minstens 40 A, aan het begin van de installatie een differentieelschakelaar van maximaal 300 mA, daarachter differentieelschakelaars van 30 mA voor stopcontacten, verlichting, badkamer en wastoestellen – met maximaal acht eindkringen per toestel. Deze gids toont opbouw, regels en een volledig voorbeeld voor een eengezinswoning.",[12,42880,42881],{},[22,42882],{"alt":19470,"src":42883},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-distribution-board-planning-editorial.webp",[41,42885,42887],{"id":42886},"basisprincipes-opbouw-van-een-verdeelkast","Basisprincipes: opbouw van een verdeelkast",[1396,42889,35858],{"id":39559},[12,42891,42892,42893,42896,42897,39],{},"Alle modules in de kast klik je op genormaliseerde ",[15,42894,42895],{},"DIN-rails"," (35 mm-rail volgens EN 60715). Elke rail vormt een ",[15,42898,42899],{},"rij",[1396,42901,42903],{"id":42902},"modulebreedte-te","Modulebreedte (TE)",[12,42905,42906,42907,42910,42911,42914],{},"De breedte van een module wordt uitgedrukt in ",[15,42908,42909],{},"TE"," (modules). Eén TE is ",[15,42912,42913],{},"18 mm",". Typische breedtes:",[49,42916,42917,42925],{},[52,42918,42919],{},[55,42920,42921,42923],{},[58,42922,493],{},[58,42924,13995],{},[68,42926,42927,42935,42943,42951,42958,42966,42973,42980,42987,42994],{},[55,42928,42929,42932],{},[73,42930,42931],{},"Automaat 1P+N",[73,42933,42934],{},"1 TE (compact) of 2 TE",[55,42936,42937,42940],{},[73,42938,42939],{},"Automaat 2-polig",[73,42941,42942],{},"2 TE",[55,42944,42945,42948],{},[73,42946,42947],{},"Automaat 3-polig",[73,42949,42950],{},"3 TE",[55,42952,42953,42956],{},[73,42954,42955],{},"Differentieelschakelaar 2-polig (30\u002F300 mA)",[73,42957,42942],{},[55,42959,42960,42963],{},[73,42961,42962],{},"Differentieelschakelaar 4-polig",[73,42964,42965],{},"4 TE",[55,42967,42968,42971],{},[73,42969,42970],{},"Hoofdschakelaar 2-polig",[73,42972,42942],{},[55,42974,42975,42978],{},[73,42976,42977],{},"Hoofdschakelaar 4-polig",[73,42979,42965],{},[55,42981,42982,42984],{},[73,42983,31382],{},[73,42985,42986],{},"2–4 TE",[55,42988,42989,42992],{},[73,42990,42991],{},"Beltransformator",[73,42993,42942],{},[55,42995,42996,42999],{},[73,42997,42998],{},"Schakelklok",[73,43000,42942],{},[12,43002,43003],{},"Doorslaggevend zijn de technische fiches van de toestellen die je effectief plaatst.",[1396,43005,43007],{"id":43006},"afmetingen-van-de-verdeelkast","Afmetingen van de verdeelkast",[12,43009,43010],{},"Kasten worden gedimensioneerd op aantal rijen en TE per rij:",[49,43012,43013,43029],{},[52,43014,43015],{},[55,43016,43017,43020,43023,43026],{},[58,43018,43019],{},"Benaming",[58,43021,43022],{},"Rijen",[58,43024,43025],{},"TE per rij",[58,43027,43028],{},"Totaal TE",[68,43030,43031,43043,43055,43067],{},[55,43032,43033,43036,43038,43041],{},[73,43034,43035],{},"1 rij",[73,43037,343],{},[73,43039,43040],{},"12–18",[73,43042,43040],{},[55,43044,43045,43048,43050,43052],{},[73,43046,43047],{},"2 rijen",[73,43049,326],{},[73,43051,43040],{},[73,43053,43054],{},"24–36",[55,43056,43057,43060,43062,43064],{},[73,43058,43059],{},"3 rijen",[73,43061,577],{},[73,43063,43040],{},[73,43065,43066],{},"36–54",[55,43068,43069,43072,43074,43076],{},[73,43070,43071],{},"4 rijen",[73,43073,574],{},[73,43075,43040],{},[73,43077,43078],{},"48–72",[12,43080,43081],{},"Voor de eengezinswoning in het voorbeeld hieronder past een kast met 4 rijen van 18 TE (72 TE), met ruim plaats voor latere uitbreidingen.",[1396,43083,43085],{"id":43084},"wat-het-arei-van-de-kast-vraagt","Wat het AREI van de kast vraagt",[12,43087,43088],{},"In huishoudelijke installaties behoort de verdeelkast tot klasse I of II, heeft ze een achterwand die gedurende haar hele levensduur niet wegneembaar is, en een deur. Ze bestaat uit onbrandbaar, niet-hygroscopisch materiaal en is zonder bijzondere hulpmiddelen gemakkelijk bereikbaar (onderafdeling 5.3.5.1, punten a en c). Beveiligingen voor kringen met verschillende energietarieven staan op gescheiden borden met minstens 10 cm tussenruimte of in een aparte kast, tenzij de netbeheerder iets anders toestaat.",[41,43090,43092],{"id":43091},"stap-1-kringen-tellen","Stap 1: kringen tellen",[12,43094,43095],{},"Lijst alle nodige kringen op. De voorbeeldwoning (3 slaapkamers, 150 m², zonder PV) geeft deze lijst:",[49,43097,43098,43110],{},[52,43099,43100],{},[55,43101,43102,43105,43108],{},[58,43103,43104],{},"Kring",[58,43106,43107],{},"Aantal in voorbeeld",[58,43109,40357],{},[68,43111,43112,43121,43131,43141,43151,43161,43170,43179,43188,43198],{},[55,43113,43114,43116,43118],{},[73,43115,304],{},[73,43117,577],{},[73,43119,43120],{},"B10A of B16A (1,5 mm²)",[55,43122,43123,43126,43128],{},[73,43124,43125],{},"Stopcontacten algemeen",[73,43127,1233],{},[73,43129,43130],{},"B16A of B20A (2,5 mm²)",[55,43132,43133,43136,43138],{},[73,43134,43135],{},"Oven",[73,43137,343],{},[73,43139,43140],{},"B20A met 2,5 mm², B25A met 4 mm²",[55,43142,43143,43146,43148],{},[73,43144,43145],{},"Kookplaat",[73,43147,343],{},[73,43149,43150],{},"B32A met 6 mm² of driefasig volgens fabrikant",[55,43152,43153,43156,43158],{},[73,43154,43155],{},"Vaatwasser",[73,43157,343],{},[73,43159,43160],{},"B16A",[55,43162,43163,43166,43168],{},[73,43164,43165],{},"Wasmachine",[73,43167,343],{},[73,43169,43160],{},[55,43171,43172,43175,43177],{},[73,43173,43174],{},"Droogkast",[73,43176,343],{},[73,43178,43160],{},[55,43180,43181,43184,43186],{},[73,43182,43183],{},"Koelkast",[73,43185,343],{},[73,43187,43160],{},[55,43189,43190,43193,43195],{},[73,43191,43192],{},"Boiler",[73,43194,343],{},[73,43196,43197],{},"B16A of B20A",[55,43199,43200,43203,43205],{},[73,43201,43202],{},"Laadpaal (indien aanwezig)",[73,43204,343],{},[73,43206,43207],{},"volgens fabrikant, bv. B32A met 6 mm² bij 7,4 kW eenfasig",[12,43209,43210,43211,43214,43215,39],{},"De maxima per doorsnede staan in tabel 4.11 (onderafdeling 4.4.1.4). Wasmachine, droogkast, vaatwasser, fornuis, kookplaat, oven en elk toestel met vaste standplaats vanaf 2600 W krijgen een eigen kring (5.2.1.2). Op een stopcontactkring hangen maximaal ",[15,43212,43213],{},"8 stopcontacten"," (5.3.5.2 b); zuivere verlichtingskringen hebben geen vaste puntgrens. Meer daarover in ",[30,43216,37014],{"href":25635},[41,43218,43220],{"id":43219},"stap-2-de-beveiligingsketen-vastleggen","Stap 2: de beveiligingsketen vastleggen",[12,43222,43223,43224,43227],{},"De beveiligingstoestellen orden je ",[15,43225,43226],{},"hiërarchisch",", van de voeding naar beneden:",[1396,43229,43231],{"id":43230},"hiërarchie-van-beveiligingstoestellen","Hiërarchie van beveiligingstoestellen",[27702,43233,43236],{"className":43234,"code":43235,"language":27707},[27705],"Hoofdschakelaar (min. 40 A)\n   └── Differentieelschakelaar aan het begin ≤ 300 mA (min. type A, min. 40 A)\n        ├── Differentieelschakelaar 30 mA #1 (type A)\n        │    ├── Automaat licht gelijkvloers (B10A)\n        │    ├── Automaat licht verdieping (B10A)\n        │    ├── Automaat stopcontacten woonkamer (B16A)\n        │    └── Automaat stopcontacten gang (B16A)\n        ├── Differentieelschakelaar 30 mA #2 (type A)\n        │    ├── Automaat stopcontacten keuken (B16A)\n        │    ├── Automaat oven (B20A)\n        │    ├── Automaat vaatwasser (B16A)\n        │    └── Automaat stopcontacten slaapkamer (B16A)\n        └── Differentieelschakelaar 30 mA #3 (type A)\n             ├── Automaat wasmachine (B16A)\n             ├── Automaat badkamer (B16A)\n             ├── Automaat buiten (B16A)\n             └── Automaat garage (B16A)\n",[1300,43237,43235],{"__ignoreMap":1467},[12,43239,43240,43241,39],{},"Bij een driefasige aansluiting (3N~400\u002F230 V) heb je een 4-polige hoofdschakelaar en differentieelschakelaar nodig, en meerpolige automaten voor driefasige kringen. De verschillen tussen de Belgische netvormen lees je in ",[30,43242,43243],{"href":32640},"eenfasig of driefasig?",[1396,43245,43247],{"id":43246},"wat-het-arei-voor-de-beveiligingsketen-voorschrijft","Wat het AREI voor de beveiligingsketen voorschrijft",[49,43249,43250,43261],{},[52,43251,43252],{},[55,43253,43254,43257,43259],{},[58,43255,43256],{},"Element",[58,43258,41506],{},[58,43260,20865],{},[68,43262,43263,43272,43282,43293,43303,43313],{},[55,43264,43265,43267,43270],{},[73,43266,38032],{},[73,43268,43269],{},"schakelt alle lijngeleiders en eventueel de nulgeleider tegelijk af; minstens 40 A",[73,43271,38038],{},[55,43273,43274,43277,43280],{},[73,43275,43276],{},"Differentieel aan het begin",[73,43278,43279],{},"aanspreekstroom maximaal 300 mA; verzekert de scheidingsfunctie",[73,43281,37047],{},[55,43283,43284,43287,43290],{},[73,43285,43286],{},"Alle differentieelschakelaars",[73,43288,43289],{},"minstens type A; aan het begin minstens 40 A nominale stroom; onderbreken alle actieve geleiders, ook N",[73,43291,43292],{},"5.3.5.3 a en c",[55,43294,43295,43298,43301],{},[73,43296,43297],{},"Differentieel 30 mA",[73,43299,43300],{},"onmiddellijk na het begin; beschermt minstens stopcontacten, verlichting, badkamer en wasmachine, droogkast en vaatwasser; maximaal acht eindkringen",[73,43302,37047],{},[55,43304,43305,43308,43311],{},[73,43306,43307],{},"Vaste toestellen",[73,43309,43310],{},"koeltoestellen, fornuis, verwarming en andere niet genoemde kringen mogen rechtstreeks achter de differentieel aan het begin",[73,43312,37047],{},[55,43314,43315,43318,43321],{},[73,43316,43317],{},"Elektrische wandverwarming > 25 V AC",[73,43319,43320],{},"eigen differentieelschakelaar van maximaal 100 mA",[73,43322,37047],{},[12,43324,17020,43325,43327,43328,39],{},[15,43326,17023],{}," (Boek 1 versie 07, koninklijk besluit van 13 augustus 2026) verzegelt het controleorganisme de differentieel aan het begin niet meer; tot 31 oktober 2026 schrijft versie 06 de verzegeling nog voor; de verplichting van 300 mA zelf blijft. Details lees je in ",[30,43329,43330],{"href":17503},"verzegeling van de differentieel vervalt",[1396,43332,43334],{"id":43333},"als-de-aardingsweerstand-hoger-is-dan-30-ω","Als de aardingsweerstand hoger is dan 30 Ω",[12,43336,43337,43338,43341],{},"Ligt de spreidingsweerstand van de aardverbinding boven 30 Ω, dan plan je minstens ",[15,43339,43340],{},"twee"," differentieelschakelaars met hoge of zeer hoge gevoeligheid. Elk beschermt maximaal zestien enkelvoudige of meervoudige stopcontacten. De overige kringen aan het begin vul je aan met minstens één differentieelschakelaar van maximaal 100 mA per kring of groep (4.2.4.3 b). Hou daarom al in het eerste ontwerp plaats vrij voor die extra toestellen als de aardingsmeting nog ontbreekt.",[1396,43343,43345],{"id":43344},"types-differentieelschakelaars","Types differentieelschakelaars",[49,43347,43348,43359],{},[52,43349,43350],{},[55,43351,43352,43354,43356],{},[58,43353,9898],{},[58,43355,18883],{},[58,43357,43358],{},"Ontwerpgrens",[68,43360,43361,43374,43387,43400],{},[55,43362,43363,43368,43371],{},[73,43364,43365],{},[15,43366,43367],{},"maximaal 300 mA, min. type A",[73,43369,43370],{},"Beveiliging aan het begin van de woning",[73,43372,43373],{},"Nominale stroom en polen moeten passen; type S is alleen een optie bij aangetoonde tijdselectiviteit",[55,43375,43376,43381,43384],{},[73,43377,43378],{},[15,43379,43380],{},"maximaal 30 mA, type A",[73,43382,43383],{},"Hoge of zeer hoge gevoeligheid",[73,43385,43386],{},"Voor de kringen uit 4.2.4.3 b; bijkomende toestelvoorwaarden controleer je in de fabrikantgegevens",[55,43388,43389,43394,43397],{},[73,43390,43391],{},[15,43392,43393],{},"Type B",[73,43395,43396],{},"Detecteert ook gladde DC-foutstromen",[73,43398,43399],{},"Alleen waar foutstroomspectrum en toestelconcept dit vragen; geen automatisme voor elke laadpaal of omvormer",[55,43401,43402,43407,43410],{},[73,43403,43404],{},[15,43405,43406],{},"Type F",[73,43408,43409],{},"Detecteert bepaalde gemengde frequenties",[73,43411,43412],{},"Alleen wanneer belasting, productnorm en fabrikantdocumentatie deze karakteristiek vereisen",[12,43414,43415],{},"Toestellen met halfgeleiders kunnen storende gelijkstroomcomponenten veroorzaken. Onderafdeling 5.3.5.3 punt f noemt daarvoor meerdere toegelaten oplossingen, waaronder een differentieelschakelaar die ook bij zulke fouten veilig werkt, of een DC-foutstroomdetectie in coördinatie met de differentieelschakelaar.",[1396,43417,23151],{"id":43418},"selectiviteit",[12,43420,43421],{},"Selectiviteit tussen voor- en nageschakelde differentieelschakelaars toon je aan met gevoeligheid, tijd-stroomkarakteristieken, fabrikantgegevens over coördinatie en het volledige beveiligingsconcept. Een vertraagd toestel kan deel van de oplossing zijn; op zichzelf garandeert het geen selectiviteit.",[41,43423,43425],{"id":43424},"stap-3-groepen-over-rijen-verdelen","Stap 3: groepen over rijen verdelen",[1396,43427,43429],{"id":43428},"arei-regel-maximaal-8-eindkringen-per-differentieel-van-30-ma","AREI-regel: maximaal 8 eindkringen per differentieel van 30 mA",[12,43431,43432,43433,43436],{},"Volgens onderafdeling 4.2.4.3 b sluit je op een differentieelschakelaar met hoge of zeer hoge gevoeligheid maximaal ",[15,43434,43435],{},"acht eindkringen"," aan. Met vier tot zes kringen per toestel hou je ruimte voor latere uitbreidingen.",[1396,43438,43440],{"id":43439},"typische-rijverdeling","Typische rijverdeling",[49,43442,43443,43451],{},[52,43444,43445],{},[55,43446,43447,43449],{},[58,43448,11288],{},[58,43450,1288],{},[68,43452,43453,43463,43473,43483],{},[55,43454,43455,43460],{},[73,43456,43457],{},[15,43458,43459],{},"Rij 1",[73,43461,43462],{},"Hoofdschakelaar, differentieel aan het begin (300 mA), SPD, eventueel beltransformator",[55,43464,43465,43470],{},[73,43466,43467],{},[15,43468,43469],{},"Rij 2",[73,43471,43472],{},"Differentieel #1 (30 mA) met zijn kringen (licht en stopcontacten woonzone)",[55,43474,43475,43480],{},[73,43476,43477],{},[15,43478,43479],{},"Rij 3",[73,43481,43482],{},"Differentieel #2 (30 mA) met zijn kringen (keuken en slaapkamers)",[55,43484,43485,43490],{},[73,43486,43487],{},[15,43488,43489],{},"Rij 4",[73,43491,43492],{},"Differentieel #3 (30 mA) met zijn kringen (badkamer, buiten, garage, technisch)",[41,43494,43496],{"id":43495},"stap-4-reserve-voorzien","Stap 4: reserve voorzien",[12,43498,43499,43500,39],{},"Voorzie vrije plaatsen; 20 tot 30 % van de TE is een beproefde praktijk, maar geen AREI-eis. Bij 20 automaten betekent dat minstens vier tot zes vrije TE. Lege plaatsen sluit je af met ",[15,43501,43502],{},"blindplaten",[12,43504,43505],{},"Reserve heb je nodig voor:",[1450,43507,43508,43511,43514],{},[1453,43509,43510],{},"latere verbruikers zoals laadpaal, airco of sauna,",[1453,43512,43513],{},"herverdeling wanneer een differentieel te veel kringen draagt,",[1453,43515,43516],{},"een latere kastvervanging die je zo uitspaart.",[12,43518,43519],{},"Reserve is meer dan vrije TE: voorzie ook vrije klemmen, voldoende bedradingsgoot, bereikbare N- en PE-rails, plaats voor metingen en een gedocumenteerde uitbreidingsrichting.",[41,43521,43523],{"id":43522},"voorbeeld-verdeelkast-met-4-rijen-voor-een-eengezinswoning","Voorbeeld: verdeelkast met 4 rijen voor een eengezinswoning",[12,43525,43526],{},"Een volledig voorbeeld voor een Belgische eengezinswoning (3 slaapkamers, 150 m², eenfasig, zonder PV):",[1396,43528,43530],{"id":43529},"rij-1-voeding-en-bescherming-18-te","Rij 1 — Voeding en bescherming (18 TE)",[49,43532,43533,43545],{},[52,43534,43535],{},[55,43536,43537,43539,43541,43543],{},[58,43538,30419],{},[58,43540,493],{},[58,43542,42909],{},[58,43544,16355],{},[68,43546,43547,43559,43572,43583,43595],{},[55,43548,43549,43552,43555,43557],{},[73,43550,43551],{},"1–2",[73,43553,43554],{},"Hoofdschakelaar 2P",[73,43556,326],{},[73,43558,22954],{},[55,43560,43561,43564,43567,43569],{},[73,43562,43563],{},"3–4",[73,43565,43566],{},"Differentieelschakelaar 2P",[73,43568,326],{},[73,43570,43571],{},"300 mA, type A, 40 A",[55,43573,43574,43577,43579,43581],{},[73,43575,43576],{},"5–8",[73,43578,37425],{},[73,43580,574],{},[73,43582,38111],{},[55,43584,43585,43588,43590,43592],{},[73,43586,43587],{},"9–10",[73,43589,42991],{},[73,43591,326],{},[73,43593,43594],{},"8 V-bel",[55,43596,43597,43600,43603,43605],{},[73,43598,43599],{},"11–18",[73,43601,43602],{},"Reserve",[73,43604,560],{},[73,43606,43607],{},"Blindplaten",[1396,43609,43611],{"id":43610},"rij-2-groep-1-verlichting-en-wonen-18-te","Rij 2 — Groep 1: verlichting en wonen (18 TE)",[49,43613,43614,43626],{},[52,43615,43616],{},[55,43617,43618,43620,43622,43624],{},[58,43619,30419],{},[58,43621,493],{},[58,43623,42909],{},[58,43625,16355],{},[68,43627,43628,43639,43651,43662,43673,43685,43696,43707],{},[55,43629,43630,43632,43634,43636],{},[73,43631,43551],{},[73,43633,43297],{},[73,43635,326],{},[73,43637,43638],{},"Type A",[55,43640,43641,43643,43646,43648],{},[73,43642,577],{},[73,43644,43645],{},"Automaat B10A",[73,43647,343],{},[73,43649,43650],{},"Licht gelijkvloers",[55,43652,43653,43655,43657,43659],{},[73,43654,574],{},[73,43656,43645],{},[73,43658,343],{},[73,43660,43661],{},"Licht verdieping",[55,43663,43664,43666,43668,43670],{},[73,43665,1219],{},[73,43667,43645],{},[73,43669,343],{},[73,43671,43672],{},"Licht kelder\u002Fbuiten",[55,43674,43675,43677,43680,43682],{},[73,43676,1233],{},[73,43678,43679],{},"Automaat B16A",[73,43681,343],{},[73,43683,43684],{},"Stopcontacten woonkamer",[55,43686,43687,43689,43691,43693],{},[73,43688,546],{},[73,43690,43679],{},[73,43692,343],{},[73,43694,43695],{},"Stopcontacten eetkamer",[55,43697,43698,43700,43702,43704],{},[73,43699,560],{},[73,43701,43679],{},[73,43703,343],{},[73,43705,43706],{},"Stopcontacten gang",[55,43708,43709,43712,43714,43716],{},[73,43710,43711],{},"9–18",[73,43713,43602],{},[73,43715,38108],{},[73,43717,43607],{},[1396,43719,43721],{"id":43720},"rij-3-groep-2-keuken-en-slaapkamers-18-te","Rij 3 — Groep 2: keuken en slaapkamers (18 TE)",[49,43723,43724,43736],{},[52,43725,43726],{},[55,43727,43728,43730,43732,43734],{},[58,43729,30419],{},[58,43731,493],{},[58,43733,42909],{},[58,43735,16355],{},[68,43737,43738,43748,43759,43771,43782,43793,43804,43815],{},[55,43739,43740,43742,43744,43746],{},[73,43741,43551],{},[73,43743,43297],{},[73,43745,326],{},[73,43747,43638],{},[55,43749,43750,43752,43754,43756],{},[73,43751,577],{},[73,43753,43679],{},[73,43755,343],{},[73,43757,43758],{},"Stopcontacten keuken",[55,43760,43761,43763,43766,43768],{},[73,43762,574],{},[73,43764,43765],{},"Automaat B20A",[73,43767,343],{},[73,43769,43770],{},"Oven (eigen kring)",[55,43772,43773,43775,43777,43779],{},[73,43774,1219],{},[73,43776,43679],{},[73,43778,343],{},[73,43780,43781],{},"Vaatwasser (eigen kring)",[55,43783,43784,43786,43788,43790],{},[73,43785,1233],{},[73,43787,43679],{},[73,43789,343],{},[73,43791,43792],{},"Koelkast (eigen kring)",[55,43794,43795,43797,43799,43801],{},[73,43796,546],{},[73,43798,43679],{},[73,43800,343],{},[73,43802,43803],{},"Stopcontacten slaapkamer 1",[55,43805,43806,43808,43810,43812],{},[73,43807,560],{},[73,43809,43679],{},[73,43811,343],{},[73,43813,43814],{},"Stopcontacten slaapkamer 2+3",[55,43816,43817,43819,43821,43823],{},[73,43818,43711],{},[73,43820,43602],{},[73,43822,38108],{},[73,43824,43607],{},[1396,43826,43828],{"id":43827},"rij-4-groep-3-badkamer-buiten-technisch-18-te","Rij 4 — Groep 3: badkamer, buiten, technisch (18 TE)",[49,43830,43831,43843],{},[52,43832,43833],{},[55,43834,43835,43837,43839,43841],{},[58,43836,30419],{},[58,43838,493],{},[58,43840,42909],{},[58,43842,16355],{},[68,43844,43845,43855,43866,43877,43888,43899,43910,43921],{},[55,43846,43847,43849,43851,43853],{},[73,43848,43551],{},[73,43850,43297],{},[73,43852,326],{},[73,43854,43638],{},[55,43856,43857,43859,43861,43863],{},[73,43858,577],{},[73,43860,43679],{},[73,43862,343],{},[73,43864,43865],{},"Stopcontacten badkamer",[55,43867,43868,43870,43872,43874],{},[73,43869,574],{},[73,43871,43679],{},[73,43873,343],{},[73,43875,43876],{},"Wasmachine (eigen kring)",[55,43878,43879,43881,43883,43885],{},[73,43880,1219],{},[73,43882,43679],{},[73,43884,343],{},[73,43886,43887],{},"Droogkast (eigen kring)",[55,43889,43890,43892,43894,43896],{},[73,43891,1233],{},[73,43893,43765],{},[73,43895,343],{},[73,43897,43898],{},"Boiler (eigen kring)",[55,43900,43901,43903,43905,43907],{},[73,43902,546],{},[73,43904,43679],{},[73,43906,343],{},[73,43908,43909],{},"Stopcontacten buiten",[55,43911,43912,43914,43916,43918],{},[73,43913,560],{},[73,43915,43679],{},[73,43917,343],{},[73,43919,43920],{},"Garage",[55,43922,43923,43925,43927,43929],{},[73,43924,43711],{},[73,43926,43602],{},[73,43928,38108],{},[73,43930,43607],{},[12,43932,43933,43936],{},[15,43934,43935],{},"Totaal: 18 automaten (compacte 1P+N-uitvoering), 4 differentieelschakelaars, SPD, hoofdschakelaar en beltransformator = 34 van 72 TE bezet, 53 % reserve."," Elke differentieel van 30 mA draagt zes eindkringen en blijft zo onder de grens van acht. Kookplaat en een latere laadpaal passen in de reserveplaatsen.",[41,43938,43940],{"id":43939},"typische-fouten-bij-het-plannen-van-een-verdeelkast","Typische fouten bij het plannen van een verdeelkast",[49,43942,43943,43953],{},[52,43944,43945],{},[55,43946,43947,43949,43951],{},[58,43948,2704],{},[58,43950,11428],{},[58,43952,12461],{},[68,43954,43955,43966,43977,43988,43999,44010,44021,44032],{},[55,43956,43957,43960,43963],{},[73,43958,43959],{},"Te weinig rijen",[73,43961,43962],{},"Geen plaats, geen thermische reserve",[73,43964,43965],{},"Dimensioneren op modules, bedrading en kastgegevens",[55,43967,43968,43971,43974],{},[73,43969,43970],{},"SPD zonder analyse weglaten",[73,43972,43973],{},"Beveiligingsconcept blijft onbewezen",[73,43975,43976],{},"Toepasbaarheid en keuze projectspecifiek nagaan",[55,43978,43979,43982,43985],{},[73,43980,43981],{},"Meer dan 8 eindkringen per differentieel 30 mA",[73,43983,43984],{},"Inbreuk op 4.2.4.3 b",[73,43986,43987],{},"Extra differentieelschakelaar plaatsen",[55,43989,43990,43993,43996],{},[73,43991,43992],{},"Ontbrekende opschriften",[73,43994,43995],{},"Inbreuk op 3.1.3.1",[73,43997,43998],{},"Elke beveiliging labelen (kringaanduiding en functie)",[55,44000,44001,44004,44007],{},[73,44002,44003],{},"Geen differentieel aan het begin",[73,44005,44006],{},"Beveiligingsketen aan het begin onvolledig",[73,44008,44009],{},"Toestel van maximaal 300 mA, minstens type A en 40 A voorzien",[55,44011,44012,44015,44018],{},[73,44013,44014],{},"Laadpaalbeveiliging zonder analyse kiezen",[73,44016,44017],{},"DC-foutstroombeveiliging kan tekortschieten",[73,44019,44020],{},"Hoofdstuk 7.22, ingebouwde DC-detectie en fabrikantgegevens samen nagaan",[55,44022,44023,44026,44029],{},[73,44024,44025],{},"Aardingswaarde negeren",[73,44027,44028],{},"Te weinig differentieels bij > 30 Ω",[73,44030,44031],{},"Aardingsmeting afwachten of plaats voorzien voor extra toestellen",[55,44033,44034,44037,44040],{},[73,44035,44036],{},"Geen bruikbare reserve",[73,44038,44039],{},"Uitbreiding wordt onnodig complex",[73,44041,44042],{},"Module-, klem- en bedradingsreserve per project plannen",[41,44044,44046],{"id":44045},"opschriften-en-documentatie","Opschriften en documentatie",[12,44048,44049],{},"Onderafdeling 3.1.3.1 eist dat bedienings-, beveiligings- en scheidingsinrichtingen duidelijk, opvallend en onuitwisbaar gemerkt zijn. De verdeelkast zelf krijgt een eigen aanduiding en de vermelding van de voedingsspanning (3.1.3.3). Label elke beveiliging met:",[1450,44051,44052,44055,44058],{},[1453,44053,44054],{},"de kringaanduiding, identiek aan eendraadschema en situatieplan (op het eendraadschema identificeert een hoofdletter de kring, 3.1.2.1),",[1453,44056,44057],{},"de functie, bijvoorbeeld “Licht gelijkvloers” of “Stopcontacten keuken”,",[1453,44059,44060],{},"optioneel ruimte of verdieping.",[12,44062,44063],{},"Gebruik een labelstrook of kleef het overzicht in de deur; de meeste fabrikanten leveren beschrijfbare inlegstroken mee.",[41,44065,44067],{"id":44066},"van-indeling-naar-uitvoerbaar-ontwerp","Van indeling naar uitvoerbaar ontwerp",[12,44069,44070],{},"Het tellen van modules is het ruimtelijke begin. Vóór de bestelling controleert de elektricien aansluitgegevens, aardingsstelsel, de prospectieve kortsluitstroom, selectiviteit of back-upbeveiliging en de fabrikantgoedkeuring van gecombineerde toestellen. Nominale stroom, onderbrekingsvermogen en kabeldoorsnede neem je dus nooit ongecontroleerd over uit een voorbeeld. Ook dissipatie in de gesloten kast, omgevingstemperatuur, ventilatie en toegelaten klembezetting bepalen de keuze.",[12,44072,44073],{},"Werk rij per rij. Leg voeding, hoofdscheiding, differentieelbescherming en overspanningsbeveiliging vast als traceerbare beveiligingsketen. Orden daarna de eindkringen, maar verwar een visueel nette rij niet met elektrische selectiviteit. Bij PV, batterij, generator of laadinfrastructuur toon je duidelijk vanuit welke richting energie kan stromen en welke delen bij uitgeschakeld net nog gevoed kunnen zijn. De fabrikantgegevens van differentieel, SPD, omvormer of laadpaal zijn bindende input voor het ontwerp.",[12,44075,44076],{},"Vóór de export stem je drie niveaus af: de fysieke bezetting van de kast, de beveiligingsketen in het eendraadschema en de kringaanduidingen op het situatieplan tonen dezelfde stand. Boek 1 V06 vraagt voor schema's, plannen en documenten een eenduidig nummer, een versie en een versiedatum (afdeling 3.1.2). Bij huishoudelijke installaties staan bovendien naam, hoedanigheid en eventueel btw-nummer van de verantwoordelijke en het adres van de installatie op eendraadschema en situatieplan (3.1.2.1 a).",[41,44078,44080],{"id":44079},"opleveringsstaat-van-de-kast","Opleveringsstaat van de kast",[12,44082,44083],{},"Noteer vóór het sluiten van de afdekking voor elke uitgang kringaanduiding, doel, aantal polen, beveiligingstoestel, nominale stroom, kabelgegevens en bijbehorende differentieel. Vul bij stuurbare lasten contactor, stuurkring en handbediening aan. Bij meerfasige uitgangen documenteer je de gebruikte fasen; bij eenfasige uitgangen helpt een faselijst om later onevenwicht te herkennen. Controleer of elke nulleider aan de juiste differentieel is toegewezen en of de aansluitingen van de beschermingsgeleider bereikbaar blijven.",[12,44085,44086],{},"Een foto vult de gestructureerde gegevens aan, maar vervangt ze niet. Klemaanduidingen komen overeen met schema en labelstrook. Aanhaalmomenten of thermische nacontroles noteer je alleen als ze uit fabrikantinstructies of een uitvoeringsprotocol komen.",[12,44088,44089],{},"Controleer ook de mechanische toegankelijkheid: afdekkingen blijven monteerbaar, geleiders liggen niet voor bedieningsorganen en meetpunten blijven bereikbaar voor latere metingen. Aparte N-rails, bruggen en voedingen leg je traceerbaar vast. Een reserveplaats zonder veilige aansluitmogelijkheid is geen bruikbare reserve.",[12,44091,44092],{},"Bewaar de goedgekeurde pdf-versie met keuringsverslag, meetprotocollen en relevante technische fiches in het installatiedossier. Bij een latere uitbreiding overschrijf je het oude bestand niet: verhoog de versie, zet een nieuwe versiedatum en beschrijf de wijziging. Zo blijft traceerbaar welk plan bij welke keuring de werkelijke kast toonde.",[41,44094,44096],{"id":44095},"zo-plan-je-de-verdeelkast-in-planelec","Zo plan je de verdeelkast in PlanElec",[12,44098,44099,44100,39],{},"In de verdeelkasteditor van PlanElec plaats je modules op DIN-rails, automatisch of manueel; kastvoorstellen houden rekening met ingevoerde modulebreedtes, reserve en toebehoren. Bij bestaande installaties herkent PlanElec zichtbare DIN-modules op foto's als controleerbaar bezettingsvoorstel. De AREI\u002FRGIE-zelfcontrole meldt onder meer een overvolle kast, meer dan acht eindkringen op een differentieel van 30 mA, een ontbrekende differentieel aan het begin, een hoofdschakelaar of hoofddifferentieel onder 40 A en stopcontactkringen zonder 30 mA-bescherming; minder dan 20 % reserve toont ze als tip. Meetwaarden, fabrikantbewijzen en de keuring door het erkende controleorganisme blijven aparte stappen. Welke regels de zelfcontrole dekt, lees je in ",[30,44101,37095],{"href":2457},[41,44103,44105],{"id":44104},"officiële-basis","Officiële basis",[1450,44107,44108,44114,44120],{},[1453,44109,44110],{},[30,44111,44113],{"href":15357,"rel":44112},[2532],"FOD Economie: AREI Boek 1",[1453,44115,44116],{},[30,44117,44119],{"href":28056,"rel":44118},[2532],"FOD Economie: RGIE Livre 1 (Franse uitgave)",[1453,44121,44122],{},"Boek 1 V06: afdelingen 3.1.2 en 3.1.3 (schema's, plannen, aanduiding), onderafdelingen 4.2.4.3, 4.4.1.4, 5.2.1.2, 5.3.5.1 tot 5.3.5.3; verzegeling volgens versie 07 afgeschaft vanaf 01.11.2026.",[41,44124,32827],{"id":32826},[1450,44126,44127,44132,44136,44140,44145,44149,44153],{},[1453,44128,44129],{},[30,44130,44131],{"href":7514},"Een eendraadschema maken in België",[1453,44133,44134],{},[30,44135,37153],{"href":37084},[1453,44137,44138],{},[30,44139,39920],{"href":26440},[1453,44141,44142],{},[30,44143,44144],{"href":28125},"Zonnepanelen in het schema",[1453,44146,44147],{},[30,44148,27066],{"href":27065},[1453,44150,44151],{},[30,44152,18474],{"href":19100},[1453,44154,44155],{},[30,44156,37220],{"href":37430},[12,44158,44159],{},[30,44160,44161],{"href":6989},"Plan je verdeelkast in de PlanElec-verdeelkasteditor en controleer ze zelf →",{"title":1467,"searchDepth":1468,"depth":1468,"links":44163},[44164,44170,44171,44178,44182,44183,44189,44190,44191,44192,44193,44194,44195],{"id":42886,"depth":1468,"text":42887,"children":44165},[44166,44167,44168,44169],{"id":39559,"depth":1486,"text":35858},{"id":42902,"depth":1486,"text":42903},{"id":43006,"depth":1486,"text":43007},{"id":43084,"depth":1486,"text":43085},{"id":43091,"depth":1468,"text":43092},{"id":43219,"depth":1468,"text":43220,"children":44172},[44173,44174,44175,44176,44177],{"id":43230,"depth":1486,"text":43231},{"id":43246,"depth":1486,"text":43247},{"id":43333,"depth":1486,"text":43334},{"id":43344,"depth":1486,"text":43345},{"id":43418,"depth":1486,"text":23151},{"id":43424,"depth":1468,"text":43425,"children":44179},[44180,44181],{"id":43428,"depth":1486,"text":43429},{"id":43439,"depth":1486,"text":43440},{"id":43495,"depth":1468,"text":43496},{"id":43522,"depth":1468,"text":43523,"children":44184},[44185,44186,44187,44188],{"id":43529,"depth":1486,"text":43530},{"id":43610,"depth":1486,"text":43611},{"id":43720,"depth":1486,"text":43721},{"id":43827,"depth":1486,"text":43828},{"id":43939,"depth":1468,"text":43940},{"id":44045,"depth":1468,"text":44046},{"id":44066,"depth":1468,"text":44067},{"id":44079,"depth":1468,"text":44080},{"id":44095,"depth":1468,"text":44096},{"id":44104,"depth":1468,"text":44105},{"id":32826,"depth":1468,"text":32827},"2026-04-07","Verdeelkast plannen volgens het AREI: hoofdschakelaar, differentieels van 300 mA en 30 mA, maximaal 8 kringen per 30 mA-differentieel, rijverdeling, reserve en een volledig voorbeeld voor een eengezinswoning.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-distribution-board-planning-editorial.jpg","\u002Fblog\u002Fdistribution-board-planning.nl",{"title":42869,"description":44197},"verdeelkast-plannen-opbouw","blog\u002Fdistribution-board-planning.nl",[14346,44205,35858,44206,44207,3275,9340,44208],"verdeler","RCD","MCB","eengezinswoning","T0Z4nbWG4RGOiV347Q3JbzPC75162zGFUoEMIBa66DU",{"id":44211,"title":44212,"articleId":44213,"body":44214,"category":1493,"date":44942,"description":44943,"extension":1496,"image":44230,"lastUpdated":15381,"locale":1497,"meta":44944,"navigation":1499,"ogImage":44945,"path":44946,"publishDate":44942,"readTime":21425,"refreshInterval":11097,"seo":44947,"seoTitle":44948,"slug":44949,"stem":44950,"tags":44951,"__hash__":44956,"kind":1515,"href":25796},"blog\u002Fblog\u002Fdraw-situation-plan.nl.md","Situatieplan tekenen: stap-voor-stap handleiding volgens het AREI","draw-situation-plan",{"type":9,"value":44215,"toc":44916},[44216,44225,44231,44246,44249,44251,44255,44259,44262,44285,44288,44292,44295,44394,44396,44400,44408,44415,44417,44421,44424,44427,44459,44462,44481,44485,44502,44506,44509,44513,44538,44540,44544,44547,44551,44554,44559,44563,44613,44616,44619,44630,44632,44636,44639,44665,44667,44669,44760,44762,44766,44823,44827,44830,44833,44836,44840,44843,44846,44850,44853,44856,44858,44869,44871,44873,44904,44906],[12,44217,44218,44221,44222,39],{},[15,44219,44220],{},"Een situatieplan teken je in vijf stappen: het grondplan op schaal voorbereiden, symbolen uit AREI-tabel 2.23 kiezen, alle punten op hun werkelijke plaats intekenen, elk punt aanduiden met kringletter en nummer uit het eendraadschema en het plan afwerken met legende en titelblok."," Voor nieuwe huishoudelijke installaties en voor belangrijke wijzigingen of uitbreidingen hoort het samen met het eendraadschema bij de verplichte plannen (AREI 3.1.2.1 a). In het Frans heet het ",[17563,44223,44224],{},"plan de position",[12,44226,44227],{},[22,44228],{"alt":44229,"src":44230},"Een elektricien meet een kamer op met een laserafstandsmeter.