[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-nl-elektrische-keuring":3,"blog-alternates-blog-post-nl-elektrische-keuring-electrical-inspection":953,"blog-next-steps-blog-post-nl-elektrische-keuring-electrical-inspection":4253},{"id":4,"title":5,"articleId":6,"body":7,"category":919,"date":920,"description":921,"extension":922,"image":25,"lastUpdated":923,"locale":924,"meta":925,"navigation":926,"ogImage":927,"path":928,"publishDate":929,"readTime":930,"refreshInterval":931,"seo":932,"seoTitle":933,"slug":934,"stem":935,"tags":936,"__hash__":952},"blog\u002Fblog\u002Felectrical-inspection.nl.md","Elektrische keuring in België: aanvragen, herkeuring en AREI-eisen","electrical-inspection",{"type":8,"value":9,"toc":894},"minimark",[10,15,19,26,29,36,40,140,143,147,158,248,254,258,261,318,321,326,357,360,364,373,393,400,404,407,491,494,498,501,521,525,528,555,558,565,569,572,589,592,596,599,603,606,609,613,616,708,711,715,718,721,725,731,737,783,796,800,803,829,834,838,841,845,852,882,888],[11,12,14],"h2",{"id":13},"wat-is-een-elektrische-keuring","Wat is een elektrische keuring?",[16,17,18],"p",{},"De elektrische keuring – ook keuring van de elektrische installatie of elektriciteitskeuring genoemd – is de controle van je elektrische installatie door een erkend organisme. Een nieuwe installatie wordt vóór de ingebruikname gecontroleerd op gelijkvormigheid met het AREI (Boek 1, hoofdstuk 6.4); daarna volgen controlebezoeken, voor huishoudelijke installaties ten minste om de 25 jaar (afdeling 6.5.2). Het organisme bekijkt de documenten, inspecteert de installatie, beproeft de beveiligingen en meet isolatie- en aardingsweerstand. Pas met een positief verslag stelt de netbeheerder het vermogen van een nieuwe installatie ter beschikking (onderafdeling 6.4.6.2).",[16,20,21],{},[22,23],"img",{"alt":24,"src":25},"Controle van een Belgische woninginstallatie ter plaatse.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-electrical-inspection-editorial.webp",[16,27,28],{},"Welke controle voor jou geldt, hangt af van de aanleiding: nieuwbouw, belangrijke uitbreiding, periodiek bezoek, verkoop van een woning met een oude installatie of een verhoging van het aansluitvermogen. Deze gids zet de gevallen op een rij, noemt de eisen die de keurder bij een woning doorgaans controleert en toont hoe je de documenten voorbereidt zodat plan en installatie overeenkomen.",[16,30,31,35],{},[32,33,34],"strong",{},"Redactie en controle: PlanElec-team, 8 oktober 2026."," Alle vindplaatsen verwijzen naar AREI Boek 1, versie 06, van toepassing sinds 1 april 2026.",[11,37,39],{"id":38},"wanneer-heb-je-een-keuring-nodig","Wanneer heb je een keuring nodig?",[41,42,43,59],"table",{},[44,45,46],"thead",{},[47,48,49,53,56],"tr",{},[50,51,52],"th",{},"Aanleiding",[50,54,55],{},"Wat wordt gecontroleerd",[50,57,58],{},"Vindplaats Boek 1",[60,61,62,74,85,96,107,118,129],"tbody",{},[47,63,64,68,71],{},[65,66,67],"td",{},"Nieuwe installatie",[65,69,70],{},"Gelijkvormigheidscontrole vóór ingebruikname",[65,72,73],{},"hoofdstuk 6.4",[47,75,76,79,82],{},[65,77,78],{},"Belangrijke wijziging of uitbreiding, bijvoorbeeld een nieuwe kring",[65,80,81],{},"Toegevoegde of gewijzigde delen; betrokken ongewijzigde delen voor wat de gewijzigde kenmerken betreft",[65,83,84],{},"onderafdeling 6.4.7.3",[47,86,87,90,93],{},[65,88,89],{},"Niet-belangrijke wijziging, bijvoorbeeld een stopcontact op een bestaande kring",[65,91,92],{},"Geen controle vóór ingebruikname; een korte beschrijving hoort in het dossier",[65,94,95],{},"afdeling 9.1.2 nr. 7",[47,97,98,101,104],{},[65,99,100],{},"Periodiek controlebezoek",[65,102,103],{},"Huishoudelijke installaties ten minste om de 25 jaar, andere installaties om de 5 jaar",[65,105,106],{},"afdeling 6.5.2",[47,108,109,112,115],{},[65,110,111],{},"Verkoop van een wooneenheid met een oude installatie (vóór 1 oktober 1981)",[65,113,114],{},"Controlebezoek dat de verkoper laat uitvoeren",[65,116,117],{},"afdeling 8.4.2",[47,119,120,123,126],{},[65,121,122],{},"Verhoging van het aansluitvermogen bij een oude woninginstallatie",[65,124,125],{},"Controlebezoek vóór de netbeheerder het vermogen verhoogt",[65,127,128],{},"afdeling 8.4.1",[47,130,131,134,137],{},[65,132,133],{},"Negatief verslag",[65,135,136],{},"Nieuwe controle nadat de inbreuken zijn verholpen",[65,138,139],{},"hoofdstuk 9.1, afdeling 8.4.2",[16,141,142],{},"Een wijziging is belangrijk als ze een bijkomende, nog niet door een gelijkvormigheidscontrole gedekte invloed heeft op de veiligheid van personen of goederen (definitie in deel 2). Beschrijf de werken daarom concreet aan je elektricien en aan het organisme, in plaats van alleen „renovatie” aan te vinken. Zo plant het organisme het juiste controletype en de juiste omvang.",[11,144,146],{"id":145},"elektrische-keuring-aanvragen-bij-welk-organisme","Elektrische keuring aanvragen: bij welk organisme?",[16,148,149,150,157],{},"Een elektrische keuring vraag je aan bij een erkend organisme. Dat is een keuringsorganisme dat de minister van Energie erkent voor gelijkvormigheidscontroles vóór de ingebruikname en voor controlebezoeken (afdeling 6.3.1). Om erkend te worden, moet het organisme geaccrediteerd zijn volgens NBN EN ISO\u002FIEC 17020 als keuringsinstelling van type A (onderafdeling 6.3.3.1 a). Ook de daarvoor bevoegde overheid mag de controle uitvoeren (afdelingen 6.4.1 en 6.5.1). De actuele lijst van erkende organismen publiceert de ",[151,152,156],"a",{"href":153,"rel":154},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Forganismes-de-controle-agrees",[155],"nofollow","FOD Economie",".",[41,159,160,172],{},[44,161,162],{},[47,163,164,167,170],{},[50,165,166],{},"Situatie",[50,168,169],{},"Wat je bij de aanvraag moet weten",[50,171,58],{},[60,173,174,184,195,205,216,227,238],{},[47,175,176,178,181],{},[65,177,67],{},[65,179,180],{},"Keuring aanvragen vóór de ingebruikname; zonder positief verslag stelt de netbeheerder geen vermogen ter beschikking",[65,182,183],{},"6.4.1, 6.4.6.2",[47,185,186,189,192],{},[65,187,188],{},"Belangrijke wijziging of uitbreiding",[65,190,191],{},"Keuring vóór de ingebruikname van het nieuwe deel; de controle beperkt zich tot het toegevoegde of gewijzigde deel",[65,193,194],{},"6.4.7.3",[47,196,197,199,202],{},[65,198,100],{},[65,200,201],{},"De uiterste datum staat in het verslag van de vorige controle",[65,203,204],{},"6.4.6.4 b.6, 6.5.2",[47,206,207,210,213],{},[65,208,209],{},"Verkoop van een woning met een oude installatie",[65,211,212],{},"De verkoper laat het controlebezoek uitvoeren; de datum van het verslag komt in de authentieke akte",[65,214,215],{},"8.4.2.2 a",[47,217,218,221,224],{},[65,219,220],{},"Verzwaring van de aansluiting bij een oude installatie",[65,222,223],{},"Het controleverslag gaat mee met de aanvraag tot verzwaring",[65,225,226],{},"8.4.1",[47,228,229,232,235],{},[65,230,231],{},"Herkeuring na een negatief periodiek controlebezoek",[65,233,234],{},"Het aanvullende bezoek doet hetzelfde erkend organisme",[65,236,237],{},"6.5.7.2 b.6, 9.1.3.2",[47,239,240,243,246],{},[65,241,242],{},"Herkeuring na een verkoopkeuring",[65,244,245],{},"De koper kiest het erkend organisme vrij",[65,247,215],{},[16,249,250,253],{},[32,251,252],{},"Deze gegevens houd je bij de aanvraag klaar."," Het verslag vermeldt onder meer naam en adres van de eigenaar, beheerder of uitbater, de EAN-code van de installatie (indien beschikbaar), het adres van de installatie en het type lokalen dat ze bedient (onderafdelingen 6.4.6.4 b.1 en 6.5.7.2 b.1). Bij een gelijkvormigheidscontrole komen daar de verantwoordelijke voor de uitvoering van de werken, met btw-nummer indien van toepassing, en de distributienetbeheerder bij. Welke praktische vragen je bij het maken van de afspraak stelt, lees je verderop in dit artikel.",[11,255,257],{"id":256},"hoe-lang-is-een-elektrische-keuring-geldig","Hoe lang is een elektrische keuring geldig?",[16,259,260],{},"Een positief keuringsverslag bevestigt de conformiteit op het moment van de controle; het volgende controlebezoek moet ten laatste plaatsvinden binnen de termijn van afdeling 6.5.2. Voor een huishoudelijke installatie is dat om de 25 jaar, en het verslag van de gelijkvormigheidscontrole vermeldt de uiterste datum zelf (onderafdeling 6.4.6.4 b.6).",[41,262,263,276],{},[44,264,265],{},[47,266,267,270,273],{},[50,268,269],{},"Soort installatie",[50,271,272],{},"Controlebezoek ten minste",[50,274,275],{},"Vindplaats",[60,277,278,289,299,309],{},[47,279,280,283,286],{},[65,281,282],{},"Huishoudelijke installatie",[65,284,285],{},"om de 25 jaar",[65,287,288],{},"6.5.2",[47,290,291,294,297],{},[65,292,293],{},"Andere installaties, bijvoorbeeld niet-huishoudelijk",[65,295,296],{},"om de 5 jaar",[65,298,288],{},[47,300,301,304,307],{},[65,302,303],{},"Verplaatsbare, mobiele of tijdelijke installatie",[65,305,306],{},"jaarlijks",[65,308,288],{},[47,310,311,314,316],{},[65,312,313],{},"Installatie in een ontploffingsgevaarlijke zone",[65,315,306],{},[65,317,288],{},[16,319,320],{},"Een keuring „verlengen” voorziet Boek 1 niet. Nadert de datum uit je laatste verslag, dan laat je een nieuw controlebezoek uitvoeren; daarna begint de periodieke termijn opnieuw. Ook na een controlebezoek van een oude installatie gelden voor elk later bezoek de afdelingen 6.5.1 en 6.5.2 (afdeling 8.4.1 en onderafdeling 8.4.2.3).",[322,323,325],"h3",{"id":324},"wanneer-heb-je-vroeger-een-nieuwe-keuring-nodig","Wanneer heb je vroeger een nieuwe keuring nodig?",[327,328,329,335,340,346,351],"ul",{},[330,331,332,334],"li",{},[32,333,188],{},": gelijkvormigheidscontrole van dat deel vóór de ingebruikname (onderafdeling 6.4.7.3).",[330,336,337,339],{},[32,338,209],{},": als de installatie van vóór 1 oktober 1981 is en dat deel nog geen controlebezoek kreeg (onderafdeling 8.4.2.1).",[330,341,342,345],{},[32,343,344],{},"Verzwaring van de aansluiting"," bij een oude huishoudelijke installatie (afdeling 8.4.1).",[330,347,348,350],{},[32,349,133],{},": een herkeuring nadat de inbreuken verholpen zijn (zie verderop: installatie in orde brengen en herkeuring).",[330,352,353,356],{},[32,354,355],{},"Installatie gekeurd volgens het oud AREI",": het eerste controlebezoek volgens afdeling 6.5.2 gebeurt binnen de termijn uit het laatste verslag volgens het oud AREI (afdeling 8.1.2).",[16,358,359],{},"Verkoop je een woning waarvan de installatie al een gelijkvormigheidscontrole of controlebezoek kreeg, dan valt ze niet onder het toepassingsgebied van afdeling 8.4.2. Het dossier met schema's, plannen en verslagen draag je wel over aan de nieuwe eigenaar (afdeling 9.1.2), en de termijn uit het laatste verslag blijft gelden.",[11,361,363],{"id":362},"deze-documenten-leg-je-voor","Deze documenten leg je voor",[16,365,366,367,372],{},"De ",[151,368,371],{"href":369,"rel":370},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[155],"FOD-pagina over de controle van huishoudelijke installaties"," noemt minstens het eendraadschema, het situatieplan en – indien beschikbaar – de EAN-code van de aansluiting.",[327,374,375,381,387],{},[330,376,377,380],{},[32,378,379],{},"Eendraadschema"," (Eindrahtschema \u002F schéma unifilaire): alle borden, kringen, beveiligingen en leidingen met hun kenmerken (onderafdeling 3.1.2.2).",[330,382,383,386],{},[32,384,385],{},"Situatieplan"," (Situationsplan \u002F plan de position): de ligging van borden, dozen, contactdozen, lichtpunten, schakelaars, vaste toestellen en bronnen (onderafdeling 3.1.2.3).",[330,388,389,392],{},[32,390,391],{},"Fabrikantdocumenten"," voor bijzonder materieel. Bij een PV-installatie horen de gebruiksaanwijzing, de veiligheidsinstructies en de technische gegevens van de componenten in het dossier (afdeling 9.1.2).",[16,394,395,396,157],{},"Bij de gelijkvormigheidscontrole bevestigt het verslag uitdrukkelijk dat de installatie volgens eendraadschema en situatieplan is uitgevoerd (onderafdeling 6.4.6.4, b.4). Een plan met een oude toestand valt dus net zo goed op als een ontbrekende tekening. Wat een situatieplan precies is, lees je in ",[151,397,399],{"href":398},"\u002Fblog\u002Fwat-is-een-situatieschema","Wat is een situatieplan",[11,401,403],{"id":402},"deze-eisen-controleert-de-keurder-bij-een-woning","Deze