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-draw-situation-plan-editorial.webp",[31245,44232,44233],{},[12,44234,44235,44238,44239,44242,44243,44245],{},[15,44236,44237],{},"Kort uitgelegd:"," het eendraadschema toont de ",[17563,44240,44241],{},"elektrische structuur"," (welke beveiliging welke kring voedt, welke schakelaar welk lichtpunt bedient). Het situatieplan toont de ",[17563,44244,30263],{}," van elk onderdeel op het grondplan.",[12,44247,44248],{},"Deze handleiding brengt je stap voor stap naar een controleerbaar situatieplan. Bij de keuring beoordeelt het erkende controleorganisme het volledige dossier en de uitgevoerde installatie.",[29567,44250],{},[41,44252,44254],{"id":44253},"stap-1-grondplan-voorbereiden","Stap 1: grondplan voorbereiden",[1396,44256,44258],{"id":44257},"afmetingen-en-schaal","Afmetingen en schaal",[12,44260,44261],{},"Het grondplan is de basis van je situatieplan. Je neemt het over van het bouwplan of tekent het zelf.",[1450,44263,44264,44271,44278],{},[1453,44265,44266,44267,44270],{},"Werk met een ",[15,44268,44269],{},"uniforme schaal"," (gebruikelijk: 1:50 of 1:100). Het AREI definieert een plan als voorstelling op schaal van de plaats van de installatiedelen (hoofdstuk 2.12); een bepaalde verhouding schrijft het niet voor.",[1453,44272,44273,44274,44277],{},"Teken alle ",[15,44275,44276],{},"muren, deuren en ramen"," in.",[1453,44279,44280,44281,44284],{},"Markeer de ",[15,44282,44283],{},"draairichting"," van deuren (kwartcirkel); die bepaalt waar de schakelaar logisch zit.",[12,44286,44287],{},"In PlanElec importeer je daarvoor een bestaand plan als afbeelding, pdf of DXF en kalibreer je de schaal, of laat je muren en ruimtes uit een pdf of scan herkennen als bewerkbaar voorstel. Zonder bevestigde schaal neemt PlanElec geen herkend grondplan over.",[1396,44289,44291],{"id":44290},"ruimtes-benoemen","Ruimtes benoemen",[12,44293,44294],{},"Geef elke ruimte een duidelijke naam. Een afkorting helpt als de ruimte krap is:",[49,44296,44297,44309],{},[52,44298,44299],{},[55,44300,44301,44304,44306],{},[58,44302,44303],{},"Afkorting",[58,44305,301],{},[58,44307,44308],{},"Waar je op let bij het intekenen",[68,44310,44311,44321,44331,44341,44351,44362,44372,44383],{},[55,44312,44313,44316,44318],{},[73,44314,44315],{},"WK",[73,44317,320],{},[73,44319,44320],{},"stopcontacten op hun werkelijke wandpositie, lichtpunten, schakelaars",[55,44322,44323,44326,44328],{},[73,44324,44325],{},"KE",[73,44327,368],{},[73,44329,44330],{},"vaste toestellen zoals kookplaat, oven en vaatwasser apart",[55,44332,44333,44336,44338],{},[73,44334,44335],{},"SK",[73,44337,337],{},[73,44339,44340],{},"stopcontacten op hun werkelijke plaats, lichtpunt en schakelaar aan de deur",[55,44342,44343,44346,44348],{},[73,44344,44345],{},"BK",[73,44347,382],{},[73,44349,44350],{},"volumes 0, 1 en 2 en de plaats van elk stopcontact daartegenover",[55,44352,44353,44356,44359],{},[73,44354,44355],{},"HA",[73,44357,44358],{},"Hal\u002Fgang",[73,44360,44361],{},"wissel- of kruisschakelingen met alle bedieningspunten",[55,44363,44364,44367,44369],{},[73,44365,44366],{},"GA",[73,44368,43920],{},[73,44370,44371],{},"laadpaal, buitenstopcontacten, eventueel verdeelbord",[55,44373,44374,44377,44380],{},[73,44375,44376],{},"KL",[73,44378,44379],{},"Kelder",[73,44381,44382],{},"verdeelbord, meter, techniek zoals warmtepomp of boiler",[55,44384,44385,44388,44391],{},[73,44386,44387],{},"BU",[73,44389,44390],{},"Buitenzone",[73,44392,44393],{},"buitenverlichting, buitenstopcontacten, buitenunits",[29567,44395],{},[41,44397,44399],{"id":44398},"stap-2-arei-symbolen-gebruiken","Stap 2: AREI-symbolen gebruiken",[12,44401,44402,44404,44405,39],{},[15,44403,17697],{}," in hoofdstuk 2.13 is de officiële, niet-limitatieve symbolenlijst voor eendraadschema en situatieplan. Ontbreekt een symbool voor een onderdeel, dan gebruik je een ander ondubbelzinnig herkenbaar teken en definieer je het in de legende (3.1.2.1 a). Het volledige overzicht vind je in ",[30,44406,44407],{"href":25786},"AREI-symbolen voor het eendraadschema",[31245,44409,44410],{},[12,44411,44412,44414],{},[15,44413,37362],{}," voor gangbare onderdelen neem je de symbolen uit tabel 2.23. Eigen symbolen moeten ondubbelzinnig zijn en in de legende staan; een niet-verklaard symbool voldoet niet aan 3.1.2.1 a.",[29567,44416],{},[41,44418,44420],{"id":44419},"stap-3-onderdelen-intekenen","Stap 3: onderdelen intekenen",[12,44422,44423],{},"Nu plaats je de symbolen op het grondplan. Onderafdeling 3.1.2.3 a vraagt de plaats van verdeelborden, verbindings- en aftakdozen, stopcontacten, lichtpunten, schakelaars, vaste toestellen en bronnen die op het eendraadschema staan.",[1396,44425,44426],{"id":30497},"Stopcontacten",[1450,44428,44429,44435,44441,44447,44453],{},[1453,44430,44431,44434],{},[15,44432,44433],{},"Op de wand"," tekenen, op de werkelijke positie.",[1453,44436,44437,44440],{},[15,44438,44439],{},"Keuken:"," werkstopcontacten en vaste toestellen apart opnemen; aantal en aparte kringen volgen uit gebruik en ontwerp.",[1453,44442,44443,44446],{},[15,44444,44445],{},"Woonruimtes:"," alle geplande of aanwezige stopcontacten intekenen; een minimumaantal per oppervlakte legt het AREI niet op.",[1453,44448,44449,44452],{},[15,44450,44451],{},"Badkamer:"," laagspanningsstopcontacten zijn ten vroegste in volume 2 toegelaten, en alleen als ze beveiligd zijn door een differentieelstroominrichting met zeer hoge gevoeligheid (≤ 10 mA) of afzonderlijk door een scheidingstransformator van maximaal 100 W (7.1.5.2 d); anders liggen ze buiten de volumes. Volume 2 bestaat alleen bij een bad; voor een douche is het niet vastgelegd (7.1.3.2 nr. 3 b).",[1453,44454,44455,44458],{},[15,44456,44457],{},"Buiten:"," kies de beschermingsgraad volgens de werkelijke uitwendige invloeden; stopcontacten die niet voor vaste toestellen bestemd zijn, zitten net als binnen achter het bijkomende differentieel ≤ 30 mA (4.2.4.3 b).",[1396,44460,44461],{"id":30498},"Schakelaars",[1450,44463,44464,44470,44478],{},[1453,44465,44466,44469],{},[15,44467,44468],{},"Naast de deur"," aan de openingszijde, gebruikelijk op ongeveer 105 cm (praktijkwaarde; Boek 1 legt geen vaste schakelaarhoogte op).",[1453,44471,44472,44475,44476,39],{},[15,44473,44474],{},"Wisselschakelaars"," in ruimtes met meerdere ingangen en aan begin en einde van de trap; vanaf drie bedieningspunten met kruisschakelaar. Meer in ",[30,44477,26435],{"href":25849},[1453,44479,44480],{},"De koppeling met het lichtpunt toont de referentie: de schakelaar draagt de letter van zijn kring en het nummer van het bediende lichtpunt (3.1.2.1 a). Een stippellijn is een extra leeshulp.",[1396,44482,44484],{"id":44483},"lichtpunten","Lichtpunten",[1450,44486,44487,44493,44499],{},[1453,44488,44489,44492],{},[15,44490,44491],{},"Plafondlampen"," op hun geplande positie, anders in het midden van de ruimte.",[1453,44494,44495,44498],{},[15,44496,44497],{},"Wandlampen"," op de wandpositie.",[1453,44500,44501],{},"Teken alle geplande of aanwezige lichtpunten; het aantal volgt uit gebruik en ontwerp.",[1396,44503,44505],{"id":44504},"rookmelders-apart-houden","Rookmelders apart houden",[12,44507,44508],{},"Rookmelders kun je als extra gebouwinformatie intekenen. De verplichting komt uit regionale bouw- en woonregelgeving en verschilt per gewest en gebruik; controleer ze aan de actuele bevoegde bron. Tot de verplichte inhoud van het AREI-situatieplan horen ze niet, dus houd je ze op het plan duidelijk gescheiden van de kringreferenties.",[1396,44510,44512],{"id":44511},"speciale-verbruikers","Speciale verbruikers",[1450,44514,44515,44520,44526,44532],{},[1453,44516,44517,44519],{},[15,44518,33081],{}," in de garage of aan de buitenmuur, met eigen kring.",[1453,44521,44522,44525],{},[15,44523,44524],{},"Boiler\u002Fdoorstromer:"," positie, vermogen en aansluitwijze noteren; de kring bepaal je volgens toestelvereisten en geldende regels.",[1453,44527,44528,44531],{},[15,44529,44530],{},"Warmtepomp\u002Fairco:"," buiten- en binnenunit markeren.",[1453,44533,44534,44537],{},[15,44535,44536],{},"PV-installatie:"," omvormer en eventueel batterij als bronnen intekenen (3.1.2.3 a).",[29567,44539],{},[41,44541,44543],{"id":44542},"stap-4-referenties-tussen-beide-plannen-volgen","Stap 4: referenties tussen beide plannen volgen",[12,44545,44546],{},"Elke elementaire kring krijgt een hoofdletter, elk punt een volgnummer vanaf de beveiliging. Op het situatieplan staat bij elk punt dezelfde combinatie als op het eendraadschema. Alleen de kringletter bij alle toestellen zetten volstaat niet: pas het nummer maakt elk punt eenduidig.",[1396,44548,44550],{"id":44549},"fictief-productvoorbeeld-dezelfde-verbruikers-terugvinden","Fictief productvoorbeeld: dezelfde verbruikers terugvinden",[12,44552,44553],{},"De twee echte productweergaven tonen hetzelfde demonstratieproject in twee werkstanden. Ze verklaren de koppeling; in het schema zijn nog waarschuwingen van de voorbeeldstand zichtbaar.",[422,44555],{":height":614,":width":19481,"alt":44556,"caption":44557,"src":44558},"Situatieplan van het fictieve project met C1, E1, F1 en G1.","Op het fictieve grondplan vind je E1, F1 en G1 ruimtelijk terug. C1 koppelt de schakelaar aan het bijbehorende lichtpunt.","\u002Fhelp\u002Fworkflows\u002Fnl-situation-plan.png",[422,44560],{":height":19548,":width":19481,"alt":44561,"caption":44562,"src":19551},"Afgeleid eendraadschema van het fictieve project met kringen C, E, F en G.","Het afgeleide schema toont de bijbehorende kringen en punten. De zichtbare waarschuwingen markeren een werkversie die nog gecontroleerd wordt.",[49,44564,44565,44578],{},[52,44566,44567],{},[55,44568,44569,44572,44575],{},[58,44570,44571],{},"Referentie op het grondplan",[58,44573,44574],{},"Vermelding in het schema",[58,44576,44577],{},"Op de werf vergelijken",[68,44579,44580,44591,44602],{},[55,44581,44582,44585,44588],{},[73,44583,44584],{},"E1",[73,44586,44587],{},"E, punt 1: oven",[73,44589,44590],{},"toestelidentiteit en werkelijke aansluitplaats",[55,44592,44593,44596,44599],{},[73,44594,44595],{},"F1",[73,44597,44598],{},"F, punt 1: vaatwasser",[73,44600,44601],{},"aansluitpunt en gedocumenteerde toewijzing",[55,44603,44604,44607,44610],{},[73,44605,44606],{},"G1",[73,44608,44609],{},"G, punt 1: wasmachine",[73,44611,44612],{},"toestel en plaats in de ruimte",[12,44614,44615],{},"C1 staat in het voorbeeld bij de schakelaar en bij het bijbehorende lichtpunt: beide verwijzen naar hetzelfde geschakelde lichtpunt. De dubbele referentie is hier dus bewust en geen duplicaatfout. Controleer de schakelrelatie voordat je hernummert.",[12,44617,44618],{},"Verplaats je een toestel, dan controleer je plaats en elektrische toewijzing apart. Verandert het van kring, dan pas je de referentie in beide documenten aan. Na aanvullingen volgt een tweede persoon steekproefsgewijs grondplan, schema en opschriften in het verdeelbord.",[1450,44620,44621,44625],{},[1453,44622,44623],{},[30,44624,3378],{"href":3377},[1453,44626,44627],{},[30,44628,44629],{"href":11068},"Installatie en onderverdelers plannen",[29567,44631],{},[41,44633,44635],{"id":44634},"stap-5-legende-en-titelblok","Stap 5: legende en titelblok",[12,44637,44638],{},"Vul je plan aan met:",[1450,44640,44641,44647,44653,44659],{},[1453,44642,44643,44646],{},[15,44644,44645],{},"Legende"," met alle gebruikte symbolen en hun betekenis, zeker voor eigen tekens.",[1453,44648,44649,44652],{},[15,44650,44651],{},"Titelblok"," (cartouche) met de AREI-verplichte gegevens: nummer, versie en versiedatum (3.1.2), adres van de installatie en naam, hoedanigheid en eventueel btw-nummer van de verantwoordelijke voor de uitvoering (3.1.2.1 a); daarnaast de schaal en ruimte voor handtekening en visum.",[1453,44654,44655,44658],{},[15,44656,44657],{},"Noordpijl"," (optioneel, maar handig).",[1453,44660,44661,44664],{},[15,44662,44663],{},"Verdiepingsaanduiding"," bij meerdere bouwlagen; één blad per verdieping blijft het best leesbaar.",[29567,44666],{},[41,44668,32716],{"id":32715},[49,44670,44671,44681],{},[52,44672,44673],{},[55,44674,44675,44677,44679],{},[58,44676,2704],{},[58,44678,11428],{},[58,44680,12461],{},[68,44682,44683,44694,44705,44716,44727,44738,44749],{},[55,44684,44685,44688,44691],{},[73,44686,44687],{},"rookmelderplicht als AREI-regel behandelen",[73,44689,44690],{},"verkeerde toetsingsbasis",[73,44692,44693],{},"apart aan de actuele regionale bron toetsen en aanduiden",[55,44695,44696,44699,44702],{},[73,44697,44698],{},"buitenstopcontact algemeen behandelen",[73,44700,44701],{},"beschermingsgraad of beveiliging past niet bij de uitwendige invloeden",[73,44703,44704],{},"beschermingsgraad en differentieel per project controleren",[55,44706,44707,44710,44713],{},[73,44708,44709],{},"ontbrekende opschriften of kringnummers",[73,44711,44712],{},"punten zijn niet aan het schema te koppelen",[73,44714,44715],{},"elk punt met letter en nummer aanduiden",[55,44717,44718,44721,44724],{},[73,44719,44720],{},"niet-verklaarde symbolen",[73,44722,44723],{},"in strijd met 3.1.2.1 a",[73,44725,44726],{},"symbolen uit tabel 2.23 gebruiken; eigen tekens ondubbelzinnig kiezen en in de legende verklaren",[55,44728,44729,44732,44735],{},[73,44730,44731],{},"schakelaar aan de verkeerde deurzijde",[73,44733,44734],{},"onpraktisch (geen AREI-overtreding)",[73,44736,44737],{},"draairichting controleren",[55,44739,44740,44743,44746],{},[73,44741,44742],{},"badkamerstopcontact verkeerd t.o.v. het volume getekend",[73,44744,44745],{},"plan en uitvoering leiden tot een veiligheidsrelevante vaststelling",[73,44747,44748],{},"volumes en beveiliging volgens hoofdstuk 7.1 controleren",[55,44750,44751,44754,44757],{},[73,44752,44753],{},"geen legende",[73,44755,44756],{},"eigen tekens zijn niet leesbaar",[73,44758,44759],{},"symbolentabel toevoegen",[29567,44761],{},[41,44763,44765],{"id":44764},"checklist-vóór-de-keuring","Checklist vóór de keuring",[1450,44767,44769,44775,44781,44787,44793,44799,44805,44811,44817],{"className":44768},[26917],[1453,44770,44772,44774],{"className":44771},[26921],[26923,44773],{"disabled":1499,"type":26925}," Alle ruimtes benoemd",[1453,44776,44778,44780],{"className":44777},[26921],[26923,44779],{"disabled":1499,"type":26925}," Alle verdeelborden, dozen, stopcontacten, schakelaars, lichtpunten, vaste toestellen en bronnen ingetekend",[1453,44782,44784,44786],{"className":44783},[26921],[26923,44785],{"disabled":1499,"type":26925}," Rookmelders, indien getekend, apart gecontroleerd en aangeduid",[1453,44788,44790,44792],{"className":44789},[26921],[26923,44791],{"disabled":1499,"type":26925}," Buitenstopcontacten met projectgebonden beschermingsgraad en beveiliging opgenomen",[1453,44794,44796,44798],{"className":44795},[26921],[26923,44797],{"disabled":1499,"type":26925}," Kringletter en nummer bij elk punt",[1453,44800,44802,44804],{"className":44801},[26921],[26923,44803],{"disabled":1499,"type":26925}," Referenties komen overeen met het eendraadschema",[1453,44806,44808,44810],{"className":44807},[26921],[26923,44809],{"disabled":1499,"type":26925}," Symbolen uit tabel 2.23, eigen tekens in de legende",[1453,44812,44814,44816],{"className":44813},[26921],[26923,44815],{"disabled":1499,"type":26925}," Titelblok met nummer, versie, datum, adres en verantwoordelijke",[1453,44818,44820,44822],{"className":44819},[26921],[26923,44821],{"disabled":1499,"type":26925}," Eén blad per verdieping",[41,44824,44826],{"id":44825},"praktijkcontrole-klopt-het-plan-met-het-gebouw","Praktijkcontrole: klopt het plan met het gebouw?",[12,44828,44829],{},"Loop na het tekenen met het plan door het gebouw. Begin bij het verdeelbord en volg elke kring. Controleer niet alleen of een stopcontact aanwezig is, maar ook of meervoudig stopcontact, geschakeld stopcontact, verbindingsdoos, vaste aansluiting en lichtpunt correct onderscheiden zijn. Bij schakelaars moet de referentie tonen welk lichtpunt of toestel ze bedienen. Toestellen achter inbouwmeubelen, buitenelementen, technische ruimtes en bijgebouwen worden snel vergeten.",[12,44831,44832],{},"Daarna vergelijk je met het eendraadschema. Een element met referentie A3 op het situatieplan verschijnt daar als hetzelfde element in kring A. Tegenstrijdige toewijzingen en later verplaatste toestellen zijn de meest voorkomende oorzaken van tegenstrijdige documenten. Bij meerdere verdiepingen of gebouwdelen helpt een duidelijke bladstructuur; nummer, versie en versiedatum staan op elk uitgegeven plan.",[12,44834,44835],{},"Het situatieplan toont de werkelijke toestand, niet alleen de oorspronkelijke bedoeling. Een wijziging markeer je pas als afgerond wanneer leidingtraject en toestelpositie ter plaatse gecontroleerd zijn. Bij een niet-belangrijke wijziging volstaat voor het eendraadschema een korte beschrijving; op het situatieplan teken je de wijziging toch in (3.1.2.1 a). Bij belangrijke wijzigingen of uitbreidingen maak of actualiseer je eendraadschema en situatieplan, en de betrokken werken worden vóór ingebruikname gecontroleerd.",[41,44837,44839],{"id":44838},"wat-het-plan-niet-beslist","Wat het plan niet beslist",[12,44841,44842],{},"Een symbool bewijst geen montagehoogte, beschermingsgraad, badkamervolume, aardingskwaliteit of uitschakeltijd. Die eigenschappen bepaal je met controle ter plaatse, metingen en fabrikantgegevens. Rookmelderverplichtingen komen uit regionale bouw- en woonregelgeving; het plan mag rookmelders tonen, maar elektrische keuring en regionale vereisten blijven aparte vragen.",[12,44844,44845],{},"PlanElec houdt toestelpositie en elektrische toewijzing samen in één projectmodel. Elementen die nog niet geplaatst, aan geen kring toegewezen of alleen als referentie geïmporteerd zijn, blijven zichtbaar open. De indicatieve zelfcontrole toont je fouten in de ondersteunde regels; de officiële beoordeling doet het erkende controleorganisme.",[1396,44847,44849],{"id":44848},"leesbaarheid-voor-de-keuring-voorbereiden","Leesbaarheid voor de keuring voorbereiden",[12,44851,44852],{},"Exporteer het plan één keer op het voorziene bladformaat. Symbolen, referenties en ruimtegrenzen blijven zonder sterk inzoomen te onderscheiden. Overlappende referenties verschuif je en verbind je met een duidelijke verwijslijn. Kleur helpt bij het bewerken, maar draagt nooit alleen een betekenis, omdat afdrukken vaak zwart-wit zijn.",[12,44854,44855],{},"Houd een lijst met open punten bij voor ontoegankelijke dozen, onbekende schakelrelaties of vermoedelijke leidingtrajecten. Die punten los je op vóór de definitieve versie, of je duidt ze zichtbaar aan als onbekend. Een nauwkeurig gemarkeerd gegevensgebrek is vakkundig eerlijker dan een symbool op een geschatte plaats. Laat ten slotte een tweede persoon steekproefsgewijs de referenties volgen tussen situatieplan, eendraadschema en opschriften in het verdeelbord.",[41,44857,33859],{"id":33858},[1450,44859,44860,44866],{},[1453,44861,44862],{},[30,44863,44865],{"href":28056,"rel":44864},[2532],"FOD Economie: AREI\u002FRGIE Boek 1, actuele officiële publicatie",[1453,44867,44868],{},"Bepalend zijn Boek 1 V06, hoofdstuk 2.12 (begrip plan), afdeling 3.1.2 (inhoud en codering), tabel 2.23 (symbolen) en hoofdstuk 7.1 (ruimtes met bad of douche).",[29567,44870],{},[41,44872,32827],{"id":32826},[1450,44874,44875,44879,44884,44888,44892,44896,44900],{},[1453,44876,44877],{},[30,44878,26430],{"href":7514},[1453,44880,44881],{},[30,44882,44883],{"href":5957},"Eendraadschema of situatieplan: het verschil",[1453,44885,44886],{},[30,44887,17455],{"href":17361},[1453,44889,44890],{},[30,44891,22599],{"href":36784},[1453,44893,44894],{},[30,44895,18803],{"href":23781},[1453,44897,44898],{},[30,44899,27077],{"href":27076},[1453,44901,44902],{},[30,44903,16418],{"href":16417},[29567,44905],{},[12,44907,44908],{},[17563,44909,9364,44910,44912,44913],{},[15,44911,1337],{}," teken je je situatieplan rechtstreeks op het grondplan: ruimtes aanmaken, toestellen uit de symbolencatalogus plaatsen, aan kringen toewijzen en situatieplan plus eendraadschema als pdf exporteren. ",[30,44914,44915],{"href":6989},"Nu gratis starten →",{"title":1467,"searchDepth":1468,"depth":1468,"links":44917},[44918,44922,44923,44930,44933,44934,44935,44936,44937,44940,44941],{"id":44253,"depth":1468,"text":44254,"children":44919},[44920,44921],{"id":44257,"depth":1486,"text":44258},{"id":44290,"depth":1486,"text":44291},{"id":44398,"depth":1468,"text":44399},{"id":44419,"depth":1468,"text":44420,"children":44924},[44925,44926,44927,44928,44929],{"id":30497,"depth":1486,"text":44426},{"id":30498,"depth":1486,"text":44461},{"id":44483,"depth":1486,"text":44484},{"id":44504,"depth":1486,"text":44505},{"id":44511,"depth":1486,"text":44512},{"id":44542,"depth":1468,"text":44543,"children":44931},[44932],{"id":44549,"depth":1486,"text":44550},{"id":44634,"depth":1468,"text":44635},{"id":32715,"depth":1468,"text":32716},{"id":44764,"depth":1468,"text":44765},{"id":44825,"depth":1468,"text":44826},{"id":44838,"depth":1468,"text":44839,"children":44938},[44939],{"id":44848,"depth":1486,"text":44849},{"id":33858,"depth":1468,"text":33859},{"id":32826,"depth":1468,"text":32827},"2026-03-30","Zo teken je een controleerbaar situatieplan volgens het AREI: grondplan, symbolen uit tabel 2.23, kringreferenties zoals in het eendraadschema, legende, titelblok en controleronde.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-draw-situation-plan-editorial.jpg","\u002Fblog\u002Fdraw-situation-plan.nl",{"title":44212,"description":44943},"Situatieplan tekenen: stap-voor-stap handleiding (AREI)","situatieschema-tekenen-handleiding","blog\u002Fdraw-situation-plan.nl",[6216,3275,44952,44953,44954,44955,35569],"symbolen","handleiding","tekenen","elektroplan","jhu-eRWMCyOQ0PmXxGMGw8g93Bllsm1D75ba905AgCQ",{"id":44958,"title":44959,"articleId":44960,"body":44961,"category":19087,"date":45251,"description":45252,"extension":1496,"image":44973,"lastUpdated":15381,"locale":1497,"meta":45253,"navigation":1499,"ogImage":45254,"path":45255,"publishDate":45251,"readTime":19590,"refreshInterval":11097,"seo":45256,"seoTitle":45257,"slug":45258,"stem":45259,"tags":45260,"__hash__":45264,"kind":1515,"href":42805},"blog\u002Fblog\u002Fpreflex-vs-open-wiring.nl.md","Preflex vs. vrije bedrading: welke kabelmethode voor jouw project?","preflex-vs-open-wiring",{"type":9,"value":44962,"toc":45242},[44963,44969,44974,44978,44981,44984,44988,45070,45074,45077,45115,45118,45122,45125,45129,45132,45152,45155,45159,45191,45200,45202,45224,45234],[12,44964,44965,44968],{},[15,44966,44967],{},"In nieuwbouw is Preflex met VOB-draad de Belgische standaard: de buizen liggen tijdens de ruwbouw op de vloerplaat of in de muur, en de draden blijven later vervangbaar. Bij renovatie is XVB-kabel zonder buis meestal de snellere oplossing, in een sleuf, in opbouw of in een holle ruimte."," Het AREI laat beide methodes toe; het regelt hoe je ze uitvoert.",[12,44970,44971],{},[22,44972],{"alt":23821,"src":44973},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-preflex-vs-open-wiring-editorial.webp",[41,44975,44977],{"id":44976},"wat-is-preflex","Wat is Preflex?",[12,44979,44980],{},"Preflex is in België de gangbare naam voor flexibele, geribde elektrische installatiebuizen in kunststof. Ze bestaan leeg of met in de fabriek ingetrokken VOB-draden. In nieuwbouw worden ze tijdens de ruwbouwfase op de betonplaat, in de dekvloer of in muursleuven gelegd en daarna ingegoten of bepleisterd.",[12,44982,44983],{},"Met vrije bedrading bedoelen we hier kabels zonder buis, meestal XVB: rechtstreeks in een sleuf onder pleister, in opbouw, op een kabelgoot of in holle constructieruimten.",[41,44985,44987],{"id":44986},"preflex-en-vrije-bedrading-vergeleken","Preflex en vrije bedrading vergeleken",[49,44989,44990,45002],{},[52,44991,44992],{},[55,44993,44994,44996,44999],{},[58,44995,4902],{},[58,44997,44998],{},"Preflex met VOB-draad",[58,45000,45001],{},"Vrije bedrading met XVB",[68,45003,45004,45015,45026,45037,45048,45059],{},[55,45005,45006,45009,45012],{},[73,45007,45008],{},"Type geleider",[73,45010,45011],{},"Draad (H07V-U\u002F-R) in buis",[73,45013,45014],{},"Mantelkabel",[55,45016,45017,45020,45023],{},[73,45018,45019],{},"Typisch gebruik",[73,45021,45022],{},"Nieuwbouw, totaalrenovatie",[73,45024,45025],{},"Renovatie, kelder, technische ruimte, uitbreiding",[55,45027,45028,45031,45034],{},[73,45029,45030],{},"Draden later vervangen",[73,45032,45033],{},"ja, draden moeten altijd intrekbaar blijven (5.2.9.3)",[73,45035,45036],{},"alleen door open te breken of een nieuwe route",[55,45038,45039,45042,45045],{},[73,45040,45041],{},"In opbouw toegelaten",[73,45043,45044],{},"alleen de buis, niet de losse draad (5.2.9.5)",[73,45046,45047],{},"ja (5.2.9.5)",[55,45049,45050,45053,45056],{},[73,45051,45052],{},"Rechtstreeks in een sleuf",[73,45054,45055],{},"niet van toepassing",[73,45057,45058],{},"ja, binnen de installatiezones (5.2.9.10)",[55,45060,45061,45064,45067],{},[73,45062,45063],{},"Materiaal",[73,45065,45066],{},"buis plus elke draad afzonderlijk",[73,45068,45069],{},"één kabel met alle aders",[41,45071,45073],{"id":45072},"wat-het-arei-voorschrijft-voor-buizen","Wat het AREI voorschrijft voor buizen",[12,45075,45076],{},"Onderafdeling 5.2.9.3 regelt de plaatsing in elektrische installatiebuizen:",[1450,45078,45079,45085,45091,45097,45103,45109],{},[1453,45080,45081,45084],{},[15,45082,45083],{},"Diameter:"," buis en toebehoren zo kiezen dat de geleiders na plaatsing gemakkelijk in te trekken en te verwijderen zijn (letter d).",[1453,45086,45087,45090],{},[15,45088,45089],{},"Buigstraal:"," bij flexibele kunststofbuizen minstens acht keer de buitendiameter (letter e).",[1453,45092,45093,45096],{},[15,45094,45095],{},"Geen verbindingen in de buis:"," aansluitingen horen in trek- en verbindingsdozen op een geschikt klemmenblok (letter f).",[1453,45098,45099,45102],{},[15,45100,45101],{},"Brandbare buizen:"," alleen toegelaten als ze minstens 3 cm diep in onbrandbare materialen zijn ingewerkt (letter f).",[1453,45104,45105,45108],{},[15,45106,45107],{},"Warmte:"," geen kunststofbuizen waar de temperatuur bij normaal bedrijf 60 °C kan overschrijden (letter f).",[1453,45110,45111,45114],{},[15,45112,45113],{},"In ingewerkte buizen:"," geen T-stukken en bochtstukken; geleiders blijven in de dozen toegankelijk (letter i.2).",[12,45116,45117],{},"Een vaste vullingsgraad in procent staat niet in het AREI. De maatstaf is dat je de geleiders altijd kunt intrekken en verwijderen.",[41,45119,45121],{"id":45120},"wat-het-arei-voorschrijft-voor-vrije-bedrading","Wat het AREI voorschrijft voor vrije bedrading",[12,45123,45124],{},"Leidingen die zonder buis worden ingewerkt, moeten kabels zijn; geleiders met alleen basisisolatie zijn daarvoor verboden (5.2.9.10). In muren van lokalen gelden installatiezones: horizontale tracés 25 tot 35 cm onder het plafond of boven de vloer, verticale tracés zo dicht mogelijk bij een hoek of 10 tot 20 cm naast deuromlijstingen, en minstens 0,4 cm pleister erover. In beton of cement heb je minstens 3 cm dekking nodig.",[41,45126,45128],{"id":45127},"welke-brandklasse-heb-je-nodig","Welke brandklasse heb je nodig?",[12,45130,45131],{},"Bepalend is de CPR-klasse van de kabel, niet die van de buis:",[1450,45133,45134,45140,45146],{},[1453,45135,45136,45139],{},[15,45137,45138],{},"Afzonderlijk geplaatst:"," minstens F1 of klasse Eca (5.2.7.2).",[1453,45141,45142,45145],{},[15,45143,45144],{},"In bundels of in vlakke schikking:"," minstens F2 of klasse Cca (5.2.7.3).",[1453,45147,45148,45151],{},[15,45149,45150],{},"In holle constructieruimten:"," eveneens F2 of Cca (4.3.3.5 b en 5.2.9.9). Een houtskelet- of gipskartonwand is een holle constructieruimte.",[12,45153,45154],{},"Uitgezonderd zijn kabels en buizen die minstens 3 cm diep in een onbrandbare bekleding zijn ingewerkt (5.2.7.1 nr. 3). Ligt de Preflex-buis minstens 3 cm diep in beton of chape, dan geldt die uitzondering. In een holle ruimte telt daarentegen de klasse van kabel en buis (5.2.9.9 met 5.2.7.3 en 5.2.7.4).",[41,45156,45158],{"id":45157},"wanneer-welke-methode","Wanneer welke methode?",[1450,45160,45161,45167,45173,45179,45185],{},[1453,45162,45163,45166],{},[15,45164,45165],{},"Nieuwbouw:"," Preflex met VOB-draad, ingegoten of ingepleisterd in vloer en muur.",[1453,45168,45169,45172],{},[15,45170,45171],{},"Renovatie met sleuven:"," XVB rechtstreeks in de sleuf, binnen de installatiezones.",[1453,45174,45175,45178],{},[15,45176,45177],{},"Kelder, garage, technische ruimte:"," XVB in opbouw of op een kabelgoot.",[1453,45180,45181,45184],{},[15,45182,45183],{},"Houtbouw, droogbouw, verlaagd plafond:"," kabel met minstens Cca of een geschikt buizensysteem.",[1453,45186,45187,45190],{},[15,45188,45189],{},"Gedeeltelijke renovatie:"," beide combineren; nieuwe kringen in Preflex, bestaande leidingen na controle behouden.",[12,45192,45193,45194,45197,45198,39],{},"Meer over de kabeltypes in ",[30,45195,20983],{"href":45196},"\u002Fblog\u002Fxvb-vs-vob-kabel",", de volledige systematiek in ",[30,45199,22256],{"href":25275},[41,45201,32827],{"id":32826},[1450,45203,45204,45210,45215,45220],{},[1453,45205,45206],{},[30,45207,45209],{"href":45208},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[1453,45211,45212],{},[30,45213,45214],{"href":15255},"Badkamer-elektriciteit: zones en kabeltypes",[1453,45216,45217],{},[30,45218,45219],{"href":37906},"Oudere installaties en AREI Deel 8",[1453,45221,45222],{},[30,45223,33377],{"href":33958},[12,45225,45226],{},[17563,45227,45228,45229,45231,45232],{},"Plan je elektrische installatie met ",[15,45230,1337],{},", of het nu nieuwbouw met Preflex is of renovatie met vrije bedrading: plaatsingswijze en kabeltype leg je per kabel vast, eendraadschema en situatieplan exporteer je als pdf. De zelfcontrole meldt kabels in holle wanden onder Cca zonder gedocumenteerde buis. ",[30,45233,44915],{"href":6989},[12,45235,45236],{},[17563,45237,45238,45239,39],{},"Regelgrondslag: AREI Boek 1, versie 06, onderafdelingen 4.3.3.5, 5.2.7.1–5.2.7.3, 5.2.9.3, 5.2.9.5, 5.2.9.9 en 5.2.9.10. Officiële tekst: ",[30,45240,19073],{"href":15357,"rel":45241},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":45243},[45244,45245,45246,45247,45248,45249,45250],{"id":44976,"depth":1468,"text":44977},{"id":44986,"depth":1468,"text":44987},{"id":45072,"depth":1468,"text":45073},{"id":45120,"depth":1468,"text":45121},{"id":45127,"depth":1468,"text":45128},{"id":45157,"depth":1468,"text":45158},{"id":32826,"depth":1468,"text":32827},"2026-03-27","Preflex-buis of XVB rechtstreeks geplaatst? Vergelijking voor nieuwbouw en renovatie in België met de AREI-regels voor buizen, brandklassen en installatiezones.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-preflex-vs-open-wiring-editorial.jpg","\u002Fblog\u002Fpreflex-vs-open-wiring.nl",{"title":44959,"description":45252},"Preflex of vrije bedrading: welke kabelmethode?","preflex-vs-vrije-bedrading","blog\u002Fpreflex-vs-open-wiring.nl",[45261,45262,27117,33951,3275,40205,45263],"preflex","bedrading","XVB","mtb82D1wt4fncIuvTqHYie8bEJDD81z-HkpE0l4sXPE",{"id":45266,"title":45267,"articleId":45268,"body":45269,"category":19087,"date":45669,"description":45670,"extension":1496,"image":45285,"lastUpdated":15381,"locale":1497,"meta":45671,"navigation":1499,"ogImage":45672,"path":45673,"publishDate":45669,"readTime":3262,"refreshInterval":11097,"seo":45674,"seoTitle":4037,"slug":45675,"stem":45676,"tags":45677,"__hash__":45681,"kind":1515,"href":17466},"blog\u002Fblog\u002Frcd-type-a-vs-b.nl.md","Differentieel type A of type B? De AREI-regel 2026","rcd-type-a-vs-b",{"type":9,"value":45270,"toc":45654},[45271,45275,45281,45286,45289,45292,45296,45316,45319,45323,45403,45406,45410,45435,45438,45442,45445,45490,45493,45497,45517,45521,45524,45528,45531,45534,45538,45541,45545,45594,45598,45618,45622,45630,45632,45646],[41,45272,45274],{"id":45273},"kort-antwoord-minstens-type-a-type-b-alleen-bij-gladde-gelijkfoutstroom","Kort antwoord: minstens type A, type B alleen bij gladde gelijkfoutstroom",[12,45276,45277,45280],{},[15,45278,45279],{},"Elke differentieelschakelaar in een Belgische huishoudelijke installatie is minstens type A"," (AREI Boek 1, onderafdeling 5.3.5.3, punt a). Type B heb je nodig waar gladde gelijkfoutstromen kunnen optreden en geen andere toegelaten combinatie die opvangt. Voor de laadpaal ligt dat vast: ofwel een differentieel die bij gelijkfoutstroom blijft werken (bijvoorbeeld type B), ofwel een differentieel samen met een detectieapparaat voor residuele gelijkstroom, bijvoorbeeld type A plus RDC-DD in het laadstation (7.22.4.1 b).",[12,45282,45283],{},[22,45284],{"alt":17042,"src":45285},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-rcd-type-a-vs-b-editorial.webp",[12,45287,45288],{},"Voor alle andere toestellen beslist de datasheet: welke foutstroomvormen zijn mogelijk, is er ingebouwde DC-bewaking, welke externe differentieel schrijft de fabrikant voor? “Met omvormer” alleen is geen reden voor type B.",[12,45290,45291],{},"Dit artikel gaat over huishoudelijke wisselstroominstallaties volgens Boek 1, versie 06, van toepassing sinds 1 april 2026. Geaarde gelijkstroomsystemen, die versie 06 nieuw regelt, zijn een apart onderwerp.",[41,45293,45295],{"id":45294},"type-hoge-immuniteit-en-selectiviteit-zijn-drie-verschillende-dingen","Type, hoge immuniteit en selectiviteit zijn drie verschillende dingen",[1602,45297,45298,45304,45310],{},[1453,45299,45300,45303],{},[15,45301,45302],{},"AC, A, F of B"," zegt bij welke foutstroomvormen de uitschakeling gegarandeerd is.",[1453,45305,45306,45309],{},[15,45307,45308],{},"Hoge immuniteit"," (fabrikantcodes zoals SI, HI of AP-R) beperkt ongewenst uitschakelen bij bepaalde storingen.",[1453,45311,45312,45315],{},[15,45313,45314],{},"Selectiviteit of tijdvertraging"," beschrijft het tijdgedrag tegenover een nageschakelde differentieel. Bepalend zijn een S-markering of een gedocumenteerde tijdkarakteristiek.",[12,45317,45318],{},"Een “type A-SI” is dus niet vanzelf selectief. Er bestaan A-SI-toestellen die ogenblikkelijk uitschakelen.",[41,45320,45322],{"id":45321},"alle-differentieeltypes-op-een-rij","Alle differentieeltypes op een rij",[49,45324,45325,45337],{},[52,45326,45327],{},[55,45328,45329,45331,45334],{},[58,45330,9898],{},[58,45332,45333],{},"Detecteert",[58,45335,45336],{},"Gebruik in Belgische woningen",[68,45338,45339,45352,45365,45378,45391],{},[55,45340,45341,45346,45349],{},[73,45342,45343],{},[15,45344,45345],{},"AC",[73,45347,45348],{},"Alleen zuivere wisselfoutstromen",[73,45350,45351],{},"Voldoet niet aan de minimumeis type A",[55,45353,45354,45359,45362],{},[73,45355,45356],{},[15,45357,45358],{},"A",[73,45360,45361],{},"Wissel- en pulserende gelijkfoutstromen",[73,45363,45364],{},"Minimumklasse (5.3.5.3 a); toestelvereisten blijven gelden",[55,45366,45367,45372,45375],{},[73,45368,45369],{},[15,45370,45371],{},"A-SI",[73,45373,45374],{},"Zelfde foutstroomvormen als type A",[73,45376,45377],{},"Hogere storingsimmuniteit; niet automatisch selectief",[55,45379,45380,45385,45388],{},[73,45381,45382],{},[15,45383,45384],{},"F",[73,45386,45387],{},"Bijkomend bepaalde mengfrequenties",[73,45389,45390],{},"Voor bepaalde eenfasige omvormerlasten volgens de fabrikant",[55,45392,45393,45397,45400],{},[73,45394,45395],{},[15,45396,23013],{},[73,45398,45399],{},"Bijkomend gladde gelijkfoutstromen",[73,45401,45402],{},"Als het beschermingsconcept of de fabrikant die detectie vraagt",[12,45404,45405],{},"Nieuw in versie 06: de gevoeligheidsklassen maken nu onderscheid tussen wisselstroom of gelijkstroom met rimpel en gladde gelijkstroom. “Hoge gevoeligheid” betekent meer dan 10 mA tot maximaal 30 mA bij wisselstroom en meer dan 20 mA tot maximaal 80 mA bij gladde gelijkstroom (2.6.4).",[41,45407,45409],{"id":45408},"vier-gegevens-op-het-toestel-die-je-niet-mag-verwarren","Vier gegevens op het toestel die je niet mag verwarren",[1450,45411,45412,45417,45423,45429],{},[1453,45413,45414,45416],{},[15,45415,9898],{}," (A, F, B …): gedetecteerde foutstroomvorm.",[1453,45418,45419,45422],{},[15,45420,45421],{},"IΔn"," (bijvoorbeeld 30 of 300 mA): gevoeligheid voor differentiële stroom.",[1453,45424,45425,45428],{},[15,45426,45427],{},"In"," (bijvoorbeeld 40 of 63 A): stroom die de differentieel blijvend mag voeren. Hij schakelt niet af bij overbelasting; een zuivere differentieel heeft dus een gecoördineerde overstroombeveiliging nodig.",[1453,45430,45431,45434],{},[15,45432,45433],{},"Kortsluitvastheid"," of voorwaardelijke kortsluitstroom: moet passen bij de plaats van installatie (5.3.5.3 a).",[12,45436,45437],{},"Ook aantal polen, netspanning en bedrading tellen mee: alle actieve geleiders van de beschermde kring lopen door de somstroomtransformator, en nulgeleiders van verschillende differentieelgroepen worden niet gemengd. De testknop test het interne mechanisme – niet de aardingsweerstand en niet de volledige beschermingsmaatregel. Dat doen pas de metingen bij de keuring.",[41,45439,45441],{"id":45440},"wanneer-heb-je-type-b-nodig","Wanneer heb je type B nodig?",[12,45443,45444],{},"Type B komt in beeld als gladde gelijkfoutstromen mogelijk zijn en geen andere door het AREI en de fabrikant toegelaten combinatie dat risico afdekt. Controleer daarvoor het concrete toestel:",[49,45446,45447,45456],{},[52,45448,45449],{},[55,45450,45451,45453],{},[58,45452,1093],{},[58,45454,45455],{},"Wat beslist",[68,45457,45458,45468,45475,45482],{},[55,45459,45460,45462],{},[73,45461,28588],{},[73,45463,45464,45465,45467],{},"7.22.4.1 b: type B ",[15,45466,38443],{}," differentieel plus gecoördineerde RDC-DD (in installatie, laadstation of beide)",[55,45469,45470,45472],{},[73,45471,28090],{},[73,45473,45474],{},"Datasheet van compressoraandrijving, bijverwarming en sturing; voorgeschreven externe differentieel",[55,45476,45477,45479],{},[73,45478,11626],{},[73,45480,45481],{},"Omvormertopologie, interne foutstroombewaking, fabrikantvoorschrift voor de externe differentieel",[55,45483,45484,45487],{},[73,45485,45486],{},"Meerdere omvormers op één differentieel",[73,45488,45489],{},"Som van normale lekstromen en mogelijke gelijkstroomcomponenten samen beoordelen",[12,45491,45492],{},"Uit “transformatorloos” of “met omvormer” volgt geen algemene type B-plicht. Omgekeerd is type B of F niet gewoon “beter”: een ruimer golfvormbereik vervangt geen juiste gevoeligheid, nominale stroom, uitschakeltijd, overstroombeveiliging of correcte bedrading.",[41,45494,45496],{"id":45495},"wanneer-volstaat-type-a","Wanneer volstaat type A?",[1450,45498,45499,45505,45511],{},[1453,45500,45501,45504],{},[15,45502,45503],{},"Stopcontact- en lichtkringen:"," de gebruikelijke 30 mA-differentieel type A.",[1453,45506,45507,45510],{},[15,45508,45509],{},"Gewone huishoudtoestellen"," zoals wasmachine, vaatwasser, kookplaat en verlichting, tenzij de fabrikant iets anders voorschrijft.",[1453,45512,45513,45516],{},[15,45514,45515],{},"Laadpaal met ingebouwde RDC-DD:"," elke laadkring krijgt een eigen differentieel van maximaal 30 mA (7.22.4.1 b). Heeft het laadstation een detectieapparaat voor residuele gelijkstroom dat met de externe differentieel gecoördineerd is, dan volstaat daar type A. De datasheet van het laadstation toont die coördinatie aan.",[41,45518,45520],{"id":45519},"nieuw-gewijzigd-of-bestaand","Nieuw, gewijzigd of bestaand?",[12,45522,45523],{},"“Minstens type A” is de basis voor een nieuwe huishoudelijke installatie. Bij een bestaande installatie controleer je bovendien wanneer ze werd aangelegd, welke afwijkingen uit deel 8 gelden en of een verbouwing of uitbreiding de huidige eisen voor het gewijzigde deel activeert. Een aanwezige type AC is dus niet zonder meer toegelaten, maar ook geen bewijs dat de hele installatie onbruikbaar is.",[41,45525,45527],{"id":45526},"ongewenst-uitschakelen-eerst-de-oorzaak-dan-het-toestel","Ongewenst uitschakelen: eerst de oorzaak, dan het toestel",[12,45529,45530],{},"Schakelt een differentieel schijnbaar zonder reden uit, dan is “een A-SI plaatsen” geen diagnose. Controleer eerst isolatiefouten, vocht, verwisselde of gedeelde nulgeleiders, lekstromen en bedradingsfouten. Pas daarna beoordeel je of een toestel met gedocumenteerde hoge immuniteit past. Hoge immuniteit mag de persoonsbeveiliging niet verzwakken.",[12,45532,45533],{},"Een gecombineerde differentieelautomaat (RCBO) verenigt differentieel- en overstroombeveiliging voor één eindstroombaan. Ook dan moet het type bij de belasting passen en blijft afstemming met de voorliggende differentieel nodig. Noteer in het dossier de werkelijke referentie – datasheet, schema en installatie-instructies – en niet alleen “30 mA type A”.",[41,45535,45537],{"id":45536},"selectiviteit-300-ma-vóór-30-ma-volstaat-niet","Selectiviteit: 300 mA vóór 30 mA volstaat niet",[12,45539,45540],{},"De trap 300 mA vóór 30 mA garandeert geen selectiviteit. Controleer de verhouding van de aanspreekstromen, een uitdrukkelijk selectieve of vertraagde karakteristiek van het voorliggende toestel, de door de fabrikant vrijgegeven combinatie, de uitschakeltijden en de normale lekstromen. Hoge immuniteit vervangt geen tijd-\u002Fstroomcoördinatie. Pas met dat bewijs schakelt bij een fout betrouwbaar alleen de groepsdifferentieel uit.",[41,45542,45544],{"id":45543},"arei-vindplaatsen-in-één-oogopslag","AREI-vindplaatsen in één oogopslag",[49,45546,45547,45555],{},[52,45548,45549],{},[55,45550,45551,45553],{},[58,45552,37173],{},[58,45554,40239],{},[68,45556,45557,45565,45572,45579,45587],{},[55,45558,45559,45562],{},[73,45560,45561],{},"2.6.4",[73,45563,45564],{},"Gevoeligheidsklassen voor wisselstroom\u002Fgelijkstroom met rimpel en voor gladde gelijkstroom",[55,45566,45567,45569],{},[73,45568,37047],{},[73,45570,45571],{},"Aan het begin maximaal 300 mA; daarachter gevoelige bescherming voor de opgesomde kringen",[55,45573,45574,45576],{},[73,45575,37047],{},[73,45577,45578],{},"Maximaal 8 eindstroombanen per differentieel met hoge of zeer hoge gevoeligheid",[55,45580,45581,45584],{},[73,45582,45583],{},"5.3.5.3 a",[73,45585,45586],{},"In woningen minstens type A; differentieel aan het begin minstens 40 A; kortsluitvastheid passend bij de plaats",[55,45588,45589,45591],{},[73,45590,37078],{},[73,45592,45593],{},"Laadpaal: eigen differentieel ≤ 30 mA per laadkring; DC-bestendige differentieel of differentieel plus DC-detectie",[41,45595,45597],{"id":45596},"keuze-in-zes-stappen","Keuze in zes stappen",[1602,45599,45600,45603,45606,45609,45612,45615],{},[1453,45601,45602],{},"Kring en alle aangesloten toestellen bepalen.",[1453,45604,45605],{},"AREI-basisbescherming en gevoeligheid vastleggen.",[1453,45607,45608],{},"Fabrikantdocumenten nakijken op foutstroomvorm, DC-detectie en voorgeschreven externe differentieel.",[1453,45610,45611],{},"Bij cascades de tijd-\u002Fstroomcoördinatie van de concrete modellen aantonen.",[1453,45613,45614],{},"Type, gevoeligheid, nominale stroom en vertraging in het eendraadschema documenteren.",[1453,45616,45617],{},"De uitgevoerde installatie laten keuren door het erkend organisme.",[41,45619,45621],{"id":45620},"differentieelgegevens-vastleggen-en-controleren-in-planelec","Differentieelgegevens vastleggen en controleren in PlanElec",[12,45623,12598,45624,45626,45627,45629],{},[30,45625,1337],{"href":6989}," leg je per differentieel type, gevoeligheid en nominale stroom vast; die gegevens verschijnen in het eendraadschema en de pdf. De AREI\u002FRGIE-zelfcontrole meldt je onder meer een hoofddifferentieel onder 40 A, een laadpaal zonder eigen differentieel, een laadpaaldifferentieel die geen type B is en ook niet samenwerkt met een in de inspector bevestigde RDC-DD van de laadpaal, en – als praktijkaanbeveling volgens IEC 60364-5-53 – een voorliggende differentieel zonder tijdvertraging. De volledige controle-omvang vind je in ",[30,45628,10087],{"href":2457},". Fabrikantcoördinatie en metingen controleer je op het echte toestel; de keuring doet het erkend organisme.",[41,45631,17442],{"id":17441},[1450,45633,45634,45638,45642],{},[1453,45635,45636],{},[30,45637,37388],{"href":37084},[1453,45639,45640],{},[30,45641,32843],{"href":32842},[1453,45643,45644],{},[30,45645,40150],{"href":17449},[12,45647,45648],{},[17563,45649,45650,45651,19074],{},"Regelgrond: AREI Boek 1, versie 06, afdeling 2.6.4 en onderafdelingen 4.2.4.3 b, 5.3.5.3 a en 7.22.4.1 b. De officiële tekst van de ",[30,45652,19073],{"href":15357,"rel":45653},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":45655},[45656,45657,45658,45659,45660,45661,45662,45663,45664,45665,45666,45667,45668],{"id":45273,"depth":1468,"text":45274},{"id":45294,"depth":1468,"text":45295},{"id":45321,"depth":1468,"text":45322},{"id":45408,"depth":1468,"text":45409},{"id":45440,"depth":1468,"text":45441},{"id":45495,"depth":1468,"text":45496},{"id":45519,"depth":1468,"text":45520},{"id":45526,"depth":1468,"text":45527},{"id":45536,"depth":1468,"text":45537},{"id":45543,"depth":1468,"text":45544},{"id":45596,"depth":1468,"text":45597},{"id":45620,"depth":1468,"text":45621},{"id":17441,"depth":1468,"text":17442},"2026-03-25","In Belgische woningen is elke differentieel minstens type A. Wanneer je type B of type A met RDC-DD nodig hebt – laadpaal, warmtepomp, PV – en waarom A-SI niet selectief betekent.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-rcd-type-a-vs-b-editorial.jpg","\u002Fblog\u002Frcd-type-a-vs-b.nl",{"title":45267,"description":45670},"differentieel-type-a-vs-type-b","blog\u002Frcd-type-a-vs-b.nl",[17497,45678,45679,45680,32906,33372],"rcd","type-a","type-b","otzH0RHA4qDpvJcBdTWJjbGMXTsE85tuEi760PD_T9A",{"id":45683,"title":45684,"articleId":45685,"body":45686,"category":19087,"date":45895,"description":45896,"extension":1496,"image":45712,"lastUpdated":15381,"locale":1497,"meta":45897,"navigation":1499,"ogImage":45898,"path":45899,"publishDate":45895,"readTime":19590,"refreshInterval":11097,"seo":45900,"seoTitle":4037,"slug":45901,"stem":45902,"tags":45903,"__hash__":45906,"kind":1515,"href":27065},"blog\u002Fblog\u002Fmain-switch-mandatory.nl.md","Is een hoofdschakelaar verplicht? Wat het AREI voorschrijft","main-switch-mandatory",{"type":9,"value":45687,"toc":45885},[45688,45692,45707,45713,45716,45720,45786,45789,45793,45807,45811,45814,45828,45832,45842,45846,45849,45853,45861,45863,45877],[41,45689,45691],{"id":45690},"kort-antwoord-ja-met-minstens-40-a-in-woningen","Kort antwoord: ja, met minstens 40 A in woningen",[12,45693,45694,45697,45698,45701,45702,45704,45705,39],{},[15,45695,45696],{},"Ja, een hoofdschakelaar is in België verplicht."," Volgens AREI Boek 1, onderafdeling 5.3.5.1 b is elk hoofdschakel- en verdeelbord voorzien van een ",[15,45699,45700],{},"algemene lastscheidingsschakelaar"," die alle lijngeleiders en eventueel de nulgeleider gelijktijdig onderbreekt. Zijn toegekende stroom is aangepast aan de installatie en bedraagt algemeen minstens ",[15,45703,22943],{},", in huishoudelijke installaties minstens ",[15,45706,22954],{},[12,45708,45709],{},[22,45710],{"alt":45711,"src":45712},"Een elektricien bedient een afgedekt beveiligings- of schakeltoestel.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-main-switch-mandatory-editorial.webp",[12,45714,45715],{},"Een lastscheidingsschakelaar mag – anders dan een gewone scheider – onder belasting geschakeld worden. Precies daarom is hij de hoofdschakelaar: één handgreep en de hele installatie is spanningsloos.",[41,45717,45719],{"id":45718},"de-eisen-op-een-rij","De eisen op een rij",[49,45721,45722,45733],{},[52,45723,45724],{},[55,45725,45726,45728,45731],{},[58,45727,41506],{},[58,45729,45730],{},"Wat het AREI vraagt",[58,45732,3189],{},[68,45734,45735,45745,45755,45765,45775],{},[55,45736,45737,45740,45743],{},[73,45738,45739],{},"Aanwezig",[73,45741,45742],{},"Algemene lastscheidingsschakelaar op het hoofdschakel- en verdeelbord",[73,45744,38038],{},[55,45746,45747,45750,45753],{},[73,45748,45749],{},"Alle lijngeleiders tegelijk",[73,45751,45752],{},"Eén schakelbeweging onderbreekt alle lijngeleiders en eventueel de nulgeleider",[73,45754,38038],{},[55,45756,45757,45760,45763],{},[73,45758,45759],{},"Toegekende stroom",[73,45761,45762],{},"aangepast aan de installatie; minstens 25 A, in woningen minstens 40 A",[73,45764,38038],{},[55,45766,45767,45770,45773],{},[73,45768,45769],{},"Uitzondering",[73,45771,45772],{},"De overstroombeveiliging van de netbeheerder mag de functie overnemen als ze ontworpen is om te scheiden",[73,45774,38038],{},[55,45776,45777,45780,45783],{},[73,45778,45779],{},"Toegankelijk",[73,45781,45782],{},"Bord gemakkelijk te bedienen en te onderhouden; in woningen zonder bijzondere hulpmiddelen bereikbaar",[73,45784,45785],{},"5.3.5.1 c",[12,45787,45788],{},"In de praktijk betekent “alle lijngeleiders en eventueel de nulgeleider”: tweepolig bij een eenfasige aansluiting, vierpolig bij 3N~400 V en driepolig bij 3×230 V zonder nulgeleider. Een vaste montagehoogte noemt het AREI niet; wat telt, is dat je het bord bereikt zonder ladder, gereedschap of meubels te verschuiven.",[41,45790,45792],{"id":45791},"waarvoor-de-hoofdschakelaar-dient","Waarvoor de hoofdschakelaar dient",[1602,45794,45795,45801],{},[1453,45796,45797,45800],{},[15,45798,45799],{},"Uitschakelen in een noodgeval:"," bij brand, waterschade of een elektrisch ongeval schakelt elke bewoner de hele installatie met één handgreep uit – zonder vakkennis.",[1453,45802,45803,45806],{},[15,45804,45805],{},"Spanningsloos maken voor werken:"," wie aan de installatie werkt, scheidt ze eerst veilig van het net.",[41,45808,45810],{"id":45809},"typische-vaststellingen-bij-de-keuring","Typische vaststellingen bij de keuring",[12,45812,45813],{},"In oude installaties ontbreekt de hoofdschakelaar soms helemaal, of zit er alleen een eenpolige schakelaar die de nulgeleider niet onderbreekt. Deze punten controleer je vóór de keuring:",[1450,45815,45816,45819,45822,45825],{},[1453,45817,45818],{},"Is er een hoofdschakelaar?",[1453,45820,45821],{},"Onderbreekt hij alle lijngeleiders (en de nulgeleider waar aanwezig) tegelijk?",[1453,45823,45824],{},"Is de toegekende stroom in de woning minstens 40 A en passend voor de installatie?",[1453,45826,45827],{},"Is het bord vrij bereikbaar – niet achter meubels of in een afgesloten ruimte?",[41,45829,45831],{"id":45830},"hoofdschakelaar-en-hoofdzekering-zijn-twee-verschillende-dingen","Hoofdschakelaar en hoofdzekering zijn twee verschillende dingen",[12,45833,45834,45835,45838,45839,39],{},"De hoofdschakelaar is ",[15,45836,45837],{},"geen overstroombeveiliging",". Hij scheidt, hij beveiligt niet. De overstroombeveiliging komt van het toestel van de netbeheerder vóór de meter en van de automaten in het bord. Omgekeerd mag het toestel van de netbeheerder de functie van hoofdschakelaar alleen overnemen als het uitdrukkelijk ontworpen is om te scheiden (5.3.5.1 b). Welk onderbrekingsvermogen de automaten achter de hoofdschakelaar nodig hebben, lees je in ",[30,45840,45841],{"href":19100},"Onderbrekingsvermogen van automaten",[41,45843,45845],{"id":45844},"hoofdschakelaar-en-differentieel-aan-het-voedingspunt","Hoofdschakelaar en differentieel aan het voedingspunt",[12,45847,45848],{},"Aan het voedingspunt van een woning zit bovendien minstens één differentieelschakelaar van hoogstens 300 mA, minstens type A en met een nominale stroom van minstens 40 A (4.2.4.3 b, 5.3.5.3 a). Die verzekert de scheidingsfunctie volgens 5.3.3.1 a.3. Dat is een eis aan dat toestel, geen uitzondering op 5.3.5.1 b: als vervanging van de algemene lastscheidingsschakelaar noemt het AREI uitdrukkelijk alleen de overstroombeveiliging van de netbeheerder. Of één toestel beide rollen vervult, toon je aan met zijn kenmerken. Op het eendraadschema moet in elk geval eenduidig te zien zijn welk toestel de functie van algemene lastscheidingsschakelaar vervult.",[41,45850,45852],{"id":45851},"hoofdschakelaar-ontwerpen-in-planelec","Hoofdschakelaar ontwerpen in PlanElec",[12,45854,12598,45855,45857,45858,45860],{},[30,45856,1337],{"href":6989}," plaats je de hoofdschakelaar met aantal polen en toegekende stroom in eendraadschema en verdeelbord. De AREI\u002FRGIE-zelfcontrole meldt een ontbrekende hoofdschakelaar en een hoofdschakelaar onder 40 A in een woning als fout. De volledige controle-omvang vind je in ",[30,45859,10087],{"href":2457},". De keuring van de uitgevoerde installatie doet het erkend organisme.",[41,45862,17442],{"id":17441},[1450,45864,45865,45869,45873],{},[1453,45866,45867],{},[30,45868,17461],{"href":17460},[1453,45870,45871],{},[30,45872,37388],{"href":37084},[1453,45874,45875],{},[30,45876,17455],{"href":17361},[12,45878,45879],{},[17563,45880,45881,45882,19074],{},"Regelgrond: AREI Boek 1, versie 06, onderafdeling 5.3.5.1 b en c, aangevuld met 4.2.4.3 b, 5.3.3.1 a.3 en 5.3.5.3 a. De officiële tekst van de ",[30,45883,19073],{"href":15357,"rel":45884},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":45886},[45887,45888,45889,45890,45891,45892,45893,45894],{"id":45690,"depth":1468,"text":45691},{"id":45718,"depth":1468,"text":45719},{"id":45791,"depth":1468,"text":45792},{"id":45809,"depth":1468,"text":45810},{"id":45830,"depth":1468,"text":45831},{"id":45844,"depth":1468,"text":45845},{"id":45851,"depth":1468,"text":45852},{"id":17441,"depth":1468,"text":17442},"2026-03-23","Ja: elk hoofdbord heeft een algemene lastscheidingsschakelaar die alle lijngeleiders tegelijk onderbreekt – in woningen van minstens 40 A (AREI 5.3.5.1 b). Alle eisen op een rij.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-main-switch-mandatory-editorial.jpg","\u002Fblog\u002Fmain-switch-mandatory.nl",{"title":45684,"description":45896},"hoofdschakelaar-verplicht-arei","blog\u002Fmain-switch-mandatory.nl",[45904,32906,45905,44205,17499],"hoofdschakelaar","verplicht","8xkoyzjQDt7IJKXVsPlVZIsWa_zBq58OTfHb0cHL3iM",{"id":45908,"title":45909,"articleId":45910,"body":45911,"category":19087,"date":46285,"description":46286,"extension":1496,"image":45928,"lastUpdated":15381,"locale":1497,"meta":46287,"navigation":1499,"ogImage":46288,"path":46289,"publishDate":46285,"readTime":3262,"refreshInterval":11097,"seo":46290,"seoTitle":4037,"slug":46291,"stem":46292,"tags":46293,"__hash__":46296,"kind":1515,"href":33334},"blog\u002Fblog\u002Fearthing-tt-vs-tns.nl.md","Aarding TT of TN-S? Het verschil volgens het AREI (2026)","earthing-tt-vs-tns",{"type":9,"value":45912,"toc":46271},[45913,45917,45923,45929,45932,45935,45939,45946,46017,46020,46024,46027,46032,46053,46060,46064,46070,46074,46088,46091,46095,46101,46104,46108,46161,46166,46170,46173,46176,46180,46183,46186,46189,46193,46196,46199,46227,46231,46234,46238,46246,46248,46263],[41,45914,45916],{"id":45915},"kort-antwoord-het-foutstroompad-maakt-het-verschil","Kort antwoord: het foutstroompad maakt het verschil",[12,45918,45919,45922],{},[15,45920,45921],{},"In een TT-net loopt een foutstroom via de lokale aardverbinding en de grond terug naar de bron; in een TN-S-net metallisch via de beschermingsgeleider."," Daaruit volgen verschillende uitschakelvoorwaarden: in een TT-net schakelt in de praktijk de differentieelschakelaar af, in een TN-S-net kan ook de automaat tijdig uitschakelen (AREI Boek 1, onderafdeling 4.2.3.4).",[12,45924,45925],{},[22,45926],{"alt":45927,"src":45928},"Beschermingsgeleiders eindigen op een netjes aangesloten aardrail.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-earthing-tt-vs-tns-editorial.webp",[12,45930,45931],{},"Welk netsysteem jouw aansluiting heeft, stel je vast aan de hand van de aansluiting en de gegevens van de netbeheerder – niet op basis van bouwjaar of gebruik. Het AREI verklaart TT niet algemeen tot Belgische woningstandaard en TN-S niet tot een systeem dat alleen voor nieuwbouw of industrie bestaat.",[12,45933,45934],{},"Dit artikel gaat over huishoudelijke wisselstroominstallaties volgens Boek 1, versie 06, van toepassing sinds 1 april 2026. De nieuwe gelijkstroomsystemen uit versie 06 zijn een apart onderwerp.",[41,45936,45938],{"id":45937},"de-letters-juist-lezen","De letters juist lezen",[12,45940,45941,45942,45945],{},"De eerste letter beschrijft de relatie van de bron tot de aarde: ",[1300,45943,45944],{},"T"," betekent dat een punt van de bron rechtstreeks geaard is. De tweede letter beschrijft hoe de massa's van de verbruikersinstallatie aangesloten zijn:",[49,45947,45948,45961],{},[52,45949,45950],{},[55,45951,45952,45955,45958],{},[58,45953,45954],{},"Netsysteem",[58,45956,45957],{},"Massa's van de installatie verbonden met …",[58,45959,45960],{},"Nul- en beschermingsgeleider",[68,45962,45963,45976,45995],{},[55,45964,45965,45970,45973],{},[73,45966,45967],{},[15,45968,45969],{},"TT",[73,45971,45972],{},"een eigen lokale aardverbinding, los van de aarding van de bron",[73,45974,45975],{},"gescheiden",[55,45977,45978,45983,45986],{},[73,45979,45980],{},[15,45981,45982],{},"TN-S",[73,45984,45985],{},"het geaarde punt van de bron via de beschermingsgeleider",[73,45987,45988,933,45991,45994],{},[1300,45989,45990],{},"N",[1300,45992,45993],{},"PE"," over de hele lengte gescheiden",[55,45996,45997,46002,46011],{},[73,45998,45999],{},[15,46000,46001],{},"TN-C-S",[73,46003,46004,46005,46008,46009],{},"het geaarde punt van de bron via ",[1300,46006,46007],{},"PEN",", later ",[1300,46010,45993],{},[73,46012,46013,46014,46016],{},"eerst gecombineerd als ",[1300,46015,46007],{},", daarna gesplitst",[12,46018,46019],{},"Of TN-C-S aanwezig is, stel je vast aan de hand van de aansluiting en de informatie van de netbeheerder; het is niet zomaar “typisch voor oude huizen”.",[41,46021,46023],{"id":46022},"tt-net-lokale-aardverbinding-en-differentieel","TT-net: lokale aardverbinding en differentieel",[12,46025,46026],{},"Bij een fout naar de massa loopt de foutstroom van de lijngeleider via de massa van het toestel, de beschermingsgeleider, de lokale aardverbinding en de grond naar het geaarde punt van de bron. De aarde maakt deel uit van de foutlus; de foutstroom blijft duidelijk onder een kortsluitstroom. Daarom zorgt in een TT-net doorgaans de differentieel voor de automatische uitschakeling. De voorwaarde luidt (4.2.3.4 c.2):",[12,46028,46029],{},[1300,46030,46031],{},"IΔn × RE ≤ UL",[12,46033,46034,46036,46037,46040,46041,46044,46045,46048,46049,46052],{},[1300,46035,45421],{}," is de aanspreekstroom van de differentieel, ",[1300,46038,46039],{},"RE"," de spreidingsweerstand van de aardverbinding van de massa's en ",[1300,46042,46043],{},"UL"," de conventionele grenswaarde van de aanraakspanning (2.4.1, tabel 2.3). De berekening ",[1300,46046,46047],{},"50 V \u002F 0,3 A ≈ 166 Ω"," heft de huishoudelijke grens van ",[15,46050,46051],{},"lager dan 100 Ω"," (4.2.3.2) niet op.",[12,46054,46055,46056,46059],{},"Ook uitschakeling via overstroombeveiligingen laat het AREI in een TT-net toe, als ",[1300,46057,46058],{},"Ia ≤ U0 \u002F Zs"," echt vervuld is (4.2.3.4 c.2). “TT werkt alleen met een differentieel” is dus te absoluut – in de praktijk blijft de differentieel wel het aangewezen middel.",[41,46061,46063],{"id":46062},"tn-s-net-terugweg-via-de-beschermingsgeleider","TN-S-net: terugweg via de beschermingsgeleider",[12,46065,46066,46067,46069],{},"In een TN-S-net loopt de foutstroom via ",[1300,46068,45993],{}," metallisch terug naar het geaarde punt van de bron. De foutlus moet zo laagohmig zijn dat de beveiliging uitschakelt binnen de tijd van de veiligheidscurve (4.2.3.4 b.2):",[12,46071,46072],{},[1300,46073,46058],{},[12,46075,46076,46079,46080,46083,46084,46087],{},[1300,46077,46078],{},"Ia"," is de aanspreekstroom van de beveiliging binnen de toegelaten tijd, ",[1300,46081,46082],{},"U0"," de spanning ten opzichte van de aarde, ",[1300,46085,46086],{},"Zs"," de impedantie van de foutlus.",[12,46089,46090],{},"De netbeheerder garandeert daarmee geen bepaalde aardingsweerstand, en de differentieel wordt niet overbodig: de huishoudelijke differentieeleisen uit 4.2.4.3 gelden ongeacht het netsysteem. Omgekeerd vervangt een 30 mA-differentieel niet de controle van de continuïteit van de beschermingsgeleider en van de uitschakelvoorwaarden.",[41,46092,46094],{"id":46093},"ook-bij-tn-een-lokale-aardverbinding","Ook bij TN een lokale aardverbinding",[12,46096,46097,46098,46100],{},"Uit “de PE komt mee met het net” volgt niet dat een woning geen eigen aardverbinding nodig heeft. In huishoudelijke installaties wordt de aardverbinding uitgevoerd volgens 5.4.2.1 en is haar spreidingsweerstand ",[15,46099,46051],{}," (4.2.3.2). Aardgeleider, aardingsonderbreker, hoofdbeschermingsgeleider en equipotentiale verbindingen maken deel uit van de installatie en worden bereikbaar, duurzaam en controleerbaar uitgevoerd.",[12,46102,46103],{},"Welke uitvoering van de aardverbinding past, hangt af van nieuwbouw of bestaand gebouw, fundering en bodem. Doorslaggevend zijn uitvoering en meetwaarde, niet een vaste penlengte.",[41,46105,46107],{"id":46106},"_30-ω-en-100-ω-twee-verschillende-drempels","30 Ω en 100 Ω: twee verschillende drempels",[49,46109,46110,46122],{},[52,46111,46112],{},[55,46113,46114,46117,46120],{},[58,46115,46116],{},"Spreidingsweerstand",[58,46118,46119],{},"Gevolg voor de woning",[58,46121,3189],{},[68,46123,46124,46136,46148],{},[55,46125,46126,46131,46134],{},[73,46127,46128],{},[1300,46129,46130],{},"RE ≤ 30 Ω",[73,46132,46133],{},"De gewone huishoudelijke differentieelregels gelden.",[73,46135,37047],{},[55,46137,46138,46143,46146],{},[73,46139,46140],{},[1300,46141,46142],{},"30 Ω \u003C RE \u003C 100 Ω",[73,46144,46145],{},"Minstens twee differentiëlen met hoge of zeer hoge gevoeligheid met elk maximaal 16 contactdozen, plus minstens één differentieel ≤ 100 mA voor de andere kringen",[73,46147,37047],{},[55,46149,46150,46155,46158],{},[73,46151,46152],{},[1300,46153,46154],{},"RE ≥ 100 Ω",[73,46156,46157],{},"Niet in orde; de aarding moet beter. Extra differentiëlen lossen dat niet op.",[73,46159,46160],{},"4.2.3.2",[12,46162,46163,46164,39],{},"De zestien telt contactdozen, geen eindstroombanen. Daarnaast blijft gelden: maximaal acht eindstroombanen per differentieel met hoge of zeer hoge gevoeligheid. Beide telregels gelden tegelijk – details in ",[30,46165,37388],{"href":37084},[41,46167,46169],{"id":46168},"wat-de-meting-zegt","Wat de meting zegt",[12,46171,46172],{},"De spreidingsweerstand bepaal je met een meting volgens een geschikte methode. Bodemvochtigheid, temperatuur, corrosie, losse verbindingen of een beschadigde aardgeleider veranderen de waarde; een visuele controle volstaat niet. Bij de keuring worden ook beschermingsgeleiders, equipotentiale verbindingen, differentiëlen en andere beschermingsmaatregelen gecontroleerd.",[12,46174,46175],{},"Het keuringsverslag van het erkend organisme vermeldt de gemeten spreidingsweerstand. Huishoudelijke installaties worden na de gelijkvormigheidscontrole minstens om de 25 jaar opnieuw gecontroleerd (6.5.2). Die termijn dekt geen latere wijzigingen: een belangrijke wijziging of uitbreiding vraagt een eigen gelijkvormigheidscontrole, en stelt een controlebezoek inbreuken vast, dan legt het organisme in het verslag een datum voor het bijkomend bezoek vast (6.5.7.2 b.6).",[41,46177,46179],{"id":46178},"aarding-en-equipotentiale-verbindingen-horen-samen","Aarding en equipotentiale verbindingen horen samen",[12,46181,46182],{},"De aardverbinding is maar één deel van de beschermingsmaatregel. De aardgeleider verbindt ze met de aardingsonderbreker; van daar lopen beschermingsgeleiders en de hoofdequipotentiale verbinding naar de geleidende delen. Water-, gas- of verwarmingsleidingen vervangen geen aardverbinding, maar worden volgens de geldende regels in de equipotentiale verbinding opgenomen.",[12,46184,46185],{},"Een goede aardingsmeting compenseert geen onderbroken PE naar een stopcontact, en een doorlopende beschermingsgeleider zegt niets over de spreidingsweerstand. Weerstand, continuïteit, isolatie, werking van de differentieel en uitschakelvoorwaarden worden daarom apart gecontroleerd. Let bij een verbouwing vooral op oude combinaties van nul- en beschermingsgeleider: een ongeoorloofde N-PE-verbinding achter het scheidingspunt vervalst de werking van de differentieel en de meetwaarden.",[12,46187,46188],{},"Voor het dossier tellen meetdatum, gemeten installatiedeel en verslag – niet een cijfer dat mondeling werd doorgegeven. Een oude meetwaarde neem je niet ongecontroleerd over voor een nieuwe aardverbinding, een uitbreiding of gewijzigde verbindingen.",[41,46190,46192],{"id":46191},"wat-hoort-in-schema-en-dossier","Wat hoort in schema en dossier?",[12,46194,46195],{},"Afdeling 9.1.2 vraagt voor woningen onder meer het eendraadschema en het situatieplan. Geef daarin de werkelijk aanwezige aardings- en beschermingscomponenten correct weer: aardgeleider, aardingsonderbreker, hoofdequipotentiale verbinding en beveiligingen met hun toewijzing.",[12,46197,46198],{},"Zo pak je een inventaris aan:",[1602,46200,46201,46204,46215,46218,46221,46224],{},[1453,46202,46203],{},"Netaansluiting en gegevens van de netbeheerder nakijken.",[1453,46205,46206,46207,702,46209,46211,46212,46214],{},"Het verloop van ",[1300,46208,45990],{},[1300,46210,45993],{}," en eventueel ",[1300,46213,46007],{}," volgen.",[1453,46216,46217],{},"Lokale aardverbinding, aardingsonderbreker en equipotentiale verbindingen opnemen.",[1453,46219,46220],{},"Spreidingsweerstand en continuïteit van de beschermingsgeleider laten meten.",[1453,46222,46223],{},"Differentieel- en overstroombeveiliging met uitschakelvoorwaarden beoordelen.",[1453,46225,46226],{},"Installatie, bordopschriften, eendraadschema en situatieplan vergelijken.",[41,46228,46230],{"id":46229},"tt-of-tn-s-geen-rangorde","TT of TN-S: geen rangorde",[12,46232,46233],{},"Beide netsystemen zijn veilig als ontwerp, netvoorwaarden, geleidertracé en beveiligingen op elkaar afgestemd zijn. TT is niet automatisch beter, TN-S niet automatisch betrouwbaarder. Doorslaggevend is dat de foutstroom een bepaalde terugweg heeft en de uitschakeling in het concrete geval tijdig gebeurt.",[41,46235,46237],{"id":46236},"aarding-documenteren-in-planelec","Aarding documenteren in PlanElec",[12,46239,12598,46240,46242,46243,46245],{},[30,46241,1337],{"href":6989}," leg je in de netconfiguratie het netsysteem vast (TT, TN-S, TN-C-S of IT) en documenteer je aardverbinding, equipotentiale verbindingen en beveiligingen in eendraadschema en situatieplan, beide exporteerbaar als pdf. De AREI\u002FRGIE-zelfcontrole meldt een ontbrekende hoofdequipotentiale verbinding, een ontbrekende aardelektrode in een TT- of IT-net en – als plausibiliteitscontrole – een openbare 3×230 V-aansluiting die als TN is opgeslagen. De controle-omvang vind je in ",[30,46244,10087],{"href":2457},". De spreidingsweerstand meet de elektrotechnicus ter plaatse; de keuring doet het erkend organisme.",[41,46247,6947],{"id":6946},[1450,46249,46250,46254,46259],{},[1453,46251,46252],{},[30,46253,37388],{"href":37084},[1453,46255,46256],{},[30,46257,46258],{"href":17466},"Differentieel type A of type B?",[1453,46260,46261],{},[30,46262,17461],{"href":17460},[12,46264,46265],{},[17563,46266,46267,46268,19074],{},"Regelgrond: AREI Boek 1, versie 06, afdeling 2.4.1, onderafdelingen 4.2.3.2, 4.2.3.4 b en c, 4.2.4.3 b en 5.4.2.1, afdeling 6.5.2, onderafdeling 6.5.7.2 b.6 en afdeling 9.1.2. De officiële tekst van de ",[30,46269,19073],{"href":15357,"rel":46270},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":46272},[46273,46274,46275,46276,46277,46278,46279,46280,46281,46282,46283,46284],{"id":45915,"depth":1468,"text":45916},{"id":45937,"depth":1468,"text":45938},{"id":46022,"depth":1468,"text":46023},{"id":46062,"depth":1468,"text":46063},{"id":46093,"depth":1468,"text":46094},{"id":46106,"depth":1468,"text":46107},{"id":46168,"depth":1468,"text":46169},{"id":46178,"depth":1468,"text":46179},{"id":46191,"depth":1468,"text":46192},{"id":46229,"depth":1468,"text":46230},{"id":46236,"depth":1468,"text":46237},{"id":6946,"depth":1468,"text":6947},"2026-03-20","TT of TN-S bepaalt het foutstroompad en de uitschakelvoorwaarde. Formules, lokale aardverbinding onder 100 Ω en de 30 Ω-regel voor Belgische woningen volgens AREI Boek 1 V06.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-earthing-tt-vs-tns-editorial.jpg","\u002Fblog\u002Fearthing-tt-vs-tns.nl",{"title":45909,"description":46286},"aarding-tt-tns-belgie","blog\u002Fearthing-tt-vs-tns.nl",[22648,46294,46295,32906,38766],"tt-systeem","tn-s","FkrnC8_py0jFPYhPthLeI-SMMvibZwZVawx1yPxlJEA",{"id":46298,"title":46299,"articleId":46300,"body":46301,"category":19087,"date":46887,"description":46888,"extension":1496,"image":46314,"lastUpdated":15381,"locale":1497,"meta":46889,"navigation":1499,"ogImage":46890,"path":46891,"publishDate":46887,"readTime":14340,"refreshInterval":11097,"seo":46892,"seoTitle":4037,"slug":46893,"stem":46894,"tags":46895,"__hash__":46897,"kind":1515,"href":26440},"blog\u002Fblog\u002Fcable-cross-section-breaker.nl.md","Kabeldoorsnede per automaat: welke kabel bij welke zekering?","cable-cross-section-breaker",{"type":9,"value":46302,"toc":46875},[46303,46309,46315,46319,46322,46419,46422,46426,46429,46434,46572,46575,46579,46582,46617,46620,46624,46631,46635,46656,46659,46697,46703,46707,46715,46724,46728,46731,46733,46759,46762,46766,46827,46831,46839,46841,46867],[12,46304,46305,46308],{},[15,46306,46307],{},"In Belgische woningen geldt volgens AREI-tabel 4.11: 1,5 mm² koper krijgt hoogstens een automaat van 16 A, 2,5 mm² hoogstens 20 A, 4 mm² hoogstens 25 A en 6 mm² hoogstens 40 A."," Stopcontactkringen leg je volgens onderafdeling 5.2.1.2 altijd in minstens 2,5 mm². De beveiliging beschermt daarbij de leiding, niet het toestel: is de automaat te groot voor de doorsnede, dan schakelt hij bij overbelasting te laat af en raakt de leiding oververhit.",[12,46310,46311],{},[22,46312],{"alt":46313,"src":46314},"Een elektricien vergelijkt kabelmateriaal op de werkbank.