eisen controleert de keurder bij een woning",[16,405,406],{},"De tabel bundelt eisen uit Boek 1 die bij huishoudelijke installaties geregeld centraal staan. Ze vervangt de volledige tekst niet, maar toont je waar je vóór de afspraak moet kijken.",[41,408,409,418],{},[44,410,411],{},[47,412,413,416],{},[50,414,415],{},"Eis",[50,417,275],{},[60,419,420,428,435,443,451,459,467,475,483],{},[47,421,422,425],{},[65,423,424],{},"Differentieelschakelaar van ten hoogste 300 mA aan de oorsprong van de installatie",[65,426,427],{},"4.2.4.3 b",[47,429,430,433],{},[65,431,432],{},"Differentieel met hoge of zeer hoge gevoeligheid (ten hoogste 30 mA) voor contactdozen, verlichting, badkamer\u002Fdouche en wasmachine, droogkast en vaatwasser; ten hoogste acht eindkringen per toestel",[65,434,427],{},[47,436,437,440],{},[65,438,439],{},"Aardingsweerstand onder 100 Ω; boven 30 Ω minstens twee differentiëlen met hoge gevoeligheid met elk ten hoogste 16 contactdozen en ten hoogste 100 mA voor de overige kringen",[65,441,442],{},"4.2.3.2 en 4.2.4.3 b",[47,444,445,448],{},[65,446,447],{},"Beveiliging afgestemd op de doorsnede, bv. 1,5 mm²: automaat 16 A of smeltzekering 10 A; 2,5 mm²: 20 A of 16 A",[65,449,450],{},"4.4.1.4, tabel 4.11",[47,452,453,456],{},[65,454,455],{},"Kringen met contactdozen minstens 2,5 mm²; ten hoogste acht enkelvoudige of meervoudige contactdozen per eindkring",[65,457,458],{},"5.2.1.2 en 5.3.5.2 b",[47,460,461,464],{},[65,462,463],{},"Minstens twee gescheiden verlichtingskringen als de woning meer dan twee ruimten telt",[65,465,466],{},"5.3.5.2 b",[47,468,469,472],{},[65,470,471],{},"Eigen kring voor wasmachine, vaatwasser, droogkast, fornuis, kookplaat, oven en elk toestel met vaste standplaats vanaf 2600 W",[65,473,474],{},"5.2.1.2",[47,476,477,480],{},[65,478,479],{},"Hoofdschakelaar van minstens 40 A in huishoudelijke installaties",[65,481,482],{},"5.3.5.1 b",[47,484,485,488],{},[65,486,487],{},"Isolatieweerstand per kring minstens 500 kΩ bij een proefspanning van 500 V gelijkstroom",[65,489,490],{},"6.4.5.1, tabel 6.1",[16,492,493],{},"Dertig ohm is geen goed\u002Fafkeurgrens: daarboven eist Boek 1 een strengere opbouw van de differentiëlen, onder 100 Ω moet de aarding hoe dan ook liggen. De toelaatbare stroom van een leiding hangt bovendien af van plaatsingswijze, isolatie en omgevingstemperatuur (4.4.1.4). Laat dimensionering en beveiligingsconcept dus bevestigen door je elektricien.",[322,495,497],{"id":496},"typische-struikelblokken","Typische struikelblokken",[16,499,500],{},"Deze punten vallen in de praktijk vaak op; een betrouwbare rangorde bestaat niet:",[327,502,503,506,509,512,515,518],{},[330,504,505],{},"het eendraadschema ontbreekt of toont een oude toestand",[330,507,508],{},"te weinig of verkeerd toegewezen differentiëlen met hoge gevoeligheid",[330,510,511],{},"een aardingsweerstand zonder de bijhorende beveiligingsopbouw",[330,513,514],{},"leidingen die onvoldoende bevestigd of mechanisch beschermd zijn",[330,516,517],{},"aftakdozen zonder deksel of onbereikbaar",[330,519,520],{},"slechts één verlichtingskring in een woning met meer dan twee ruimten",[11,522,524],{"id":523},"wat-gebeurt-er-tijdens-de-keuring-van-de-elektrische-installatie","Wat gebeurt er tijdens de keuring van de elektrische installatie?",[16,526,527],{},"De gelijkvormigheidscontrole gebeurt spanningsloos en bestaat uit vier delen (afdeling 6.4.1):",[529,530,531,537,543,549],"ol",{},[330,532,533,536],{},[32,534,535],{},"Administratieve controle",": documenten, installatiegegevens en vergelijking van eendraadschema en situatieplan met de uitvoering.",[330,538,539,542],{},[32,540,541],{},"Visuele controle",": materieel, leidingen, afdekkingen, aanduidingen en bereikbaarheid.",[330,544,545,548],{},[32,546,547],{},"Controle door beproevingen",": bijvoorbeeld de werking van de beveiligingen en de continuïteit van beschermingsgeleiders en equipotentiale verbindingen.",[330,550,551,554],{},[32,552,553],{},"Controle door metingen",": isolatieweerstand (6.4.5.1) en aardingsweerstand van de aardelektrode (6.4.5.2).",[16,556,557],{},"Het verslag vermeldt aardingsweerstand en isolatieniveau en bevestigt dat differentiëlen en aardingswaarde, en overstroombeveiliging en leidingen, op elkaar zijn afgestemd (6.4.6.4, b.4). Is de installatie conform, dan viseert de keurder eendraadschema en situatieplan en vermeldt hij de datum waarvoor het volgende controlebezoek moet plaatsvinden (b.6).",[16,559,560,561,157],{},"Volgens versie 06 verzegelt de keurder bij een conforme installatie ook de differentieelschakelaar aan de oorsprong. Vanaf 1 november 2026 vervalt die verplichting met Boek 1 versie 07; de details lees je in ons artikel ",[151,562,564],{"href":563},"\u002Fblog\u002Fverzegeling-differentieel-vervalt-2026","Verzegeling van de differentieel vervalt",[11,566,568],{"id":567},"stem-documenten-en-uitvoering-vóór-de-afspraak-af","Stem documenten en uitvoering vóór de afspraak af",[16,570,571],{},"Vergelijk beide plannen systematisch met de uitgevoerde installatie:",[529,573,574,577,580,583,586],{},[330,575,576],{},"Kloppen de kringaanduidingen in het bord, op het eendraadschema en op het situatieplan?",[330,578,579],{},"Zijn nominale waarden, aantal polen, kabeltype en doorsnede juist genoteerd?",[330,581,582],{},"Staan nieuwe contactdozen, lichtpunten, vaste toestellen en bronnen op het plan?",[330,584,585],{},"Zijn verbindings- en aftakdozen terug te vinden en bereikbaar?",[330,587,588],{},"Liggen de fabrikantdocumenten voor PV, laadpaal, batterij of ander bijzonder materieel klaar?",[16,590,591],{},"Een mooie tekening met een oude toestand helpt je niet, en een technisch degelijke installatie heeft toch de voorgeschreven plannen nodig. Markeer open punten en los ze vóór de afspraak op met je elektricien.",[11,593,595],{"id":594},"visuele-controle-en-metingen-voorbereiden","Visuele controle en metingen voorbereiden",[16,597,598],{},"Meetwaarden ontstaan op de dag zelf aan jouw installatie. Neem geen waarden over uit een oud verslag en zet geen geschatte waarden op de plannen. Zorg voor veilige toegang tot het bord, de aardingsonderbreker en alle ruimten; labels moeten leesbaar zijn en afdekkingen volledig. Meld bijzonderheden zoals PV, batterij, noodstroom, laadpunt of oudere installatiedelen vooraf. Openen en meten onder spanning is werk voor de vakman, geen onderdeel van jouw voorbereiding.",[11,600,602],{"id":601},"vragen-bij-het-maken-van-de-afspraak","Vragen bij het maken van de afspraak",[16,604,605],{},"Geef het organisme door of het om huishoudelijk of niet-huishoudelijk gebruik gaat, welk controletype je nodig hebt, hoeveel borden er zijn en welke bijzondere bronnen. Vraag of de documenten digitaal of op papier verwacht worden, of alle ruimten bereikbaar moeten zijn en hoe een lopende renovatie wordt behandeld. Tarief, betaalwijze en annuleringsvoorwaarden laat je rechtstreeks bevestigen; prijzen van een andere aanbieder gelden niet automatisch voor jou.",[16,607,608],{},"Bij een verkoopkeuring vermeld je het bouwjaar en eerdere verslagen. Bij een belangrijke uitbreiding beschrijf je wat oud en wat nieuw is. Bij PV, batterij of laadpaal noem je de bedrijfswijze en de fabrikantdocumenten. Zo plant het organisme controletype en benodigde tijd correct.",[11,610,612],{"id":611},"wat-kost-een-elektrische-keuring-of-herkeuring","Wat kost een elektrische keuring of herkeuring?",[16,614,615],{},"Boek 1 legt geen tarieven vast: de prijs van een keuring of herkeuring spreek je af met het erkend organisme. Wat wel uit het reglement volgt, is wat de omvang van de controle bepaalt – en dus het werk ter plaatse:",[41,617,618,630],{},[44,619,620],{},[47,621,622,625,628],{},[50,623,624],{},"Factor",[50,626,627],{},"Waarom het meetelt",[50,629,275],{},[60,631,632,643,654,665,676,687,697],{},[47,633,634,637,640],{},[65,635,636],{},"Type controle",[65,638,639],{},"Gelijkvormigheidscontrole, periodiek controlebezoek en verkoopkeuring hebben elk een eigen inhoud en verslag",[65,641,642],{},"6.4, 6.5, 8.4.2",[47,644,645,648,651],{},[65,646,647],{},"Huishoudelijk of niet-huishoudelijk",[65,649,650],{},"Andere verslaginhoud en een andere periodiciteit",[65,652,653],{},"6.4.6.4, 6.4.6.5, 6.5.2",[47,655,656,659,662],{},[65,657,658],{},"Omvang van de installatie",[65,660,661],{},"Het verslag van een controlebezoek vermeldt het aantal borden en eindstroombanen",[65,663,664],{},"6.5.7.2 b.3",[47,666,667,670,673],{},[65,668,669],{},"Huishoudelijke PV-installatie (≤ 10 kVA)",[65,671,672],{},"Bijkomende beproevingen: scheiding bij wegvallen van de netspanning en werking van de differentieelschakelaar",[65,674,675],{},"7.112.3",[47,677,678,681,684],{},[65,679,680],{},"Ontbrekende plannen bij een verkoopkeuring",[65,682,683],{},"De agent-bezoeker maakt een summiere beschrijving en schets; het ontbreken wordt als inbreuk vermeld",[65,685,686],{},"8.4.2.2 d",[47,688,689,692,695],{},[65,690,691],{},"Wijziging of uitbreiding",[65,693,694],{},"De controle beperkt zich tot het toegevoegde of gewijzigde deel",[65,696,194],{},[47,698,699,702,705],{},[65,700,701],{},"Herkeuring",[65,703,704],{},"Het nazicht betreft het verdwijnen van de vastgestelde inbreuken",[65,706,707],{},"9.1.3.2",[16,709,710],{},"Vraag daarom een prijs voor jouw concrete controletype en omvang, en laat bevestigen of een herkeuring apart wordt aangerekend. Een tarief van een ander organisme of uit een oud verslag geldt niet automatisch voor jou. Liggen eendraadschema en situatieplan klaar, dan hoeft de agent-bezoeker bij een verkoopkeuring geen noodschets te maken – en vermijd je meteen een inbreuk.",[11,712,714],{"id":713},"op-de-keuringsdag","Op de keuringsdag",[16,716,717],{},"Zorg voor een contactpersoon die de installatie kent. Verwijder geen vaste afdekkingen op voorhand, tenzij het organisme daarom vraagt; veilige toegang is belangrijker dan geïmproviseerd openen. Zorg dat huisdieren, opgeslagen spullen of gesloten ruimten de toegang niet blokkeren.",[16,719,720],{},"Noteer vragen, maar wijzig tijdens de controle niets aan de installatie. Controleer het verslag bij ontvangst op naam en adres, controletype, omvang van de installatie en vermelde documenten. Technische bezwaren breng je zakelijk en schriftelijk aan, met verwijzing naar de concrete vaststelling. Was een ruimte of installatiedeel niet bereikbaar, lees dan in het verslag hoe dat de conclusie beïnvloedt en vraag of een extra bezoek nodig is.",[11,722,724],{"id":723},"na-het-verslag","Na het verslag",[16,726,727,730],{},[32,728,729],{},"Positief verslag:"," het bevestigt de beoordeling op dat moment en binnen die omvang. Bewaar het samen met eendraadschema en situatieplan in het dossier van de installatie, dat je in twee exemplaren bezit en bij verkoop aan de nieuwe eigenaar overdraagt (afdeling 9.1.2). Elke latere wijziging noteer je in het dossier.",[16,732,733,736],{},[32,734,735],{},"Negatief verslag:"," je behandelt elke inbreuk afzonderlijk. De gevolgen hangen af van het controletype:",[41,738,739,751],{},[44,740,741],{},[47,742,743,746,749],{},[50,744,745],{},"Controletype",[50,747,748],{},"Gevolg van een negatief verslag",[50,750,275],{},[60,752,753,763,773],{},[47,754,755,757,760],{},[65,756,70],{},[65,758,759],{},"Het betrokken deel mag niet in gebruik genomen worden tot de inbreuken verholpen en opnieuw gecontroleerd zijn",[65,761,762],{},"9.1.3.1",[47,764,765,767,770],{},[65,766,100],{},[65,768,769],{},"Inbreuken onverwijld verhelpen; nieuw bezoek door hetzelfde organisme binnen een jaar",[65,771,772],{},"9.1.3.2, 6.5.7.2 b.6 en b.7",[47,774,775,778,781],{},[65,776,777],{},"Verkoopkeuring van een oude installatie",[65,779,780],{},"De koper laat het herstel binnen 18 maanden na de verkoopakte opnieuw controleren; het organisme kiest hij vrij",[65,782,215],{},[16,784,785,786,791,792,157],{},"Het ",[151,787,790],{"href":788,"rel":789},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations\u002Ftypes-de-controle-des",[155],"FOD-overzicht van de controletypes"," licht de procedures verder toe. Hoe je na een negatief resultaat stap voor stap te werk gaat, lees je in ",[151,793,795],{"href":794},"\u002Fblog\u002Felektrokeuring-afgekeurd","Elektrische keuring afgekeurd – wat nu?",[11,797,799],{"id":798},"installatie-in-orde-brengen-en-herkeuring","Installatie in orde brengen en herkeuring",[16,801,802],{},"Je elektriciteit in orde brengen betekent: elke inbreuk uit het verslag laten verhelpen en het herstel laten nakijken door een erkend organisme. Na een controlebezoek gebeuren de werken zonder vertraging, en zolang de installatie in dienst blijft, neem je maatregelen zodat de inbreuken geen gevaar vormen voor personen of goederen (onderafdeling 9.1.3.2). Na een gelijkvormigheidscontrole mag het betrokken deel pas in gebruik na herstel en nieuwe controle (onderafdeling 9.1.3.1).",[529,804,805,811,817,823],{},[330,806,807,810],{},[32,808,809],{},"Lees elke inbreuk met haar vindplaats."," Het verslag somt de inbreuken op (onderafdelingen 6.4.6.4 b.5 en 6.5.7.2 b.5); behandel ze één voor één.",[330,812,813,816],{},[32,814,815],{},"Laat het herstel uitvoeren en bevestigen"," door je elektricien, per inbreuk en met de betrokken kring.",[330,818,819,822],{},[32,820,821],{},"Werk de documenten bij."," Wijzigt het herstel kringen, beveiligingen of punten, dan pas je eendraadschema en situatieplan aan en noteer je de wijziging in het dossier (afdeling 9.1.2). Ontbrekende plannen zijn bij een verkoopkeuring zelf een inbreuk (onderafdeling 8.4.2.2 d).",[330,824,825,828],{},[32,826,827],{},"Vraag de herkeuring aan bij het juiste organisme."," Na een periodiek controlebezoek doet hetzelfde erkend organisme het aanvullende bezoek vóór de datum in het verslag (onderafdeling 6.5.7.2 b.6). Na een verkoopkeuring meldt de koper zijn identiteit en de datum van de akte aan het organisme van het eerste verslag en laat hij door een organisme naar keuze nagaan of de inbreuken na afloop van 18 maanden verdwenen zijn (onderafdeling 8.4.2.2 a).",[16,830,831,832,157],{},"Wie niets doet, blijft niet onder de radar: zijn er bij het tweede bezoek na een periodieke controle nog inbreuken, dan stuurt het erkend organisme een kopie van het verslag naar de Algemene Directie Energie (onderafdeling 6.5.7.2 b.7 d). De volledige aanpak na een negatief resultaat staat in ",[151,833,795],{"href":794},[11,835,837],{"id":836},"leg-de-gekeurde-omvang-na-het-bezoek-vast","Leg de gekeurde omvang na het bezoek vast",[16,839,840],{},"Noteer welke borden, ruimten, bronnen en bedrijfswijzen werkelijk deel uitmaakten van de controle en vergelijk dat met de omschrijving in het verslag. Een positief verslag voor een duidelijk afgebakend deel zegt niets over later toegevoegde of niet bezochte delen. Bewaar de voorgelegde planversie ongewijzigd bij het verslag en maak voor latere werken een nieuwe, gedateerde versie. Zo blijft aantoonbaar welke uitvoeringsstand beoordeeld werd. Wijzig je nadien vaste leidingen, beveiligingen of PV-, batterij- en laadfuncties, ga dan na of een nieuwe gelijkvormigheidscontrole nodig is.",[11,842,844],{"id":843},"hoe-planelec-helpt","Hoe PlanElec helpt",[16,846,847,848,851],{},"De documentatie is vaak het zwaarste deel van de voorbereiding. ",[32,849,850],{},"PlanElec"," brengt plattegrond, kringen en verdeelbord samen in één project en maakt daaruit je documenten:",[327,853,854,859,864,870,876],{},[330,855,856,858],{},[32,857,379],{}," uit de ingevoerde elektrische topologie, als PDF",[330,860,861,863],{},[32,862,385],{}," op basis van je plattegrond met Belgische symbolenbibliotheek, als PDF",[330,865,866,869],{},[32,867,868],{},"AREI\u002FRGIE-zelfcontrole"," die ontwerpfouten in de ondersteunde regels vóór de keuring zichtbaar maakt",[330,871,872,875],{},[32,873,874],{},"Installatiedossier"," met voorblad, documentenlijst en doorlopende paginanummering",[330,877,878,881],{},[32,879,880],{},"Vier talen",": Nederlands, Frans, Duits en Engels",[16,883,884,885,157],{},"De rollen zijn duidelijk verdeeld: de zelfcontrole toont je bevindingen uit de ingevoerde projectgegevens, je elektricien bevestigt dimensionering en uitvoering, en de keuring met metingen doet het erkend organisme. De lijst van erkende organismen publiceert de ",[151,886,156],{"href":153,"rel":887},[155],[16,889,890],{},[151,891,893],{"href":892},"\u002F","Begin nu gratis met je elektrische documentatie →",{"title":895,"searchDepth":896,"depth":896,"links":897},"",2,[898,899,900,901,905,906,909,910,911,912,913,914,915,916,917,918],{"id":13,"depth":896,"text":14},{"id":38,"depth":896,"text":39},{"id":145,"depth":896,"text":146},{"id":256,"depth":896,"text":257,"children":902},[903],{"id":324,"depth":904,"text":325},3,{"id":362,"depth":896,"text":363},{"id":402,"depth":896,"text":403,"children":907},[908],{"id":496,"depth":904,"text":497},{"id":523,"depth":896,"text":524},{"id":567,"depth":896,"text":568},{"id":594,"depth":896,"text":595},{"id":601,"depth":896,"text":602},{"id":611,"depth":896,"text":612},{"id":713,"depth":896,"text":714},{"id":723,"depth":896,"text":724},{"id":798,"depth":896,"text":799},{"id":836,"depth":896,"text":837},{"id":843,"depth":896,"text":844},"guide","2026-01-08","Elektrische keuring aanvragen bij een erkend organisme: hoe lang ze geldig is, wanneer een herkeuring nodig is, wat de kost bepaalt en wat de keurder controleert – met AREI-vindplaatsen.","md","2026-10-08","nl",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-electrical-inspection-editorial.jpg","\u002Fblog\u002Felectrical-inspection.nl",null,"13 min",12,{"title":5,"description":921},"Elektrische keuring: aanvragen, herkeuring en geldigheid","elektrische-keuring","blog\u002Felectrical-inspection.nl",[937,938,939,940,941,942,943,944,945,946,947,948,949,950,951],"AREI","RGIE","keuring","elektrische keuring","eendraadschema","situatieschema","conformiteitsverklaring","differentieel","aarding","elektricien","België","Eindrahtschema","schéma unifilaire","plan de situation","Situationsplan","MmFFitj_m6jBio7Tp-m011_Lr0fdDGgA-COU8gWD8o8",[954,1839,2723,3603],{"id":955,"title":956,"articleId":6,"body":957,"category":919,"date":920,"description":1821,"extension":922,"image":25,"lastUpdated":923,"locale":1822,"meta":1823,"navigation":926,"ogImage":927,"path":1824,"publishDate":929,"readTime":930,"refreshInterval":931,"seo":1825,"seoTitle":1826,"slug":1827,"stem":1828,"tags":1829,"__hash__":1838},"blog\u002Fblog\u002Felectrical-inspection.de.md","Stromabnahme in Belgien: beantragen, Nachkontrolle und AREI-Anforderungen",{"type":8,"value":958,"toc":1799},[959,963,966,971,974,980,984,1078,1081,1085,1092,1176,1182,1186,1189,1245,1248,1252,1281,1284,1288,1296,1315,1322,1326,1329,1409,1412,1416,1419,1439,1443,1446,1472,1475,1482,1486,1489,1506,1509,1513,1516,1520,1523,1526,1530,1533,1619,1622,1626,1629,1632,1636,1642,1648,1692,1703,1707,1710,1736,1741,1745,1748,1752,1758,1788,1794],[11,960,962],{"id":961},"was-ist-eine-stromabnahme","Was ist eine Stromabnahme?",[16,964,965],{},"Die Stromabnahme – in Belgien meist Keuring genannt – ist die Prüfung deiner Elektroinstallation durch eine zugelassene Kontrollstelle (Kontrollorganismus). Eine neue Anlage wird vor der Ingebrauchnahme auf Konformität mit dem AREI\u002FRGIE geprüft (Buch 1, Kapitel 6.4); danach folgen Kontrollbesuche, bei Wohnanlagen spätestens alle 25 Jahre (Abschnitt 6.5.2). Die Kontrollstelle prüft die Unterlagen, schaut sich die Anlage an, erprobt Schutzeinrichtungen und misst Isolations- und Erdungswiderstand. Erst mit einem positiven Bericht stellt der Netzbetreiber bei einer neuen Anlage die Leistung bereit (Unterabschnitt 6.4.6.2).",[16,967,968],{},[22,969],{"alt":970,"src":25},"Vor-Ort-Kontrolle einer belgischen Wohninstallation.",[16,972,973],{},"Welche Kontrolle für dich gilt, hängt vom Anlass ab: Neubau, wesentliche Erweiterung, periodischer Besuch, Verkauf einer Wohnung mit alter Anlage oder Leistungserhöhung. Dieser Leitfaden ordnet die Fälle ein, nennt die Anforderungen, die der Prüfer an einer Hausinstallation typischerweise kontrolliert, und zeigt, wie du die Unterlagen so vorbereitest, dass Plan und Anlage übereinstimmen.",[16,975,976,979],{},[32,977,978],{},"Redaktion und Prüfung: PlanElec-Team, 8. Oktober 2026."," Alle Fundstellen beziehen sich auf AREI\u002FRGIE Buch 1, Version 06, anwendbar seit 1. April 2026.",[11,981,983],{"id":982},"wann-brauchst-du-eine-abnahme","Wann brauchst du eine Abnahme?",[41,985,986,999],{},[44,987,988],{},[47,989,990,993,996],{},[50,991,992],{},"Anlass",[50,994,995],{},"Was geprüft wird",[50,997,998],{},"Fundstelle Buch 1",[60,1000,1001,1012,1023,1034,1045,1056,1067],{},[47,1002,1003,1006,1009],{},[65,1004,1005],{},"Neue Anlage",[65,1007,1008],{},"Konformitätsprüfung vor Ingebrauchnahme",[65,1010,1011],{},"Kapitel 6.4",[47,1013,1014,1017,1020],{},[65,1015,1016],{},"Wesentliche Änderung oder Erweiterung, etwa ein neuer Stromkreis",[65,1018,1019],{},"Hinzugefügte oder geänderte Teile; betroffene unveränderte Teile hinsichtlich der geänderten Eigenschaften",[65,1021,1022],{},"Unterabschnitt 6.4.7.3",[47,1024,1025,1028,1031],{},[65,1026,1027],{},"Unwesentliche Änderung, etwa eine Steckdose an einem bestehenden Kreis",[65,1029,1030],{},"Keine Prüfung vor Ingebrauchnahme; kurze Beschreibung gehört in die Anlagenakte",[65,1032,1033],{},"Abschnitt 9.1.2 Nr. 7",[47,1035,1036,1039,1042],{},[65,1037,1038],{},"Periodischer Kontrollbesuch",[65,1040,1041],{},"Wohnanlagen spätestens alle 25 Jahre, andere Anlagen alle 5 Jahre",[65,1043,1044],{},"Abschnitt 6.5.2",[47,1046,1047,1050,1053],{},[65,1048,1049],{},"Verkauf einer Wohneinheit mit alter Anlage (vor 1. Oktober 1981)",[65,1051,1052],{},"Kontrollbesuch, den der Verkäufer veranlasst",[65,1054,1055],{},"Abschnitt 8.4.2",[47,1057,1058,1061,1064],{},[65,1059,1060],{},"Anhebung der Anschlussleistung bei einer alten Wohnanlage",[65,1062,1063],{},"Kontrollbesuch, bevor der Netzbetreiber die Leistung erhöht",[65,1065,1066],{},"Abschnitt 8.4.1",[47,1068,1069,1072,1075],{},[65,1070,1071],{},"Negativer Bericht",[65,1073,1074],{},"Erneute Kontrolle nach Behebung der Verstöße",[65,1076,1077],{},"Kapitel 9.1, Abschnitt 8.4.2",[16,1079,1080],{},"Wesentlich ist eine Änderung, wenn sie eine zusätzliche, noch nicht durch eine Konformitätsprüfung abgedeckte Auswirkung auf die Sicherheit von Personen oder Gütern hat (Begriffsbestimmung in Teil 2). Beschreibe dem Elektriker und der Kontrollstelle deshalb die tatsächlichen Arbeiten, statt nur „Renovierung“ anzukreuzen. So plant die Kontrollstelle den richtigen Kontrolltyp und den passenden Umfang.",[11,1082,1084],{"id":1083},"stromabnahme-beantragen-bei-welcher-kontrollstelle","Stromabnahme beantragen: bei welcher Kontrollstelle?",[16,1086,1087,1088,157],{},"Eine Stromabnahme beantragst du bei einer zugelassenen Kontrollstelle. Das ist eine Stelle, die der für Energie zuständige Minister für Konformitätsprüfungen vor Ingebrauchnahme und für Kontrollbesuche zulässt (Abschnitt 6.3.1). Für die Zulassung muss sie nach NBN EN ISO\u002FIEC 17020 akkreditiert sein und die Anforderungen an eine Prüfstelle vom Typ A erfüllen (Unterabschnitt 6.3.3.1 a). Auch die dafür zuständige Behörde darf die Kontrolle durchführen (Abschnitte 6.4.1 und 6.5.1). Die aktuelle Liste der zugelassenen Stellen veröffentlicht der ",[151,1089,1091],{"href":153,"rel":1090},[155],"FÖD Wirtschaft",[41,1093,1094,1106],{},[44,1095,1096],{},[47,1097,1098,1101,1104],{},[50,1099,1100],{},"Situation",[50,1102,1103],{},"Was du bei der Beantragung wissen musst",[50,1105,998],{},[60,1107,1108,1117,1127,1136,1146,1156,1166],{},[47,1109,1110,1112,1115],{},[65,1111,1005],{},[65,1113,1114],{},"Abnahme vor der Ingebrauchnahme beantragen; ohne positiven Bericht stellt der Netzbetreiber keine Leistung bereit",[65,1116,183],{},[47,1118,1119,1122,1125],{},[65,1120,1121],{},"Wesentliche Änderung oder Erweiterung",[65,1123,1124],{},"Kontrolle vor Ingebrauchnahme des neuen Teils; sie beschränkt sich auf den hinzugefügten oder geänderten Teil",[65,1126,194],{},[47,1128,1129,1131,1134],{},[65,1130,1038],{},[65,1132,1133],{},"Das späteste Datum steht im Bericht der vorigen Kontrolle",[65,1135,204],{},[47,1137,1138,1141,1144],{},[65,1139,1140],{},"Verkauf einer Wohnung mit alter Anlage",[65,1142,1143],{},"Der Verkäufer lässt den Kontrollbesuch durchführen; das Datum des Berichts wird in der notariellen Urkunde vermerkt",[65,1145,215],{},[47,1147,1148,1151,1154],{},[65,1149,1150],{},"Anhebung der Anschlussleistung bei einer alten Anlage",[65,1152,1153],{},"Der Kontrollbericht liegt dem Antrag auf Leistungserhöhung bei",[65,1155,226],{},[47,1157,1158,1161,1164],{},[65,1159,1160],{},"Nachkontrolle nach negativem periodischem Besuch",[65,1162,1163],{},"Den Ergänzungsbesuch macht dieselbe zugelassene Stelle",[65,1165,237],{},[47,1167,1168,1171,1174],{},[65,1169,1170],{},"Nachkontrolle nach einer Verkaufskontrolle",[65,1172,1173],{},"Der Käufer wählt die zugelassene Stelle frei",[65,1175,215],{},[16,1177,1178,1181],{},[32,1179,1180],{},"Diese Angaben hältst du für den Antrag bereit."," Der Bericht nennt unter anderem Name und Adresse des Eigentümers, Verwalters oder Betreibers, den EAN-Code der Anlage (falls verfügbar), die Adresse der Anlage und die Art der versorgten Räume (Unterabschnitte 6.4.6.4 b.1 und 6.5.7.2 b.1). Bei einer Konformitätsprüfung kommen die für die Ausführung der Arbeiten verantwortliche Person, gegebenenfalls mit MwSt.