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-cable-cross-section-breaker-editorial.webp",[41,46316,46318],{"id":46317},"snel-overzicht-automaat-minimale-doorsnede","Snel overzicht: automaat → minimale doorsnede",[12,46320,46321],{},"Dit overzicht leest Tabel 4.11 zoals de vraag op de werf gesteld wordt: de automaat ligt vast, je zoekt de kleinste toegelaten koperdoorsnede.",[49,46323,46324,46335],{},[52,46325,46326],{},[55,46327,46328,46330,46333],{},[58,46329,40357],{},[58,46331,46332],{},"Minimale doorsnede koper",[58,46334,45019],{},[68,46336,46337,46346,46356,46365,46374,46383,46393,46402,46411],{},[55,46338,46339,46341,46344],{},[73,46340,22921],{},[73,46342,46343],{},"1,5 mm² (Tabel 4.11 vermeldt 1 mm², maar Tabel 5.1 laat 1 mm² niet toe voor nieuwe leidingen)",[73,46345,304],{},[55,46347,46348,46350,46353],{},[73,46349,22924],{},[73,46351,46352],{},"1,5 mm²; stopcontactkringen minstens 2,5 mm² volgens 5.2.1.2",[73,46354,46355],{},"Verlichting, kring zonder stopcontact",[55,46357,46358,46360,46362],{},[73,46359,22933],{},[73,46361,15138],{},[73,46363,46364],{},"Stopcontactkring, toestelkring",[55,46366,46367,46369,46371],{},[73,46368,22943],{},[73,46370,22938],{},[73,46372,46373],{},"Eindkring met hogere belasting",[55,46375,46376,46378,46380],{},[73,46377,22951],{},[73,46379,22948],{},[73,46381,46382],{},"Kookplaat, doorstroomtoestel",[55,46384,46385,46387,46390],{},[73,46386,22954],{},[73,46388,46389],{},"6 mm² (bovengrens van de tabel)",[73,46391,46392],{},"Eindkring of voedingsleiding",[55,46394,46395,46397,46399],{},[73,46396,22965],{},[73,46398,22959],{},[73,46400,46401],{},"Voeding van een onderverdeling",[55,46403,46404,46406,46408],{},[73,46405,22975],{},[73,46407,22970],{},[73,46409,46410],{},"Voedingsleiding, hoofdschakelaar",[55,46412,46413,46415,46417],{},[73,46414,22985],{},[73,46416,22980],{},[73,46418,46410],{},[12,46420,46421],{},"De tabel is een bovengrens voor de beveiliging, geen afgewerkte dimensionering. Plaatsingswijze, groepering, omgevingstemperatuur en spanningsval kunnen een grotere doorsnede vragen; hoe je dat controleert, lees je verderop.",[41,46423,46425],{"id":46424},"de-volledige-tabel-411","De volledige Tabel 4.11",[12,46427,46428],{},"In het AREI staat het verband in de andere richting: per geleiderdoorsnede het grootste toegelaten kaliber van de beveiliging, apart voor smeltzekering en automaat (onderafdeling 4.4.1.4, geldt voor huishoudelijke installaties).",[12,46430,46431],{},[17563,46432,46433],{},"Tabel 4.11 — Kaliber van de beveiliging volgens de geleiderdoorsnede (AREI 4.4.1.4)",[49,46435,46436,46450],{},[52,46437,46438],{},[55,46439,46440,46443,46445,46447],{},[58,46441,46442],{},"Doorsnede geleider",[58,46444,38390],{"align":33038},[58,46446,38393],{"align":33038},[58,46448,46449],{},"Gebruik in huishoudelijke installaties",[68,46451,46452,46466,46478,46490,46501,46512,46522,46532,46542,46552,46562],{},[55,46453,46454,46457,46460,46463],{},[73,46455,46456],{},"0,5 mm²",[73,46458,46459],{"align":33038},"2 A",[73,46461,46462],{"align":33038},"4 A",[73,46464,46465],{},"alleen stuur-, controle-, meld- en meetkringen",[55,46467,46468,46470,46472,46475],{},[73,46469,15132],{},[73,46471,46462],{"align":33038},[73,46473,46474],{"align":33038},"6 A",[73,46476,46477],{},"alleen ingebouwde kringen in verdeelborden",[55,46479,46480,46483,46485,46487],{},[73,46481,46482],{},"1 mm²",[73,46484,46474],{"align":33038},[73,46486,22921],{"align":33038},[73,46488,46489],{},"alleen als bestaand deel van vóór 17 mei 1986",[55,46491,46492,46494,46496,46498],{},[73,46493,15135],{},[73,46495,22921],{"align":33038},[73,46497,22924],{"align":33038},[73,46499,46500],{},"kringen zonder stopcontacten",[55,46502,46503,46505,46507,46509],{},[73,46504,15138],{},[73,46506,22924],{"align":33038},[73,46508,22933],{"align":33038},[73,46510,46511],{},"algemeen toegelaten",[55,46513,46514,46516,46518,46520],{},[73,46515,22938],{},[73,46517,22933],{"align":33038},[73,46519,22943],{"align":33038},[73,46521,46511],{},[55,46523,46524,46526,46528,46530],{},[73,46525,22948],{},[73,46527,22951],{"align":33038},[73,46529,22954],{"align":33038},[73,46531,46511],{},[55,46533,46534,46536,46538,46540],{},[73,46535,22959],{},[73,46537,22962],{"align":33038},[73,46539,22965],{"align":33038},[73,46541,46511],{},[55,46543,46544,46546,46548,46550],{},[73,46545,22970],{},[73,46547,22965],{"align":33038},[73,46549,22975],{"align":33038},[73,46551,46511],{},[55,46553,46554,46556,46558,46560],{},[73,46555,22980],{},[73,46557,22975],{"align":33038},[73,46559,22985],{"align":33038},[73,46561,46511],{},[55,46563,46564,46566,46568,46570],{},[73,46565,22990],{},[73,46567,22985],{"align":33038},[73,46569,22995],{"align":33038},[73,46571,46511],{},[12,46573,46574],{},"De twee kolommen zijn niet uitwisselbaar. Voor dezelfde leiding ligt de grens van de smeltzekering één stap onder die van de automaat. Wie op 2,5 mm² een smeltzekering van 16 A vervangt door een automaat van 20 A, verhoogt de nominale stroom en moet de kring opnieuw beoordelen.",[41,46576,46578],{"id":46577},"tabel-51-de-uitzonderingen-onder-25-mm","Tabel 5.1: de uitzonderingen onder 2,5 mm²",[12,46580,46581],{},"Onderafdeling 5.2.1.2 verbiedt geïsoleerde geleiders kleiner dan 2,5 mm² wanneer ze geen integraal deel van een machine of toestel zijn. Tabel 5.1 somt de uitzonderingen limitatief op:",[49,46583,46584,46594],{},[52,46585,46586],{},[55,46587,46588,46591],{},[58,46589,46590],{},"Minimum",[58,46592,46593],{},"Alleen voor",[68,46595,46596,46603,46610],{},[55,46597,46598,46600],{},[73,46599,15135],{},[73,46601,46602],{},"kringen zonder stopcontacten; enkel een afzonderlijk stopcontact tot 2,5 A ingebouwd in een armatuur mag",[55,46604,46605,46607],{},[73,46606,15132],{},[73,46608,46609],{},"in verdeel- en schakelborden ingebouwde kringen die één enkel stopcontact voeden",[55,46611,46612,46614],{},[73,46613,46456],{},[73,46615,46616],{},"stuur-, controle-, meld- en meetkringen",[12,46618,46619],{},"De rij 1 mm² uit Tabel 4.11 is dus geen toestemming voor nieuwe 1 mm²-leidingen. Tabel 4.11 bepaalt hoe groot de beveiliging hoogstens mag zijn; of je die doorsnede mag leggen, regelt Tabel 5.1.",[41,46621,46623],{"id":46622},"bestaande-installaties-1-mm-leidingen","Bestaande installaties: 1 mm²-leidingen",[12,46625,46626,46627,46630],{},"Voor bestaande huishoudelijke installaties bevat afdeling 8.2.2 (punt 5, keuze van elektrische leidingen) een strikt afgebakende afwijking: EMCB- en EMCVB-leidingen van 1 mm² en CTLB- en VTLB-leidingen van 0,75 mm² mogen in dienst blijven wanneer de uitvoering ter plaatse vóór ",[15,46628,46629],{},"17 mei 1986"," is aangevat en ze deel uitmaken van kringen zonder stopcontact. De beveiliging moet aangepast zijn aan de doorsnede. Dat is een overgangsregel voor bestaande installaties, geen regel voor nieuwe leidingen. Bouwjaar en werkelijk leidingtype moet je bij de keuring kunnen aantonen.",[41,46632,46634],{"id":46633},"wat-de-tabel-niet-beslist","Wat de tabel niet beslist",[12,46636,46637,46638,46641,46642,46645,46646,46649,46650,708,46653,46655],{},"Een volledige keuze verbindt drie stromen: de ontwerpstroom van de belasting ",[1300,46639,46640],{},"I_B",", de nominale stroom van de beveiliging ",[1300,46643,46644],{},"I_n"," en de stroombelastbaarheid van de leiding ",[1300,46647,46648],{},"I_Z",". In principe geldt ",[1300,46651,46652],{},"I_B ≤ I_n ≤ I_Z",[1300,46654,46648],{}," is geen vaste waarde per mm²: onderafdeling 4.4.1.4 maakt ze afhankelijk van doorsnede, isolatie, opbouw van de leiding, plaatsingswijze en omgevingstemperatuur.",[12,46657,46658],{},"Controleer daarom ook:",[1450,46660,46661,46667,46673,46679,46685,46691],{},[1453,46662,46663,46666],{},[15,46664,46665],{},"Leiding:"," materiaal, isolatie en opbouw van de kabel; de tabelwaarden gelden voor koper.",[1453,46668,46669,46672],{},[15,46670,46671],{},"Plaatsingswijze:"," in buis, in thermische isolatie, op de wand, gebundeld of op een kabelgoot.",[1453,46674,46675,46678],{},[15,46676,46677],{},"Groepering:"," aantal gelijktijdig belaste geleiders en kringen naast elkaar.",[1453,46680,46681,46684],{},[15,46682,46683],{},"Omgeving:"," omgevingstemperatuur en warmteafvoer.",[1453,46686,46687,46690],{},[15,46688,46689],{},"Lengte en belasting:"," de spanningsval over de werkelijke leidinglengte.",[1453,46692,46693,46696],{},[15,46694,46695],{},"Kortsluiting:"," uitschakelvoorwaarden, foutlusimpedantie en het uitschakelvermogen van de automaat tegenover de verwachte kortsluitstroom.",[12,46698,46699,46700,46702],{},"Een lange leiding kan door de spanningsval een grotere doorsnede vragen, een ongunstige plaatsingswijze verlaagt de stroombelastbaarheid. Voor niet-huishoudelijke installaties is Tabel 4.11 geen algemene bovengrens; daar bepaal je ",[1300,46701,46648],{}," volgens de regels van goed vakmanschap.",[41,46704,46706],{"id":46705},"spanningsval-3-en-5-zijn-richtwaarden-geen-arei-grens","Spanningsval: 3% en 5% zijn richtwaarden, geen AREI-grens",[12,46708,46709,46710,933,46712,46714],{},"Afdeling 5.2.5 („Spanningsval”) vraagt de spanningsval te beperken tot de waarden uit de regels van goed vakmanschap. Onderafdeling 5.2.1.2 b voegt toe dat hij verenigbaar moet zijn met de bedrijfszekere werking van de gevoede toestellen. Een vast percentage staat niet in het AREI. In de praktijk rekenen ontwerpers met ",[15,46711,32328],{},[15,46713,32331],{},": beproefde richtwaarden voor een eerste toets. Bij lange leidingen, motoren, laadpunten of gevoelige toestellen reken je met de concrete omstandigheden.",[12,46716,46717,46718,46720,46721,39],{},"Voor de berekening heb je leidinglengte, geleidermateriaal, doorsnede, stroom, arbeidsfactor en het net (een- of driefasig) nodig. Hoe die samenhangen, lees je in ",[30,46719,33319],{"href":15202},". Sneller gaat het met de ",[30,46722,46723],{"href":32696},"gratis kabeldoorsnede-calculator",[41,46725,46727],{"id":46726},"oude-smeltzekering-vervangen-door-een-automaat","Oude smeltzekering vervangen door een automaat",[12,46729,46730],{},"Een klassieke inbreuk bij de keuring is een beveiliging die te groot is voor de geplaatste doorsnede. Typisch geval: in een oudere installatie zijn smeltzekeringen later door automaten vervangen, zonder dat iemand de leiding erachter heeft gecontroleerd.",[12,46732,14064],{},[1602,46734,46735,46741,46747,46753],{},[1453,46736,46737,46740],{},[15,46738,46739],{},"Leiding vaststellen:"," welke doorsnede en welk kabeltype liggen er werkelijk, en hoe zijn ze geplaatst?",[1453,46742,46743,46746],{},[15,46744,46745],{},"Bestaande toestand inschatten:"," geldt een afwijking uit Deel 8, bijvoorbeeld voor 1 mm²-leidingen van vóór 17 mei 1986?",[1453,46748,46749,46752],{},[15,46750,46751],{},"Kolom kiezen:"," voor 1,5 mm² vermeldt Tabel 4.11 hoogstens 10 A smeltzekering of 16 A automaat, voor 2,5 mm² hoogstens 16 A of 20 A.",[1453,46754,46755,46758],{},[15,46756,46757],{},"Soort kring controleren:"," een stopcontactkring vraagt los van de automaat minstens 2,5 mm².",[12,46760,46761],{},"Een automaat van 20 A op 1,5 mm² is nooit toegelaten. De tabelgrens is ook geen opdracht om de beveiliging te verhogen.",[41,46763,46765],{"id":46764},"arei-grondslagen-in-één-oogopslag","AREI-grondslagen in één oogopslag",[49,46767,46768,46778],{},[52,46769,46770],{},[55,46771,46772,46775],{},[58,46773,46774],{},"AREI-vindplaats",[58,46776,46777],{},"Regeling",[68,46779,46780,46791,46803,46811,46819],{},[55,46781,46782,46785],{},[73,46783,46784],{},"Onderafdeling 4.4.1.4",[73,46786,46787,46788,46790],{},"Stroombelastbaarheid ",[1300,46789,46648],{},"; Tabel 4.11 met het grootste kaliber van zekering en automaat per doorsnede",[55,46792,46793,46796],{},[73,46794,46795],{},"Onderafdeling 5.2.1.2",[73,46797,46798,46799,46802],{},"Keuze van leidingen: ",[1300,46800,46801],{},"I_Z ≥ I_B",", verenigbare spanningsval, in principe minstens 2,5 mm²",[55,46804,46805,46808],{},[73,46806,46807],{},"Tabel 5.1",[73,46809,46810],{},"Limitatieve uitzonderingen onder 2,5 mm²: 1,5 mm², 0,75 mm² en 0,5 mm² met vastgelegd gebruik",[55,46812,46813,46816],{},[73,46814,46815],{},"Afdeling 5.2.5",[73,46817,46818],{},"Spanningsval beperken tot de waarden uit de regels van goed vakmanschap",[55,46820,46821,46824],{},[73,46822,46823],{},"Afdeling 8.2.2, punt 5",[73,46825,46826],{},"Bestaand vóór 17 mei 1986: EMCB\u002FEMCVB 1 mm² en CTLB\u002FVTLB 0,75 mm² in kringen zonder stopcontact",[41,46828,46830],{"id":46829},"doorsnede-en-beveiliging-controleren-in-planelec","Doorsnede en beveiliging controleren in PlanElec",[12,46832,12598,46833,46835,46836,46838],{},[30,46834,1337],{"href":6989}," leg je per kring beveiliging, doorsnede en leidinglengte vast, rechtstreeks in het eendraadschema. De zelfcontrole toetst of de doorsnede past bij de nominale stroom van de beveiliging en berekent de spanningsval uit de kabellengte tegenover de richtwaarden 3% en 5%. Welke regels ze precies dekt, staat in ",[30,46837,10087],{"href":2457},". Plaatsingswijze, groepering en metingen ter plaatse beoordeelt de elektrotechnicus; de keuring doet het erkend organisme.",[41,46840,6947],{"id":6946},[1450,46842,46843,46847,46851,46855,46859,46863],{},[1453,46844,46845],{},[30,46846,33319],{"href":15202},[1453,46848,46849],{},[30,46850,17455],{"href":17361},[1453,46852,46853],{},[30,46854,36775],{"href":7514},[1453,46856,46857],{},[30,46858,27066],{"href":27065},[1453,46860,46861],{},[30,46862,21427],{"href":21435},[1453,46864,46865],{},[30,46866,18474],{"href":19100},[12,46868,46869],{},[17563,46870,46871,46872,39],{},"Regelgrondslag: AREI Boek 1, versie 06, van toepassing sinds 1 april 2026, in het bijzonder 4.4.1.4, 5.2.1.2, 5.2.5 en 8.2.2. Officiële tekst: ",[30,46873,19073],{"href":15357,"rel":46874},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":46876},[46877,46878,46879,46880,46881,46882,46883,46884,46885,46886],{"id":46317,"depth":1468,"text":46318},{"id":46424,"depth":1468,"text":46425},{"id":46577,"depth":1468,"text":46578},{"id":46622,"depth":1468,"text":46623},{"id":46633,"depth":1468,"text":46634},{"id":46705,"depth":1468,"text":46706},{"id":46726,"depth":1468,"text":46727},{"id":46764,"depth":1468,"text":46765},{"id":46829,"depth":1468,"text":46830},{"id":6946,"depth":1468,"text":6947},"2026-03-18","Welke kabeldoorsnede hoort bij 16, 20 of 32 A? Tabel 4.11 van het AREI, minimumdoorsneden voor stopcontacten en wat je daarnaast moet controleren.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-cable-cross-section-breaker-editorial.jpg","\u002Fblog\u002Fcable-cross-section-breaker.nl",{"title":46299,"description":46888},"kabeldoorsnede-automaat","blog\u002Fcable-cross-section-breaker.nl",[32904,31224,32906,46896],"elektro-installatie","e3_vNX2NnnaoU7tzwMIaRBJCwkbsC2C01XpaARChOno",{"id":46899,"title":46900,"articleId":46901,"body":46902,"category":19087,"date":47192,"description":47193,"extension":1496,"image":46914,"lastUpdated":15381,"locale":1497,"meta":47194,"navigation":1499,"ogImage":47195,"path":47196,"publishDate":47192,"readTime":47197,"refreshInterval":11097,"seo":47198,"seoTitle":4037,"slug":47199,"stem":47200,"tags":47201,"__hash__":47205,"kind":1515,"href":45196},"blog\u002Fblog\u002Fxvb-vs-vob-cable.nl.md","XVB-kabel of VOB-draad: verschillen en keuze in België","xvb-vs-vob-cable",{"type":9,"value":46903,"toc":47182},[46904,46910,46915,46919,46926,46930,46941,46945,47041,47046,47048,47051,47069,47072,47076,47135,47140,47143,47148,47152,47155,47159],[12,46905,46906,46909],{},[15,46907,46908],{},"XVB is een kabel met buitenmantel, VOB een draad met alleen basisisolatie."," Daaruit volgt de belangrijkste regel: XVB mag je in opbouw, op een kabelgoot en rechtstreeks in een sleuf plaatsen; VOB hoort volgens het AREI in een elektrische installatiebuis of een gesloten goot. Welk product uiteindelijk past, bepalen de route, de brandklasse en het concrete productblad, niet de meterprijs.",[12,46911,46912],{},[22,46913],{"alt":46313,"src":46914},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-xvb-vs-vob-cable-editorial.webp",[41,46916,46918],{"id":46917},"wat-is-xvb-kabel","Wat is XVB-kabel?",[12,46920,46921,46922,46925],{},"XVB heeft aderisolatie in ",[15,46923,46924],{},"XLPE"," (vernet polyethyleen) en een PVC-buitenmantel. Een aanduiding als 3G2,5 staat voor drie aders van 2,5 mm², waarvan één groen-gele beschermingsgeleider. Aantal aders, beschermingsgeleider en doorsnede controleer je op het productblad van het gekozen product. Nexans biedt XVB bijvoorbeeld aan als variant in CPR-klasse Cca.",[41,46927,46929],{"id":46928},"wat-is-vob-draad","Wat is VOB-draad?",[12,46931,46932,46933,46936,46937,46940],{},"VOB is een PVC-geïsoleerde enkele geleider. ",[15,46934,46935],{},"H07V-U"," heeft een massieve, ",[15,46938,46939],{},"H07V-R"," een samengeslagen geleider; VOB betekent dus niet automatisch soepele draad. Omdat de draad alleen basisisolatie heeft, plaats je hem in elektrische installatiebuizen zoals Preflex of in een geschikt gesloten systeem. Voor H07V-U vermeldt Nexans CPR-klasse Eca.",[41,46942,46944],{"id":46943},"waar-mag-je-xvb-en-waar-vob-plaatsen","Waar mag je XVB en waar VOB plaatsen?",[49,46946,46947,46962],{},[52,46948,46949],{},[55,46950,46951,46954,46957,46960],{},[58,46952,46953],{},"Plaatsing",[58,46955,46956],{},"XVB (kabel)",[58,46958,46959],{},"VOB (draad)",[58,46961,3275],{},[68,46963,46964,46977,46990,47002,47014,47027],{},[55,46965,46966,46969,46971,46974],{},[73,46967,46968],{},"In een installatiebuis",[73,46970,206],{},[73,46972,46973],{},"ja, standaardgeval",[73,46975,46976],{},"5.2.9.3",[55,46978,46979,46982,46984,46987],{},[73,46980,46981],{},"In opbouw of in de vrije lucht",[73,46983,206],{},[73,46985,46986],{},"nee, alleen kabels toegelaten",[73,46988,46989],{},"5.2.9.5",[55,46991,46992,46995,46997,46999],{},[73,46993,46994],{},"In een open goot (kabelgoot)",[73,46996,206],{},[73,46998,46986],{},[73,47000,47001],{},"5.2.9.6",[55,47003,47004,47007,47009,47012],{},[73,47005,47006],{},"In een gesloten goot",[73,47008,206],{},[73,47010,47011],{},"ja; buiten elektrische dienstruimten volwandig, alleen met gereedschap te openen",[73,47013,47001],{},[55,47015,47016,47019,47022,47024],{},[73,47017,47018],{},"Verzonken in een sleuf, zonder buis",[73,47020,47021],{},"ja, binnen de installatiezones",[73,47023,224],{},[73,47025,47026],{},"5.2.9.10",[55,47028,47029,47032,47035,47038],{},[73,47030,47031],{},"In holle constructieruimten (plafond, vloer)",[73,47033,47034],{},"ja, met F2 of minstens Cca",[73,47036,47037],{},"niet als losse draad; buizen moeten aan 5.2.7.4 voldoen",[73,47039,47040],{},"5.2.9.9",[12,47042,47043,47044,39],{},"Voor verzonken plaatsing zonder buis schrijft onderafdeling 5.2.9.10 horizontale tracés 25 tot 35 cm onder het plafond of boven de vloer voor, verticale tracés zo dicht mogelijk bij een hoek of 10 tot 20 cm naast deuromlijstingen, en minstens 0,4 cm pleister erover. In beton of cement ingewerkte leidingen krijgen minstens 3 cm dekking. De volledige systematiek van de plaatsingswijzen lees je in ",[30,47045,22256],{"href":25275},[41,47047,45128],{"id":45127},[12,47049,47050],{},"Afdeling 5.2.7 regelt de brandvoortplanting via de CPR-klasse:",[1450,47052,47053,47058,47063],{},[1453,47054,47055,47057],{},[15,47056,45138],{}," minstens eigenschap F1 of klasse Eca (onderafdeling 5.2.7.2).",[1453,47059,47060,47062],{},[15,47061,45144],{}," minstens F2 of klasse Cca (onderafdeling 5.2.7.3).",[1453,47064,47065,47068],{},[15,47066,47067],{},"In holle constructieruimten en brandbare lijsten:"," eveneens F2 of Cca (onderafdeling 4.3.3.5 b).",[12,47070,47071],{},"Uitgezonderd zijn onder meer kabels en buizen die minstens 3 cm diep in een onbrandbare bekleding zijn ingewerkt (onderafdeling 5.2.7.1 nr. 3). Bepalend is de klasse van het werkelijk geleverde product volgens de prestatieverklaring; de naam XVB of VOB alleen legt die niet vast.",[41,47073,47075],{"id":47074},"kosten-correct-vergelijken","Kosten correct vergelijken",[49,47077,47078,47089],{},[52,47079,47080],{},[55,47081,47082,47084,47086],{},[58,47083,2971],{},[58,47085,45263],{},[58,47087,47088],{},"VOB",[68,47090,47091,47102,47113,47124],{},[55,47092,47093,47096,47099],{},[73,47094,47095],{},"Wat tel je?",[73,47097,47098],{},"Kabellengte met de aanwezige aders",[73,47100,47101],{},"Lengte van elke draad plus buis",[55,47103,47104,47107,47110],{},[73,47105,47106],{},"Past de route?",[73,47108,47109],{},"Bevestiging, bescherming en omgeving",[73,47111,47112],{},"Buisdiameter, vulling, continuïteit, toegankelijkheid",[55,47114,47115,47118,47121],{},[73,47116,47117],{},"Bestaande aanleg gebruiken?",[73,47119,47120],{},"Route en aansluitingen controleren",[73,47122,47123],{},"Staat en vrije doorgang van de buizen controleren",[55,47125,47126,47129,47132],{},[73,47127,47128],{},"Wat hoort in de prijs?",[73,47130,47131],{},"Kabel, bevestiging, toebehoren en werk",[73,47133,47134],{},"Alle draden, buizen, toebehoren en werk",[12,47136,47137,47138,39],{},"Een meter kabel 3G2,5 is niet te vergelijken met een meter van één draad van 2,5 mm². Vergelijk offertes voor dezelfde route, hetzelfde aantal geleiders en hetzelfde werk. VOB in buis heeft één duidelijk voordeel: je kunt draden later vervangen of bijtrekken, omdat ze altijd intrekbaar moeten blijven (5.2.9.3). Meer daarover in ",[30,47139,20978],{"href":42805},[41,47141,38058],{"id":47142},"doorsnede-en-beveiliging",[12,47144,47145,47146,39],{},"Het kabeltype vervangt geen dimensionering. Belasting, lengte, plaatsingswijze en spanningsval bepalen de doorsnede, Tabel 4.11 begrenst de automaat. Het verband staat in ",[30,47147,21004],{"href":26440},[41,47149,47151],{"id":47150},"je-keuze-documenteren","Je keuze documenteren",[12,47153,47154],{},"Noteer per deeltraject kabeltype, doorsnede, aantal aders, plaatsingswijze en route. Wijzigt de plaatsingswijze, bijvoorbeeld van buis naar kabelgoot, dan moet dat in het plan zichtbaar zijn. In PlanElec leg je die gegevens per kabel vast; de zelfcontrole meldt afzonderlijk geplaatste kabels onder Eca en kabels in holle wanden onder Cca zonder gedocumenteerde buis. De keuring ter plaatse doet het erkend organisme.",[41,47156,47158],{"id":47157},"bronnen-gecontroleerd-op-5-oktober-2026","Bronnen gecontroleerd op 5 oktober 2026",[1450,47160,47161,47168,47175],{},[1453,47162,47163],{},[30,47164,47167],{"href":47165,"rel":47166},"https:\u002F\u002Fwww.nexans.be\u002Ffr\u002Fproducts\u002FEnergy-up-to-1kV\u002FPVC\u002FPVC-unarmoured-cables\u002FXVB-Cca-0%2C30373.html",[2532],"Nexans — XVB Cca ULTIMO",[1453,47169,47170],{},[30,47171,47174],{"href":47172,"rel":47173},"https:\u002F\u002Fwww.nexans.be\u002Ffr\u002Fproducts\u002FEnergy-up-to-1kV\u002FPVC\u002FPVC-wires\u002FH07V-U-Eca29393.html",[2532],"Nexans — H07V-U \u002F H07V-R",[1453,47176,47177,47181],{},[30,47178,47180],{"href":15357,"rel":47179},[2532],"FOD Economie — AREI Boek 1",", onderafdelingen 4.3.3.5, 5.2.7.1–5.2.7.3, 5.2.9.3, 5.2.9.5, 5.2.9.6, 5.2.9.9 en 5.2.9.10",{"title":1467,"searchDepth":1468,"depth":1468,"links":47183},[47184,47185,47186,47187,47188,47189,47190,47191],{"id":46917,"depth":1468,"text":46918},{"id":46928,"depth":1468,"text":46929},{"id":46943,"depth":1468,"text":46944},{"id":45127,"depth":1468,"text":45128},{"id":47074,"depth":1468,"text":47075},{"id":47142,"depth":1468,"text":38058},{"id":47150,"depth":1468,"text":47151},{"id":47157,"depth":1468,"text":47158},"2026-03-16","XVB of VOB? Waar je mantelkabel en draad volgens het AREI mag plaatsen, welke brandklasse telt en hoe je de kosten correct vergelijkt.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-xvb-vs-vob-cable-editorial.jpg","\u002Fblog\u002Fxvb-vs-vob-cable.nl","5 min",{"title":46900,"description":47193},"xvb-vs-vob-kabel","blog\u002Fxvb-vs-vob-cable.nl",[47202,47203,47204,22552,32906],"kabel","xvb","vob","7wW0gs5Zr7iMY_nxJtxoVUWGnl-4h2GAe0ewgv-v46Y",{"id":47207,"title":47208,"articleId":47209,"body":47210,"category":19087,"date":47432,"description":47433,"extension":1496,"image":47222,"lastUpdated":15381,"locale":1497,"meta":47434,"navigation":1499,"ogImage":47435,"path":47436,"publishDate":47432,"readTime":47197,"refreshInterval":11097,"seo":47437,"seoTitle":4037,"slug":47438,"stem":47439,"tags":47440,"__hash__":47447,"kind":1515,"href":17460},"blog\u002Fblog\u002Finspection-checklist.nl.md","Wat controleert de keurder bij een elektrische keuring?","inspection-checklist",{"type":9,"value":47211,"toc":47422},[47212,47214,47217,47223,47302,47305,47309,47312,47371,47374,47378,47381,47385,47388,47392,47395,47399,47402,47414,47416],[41,47213,38133],{"id":38132},[12,47215,47216],{},"Bij de keuring van een woninginstallatie controleert de keurder van het erkend organisme vier zaken: de documenten, de zichtbare toestand van de installatie, de werking van de beveiligingen en twee meetwaarden – isolatieweerstand en aardingsweerstand. Zo legt AREI Boek 1 het vast in afdeling 6.4.1; de controle gebeurt spanningsloos.",[12,47218,47219],{},[22,47220],{"alt":47221,"src":47222},"Controle van een Belgische woninginstallatie ter plaatse.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-inspection-checklist-editorial.webp",[49,47224,47225,47236],{},[52,47226,47227],{},[55,47228,47229,47231,47233],{},[58,47230,38901],{},[58,47232,38133],{},[58,47234,47235],{},"Vindplaats Boek 1 V06",[68,47237,47238,47248,47259,47270,47281,47291],{},[55,47239,47240,47242,47245],{},[73,47241,6532],{},[73,47243,47244],{},"Eendraadschema en situatieplan aanwezig en in overeenstemming met de uitvoering; aansluitgegevens, hoofdschakelaar, type aardelektrode",[73,47246,47247],{},"3.1.2, 6.4.6.4 b.2 tot b.4",[55,47249,47250,47253,47256],{},[73,47251,47252],{},"Visuele controle",[73,47254,47255],{},"Keuze, montage en installatie van vast materieel, afdekkingen, aanduidingen, bereikbaarheid",[73,47257,47258],{},"6.4.3, 6.4.6.4 b.4",[55,47260,47261,47264,47267],{},[73,47262,47263],{},"Beproevingen",[73,47265,47266],{},"Continuïteit van beschermingsgeleiders en equipotentiale verbindingen; werking van de beveiligingen",[73,47268,47269],{},"6.4.4, 6.4.6.4 b.4",[55,47271,47272,47275,47278],{},[73,47273,47274],{},"Isolatiemeting",[73,47276,47277],{},"Minstens 500 kΩ per kring bij een proefspanning van 500 V gelijkstroom, verbruikers uitgeschakeld",[73,47279,47280],{},"6.4.5.1, tabel 6.1",[55,47282,47283,47285,47288],{},[73,47284,42554],{},[73,47286,47287],{},"Meting van de aardelektrode; bij woningen onder 100 Ω, boven 30 Ω geldt een strengere opbouw van de differentiëlen",[73,47289,47290],{},"6.4.5.2, 4.2.3.2, 4.2.4.3 b",[55,47292,47293,47296,47299],{},[73,47294,47295],{},"Afstemming in het verslag",[73,47297,47298],{},"Differentiëlen passen bij de aardingswaarde, overstroombeveiliging past bij de leidingen, installatie volgt de plannen",[73,47300,47301],{},"6.4.6.4 b.4",[12,47303,47304],{},"Is alles in orde, dan viseert de keurder eendraadschema en situatieplan en vermeldt het verslag de datum van het volgende controlebezoek (6.4.6.4 b.6).",[41,47306,47308],{"id":47307},"documenten-voorbereiden-voor-de-keuring","Documenten voorbereiden voor de keuring",[12,47310,47311],{},"Deze checklist is bedoeld voor elektrotechnische bedrijven die een woninginstallatie in België klaarmaken voor de keuring. Bepaal eerst de aanleiding, de ouderdom van de installatie en de omvang van de werken; voor niet-huishoudelijke installaties gelden bijkomende dossiereisen.",[49,47313,47314,47327],{},[52,47315,47316],{},[55,47317,47318,47321,47324],{},[58,47319,47320],{},"Document \u002F taak",[58,47322,47323],{},"Verantwoordelijk",[58,47325,47326],{},"Controle vóór overdracht",[68,47328,47329,47339,47350,47361],{},[55,47330,47331,47333,47336],{},[73,47332,29688],{},[73,47334,47335],{},"Tekenaar \u002F uitvoerend bedrijf",[73,47337,47338],{},"Referenties, werkelijke toestand en gemeenschappelijke versie afstemmen",[55,47340,47341,47344,47347],{},[73,47342,47343],{},"Vroegere verslagen en wijzigingen",[73,47345,47346],{},"Eigenaar \u002F bedrijf",[73,47348,47349],{},"Beschikbare verslagen verzamelen en open punten toewijzen",[55,47351,47352,47355,47358],{},[73,47353,47354],{},"Fabrikantdocumenten",[73,47356,47357],{},"Uitvoerend bedrijf",[73,47359,47360],{},"Documenten koppelen aan de gebruikte toestellen en het beveiligingsconcept",[55,47362,47363,47366,47368],{},[73,47364,47365],{},"Keuringsverslag",[73,47367,4853],{},[73,47369,47370],{},"Na de keuring opnemen in het dossier van de installatie",[12,47372,47373],{},"Vul per rij aan: aanwezig, open, verantwoordelijke en versiedatum. De matrix verdeelt het werk; de wettelijke lijst van het dossier staat in afdeling 9.1.2. Het keuringsverslag stelt alleen het erkend organisme op – een verklaring van de installateur komt daar niet in de plaats.",[41,47375,47377],{"id":47376},"visuele-controle-en-metingen-apart-voorbereiden","Visuele controle en metingen apart voorbereiden",[12,47379,47380],{},"Vergelijk ter plaatse labels, afdekkingen, bereikbaarheid, geleidergegevens, beveiligingen en de aardverbinding met de documenten. Welke bescherming nodig is, hangt af van kring, gebruik en eventueel van de regels voor bestaande installaties in deel 8; een standaardtabel voor doorsnede, differentieel of overspanningsbeveiliging volstaat niet. Beoordeel eigen voorafgaande metingen alleen met de juiste meetmethode en de toepasselijke eisen.",[1396,47382,47384],{"id":47383},"differentieeltest-ma-is-geen-tijd","Differentieeltest: mA is geen tijd",[12,47386,47387],{},"De aanspreekstroom IΔn beschrijft een eigenschap van het toestel; proefstroom en uitschakeltijd zijn andere grootheden. Noteer in het meetverslag type toestel, eventuele vertraging, proefinstelling en resultaat. Uit „30 mA” of „300 mA” volgt geen algemene uitschakeltijd – een koppeling als „300 mA = 300 ms” klopt niet. De proefcriteria hangen af van toestel en proefmethode.",[41,47389,47391],{"id":47390},"overdracht-in-het-bedrijf-organiseren","Overdracht in het bedrijf organiseren",[12,47393,47394],{},"Elk open punt krijgt een verantwoordelijke en een termijn. Na elke wijziging vergelijk je beide plannen opnieuw met de uitvoering. Leg de effectief overgedragen documentversie vast en voeg het keuringsverslag eraan toe. Termijnen en vervolgstappen hangen af van de aanleiding en de vaststellingen.",[41,47396,47398],{"id":47397},"documenten-samenstellen-in-planelec","Documenten samenstellen in PlanElec",[12,47400,47401],{},"PlanElec maakt eendraadschema, situatieplan en het AREI\u002FRGIE-zelfcontroleverslag uit één gemeenschappelijk projectmodel. Het zelfcontroleverslag toont bevindingen in de ondersteunde regels; plaatsbezoek, metingen en het officiële verslag doet het erkend organisme.",[1450,47403,47404,47409],{},[1453,47405,47406],{},[30,47407,47408],{"href":2451},"Exporthandleiding",[1453,47410,47411],{},[30,47412,47413],{"href":6984},"Fictief voorbeelddossier (PDF)",[41,47415,44105],{"id":44104},[12,47417,47418],{},[30,47419,47421],{"href":28056,"rel":47420},[2532],"FOD Economie – AREI Boek 1 V06, afdelingen 3.1.2, 6.4, 6.5 en 9.1.2",{"title":1467,"searchDepth":1468,"depth":1468,"links":47423},[47424,47425,47426,47429,47430,47431],{"id":38132,"depth":1468,"text":38133},{"id":47307,"depth":1468,"text":47308},{"id":47376,"depth":1468,"text":47377,"children":47427},[47428],{"id":47383,"depth":1486,"text":47384},{"id":47390,"depth":1468,"text":47391},{"id":47397,"depth":1468,"text":47398},{"id":44104,"depth":1468,"text":44105},"2026-03-13","Documenten, visuele controle, beproevingen, metingen: punt voor punt wat de keurder bij een elektrische keuring in België controleert en meet – met grenswaarden en AREI-vindplaatsen.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-inspection-checklist-editorial.jpg","\u002Fblog\u002Finspection-checklist.nl",{"title":47208,"description":47433},"inspectie-checklist","blog\u002Finspection-checklist.nl",[3275,3276,17499,8185,3273,6216,17497,47441,47442,31224,1513,47443,47444,47445,47446],"aardingsweerstand","isolatieweerstand","Eindrahtschema","schéma unifilaire","plan de situation","Situationsplan","EpCBjQ4BUXSHpttl1dXO_3TL29z9BK4QcEwR9RJ0W2c",{"id":47449,"title":47450,"articleId":47451,"body":47452,"category":19087,"date":47740,"description":47741,"extension":1496,"image":47472,"lastUpdated":15381,"locale":1497,"meta":47742,"navigation":1499,"ogImage":47743,"path":47744,"publishDate":47740,"readTime":19590,"refreshInterval":11097,"seo":47745,"seoTitle":4037,"slug":47746,"stem":47747,"tags":47748,"__hash__":47750,"kind":1515,"href":25635},"blog\u002Fblog\u002Fsockets-per-circuit.nl.md","Hoeveel stopcontacten per stroomkring? De AREI-regel","sockets-per-circuit",{"type":9,"value":47453,"toc":47730},[47454,47458,47467,47473,47477,47535,47538,47542,47612,47622,47626,47635,47639,47671,47674,47678,47688,47692,47697,47703,47705,47725],[41,47455,47457],{"id":47456},"maximaal-8-stopcontacten-per-stroomkring","Maximaal 8 stopcontacten per stroomkring",[12,47459,47460,47463,47464,47466],{},[15,47461,47462],{},"Op een eindkring van een woning hangen maximaal acht enkelvoudige of meervoudige stopcontacten."," Dat legt AREI Boek 1 vast in onderafdeling 5.3.5.2 punt b. Een dubbel of drievoudig stopcontact telt als ",[15,47465,16763],{}," punt. Zuivere verlichtingskringen hebben geen vast maximum; wel heeft elke wooneenheid met meer dan twee ruimten of zones minstens twee gescheiden verlichtingskringen nodig.",[12,47468,47469],{},[22,47470],{"alt":47471,"src":47472},"Een elektricien controleert de posities van stopcontacten in een kamer.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-sockets-per-circuit-editorial.webp",[41,47474,47476],{"id":47475},"zo-tel-je-correct","Zo tel je correct",[49,47478,47479,47488],{},[52,47480,47481],{},[55,47482,47483,47485],{},[58,47484,33035],{},[58,47486,47487],{},"Telt mee voor de grens van acht",[68,47489,47490,47498,47505,47513,47520,47527],{},[55,47491,47492,47495],{},[73,47493,47494],{},"Enkelvoudig stopcontact",[73,47496,47497],{},"1 punt",[55,47499,47500,47503],{},[73,47501,47502],{},"Dubbel of drievoudig stopcontact",[73,47504,47497],{},[55,47506,47507,47510],{},[73,47508,47509],{},"Lichtpunt op een zuivere verlichtingskring",[73,47511,47512],{},"telt niet mee",[55,47514,47515,47518],{},[73,47516,47517],{},"Vast toestel op een gemengde kring",[73,47519,47497],{},[55,47521,47522,47525],{},[73,47523,47524],{},"Groep lichtpunten of toestellen met één gemeenschappelijke bediening (gemengde kring)",[73,47526,47497],{},[55,47528,47529,47532],{},[73,47530,47531],{},"Toestel met een toegekende stroombaan (5.2.1.2)",[73,47533,47534],{},"hoort niet op de stopcontactkring",[12,47536,47537],{},"Gemengde kringen zijn toegelaten: stopcontacten, verlichtingstoestellen en andere vaste toestellen mogen een eindkring delen. Dan geldt voor de hele kring de stopcontactregel, en elk vast toestel – of elke groep achter één gemeenschappelijke schakelaar – telt als één stopcontact (5.3.5.2 b).",[41,47539,47541],{"id":47540},"kabel-en-automaat-per-type-stroomkring","Kabel en automaat per type stroomkring",[49,47543,47544,47560],{},[52,47545,47546],{},[55,47547,47548,47551,47554,47557],{},[58,47549,47550],{},"Type stroomkring",[58,47552,47553],{},"Gangbare kabel",[58,47555,47556],{},"Max. automaat (tabel 4.11)",[58,47558,47559],{},"Max. punten",[68,47561,47562,47573,47586,47600],{},[55,47563,47564,47566,47568,47571],{},[73,47565,44426],{},[73,47567,26785],{},[73,47569,47570],{},"20 A (smeltzekering: 16 A)",[73,47572,560],{},[55,47574,47575,47577,47580,47583],{},[73,47576,304],{},[73,47578,47579],{},"XVB 3G1,5",[73,47581,47582],{},"16 A (smeltzekering: 10 A)",[73,47584,47585],{},"geen vast maximum; min. 2 verlichtingskringen",[55,47587,47588,47591,47594,47597],{},[73,47589,47590],{},"Eigen toestelkring 4 mm²",[73,47592,47593],{},"XVB 3G4",[73,47595,47596],{},"25 A (smeltzekering: 20 A)",[73,47598,47599],{},"1 toestel",[55,47601,47602,47605,47607,47610],{},[73,47603,47604],{},"Eigen toestelkring 6 mm²",[73,47606,40628],{},[73,47608,47609],{},"40 A (smeltzekering: 32 A)",[73,47611,47599],{},[12,47613,47614,47615,47618,47619,47621],{},"Tabel 4.11 in onderafdeling 4.4.1.4 geeft voor huishoudelijke installaties de ",[15,47616,47617],{},"hoogste"," toegelaten nominale stroom per doorsnede. Plaatsingswijze, bundeling en kabellengte kunnen een grotere doorsnede vragen; hoe je die bepaalt, lees je in ",[30,47620,24305],{"href":26440},". Stopcontactkringen vragen minstens 2,5 mm²: 1,5 mm² is volgens tabel 5.1 alleen toegelaten voor kringen zonder stopcontacten.",[41,47623,47625],{"id":47624},"welke-toestellen-een-eigen-kring-nodig-hebben","Welke toestellen een eigen kring nodig hebben",[12,47627,47628,47629,47631,47632,39],{},"Onderafdeling 5.2.1.2 haalt bepaalde toestellen volledig van de stopcontactkring. In huishoudelijke installaties krijgt elk toestel met vaste standplaats vanaf ",[15,47630,36869],{}," een eigen stroombaan. De wasmachine, de afwasmachine, de droogkast, het elektrisch fornuis, de kookplaat en de oven krijgen, ongeacht hun vermogen, elk een toegekende stroombaan; vaste elektrische verwarming één of meer afzonderlijke kringen. Details en voorbeelden staan in ",[30,47633,47634],{"href":32848},"eigen stroomkring voor toestellen",[41,47636,47638],{"id":47637},"zo-verdeel-je-een-woning","Zo verdeel je een woning",[1602,47640,47641,47647,47653,47659,47665],{},[1453,47642,47643,47646],{},[15,47644,47645],{},"Stopcontacten per ruimte plaatsen."," Plan eerst wat je ter plaatse nodig hebt, niet de kringen.",[1453,47648,47649,47652],{},[15,47650,47651],{},"Bundelen tot kringen."," Groepeer naburige stopcontacten tot eindkringen van maximaal acht punten. Wil je meer reserve of beschikbaarheid, plan dan kleinere kringen.",[1453,47654,47655,47658],{},[15,47656,47657],{},"Toestelkringen afsplitsen."," Alles wat 5.2.1.2 noemt, krijgt een eigen kring.",[1453,47660,47661,47664],{},[15,47662,47663],{},"Verlichting spreiden."," Minstens twee verlichtingskringen, zodat bij een uitschakeling niet de hele woning donker valt.",[1453,47666,47667,47670],{},[15,47668,47669],{},"Gelijk nummeren."," Kring- en puntnummers zijn identiek op eendraadschema en situatieplan.",[12,47672,47673],{},"Hoeveel kringen een woning uiteindelijk nodig heeft, volgt uit deze stappen – niet uit een vuistregel.",[41,47675,47677],{"id":47676},"bestaande-installaties-meer-dan-acht-alleen-in-het-bestaande-deel","Bestaande installaties: meer dan acht alleen in het bestaande deel",[12,47679,47680,47681,47684,47685,39],{},"Deel 8 laat in bestaande huishoudelijke installaties meer dan acht stopcontacten per eindkring ",[15,47682,47683],{},"in dienst",", op voorwaarde dat het vermogen van de aangesloten vaste toestellen en toestellen met vaste standplaats het toegelaten vermogen van de leiding niet overschrijdt (afdeling 8.2.1 nr. 6 voor installaties van vóór 1 oktober 1981, afdeling 8.2.2 nr. 6 voor installaties volgens het oud AREI). De afwijking geldt voor bestaande gedeelten. Nieuwe of gewijzigde kringen plan je volgens 5.3.5.2. Meer daarover in ",[30,47686,47687],{"href":37906},"oude installaties en AREI Deel 8",[41,47689,47691],{"id":47690},"zo-telt-planelec-mee","Zo telt PlanElec mee",[12,47693,47694,47695,39],{},"De AREI\u002FRGIE-zelfcontrole in PlanElec telt per eindkring de stopcontacten en vaste toestellen en meldt meer dan acht als fout; zuivere verlichtingskringen vallen erbuiten. Ze controleert ook of er minstens twee verlichtingskringen zijn en of grote toestellen een eigen kring hebben. Zo zie je overschrijdingen al tijdens het ontwerp. De keuring van de installatie doet het erkende controleorganisme. Welke regels de zelfcontrole dekt, lees je in ",[30,47696,37095],{"href":2457},[12,47698,37169,47699,47702],{},[30,47700,27031],{"href":15357,"rel":47701},[2532],", onderafdelingen 4.4.1.4, 5.2.1.2 en 5.3.5.2 en Deel 8.",[41,47704,32827],{"id":32826},[1450,47706,47707,47711,47716,47720],{},[1453,47708,47709],{},[30,47710,37153],{"href":37084},[1453,47712,47713],{},[30,47714,47715],{"href":17361},"Elektrische keuring in België: verloop en documenten",[1453,47717,47718],{},[30,47719,25806],{"href":15398},[1453,47721,47722],{},[30,47723,47724],{"href":45196},"XVB-kabel of VOB-draad: verschillen en keuze",[12,47726,47727],{},[30,47728,47729],{"href":6989},"Plan je kringen in PlanElec en controleer ze zelf →",{"title":1467,"searchDepth":1468,"depth":1468,"links":47731},[47732,47733,47734,47735,47736,47737,47738,47739],{"id":47456,"depth":1468,"text":47457},{"id":47475,"depth":1468,"text":47476},{"id":47540,"depth":1468,"text":47541},{"id":47624,"depth":1468,"text":47625},{"id":47637,"depth":1468,"text":47638},{"id":47676,"depth":1468,"text":47677},{"id":47690,"depth":1468,"text":47691},{"id":32826,"depth":1468,"text":32827},"2026-03-11","Maximaal 8 stopcontacten per eindkring, meervoudige stopcontacten tellen als één: zo tel je correct, kies je kabel en automaat en plan je licht- en toestelkringen volgens het AREI.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-sockets-per-circuit-editorial.jpg","\u002Fblog\u002Fsockets-per-circuit.nl",{"title":47450,"description":47741},"stopcontacten-per-circuit","blog\u002Fsockets-per-circuit.nl",[3275,3276,47749,27628,31224,47202,45263,3273,17499,39470,1513,47443,47444,6216],"stopcontact","bCp2LhdBX6p83paWiWYYvw3Gpsk5oLD5w1ApPVWCH9I",{"id":47752,"title":47753,"articleId":47754,"body":47755,"category":19087,"date":48148,"description":48149,"extension":1496,"image":47772,"lastUpdated":15381,"locale":1497,"meta":48150,"navigation":1499,"ogImage":48151,"path":48152,"publishDate":48148,"readTime":37204,"refreshInterval":11097,"seo":48153,"seoTitle":4037,"slug":48154,"stem":48155,"tags":48156,"__hash__":48163,"kind":1515,"href":15255},"blog\u002Fblog\u002Fbathroom-cables-arei-zones.nl.md","Welke kabels mag ik gebruiken in de badkamer? (AREI-volumes)","bathroom-cables-arei-zones",{"type":9,"value":47756,"toc":48136},[47757,47761,47767,47773,47777,47784,47868,47871,47875,47948,47951,47955,47981,47983,47986,48047,48050,48054,48061,48064,48079,48082,48086,48089,48093,48098,48104,48106,48131],[41,47758,47760],{"id":47759},"welke-kabels-in-de-badkamer-toegelaten-zijn","Welke kabels in de badkamer toegelaten zijn",[12,47762,47763,47766],{},[15,47764,47765],{},"In de badkamer leg je leidingen zonder metalen elementen: typisch een XVB-kabel of geïsoleerde enkeldraden (VOB) in een elektrische installatiebuis."," Gewapende kabels en stalen buizen zijn verboden in de badkamer en tot 5 cm diep in haar wanden. In volumes 1 en 2 liggen alleen leidingen die toestellen in volumes 0, 1 en 2 voeden; in volume 0 alleen de leidingen van de daar toegelaten ZLVS-toestellen. Alle badkamerkringen zijn beschermd door een differentieelschakelaar met hoge of zeer hoge gevoeligheid buiten de badkamer. Zo regelt AREI Boek 1 het in hoofdstuk 7.1.",[12,47768,47769],{},[22,47770],{"alt":47771,"src":47772},"Een elektricien meet een badkamer op.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-bathroom-cables-arei-zones-editorial.webp",[41,47774,47776],{"id":47775},"volumes-0-1-en-2","Volumes 0, 1 en 2",[12,47778,47779,47780,47783],{},"Het AREI spreekt van ",[15,47781,47782],{},"volumes"," (in de praktijk vaak zones genoemd). Ze hangen af van een bad of een douche (onderafdeling 7.1.3.2).",[49,47785,47786,47801],{},[52,47787,47788],{},[55,47789,47790,47792,47795,47798],{},[58,47791,25656],{},[58,47793,47794],{},"Bad",[58,47796,47797],{},"Douche",[58,47799,47800],{},"Wat er toegelaten is",[68,47802,47803,47819,47835,47853],{},[55,47804,47805,47810,47813,47816],{},[73,47806,47807],{},[15,47808,47809],{},"Volume 0",[73,47811,47812],{},"binnenkant van het bad",[73,47814,47815],{},"Douchebak van minstens 10 cm diep: binnenkant tot 10 cm boven de bodem. Anders: tot 10 cm boven de vloer binnen 1,20 m rond elk vast wateruitlaatpunt",[73,47817,47818],{},"Alleen vaste, permanent aangesloten toestellen op ZLVS (bron buiten volumes 0 en 1), maximaal 12 V wisselspanning; geen stopcontacten, geen aftakdozen",[55,47820,47821,47826,47829,47832],{},[73,47822,47823],{},[15,47824,47825],{},"Volume 1",[73,47827,47828],{},"boven het bad tot 2,25 m (of tot het hogere vaste wateruitlaatpunt), inclusief de ruimte onder het bad",[73,47830,47831],{},"binnen 1,20 m rond elk vast wateruitlaatpunt, tot 2,25 m of tot het hogere uitlaatpunt",[73,47833,47834],{},"ZLVS-toestellen, ZLVS-stopcontacten en ZLVS-bedieningsorganen; laagspanningstoestellen alleen permanent aangesloten en door de fabrikant geschikt verklaard voor volume 1",[55,47836,47837,47842,47845,47850],{},[73,47838,47839],{},[15,47840,47841],{},"Volume 2",[73,47843,47844],{},"0,60 m rond volume 1",[73,47846,47847],{},[15,47848,47849],{},"niet bepaald",[73,47851,47852],{},"Vaste toestellen, schakelaars, ZLVS-stopcontacten; 230 V-stopcontacten alleen achter een differentieelschakelaar met zeer hoge gevoeligheid (≤ 10 mA) of elk afzonderlijk via een scheidingstransformator tot 100 W",[55,47854,47855,47860,47863,47865],{},[73,47856,47857],{},[15,47858,47859],{},"Buiten de volumes",[73,47861,47862],{},"rest van de ruimte",[73,47864,47862],{},[73,47866,47867],{},"Algemene regels van Boek 1",[12,47869,47870],{},"Vaste wanden kunnen de volumes begrenzen; de figuren staan in onderafdelingen 7.1.3.3 en 7.1.3.4. De vereiste waterbestendigheid volgt uit tabel 7.3: volume 0 vraagt uitwendige invloed AD7 (minstens IPX7), volumes 1 en 2 AD4 (minstens IPX4). Uitzondering volgens de voetnoot bij tabel 7.3: stopcontacten op laagspanning in volume 2 en buiten de volumes mogen beschermingsgraad IPXX hebben. De maximale ZLVS-spanningen staan in tabellen 7.1 en 7.2. De toestelregels per volume staan in onderafdeling 7.1.5.2, punten b tot d. Verdeelborden zijn verboden in volumes 0, 1 en 2, net als materieel dat andere ruimten voedt of beschermt.",[41,47872,47874],{"id":47873},"kabeltypes-per-volume","Kabeltypes per volume",[49,47876,47877,47891],{},[52,47878,47879],{},[55,47880,47881,47884,47886,47889],{},[58,47882,47883],{},"Leiding",[58,47885,47809],{},[58,47887,47888],{},"Volumes 1 en 2",[58,47890,47859],{},[68,47892,47893,47907,47921,47934],{},[55,47894,47895,47899,47902,47905],{},[73,47896,47897],{},[15,47898,40676],{},[73,47900,47901],{},"alleen voor toestellen in volume 0, ingebouwd in vaste wanden",[73,47903,47904],{},"ja, als hij toestellen in volume 0, 1 of 2 voedt",[73,47906,206],{},[55,47908,47909,47914,47917,47919],{},[73,47910,47911],{},[15,47912,47913],{},"VOB \u002F H07V-U in buis",[73,47915,47916],{},"alleen voor toestellen in volume 0, in buis in vaste wanden",[73,47918,47904],{},[73,47920,206],{},[55,47922,47923,47928,47930,47932],{},[73,47924,47925],{},[15,47926,47927],{},"Enkeldraden zonder buis",[73,47929,224],{},[73,47931,224],{},[73,47933,224],{},[55,47935,47936,47941,47943,47945],{},[73,47937,47938],{},[15,47939,47940],{},"Gewapende kabel, stalen buis",[73,47942,224],{},[73,47944,224],{},[73,47946,47947],{},"nee in de ruimte en tot 5 cm diep in haar wanden",[12,47949,47950],{},"Voor volumes 1 en 2 laat onderafdeling 7.1.5.2 punt e vier plaatsingswijzen toe: in buizen ingebouwd in vaste wanden (5.2.9.3), in open lucht of in opbouw (5.2.9.5), in bouwkundige holten (5.2.9.9) en ingebouwd zonder buis (5.2.9.10). ZLVS-leidingen in volumes 0, 1 en 2 krijgen, ongeacht de plaatsingswijze, de beschermingswijze door isolatie volgens 4.2.5.4 punt a.",[1396,47952,47954],{"id":47953},"waar-je-bij-de-buis-op-let","Waar je bij de buis op let",[1450,47956,47957,47963,47969,47975],{},[1453,47958,47959,47962],{},[15,47960,47961],{},"Brandgedrag van de buis:"," een installatiebuis die bijdraagt tot vlamvoortplanting gebruik je alleen als ze minstens 3 cm diep in onbrandbaar materiaal ingebouwd is (5.2.7.4 en 5.2.9.3 punt f). In holle wanden en verlaagde plafonds heb je dus een buis nodig die niet bijdraagt tot vlamvoortplanting. Welke eigenschap jouw voorbedrade buis (Preflex) heeft, staat op de buis en in de technische fiche.",[1453,47964,47965,47968],{},[15,47966,47967],{},"Geen losse enkeldraden:"," geleiders met alleen basisisolatie, zoals VOB, gaan nooit zonder buis in een wand of holte (5.2.9.9 en 5.2.9.10).",[1453,47970,47971,47974],{},[15,47972,47973],{},"Kabels in bundels:"," gebundeld gelegde geleiders en kabels hebben minstens eigenschap F2 of brandklasse Cca nodig, afzonderlijk gelegde minstens F1 of Eca (5.2.7.2 en 5.2.7.3).",[1453,47976,47977,47980],{},[15,47978,47979],{},"Doorgaande leidingen:"," een leiding die alleen door de badkamer naar een andere ruimte loopt, hoort niet in volumes 1 en 2. Leg ze buiten de volumes.",[41,47982,38058],{"id":47142},[12,47984,47985],{},"Voor de badkamer gelden dezelfde maxima als in de rest van de woning (tabel 4.11 in onderafdeling 4.4.1.4):",[49,47987,47988,47999],{},[52,47989,47990],{},[55,47991,47992,47995,47997],{},[58,47993,47994],{},"Gebruik",[58,47996,32408],{},[58,47998,38393],{},[68,48000,48001,48009,48017,48026,48037],{},[55,48002,48003,48005,48007],{},[73,48004,304],{},[73,48006,15135],{},[73,48008,22924],{},[55,48010,48011,48013,48015],{},[73,48012,44426],{},[73,48014,15138],{},[73,48016,22933],{},[55,48018,48019,48022,48024],{},[73,48020,48021],{},"Wasmachine, droogkast (eigen kring)",[73,48023,15138],{},[73,48025,22933],{},[55,48027,48028,48031,48034],{},[73,48029,48030],{},"Elektrische vloer- of wandverwarming",[73,48032,48033],{},"volgens vermogen",[73,48035,48036],{},"volgens tabel 4.11",[55,48038,48039,48042,48045],{},[73,48040,48041],{},"Doorstromer, grote boiler",[73,48043,48044],{},"volgens vermogen en fabrikant",[73,48046,48036],{},[12,48048,48049],{},"Toestellen met vaste standplaats vanaf 2600 W krijgen een eigen kring (5.2.1.2). In vaste wanden ingebouwde verwarmingselementen zijn buiten volume 0 toegelaten als ze afgedekt zijn met een metalen rooster dat verbonden is met de bijkomende equipotentiaalverbinding (7.1.4.5).",[41,48051,48053],{"id":48052},"differentieelschakelaar-voor-elke-badkamerkring","Differentieelschakelaar voor elke badkamerkring",[12,48055,48056,48057,48060],{},"Onderafdeling 7.1.4.3 eist voor ",[15,48058,48059],{},"alle kringen die de badkamer voeden"," één of meer differentieelschakelaars met hoge of zeer hoge gevoeligheid, in de praktijk 30 mA. Alleen eindkringen op ZLVS, met veiligheidsscheiding of van een veiligheidsinstallatie zijn uitgezonderd. Dat geldt evengoed voor verlichting, stopcontacten en vast aangesloten toestellen.",[12,48062,48063],{},"Twee details zijn doorslaggevend:",[1450,48065,48066,48072],{},[1453,48067,48068,48069,48071],{},"De differentieelschakelaar zit ",[15,48070,19945],{}," de badkamer.",[1453,48073,48074,48075,48078],{},"In huishoudelijke installaties staat hij ",[15,48076,48077],{},"stroomafwaarts"," van de differentieelschakelaar aan het begin van de installatie. De hoofddifferentieel alleen volstaat niet voor de badkamer.",[12,48080,48081],{},"Dezelfde 30 mA-schakelaar mag ook kringen van andere ruimten beschermen.",[41,48083,48085],{"id":48084},"bijkomende-equipotentiaalverbinding","Bijkomende equipotentiaalverbinding",[12,48087,48088],{},"Onderafdeling 7.1.4.4 eist in de badkamer een bijkomende equipotentiaalverbinding: ze verbindt plaatselijk de massa's van het elektrisch materieel met de gelijktijdig aanraakbare vreemde geleidende delen, zoals metalen water- en verwarmingsleidingen, een metalen bad of een metalen afvoer. Uitgezonderd zijn ZLVS-materieel, kunststofleidingen, radiatoren op kunststofleidingen en materieel van klasse II.",[41,48090,48092],{"id":48091},"zo-helpt-planelec-bij-de-badkamer","Zo helpt PlanElec bij de badkamer",[12,48094,48095,48096,39],{},"Wijs in PlanElec de toestellen in de badkamer hun volume toe. De AREI\u002FRGIE-zelfcontrole meldt dan badkamerkringen zonder 30 mA-differentieel en materieel dat in volume 0, 1 of 2 niet toegelaten is, bijvoorbeeld een netstopcontact of netschakelaar in volume 1. Kabeltype, buis en plaatsingswijze kies je volgens de regels hierboven. De keuring van de installatie doet het erkende controleorganisme. Welke regels de zelfcontrole dekt, lees je in ",[30,48097,37095],{"href":2457},[12,48099,37169,48100,48103],{},[30,48101,27031],{"href":15357,"rel":48102},[2532],", hoofdstuk 7.1 en onderafdelingen 4.4.1.4, 5.2.7.2 tot 5.2.7.4 en 5.2.9.",[41,48105,32827],{"id":32826},[1450,48107,48108,48112,48117,48122,48126],{},[1453,48109,48110],{},[30,48111,37153],{"href":37084},[1453,48113,48114],{},[30,48115,48116],{"href":32848},"Eigen stroomkring voor toestellen",[1453,48118,48119],{},[30,48120,48121],{"href":45196},"XVB-kabel of VOB-draad?",[1453,48123,48124],{},[30,48125,17455],{"href":17361},[1453,48127,48128],{},[30,48129,48130],{"href":42805},"Preflex of vrije bedrading: welke kabelmethode kies je?",[12,48132,48133],{},[30,48134,48135],{"href":6989},"Plan je badkamer in PlanElec en controleer ze zelf →",{"title":1467,"searchDepth":1468,"depth":1468,"links":48137},[48138,48139,48140,48143,48144,48145,48146,48147],{"id":47759,"depth":1468,"text":47760},{"id":47775,"depth":1468,"text":47776},{"id":47873,"depth":1468,"text":47874,"children":48141},[48142],{"id":47953,"depth":1486,"text":47954},{"id":47142,"depth":1468,"text":38058},{"id":48052,"depth":1468,"text":48053},{"id":48084,"depth":1468,"text":48085},{"id":48091,"depth":1468,"text":48092},{"id":32826,"depth":1468,"text":32827},"2026-03-09","XVB of VOB in buis, zonder metalen elementen: welke leidingen in badkamervolumes 0, 1 en 2 mogen, hoe je ze legt en welke differentieelschakelaar de badkamer nodig heeft.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-bathroom-cables-arei-zones-editorial.jpg","\u002Fblog\u002Fbathroom-cables-arei-zones.nl",{"title":47753,"description":48149},"badkamer-kabels-arei-zones","blog\u002Fbathroom-cables-arei-zones.nl",[3275,3276,48157,48158,45263,47088,48159,48160,17497,48161,17499,39470,1513,3273,6216,48162],"badkamer","zones","Preflex","kabels","30mA","CPR","MwFY7LOj1Yo51qzx6wJoA-BHh7DrPuDCB5ZEeSmPbzA",{"id":48165,"title":26447,"articleId":48166,"body":48167,"category":19087,"date":48445,"description":48446,"extension":1496,"image":48179,"lastUpdated":15381,"locale":1497,"meta":48447,"navigation":1499,"ogImage":48448,"path":48449,"publishDate":48445,"readTime":19590,"refreshInterval":11097,"seo":48450,"seoTitle":4037,"slug":48451,"stem":48452,"tags":48453,"__hash__":48456,"kind":1515,"href":26446},"blog\u002Fblog\u002Fwhat-is-a-situation-plan.nl.md","what-is-a-situation-plan",{"type":9,"value":48168,"toc":48438},[48169,48175,48180,48184,48196,48202,48206,48218,48292,48295,48299,48332,48335,48339,48410,48420,48422,48433],[12,48170,48171,48174],{},[15,48172,48173],{},"Het situatieplan is de plattegrond van je elektrische installatie: het toont waar verdeelborden, dozen, stopcontacten, lichtpunten, schakelaars, vaste toestellen en bronnen in het gebouw zitten."," Het AREI vraagt het samen met het eendraadschema voor elke nieuwe huishoudelijke installatie en voor belangrijke wijzigingen of uitbreidingen (onderafdeling 3.1.2.1 a).",[12,48176,48177],{},[22,48178],{"alt":15935,"src":48179},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-what-is-a-situation-plan-editorial.webp",[41,48181,48183],{"id":48182},"een-plattegrond-van-je-elektrische-installatie","Een plattegrond van je elektrische installatie",[12,48185,48186,48187,48189,48190,48192,48193,48195],{},"Het situatieplan (Frans: ",[17563,48188,44224],{},", Duits: ",[17563,48191,47446],{},") is een vereenvoudigde plattegrond met de ",[15,48194,30263],{}," van de elektrische onderdelen. Elk punt draagt dezelfde referentie als in het eendraadschema: de letter van zijn kring en zijn volgnummer.",[12,48197,48198,48199,48201],{},"Het eendraadschema toont de elektrische structuur, dus welke beveiliging welke kring voedt. Het situatieplan toont ",[15,48200,19457],{}," elk punt zich bevindt.",[41,48203,48205],{"id":48204},"wat-zegt-het-arei","Wat zegt het AREI?",[12,48207,48208,48209,48212,48213,48217],{},"Het actuele ",[30,48210,28058],{"href":40951,"rel":48211},[2532]," (versie 06) regelt inhoud en codering; de ",[30,48214,48216],{"href":27024,"rel":48215},[2532],"FOD-pagina over de controle van huishoudelijke installaties"," noemt beide plannen als voor te leggen documenten.",[49,48219,48220,48230],{},[52,48221,48222],{},[55,48223,48224,48226,48228],{},[58,48225,42169],{},[58,48227,46774],{},[58,48229,1288],{},[68,48231,48232,48243,48252,48261,48270,48281],{},[55,48233,48234,48237,48240],{},[73,48235,48236],{},"Begrip \"plan\"",[73,48238,48239],{},"hoofdstuk 2.12",[73,48241,48242],{},"voorstelling op schaal van de plaats van de installatiedelen; een bepaalde schaalverhouding schrijft het AREI niet voor",[55,48244,48245,48247,48249],{},[73,48246,42419],{},[73,48248,17637],{},[73,48250,48251],{},"eendraadschema en situatieplan voor nieuwe huishoudelijke installaties en belangrijke wijzigingen of uitbreidingen",[55,48253,48254,48256,48258],{},[73,48255,1288],{},[73,48257,17572],{},[73,48259,48260],{},"plaats van verdeelborden, verbindings- en aftakdozen, stopcontacten, lichtpunten, schakelaars, vaste toestellen en bronnen",[55,48262,48263,48265,48267],{},[73,48264,27219],{},[73,48266,17637],{},[73,48268,48269],{},"kringletter plus volgnummer uit het eendraadschema; schakelaars dragen het nummer van het bediende punt",[55,48271,48272,48275,48278],{},[73,48273,48274],{},"Symbolen",[73,48276,48277],{},"hoofdstuk 2.13, tabel 2.23",[73,48279,48280],{},"officiële symbolenlijst; ontbrekende symbolen definieer je in de legende",[55,48282,48283,48286,48289],{},[73,48284,48285],{},"Dossier",[73,48287,48288],{},"9.1.2",[73,48290,48291],{},"de eigenaar bewaart eendraadschema, situatieplan en controleverslagen in het dossier van de elektrische installatie",[12,48293,48294],{},"Stelt het erkend organisme bij de controle de conformiteit vast, dan ondertekenen het en de verantwoordelijke voor de uitvoering schema en situatieplan. Een ontbrekend of tegenstrijdig plan komt in het controleverslag; de officiële conclusie trekt alleen het erkende controleorganisme.",[41,48296,48298],{"id":48297},"wat-moet-op-het-situatieplan","Wat moet op het situatieplan?",[1450,48300,48301,48304,48307,48310,48313,48316,48319,48326,48329],{},[1453,48302,48303],{},"vereenvoudigde, leesbare plattegrond van elke betrokken verdieping",[1453,48305,48306],{},"schakel- en verdeelborden",[1453,48308,48309],{},"verbindings- en aftakdozen",[1453,48311,48312],{},"alle stopcontacten, lichtpunten en schakelaars",[1453,48314,48315],{},"vaste machines en toestellen zoals kookplaat, boiler of laadpaal",[1453,48317,48318],{},"bronnen zoals PV-omvormer of batterij",[1453,48320,48321,48322,48325],{},"per punt kringletter en nummer, ",[15,48323,48324],{},"identiek"," aan het eendraadschema",[1453,48327,48328],{},"symbolen uit tabel 2.23 en een legende voor eigen tekens",[1453,48330,48331],{},"nummer, versie en datum, adres van de installatie en gegevens van de verantwoordelijke",[12,48333,48334],{},"Een wijziging teken je altijd op het situatieplan, ook als voor het eendraadschema een korte beschrijving volstaat (3.1.2.1 a).",[41,48336,48338],{"id":48337},"situatieplan-en-eendraadschema-vergeleken","Situatieplan en eendraadschema vergeleken",[49,48340,48341,48351],{},[52,48342,48343],{},[55,48344,48345,48347,48349],{},[58,48346,18883],{},[58,48348,3836],{},[58,48350,3764],{},[68,48352,48353,48363,48373,48383,48392,48401],{},[55,48354,48355,48357,48360],{},[73,48356,7790],{},[73,48358,48359],{},"plattegrond met de plaats van de punten",[73,48361,48362],{},"schema met één lijn per kring",[55,48364,48365,48368,48371],{},[73,48366,48367],{},"Toont plaats",[73,48369,48370],{},"ja — exacte locatie",[73,48372,224],{},[55,48374,48375,48378,48380],{},[73,48376,48377],{},"Toont structuur",[73,48379,224],{},[73,48381,48382],{},"ja — van voedingspunt tot verbruiker",[55,48384,48385,48387,48389],{},[73,48386,27198],{},[73,48388,27204],{},[73,48390,48391],{},"type, waarden en volgorde",[55,48393,48394,48396,48399],{},[73,48395,21519],{},[73,48397,48398],{},"traject kan getekend worden",[73,48400,27211],{},[55,48402,48403,48405,48408],{},[73,48404,10281],{},[73,48406,48407],{},"op schaal, zonder voorgeschreven verhouding",[73,48409,27190],{},[12,48411,48412,48413,48416,48417,39],{},"Beide documenten horen samen en zijn allebei verplicht. Hoe je het ruimte per ruimte tekent, lees je in ",[30,48414,48415],{"href":25796},"Een situatieplan tekenen volgens het AREI","; de vergelijking in detail staat in ",[30,48418,48419],{"href":5957},"Eendraadschema of situatieplan",[41,48421,32827],{"id":32826},[1450,48423,48424,48428],{},[1453,48425,48426],{},[30,48427,26430],{"href":7514},[1453,48429,48430],{},[30,48431,48432],{"href":33746},"Wat kost een elektriciteitsplan in België?",[12,48434,48435],{},[30,48436,48437],{"href":6989},"Teken je situatieplan met PlanElec — gratis starten →",{"title":1467,"searchDepth":1468,"depth":1468,"links":48439},[48440,48441,48442,48443,48444],{"id":48182,"depth":1468,"text":48183},{"id":48204,"depth":1468,"text":48205},{"id":48297,"depth":1468,"text":48298},{"id":48337,"depth":1468,"text":48338},{"id":32826,"depth":1468,"text":32827},"2026-03-06","Het situatieplan toont waar de elektrische onderdelen in je gebouw zitten. Wat er volgens het AREI op moet, hoe het samenhangt met het eendraadschema en waar de keuring op let.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-what-is-a-situation-plan-editorial.jpg","\u002Fblog\u002Fwhat-is-a-situation-plan.nl",{"title":26447,"description":48446},"wat-is-een-situatieschema","blog\u002Fwhat-is-a-situation-plan.nl",[3275,3276,6216,3274,47445,47446,48454,3273,47443,47444,17499,48455,1513],"situation plan","plattegrond","GOKjIPMo_3jOygADFlrvU7CYaQeTkJ_vq9z_eIwe1j0",{"id":48458,"title":48459,"articleId":48460,"body":48461,"category":19087,"date":48785,"description":48786,"extension":1496,"image":48481,"lastUpdated":15381,"locale":1497,"meta":48787,"navigation":1499,"ogImage":48788,"path":48789,"publishDate":48785,"readTime":14340,"refreshInterval":11097,"seo":48790,"seoTitle":4037,"slug":48791,"stem":48792,"tags":48793,"__hash__":48796,"kind":1515,"href":37084},"blog\u002Fblog\u002F30ma-rcd-per-socket.nl.md","30 mA-differentieel per stopcontact? De AREI-regel (2026)","30ma-rcd-per-socket",{"type":9,"value":48462,"toc":48773},[48463,48467,48477,48482,48485,48488,48492,48495,48540,48547,48550,48559,48563,48609,48612,48614,48624,48628,48635,48657,48667,48671,48677,48680,48684,48691,48702,48705,48708,48722,48726,48729,48732,48736,48744,48746,48765],[41,48464,48466],{"id":48465},"kort-antwoord-niet-per-stopcontact-en-niet-per-kring","Kort antwoord: niet per stopcontact en niet per kring",[12,48468,48469,48472,48473,48476],{},[15,48470,48471],{},"Nee."," Het AREI vraagt geen eigen 30 mA-differentieelschakelaar voor elk stopcontact en ook geen aparte differentieel voor elke stopcontactkring. In een nieuwe woning beschermt één differentieel met hoge of zeer hoge gevoeligheid (maximaal 30 mA) de voorgeschreven eindstroombanen samen – ",[15,48474,48475],{},"tot acht eindstroombanen per differentieel"," (AREI Boek 1, onderafdeling 4.2.4.3, punt b).",[12,48478,48479],{},[22,48480],{"alt":45711,"src":48481},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-30ma-rcd-per-socket-editorial.webp",[12,48483,48484],{},"Je telt dus stroombanen achter de differentieel, geen stopcontacten. Een stekkerdoos verandert daar niets aan: ze hangt aan een bestaand stopcontact en vormt geen nieuwe kring of eigen bescherming.",[12,48486,48487],{},"Dit artikel gaat over huishoudelijke wisselstroominstallaties volgens Boek 1, versie 06, van toepassing sinds 1 april 2026. Gelijkstroominstallaties, zwembaden en andere bijzondere installaties hebben bijkomende regels.",[41,48489,48491],{"id":48490},"wat-het-arei-vraagt-voor-een-nieuwe-installatie","Wat het AREI vraagt voor een nieuwe installatie",[12,48493,48494],{},"Aan het begin van de installatie staat minstens één differentieel van maximaal 300 mA. Onmiddellijk daarachter volgt minstens één differentieel met hoge of zeer hoge gevoeligheid, waarop minstens deze kringen worden aangesloten (4.2.4.3 b):",[49,48496,48497,48507],{},[52,48498,48499],{},[55,48500,48501,48504],{},[58,48502,48503],{},"Kring of ruimte",[58,48505,48506],{},"Wat dat betekent voor jouw ontwerp",[68,48508,48509,48517,48524,48532],{},[55,48510,48511,48514],{},[73,48512,48513],{},"Stopcontacten die niet voor vaste toestellen bestemd zijn",[73,48515,48516],{},"Alle gewone stopcontactkringen zitten achter de 30 mA-differentieel.",[55,48518,48519,48521],{},[73,48520,304],{},[73,48522,48523],{},"Ook de lichtkringen horen er in een nieuwe installatie bij.",[55,48525,48526,48529],{},[73,48527,48528],{},"Ruimten met bad en\u002Fof douche",[73,48530,48531],{},"De kringen van die ruimten krijgen de gevoelige bescherming.",[55,48533,48534,48537],{},[73,48535,48536],{},"Wasmachine, droogkast, vaatwasser",[73,48538,48539],{},"Het AREI noemt deze toestellen uitdrukkelijk.",[12,48541,48542,48543,48546],{},"Op zo’n differentieel komen ",[15,48544,48545],{},"ten hoogste acht eindstroombanen",". Zes geschikte eindstroombanen mag je dus achter één 30 mA-differentieel plaatsen. Twee groepen van drie zijn een ontwerpkeuze voor meer beschikbaarheid, geen verplichting.",[12,48548,48549],{},"Vaste toestellen zoals een koelkast, elektrisch fornuis of elektrische verwarming mogen per kring of groep op een bijkomende differentieel aan het begin van de installatie. Dat is geen achterpoortje om stopcontacten of verlichting achter 300 mA te zetten – en wasmachine, droogkast en vaatwasser staan uitdrukkelijk in de 30 mA-lijst. Verwarming met in de wand verzonken weerstanden boven 25 V wisselspanning krijgt een afzonderlijke differentieel van maximaal 100 mA.",[12,48551,48552,48553,48556,48557,39],{},"De differentieel zelf is in huishoudelijke installaties ",[15,48554,48555],{},"minstens type A","; die aan het begin van de installatie heeft een nominale stroom van minstens 40 A (5.3.5.3 a). Wanneer type A niet volstaat, lees je in ",[30,48558,17467],{"href":17466},[41,48560,48562],{"id":48561},"drie-acht-regels-die-vaak-door-elkaar-lopen","Drie “acht”-regels die vaak door elkaar lopen",[49,48564,48565,48576],{},[52,48566,48567],{},[55,48568,48569,48571,48574],{},[58,48570,2132],{},[58,48572,48573],{},"Wat je telt",[58,48575,3189],{},[68,48577,48578,48588,48599],{},[55,48579,48580,48583,48586],{},[73,48581,48582],{},"Maximaal 8 eindstroombanen per 30 mA-differentieel",[73,48584,48585],{},"Kringen achter de differentieel, geen stopcontacten",[73,48587,37047],{},[55,48589,48590,48593,48596],{},[73,48591,48592],{},"Maximaal 8 contactdozen per eindstroombaan",[73,48594,48595],{},"Enkelvoudige of meervoudige contactdozen; een meervoudige telt één keer",[73,48597,48598],{},"5.3.5.2 b",[55,48600,48601,48604,48607],{},[73,48602,48603],{},"Gemengde kring (stopcontacten, licht, toestellen)",[73,48605,48606],{},"Elk vast toestel of elke groep met één gemeenschappelijk bedieningstoestel telt als één contactdoos",[73,48608,48598],{},[12,48610,48611],{},"Een woonkamer met vier dubbele stopcontacten kan dus één eindstroombaan zijn. Omgekeerd zijn acht kringen achter één differentieel al het maximum, ook als elke kring maar één stopcontact voedt. Toestellen die volgens 5.2.1.2 een eigen kring nodig hebben, horen niet in een gemengde kring.",[41,48613,38058],{"id":47142},[12,48615,48616,48617,1628,48620,48623],{},"Stopcontactkringen voer je in koper uit met minstens 2,5 mm² (5.2.1.2). Tabel 4.11 (4.4.1.4) beperkt de beveiliging daarvan tot ",[15,48618,48619],{},"20 A met een automaat",[15,48621,48622],{},"16 A met een smeltveiligheid",". Dat is een bovengrens: plaatsingswijze, bundeling, omgevingstemperatuur, kabellengte en spanningsval kunnen een kleinere beveiliging of een grotere doorsnede vragen.",[41,48625,48627],{"id":48626},"aardingsweerstand-boven-30-ohm","Aardingsweerstand boven 30 ohm",[12,48629,48630,48631,48634],{},"De grens van 30 ohm schaft de 30 mA-regel niet af, ze verstrengt hem. Is de spreidingsweerstand van de aardverbinding ",[15,48632,48633],{},"hoger dan 30 ohm",", dan vraagt 4.2.4.3 b:",[1450,48636,48637,48643,48650],{},[1453,48638,48639,48642],{},[15,48640,48641],{},"minstens twee"," differentiëlen met hoge of zeer hoge gevoeligheid,",[1453,48644,48645,48646,48649],{},"per differentieel ",[15,48647,48648],{},"ten hoogste zestien"," enkelvoudige of meervoudige contactdozen (een vast toestel of een groep met één gemeenschappelijk bedieningstoestel telt als contactdoos),",[1453,48651,48652,48653,48656],{},"voor de kringen van vaste toestellen en alle andere kringen buiten de 30 mA-lijst bijkomend minstens één differentieel van maximaal ",[15,48654,48655],{},"100 mA"," per kring of groep.",[12,48658,48659,48660,48663,48664,39],{},"Die zestien telt contactdozen, geen kringen; de grens van acht eindstroombanen blijft gelden. Een meting van precies 30 ohm is niet “hoger dan 30 ohm”. In huishoudelijke installaties moet de spreidingsweerstand bovendien ",[15,48661,48662],{},"lager dan 100 ohm"," zijn (4.2.3.2). Lukt dat niet, dan redden extra differentiëlen de installatie niet – dan moet de aarding beter. Meer daarover in ",[30,48665,48666],{"href":33334},"Aarding in België: TT of TN-S?",[41,48668,48670],{"id":48669},"badkamer-30-ma-is-maar-een-deel-van-de-bescherming","Badkamer: 30 mA is maar een deel van de bescherming",[12,48672,48673,48674,48676],{},"Kringen die een ruimte met bad of douche voeden, worden beschermd door één of meer differentiëlen met hoge of zeer hoge gevoeligheid, geplaatst ",[15,48675,19945],{}," de badkamer (7.1.4.3). Uitgezonderd zijn ZLVS-kringen, elektrische scheiding en veiligheidsinstallaties. Dezelfde differentieel mag ook kringen in andere ruimten beschermen.",[12,48678,48679],{},"Zones 0, 1 en 2, toegelaten materieel, beschermingsgraad en de bijkomende equipotentiale verbinding (7.1.4.4) zijn aparte eisen. Een 30 mA-differentieel maakt een stopcontact in een verboden zone niet toegelaten. Voor bestaande badkamers waarvan de uitvoering vóór 1 maart 2025 begon, bevat 6.5.8.1 punt 3 gerichte afwijkingen – geen regel voor een nieuwe badkamer.",[41,48681,48683],{"id":48682},"bestaande-installaties-overgang-voor-installaties-van-vóór-1-juni-2023","Bestaande installaties: overgang voor installaties van vóór 1 juni 2023",[12,48685,48686,48687,48690],{},"Voor bestaande delen van huishoudelijke installaties waarvan de uitvoering ter plaatse vanaf 1 juni 2020 en ",[15,48688,48689],{},"vóór 1 juni 2023"," begon en die volgens hoofdstuk 6.4 gekeurd werden, bevat 6.5.8.1 punt 1 een afwijking; voor oudere installaties staan dezelfde afwijkingen in deel 8 (8.2.1 nr. 16, 8.2.2 nr. 10). Onder de voorwaarden van die bepaling mogen",[1450,48692,48693,48696,48699],{},[1453,48694,48695],{},"stopcontact- en lichtkringen zonder de huidige 30 mA-bescherming in dienst blijven, ook na niet-belangrijke wijzigingen of uitbreidingen van die kringen;",[1453,48697,48698],{},"meer dan acht eindstroombanen achter een gevoelige differentieel blijven;",[1453,48700,48701],{},"bij een spreidingsweerstand hoger dan 30 ohm, in plaats van de huidige opbouw, één differentieel voor alle verlichting en per andere kring of groep één differentieel met maximaal zestien contactdozen in dienst blijven.",[12,48703,48704],{},"Dat is geen algemene vrijstelling voor elke oudere woning. Startdatum en bestaand deel moeten kloppen; het erkend organisme wordt op de hoogte gebracht en vermeldt de afwijking in het controleverslag. Bij een belangrijke wijziging of uitbreiding van een oude installatie volgens deel 8 beschermt minstens één differentieel aan het begin de hele installatie (4.2.4.3 b). Nieuwe installaties of projecten die na 1 juni 2023 startten, kunnen zich niet op deze overgang beroepen.",[12,48706,48707],{},"Zo pak je een bestaande installatie aan:",[1602,48709,48710,48713,48716,48719],{},[1453,48711,48712],{},"Begin en omvang van de oorspronkelijke uitvoering vaststellen.",[1453,48714,48715],{},"Uitmaken of het om bestaand deel, een niet-belangrijke of een belangrijke wijziging gaat.",[1453,48717,48718],{},"De toegepaste afwijking documenteren.",[1453,48720,48721],{},"Eendraadschema, situatieplan en verdeelbord met de werkelijke opbouw vergelijken.",[41,48723,48725],{"id":48724},"meer-differentiëlen-betekent-niet-nooit-zonder-stroom","Meer differentiëlen betekent niet: nooit zonder stroom",[12,48727,48728],{},"Een differentieel schakelt uit wanneer hij een foutstroom detecteert. Dat is zijn taak. Lekstromen, vocht of een defect toestel doen hem afslaan. Meerdere differentiëlen beperken wat er dan uitvalt – zodat koelkast en bureau bijvoorbeeld niet samen zonder stroom zitten. Selectiviteit ontstaat daar niet vanzelf door; die hangt af van fouttype, bedrading en trapsgewijze afstemming.",[12,48730,48731],{},"Noteer bij een inventaris dus niet alleen “30 mA”, maar ook type, nominale stroom, aantal polen en alle werkelijk aangesloten eindstroombanen. Een verouderd schema doet een telling al snel kloppen, terwijl nulgeleiders of kringen in het bord intussen anders lopen.",[41,48733,48735],{"id":48734},"ontwerpen-en-zelf-controleren-in-planelec","Ontwerpen en zelf controleren in PlanElec",[12,48737,12598,48738,48740,48741,48743],{},[30,48739,1337],{"href":6989}," leg je kringen, differentiëlen en stopcontacten vast in de editor en exporteer je eendraadschema en situatieplan als pdf. De AREI\u002FRGIE-zelfcontrole meldt je daarbij onder meer een ontbrekende hoofddifferentieel van maximaal 300 mA, stopcontactkringen zonder 30 mA-differentieel, meer dan acht eindstroombanen per gevoelige differentieel en meer dan acht stopcontacten of toestellen per eindstroombaan. Welke regels ze precies controleert, staat in ",[30,48742,10087],{"href":2457},". Metingen en de keuring ter plaatse doet het erkend organisme.",[41,48745,6947],{"id":6946},[1450,48747,48748,48752,48757,48761],{},[1453,48749,48750],{},[30,48751,17467],{"href":17466},[1453,48753,48754],{},[30,48755,48756],{"href":25635},"Stopcontacten: hoeveel per kring?",[1453,48758,48759],{},[30,48760,36775],{"href":7514},[1453,48762,48763],{},[30,48764,17455],{"href":17361},[12,48766,48767],{},[17563,48768,48769,48770,19074],{},"Regelgrond: AREI Boek 1, versie 06, onderafdelingen 4.2.3.2, 4.2.4.3 b, 4.4.1.4 (tabel 4.11), 5.2.1.2, 5.3.5.2 b, 5.3.5.3 a, 6.5.8.1 en 7.1.4.3 en 7.1.4.4. De officiële tekst van de ",[30,48771,19073],{"href":15357,"rel":48772},[2532],{"title":1467,"searchDepth":1468,"depth":1468,"links":48774},[48775,48776,48777,48778,48779,48780,48781,48782,48783,48784],{"id":48465,"depth":1468,"text":48466},{"id":48490,"depth":1468,"text":48491},{"id":48561,"depth":1468,"text":48562},{"id":47142,"depth":1468,"text":38058},{"id":48626,"depth":1468,"text":48627},{"id":48669,"depth":1468,"text":48670},{"id":48682,"depth":1468,"text":48683},{"id":48724,"depth":1468,"text":48725},{"id":48734,"depth":1468,"text":48735},{"id":6946,"depth":1468,"text":6947},"2026-03-04","Nee: het AREI vraagt geen 30 mA-differentieel per stopcontact en ook niet per kring. Eén 30 mA-differentieel beschermt tot acht eindstroombanen – zo tel je juist, nieuw en bestaand.