-Nummer, und das Stromverteilungsunternehmen hinzu. Welche praktischen Fragen du bei der Terminvereinbarung stellst, steht weiter unten in diesem Artikel.",[11,1183,1185],{"id":1184},"wie-lange-ist-eine-stromabnahme-gültig","Wie lange ist eine Stromabnahme gültig?",[16,1187,1188],{},"Ein positiver Bericht bestätigt die Konformität zum Zeitpunkt der Kontrolle; der nächste Kontrollbesuch muss spätestens innerhalb der Frist aus Abschnitt 6.5.2 stattfinden. Bei einer Wohnanlage sind das 25 Jahre, und der Bericht der Konformitätsprüfung nennt das späteste Datum selbst (Unterabschnitt 6.4.6.4 b.6).",[41,1190,1191,1204],{},[44,1192,1193],{},[47,1194,1195,1198,1201],{},[50,1196,1197],{},"Art der Anlage",[50,1199,1200],{},"Kontrollbesuch mindestens",[50,1202,1203],{},"Fundstelle",[60,1205,1206,1216,1226,1236],{},[47,1207,1208,1211,1214],{},[65,1209,1210],{},"Wohnanlage (hauswirtschaftliche Anlage)",[65,1212,1213],{},"alle 25 Jahre",[65,1215,288],{},[47,1217,1218,1221,1224],{},[65,1219,1220],{},"Andere Anlagen, zum Beispiel Nichtwohnanlagen",[65,1222,1223],{},"alle 5 Jahre",[65,1225,288],{},[47,1227,1228,1231,1234],{},[65,1229,1230],{},"Ortsveränderliche, mobile oder vorübergehende Anlage",[65,1232,1233],{},"jährlich",[65,1235,288],{},[47,1237,1238,1241,1243],{},[65,1239,1240],{},"Anlage in einem explosionsgefährdeten Bereich",[65,1242,1233],{},[65,1244,288],{},[16,1246,1247],{},"Eine „Verlängerung“ der Abnahme sieht Buch 1 nicht vor. Rückt das Datum aus deinem letzten Bericht näher, lässt du einen neuen Kontrollbesuch durchführen; danach beginnt die periodische Frist neu. Auch nach dem Kontrollbesuch einer alten Anlage gelten für jeden späteren Besuch die Abschnitte 6.5.1 und 6.5.2 (Abschnitt 8.4.1 und Unterabschnitt 8.4.2.3).",[322,1249,1251],{"id":1250},"wann-brauchst-du-früher-eine-neue-abnahme","Wann brauchst du früher eine neue Abnahme?",[327,1253,1254,1259,1264,1270,1275],{},[330,1255,1256,1258],{},[32,1257,1121],{},": Konformitätsprüfung dieses Teils vor der Ingebrauchnahme (Unterabschnitt 6.4.7.3).",[330,1260,1261,1263],{},[32,1262,1140],{},": wenn die Anlage vor dem 1. Oktober 1981 errichtet wurde und dieser Teil noch keinen Kontrollbesuch hatte (Unterabschnitt 8.4.2.1).",[330,1265,1266,1269],{},[32,1267,1268],{},"Anhebung der Anschlussleistung"," bei einer alten Wohnanlage (Abschnitt 8.4.1).",[330,1271,1272,1274],{},[32,1273,1071],{},": eine Nachkontrolle, nachdem die Verstöße behoben sind (siehe weiter unten: Anlage in Ordnung bringen und Nachkontrolle).",[330,1276,1277,1280],{},[32,1278,1279],{},"Nach der früheren A.O.E.A. geprüfte Anlage",": Der erste Kontrollbesuch nach Abschnitt 6.5.2 erfolgt innerhalb der Frist aus dem letzten Bericht nach den früheren Vorschriften (Abschnitt 8.1.2).",[16,1282,1283],{},"Verkaufst du eine Wohnung, deren Anlage bereits eine Konformitätsprüfung oder einen Kontrollbesuch hatte, fällt sie nicht in den Anwendungsbereich von Abschnitt 8.4.2. Die Anlagenakte mit Schemata, Plänen und Berichten übergibst du trotzdem an den neuen Eigentümer (Abschnitt 9.1.2), und die Frist aus dem letzten Bericht gilt weiter.",[11,1285,1287],{"id":1286},"diese-unterlagen-legst-du-vor","Diese Unterlagen legst du vor",[16,1289,1290,1291,1295],{},"Die ",[151,1292,1294],{"href":369,"rel":1293},[155],"FÖD-Seite zur Kontrolle von Hausinstallationen"," nennt mindestens Eindrahtschema, Positionsplan und – falls vorhanden – die EAN-Nummer des Anschlusses.",[327,1297,1298,1303,1309],{},[330,1299,1300,1302],{},[32,1301,948],{}," (Eendraadschema \u002F schéma unifilaire): alle Verteiler, Stromkreise, Schutzeinrichtungen und Leitungen mit ihren Merkmalen (Unterabschnitt 3.1.2.2).",[330,1304,1305,1308],{},[32,1306,1307],{},"Positionsplan"," (situatieplan \u002F plan de position): die Lage von Verteilern, Dosen, Steckdosen, Lichtpunkten, Schaltern, festen Geräten und Quellen (Unterabschnitt 3.1.2.3).",[330,1310,1311,1314],{},[32,1312,1313],{},"Herstellerunterlagen"," für besondere Betriebsmittel. Bei einer PV-Anlage gehören Betriebsanleitung, Sicherheitshinweise und die technischen Daten der Komponenten in die Akte (Abschnitt 9.1.2).",[16,1316,1317,1318,157],{},"Bei der Konformitätsprüfung bescheinigt der Bericht ausdrücklich, dass die Anlage gemäß Eindrahtschema und Positionsplan ausgeführt ist (Unterabschnitt 6.4.6.4, b.4). Ein Plan, der einen alten Stand zeigt, fällt deshalb genauso auf wie eine fehlende Zeichnung. Was ein Positionsplan genau ist, steht in ",[151,1319,1321],{"href":1320},"\u002Fde\u002Fblog\u002Fwas-ist-ein-situationsplan","Was ist ein Positionsplan",[11,1323,1325],{"id":1324},"diese-anforderungen-kontrolliert-der-prüfer-an-einer-hausinstallation","Diese Anforderungen kontrolliert der Prüfer an einer Hausinstallation",[16,1327,1328],{},"Die folgende Tabelle bündelt Anforderungen aus Buch 1, die bei hauswirtschaftlichen Anlagen regelmäßig im Mittelpunkt stehen. Sie ersetzt nicht den Volltext, zeigt dir aber, wo du vor dem Termin hinschauen solltest.",[41,1330,1331,1340],{},[44,1332,1333],{},[47,1334,1335,1338],{},[50,1336,1337],{},"Anforderung",[50,1339,1203],{},[60,1341,1342,1349,1356,1364,1372,1380,1387,1394,1401],{},[47,1343,1344,1347],{},[65,1345,1346],{},"Differenzialschalter (FI-Schutzschalter) mit höchstens 300 mA am Speisepunkt der Anlage",[65,1348,427],{},[47,1350,1351,1354],{},[65,1352,1353],{},"Hoch- oder sehr hochempfindlicher Differenzialschalter (höchstens 30 mA) für Steckdosen, Beleuchtung, Bad\u002FDusche sowie Waschmaschine, Trockner und Geschirrspüler; höchstens acht Endstromkreise je Gerät",[65,1355,427],{},[47,1357,1358,1361],{},[65,1359,1360],{},"Erdungswiderstand unter 100 Ω; über 30 Ω mindestens zwei hochempfindliche Differenzialschalter mit je höchstens 16 Steckdosen und höchstens 100 mA für die übrigen Kreise",[65,1362,1363],{},"4.2.3.2 und 4.2.4.3 b",[47,1365,1366,1369],{},[65,1367,1368],{},"Schutzorgan passend zum Querschnitt, z. B. 1,5 mm²: Leitungsschutzschalter 16 A oder Sicherung 10 A; 2,5 mm²: 20 A oder 16 A",[65,1370,1371],{},"4.4.1.4, Tabelle 4.11",[47,1373,1374,1377],{},[65,1375,1376],{},"Steckdosenkreise mindestens 2,5 mm²; höchstens acht Einzel- oder Mehrfachsteckdosen je Endstromkreis",[65,1378,1379],{},"5.2.1.2 und 5.3.5.2 b",[47,1381,1382,1385],{},[65,1383,1384],{},"Mindestens zwei getrennte Beleuchtungsstromkreise, wenn die Wohnung mehr als zwei Räume umfasst",[65,1386,466],{},[47,1388,1389,1392],{},[65,1390,1391],{},"Eigener Stromkreis für Waschmaschine, Geschirrspüler, Trockner, Herd, Kochfeld, Backofen und jedes Gerät mit festem Standplatz ab 2600 W",[65,1393,474],{},[47,1395,1396,1399],{},[65,1397,1398],{},"Haupt-Lasttrennschalter mit mindestens 40 A in Hausinstallationen",[65,1400,482],{},[47,1402,1403,1406],{},[65,1404,1405],{},"Isolationswiderstand je Stromkreis mindestens 500 kΩ bei 500 V Prüfspannung (Gleichstrom)",[65,1407,1408],{},"6.4.5.1, Tabelle 6.1",[16,1410,1411],{},"Der Wert von 30 Ω ist kein Alles-oder-nichts-Kriterium: Darüber verlangt Buch 1 eine strengere Anordnung der Differenzialschalter, unter 100 Ω muss die Erdung in jedem Fall liegen. Die Leiterbelastbarkeit hängt außerdem von Verlegeart, Isolierung und Umgebungstemperatur ab (4.4.1.4). Lass Dimensionierung und Schutzkonzept deshalb von deinem Elektriker bestätigen.",[322,1413,1415],{"id":1414},"typische-stolpersteine","Typische Stolpersteine",[16,1417,1418],{},"Diese Punkte fallen in der Praxis besonders oft auf; eine belastbare Rangfolge gibt es nicht:",[327,1420,1421,1424,1427,1430,1433,1436],{},[330,1422,1423],{},"Eindrahtschema fehlt oder zeigt einen alten Stand",[330,1425,1426],{},"zu wenige oder falsch zugeordnete hochempfindliche Differenzialschalter",[330,1428,1429],{},"Erdungswiderstand ohne die dazu passende Schutzanordnung",[330,1431,1432],{},"Leitungen nicht ausreichend befestigt oder mechanisch geschützt",[330,1434,1435],{},"Abzweigdosen ohne Deckel oder nicht zugänglich",[330,1437,1438],{},"nur ein Beleuchtungsstromkreis in einer Wohnung mit mehr als zwei Räumen",[11,1440,1442],{"id":1441},"was-passiert-während-der-abnahme","Was passiert während der Abnahme?",[16,1444,1445],{},"Die Konformitätsprüfung erfolgt im spannungsfreien Zustand und umfasst vier Teile (Abschnitt 6.4.1):",[529,1447,1448,1454,1460,1466],{},[330,1449,1450,1453],{},[32,1451,1452],{},"Verwaltungstechnische Kontrolle",": Unterlagen, Anlagendaten, Abgleich von Eindrahtschema und Positionsplan mit der Ausführung.",[330,1455,1456,1459],{},[32,1457,1458],{},"Sichtkontrolle",": Betriebsmittel, Leitungen, Abdeckungen, Kennzeichnung und Zugänglichkeit.",[330,1461,1462,1465],{},[32,1463,1464],{},"Kontrollen durch Prüfungen",": etwa die Funktion der Schutzeinrichtungen und die Durchgängigkeit von Schutzleitern und Potentialausgleich.",[330,1467,1468,1471],{},[32,1469,1470],{},"Kontrollen durch Messungen",": Isolationswiderstand (6.4.5.1) und Erdungswiderstand des Erders (6.4.5.2).",[16,1473,1474],{},"Der Bericht enthält Erdungswiderstand und Isolationspegel und bescheinigt, dass Differenzialschalter und Erdungswert sowie Überstromschutz und Leitungen aufeinander abgestimmt sind (6.4.6.4, b.4). Ist die Anlage konform, visiert der Prüfer Eindrahtschema und Positionsplan und nennt das Datum, bis zu dem der nächste Kontrollbesuch stattfinden muss (b.6).",[16,1476,1477,1478,157],{},"Nach Version 06 verplombt der Prüfer bei einer konformen Anlage außerdem den Differenzialschalter am Speisepunkt. Ab dem 1. November 2026 entfällt diese Pflicht mit Buch 1 Version 07; Details stehen in unserem Artikel ",[151,1479,1481],{"href":1480},"\u002Fde\u002Fblog\u002Fverplombung-differenzialschalter-entfaellt-2026","Verplombung des Differenzialschalters entfällt",[11,1483,1485],{"id":1484},"unterlagen-vor-dem-termin-abgleichen","Unterlagen vor dem Termin abgleichen",[16,1487,1488],{},"Vergleiche beide Pläne systematisch mit der ausgeführten Anlage:",[529,1490,1491,1494,1497,1500,1503],{},[330,1492,1493],{},"Stimmen die Stromkreiskennzeichen im Verteiler, im Eindrahtschema und im Positionsplan überein?",[330,1495,1496],{},"Sind Nennwerte, Polzahl, Kabeltyp und Querschnitt korrekt erfasst?",[330,1498,1499],{},"Sind neue Steckdosen, Leuchten, feste Geräte und Quellen eingezeichnet?",[330,1501,1502],{},"Sind Verbindungs- und Abzweigdosen auffindbar und zugänglich?",[330,1504,1505],{},"Liegen die Herstellerunterlagen für PV, Wallbox, Speicher oder andere besondere Betriebsmittel bereit?",[16,1507,1508],{},"Eine schöne Zeichnung mit altem Stand hilft dir nicht weiter, und eine fachlich einwandfreie Anlage braucht trotzdem die vorgeschriebenen Pläne. Markiere offene Punkte und kläre sie vor dem Termin mit deinem Elektriker.",[11,1510,1512],{"id":1511},"sichtprüfung-und-messung-vorbereiten","Sichtprüfung und Messung vorbereiten",[16,1514,1515],{},"Messwerte entstehen am Termin an deiner konkreten Anlage. Übernimm keine Werte aus einem früheren Bericht und trage keine geschätzten Werte in die Pläne ein. Sorge für sicheren Zugang zu Verteiler, Erdungstrennstelle und allen Räumen; Beschriftungen müssen lesbar sein, Abdeckungen vollständig. Kündige Besonderheiten wie PV, Batterie, Notstromfunktion, Ladepunkt oder ältere Anlagenteile vorab an. Öffnen und Messen unter Spannung ist Sache der Fachkraft, nicht Teil deiner