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-30ma-rcd-per-socket-editorial.jpg","\u002Fblog\u002F30ma-rcd-per-socket.nl",{"title":48459,"description":48786},"30ma-aardlek-per-stopcontact","blog\u002F30ma-rcd-per-socket.nl",[3275,3276,48794,17497,17498,48161,48795,47749,27628,33956,39470,1513,3273,3274],"Boek 1 V06","aardlekschakelaar","24SqCPhzlpXJgIVjnCn5E9UInWKLm3WMuBteBD9tDTk",{"id":48798,"title":33886,"articleId":48799,"body":48800,"category":1493,"date":49253,"description":49254,"extension":1496,"image":48813,"lastUpdated":33942,"locale":1497,"meta":49255,"navigation":1499,"ogImage":49256,"path":49257,"publishDate":4037,"readTime":7016,"refreshInterval":11097,"seo":49258,"seoTitle":4037,"slug":49259,"stem":49260,"tags":49261,"__hash__":49265,"kind":1515,"href":33746},"blog\u002Fblog\u002Felectrical-plan-costs.nl.md","electrical-plan-costs",{"type":9,"value":48801,"toc":49229},[48802,48806,48809,48814,48821,48825,48836,48839,48904,48907,48911,48914,49005,49009,49012,49017,49020,49025,49028,49032,49035,49039,49042,49046,49052,49056,49061,49063,49117,49120,49124,49127,49135,49139,49162,49166,49169,49172,49174,49178,49181,49185,49188,49192,49195,49199,49205,49209,49212,49216,49219,49221,49224],[41,48803,48805],{"id":48804},"kort-antwoord-de-prijs-volgt-de-omvang-van-de-opdracht","Kort antwoord: de prijs volgt de omvang van de opdracht",[12,48807,48808],{},"Een officieel Belgisch forfait voor eendraadschema en situatieplan bestaat niet. De prijs volgt uit de concrete opdracht: is er een betrouwbare opname, of moet de installatie ter plaatse worden nagegaan? Worden alleen de twee plannen getekend, of horen berekeningen, herstellingen, een technische controle en de officiële keuring erbij? Een prijsvork online zonder steekproef, datum, regio en btw-status beantwoordt die vragen niet.",[12,48810,48811],{},[22,48812],{"alt":41076,"src":48813},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-electrical-plan-costs-editorial.webp",[12,48815,48816,48817,48820],{},"Vergelijk daarom ",[15,48818,48819],{},"hetzelfde resultaat met dezelfde omvang",", niet een softwareprijs met een factuur van de elektricien. PlanElec kost in Early Access 0 EUR; na de start van de tarieven is er eenmalig gebruik voor 12 EUR per pand of Pro voor 24 EUR per maand (de prijs blijft zolang het abonnement zonder onderbreking loopt), telkens exclusief btw. Je eigen tijd, metingen, materiaal, werken aan de installatie, technische begeleiding en de keuring door een erkend organisme reken je apart.",[41,48822,48824],{"id":48823},"welke-documenten-zijn-officieel-vereist","Welke documenten zijn officieel vereist?",[12,48826,48827,48828,933,48832,39],{},"De FOD Economie vermeldt dat bij een huishoudelijke controle minstens het eendraadschema, het situatieplan en, indien beschikbaar, de EAN-code worden voorgelegd. Het eendraadschema toont onder meer leidingen en plaatsingswijze, differentieelschakelaars, overstroombeveiliging, schakelaars, dozen, contactdozen, lichtpunten, vaste toestellen en bronnen (AREI\u002FRGIE Boek 1 V06, onderafdeling 3.1.2.2 a). Het situatieplan toont waar die elementen zich bevinden (onderafdeling 3.1.2.3 a). Samen met de controleverslagen horen ze in het dossier van de installatie (afdeling 9.1.2). Primaire bronnen zijn de ",[30,48829,48831],{"href":38649,"rel":48830},[2532],"officiële pagina over huishoudelijke controles",[30,48833,48835],{"href":28056,"rel":48834},[2532],"AREI Boek 1 versie 06",[12,48837,48838],{},"Welke documenten je nodig hebt, hangt af van de aanleiding:",[49,48840,48841,48852],{},[52,48842,48843],{},[55,48844,48845,48848,48850],{},[58,48846,48847],{},"Aanleiding",[58,48849,6532],{},[58,48851,3189],{},[68,48853,48854,48865,48874,48882,48893],{},[55,48855,48856,48859,48862],{},[73,48857,48858],{},"Nieuwe installatie",[73,48860,48861],{},"eendraadschema, situatieplan, gelijkvormigheidscontrole vóór ingebruikname",[73,48863,48864],{},"3.1.2.1 a, hfst. 6.4",[55,48866,48867,48869,48872],{},[73,48868,33429],{},[73,48870,48871],{},"bijgewerkte plannen; controle van gewijzigde en toegevoegde delen",[73,48873,33438],{},[55,48875,48876,48878,48880],{},[73,48877,33457],{},[73,48879,33460],{},[73,48881,17637],{},[55,48883,48884,48887,48890],{},[73,48885,48886],{},"Verkoop van een woning met oude installatie",[73,48888,48889],{},"controlebezoek; bestaand dossier ter beschikking stellen",[73,48891,48892],{},"afdeling 8.4.2",[55,48894,48895,48898,48901],{},[73,48896,48897],{},"Verhoging van het aansluitvermogen, oude installatie",[73,48899,48900],{},"controlebezoek vóór de verhoging",[73,48902,48903],{},"afdeling 8.4.1",[12,48905,48906],{},"Ontbreken eendraadschema en situatieplan bij het controlebezoek voor een verkoop, dan maakt het erkend organisme een korte beschrijving en een ruwe schets. Die vervangen de plannen niet, en het ontbreken wordt in het verslag als inbreuk genoteerd (onderafdeling 8.4.2.2 d). Wie verkoopt, plant de plannen dus tijdig in.",[41,48908,48910],{"id":48909},"leg-de-omvang-vast-vóór-de-prijs","Leg de omvang vast vóór de prijs",[12,48912,48913],{},"Een offerte wordt vergelijkbaar wanneer elke post beschreven is. Met deze lijst voorkom je dat een goedkope tekenofferte later groeit met noodzakelijk werk.",[49,48915,48916,48925],{},[52,48917,48918],{},[55,48919,48920,48922],{},[58,48921,3751],{},[58,48923,48924],{},"Wat uitdrukkelijk wordt afgesproken",[68,48926,48927,48935,48943,48950,48957,48965,48973,48981,48989,48997],{},[55,48928,48929,48932],{},[73,48930,48931],{},"Opname",[73,48933,48934],{},"Worden ruimten, verbruikers, dozen, leidingtrajecten en borden ter plaatse opgenomen, of lever jij geverifieerde gegevens?",[55,48936,48937,48940],{},[73,48938,48939],{},"Kringen nagaan",[73,48941,48942],{},"Zijn de toewijzingen gekend, of moeten ze via schakelen, meten en openen van geschikte punten worden bepaald?",[55,48944,48945,48947],{},[73,48946,3764],{},[73,48948,48949],{},"Staan alle beveiligingen, geleidergegevens, plaatsingswijzen, bronnen en vaste toestellen erop?",[55,48951,48952,48954],{},[73,48953,3836],{},[73,48955,48956],{},"Is er een bruikbaar grondplan en zijn de verwijzingen naar de kringen eenduidig?",[55,48958,48959,48962],{},[73,48960,48961],{},"Berekeningen",[73,48963,48964],{},"Horen dimensionering, kortsluit-, selectiviteits- of spanningsvalberekeningen bij de opdracht?",[55,48966,48967,48970],{},[73,48968,48969],{},"Technische controle",[73,48971,48972],{},"Controleert een vakman de werkelijke toestand en de technische plausibiliteit, of wordt alleen getekend?",[55,48974,48975,48978],{},[73,48976,48977],{},"Herstellingen",[73,48979,48980],{},"Zijn werken aan bord, leidingen of materieel inbegrepen?",[55,48982,48983,48986],{},[73,48984,48985],{},"Keuringsafspraak",[73,48987,48988],{},"Is de vergoeding van het erkend organisme inbegrepen of apart?",[55,48990,48991,48994],{},[73,48992,48993],{},"Nabewerking",[73,48995,48996],{},"Hoeveel technisch onderbouwde correctierondes zijn inbegrepen?",[55,48998,48999,49002],{},[73,49000,49001],{},"Btw en verplaatsing",[73,49003,49004],{},"Is het bedrag inclusief btw, verplaatsing en eventuele extra afspraken?",[41,49006,49008],{"id":49007},"een-aanpasbaar-rekenmodel-in-plaats-van-verzonnen-marktprijzen","Een aanpasbaar rekenmodel in plaats van verzonnen marktprijzen",[12,49010,49011],{},"Vul alleen waarden in die uit je offerte of je eigen tijdsinschatting komen:",[12,49013,49014],{},[1300,49015,49016],{},"Totaalscenario = opname + tekenwerk + technische controle + herstellingen + keuring + verplaatsing + eigen tijd",[12,49018,49019],{},"Eigen werk waardeer je met een persoonlijke vergelijkingswaarde:",[12,49021,49022],{},[1300,49023,49024],{},"gewaardeerde eigen tijd = gedocumenteerde uren × eigen vergelijkingswaarde per uur",[12,49026,49027],{},"Die vergelijkingswaarde is geen Belgisch markttarief. Ze toont dat een weekend werk economisch niet automatisch gratis is. Omgekeerd is een extern forfait niet duur wanneer opname, meting, technische verantwoordelijkheid en nabewerking erin zitten.",[1396,49029,49031],{"id":49030},"scenario-a-alle-gegevens-zijn-beschikbaar","Scenario A: alle gegevens zijn beschikbaar",[12,49033,49034],{},"Het bord is netjes gelabeld, de kringtoewijzing gecontroleerd, er is een grondplan op schaal en de kenmerken van de beveiligingen zijn leesbaar. Dan bestaat het werk vooral uit gegevens overnemen, plausibiliteit controleren en tekenen. PlanElec levert daarvoor het gedeelde projectmodel van grondplan, topologie en bord en de pdf-uitvoer; een elektricien controleert gericht de gegevens.",[1396,49036,49038],{"id":49037},"scenario-b-oude-installatie-zonder-betrouwbare-documenten","Scenario B: oude installatie zonder betrouwbare documenten",[12,49040,49041],{},"Zijn doorsneden, plaatsingswijzen of toewijzingen onbekend, dan is tekenen de laatste stap. Eerst neemt een bekwame persoon de installatie veilig op; behuizingen openen, metingen en ingrepen horen in vakkundige handen. Hier kost de opname vaak meer dan het opstellen van de plannen, en precies die post hoort duidelijk in de offerte.",[1396,49043,49045],{"id":49044},"scenario-c-renovatie-met-open-ontwerpbeslissingen","Scenario C: renovatie met open ontwerpbeslissingen",[12,49047,49048,49049,39],{},"Bij nieuwe kringen, PV, thuisbatterij, laadpaal, warmtepomp of wijzigingen aan het bord ligt eerst het technische ontwerp vast; het schema documenteert die beslissing. Vraag een offerte die ontwerp, fabrikantgegevens, voorwaarden van de netbeheerder, uitvoering en keuring scheidt. Zo zie je later welke post veranderde. Welke renovatie nieuwe plannen vraagt, lees je in ",[30,49050,49051],{"href":33958},"Renovatie en AREI",[1396,49053,49055],{"id":49054},"scenario-d-verkoop-met-deadline","Scenario D: verkoop met deadline",[12,49057,49058,49059,39],{},"Tijdsdruk alleen rechtvaardigt geen spoedtoeslag. Vraag een schriftelijke offerte met leverdatum, voorwaarden en correctieproces. Spreek af wie het controlebezoek aanvraagt en welke bestaande verslagen in het dossier horen. Een snel getekend plan dat de werkelijke toestand niet toont, lost het documentatieprobleem niet op. Meer daarover in ",[30,49060,33898],{"href":37950},[41,49062,16940],{"id":16939},[49,49064,49065,49076],{},[52,49066,49067],{},[55,49068,49069,49071,49073],{},[58,49070,6315],{},[58,49072,4940],{},[58,49074,49075],{},"Omvang",[68,49077,49078,49089,49098,49108],{},[55,49079,49080,49083,49086],{},[73,49081,49082],{},"Early Access",[73,49084,49085],{},"0 EUR tot de start van de tarieven",[73,49087,49088],{},"volledige functionaliteit, geen factuur",[55,49090,49091,49093,49095],{},[73,49092,34345],{},[73,49094,34348],{},[73,49096,49097],{},"volledig ontwerp zonder project- of kringlimiet; exports met afdekvlakken over de bruikbare gegevens",[55,49099,49100,49102,49105],{},[73,49101,34356],{},[73,49103,49104],{},"12 EUR per pand, eenmalig",[73,49106,49107],{},"alle documenten zonder afdekvlakken voor precies één bevestigd adres",[55,49109,49110,49112,49114],{},[73,49111,5247],{},[73,49113,34369],{},[73,49115,49116],{},"alle projecten en documenten zonder afdekvlakken, drie bewerkingsplaatsen, elke extra plaats 5 EUR per maand of 50 EUR per jaar",[12,49118,49119],{},"Alle prijzen zijn exclusief 21 % btw; eenmalig gebruik kost dus 14,52 EUR inclusief btw. Bij twee panden per maand kosten twee keer eenmalig gebruik evenveel als Pro (24 EUR); vanaf drie panden per maand is Pro voordeliger. De startdatum van de tarieven kondigen we tijdig vooraf aan. Wie zich vóór de start registreert, gebruikt PlanElec vanaf de start de eerste volle kalendermaand gratis. Registratie, inloggen en uitnodigingen kosten nooit iets; kosten ontstaan alleen door een uitdrukkelijke boeking.",[41,49121,49123],{"id":49122},"wat-planelec-vandaag-bijdraagt","Wat PlanElec vandaag bijdraagt",[12,49125,49126],{},"PlanElec brengt grondplan, elektrische topologie en bordplanning samen in één project. Eendraadschema en situatieplan gaan centraal als pdf de deur uit, net als een samengesteld installatiedossier met voorblad en documentenlijst. De AREI\u002FRGIE-zelfcontrole beoordeelt de ondersteunde regels die uit je gegevens beslisbaar zijn en toont ontbrekende gegevens. De gedetailleerde, merkneutrale materiaallijst is beschikbaar als pilotfunctie; ze is geen bestelvrijgave.",[12,49128,49129,49130,49132,49133,39],{},"De rollen zijn daarmee duidelijk: PlanElec maakt de plannen uit je projectmodel en houdt de documenten consistent. Opname ter plaatse, technisch ontwerp en uitvoering blijven bij de elektricien, en het controleverslag schrijft het erkend organisme. Of dat voor jou loont, hangt af van hoe volledig je projectgegevens al zijn. Alles wat PlanElec kan, vind je in ",[30,49131,30146],{"href":30145},"; hoe het zich verhoudt tot Excel en papier, lees je in ",[30,49134,41228],{"href":40984},[41,49136,49138],{"id":49137},"zo-vraag-je-vergelijkbare-offertes-aan","Zo vraag je vergelijkbare offertes aan",[1602,49140,49141,49144,49147,49150,49153,49156,49159],{},[1453,49142,49143],{},"Beschrijf gebouw, aansluiting, aantal borden en gekende kringen.",[1453,49145,49146],{},"Vermeld bijzondere bronnen en lasten zoals PV, batterij, laadpaal of warmtepomp.",[1453,49148,49149],{},"Bezorg bestaande plannen en keuringsverslagen, zonder onbekende gegevens te raden.",[1453,49151,49152],{},"Vraag aparte posten voor opname, tekenwerk, technische controle, uitvoering en keuring.",[1453,49154,49155],{},"Vraag naar btw, verplaatsing, leverformaat en correctierondes.",[1453,49157,49158],{},"Vergelijk niet alleen het totaal, maar ook verantwoordelijkheid en dekking.",[1453,49160,49161],{},"Documenteer na wijzigingen de werkelijke toestand en bewaar de documenten in het installatiedossier.",[41,49163,49165],{"id":49164},"oplevering-en-revisie-als-aparte-prestatie","Oplevering en revisie als aparte prestatie",[12,49167,49168],{},"Een goede offerte vermeldt niet alleen “plan als pdf”, maar de opgeleverde stand van het werk. Spreek af welke bestaande documenten gecontroleerd werden, welke gegevens jij leverde en welke onbekenden open blijven. Leg vast hoeveel correctierondes inbegrepen zijn, wie wijzigingen na de werf meldt en welke bestandsversie daarna als uitgevoerde toestand geldt.",[12,49170,49171],{},"Voor de oplevering helpt een korte controlelijst: kloppen de kringcodes tussen bord, eendraadschema en situatieplan? Zijn nieuw en verwijderd materieel verwerkt? Zijn aannames als aannames gemarkeerd? Liggen datasheets en meetgegevens bij de verantwoordelijke? Pas die oplevering maakt tekenwerk, technische controle en later onderhoud vergelijkbaar. Een lage offerte zonder afgesproken revisie wordt bij de volgende wijziging snel duurder.",[41,49173,1394],{"id":1393},[1396,49175,49177],{"id":49176},"welke-gegevens-verzamel-ik-vóór-de-aanvraag","Welke gegevens verzamel ik vóór de aanvraag?",[12,49179,49180],{},"Begin met alles wat zonder ingreep zichtbaar is: adres en aansluitingstype, aantal en ligging van de borden, leesbare kenmerken van differentieelschakelaars en automaten, kringnamen, grondplan, vroegere schema's en keuringsverslagen. Noteer vaste verbruikers en bronnen apart. Markeer onbekende waarden uitdrukkelijk als onbekend. Een verzonnen doorsnede laat een tekening volledig lijken en maakt ze technisch waardeloos. Foto's helpen bij de voorbereiding; de veilige vaststelling van verborgen leidinggegevens vervangen ze niet.",[1396,49182,49184],{"id":49183},"welke-prestaties-verdwijnen-niet-in-een-planprijs","Welke prestaties verdwijnen niet in een “planprijs”?",[12,49186,49187],{},"Wijzigingen aan de installatie, foutopsporing, meetrapporten, dimensionering volgens fabrikantvoorwaarden en het oplossen van een keuringsopmerking zijn aparte prestaties. Ook de procedures bij de netbeheerder voor productie-installaties of opslag lopen niet automatisch mee. Zijn die stappen nodig, dan verschijnen ze als aparte post met resultaat, verantwoordelijke en termijn. Dat beschermt beide partijen: jij ziet wat geleverd wordt, en de installateur neemt geen verantwoordelijkheid voor niet-bestelde delen.",[1396,49189,49191],{"id":49190},"hoe-behandel-ik-wijzigingen-na-de-eerste-export","Hoe behandel ik wijzigingen na de eerste export?",[12,49193,49194],{},"Bewaar een traceerbare beginversie, voer bevestigde wijzigingen in project en situatieplan in en laat technische wijzigingen controleren. Noteer niet alleen “keuken gewijzigd”, maar welke kring, welke beveiliging, welke leiding en welke punten de wijziging raakt. Zo blijft de volgende correctieronde een beperkte update in plaats van een nieuwe opname.",[1396,49196,49198],{"id":49197},"mag-ik-het-schema-zelf-tekenen","Mag ik het schema zelf tekenen?",[12,49200,49201,49202,39],{},"Het AREI bepaalt wie het eendraadschema opstelt: de verantwoordelijke van de uitvoering van het werk (onderafdeling 3.1.2.1 a). Beslissend is dat de documenten de werkelijke toestand correct tonen en in de controleprocedure beschikbaar zijn. Zelf tekenen is niet zelf installeren: opname aan spanningvoerende delen en uitvoering blijven voorbehouden aan vakmensen. Een vergelijking van beide wegen vind je in de ",[30,49203,49204],{"href":40976},"kostenvergelijking zelf tekenen of elektricien",[1396,49206,49208],{"id":49207},"betekent-een-pdf-uit-planelec-dat-de-installatie-conform-is","Betekent een pdf uit PlanElec dat de installatie conform is?",[12,49210,49211],{},"Nee. De pdf documenteert je projectgegevens, en de zelfcontrole toetst de ondersteunde regels oriënterend. Of de gekeurde installatie aan de voorschriften voldoet, stelt het erkend organisme vast in de voorziene procedure.",[1396,49213,49215],{"id":49214},"wat-is-de-belangrijkste-kostendrijver","Wat is de belangrijkste kostendrijver?",[12,49217,49218],{},"Niet de woonoppervlakte, maar de onzekerheid over de werkelijke toestand en de afgesproken omvang. Gekende, geverifieerde gegevens verlagen de opname-inspanning; onbekende leidingen, meerdere borden of technische wijzigingen verhogen ze.",[41,49220,17166],{"id":41308},[12,49222,49223],{},"Een correcte prijs voor een elektriciteitsplan is een projectspecifieke offerte. Scheid opname, tekenwerk, technische controle, werken en keuring, waardeer ook je eigen tijd en vergelijk gelijke prestaties. PlanElec structureert de documentatie en kost in Early Access niets; technisch ontwerp, uitvoering en keuring blijven aparte posten.",[12,49225,49226],{},[30,49227,49228],{"href":6989},"Start je project in de gratis Early Access →",{"title":1467,"searchDepth":1468,"depth":1468,"links":49230},[49231,49232,49233,49234,49240,49241,49242,49243,49244,49252],{"id":48804,"depth":1468,"text":48805},{"id":48823,"depth":1468,"text":48824},{"id":48909,"depth":1468,"text":48910},{"id":49007,"depth":1468,"text":49008,"children":49235},[49236,49237,49238,49239],{"id":49030,"depth":1486,"text":49031},{"id":49037,"depth":1486,"text":49038},{"id":49044,"depth":1486,"text":49045},{"id":49054,"depth":1486,"text":49055},{"id":16939,"depth":1468,"text":16940},{"id":49122,"depth":1468,"text":49123},{"id":49137,"depth":1468,"text":49138},{"id":49164,"depth":1468,"text":49165},{"id":1393,"depth":1468,"text":1394,"children":49245},[49246,49247,49248,49249,49250,49251],{"id":49176,"depth":1486,"text":49177},{"id":49183,"depth":1486,"text":49184},{"id":49190,"depth":1486,"text":49191},{"id":49197,"depth":1486,"text":49198},{"id":49207,"depth":1486,"text":49208},{"id":49214,"depth":1486,"text":49215},{"id":41308,"depth":1468,"text":17166},"2026-02-19","Wat de prijs van een Belgisch elektriciteitsplan bepaalt, hoe je offertes vergelijkt met een aanpasbaar rekenmodel en wat PlanElec kost in Early Access en na de start van de tarieven.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-electrical-plan-costs-editorial.jpg","\u002Fblog\u002Felectrical-plan-costs.nl",{"title":33886,"description":49254},"kosten-elektriciteitsplan","blog\u002Felectrical-plan-costs.nl",[3275,3276,3273,6216,41345,49262,49263,17499,39039,49264,1513,47443,47444,47445,47446],"prijs","elektriciteitsplan","immobilieverkoop","K87tqsCZr_26CvZFsHM4_catQIhW5G1UKwVPEP1HJc0",{"id":49267,"title":49268,"articleId":49269,"body":49270,"category":1493,"date":50114,"description":50115,"extension":1496,"image":49283,"lastUpdated":50116,"locale":1497,"meta":50117,"navigation":1499,"ogImage":50118,"path":50119,"publishDate":4037,"readTime":2482,"refreshInterval":11097,"seo":50120,"seoTitle":50121,"slug":50122,"stem":50123,"tags":50124,"__hash__":50126,"kind":1515,"href":17361},"blog\u002Fblog\u002Felectrical-inspection.nl.md","Elektrische keuring in België: aanvragen, herkeuring en AREI-eisen","electrical-inspection",{"type":9,"value":49271,"toc":50092},[49272,49276,49279,49284,49287,49293,49297,49384,49387,49391,49397,49483,49489,49493,49496,49552,49555,49559,49588,49591,49595,49601,49618,49624,49628,49631,49707,49710,49714,49717,49737,49741,49744,49769,49772,49778,49782,49785,49802,49805,49809,49812,49816,49819,49822,49826,49829,49920,49923,49927,49930,49933,49937,49943,49949,49992,50000,50004,50007,50033,50038,50042,50045,50047,50053,50081,50087],[41,49273,49275],{"id":49274},"wat-is-een-elektrische-keuring","Wat is een elektrische keuring?",[12,49277,49278],{},"De elektrische keuring – ook keuring van de elektrische installatie of elektriciteitskeuring genoemd – is de controle van je elektrische installatie door een erkend organisme. Een nieuwe installatie wordt vóór de ingebruikname gecontroleerd op gelijkvormigheid met het AREI (Boek 1, hoofdstuk 6.4); daarna volgen controlebezoeken, voor huishoudelijke installaties ten minste om de 25 jaar (afdeling 6.5.2). Het organisme bekijkt de documenten, inspecteert de installatie, beproeft de beveiligingen en meet isolatie- en aardingsweerstand. Pas met een positief verslag stelt de netbeheerder het vermogen van een nieuwe installatie ter beschikking (onderafdeling 6.4.6.2).",[12,49280,49281],{},[22,49282],{"alt":47221,"src":49283},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-electrical-inspection-editorial.webp",[12,49285,49286],{},"Welke controle voor jou geldt, hangt af van de aanleiding: nieuwbouw, belangrijke uitbreiding, periodiek bezoek, verkoop van een woning met een oude installatie of een verhoging van het aansluitvermogen. Deze gids zet de gevallen op een rij, noemt de eisen die de keurder bij een woning doorgaans controleert en toont hoe je de documenten voorbereidt zodat plan en installatie overeenkomen.",[12,49288,49289,49292],{},[15,49290,49291],{},"Redactie en controle: PlanElec-team, 8 oktober 2026."," Alle vindplaatsen verwijzen naar AREI Boek 1, versie 06, van toepassing sinds 1 april 2026.",[41,49294,49296],{"id":49295},"wanneer-heb-je-een-keuring-nodig","Wanneer heb je een keuring nodig?",[49,49298,49299,49310],{},[52,49300,49301],{},[55,49302,49303,49305,49308],{},[58,49304,48847],{},[58,49306,49307],{},"Wat wordt gecontroleerd",[58,49309,37986],{},[68,49311,49312,49321,49332,49343,49353,49363,49373],{},[55,49313,49314,49316,49319],{},[73,49315,48858],{},[73,49317,49318],{},"Gelijkvormigheidscontrole vóór ingebruikname",[73,49320,33493],{},[55,49322,49323,49326,49329],{},[73,49324,49325],{},"Belangrijke wijziging of uitbreiding, bijvoorbeeld een nieuwe kring",[73,49327,49328],{},"Toegevoegde of gewijzigde delen; betrokken ongewijzigde delen voor wat de gewijzigde kenmerken betreft",[73,49330,49331],{},"onderafdeling 6.4.7.3",[55,49333,49334,49337,49340],{},[73,49335,49336],{},"Niet-belangrijke wijziging, bijvoorbeeld een stopcontact op een bestaande kring",[73,49338,49339],{},"Geen controle vóór ingebruikname; een korte beschrijving hoort in het dossier",[73,49341,49342],{},"afdeling 9.1.2 nr. 7",[55,49344,49345,49347,49350],{},[73,49346,38846],{},[73,49348,49349],{},"Huishoudelijke installaties ten minste om de 25 jaar, andere installaties om de 5 jaar",[73,49351,49352],{},"afdeling 6.5.2",[55,49354,49355,49358,49361],{},[73,49356,49357],{},"Verkoop van een wooneenheid met een oude installatie (vóór 1 oktober 1981)",[73,49359,49360],{},"Controlebezoek dat de verkoper laat uitvoeren",[73,49362,48892],{},[55,49364,49365,49368,49371],{},[73,49366,49367],{},"Verhoging van het aansluitvermogen bij een oude woninginstallatie",[73,49369,49370],{},"Controlebezoek vóór de netbeheerder het vermogen verhoogt",[73,49372,48903],{},[55,49374,49375,49378,49381],{},[73,49376,49377],{},"Negatief verslag",[73,49379,49380],{},"Nieuwe controle nadat de inbreuken zijn verholpen",[73,49382,49383],{},"hoofdstuk 9.1, afdeling 8.4.2",[12,49385,49386],{},"Een wijziging is belangrijk als ze een bijkomende, nog niet door een gelijkvormigheidscontrole gedekte invloed heeft op de veiligheid van personen of goederen (definitie in deel 2). Beschrijf de werken daarom concreet aan je elektricien en aan het organisme, in plaats van alleen „renovatie” aan te vinken. Zo plant het organisme het juiste controletype en de juiste omvang.",[41,49388,49390],{"id":49389},"elektrische-keuring-aanvragen-bij-welk-organisme","Elektrische keuring aanvragen: bij welk organisme?",[12,49392,49393,49394,39],{},"Een elektrische keuring vraag je aan bij een erkend organisme. Dat is een keuringsorganisme dat de minister van Energie erkent voor gelijkvormigheidscontroles vóór de ingebruikname en voor controlebezoeken (afdeling 6.3.1). Om erkend te worden, moet het organisme geaccrediteerd zijn volgens NBN EN ISO\u002FIEC 17020 als keuringsinstelling van type A (onderafdeling 6.3.3.1 a). Ook de daarvoor bevoegde overheid mag de controle uitvoeren (afdelingen 6.4.1 en 6.5.1). De actuele lijst van erkende organismen publiceert de ",[30,49395,19073],{"href":39149,"rel":49396},[2532],[49,49398,49399,49410],{},[52,49400,49401],{},[55,49402,49403,49405,49408],{},[58,49404,8306],{},[58,49406,49407],{},"Wat je bij de aanvraag moet weten",[58,49409,37986],{},[68,49411,49412,49422,49431,49441,49451,49462,49473],{},[55,49413,49414,49416,49419],{},[73,49415,48858],{},[73,49417,49418],{},"Keuring aanvragen vóór de ingebruikname; zonder positief verslag stelt de netbeheerder geen vermogen ter beschikking",[73,49420,49421],{},"6.4.1, 6.4.6.2",[55,49423,49424,49426,49429],{},[73,49425,33429],{},[73,49427,49428],{},"Keuring vóór de ingebruikname van het nieuwe deel; de controle beperkt zich tot het toegevoegde of gewijzigde deel",[73,49430,33452],{},[55,49432,49433,49435,49438],{},[73,49434,38846],{},[73,49436,49437],{},"De uiterste datum staat in het verslag van de vorige controle",[73,49439,49440],{},"6.4.6.4 b.6, 6.5.2",[55,49442,49443,49446,49449],{},[73,49444,49445],{},"Verkoop van een woning met een oude installatie",[73,49447,49448],{},"De verkoper laat het controlebezoek uitvoeren; de datum van het verslag komt in de authentieke akte",[73,49450,37517],{},[55,49452,49453,49456,49459],{},[73,49454,49455],{},"Verzwaring van de aansluiting bij een oude installatie",[73,49457,49458],{},"Het controleverslag gaat mee met de aanvraag tot verzwaring",[73,49460,49461],{},"8.4.1",[55,49463,49464,49467,49470],{},[73,49465,49466],{},"Herkeuring na een negatief periodiek controlebezoek",[73,49468,49469],{},"Het aanvullende bezoek doet hetzelfde erkend organisme",[73,49471,49472],{},"6.5.7.2 b.6, 9.1.3.2",[55,49474,49475,49478,49481],{},[73,49476,49477],{},"Herkeuring na een verkoopkeuring",[73,49479,49480],{},"De koper kiest het erkend organisme vrij",[73,49482,37517],{},[12,49484,49485,49488],{},[15,49486,49487],{},"Deze gegevens houd je bij de aanvraag klaar."," Het verslag vermeldt onder meer naam en adres van de eigenaar, beheerder of uitbater, de EAN-code van de installatie (indien beschikbaar), het adres van de installatie en het type lokalen dat ze bedient (onderafdelingen 6.4.6.4 b.1 en 6.5.7.2 b.1). Bij een gelijkvormigheidscontrole komen daar de verantwoordelijke voor de uitvoering van de werken, met btw-nummer indien van toepassing, en de distributienetbeheerder bij. Welke praktische vragen je bij het maken van de afspraak stelt, lees je verderop in dit artikel.",[41,49490,49492],{"id":49491},"hoe-lang-is-een-elektrische-keuring-geldig","Hoe lang is een elektrische keuring geldig?",[12,49494,49495],{},"Een positief keuringsverslag bevestigt de conformiteit op het moment van de controle; het volgende controlebezoek moet ten laatste plaatsvinden binnen de termijn van afdeling 6.5.2. Voor een huishoudelijke installatie is dat om de 25 jaar, en het verslag van de gelijkvormigheidscontrole vermeldt de uiterste datum zelf (onderafdeling 6.4.6.4 b.6).",[49,49497,49498,49510],{},[52,49499,49500],{},[55,49501,49502,49505,49508],{},[58,49503,49504],{},"Soort installatie",[58,49506,49507],{},"Controlebezoek ten minste",[58,49509,20865],{},[68,49511,49512,49523,49533,49543],{},[55,49513,49514,49517,49520],{},[73,49515,49516],{},"Huishoudelijke installatie",[73,49518,49519],{},"om de 25 jaar",[73,49521,49522],{},"6.5.2",[55,49524,49525,49528,49531],{},[73,49526,49527],{},"Andere installaties, bijvoorbeeld niet-huishoudelijk",[73,49529,49530],{},"om de 5 jaar",[73,49532,49522],{},[55,49534,49535,49538,49541],{},[73,49536,49537],{},"Verplaatsbare, mobiele of tijdelijke installatie",[73,49539,49540],{},"jaarlijks",[73,49542,49522],{},[55,49544,49545,49548,49550],{},[73,49546,49547],{},"Installatie in een ontploffingsgevaarlijke zone",[73,49549,49540],{},[73,49551,49522],{},[12,49553,49554],{},"Een keuring „verlengen” voorziet Boek 1 niet. Nadert de datum uit je laatste verslag, dan laat je een nieuw controlebezoek uitvoeren; daarna begint de periodieke termijn opnieuw. Ook na een controlebezoek van een oude installatie gelden voor elk later bezoek de afdelingen 6.5.1 en 6.5.2 (afdeling 8.4.1 en onderafdeling 8.4.2.3).",[1396,49556,49558],{"id":49557},"wanneer-heb-je-vroeger-een-nieuwe-keuring-nodig","Wanneer heb je vroeger een nieuwe keuring nodig?",[1450,49560,49561,49566,49571,49577,49582],{},[1453,49562,49563,49565],{},[15,49564,33429],{},": gelijkvormigheidscontrole van dat deel vóór de ingebruikname (onderafdeling 6.4.7.3).",[1453,49567,49568,49570],{},[15,49569,49445],{},": als de installatie van vóór 1 oktober 1981 is en dat deel nog geen controlebezoek kreeg (onderafdeling 8.4.2.1).",[1453,49572,49573,49576],{},[15,49574,49575],{},"Verzwaring van de aansluiting"," bij een oude huishoudelijke installatie (afdeling 8.4.1).",[1453,49578,49579,49581],{},[15,49580,49377],{},": een herkeuring nadat de inbreuken verholpen zijn (zie verderop: installatie in orde brengen en herkeuring).",[1453,49583,49584,49587],{},[15,49585,49586],{},"Installatie gekeurd volgens het oud AREI",": het eerste controlebezoek volgens afdeling 6.5.2 gebeurt binnen de termijn uit het laatste verslag volgens het oud AREI (afdeling 8.1.2).",[12,49589,49590],{},"Verkoop je een woning waarvan de installatie