Vorbereitung.",[11,1517,1519],{"id":1518},"fragen-bei-der-terminvereinbarung","Fragen bei der Terminvereinbarung",[16,1521,1522],{},"Nenne der Kontrollstelle Wohn- oder Nichtwohnnutzung, Art der Kontrolle, Zahl der Verteiler und besondere Quellen. Frag, ob die Unterlagen digital oder ausgedruckt erwartet werden, ob alle Räume zugänglich sein müssen und wie mit einer Anlage in Renovierung umzugehen ist. Tarif, Zahlungsweise und Bedingungen für eine Terminverschiebung lässt du dir direkt bestätigen; veröffentlichte Pauschalen anderer Anbieter gelten für dich nicht automatisch.",[16,1524,1525],{},"Bei einer Verkaufskontrolle teilst du Baualter und bekannte frühere Berichte mit. Bei einer wesentlichen Erweiterung beschreibst du Altbestand und neuen Teil. Bei PV, Speicher oder Wallbox nennst du Betriebsart und Herstellerunterlagen. So plant die Kontrollstelle Kontrolltyp und Zeitbedarf richtig.",[11,1527,1529],{"id":1528},"was-kostet-eine-stromabnahme-oder-nachkontrolle","Was kostet eine Stromabnahme oder Nachkontrolle?",[16,1531,1532],{},"Buch 1 legt keine Tarife fest: Den Preis einer Abnahme oder Nachkontrolle vereinbarst du mit der zugelassenen Stelle. Aus der Vorschrift ergibt sich aber, was den Umfang der Kontrolle bestimmt – und damit den Aufwand vor Ort:",[41,1534,1535,1547],{},[44,1536,1537],{},[47,1538,1539,1542,1545],{},[50,1540,1541],{},"Faktor",[50,1543,1544],{},"Warum er zählt",[50,1546,1203],{},[60,1548,1549,1559,1569,1579,1589,1599,1609],{},[47,1550,1551,1554,1557],{},[65,1552,1553],{},"Kontrollart",[65,1555,1556],{},"Konformitätsprüfung, periodischer Kontrollbesuch und Verkaufskontrolle haben jeweils eigenen Inhalt und Bericht",[65,1558,642],{},[47,1560,1561,1564,1567],{},[65,1562,1563],{},"Wohn- oder Nichtwohnanlage",[65,1565,1566],{},"Anderer Berichtsinhalt und andere Periodizität",[65,1568,653],{},[47,1570,1571,1574,1577],{},[65,1572,1573],{},"Größe der Anlage",[65,1575,1576],{},"Der Bericht eines Kontrollbesuchs nennt die Zahl der Verteiler und Endstromkreise",[65,1578,664],{},[47,1580,1581,1584,1587],{},[65,1582,1583],{},"Hauswirtschaftliche PV-Anlage (≤ 10 kVA)",[65,1585,1586],{},"Zusätzliche Prüfungen: Trennung bei fehlender Netzspannung und Funktion der Fehlerstromschutzeinrichtung",[65,1588,675],{},[47,1590,1591,1594,1597],{},[65,1592,1593],{},"Fehlende Pläne bei einer Verkaufskontrolle",[65,1595,1596],{},"Der Prüfer erstellt eine summarische Beschreibung und Skizze; das Fehlen wird als Verstoß vermerkt",[65,1598,686],{},[47,1600,1601,1604,1607],{},[65,1602,1603],{},"Änderung oder Erweiterung",[65,1605,1606],{},"Die Kontrolle beschränkt sich auf den hinzugefügten oder geänderten Teil",[65,1608,194],{},[47,1610,1611,1614,1617],{},[65,1612,1613],{},"Nachkontrolle",[65,1615,1616],{},"Geprüft wird die Behebung der festgestellten Verstöße",[65,1618,707],{},[16,1620,1621],{},"Frag deshalb einen Preis für deine konkrete Kontrollart und Anlagengröße an und lass dir bestätigen, ob eine Nachkontrolle gesondert berechnet wird. Der Tarif einer anderen Stelle oder aus einem alten Bericht gilt nicht automatisch für dich. Liegen Eindrahtschema und Positionsplan bereit, muss der Prüfer bei einer Verkaufskontrolle keine Behelfsskizze anfertigen – und du vermeidest gleich einen Verstoß.",[11,1623,1625],{"id":1624},"am-kontrolltag","Am Kontrolltag",[16,1627,1628],{},"Halte eine Ansprechperson bereit, die die Anlage kennt. Entferne keine fest montierten Abdeckungen im Voraus, sofern die Kontrollstelle nichts anderes verlangt; sicherer Zugang ist wichtiger als improvisiertes Öffnen. Sorge dafür, dass Haustiere, gelagerte Gegenstände oder verschlossene Räume den Zugang nicht blockieren.",[16,1630,1631],{},"Notiere Fragen, aber ändere während der Kontrolle nichts an der Installation. Prüfe den Bericht nach Erhalt auf Name und Adresse, Kontrollart, Anlagenumfang und aufgeführte Unterlagen. Fachliche Einwände klärst du sachlich und schriftlich mit Bezug auf die konkrete Feststellung. War ein Raum oder Anlagenteil nicht zugänglich, lies im Bericht nach, wie sich das auf die Schlussfolgerung auswirkt, und kläre, ob ein zusätzlicher Besuch nötig ist.",[11,1633,1635],{"id":1634},"nach-dem-bericht","Nach dem Bericht",[16,1637,1638,1641],{},[32,1639,1640],{},"Positiver Bericht:"," Er bestätigt die Bewertung zum Zeitpunkt und im Umfang der Kontrolle. Bewahre ihn mit Eindrahtschema und Positionsplan in der Anlagenakte auf, die du in zweifacher Ausfertigung besitzt und bei einem Verkauf an den neuen Eigentümer übergibst (Abschnitt 9.1.2). Jede spätere Änderung trägst du in die Akte ein.",[16,1643,1644,1647],{},[32,1645,1646],{},"Negativer Bericht:"," Jeder Verstoß wird einzeln bearbeitet. Die Folgen hängen von der Kontrollart ab:",[41,1649,1650,1661],{},[44,1651,1652],{},[47,1653,1654,1656,1659],{},[50,1655,1553],{},[50,1657,1658],{},"Folge eines negativen Berichts",[50,1660,1203],{},[60,1662,1663,1672,1682],{},[47,1664,1665,1667,1670],{},[65,1666,1008],{},[65,1668,1669],{},"Der betroffene Teil darf nicht in Gebrauch genommen werden, bis die Verstöße behoben und erneut geprüft sind",[65,1671,762],{},[47,1673,1674,1676,1679],{},[65,1675,1038],{},[65,1677,1678],{},"Verstöße unverzüglich beheben; erneuter Besuch durch dieselbe Stelle innerhalb eines Jahres",[65,1680,1681],{},"9.1.3.2, 6.5.7.2 b.6 und b.7",[47,1683,1684,1687,1690],{},[65,1685,1686],{},"Verkaufskontrolle einer alten Anlage",[65,1688,1689],{},"Der Käufer lässt die Behebung innerhalb von 18 Monaten ab der Kaufurkunde erneut kontrollieren; die Stelle wählt er frei",[65,1691,215],{},[16,1693,1290,1694,1698,1699,157],{},[151,1695,1697],{"href":788,"rel":1696},[155],"FÖD-Übersicht der Kontrollarten"," erläutert die Verfahren zusätzlich. Wie du nach einem negativen Ergebnis Schritt für Schritt vorgehst, zeigt unser Leitfaden ",[151,1700,1702],{"href":1701},"\u002Fde\u002Fblog\u002Fstromabnahme-durchgefallen","Elektrokontrolle durchgefallen – was nun?",[11,1704,1706],{"id":1705},"anlage-in-ordnung-bringen-und-nachkontrolle","Anlage in Ordnung bringen und Nachkontrolle",[16,1708,1709],{},"Die Anlage in Ordnung zu bringen heißt: jeden Verstoß aus dem Bericht beheben lassen und die Behebung von einer zugelassenen Stelle prüfen lassen. Nach einem Kontrollbesuch werden die Arbeiten unverzüglich ausgeführt, und solange die Anlage in Betrieb bleibt, triffst du Maßnahmen, damit die Verstöße keine Gefahr für Personen und Güter darstellen (Unterabschnitt 9.1.3.2). Nach einer Konformitätsprüfung darf der betroffene Teil erst nach Behebung und erneuter Kontrolle in Gebrauch genommen werden (Unterabschnitt 9.1.3.1).",[529,1711,1712,1718,1724,1730],{},[330,1713,1714,1717],{},[32,1715,1716],{},"Lies jeden Verstoß mit seiner Fundstelle."," Der Bericht listet die Verstöße auf (Unterabschnitte 6.4.6.4 b.5 und 6.5.7.2 b.5); bearbeite sie einzeln.",[330,1719,1720,1723],{},[32,1721,1722],{},"Lass die Behebung ausführen und bestätigen"," – durch deinen Elektriker, je Verstoß und mit dem betroffenen Stromkreis.",[330,1725,1726,1729],{},[32,1727,1728],{},"Aktualisiere die Unterlagen."," Ändert die Behebung Stromkreise, Schutzeinrichtungen oder Punkte, passt du Eindrahtschema und Positionsplan an und trägst die Änderung in die Anlagenakte ein (Abschnitt 9.1.2). Bei einer Verkaufskontrolle ist das Fehlen der Pläne selbst ein Verstoß (Unterabschnitt 8.4.2.2 d).",[330,1731,1732,1735],{},[32,1733,1734],{},"Beantrage die Nachkontrolle bei der richtigen Stelle."," Nach einem periodischen Kontrollbesuch macht dieselbe zugelassene Stelle den Ergänzungsbesuch vor dem im Bericht genannten Datum (Unterabschnitt 6.5.7.2 b.6). Nach einer Verkaufskontrolle teilt der Käufer seine Identität und das Datum der Urkunde der Stelle des ersten Berichts mit und lässt von einer Stelle seiner Wahl prüfen, ob die Verstöße nach Ablauf von 18 Monaten behoben sind (Unterabschnitt 8.4.2.2 a).",[16,1737,1738,1739,157],{},"Untätigkeit bleibt nicht folgenlos: Bestehen beim zweiten Besuch nach einer periodischen Kontrolle weiter Verstöße, schickt die zugelassene Stelle eine Kopie des Berichts an die Generaldirektion Energie (Unterabschnitt 6.5.7.2 b.7 d). Das vollständige Vorgehen nach einem negativen Ergebnis beschreibt ",[151,1740,1702],{"href":1701},[11,1742,1744],{"id":1743},"prüfumfang-nach-dem-termin-dokumentieren","Prüfumfang nach dem Termin dokumentieren",[16,1746,1747],{},"Halte fest, welche Verteiler, Räume, Quellen und Betriebsarten tatsächlich Teil der Kontrolle waren, und gleiche das mit der Bezeichnung im Bericht ab. Ein positiver Bericht für einen klar umgrenzten Anlagenteil sagt nichts über später ergänzte oder nicht besichtigte Teile. Bewahre die beim Termin vorgelegte Planversion unverändert beim Bericht auf und lege für spätere Änderungen eine neue, datierte Version an. So bleibt nachvollziehbar, welcher Ausführungsstand beurteilt wurde. Änderst du danach feste Leitungen, Schutzgeräte oder PV-, Batterie- und Ladefunktionen, kläre, ob eine neue Konformitätsprüfung nötig ist.",[11,1749,1751],{"id":1750},"wie-planelec-hilft","Wie PlanElec hilft",[16,1753,1754,1755,1757],{},"Die Dokumentation ist oft der aufwändigste Teil der Vorbereitung. ",[32,1756,850],{}," führt Grundriss, Stromkreise und Schaltschrank in einem Projekt zusammen und erzeugt daraus deine Unterlagen:",[327,1759,1760,1765,1770,1776,1782],{},[330,1761,1762,1764],{},[32,1763,948],{}," aus der erfassten elektrischen Topologie, als PDF",[330,1766,1767,1769],{},[32,1768,1307],{}," auf Basis deines Grundrisses mit belgischer Symbolbibliothek, als PDF",[330,1771,1772,1775],{},[32,1773,1774],{},"AREI\u002FRGIE-Selbstprüfung",", die Planungsfehler in den unterstützten Regeln vor dem Termin sichtbar macht",[330,1777,1778,1781],{},[32,1779,1780],{},"Installationsdossier"," mit Deckblatt, Dokumentverzeichnis und durchgehender Seitennummerierung",[330,1783,1784,1787],{},[32,1785,1786],{},"Vier Sprachen",": Niederländisch, Französisch, Deutsch und Englisch",[16,1789,1790,1791,157],{},"Die Rollen sind klar verteilt: Die Selbstprüfung zeigt dir Befunde aus den erfassten Projektdaten, dein Elektriker bestätigt Dimensionierung und Ausführung, und die Abnahme mit Messungen macht die zugelassene Kontrollstelle. Die Liste der zugelassenen Stellen veröffentlicht der ",[151,1792,1091],{"href":153,"rel":1793},[155],[16,1795,1796],{},[151,1797,1798],{"href":892},"Starte jetzt kostenlos mit deiner elektrischen Dokumentation →",{"title":895,"searchDepth":896,"depth":896,"links":1800},[1801,1802,1803,1804,1807,1808,1811,1812,1813,1814,1815,1816,1817,1818,1819,1820],{"id":961,"depth":896,"text":962},{"id":982,"depth":896,"text":983},{"id":1083,"depth":896,"text":1084},{"id":1184,"depth":896,"text":1185,"children":1805},[1806],{"id":1250,"depth":904,"text":1251},{"id":1286,"depth":896,"text":1287},{"id":1324,"depth":896,"text":1325,"children":1809},[1810],{"id":1414,"depth":904,"text":1415},{"id":1441,"depth":896,"text":1442},{"id":1484,"depth":896,"text":1485},{"id":1511,"depth":896,"text":1512},{"id":1518,"depth":896,"text":1519},{"id":1528,"depth":896,"text":1529},{"id":1624,"depth":896,"text":1625},{"id":1634,"depth":896,"text":1635},{"id":1705,"depth":896,"text":1706},{"id":1743,"depth":896,"text":1744},{"id":1750,"depth":896,"text":1751},"Stromabnahme bei einer zugelassenen Kontrollstelle beantragen: wie lange sie gilt, wann eine Nachkontrolle nötig ist, was die Kosten bestimmt und was der Prüfer kontrolliert – mit AREI-Fundstellen.","de",{},"\u002Fblog\u002Felectrical-inspection.de",{"title":956,"description":1821},"Stromabnahme: beantragen, Nachkontrolle und Gültigkeit","elektrische-abnahme","blog\u002Felectrical-inspection.de",[937,938,1830,1831,1832,948,379,1307,1833,1834,1835,1836,1837,949,950],"Stromabnahme","Keuring","elektrische Abnahme","Konformitätserklärung","FI-Schutzschalter","Erdung","Elektriker","Belgien","3D43NnzfkkUgekak4YGPiG-5rii2eu1S9UPG3BV8klA",{"id":1840,"title":1841,"articleId":6,"body":1842,"category":919,"date":920,"description":2706,"extension":922,"image":25,"lastUpdated":923,"locale":2707,"meta":2708,"navigation":926,"ogImage":927,"path":2709,"publishDate":929,"readTime":930,"refreshInterval":931,"seo":2710,"seoTitle":2711,"slug":6,"stem":2712,"tags":2713,"__hash__":2722},"blog\u002Fblog\u002Felectrical-inspection.en.md","Electrical Inspection in Belgium: Booking, Re-inspection and AREI Requirements",{"type":8,"value":1843,"toc":2684},[1844,1848,1851,1856,1859,1865,1869,1963,1966,1970,1977,2060,2066,2070,2073,2129,2132,2136,2165,2168,2172,2180,2200,2207,2211,2214,2294,2297,2301,2304,2324,2328,2331,2357,2360,2367,2371,2374,2391,2394,2398,2401,2405,2408,2411,2415,2418,2503,2506,2510,2513,2516,2520,2526,2532,2577,2588,2592,2595,2621,2626,2630,2633,2637,2643,2673,2679],[11,1845,1847],{"id":1846},"what-is-an-electrical-inspection","What is an electrical inspection?",[16,1849,1850],{},"The electrical inspection – the keuring – is the check of your installation by an approved inspection body. A new installation is inspected for conformity with the AREI\u002FRGIE before it is put into use (Book 1, chapter 6.4); after that come control visits, at the latest every 25 years for a domestic installation (section 6.5.2). The inspector reviews the documents, examines the installation, tests the protective devices and measures insulation resistance and earth electrode resistance. For a new installation, the grid operator only makes the power available once a positive conformity report exists (subsection 6.4.6.2).",[16,1852,1853],{},[22,1854],{"alt":1855,"src":25},"An on-site inspection of a Belgian residential installation.",[16,1857,1858],{},"Which inspection applies to you depends on the trigger: new build, significant extension, periodic visit, sale of a home with an old installation, or an increase in connection capacity. This guide sorts the cases, lists the requirements an inspector typically checks in a home and shows you how to prepare documents that match the installation as built.",[16,1860,1861,1864],{},[32,1862,1863],{},"Editing and review: PlanElec team, 8 October 2026."," All references point to AREI\u002FRGIE Book 1, version 06, applicable since 1 April 2026.",[11,1866,1868],{"id":1867},"when-do-you-need-an-inspection","When do you need an inspection?",[41,1870,1871,1884],{},[44,1872,1873],{},[47,1874,1875,1878,1881],{},[50,1876,1877],{},"Trigger",[50,1879,1880],{},"What is inspected",[50,1882,1883],{},"Book 1 reference",[60,1885,1886,1897,1908,1919,1930,1941,1952],{},[47,1887,1888,1891,1894],{},[65,1889,1890],{},"New installation",[65,1892,1893],{},"Conformity inspection before putting into use",[65,1895,1896],{},"chapter 6.4",[47,1898,1899,1902,1905],{},[65,1900,1901],{},"Significant modification or extension, for example a new circuit",[65,1903,1904],{},"Added or modified parts; affected unchanged parts with regard to the modified characteristics",[65,1906,1907],{},"subsection 6.4.7.3",[47,1909,1910,1913,1916],{},[65,1911,1912],{},"Non-significant modification, for example a socket on an existing circuit",[65,1914,1915],{},"No inspection before use; a short description goes into the installation file",[65,1917,1918],{},"section 9.1.2 no. 7",[47,1920,1921,1924,1927],{},[65,1922,1923],{},"Periodic control visit",[65,1925,1926],{},"Domestic installations at the latest every 25 years, other installations every 5 years",[65,1928,1929],{},"section 6.5.2",[47,1931,1932,1935,1938],{},[65,1933,1934],{},"Sale of a dwelling with an old installation (before 1 October 1981)",[65,1936,1937],{},"Control visit arranged by the seller",[65,1939,1940],{},"section 8.4.2",[47,1942,1943,1946,1949],{},[65,1944,1945],{},"Higher connection capacity for an old domestic installation",[65,1947,1948],{},"Control visit before the grid operator increases the capacity",[65,1950,1951],{},"section 8.4.1",[47,1953,1954,1957,1960],{},[65,1955,1956],{},"Negative report",[65,1958,1959],{},"New inspection once the infringements are corrected",[65,1961,1962],{},"chapter 9.1, section 8.4.2",[16,1964,1965],{},"A modification is significant when it has an additional impact on the safety of people or property that no conformity inspection has covered yet (definition in part 2). Describe the actual work to your electrician and the inspection body instead of just ticking \"renovation\". That way the body schedules the right type of inspection and the right scope.",[11,1967,1969],{"id":1968},"booking-an-electrical-inspection-which-body","Booking an electrical inspection: which body?",[16,1971,1972,1973,157],{},"You book an electrical inspection with an approved inspection body: a body approved by the minister responsible for energy to carry out conformity inspections before use and control visits (section 6.3.1). To be approved, it must be accredited to NBN EN ISO\u002FIEC 17020 and meet the requirements for a type A inspection body (subsection 6.3.3.1 a). The competent authority may also carry out the inspection (sections 6.4.1 and 6.5.1). The current list of approved bodies is published by the ",[151,1974,1976],{"href":153,"rel":1975},[155],"FPS Economy",[41,1978,1979,1990],{},[44,1980,1981],{},[47,1982,1983,1985,1988],{},[50,1984,1100],{},[50,1986,1987],{},"What to know when booking",[50,1989,1883],{},[60,1991,1992,2001,2011,2020,2030,2040,2050],{},[47,1993,1994,1996,1999],{},[65,1995,1890],{},[65,1997,1998],{},"Book the inspection before first use; without a positive report the grid operator does not make power available",[65,2000,183],{},[47,2002,2003,2006,2009],{},[65,2004,2005],{},"Significant modification or extension",[65,2007,2008],{},"Inspection before the new part is used; it is limited to the added or modified part",[65,2010,194],{},[47,2012,2013,2015,2018],{},[65,2014,1923],{},[65,2016,2017],{},"The latest date is stated in the report of the previous inspection",[65,2019,204],{},[47,2021,2022,2025,2028],{},[65,2023,2024],{},"Sale of a home with an old installation",[65,2026,2027],{},"The seller has the control visit carried out; the report date is recorded in the authentic deed",[65,2029,215],{},[47,2031,2032,2035,2038],{},[65,2033,2034],{},"Connection capacity increase for an old installation",[65,2036,2037],{},"The inspection report accompanies the request for the increase",[65,2039,226],{},[47,2041,2042,2045,2048],{},[65,2043,2044],{},"Re-inspection after a negative periodic visit",[65,2046,2047],{},"The follow-up visit is carried out by the same approved body",[65,2049,237],{},[47,2051,2052,2055,2058],{},[65,2053,2054],{},"Re-inspection after a sale inspection",[65,2056,2057],{},"The buyer chooses the approved body freely",[65,2059,215],{},[16,2061,2062,2065],{},[32,2063,2064],{},"Have this information ready when booking."," The report states, among other things, the name and address of the owner, manager or operator, the installation's EAN code (if available), the address of the installation and the type of premises it supplies (subsections 6.4.6.4 b.1 and 6.5.7.2 b.1). For a conformity inspection, it also names the person responsible for carrying out the work, with VAT number where applicable, and the electricity distribution company. Practical questions to ask when booking are covered further down in this article.",[11,2067,2069],{"id":2068},"how-long-is-an-electrical-inspection-valid","How long is an electrical inspection valid?",[16,2071,2072],{},"A positive report confirms conformity at the time of the inspection; the next control visit must take place at the latest within the interval of section 6.5.2. For a domestic installation that is every 25 years, and the conformity inspection report itself states the latest date (subsection 6.4.6.4 b.6).",[41,2074,2075,2088],{},[44,2076,2077],{},[47,2078,2079,2082,2085],{},[50,2080,2081],{},"Type of installation",[50,2083,2084],{},"Control visit at least",[50,2086,2087],{},"Reference",[60,2089,2090,2100,2110,2120],{},[47,2091,2092,2095,2098],{},[65,2093,2094],{},"Domestic installation",[65,2096,2097],{},"every 25 years",[65,2099,288],{},[47,2101,2102,2105,2108],{},[65,2103,2104],{},"Other installations, for example non-domestic",[65,2106,2107],{},"every 5 years",[65,2109,288],{},[47,2111,2112,2115,2118],{},[65,2113,2114],{},"Movable, mobile or temporary installation",[65,2116,2117],{},"every year",[65,2119,288],{},[47,2121,2122,2125,2127],{},[65,2123,2124],{},"Installation in an explosive atmosphere zone",[65,2126,2117],{},[65,2128,288],{},[16,2130,2131],{},"Book 1 does not provide for \"extending\" an inspection. As the date in your last report approaches, you have a new control visit carried out; the periodic interval then starts again. After a control visit of an old installation, too, sections 6.5.1 and 6.5.2 apply to every later visit (section 8.4.1 and subsection 8.4.2.3).",[322,2133,2135],{"id":2134},"when-do-you-need-a-new-inspection-sooner","When do you need a new inspection sooner?",[327,2137,2138,2143,2148,2154,2159],{},[330,2139,2140,2142],{},[32,2141,2005],{},": conformity inspection of that part before use (subsection 6.4.7.3).",[330,2144,2145,2147],{},[32,2146,2024],{},": if the installation dates from before 1 October 1981 and that part has not yet had a control visit (subsection 8.4.2.1).",[330,2149,2150,2153],{},[32,2151,2152],{},"Connection capacity increase"," for an old domestic installation (section 8.4.1).",[330,2155,2156,2158],{},[32,2157,1956],{},": a re-inspection once the infringements are corrected (see below: bringing the installation into compliance and re-inspection).",[330,2160,2161,2164],{},[32,2162,2163],{},"Installation inspected under the old AREI",": the first control visit under section 6.5.2 takes place within the interval set in the last report under the old AREI (section 8.1.2).",[16,2166,2167],{},"If you sell a home whose installation has already had a conformity inspection or a control visit, it falls outside the scope of section 8.4.2. You still hand the file with diagrams, plans and reports to the new owner (section 9.1.2), and the interval from the last report continues to apply.",[11,2169,2171],{"id":2170},"the-documents-you-present","The documents you present",[16,2173,2174,2175,2179],{},"The ",[151,2176,2178],{"href":369,"rel":2177},[155],"FPS Economy page on domestic installation inspections"," lists at least the single-line diagram, the situation plan and – if available – the EAN code of the connection.",[327,2181,2182,2188,2194],{},[330,2183,2184,2187],{},[32,2185,2186],{},"Single-line diagram"," (eendraadschema \u002F schéma unifilaire): all boards, circuits, protective devices and wiring with their characteristics (subsection 3.1.2.2).",[330,2189,2190,2193],{},[32,2191,2192],{},"Situation plan"," (situatieplan \u002F plan de position): the location of boards, boxes, sockets, light points, switches, fixed appliances and sources (subsection 3.1.2.3).",[330,2195,2196,2199],{},[32,2197,2198],{},"Manufacturer documents"," for special equipment. For a PV system, the file includes operating instructions, safety instructions and the technical data of the components (section 9.1.2).",[16,2201,2202,2203,157],{},"In a conformity inspection, the report expressly certifies that the installation was built according to the single-line diagram and situation plan (subsection 6.4.6.4, b.4). A plan showing an outdated state stands out just as much as a missing drawing. What a situation plan is exactly is explained in ",[151,2204,2206],{"href":2205},"\u002Fen\u002Fblog\u002Fwhat-is-a-situation-plan","What is a situation plan",[11,2208,2210],{"id":2209},"the-requirements-an-inspector-checks-in-a-home","The requirements an inspector checks in a home",[16,2212,2213],{},"The table brings together Book 1 requirements that regularly sit at the centre of a domestic inspection. It does not replace the full text, but it shows you where to look before the appointment.",[41,2215,2216,2225],{},[44,2217,2218],{},[47,2219,2220,2223],{},[50,2221,2222],{},"Requirement",[50,2224,2087],{},[60,2226,2227,2234,2241,2249,2257,2265,2272,2279,2286],{},[47,2228,2229,2232],{},[65,2230,2231],{},"RCD of at most 300 mA at the origin of the installation",[65,2233,427],{},[47,2235,2236,2239],{},[65,2237,2238],{},"High- or very-high-sensitivity RCD (at most 30 mA) for sockets, lighting, bathroom\u002Fshower and washing machine, tumble dryer and dishwasher; at most eight final circuits per device",[65,2240,427],{},[47,2242,2243,2246],{},[65,2244,2245],{},"Earth electrode resistance below 100 Ω; above 30 Ω at least two high-sensitivity RCDs with at most 16 sockets each