al een gelijkvormigheidscontrole of controlebezoek kreeg, dan valt ze niet onder het toepassingsgebied van afdeling 8.4.2. Het dossier met schema's, plannen en verslagen draag je wel over aan de nieuwe eigenaar (afdeling 9.1.2), en de termijn uit het laatste verslag blijft gelden.",[41,49592,49594],{"id":49593},"deze-documenten-leg-je-voor","Deze documenten leg je voor",[12,49596,7641,49597,49600],{},[30,49598,48216],{"href":27024,"rel":49599},[2532]," noemt minstens het eendraadschema, het situatieplan en – indien beschikbaar – de EAN-code van de aansluiting.",[1450,49602,49603,49608,49613],{},[1453,49604,49605,49607],{},[15,49606,3764],{}," (Eindrahtschema \u002F schéma unifilaire): alle borden, kringen, beveiligingen en leidingen met hun kenmerken (onderafdeling 3.1.2.2).",[1453,49609,49610,49612],{},[15,49611,3836],{}," (Situationsplan \u002F plan de position): de ligging van borden, dozen, contactdozen, lichtpunten, schakelaars, vaste toestellen en bronnen (onderafdeling 3.1.2.3).",[1453,49614,49615,49617],{},[15,49616,47354],{}," voor bijzonder materieel. Bij een PV-installatie horen de gebruiksaanwijzing, de veiligheidsinstructies en de technische gegevens van de componenten in het dossier (afdeling 9.1.2).",[12,49619,49620,49621,39],{},"Bij de gelijkvormigheidscontrole bevestigt het verslag uitdrukkelijk dat de installatie volgens eendraadschema en situatieplan is uitgevoerd (onderafdeling 6.4.6.4, b.4). Een plan met een oude toestand valt dus net zo goed op als een ontbrekende tekening. Wat een situatieplan precies is, lees je in ",[30,49622,49623],{"href":26446},"Wat is een situatieplan",[41,49625,49627],{"id":49626},"deze-eisen-controleert-de-keurder-bij-een-woning","Deze eisen controleert de keurder bij een woning",[12,49629,49630],{},"De tabel bundelt eisen uit Boek 1 die bij huishoudelijke installaties geregeld centraal staan. Ze vervangt de volledige tekst niet, maar toont je waar je vóór de afspraak moet kijken.",[49,49632,49633,49641],{},[52,49634,49635],{},[55,49636,49637,49639],{},[58,49638,41506],{},[58,49640,20865],{},[68,49642,49643,49650,49657,49665,49672,49680,49687,49694,49700],{},[55,49644,49645,49648],{},[73,49646,49647],{},"Differentieelschakelaar van ten hoogste 300 mA aan de oorsprong van de installatie",[73,49649,37047],{},[55,49651,49652,49655],{},[73,49653,49654],{},"Differentieel met hoge of zeer hoge gevoeligheid (ten hoogste 30 mA) voor contactdozen, verlichting, badkamer\u002Fdouche en wasmachine, droogkast en vaatwasser; ten hoogste acht eindkringen per toestel",[73,49656,37047],{},[55,49658,49659,49662],{},[73,49660,49661],{},"Aardingsweerstand onder 100 Ω; boven 30 Ω minstens twee differentiëlen met hoge gevoeligheid met elk ten hoogste 16 contactdozen en ten hoogste 100 mA voor de overige kringen",[73,49663,49664],{},"4.2.3.2 en 4.2.4.3 b",[55,49666,49667,49670],{},[73,49668,49669],{},"Beveiliging afgestemd op de doorsnede, bv. 1,5 mm²: automaat 16 A of smeltzekering 10 A; 2,5 mm²: 20 A of 16 A",[73,49671,38981],{},[55,49673,49674,49677],{},[73,49675,49676],{},"Kringen met contactdozen minstens 2,5 mm²; ten hoogste acht enkelvoudige of meervoudige contactdozen per eindkring",[73,49678,49679],{},"5.2.1.2 en 5.3.5.2 b",[55,49681,49682,49685],{},[73,49683,49684],{},"Minstens twee gescheiden verlichtingskringen als de woning meer dan twee ruimten telt",[73,49686,48598],{},[55,49688,49689,49692],{},[73,49690,49691],{},"Eigen kring voor wasmachine, vaatwasser, droogkast, fornuis, kookplaat, oven en elk toestel met vaste standplaats vanaf 2600 W",[73,49693,36901],{},[55,49695,49696,49698],{},[73,49697,41629],{},[73,49699,38038],{},[55,49701,49702,49705],{},[73,49703,49704],{},"Isolatieweerstand per kring minstens 500 kΩ bij een proefspanning van 500 V gelijkstroom",[73,49706,47280],{},[12,49708,49709],{},"Dertig ohm is geen goed\u002Fafkeurgrens: daarboven eist Boek 1 een strengere opbouw van de differentiëlen, onder 100 Ω moet de aarding hoe dan ook liggen. De toelaatbare stroom van een leiding hangt bovendien af van plaatsingswijze, isolatie en omgevingstemperatuur (4.4.1.4). Laat dimensionering en beveiligingsconcept dus bevestigen door je elektricien.",[1396,49711,49713],{"id":49712},"typische-struikelblokken","Typische struikelblokken",[12,49715,49716],{},"Deze punten vallen in de praktijk vaak op; een betrouwbare rangorde bestaat niet:",[1450,49718,49719,49722,49725,49728,49731,49734],{},[1453,49720,49721],{},"het eendraadschema ontbreekt of toont een oude toestand",[1453,49723,49724],{},"te weinig of verkeerd toegewezen differentiëlen met hoge gevoeligheid",[1453,49726,49727],{},"een aardingsweerstand zonder de bijhorende beveiligingsopbouw",[1453,49729,49730],{},"leidingen die onvoldoende bevestigd of mechanisch beschermd zijn",[1453,49732,49733],{},"aftakdozen zonder deksel of onbereikbaar",[1453,49735,49736],{},"slechts één verlichtingskring in een woning met meer dan twee ruimten",[41,49738,49740],{"id":49739},"wat-gebeurt-er-tijdens-de-keuring-van-de-elektrische-installatie","Wat gebeurt er tijdens de keuring van de elektrische installatie?",[12,49742,49743],{},"De gelijkvormigheidscontrole gebeurt spanningsloos en bestaat uit vier delen (afdeling 6.4.1):",[1602,49745,49746,49752,49757,49763],{},[1453,49747,49748,49751],{},[15,49749,49750],{},"Administratieve controle",": documenten, installatiegegevens en vergelijking van eendraadschema en situatieplan met de uitvoering.",[1453,49753,49754,49756],{},[15,49755,47252],{},": materieel, leidingen, afdekkingen, aanduidingen en bereikbaarheid.",[1453,49758,49759,49762],{},[15,49760,49761],{},"Controle door beproevingen",": bijvoorbeeld de werking van de beveiligingen en de continuïteit van beschermingsgeleiders en equipotentiale verbindingen.",[1453,49764,49765,49768],{},[15,49766,49767],{},"Controle door metingen",": isolatieweerstand (6.4.5.1) en aardingsweerstand van de aardelektrode (6.4.5.2).",[12,49770,49771],{},"Het verslag vermeldt aardingsweerstand en isolatieniveau en bevestigt dat differentiëlen en aardingswaarde, en overstroombeveiliging en leidingen, op elkaar zijn afgestemd (6.4.6.4, b.4). Is de installatie conform, dan viseert de keurder eendraadschema en situatieplan en vermeldt hij de datum waarvoor het volgende controlebezoek moet plaatsvinden (b.6).",[12,49773,49774,49775,39],{},"Volgens versie 06 verzegelt de keurder bij een conforme installatie ook de differentieelschakelaar aan de oorsprong. Vanaf 1 november 2026 vervalt die verplichting met Boek 1 versie 07; de details lees je in ons artikel ",[30,49776,49777],{"href":17503},"Verzegeling van de differentieel vervalt",[41,49779,49781],{"id":49780},"stem-documenten-en-uitvoering-vóór-de-afspraak-af","Stem documenten en uitvoering vóór de afspraak af",[12,49783,49784],{},"Vergelijk beide plannen systematisch met de uitgevoerde installatie:",[1602,49786,49787,49790,49793,49796,49799],{},[1453,49788,49789],{},"Kloppen de kringaanduidingen in het bord, op het eendraadschema en op het situatieplan?",[1453,49791,49792],{},"Zijn nominale waarden, aantal polen, kabeltype en doorsnede juist genoteerd?",[1453,49794,49795],{},"Staan nieuwe contactdozen, lichtpunten, vaste toestellen en bronnen op het plan?",[1453,49797,49798],{},"Zijn verbindings- en aftakdozen terug te vinden en bereikbaar?",[1453,49800,49801],{},"Liggen de fabrikantdocumenten voor PV, laadpaal, batterij of ander bijzonder materieel klaar?",[12,49803,49804],{},"Een mooie tekening met een oude toestand helpt je niet, en een technisch degelijke installatie heeft toch de voorgeschreven plannen nodig. Markeer open punten en los ze vóór de afspraak op met je elektricien.",[41,49806,49808],{"id":49807},"visuele-controle-en-metingen-voorbereiden","Visuele controle en metingen voorbereiden",[12,49810,49811],{},"Meetwaarden ontstaan op de dag zelf aan jouw installatie. Neem geen waarden over uit een oud verslag en zet geen geschatte waarden op de plannen. Zorg voor veilige toegang tot het bord, de aardingsonderbreker en alle ruimten; labels moeten leesbaar zijn en afdekkingen volledig. Meld bijzonderheden zoals PV, batterij, noodstroom, laadpunt of oudere installatiedelen vooraf. Openen en meten onder spanning is werk voor de vakman, geen onderdeel van jouw voorbereiding.",[41,49813,49815],{"id":49814},"vragen-bij-het-maken-van-de-afspraak","Vragen bij het maken van de afspraak",[12,49817,49818],{},"Geef het organisme door of het om huishoudelijk of niet-huishoudelijk gebruik gaat, welk controletype je nodig hebt, hoeveel borden er zijn en welke bijzondere bronnen. Vraag of de documenten digitaal of op papier verwacht worden, of alle ruimten bereikbaar moeten zijn en hoe een lopende renovatie wordt behandeld. Tarief, betaalwijze en annuleringsvoorwaarden laat je rechtstreeks bevestigen; prijzen van een andere aanbieder gelden niet automatisch voor jou.",[12,49820,49821],{},"Bij een verkoopkeuring vermeld je het bouwjaar en eerdere verslagen. Bij een belangrijke uitbreiding beschrijf je wat oud en wat nieuw is. Bij PV, batterij of laadpaal noem je de bedrijfswijze en de fabrikantdocumenten. Zo plant het organisme controletype en benodigde tijd correct.",[41,49823,49825],{"id":49824},"wat-kost-een-elektrische-keuring-of-herkeuring","Wat kost een elektrische keuring of herkeuring?",[12,49827,49828],{},"Boek 1 legt geen tarieven vast: de prijs van een keuring of herkeuring spreek je af met het erkend organisme. Wat wel uit het reglement volgt, is wat de omvang van de controle bepaalt – en dus het werk ter plaatse:",[49,49830,49831,49842],{},[52,49832,49833],{},[55,49834,49835,49837,49840],{},[58,49836,32569],{},[58,49838,49839],{},"Waarom het meetelt",[58,49841,20865],{},[68,49843,49844,49855,49866,49877,49888,49899,49909],{},[55,49845,49846,49849,49852],{},[73,49847,49848],{},"Type controle",[73,49850,49851],{},"Gelijkvormigheidscontrole, periodiek controlebezoek en verkoopkeuring hebben elk een eigen inhoud en verslag",[73,49853,49854],{},"6.4, 6.5, 8.4.2",[55,49856,49857,49860,49863],{},[73,49858,49859],{},"Huishoudelijk of niet-huishoudelijk",[73,49861,49862],{},"Andere verslaginhoud en een andere periodiciteit",[73,49864,49865],{},"6.4.6.4, 6.4.6.5, 6.5.2",[55,49867,49868,49871,49874],{},[73,49869,49870],{},"Omvang van de installatie",[73,49872,49873],{},"Het verslag van een controlebezoek vermeldt het aantal borden en eindstroombanen",[73,49875,49876],{},"6.5.7.2 b.3",[55,49878,49879,49882,49885],{},[73,49880,49881],{},"Huishoudelijke PV-installatie (≤ 10 kVA)",[73,49883,49884],{},"Bijkomende beproevingen: scheiding bij wegvallen van de netspanning en werking van de differentieelschakelaar",[73,49886,49887],{},"7.112.3",[55,49889,49890,49893,49896],{},[73,49891,49892],{},"Ontbrekende plannen bij een verkoopkeuring",[73,49894,49895],{},"De agent-bezoeker maakt een summiere beschrijving en schets; het ontbreken wordt als inbreuk vermeld",[73,49897,49898],{},"8.4.2.2 d",[55,49900,49901,49904,49907],{},[73,49902,49903],{},"Wijziging of uitbreiding",[73,49905,49906],{},"De controle beperkt zich tot het toegevoegde of gewijzigde deel",[73,49908,33452],{},[55,49910,49911,49914,49917],{},[73,49912,49913],{},"Herkeuring",[73,49915,49916],{},"Het nazicht betreft het verdwijnen van de vastgestelde inbreuken",[73,49918,49919],{},"9.1.3.2",[12,49921,49922],{},"Vraag daarom een prijs voor jouw concrete controletype en omvang, en laat bevestigen of een herkeuring apart wordt aangerekend. Een tarief van een ander organisme of uit een oud verslag geldt niet automatisch voor jou. Liggen eendraadschema en situatieplan klaar, dan hoeft de agent-bezoeker bij een verkoopkeuring geen noodschets te maken – en vermijd je meteen een inbreuk.",[41,49924,49926],{"id":49925},"op-de-keuringsdag","Op de keuringsdag",[12,49928,49929],{},"Zorg voor een contactpersoon die de installatie kent. Verwijder geen vaste afdekkingen op voorhand, tenzij het organisme daarom vraagt; veilige toegang is belangrijker dan geïmproviseerd openen. Zorg dat huisdieren, opgeslagen spullen of gesloten ruimten de toegang niet blokkeren.",[12,49931,49932],{},"Noteer vragen, maar wijzig tijdens de controle niets aan de installatie. Controleer het verslag bij ontvangst op naam en adres, controletype, omvang van de installatie en vermelde documenten. Technische bezwaren breng je zakelijk en schriftelijk aan, met verwijzing naar de concrete vaststelling. Was een ruimte of installatiedeel niet bereikbaar, lees dan in het verslag hoe dat de conclusie beïnvloedt en vraag of een extra bezoek nodig is.",[41,49934,49936],{"id":49935},"na-het-verslag","Na het verslag",[12,49938,49939,49942],{},[15,49940,49941],{},"Positief verslag:"," het bevestigt de beoordeling op dat moment en binnen die omvang. Bewaar het samen met eendraadschema en situatieplan in het dossier van de installatie, dat je in twee exemplaren bezit en bij verkoop aan de nieuwe eigenaar overdraagt (afdeling 9.1.2). Elke latere wijziging noteer je in het dossier.",[12,49944,49945,49948],{},[15,49946,49947],{},"Negatief verslag:"," je behandelt elke inbreuk afzonderlijk. De gevolgen hangen af van het controletype:",[49,49950,49951,49962],{},[52,49952,49953],{},[55,49954,49955,49957,49960],{},[58,49956,38823],{},[58,49958,49959],{},"Gevolg van een negatief verslag",[58,49961,20865],{},[68,49963,49964,49973,49982],{},[55,49965,49966,49968,49971],{},[73,49967,49318],{},[73,49969,49970],{},"Het betrokken deel mag niet in gebruik genomen worden tot de inbreuken verholpen en opnieuw gecontroleerd zijn",[73,49972,38841],{},[55,49974,49975,49977,49979],{},[73,49976,38846],{},[73,49978,38849],{},[73,49980,49981],{},"9.1.3.2, 6.5.7.2 b.6 en b.7",[55,49983,49984,49987,49990],{},[73,49985,49986],{},"Verkoopkeuring van een oude installatie",[73,49988,49989],{},"De koper laat het herstel binnen 18 maanden na de verkoopakte opnieuw controleren; het organisme kiest hij vrij",[73,49991,37517],{},[12,49993,10081,49994,49997,49998,39],{},[30,49995,37870],{"href":37868,"rel":49996},[2532]," licht de procedures verder toe. Hoe je na een negatief resultaat stap voor stap te werk gaat, lees je in ",[30,49999,38667],{"href":38666},[41,50001,50003],{"id":50002},"installatie-in-orde-brengen-en-herkeuring","Installatie in orde brengen en herkeuring",[12,50005,50006],{},"Je elektriciteit in orde brengen betekent: elke inbreuk uit het verslag laten verhelpen en het herstel laten nakijken door een erkend organisme. Na een controlebezoek gebeuren de werken zonder vertraging, en zolang de installatie in dienst blijft, neem je maatregelen zodat de inbreuken geen gevaar vormen voor personen of goederen (onderafdeling 9.1.3.2). Na een gelijkvormigheidscontrole mag het betrokken deel pas in gebruik na herstel en nieuwe controle (onderafdeling 9.1.3.1).",[1602,50008,50009,50015,50021,50027],{},[1453,50010,50011,50014],{},[15,50012,50013],{},"Lees elke inbreuk met haar vindplaats."," Het verslag somt de inbreuken op (onderafdelingen 6.4.6.4 b.5 en 6.5.7.2 b.5); behandel ze één voor één.",[1453,50016,50017,50020],{},[15,50018,50019],{},"Laat het herstel uitvoeren en bevestigen"," door je elektricien, per inbreuk en met de betrokken kring.",[1453,50022,50023,50026],{},[15,50024,50025],{},"Werk de documenten bij."," Wijzigt het herstel kringen, beveiligingen of punten, dan pas je eendraadschema en situatieplan aan en noteer je de wijziging in het dossier (afdeling 9.1.2). Ontbrekende plannen zijn bij een verkoopkeuring zelf een inbreuk (onderafdeling 8.4.2.2 d).",[1453,50028,50029,50032],{},[15,50030,50031],{},"Vraag de herkeuring aan bij het juiste organisme."," Na een periodiek controlebezoek doet hetzelfde erkend organisme het aanvullende bezoek vóór de datum in het verslag (onderafdeling 6.5.7.2 b.6). Na een verkoopkeuring meldt de koper zijn identiteit en de datum van de akte aan het organisme van het eerste verslag en laat hij door een organisme naar keuze nagaan of de inbreuken na afloop van 18 maanden verdwenen zijn (onderafdeling 8.4.2.2 a).",[12,50034,50035,50036,39],{},"Wie niets doet, blijft niet onder de radar: zijn er bij het tweede bezoek na een periodieke controle nog inbreuken, dan stuurt het erkend organisme een kopie van het verslag naar de Algemene Directie Energie (onderafdeling 6.5.7.2 b.7 d). De volledige aanpak na een negatief resultaat staat in ",[30,50037,38667],{"href":38666},[41,50039,50041],{"id":50040},"leg-de-gekeurde-omvang-na-het-bezoek-vast","Leg de gekeurde omvang na het bezoek vast",[12,50043,50044],{},"Noteer welke borden, ruimten, bronnen en bedrijfswijzen werkelijk deel uitmaakten van de controle en vergelijk dat met de omschrijving in het verslag. Een positief verslag voor een duidelijk afgebakend deel zegt niets over later toegevoegde of niet bezochte delen. Bewaar de voorgelegde planversie ongewijzigd bij het verslag en maak voor latere werken een nieuwe, gedateerde versie. Zo blijft aantoonbaar welke uitvoeringsstand beoordeeld werd. Wijzig je nadien vaste leidingen, beveiligingen of PV-, batterij- en laadfuncties, ga dan na of een nieuwe gelijkvormigheidscontrole nodig is.",[41,50046,39193],{"id":39192},[12,50048,50049,50050,50052],{},"De documentatie is vaak het zwaarste deel van de voorbereiding. ",[15,50051,1337],{}," brengt plattegrond, kringen en verdeelbord samen in één project en maakt daaruit je documenten:",[1450,50054,50055,50060,50065,50070,50075],{},[1453,50056,50057,50059],{},[15,50058,3764],{}," uit de ingevoerde elektrische topologie, als PDF",[1453,50061,50062,50064],{},[15,50063,3836],{}," op basis van je plattegrond met Belgische symbolenbibliotheek, als PDF",[1453,50066,50067,50069],{},[15,50068,39207],{}," die ontwerpfouten in de ondersteunde regels vóór de keuring zichtbaar maakt",[1453,50071,50072,50074],{},[15,50073,9474],{}," met voorblad, documentenlijst en doorlopende paginanummering",[1453,50076,50077,50080],{},[15,50078,50079],{},"Vier talen",": Nederlands, Frans, Duits en Engels",[12,50082,50083,50084,39],{},"De rollen zijn duidelijk verdeeld: de zelfcontrole toont je bevindingen uit de ingevoerde projectgegevens, je elektricien bevestigt dimensionering en uitvoering, en de keuring met metingen doet het erkend organisme. De lijst van erkende organismen publiceert de ",[30,50085,19073],{"href":39149,"rel":50086},[2532],[12,50088,50089],{},[30,50090,50091],{"href":6989},"Begin nu gratis met je elektrische documentatie →",{"title":1467,"searchDepth":1468,"depth":1468,"links":50093},[50094,50095,50096,50097,50100,50101,50104,50105,50106,50107,50108,50109,50110,50111,50112,50113],{"id":49274,"depth":1468,"text":49275},{"id":49295,"depth":1468,"text":49296},{"id":49389,"depth":1468,"text":49390},{"id":49491,"depth":1468,"text":49492,"children":50098},[50099],{"id":49557,"depth":1486,"text":49558},{"id":49593,"depth":1468,"text":49594},{"id":49626,"depth":1468,"text":49627,"children":50102},[50103],{"id":49712,"depth":1486,"text":49713},{"id":49739,"depth":1468,"text":49740},{"id":49780,"depth":1468,"text":49781},{"id":49807,"depth":1468,"text":49808},{"id":49814,"depth":1468,"text":49815},{"id":49824,"depth":1468,"text":49825},{"id":49925,"depth":1468,"text":49926},{"id":49935,"depth":1468,"text":49936},{"id":50002,"depth":1468,"text":50003},{"id":50040,"depth":1468,"text":50041},{"id":39192,"depth":1468,"text":39193},"2026-01-08","Elektrische keuring aanvragen bij een erkend organisme: hoe lang ze geldig is, wanneer een herkeuring nodig is, wat de kost bepaalt en wat de keurder controleert – met AREI-vindplaatsen.","2026-10-08",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-electrical-inspection-editorial.jpg","\u002Fblog\u002Felectrical-inspection.nl",{"title":49268,"description":50115},"Elektrische keuring: aanvragen, herkeuring en geldigheid","elektrische-keuring","blog\u002Felectrical-inspection.nl",[3275,3276,17499,33956,3273,6216,50125,17497,22648,39039,1513,47443,47444,47445,47446],"conformiteitsverklaring","MmFFitj_m6jBio7Tp-m011_Lr0fdDGgA-COU8gWD8o8",{"id":50128,"title":50129,"articleId":50130,"body":50131,"category":16481,"date":50960,"description":50961,"extension":1496,"image":50144,"lastUpdated":50116,"locale":1497,"meta":50962,"navigation":1499,"ogImage":50963,"path":50964,"publishDate":4037,"readTime":50965,"refreshInterval":11097,"seo":50966,"seoTitle":4037,"slug":50967,"stem":50968,"tags":50969,"__hash__":50972,"kind":1515,"href":7514},"blog\u002Fblog\u002Fsingle-line-diagram.nl.md","Eendraadschema maken in België: stap-voor-stap AREI-gids","single-line-diagram",{"type":9,"value":50132,"toc":50928},[50133,50139,50145,50152,50156,50164,50167,50171,50223,50231,50235,50238,50320,50328,50332,50336,50361,50364,50368,50371,50423,50426,50430,50440,50454,50458,50461,50487,50491,50494,50497,50501,50577,50584,50588,50592,50596,50602,50604,50608,50611,50615,50618,50622,50625,50639,50643,50646,50650,50682,50686,50689,50692,50696,50699,50702,50706,50709,50781,50794,50798,50801,50805,50808,50812,50815,50818,50822,50825,50828,50832,50835,50839,50842,50845,50847,50858,50862,50865,50882,50886],[12,50134,50135,50138],{},[15,50136,50137],{},"Een eendraadschema maak je in vier stappen: verbruikers per ruimte opnemen, beveiligingen en kringen vastleggen, de topologie met eenduidige referenties controleren en het schema samen met het situatieplan als pdf uitvoeren."," Het AREI legt inhoud en codering vast in afdeling 3.1.2; de symbolen staan in tabel 2.23. In PlanElec ontstaat het schema rechtstreeks uit je projectmodel: jij vult de technische gegevens aan en controleert het resultaat.",[12,50140,50141],{},[22,50142],{"alt":50143,"src":50144},"Elektriciens bereiden een installatieproject voor.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-single-line-diagram-editorial.webp",[12,50146,50147,50148,50151],{},"Wil je eerst een voorbeeld zien? Open het ",[30,50149,50150],{"href":6984},"fictieve pdf-dossier",". Het toont de echte exportopbouw met voorbeeldgegevens; voor je eigen installatie vul je de werkelijke gegevens in.",[41,50153,50155],{"id":50154},"wat-is-een-eendraadschema","Wat is een eendraadschema?",[12,50157,50158,50159,48189,50161,50163],{},"Een eendraadschema (Frans: ",[17563,50160,47444],{},[17563,50162,47443],{},") is een vereenvoudigd elektrisch schema dat de structuur van je volledige installatie met genormaliseerde symbolen toont. Een bedradingsschema tekent elke geleider apart; het eendraadschema stelt elke kring voor met één lijn en vermeldt aantal geleiders, doorsnede en beveiliging als opschrift.",[12,50165,50166],{},"Voor elke nieuwe huishoudelijke installatie en voor elke belangrijke wijziging of uitbreiding maakt de verantwoordelijke voor de uitvoering een eendraadschema en een situatieplan (AREI 3.1.2.1 a). Voor bestaande installaties en niet-belangrijke wijzigingen gelden eigen, beperktere regels. Het erkend organisme beoordeelt bij de keuring het concrete dossier en de uitgevoerde installatie.",[41,50168,50170],{"id":50169},"waarvoor-heb-je-het-eendraadschema-nodig","Waarvoor heb je het eendraadschema nodig?",[49,50172,50173,50182],{},[52,50174,50175],{},[55,50176,50177,50179],{},[58,50178,14382],{},[58,50180,50181],{},"Wat het schema doet",[68,50183,50184,50191,50199,50207,50215],{},[55,50185,50186,50188],{},[73,50187,997],{},[73,50189,50190],{},"verplicht document voor nieuwe installaties en belangrijke wijzigingen of uitbreidingen (3.1.2.1 a); bij conformiteit ondertekenen de verantwoordelijke en het erkend organisme schema en plan",[55,50192,50193,50196],{},[73,50194,50195],{},"Veiligheidsoverzicht",[73,50197,50198],{},"toont alle beveiligingen en hun volgorde van voedingspunt tot verbruiker",[55,50200,50201,50204],{},[73,50202,50203],{},"Onderhoud en foutzoeken",[73,50205,50206],{},"elke vakman vindt kringen en onderdelen terug via letter en nummer",[55,50208,50209,50212],{},[73,50210,50211],{},"Latere wijzigingen",[73,50213,50214],{},"basis om uitbreidingen te plannen en te documenteren",[55,50216,50217,50220],{},[73,50218,50219],{},"Verkoop van een wooneenheid",[73,50221,50222],{},"schema en plan horen bij het dossier dat je aan de koper overhandigt (9.1.2); ontbreken ze bij het controlebezoek bij verkoop van een oude installatie (vóór 1981), dan maakt het erkend organisme alleen een summiere beschrijving en schets en noteert het ontbreken als inbreuk (8.4.2.2 d)",[31245,50224,50225],{},[12,50226,50227,50230],{},[15,50228,50229],{},"Belangrijk:"," de documenten tonen de actuele toestand en liggen ter plaatse klaar (3.1.2.1 d). Bij een niet-belangrijke wijziging volstaat een gedateerde en ondertekende korte beschrijving in plaats van een nieuw schema; het situatieplan werk je wel bij.",[41,50232,50234],{"id":50233},"symbolen-voor-het-eendraadschema-wat-arei-tabel-223-omvat","Symbolen voor het eendraadschema: wat AREI-tabel 2.23 omvat",[12,50236,50237],{},"Tabel 2.23 in hoofdstuk 2.13 is de officiële, niet-limitatieve symbolenlijst voor eendraadschema en situatieplan. Staat een symbool er niet in, dan gebruik je een ander ondubbelzinnig teken en verklaar je het in de legende (3.1.2.1 a). De tabel is in groepen ingedeeld:",[49,50239,50240,50249],{},[52,50241,50242],{},[55,50243,50244,50246],{},[58,50245,8711],{},[58,50247,50248],{},"Voorbeelden uit tabel 2.23",[68,50250,50251,50259,50267,50275,50282,50290,50298,50305,50313],{},[55,50252,50253,50256],{},[73,50254,50255],{},"A. Algemeen",[73,50257,50258],{},"gelijkstroom, wisselstroom, eenfasige en driefasige wisselstroom",[55,50260,50261,50264],{},[73,50262,50263],{},"B. Schakelapparatuur",[73,50265,50266],{},"verdeelbord, verbindings- en aftakdoos, aftakkast, aardingsonderbreker",[55,50268,50269,50272],{},[73,50270,50271],{},"C. Leidingen",[73,50273,50274],{},"aantal geleiders en plaatsingswijze (ingebouwd, zichtbaar, in buis, ondergronds), bv. XVB-Cca met drie geleiders van 2,5 mm² zichtbaar op de wand",[55,50276,50277,50279],{},[73,50278,25968],{},[73,50280,50281],{},"smeltzekering (bv. 16 A gG), automaat met aanduiding van de ontkoppelaars M, O en Δ, differentieelschakelaar (voorbeeld 300 mA, type A, 40 A), aarding",[55,50283,50284,50287],{},[73,50285,50286],{},"E. Schakelaars",[73,50288,50289],{},"schakelaar, serie-, wissel- en kruisschakelaar, dimmer, drukknop, tijdschakelaar, teleruptor, thermostaat, bewegingssensor",[55,50291,50292,50295],{},[73,50293,50294],{},"F. Stopcontacten",[73,50296,50297],{},"contactdoos (stopcontact), meervoudige contactdoos, dichte contactdoos, contactdoos met randaarde, met kinderbescherming, datacontactdoos",[55,50299,50300,50302],{},[73,50301,26001],{},[73,50303,50304],{},"lichtpunt, wandlicht, fornuis en kookplaat, wasmachine, droogkast, vaatwasser, boiler, motor, laadpaal, kWh-meter",[55,50306,50307,50310],{},[73,50308,50309],{},"H. Bronnen",[73,50311,50312],{},"transformator, zonnecel, omvormer, DC\u002FDC-omzetter",[55,50314,50315,50317],{},[73,50316,26023],{},[73,50318,50319],{},"sturingseenheid met basissymbool en type sturing (drukknop, draadloos, geprogrammeerd, sensor)",[12,50321,50322,50323,50325,50326,39],{},"Een apart symbool voor overspanningsbeveiliging of equipotentiale verbinding staat niet in de tabel. Zulke onderdelen teken je met een ondubbelzinnig teken dat je in de legende verklaart. Het volledige overzicht vind je in ",[30,50324,44407],{"href":25786},", de schakelaartypes in ",[30,50327,26435],{"href":25849},[41,50329,50331],{"id":50330},"eendraadschema-tekenen-stap-voor-stap-met-planelec","Eendraadschema tekenen: stap voor stap met PlanElec",[1396,50333,50335],{"id":50334},"stap-1-de-installatie-opnemen","Stap 1: de installatie opnemen",[1602,50337,50338,50341,50344],{},[1453,50339,50340],{},"Open PlanElec en maak een nieuw project aan.",[1453,50342,50343],{},"Maak de ruimtes van je gebouw aan: woonkamer, keuken, slaapkamers, badkamer, technische ruimte.",[1453,50345,50346,50347],{},"Plaats per ruimte de elektrische punten:\n",[1450,50348,50349,50352,50355,50358],{},[1453,50350,50351],{},"stopcontacten (enkel, meervoudig, dicht)",[1453,50353,50354],{},"lichtpunten en hun schakelaars",[1453,50356,50357],{},"vast aangesloten toestellen zoals oven, kookplaat of boiler",[1453,50359,50360],{},"aparte kringen voor laadpaal, warmtepomp of zonnepanelen",[12,50362,50363],{},"Heb je al een plan als pdf of scan, dan herkent PlanElec daarin muren, ruimtes en ondersteunde toestelsymbolen als bewerkbaar voorstel. De PlanElec-assistent geef je opdrachten in je eigen woorden, bijvoorbeeld \"Plaats drie stopcontacten in de keuken\".",[1396,50365,50367],{"id":50366},"stap-2-beveiligingen-vastleggen","Stap 2: beveiligingen vastleggen",[12,50369,50370],{},"PlanElec stelt kringen en beveiligingen voor als vertrekpunt. De minimale AREI-regels voor huishoudelijke installaties staan vooral in de onderafdelingen 5.3.5.1 b (hoofdschakelaar) en 4.2.4.3 b (differentieelbeveiliging):",[49,50372,50373,50382],{},[52,50374,50375],{},[55,50376,50377,50379],{},[58,50378,1802],{},[58,50380,50381],{},"Regel volgens het AREI",[68,50383,50384,50392,50400,50408,50416],{},[55,50385,50386,50389],{},[73,50387,50388],{},"Algemene lastscheidingsschakelaar",[73,50390,50391],{},"op het hoofdbord; onderbreekt alle lijngeleiders en eventueel de nulgeleider gelijktijdig; minstens 40 A",[55,50393,50394,50397],{},[73,50395,50396],{},"Differentieel aan het voedingspunt",[73,50398,50399],{},"minstens één differentieelschakelaar van hoogstens 300 mA (minstens type A, minstens 40 A); die verzorgt bovendien de scheidingsfunctie",[55,50401,50402,50405],{},[73,50403,50404],{},"Bijkomend differentieel (≤ 30 mA)",[73,50406,50407],{},"verplicht voor stopcontacten (behalve voor vaste toestellen), verlichting, ruimtes met bad of douche en wasmachine, droogkast en vaatwasser; hoogstens acht eindkringen per toestel",[55,50409,50410,50413],{},[73,50411,50412],{},"Automaat of smeltzekering",[73,50414,50415],{},"afgestemd op doorsnede, plaatsingswijze en belasting van de kring",[55,50417,50418,50420],{},[73,50419,38111],{},[73,50421,50422],{},"als je installatie dat vereist",[12,50424,50425],{},"Toets elk voorstel aan de werkelijk geplaatste toestellen, hun technische gegevens en de volledige dimensionering van de kring. Type, waarde en coördinatie van de differentieelschakelaars leg je vast voor de concrete beveiligingsketen.",[1396,50427,50429],{"id":50428},"stap-3-de-topologie-controleren","Stap 3: de topologie controleren",[12,50431,12598,50432,925,50434,50436,50437,50439],{},[15,50433,12532],{},[15,50435,19624],{}," uit de geplaatste verbruikers een voorstel met kringen en beveiligingen; met ",[15,50438,19633],{}," komt het in je project.",[1450,50441,50442,50445,50448,50451],{},[1453,50443,50444],{},"Kringen worden per functie gegroepeerd: verlichting, stopcontacten, aparte kringen.",[1453,50446,50447],{},"Elke kring krijgt een letter, elk punt een volgnummer (bv. C1, D1).",[1453,50449,50450],{},"De hiërarchie van voedingspunt tot laatste verbruiker is zichtbaar.",[1453,50452,50453],{},"Kabeltype en doorsnede staan bij elke kring.",[1396,50455,50457],{"id":50456},"stap-4-schema-afleiden-en-exporteren","Stap 4: schema afleiden en exporteren",[12,50459,50460],{},"PlanElec bouwt het eendraadschema op uit de ingevoerde kringen, beveiligingen, kabels en verbruikers:",[1450,50462,50463,50469,50475,50481],{},[1453,50464,50465,50468],{},[15,50466,50467],{},"Leesbare opbouw"," — van verdeelbord via kringen tot verbruikers",[1453,50470,50471,50474],{},[15,50472,50473],{},"Symbolencatalogus"," — elektrische symbolen voor de Belgische planningscontext",[1453,50476,50477,50480],{},[15,50478,50479],{},"Automatische labels"," — kringreferenties, kabeltypes en beveiligingswaarden",[1453,50482,50483,50486],{},[15,50484,50485],{},"Pdf-export"," — eendraadschema en situatieplan uit dezelfde opgeslagen projectstand",[41,50488,50490],{"id":50489},"van-opmeting-naar-één-gedeelde-referentie","Van opmeting naar één gedeelde referentie",[12,50492,50493],{},"Voor een elektrotechnisch bedrijf begint het schema bij de opmeting, niet bij het tekenen. Noteer per werkelijk punt minstens ruimte, functie, kring en volgnummer. Vul kabelgegevens en kenmerken van beveiligingen aan zodra je ze kent. Wat nog ontbreekt, blijft in het project zichtbaar als open controlepunt tot je het vóór de export aanvult of bevestigt.",[12,50495,50496],{},"In de installatieweergave verbind je deze gegevens tot een elektrisch pad. Een bestaand toestel uit het grondplan wijs je aan een kring toe; een tweede verbruiker aanmaken is niet nodig. Daarna lees je dezelfde projectgegevens in het eendraadschema en het situatieplan.",[422,50498],{":height":614,":width":19481,"alt":50499,"caption":50500,"src":19484},"Installatieoverzicht van het fictieve voorbeeldhuis met voeding, beveiligingen, kringen en verbruikers.","Hier controleer je de toewijzingen. Open gegevens en waarschuwingen blijven in het voorbeeldproject zichtbaar.",[49,50502,50503,50519],{},[52,50504,50505],{},[55,50506,50507,50510,50513,50516],{},[58,50508,50509],{},"Opmeting ter plaatse",[58,50511,50512],{},"Elektrische toewijzing",[58,50514,50515],{},"Weergave in het eendraadschema",[58,50517,50518],{},"Controle in het situatieplan",[68,50520,50521,50535,50549,50563],{},[55,50522,50523,50526,50529,50532],{},[73,50524,50525],{},"Toestel en ruimte, bijvoorbeeld een stopcontact in de leefruimte",[73,50527,50528],{},"bestaand toestel uit het grondplan aan de juiste kring toewijzen",[73,50530,50531],{},"passend catalogussymbool op de kringtak",[73,50533,50534],{},"dezelfde kringletter en hetzelfde volgnummer op het punt",[55,50536,50537,50540,50543,50546],{},[73,50538,50539],{},"Kring en voorgeschakelde beveiliging",[73,50541,50542],{},"voedingspad tot aan de verdeling volgen",[73,50544,50545],{},"beveiliging, tak en verbruiker in volgorde",[73,50547,50548],{},"punt blijft op zijn werkelijke plaats en verwijst naar dezelfde kring",[55,50550,50551,50554,50557,50560],{},[73,50552,50553],{},"Kabeltype, doorsnede, aantal geleiders en plaatsingswijze",[73,50555,50556],{},"gegevens van het betrokken kabeldeel controleren",[73,50558,50559],{},"kabelinformatie bij het deel",[73,50561,50562],{},"bij een gewijzigd deel het ruimtelijke traject apart controleren",[55,50564,50565,50568,50571,50574],{},[73,50566,50567],{},"Versie, datum en open controlepunten",[73,50569,50570],{},"opgeslagen projectstand vóór export nakijken",[73,50572,50573],{},"titelblok, referenties en zichtbare waarschuwingen",[73,50575,50576],{},"plan en schema als één documentstand lezen",[12,50578,50579,50580,50583],{},"De volledige werkwijze met echte productweergaven staat in de ",[30,50581,50582],{"href":11068},"installatiehandleiding over toewijzing, onderverdelers en schema",". De volgende beelden tonen twee andere perspectieven van hetzelfde fictieve project; de benamingen zijn voorbeeldwaarden.",[422,50585],{":height":19548,":width":19481,"alt":50586,"caption":50587,"src":19734},"Situatieplan van het