and at most 100 mA for the remaining circuits",[65,2247,2248],{},"4.2.3.2 and 4.2.4.3 b",[47,2250,2251,2254],{},[65,2252,2253],{},"Protective device matched to the cross-section, e.g. 1.5 mm²: circuit breaker 16 A or fuse 10 A; 2.5 mm²: 20 A or 16 A",[65,2255,2256],{},"4.4.1.4, table 4.11",[47,2258,2259,2262],{},[65,2260,2261],{},"Socket circuits at least 2.5 mm²; at most eight single or multiple socket outlets per final circuit",[65,2263,2264],{},"5.2.1.2 and 5.3.5.2 b",[47,2266,2267,2270],{},[65,2268,2269],{},"At least two separate lighting circuits when the dwelling has more than two rooms",[65,2271,466],{},[47,2273,2274,2277],{},[65,2275,2276],{},"Dedicated circuit for washing machine, dishwasher, tumble dryer, cooker, hob, oven and every appliance with a fixed location from 2600 W",[65,2278,474],{},[47,2280,2281,2284],{},[65,2282,2283],{},"Main switch-disconnector of at least 40 A in domestic installations",[65,2285,482],{},[47,2287,2288,2291],{},[65,2289,2290],{},"Insulation resistance of at least 500 kΩ per circuit at a test voltage of 500 V DC",[65,2292,2293],{},"6.4.5.1, table 6.1",[16,2295,2296],{},"The 30 Ω value is not a pass\u002Ffail line: above it, Book 1 requires a stricter RCD layout, and the earth must stay below 100 Ω in any case. A cable's current-carrying capacity also depends on installation method, insulation and ambient temperature (4.4.1.4). So have your electrician confirm the sizing and protection concept.",[322,2298,2300],{"id":2299},"typical-stumbling-blocks","Typical stumbling blocks",[16,2302,2303],{},"These points come up often in practice; no reliable ranking exists:",[327,2305,2306,2309,2312,2315,2318,2321],{},[330,2307,2308],{},"single-line diagram missing or showing an outdated state",[330,2310,2311],{},"too few or wrongly assigned high-sensitivity RCDs",[330,2313,2314],{},"an earth resistance without the matching RCD layout",[330,2316,2317],{},"cables not adequately fixed or mechanically protected",[330,2319,2320],{},"junction boxes without covers or not accessible",[330,2322,2323],{},"only one lighting circuit in a dwelling with more than two rooms",[11,2325,2327],{"id":2326},"what-happens-during-the-inspection","What happens during the inspection?",[16,2329,2330],{},"The conformity inspection is carried out with the installation de-energised and has four parts (section 6.4.1):",[529,2332,2333,2339,2345,2351],{},[330,2334,2335,2338],{},[32,2336,2337],{},"Administrative checks",": documents, installation data, comparison of single-line diagram and situation plan with the installation as built.",[330,2340,2341,2344],{},[32,2342,2343],{},"Visual checks",": equipment, wiring, covers, labelling and accessibility.",[330,2346,2347,2350],{},[32,2348,2349],{},"Checks by testing",": for example the operation of protective devices and the continuity of protective conductors and equipotential bonding.",[330,2352,2353,2356],{},[32,2354,2355],{},"Checks by measurement",": insulation resistance (6.4.5.1) and earth electrode resistance (6.4.5.2).",[16,2358,2359],{},"The report states the earth resistance and insulation level and certifies that RCDs and earth value, as well as overcurrent protection and wiring, are coordinated (6.4.6.4, b.4). If the installation conforms, the inspector endorses the single-line diagram and situation plan and states the date by which the next control visit must take place (b.6).",[16,2361,2362,2363,157],{},"Under version 06, the inspector also seals the RCD at the origin of a conforming installation. From 1 November 2026, that obligation ends with Book 1 version 07; the details are in our article ",[151,2364,2366],{"href":2365},"\u002Fen\u002Fblog\u002Frcd-sealing-abolished-2026","RCD sealing is abolished",[11,2368,2370],{"id":2369},"compare-documents-and-installation-before-the-appointment","Compare documents and installation before the appointment",[16,2372,2373],{},"Check both plans systematically against the installation as built:",[529,2375,2376,2379,2382,2385,2388],{},[330,2377,2378],{},"Do the circuit labels in the board, on the single-line diagram and on the situation plan match?",[330,2380,2381],{},"Are ratings, number of poles, cable type and cross-section recorded correctly?",[330,2383,2384],{},"Are new sockets, light points, fixed appliances and sources on the plan?",[330,2386,2387],{},"Can connection and junction boxes be found and reached?",[330,2389,2390],{},"Are the manufacturer documents for PV, charger, battery or other special equipment ready?",[16,2392,2393],{},"A neat drawing of an old state does not help you, and a technically sound installation still needs the prescribed plans. Mark open points and resolve them with your electrician before the appointment.",[11,2395,2397],{"id":2396},"prepare-for-visual-checks-and-measurements","Prepare for visual checks and measurements",[16,2399,2400],{},"Measured values are taken on the day, on your installation. Do not copy values from an old report and do not put estimated values on the plans. Make sure there is safe access to the board, the earth disconnecting link and every room; labels must be legible and covers complete. Announce special features such as PV, a battery, a backup function, a charging point or older parts of the installation in advance. Opening equipment and measuring live circuits is the electrician's job, not part of your preparation.",[11,2402,2404],{"id":2403},"questions-when-booking","Questions when booking",[16,2406,2407],{},"Tell the inspection body whether the use is domestic or non-domestic, which type of inspection you need, how many boards there are and which special sources exist. Ask whether documents are expected digitally or on paper, whether all rooms must be accessible and how an ongoing renovation is handled. Have the fee, payment method and rescheduling terms confirmed directly; another provider's published prices do not automatically apply to you.",[16,2409,2410],{},"For a sale inspection, share the construction year and earlier reports. For a significant extension, describe the existing part and the new part. For PV, storage or a charger, state the operating mode and the manufacturer documents. That lets the body plan the inspection type and duration correctly.",[11,2412,2414],{"id":2413},"what-does-an-electrical-inspection-or-re-inspection-cost","What does an electrical inspection or re-inspection cost?",[16,2416,2417],{},"Book 1 sets no fees: you agree the price of an inspection or re-inspection with the approved body. What the regulation does show is what determines the scope of the inspection – and therefore the work on site:",[41,2419,2420,2431],{},[44,2421,2422],{},[47,2423,2424,2426,2429],{},[50,2425,624],{},[50,2427,2428],{},"Why it matters",[50,2430,2087],{},[60,2432,2433,2443,2453,2463,2473,2483,2493],{},[47,2434,2435,2438,2441],{},[65,2436,2437],{},"Type of inspection",[65,2439,2440],{},"Conformity inspection, periodic control visit and sale inspection each have their own content and report",[65,2442,642],{},[47,2444,2445,2448,2451],{},[65,2446,2447],{},"Domestic or non-domestic",[65,2449,2450],{},"Different report content and a different interval",[65,2452,653],{},[47,2454,2455,2458,2461],{},[65,2456,2457],{},"Size of the installation",[65,2459,2460],{},"A control visit report states the number of boards and final circuits",[65,2462,664],{},[47,2464,2465,2468,2471],{},[65,2466,2467],{},"Domestic PV installation (≤ 10 kVA)",[65,2469,2470],{},"Additional tests: disconnection when grid voltage is absent and operation of the residual current device",[65,2472,675],{},[47,2474,2475,2478,2481],{},[65,2476,2477],{},"Missing plans during a sale inspection",[65,2479,2480],{},"The inspector draws up a summary description and sketch; the absence is recorded as an infringement",[65,2482,686],{},[47,2484,2485,2488,2491],{},[65,2486,2487],{},"Modification or extension",[65,2489,2490],{},"The inspection is limited to the added or modified part",[65,2492,194],{},[47,2494,2495,2498,2501],{},[65,2496,2497],{},"Re-inspection",[65,2499,2500],{},"The check covers the removal of the infringements found",[65,2502,707],{},[16,2504,2505],{},"So ask for a price for your specific inspection type and installation, and have it confirmed whether a re-inspection is charged separately. Another body's fee or one from an old report does not automatically apply to you. If the single-line diagram and situation plan are ready, the inspector does not need to draw a makeshift sketch during a sale inspection – and you avoid an infringement at the same time.",[11,2507,2509],{"id":2508},"on-the-day","On the day",[16,2511,2512],{},"Have a contact person available who knows the installation. Do not remove fixed covers in advance unless the body asks you to; safe access matters more than improvised opening. Make sure pets, stored items or locked rooms do not block access.",[16,2514,2515],{},"Write down questions, but do not change the installation during the inspection. When you receive the report, check name and address, inspection type, scope of the installation and the documents listed. Raise technical objections in writing, referring to the specific finding. If a room or part of the installation was not accessible, read in the report how that affects the conclusion and ask whether an additional visit is needed.",[11,2517,2519],{"id":2518},"after-the-report","After the report",[16,2521,2522,2525],{},[32,2523,2524],{},"Positive report:"," it confirms the assessment at the time and within the scope of the inspection. Keep it with the single-line diagram and situation plan in the installation file, which you hold in duplicate and hand over to the new owner when you sell (section 9.1.2). Record every later modification in that file.",[16,2527,2528,2531],{},[32,2529,2530],{},"Negative report:"," deal with each infringement separately. The consequences depend on the type of inspection:",[41,2533,2534,2545],{},[44,2535,2536],{},[47,2537,2538,2540,2543],{},[50,2539,2437],{},[50,2541,2542],{},"Consequence of a negative report",[50,2544,2087],{},[60,2546,2547,2557,2567],{},[47,2548,2549,2552,2555],{},[65,2550,2551],{},"Conformity inspection before use",[65,2553,2554],{},"The affected part may not be put into use until the infringements are corrected and inspected again",[65,2556,762],{},[47,2558,2559,2561,2564],{},[65,2560,1923],{},[65,2562,2563],{},"Correct the infringements without delay; new visit by the same body within one year",[65,2565,2566],{},"9.1.3.2, 6.5.7.2 b.6 and b.7",[47,2568,2569,2572,2575],{},[65,2570,2571],{},"Sale inspection of an old installation",[65,2573,2574],{},"The buyer has the corrections inspected within 18 months of the deed of sale and chooses the body freely",[65,2576,215],{},[16,2578,2174,2579,2583,2584,157],{},[151,2580,2582],{"href":788,"rel":2581},[155],"FPS Economy overview of inspection types"," explains the procedures further. For a step-by-step approach after a negative result, read ",[151,2585,2587],{"href":2586},"\u002Fen\u002Fblog\u002Finspection-failed-what-now","Electrical inspection failed – what now?",[11,2589,2591],{"id":2590},"bringing-the-installation-into-compliance-and-re-inspection","Bringing the installation into compliance and re-inspection",[16,2593,2594],{},"Bringing your electrical installation into compliance means having every infringement in the report corrected and having the correction checked by an approved body. After a control visit, the work is carried out without delay and, as long as the installation stays in service, you take measures so the infringements pose no danger to people or property (subsection 9.1.3.2). After a conformity inspection, the affected part may only be used after correction and a new inspection (subsection 9.1.3.1).",[529,2596,2597,2603,2609,2615],{},[330,2598,2599,2602],{},[32,2600,2601],{},"Read each infringement with its reference."," The report lists the infringements (subsections 6.4.6.4 b.5 and 6.5.7.2 b.5); deal with them one at a time.",[330,2604,2605,2608],{},[32,2606,2607],{},"Have the correction carried out and confirmed"," by your electrician, per infringement and with the circuit concerned.",[330,2610,2611,2614],{},[32,2612,2613],{},"Update the documents."," If