fictieve voorbeeldhuis met ruimtelijke toestelreferenties zoals C1 en D1.","In het situatieplan controleer je plaats en referentie van het bestaande toestel en schakel je daarna terug naar het schema.",[422,50589],{":height":19548,":width":19481,"alt":50590,"caption":50591,"src":19551},"Uit het fictieve projectmodel afgeleid eendraadschema met beveiligingspad, kringtakken en symboollegende.","Een latere werkstand van hetzelfde fictieve project. De zichtbare waarschuwing hoort bij het voorbeeld.",[41,50593,50595],{"id":50594},"voorbeeld-van-een-eendraadschema-als-pdf","Voorbeeld van een eendraadschema als pdf",[12,50597,10081,50598,50601],{},[30,50599,50600],{"href":6984},"PlanElec-voorbeelddossier"," bevat een eendraadschema uit een fictief project, samen met het situatieplan en de andere documenten van de export. Gebruik het om de documentopbouw, kringreferenties en de samenhang met het situatieplan te begrijpen. In je eigen project komen alle gegevens uit de werkelijke installatie.",[41,50603,40883],{"id":40882},[1396,50605,50607],{"id":50606},"_1-onvolledige-kringen","1. Onvolledige kringen",[12,50609,50610],{},"Elke verbruiker moet via een sluitende keten van beveiligingen terug te volgen zijn tot het voedingspunt. Laat geen \"zwevende\" verbindingen staan.",[1396,50612,50614],{"id":50613},"_2-verkeerde-symbolen","2. Verkeerde symbolen",[12,50616,50617],{},"Gebruik de symbolen uit tabel 2.23. Typische fouten zijn oude DIN-symbolen of eigen notaties zonder legende. De PlanElec-catalogus zorgt voor een consistente weergave; voor de technische inhoud staat de opsteller in.",[1396,50619,50621],{"id":50620},"_3-ontbrekende-gegevens","3. Ontbrekende gegevens",[12,50623,50624],{},"Elke kring heeft nodig:",[1450,50626,50627,50630,50633,50636],{},[1453,50628,50629],{},"kringletter en nummers van de punten",[1453,50631,50632],{},"kabeltype, aantal geleiders en doorsnede (bv. XVB 3G2,5) en plaatsingswijze",[1453,50634,50635],{},"nominale waarde van de beveiliging (bv. 16 A of 20 A); tabelwaarden zijn bovengrenzen, de kabeldimensionering controleer je volledig",[1453,50637,50638],{},"aantal en soort verbruikers",[1396,50640,50642],{"id":50641},"_4-verouderd-schema","4. Verouderd schema",[12,50644,50645],{},"Na elke wijziging aan de installatie werk je het eendraadschema bij of voeg je bij een niet-belangrijke wijziging de korte beschrijving toe. Het erkend organisme ondertekent schema en plan alleen als het de conformiteit van de uitgevoerde installatie vaststelt (3.1.2.1 a).",[41,50647,50649],{"id":50648},"tips-voor-een-overzichtelijk-schema","Tips voor een overzichtelijk schema",[1450,50651,50652,50658,50664,50670,50676],{},[1453,50653,50654,50657],{},[15,50655,50656],{},"Overzichtelijk houden"," — geen onnodige kruisingen, geen overlappende labels",[1453,50659,50660,50663],{},[15,50661,50662],{},"Consequent noteren"," — overal dezelfde notatiestijl",[1453,50665,50666,50669],{},[15,50667,50668],{},"Alle kringen opnemen"," — ook deurbel en tuinverlichting",[1453,50671,50672,50675],{},[15,50673,50674],{},"Versie en datum vermelden"," — elk document draagt nummer, versie en versiedatum (3.1.2)",[1453,50677,50678,50681],{},[15,50679,50680],{},"Verplichte gegevens invullen"," — adres van de installatie en naam, hoedanigheid en eventueel btw-nummer van de verantwoordelijke",[41,50683,50685],{"id":50684},"verplichte-gegevens-systematisch-controleren","Verplichte gegevens systematisch controleren",[12,50687,50688],{},"Onderafdeling 3.1.2.2 a vraagt voor een huishoudelijk eendraadschema minstens: kenmerken van de leidingen (type, doorsnede, aantal geleiders), plaatsingswijze, type en kenmerken van differentieel- en overstroombeveiligingen, schakelaars, verbindings- en aftakdozen, stopcontacten, lichtpunten, vaste machines en toestellen en bronnen zoals zonnecel, omvormer of batterij. Volgens 3.1.2.1 a komen daar spanning en stroomsoort, het adres van de installatie en de gegevens van de verantwoordelijke bij.",[12,50690,50691],{},"Een hoofdletter duidt de elementaire kring aan. Lichtpunten, stopcontacten en sturingseenheden krijgen een nummer in de volgorde waarin ze in de kring voorkomen, vertrekkend vanaf de voorgeschakelde overstroombeveiliging. Het situatieplan neemt letter en nummer over. Een schakelaar draagt de letter van zijn kring en het nummer van het lichtpunt of toestel dat hij bedient. Die gedeelde sleutel maakt beide plannen samen leesbaar.",[41,50693,50695],{"id":50694},"volg-elke-elektrische-keten","Volg elke elektrische keten",[12,50697,50698],{},"Start bij de voeding en volg elke tak tot de laatste verbruiker. Vraag bij elke overgang: bestaat het toestel echt, is de functie duidelijk, is de kabel volledig beschreven en klopt de referentie op het situatieplan? Verbindings- en aftakdozen controleer je extra grondig; een vlakke rij symbolen geeft geen echte vertakking weer.",[12,50700,50701],{},"Bij meerdere bronnen blijven net, PV-omvormer en andere gemodelleerde voedingen als afzonderlijke paden leesbaar. Voor PV toont PlanElec strings per MPPT, DC-beveiliging en gedocumenteerde kabeldelen gestructureerd; onbekende of niet-toegewezen gegevens blijven als lacune zichtbaar.",[41,50703,50705],{"id":50704},"eendraadschema-met-zonnepanelen-wat-moet-erop","Eendraadschema met zonnepanelen: wat moet erop?",[12,50707,50708],{},"Zonnepanelen staan als bron op het eendraadschema: onderafdeling 3.1.2.2 a noemt bronnen zoals fotovoltaïsch paneel, omvormer en batterij uitdrukkelijk bij de minimale inhoud, en het situatieplan duidt hun plaats aan (onderafdeling 3.1.2.3 a). Symbolen voor fotovoltaïsch paneel en omvormer staan in groep H van tabel 2.23; de kenmerken van de bronnen zet je op het schema of houd je ter beschikking in het dossier (opmerking bij groep H). Voor huishoudelijke PV-installaties op laagspanning tot 10 kVA gelden bovendien de aanvullende eisen van hoofdstuk 7.112.",[49,50710,50711,50722],{},[52,50712,50713],{},[55,50714,50715,50718,50720],{},[58,50716,50717],{},"Wat",[58,50719,12845],{},[58,50721,20865],{},[68,50723,50724,50733,50742,50752,50762,50771],{},[55,50725,50726,50729,50731],{},[73,50727,50728],{},"Panelen, omvormer en eventuele batterij als bron",[73,50730,3273],{},[73,50732,17565],{},[55,50734,50735,50738,50740],{},[73,50736,50737],{},"Plaats van panelen, omvormer en batterij",[73,50739,3274],{},[73,50741,17572],{},[55,50743,50744,50747,50750],{},[73,50745,50746],{},"Gebruiksaanwijzing, veiligheidsvoorschriften en technische referenties (merk, model, vermogen)",[73,50748,50749],{},"dossier van de installatie",[73,50751,48288],{},[55,50753,50754,50757,50759],{},[73,50755,50756],{},"Markering van gelijkstroom- en actieve wisselstroomgeleiders",[73,50758,22552],{},[73,50760,50761],{},"7.112.2",[55,50763,50764,50767,50769],{},[73,50765,50766],{},"Waarschuwingsborden met „Niet onderbreken bij belasting” en „Elektrische installatie altijd onder spanning”",[73,50768,22552],{},[73,50770,50761],{},[55,50772,50773,50776,50778],{},[73,50774,50775],{},"Aantal en nominaal vermogen van de panelen; aantal, type, serienummer en maximaal AC-vermogen van de omvormer(s)",[73,50777,37947],{},[73,50779,50780],{},"7.112.4",[12,50782,50783,50784,50787,50788,50790,50791,39],{},"Hoe je strings, DC-beveiliging en omvormer concreet uitwerkt, lees je in ",[30,50785,50786],{"href":28125},"Zonnepanelen op het eendraadschema",". Combineer je PV met een laadpaal, kijk dan in ",[30,50789,28097],{"href":28592},"; de ruimtelijke kant staat in ",[30,50792,50793],{"href":28193},"Zonnepanelen op het situatieplan",[41,50795,50797],{"id":50796},"bestaande-installatie-en-wijzigingen","Bestaande installatie en wijzigingen",[12,50799,50800],{},"Bij belangrijke wijzigingen of uitbreidingen van een huishoudelijke installatie maak of actualiseer je eendraadschema en situatieplan. Bij een niet-belangrijke wijziging volstaat voor het schema een korte beschrijving met naam, hoedanigheid en adres van de verantwoordelijke, gedateerd en ondertekend; op het situatieplan toon je de wijziging wel (3.1.2.1 a). Delen waarvan de aanleg vóór 1 oktober 1981 begon, duid je op het schema aan met de vermelding \"oude installatie\". Deel 8 bevat gerichte afwijkingen voor bestaande delen, geen algemene vrijstelling van documentatie of veiligheid.",[41,50802,50804],{"id":50803},"technisch-juist-vóór-grafisch-mooi","Technisch juist vóór grafisch mooi",[12,50806,50807],{},"Een nette lijnvoering maakt het schema leesbaar, maar bewijst geen dimensionering. Doorsnede en beveiliging hangen af van plaatsingswijze, toelaatbare stroom, bundeling, temperatuur, spanningsval, kortsluitvoorwaarden en uitschakeling. Hetzelfde geldt voor het type differentieel, selectiviteit, overspanningsbeveiliging en voorschriften van de fabrikant. Een eigen symbool gebruik je alleen als het ondubbelzinnig is en in de legende staat; tabel 2.23 blijft de officiële basis.",[41,50809,50811],{"id":50810},"voorbeeld-van-een-volledige-kring","Voorbeeld van een volledige kring",[12,50813,50814],{},"\"Keuken\" alleen is geen label. Een bruikbare registratie noemt kring B, de voorgeschakelde beveiliging, de toewijzing aan het differentieel, kabeltype, aantal geleiders, doorsnede, plaatsingswijze en de genummerde verbruikers B1 tot B6. Een vast aangesloten kookplaat duid je aan als eigen toestel, los van de gewone stopcontacten. Een bestaande aftakdoos staat op haar echte plaats in de topologie.",[12,50816,50817],{},"Zo worden fouten vindbaar. Ontbreekt B4 op het situatieplan, dan is het plan onvolledig of bevat het schema een verbruiker te veel. Veranderen doorsnede of type na een doos, dan beschrijf je dat deel afzonderlijk; één standaardkabel voor de hele tak zou fout zijn.",[41,50819,50821],{"id":50820},"vrijgavecontrole-per-blad","Vrijgavecontrole per blad",[12,50823,50824],{},"Lees de pdf op echte uitvoergrootte. Controleer titelblok, bladnummer, versie, datum, adres, verantwoordelijke, spanning en stroomsoort. Kijk daarna of lijnen of labels afgesneden zijn, symbolen overlappen en de legende alle eigen tekens verklaart. Bij meerdere bladen blijven de vervolgaansluitingen herkenbaar.",[12,50826,50827],{},"Neem steekproeven van verdeelbord tot toestel en terug: een verlichtingskring met schakelaar, een vaste zware verbruiker en een bron zoals PV. Open of niet-toegewezen gegevens blijven zichtbaar. Verwijder geen waarschuwing alleen voor een mooier blad.",[41,50829,50831],{"id":50830},"wie-doet-wat","Wie doet wat",[12,50833,50834],{},"De verantwoordelijke voor de uitvoering maakt schema en plan, vermeldt zich erop en stemt de versie af op de uitvoering. De elektricien controleert dimensionering, beveiliging en de werkelijke installatie. Het erkende controleorganisme voert de keuring uit en ondertekent bij vastgestelde conformiteit. PlanElec levert daarvoor projectmodel, documenten en zelfcontrole.",[41,50836,50838],{"id":50837},"archief-en-latere-wijzigingen","Archief en latere wijzigingen",[12,50840,50841],{},"Bewaar de gekeurde versie met situatieplan, controleverslag en bewijsstukken in het dossier van de installatie. Na een uitbreiding overschrijf je die geschiedenis niet: je vergelijkt het nieuwe ontwerp met de gekeurde stand, verhoogt de versie en documenteert de betrokken kringen. Zo blijft zichtbaar wat al gekeurd was, wat gepland werd en wat nieuw is uitgevoerd.",[12,50843,50844],{},"Ook de korte beschrijving van een niet-belangrijke wijziging hoort gedateerd en ondertekend in het dossier, en het situatieplan blijft actueel. Maken meerdere kleine ingrepen het schema onoverzichtelijk, dan maak je een geconsolideerde nieuwe versie en controleer je die volledig tegen het werkelijke verdeelbord.",[41,50846,33859],{"id":33858},[1450,50848,50849,50855],{},[1453,50850,50851],{},[30,50852,50854],{"href":28056,"rel":50853},[2532],"FOD Economie: AREI\u002FRGIE Boek 1, Versie 06",[1453,50856,50857],{},"Planinhoud: afdeling 3.1.2; symbolen: hoofdstuk 2.13, tabel 2.23; differentieelbeveiliging: onderafdelingen 4.2.4.3 b en 5.3.5.3 a; hoofdschakelaar: onderafdeling 5.3.5.1 b",[41,50859,50861],{"id":50860},"wat-planelec-voor-je-eendraadschema-doet","Wat PlanElec voor je eendraadschema doet",[12,50863,50864],{},"PlanElec brengt grondplan, elektrische topologie en verdeelbord samen in één project en leidt daaruit eendraadschema en situatieplan af.",[1450,50866,50867,50870,50873,50876,50879],{},[1453,50868,50869],{},"Geen CAD-software nodig, alles in de browser",[1453,50871,50872],{},"Eén projectmodel in plaats van dubbel overtypen tussen plan en schema",[1453,50874,50875],{},"PlanElec-assistent voor opdrachten in je eigen woorden; elke wijziging gaat door de zelfcontrole en is in één stap ongedaan te maken",[1453,50877,50878],{},"Indicatieve AREI\u002FRGIE-zelfcontrole: ze toont je fouten in de ondersteunde regels die uit projectgegevens beslisbaar zijn; de keuring doet het erkende controleorganisme",[1453,50880,50881],{},"Pdf-export van eendraadschema en situatieplan",[41,50883,50885],{"id":50884},"lees-ook","Lees ook",[1450,50887,50888,50892,50896,50901,50906,50911,50916,50920,50924],{},[1453,50889,50890],{},[30,50891,48415],{"href":25796},[1453,50893,50894],{},[30,50895,44883],{"href":5957},[1453,50897,50898],{},[30,50899,50900],{"href":36784},"Een verdeelkast plannen voor een Belgische installatie",[1453,50902,50903],{},[30,50904,50905],{"href":32842},"Een laadpaal documenteren in het eendraadschema",[1453,50907,50908],{},[30,50909,50910],{"href":17460},"De documenten voor de elektrische keuring voorbereiden",[1453,50912,50913],{},[30,50914,50915],{"href":17361},"Elektrische keuring aanvragen, geldigheid en herkeuring",[1453,50917,50918],{},[30,50919,37220],{"href":37430},[1453,50921,50922],{},[30,50923,27071],{"href":22651},[1453,50925,50926],{},[30,50927,33908],{"href":27119},{"title":1467,"searchDepth":1468,"depth":1468,"links":50929},[50930,50931,50932,50933,50939,50940,50941,50947,50948,50949,50950,50951,50952,50953,50954,50955,50956,50957,50958,50959],{"id":50154,"depth":1468,"text":50155},{"id":50169,"depth":1468,"text":50170},{"id":50233,"depth":1468,"text":50234},{"id":50330,"depth":1468,"text":50331,"children":50934},[50935,50936,50937,50938],{"id":50334,"depth":1486,"text":50335},{"id":50366,"depth":1486,"text":50367},{"id":50428,"depth":1486,"text":50429},{"id":50456,"depth":1486,"text":50457},{"id":50489,"depth":1468,"text":50490},{"id":50594,"depth":1468,"text":50595},{"id":40882,"depth":1468,"text":40883,"children":50942},[50943,50944,50945,50946],{"id":50606,"depth":1486,"text":50607},{"id":50613,"depth":1486,"text":50614},{"id":50620,"depth":1486,"text":50621},{"id":50641,"depth":1486,"text":50642},{"id":50648,"depth":1468,"text":50649},{"id":50684,"depth":1468,"text":50685},{"id":50694,"depth":1468,"text":50695},{"id":50704,"depth":1468,"text":50705},{"id":50796,"depth":1468,"text":50797},{"id":50803,"depth":1468,"text":50804},{"id":50810,"depth":1468,"text":50811},{"id":50820,"depth":1468,"text":50821},{"id":50830,"depth":1468,"text":50831},{"id":50837,"depth":1468,"text":50838},{"id":33858,"depth":1468,"text":33859},{"id":50860,"depth":1468,"text":50861},{"id":50884,"depth":1468,"text":50885},"2026-01-05","Zo maak en teken je een controleerbaar eendraadschema volgens het AREI: verplichte gegevens, symbolen uit tabel 2.23, een voorbeeld, zonnepanelen, kringreferenties en pdf-export met PlanElec.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-single-line-diagram-editorial.jpg","\u002Fblog\u002Fsingle-line-diagram.nl","15 min",{"title":50129,"description":50961},"eendraadschema-maken","blog\u002Fsingle-line-diagram.nl",[3275,3276,3273,47443,47444,50970,44952,50971,17499,17497,31224,47749,6216,1513],"single-line diagram","IEC 60617","17vxe0yznGd0u5eofn6Cl2Db5dzU0hOFWfB5BdJissg",{"id":50974,"title":17450,"articleId":50975,"body":50976,"category":5442,"date":51368,"description":51369,"extension":1496,"image":50992,"lastUpdated":15381,"locale":1497,"meta":51370,"navigation":1499,"ogImage":51371,"path":51372,"publishDate":4037,"readTime":7016,"refreshInterval":1503,"seo":51373,"seoTitle":4037,"slug":51374,"stem":51375,"tags":51376,"__hash__":51381,"kind":1515,"href":17449},"blog\u002Fblog\u002Farei-regulations-2026.nl.md","arei-regulations-2026",{"type":9,"value":50977,"toc":51348},[50978,50982,50988,50993,51005,51009,51013,51092,51096,51156,51159,51163,51166,51170,51176,51181,51185,51188,51191,51211,51214,51218,51222,51225,51233,51235,51238,51242,51245,51249,51252,51258,51261,51278,51282,51285,51288,51292,51298,51304,51310,51314,51317,51320,51323,51326,51333,51336,51340,51343],[41,50979,50981],{"id":50980},"wat-sinds-1-april-2026-geldt","Wat sinds 1 april 2026 geldt",[12,50983,50984,50987],{},[15,50985,50986],{},"Sinds 1 april 2026 geldt Boek 1 V06 van het AREI. De belangrijkste vernieuwing: geaarde gelijkstroomsystemen zijn nu systematisch geregeld – met DC-uitvoeringen van de stelsels TN, TT en IT, eigen geleideraanduidingen en nieuwe gevoeligheidsklassen voor differentieelschakelaars bij zuivere gelijkstroom."," Voor de klassieke woninginstallatie op wisselstroom brengt deze versie geen algemene nieuwe verplichting. Op 1 november 2026 volgt met versie 07 nog een kleine wijziging: de verzegeling van de differentieelschakelaar aan het begin van de installatie vervalt.",[12,50989,50990],{},[22,50991],{"alt":50143,"src":50992},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-arei-regulations-2026-editorial.webp",[12,50994,50995,50996,51000,51001,39],{},"Het Belgische AREI – in het Frans RGIE – bestaat uit drie boeken; voor laagspanningsinstallaties in woningen is Boek 1 bepalend. De nieuwe versie steunt op het koninklijk besluit van 6 oktober 2025, gepubliceerd op 29 oktober 2025; een erratum van 5 november 2025 verbeterde alleen de weergave, niet de inhoud. De FOD Economie beschrijft de reikwijdte op de ",[30,50997,50999],{"href":28056,"rel":50998},[2532],"overzichtspagina van het actuele AREI","; daar staat ook de bindende ",[30,51002,51004],{"href":40951,"rel":51003},[2532],"versie van Boek 1 voor 2026",[12,51006,51007],{},[15,51008,37473],{},[41,51010,51012],{"id":51011},"de-wijzigingen-van-versie-06-in-één-oogopslag","De wijzigingen van versie 06 in één oogopslag",[49,51014,51015,51026],{},[52,51016,51017],{},[55,51018,51019,51021,51024],{},[58,51020,4091],{},[58,51022,51023],{},"Wat er veranderde",[58,51025,37986],{},[68,51027,51028,51039,51050,51060,51071,51081],{},[55,51029,51030,51033,51036],{},[73,51031,51032],{},"Stelsels",[73,51034,51035],{},"Geaarde gelijkstroomsystemen TN (TN-S, TN-C, TN-C-S), TT en IT naast de wisselstroomsystemen",[73,51037,51038],{},"2.2.1.2, 3.2.2.2",[55,51040,51041,51044,51047],{},[73,51042,51043],{},"Geleiders",[73,51045,51046],{},"Nieuwe aanduidingen L+, L−, M en PEM en PEL als gecombineerde beschermings- en actieve geleiders",[73,51048,51049],{},"deel 2",[55,51051,51052,51055,51058],{},[73,51053,51054],{},"Differentieelschakelaars",[73,51056,51057],{},"Gevoeligheidsklassen apart voor wisselstroom of gelijkstroom met rimpel en voor zuivere gelijkstroom",[73,51059,45561],{},[55,51061,51062,51065,51068],{},[73,51063,51064],{},"Bescherming tegen elektrische schok",[73,51066,51067],{},"Automatische uitschakeling voor DC-TN\u002FTT\u002FIT toegevoegd, isolatiebewaking in IT-stelsels verduidelijkt",[73,51069,51070],{},"4.2.3.4",[55,51072,51073,51075,51078],{},[73,51074,21575],{},[73,51076,51077],{},"Nieuwe eis voor mechanische en chemische weerstand en corrosiebescherming van de aardingsinstallatie",[73,51079,51080],{},"5.4.2.3",[55,51082,51083,51086,51089],{},[73,51084,51085],{},"Overgang",[73,51087,51088],{},"Voor eerder begonnen installaties blijven bepaalde tweefasige TN-kringen met kleine PEN en IT-installaties zonder permanente bewaking toegelaten",[73,51090,51091],{},"4.2.3.4 e, 6.5.8.2 nr. 5, 8.3.2.2 nr. 7",[1396,51093,51095],{"id":51094},"de-nieuwe-gevoeligheidsklassen-voor-differentieelschakelaars","De nieuwe gevoeligheidsklassen voor differentieelschakelaars",[49,51097,51098,51111],{},[52,51099,51100],{},[55,51101,51102,51105,51108],{},[58,51103,51104],{},"Gevoeligheid",[58,51106,51107],{},"Wisselstroom \u002F gelijkstroom met rimpel",[58,51109,51110],{},"Zuivere gelijkstroom",[68,51112,51113,51124,51135,51146],{},[55,51114,51115,51118,51121],{},[73,51116,51117],{},"Zeer hoog",[73,51119,51120],{},"ten hoogste 10 mA",[73,51122,51123],{},"ten hoogste 20 mA",[55,51125,51126,51129,51132],{},[73,51127,51128],{},"Hoog",[73,51130,51131],{},"meer dan 10 tot ten hoogste 30 mA",[73,51133,51134],{},"meer dan 20 tot ten hoogste 80 mA",[55,51136,51137,51140,51143],{},[73,51138,51139],{},"Middelmatig",[73,51141,51142],{},"meer dan 30 tot ten hoogste 1000 mA",[73,51144,51145],{},"meer dan 80 tot ten hoogste 1000 mA",[55,51147,51148,51151,51154],{},[73,51149,51150],{},"Laag",[73,51152,51153],{},"meer dan 1000 mA",[73,51155,51153],{},[12,51157,51158],{},"Waar Boek 1 een differentieel met „hoge gevoeligheid” eist, bijvoorbeeld voor contactdozen en badkamer (4.2.4.3 b), blijft voor wisselstroom de grens van 30 mA. Nieuw is de aparte schaal voor zuivere gelijkstroom (2.6.4).",[1396,51160,51162],{"id":51161},"overgangsregel-voor-eerder-begonnen-installaties","Overgangsregel voor eerder begonnen installaties",[12,51164,51165],{},"De overgangsregels betreffen vooral niet-huishoudelijke installaties: werd de uitvoering ter plaatse vóór de inwerkingtreding begonnen, dan mogen tweefasige TN-kringen met een PEN-doorsnede onder 10 mm² koper of 16 mm² aluminium in gebruik blijven. IT-installaties zonder permanente isolatiebewaking blijven toegelaten als de melding van een eerste fout om veiligheidsredenen niet nodig is, geen bijzonder geval de bewaking vereist en aan de basiseis van 4.2.3.4 d.2 voldaan is (6.5.8.2 nr. 5; voor oudere niet-huishoudelijke installaties 8.3.2.2 nr. 7). Projecten die vóór de scharnierdatum begonnen en pas daarna hun gelijkvormigheidscontrole krijgen, kunnen die afwijking via 4.2.3.4 e toepassen; het organisme vermeldt dat in het verslag. Of de voorwaarden vervuld zijn, lees je niet af uit een eendraadschema – dat verduidelijkt je vakman met het organisme.",[41,51167,51169],{"id":51168},"aanvulling-boek-1-versie-07-vanaf-1-november-2026","Aanvulling: Boek 1 versie 07 vanaf 1 november 2026",[12,51171,51172,51173,51175],{},"Het koninklijk besluit van 13 augustus 2026 (Belgisch Staatsblad van 15.09.2026) schrapt in de delen 4 en 6 van Boek 1 de verplichting om de differentieelschakelaar aan het begin van een huishoudelijke installatie bij conformiteit te verzegelen. Boek 1 krijgt daarmee versie 07, van toepassing vanaf ",[15,51174,17023],{},". Een vergelijking van de volledige teksten toont: dat is de enige inhoudelijke wijziging ten opzichte van versie 06.",[12,51177,51178,51179],{},"Details, vindplaatsen en het effect op keuringsverslagen: ",[30,51180,17010],{"href":17503},[41,51182,51184],{"id":51183},"gelijkstroom-wordt-systematisch-ingedeeld","Gelijkstroom wordt systematisch ingedeeld",[12,51186,51187],{},"Fotovoltaïsche panelen, thuisbatterijen, gelijkstroomverdelingen en terugleverende toestellen brengen gelijkstroom in gebouwen die tot nu toe alleen wisselstroom kenden. Versie 06 vult de bekende stelsels daarom aan met geaarde gelijkstroomsystemen (3.2.2.2). De letters TN, TT en IT beschrijven nog steeds hoe actieve geleiders, aarde en aanraakbare geleidende delen zich tot elkaar verhouden; de beschermingsmaatregel past nu wel bij de gelijkstroombron, de aarding en het uitschakelgedrag.",[12,51189,51190],{},"Niet elke woning heeft daarom een DC-net nodig. Maar zodra een DC-deel verder gaat dan de gewone, toestelinterne PV-bekabeling of een eigen geaarde verdeling vormt, documenteer je het niet als een gewone AC-kring. Verduidelijk met je vakman minstens:",[1450,51192,51193,51196,51199,51202,51205,51208],{},[1453,51194,51195],{},"Waar begint en eindigt het DC-deel van de installatie?",[1453,51197,51198],{},"Is het stelsel van de aarde geïsoleerd of bewust geaard, en op welk punt?",[1453,51200,51201],{},"Welke actieve geleiders worden geschakeld en gescheiden?",[1453,51203,51204],{},"Welke beschermingsmaatregel reageert bij een isolatiefout?",[1453,51206,51207],{},"Welke uitschakelvoorwaarden gelden voor de gekozen TN-, TT- of IT-uitvoering?",[1453,51209,51210],{},"Welke fabrikantgegevens begrenzen spanning, polariteit, beveiliging en leidingtracé?",[12,51212,51213],{},"Uit het begrip „batterij” of „PV” volgt geen bepaald aardingsstelsel en geen universele beschermingsoplossing. Het ontwerp maakt een gekwalificeerde elektricien; het erkend organisme beoordeelt de afgewerkte installatie volgens het geldende reglement en de voorgelegde documenten.",[41,51215,51217],{"id":51216},"wat-in-2026-niet-nieuw-is","Wat in 2026 niet nieuw is",[1396,51219,51221],{"id":51220},"laadpalen","Laadpalen",[12,51223,51224],{},"Het bijzondere hoofdstuk 7.22 voor laadinrichtingen bestond al vóór 2026. Het vraagt een eigen kring per aansluitpunt (7.22.3), een individuele differentieelschakelaar van ten hoogste 30 mA per AC-kring en bescherming bij isolatiefouten met gelijkstroomcomponent – via een daarvoor gebouwde differentieelschakelaar of via een differentieel met afgestemde DC-foutstroomdetectie (7.22.4.1 b). Welke combinatie past, volgt uit lader, beveiligingsketen en technische fiche van de fabrikant.",[12,51226,51227,51228,51232],{},"Bij bidirectionele laders komt de netaansluiting erbij: volgens het ",[30,51229,51231],{"href":28555,"rel":51230},[2532],"Synergrid-overzicht van decentrale productie-eenheden"," vallen ze onder C10\u002F11 en hebben ze een C10\u002F26-typehomologatie nodig. Zuiver unidirectionele laders van net naar voertuig vallen daar niet alleen om die reden onder.",[1396,51234,382],{"id":48157},[12,51236,51237],{},"Bad en douche blijven een apart hoofdstuk (7.1). Volumes, IP-eisen, toegelaten materieel en differentieelbescherming controleer je daar in de actuele tekst. Een algemene „nieuwe zone 3 vanaf 2026” bestaat niet. Ook IPX5 is niet algemeen voorgeschreven voor volume 1: tabel 7.3 noemt AD4 als minimum, dat stijgt naargelang de uitwendige invloeden, bijvoorbeeld bij reiniging met een waterstraal. Neem de geometrie en het vaste wateruitlaatpunt nauwkeurig op in plaats van een vereenvoudigde internetafbeelding over te nemen.",[1396,51239,51241],{"id":51240},"overspanningsbeveiliging-pv-en-digitale-documenten","Overspanningsbeveiliging, PV en digitale documenten",[12,51243,51244],{},"Overspanningsbeveiliging, PV-beveiligingsconcepten en elektronische documenten zijn geen nieuwe 2026-verplichtingen. Boek 1 bevat daarvoor eisen en principes waarvan de toepassing afhangt van installatie, risico, toesteltechniek en uitvoeringsdatum. Een elektronisch bezorgd keuringsverslag is bovendien geen nieuw materieel beveiligingsvoorschrift.",[41,51246,51248],{"id":51247},"welke-installatie-valt-onder-welke-regel","Welke installatie valt onder welke regel?",[12,51250,51251],{},"De beslissende vraag is: wanneer werd welk deel uitgevoerd, en welk werk gebeurt nu? Een bestaande installatie wordt verder met de toegelaten afwijkingen beoordeeld, een nieuwe kring voldoet aan de actuele eisen. Bij een belangrijke wijziging of uitbreiding volgt vóór ingebruikname een gelijkvormigheidscontrole van de wijziging en van haar invloed op het ongewijzigde deel (6.4.7.3).",[12,51253,7641,51254,51257],{},[30,51255,48216],{"href":27024,"rel":51256},[2532]," noemt de aanleidingen: vóór ingebruikname, bij belangrijke wijzigingen of uitbreidingen, bij bepaalde vermogensverhogingen, bij verkoop van een wooneenheid en periodiek. Kleine werken zoals een extra stopcontact op een bestaande kring kunnen als niet-belangrijke uitbreiding gelden; de indeling hangt af van de werkelijke omvang.",[12,51259,51260],{},"Voor een renovatieproject houd je best een korte wijzigingslijst bij:",[1602,51262,51263,51266,51269,51272,51275],{},[1453,51264,51265],{},"Bestaande toestand met datum of vermoedelijke periode van aanleg vastleggen.",[1453,51267,51268],{},"Nieuwe en ongewijzigde installatiedelen op het plan onderscheiden.",[1453,51270,51271],{},"Invloed van nieuwe bronnen, batterijen of laders op bord en beveiligingsketen nagaan.",[1453,51273,51274],{},"Open veronderstellingen met elektricien en organisme verduidelijken.",[1453,51276,51277],{},"Eendraadschema en situatieplan na de uitvoering bijwerken.",[41,51279,51281],{"id":51280},"dossier-en-plannen-wat-de-keuring-vraagt","Dossier en plannen: wat de keuring vraagt",[12,51283,51284],{},"De FOD noemt voor een huishoudelijke keuring minstens eendraadschema, situatieplan en – indien beschikbaar – de EAN-code. Het eendraadschema toont kringen, verbindingen en materieel met hun kenmerken, het situatieplan situeert borden, dozen, contactdozen, lichtpunten, schakelaars, vaste toestellen en bronnen. Beide horen in het dossier van de installatie, samen met keuringsverslagen, beschrijvingen van niet-belangrijke wijzigingen en technische documenten, bijvoorbeeld voor PV-componenten (9.1.2).",[12,51286,51287],{},"Bij een DC-systeem gaan de documenten verder dan een toestelnaam: eenduidige toewijzing van bronnen en leidingen, nominale spanningen, polariteit, scheidingspunten, beveiligingen, aardingsconcept en de verwijzing naar het fabrikantdocument. Een net plan vervangt geen berekening en geen meting, maar maakt zichtbaar of alle betrokkenen over dezelfde installatie spreken.",[41,51289,51291],{"id":51290},"praktische-controle-voor-projecten-in-2026","Praktische controle voor projecten in 2026",[12,51293,51294,51297],{},[15,51295,51296],{},"Regelstand nagaan."," Gebruik de versie die op de geplande uitvoeringsdatum geldt – tot 31 oktober 2026 versie 06, vanaf 1 november 2026 versie 07. Bepalend zijn de publicaties van de FOD Economie.",[12,51299,51300,51303],{},[15,51301,51302],{},"Toepassingsgebied bepalen."," Noteer of het om nieuwbouw, belangrijke uitbreiding, kleine wijziging, verkoop, periodieke keuring of vermogensverhoging gaat. Ga bij laders de richting van de energiestroom na; bidirectionele techniek brengt eisen van de netbeheerder mee die een unidirectionele lader niet heeft.",[12,51305,51306,51309],{},[15,51307,51308],{},"Bewijzen verzamelen."," Hou kabel- en beveiligingskeuze, fabrikantinstructies, meetwaarden en plannen samen. Bij DC-componenten vermelden de technische fiches de toegelaten aarding, het foutstroomgedrag en de uitschakeling; ontbreken die gegevens, vraag ze dan op bij de fabrikant.",[41,51311,51313],{"id":51312},"versiebeheer-in-het-project-organiseren","Versiebeheer in het project organiseren",[12,51315,51316],{},"Documenteer welke versie voor welke beslissing gold: uitvoeringsdatum, gebruikte versie van het boek, betrokken hoofdstukken, open technische vragen en verantwoordelijke controleurs. Loopt het ontwerp na een reglementswijziging verder, vergelijk dan gericht de betrokken punten in plaats van eerdere beslissingen ongezien te verwerpen.",[12,51318,51319],{},"Bij fabrikantdocumenten horen modelnaam, firmware- of variantstand en uitgiftedatum bij de referentie. Juist bij omvormers, batterijen en laders hebben uiterlijk gelijkaardige varianten vaak een andere foutstroomdetectie, andere aardingsvoorwaarden of andere netfuncties.",[12,51321,51322],{},"Scheid in vergaderverslagen drie niveaus: de bindende AREI-tekst, de technische interpretatie door de vakman en de regels die de softwarematige zelfcontrole nagaat. Zo blijft traceerbaar of een punt wettelijk vereist is, als goed vakmanschap gekozen werd of nog niet automatisch geëvalueerd is. Vóór de keuring geeft een verantwoordelijke de gedocumenteerde eindtoestand vrij en bevestigt zo dat plan, toestelstand en uitgevoerde installatie gelijklopen.",[41,51324,63],{"id":51325},"wat-planelec-doet",[12,51327,51328,51329,51332],{},"PlanElec leidt je van plattegrond via de elektrische topologie naar eendraadschema, situatieplan en PDF-export. De AREI\u002FRGIE-zelfcontrole meldt bevindingen in de ondersteunde regels die uit je projectgegevens beslisbaar zijn. De volledige reglementstekst houdt PlanElec op de stand van Boek 1 V06, geldig sinds ",[15,51330,51331],{},"1 april 2026","; de PlanElec-assistent beantwoordt vakvragen met bronnen uit die tekst.",[12,51334,51335],{},"De controlelogica dekt een gedocumenteerd deel van die regels. Geaarde DC-TN-, TT- en IT-systemen, hun geleiderrollen en de bijhorende beveiligingslogica zijn nog niet volledig gemodelleerd; herkent PlanElec zulke DC-delen, dan toont de controle ze als onvolledig beoordeeld in plaats van ze als geslaagd te tellen. Voor die punten leveren ontwerp, fabrikantdocumenten en het organisme het antwoord. PlanElec houdt de informatie gestructureerd en consistent; het positieve oordeel over de installatie geeft het erkend organisme.",[41,51337,51339],{"id":51338},"kort-besluit","Kort besluit",[12,51341,51342],{},"De echte vernieuwing van 2026 is de systematische opname van geaarde gelijkstroomsystemen in Boek 1, met nieuwe geleideraanduidingen en DC-gevoeligheidsklassen voor differentieelschakelaars; vanaf 1 november 2026 vervalt bovendien de verzegeling. Voor bestaande AC-woninginstallaties volgt daaruit geen algemene verbouwingsplicht. Bepaal eerst het toepassingsgeval, werk met de actuele officiële tekst en documenteer nieuwe AC- en DC-delen traceerbaar – zo hebben elektricien en organisme een stevige basis.",[12,51344,51345],{},[30,51346,51347],{"href":6989},"Structureer je elektrische documentatie met PlanElec →",{"title":1467,"searchDepth":1468,"depth":1468,"links":51349},[51350,51351,51355,51356,51357,51362,51363,51364,51365,51366,51367],{"id":50980,"depth":1468,"text":50981},{"id":51011,"depth":1468,"text":51012,"children":51352},[51353,51354],{"id":51094,"depth":1486,"text":51095},{"id":51161,"depth":1486,"text":51162},{"id":51168,"depth":1468,"text":51169},{"id":51183,"depth":1468,"text":51184},{"id":51216,"depth":1468,"text":51217,"children":51358},[51359,51360,51361],{"id":51220,"depth":1486,"text":51221},{"id":48157,"depth":1486,"text":382},{"id":51240,"depth":1486,"text":51241},{"id":51247,"depth":1468,"text":51248},{"id":51280,"depth":1468,"text":51281},{"id":51290,"depth":1468,"text":51291},{"id":51312,"depth":1468,"text":51313},{"id":51325,"depth":1468,"text":63},{"id":51338,"depth":1468,"text":51339},"2026-01-02","Wat er op 1 april 2026 in het AREI veranderde, wat op 1 november 2026 volgt en hoe je de gevolgen voor ontwerp, dossier en keuring inschat.",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-arei-regulations-2026-editorial.jpg","\u002Fblog\u002Farei-regulations-2026.nl",{"title":17450,"description":51369},"arei-reglementen-2026","blog\u002Farei-regulations-2026.nl",[3275,3276,51377,51378,51379,17499,3273,3274,51380,29610,1513],"regelgeving 2026","elektrische voorschriften","gelijkstroom","EV-lader","bL6PQwMvIB37usuFHP7NVqRuFNfIPeyq2_O2HIx3GcM"]