the correction changes circuits, protective devices or points, update the single-line diagram and situation plan and record the change in the installation file (section 9.1.2). During a sale inspection, missing plans are an infringement in themselves (subsection 8.4.2.2 d).",[330,2616,2617,2620],{},[32,2618,2619],{},"Book the re-inspection with the right body."," After a periodic control visit, the same approved body carries out the follow-up visit before the date stated in the report (subsection 6.5.7.2 b.6). After a sale inspection, the buyer informs the body that issued the first report of their identity and the date of the deed, and has a body of their choice check that the infringements have been removed at the end of the 18-month period (subsection 8.4.2.2 a).",[16,2622,2623,2624,157],{},"Doing nothing has consequences: if infringements remain at the second visit after a periodic inspection, the approved body sends a copy of the report to the Directorate-General for Energy (subsection 6.5.7.2 b.7 d). The full approach after a negative result is in ",[151,2625,2587],{"href":2586},[11,2627,2629],{"id":2628},"record-the-inspected-scope-after-the-visit","Record the inspected scope after the visit",[16,2631,2632],{},"Note which boards, rooms, sources and operating modes were actually part of the inspection and compare that with the description in the report. A positive report for a clearly delimited part says nothing about parts added later or not visited. Keep the plan version presented at the inspection unchanged with the report, and create a new, dated version for later work. That way you can always show which state of the installation was assessed. If you later change fixed wiring, protective devices or PV, battery or charging functions, check whether a new conformity inspection is required.",[11,2634,2636],{"id":2635},"how-planelec-helps","How PlanElec helps",[16,2638,2639,2640,2642],{},"Documentation is often the heaviest part of the preparation. ",[32,2641,850],{}," brings floor plan, circuits and distribution board together in one project and generates your documents from it:",[327,2644,2645,2650,2655,2661,2667],{},[330,2646,2647,2649],{},[32,2648,2186],{}," from the electrical topology you entered, as a PDF",[330,2651,2652,2654],{},[32,2653,2192],{}," based on your floor plan with a Belgian symbol library, as a PDF",[330,2656,2657,2660],{},[32,2658,2659],{},"AREI\u002FRGIE self-check"," that surfaces design errors in the supported rules before the inspection",[330,2662,2663,2666],{},[32,2664,2665],{},"Installation dossier"," with cover page, document index and continuous page numbering",[330,2668,2669,2672],{},[32,2670,2671],{},"Four languages",": Dutch, French, German and English",[16,2674,2675,2676,157],{},"The roles are clearly split: the self-check shows you findings from the project data you entered, your electrician confirms sizing and workmanship, and the inspection with measurements is done by the approved inspection body. The list of approved bodies is published by the ",[151,2677,1976],{"href":153,"rel":2678},[155],[16,2680,2681],{},[151,2682,2683],{"href":892},"Start your electrical documentation for free →",{"title":895,"searchDepth":896,"depth":896,"links":2685},[2686,2687,2688,2689,2692,2693,2696,2697,2698,2699,2700,2701,2702,2703,2704,2705],{"id":1846,"depth":896,"text":1847},{"id":1867,"depth":896,"text":1868},{"id":1968,"depth":896,"text":1969},{"id":2068,"depth":896,"text":2069,"children":2690},[2691],{"id":2134,"depth":904,"text":2135},{"id":2170,"depth":896,"text":2171},{"id":2209,"depth":896,"text":2210,"children":2694},[2695],{"id":2299,"depth":904,"text":2300},{"id":2326,"depth":896,"text":2327},{"id":2369,"depth":896,"text":2370},{"id":2396,"depth":896,"text":2397},{"id":2403,"depth":896,"text":2404},{"id":2413,"depth":896,"text":2414},{"id":2508,"depth":896,"text":2509},{"id":2518,"depth":896,"text":2519},{"id":2590,"depth":896,"text":2591},{"id":2628,"depth":896,"text":2629},{"id":2635,"depth":896,"text":2636},"Booking an electrical inspection with an approved body: how long it stays valid, when a re-inspection is needed, what drives the cost and what the inspector checks – with AREI references.","en",{},"\u002Fblog\u002Felectrical-inspection.en",{"title":1841,"description":2706},"Electrical Inspection: Booking, Re-inspection and Validity","blog\u002Felectrical-inspection.en",[937,938,2714,939,2715,2716,941,948,949,2717,951,950,2718,2719,2720,2721],"electrical inspection","contrôle électrique","single-line diagram","situation plan","compliance","RCD","earthing","Belgium","p27vHXVgd4xKxbzy1bciRDXauQPP1OF_N3LRrYEWcFE",{"id":2724,"title":2725,"articleId":6,"body":2726,"category":919,"date":920,"description":3587,"extension":922,"image":25,"lastUpdated":923,"locale":3588,"meta":3589,"navigation":926,"ogImage":927,"path":3590,"publishDate":929,"readTime":930,"refreshInterval":931,"seo":3591,"seoTitle":3592,"slug":3593,"stem":3594,"tags":3595,"__hash__":3602},"blog\u002Fblog\u002Felectrical-inspection.fr.md","Contrôle électrique en Belgique : demande, recontrôle et exigences RGIE",{"type":8,"value":2727,"toc":3565},[2728,2732,2735,2740,2743,2749,2753,2844,2847,2851,2858,2941,2947,2951,2954,3010,3013,3017,3046,3049,3053,3061,3081,3088,3092,3095,3175,3178,3182,3185,3205,3209,3212,3238,3241,3248,3252,3255,3272,3275,3279,3282,3286,3289,3292,3296,3299,3385,3388,3392,3395,3398,3402,3408,3414,3458,3469,3473,3476,3502,3507,3511,3514,3518,3524,3554,3560],[11,2729,2731],{"id":2730},"quest-ce-quun-contrôle-électrique","Qu'est-ce qu'un contrôle électrique ?",[16,2733,2734],{},"Le contrôle électrique est la vérification de votre installation par un organisme agréé. Une nouvelle installation fait l'objet d'un contrôle de conformité au RGIE avant sa mise en usage (Livre 1, chapitre 6.4) ; viennent ensuite les visites de contrôle, au plus tard tous les 25 ans pour une installation domestique (section 6.5.2). L'organisme examine les documents, inspecte l'installation, essaie les protections et mesure la résistance d'isolement et la résistance de dispersion de la prise de terre. Pour une nouvelle installation, le gestionnaire de réseau ne met la puissance à disposition qu'au vu d'un rapport de conformité positif (sous-section 6.4.6.2).",[16,2736,2737],{},[22,2738],{"alt":2739,"src":25},"Contrôle sur place d’une installation domestique belge.",[16,2741,2742],{},"Le contrôle qui vous concerne dépend de l'occasion : construction neuve, extension importante, visite périodique, vente d'un logement doté d'une ancienne installation ou augmentation de la puissance de raccordement. Ce guide classe les cas, présente les exigences que l'agent-visiteur contrôle habituellement dans une habitation et montre comment préparer des documents qui correspondent à l'installation réelle.",[16,2744,2745,2748],{},[32,2746,2747],{},"Rédaction et vérification : équipe PlanElec, 8 octobre 2026."," Toutes les références renvoient au RGIE Livre 1, version 06, applicable depuis le 1er avril 2026.",[11,2750,2752],{"id":2751},"quand-un-contrôle-est-il-nécessaire","Quand un contrôle est-il nécessaire ?",[41,2754,2755,2768],{},[44,2756,2757],{},[47,2758,2759,2762,2765],{},[50,2760,2761],{},"Occasion",[50,2763,2764],{},"Ce qui est contrôlé",[50,2766,2767],{},"Référence Livre 1",[60,2769,2770,2781,2792,2803,2813,2823,2833],{},[47,2771,2772,2775,2778],{},[65,2773,2774],{},"Nouvelle installation",[65,2776,2777],{},"Contrôle de conformité avant mise en usage",[65,2779,2780],{},"chapitre 6.4",[47,2782,2783,2786,2789],{},[65,2784,2785],{},"Modification ou extension importante, par exemple un nouveau circuit",[65,2787,2788],{},"Parties ajoutées ou modifiées ; parties inchangées concernées, pour les caractéristiques modifiées",[65,2790,2791],{},"sous-section 6.4.7.3",[47,2793,2794,2797,2800],{},[65,2795,2796],{},"Modification non importante, par exemple une prise sur un circuit existant",[65,2798,2799],{},"Pas de contrôle avant mise en usage ; une brève description rejoint le dossier",[65,2801,2802],{},"section 9.1.2, 7°",[47,2804,2805,2808,2811],{},[65,2806,2807],{},"Visite de contrôle périodique",[65,2809,2810],{},"Installations domestiques au plus tard tous les 25 ans, autres installations tous les 5 ans",[65,2812,1929],{},[47,2814,2815,2818,2821],{},[65,2816,2817],{},"Vente d'une unité d'habitation avec une ancienne installation (avant le 1er octobre 1981)",[65,2819,2820],{},"Visite de contrôle à charge du vendeur",[65,2822,1940],{},[47,2824,2825,2828,2831],{},[65,2826,2827],{},"Augmentation de la puissance de raccordement d'une ancienne installation domestique",[65,2829,2830],{},"Visite de contrôle avant que le gestionnaire de réseau n'augmente la puissance",[65,2832,1951],{},[47,2834,2835,2838,2841],{},[65,2836,2837],{},"Rapport négatif",[65,2839,2840],{},"Nouveau contrôle après correction des infractions",[65,2842,2843],{},"chapitre 9.1, section 8.4.2",[16,2845,2846],{},"Une modification est importante lorsqu'elle a un impact supplémentaire, non encore couvert par un contrôle de conformité, sur la sécurité des personnes ou des biens (définition de la partie 2). Décrivez donc concrètement les travaux à votre électricien et à l'organisme, au lieu de cocher simplement « rénovation ». L'organisme peut alors prévoir le bon type de contrôle et le bon périmètre.",[11,2848,2850],{"id":2849},"demander-un-contrôle-électrique-à-quel-organisme","Demander un contrôle électrique : à quel organisme ?",[16,2852,2853,2854,157],{},"Un contrôle électrique se demande à un organisme agréé, c'est-à-dire un organisme de contrôle agréé par le Ministre ayant l'Energie dans ses attributions pour les contrôles de conformité avant la mise en usage et les visites de contrôle (section 6.3.1). Pour être agréé, l'organisme doit être accrédité selon la norme NBN EN ISO\u002FIEC 17020 et répondre aux exigences d'un organisme de contrôle de type A (sous-section 6.3.3.1 a). L'autorité compétente peut aussi réaliser le contrôle (sections 6.4.1 et 6.5.1). La liste à jour des organismes agréés est publiée par le ",[151,2855,2857],{"href":153,"rel":2856},[155],"SPF Economie",[41,2859,2860,2871],{},[44,2861,2862],{},[47,2863,2864,2866,2869],{},[50,2865,1100],{},[50,2867,2868],{},"Ce qu'il faut savoir au moment de la demande",[50,2870,2767],{},[60,2872,2873,2882,2892,2901,2911,2921,2931],{},[47,2874,2875,2877,2880],{},[65,2876,2774],{},[65,2878,2879],{},"Demander le contrôle avant la mise en usage ; sans rapport positif, le gestionnaire de réseau ne met pas la puissance à disposition",[65,2881,183],{},[47,2883,2884,2887,2890],{},[65,2885,2886],{},"Modification ou extension importante",[65,2888,2889],{},"Contrôle avant la mise en usage de la nouvelle partie ; il se limite à la partie ajoutée ou modifiée",[65,2891,194],{},[47,2893,2894,2896,2899],{},[65,2895,2807],{},[65,2897,2898],{},"La date limite figure dans le rapport du contrôle précédent",[65,2900,204],{},[47,2902,2903,2906,2909],{},[65,2904,2905],{},"Vente d'un logement avec une ancienne installation",[65,2907,2908],{},"Le vendeur fait effectuer la visite de contrôle ; la date du rapport est mentionnée dans l'acte authentique",[65,2910,215],{},[47,2912,2913,2916,2919],{},[65,2914,2915],{},"Renforcement du raccordement d'une ancienne installation",[65,2917,2918],{},"Le rapport de contrôle accompagne la demande de renforcement",[65,2920,226],{},[47,2922,2923,2926,2929],{},[65,2924,2925],{},"Recontrôle après une visite périodique négative",[65,2927,2928],{},"La visite complémentaire est effectuée par le même organisme agréé",[65,2930,237],{},[47,2932,2933,2936,2939],{},[65,2934,2935],{},"Recontrôle après un contrôle lors de la vente",[65,2937,2938],{},"L'acheteur choisit librement l'organisme agréé",[65,2940,215],{},[16,2942,2943,2946],{},[32,2944,2945],{},"Les données à préparer pour la demande."," Le rapport mentionne notamment les nom et adresse du propriétaire, gestionnaire ou exploitant, le code EAN de l'installation (si disponible), l'adresse de l'installation et le type de locaux qu'elle dessert (sous-sections 6.4.6.4 b.1 et 6.5.7.2 b.1). Pour un contrôle de conformité s'y ajoutent la ou les personnes responsables de l'exécution des travaux, avec leur numéro de TVA le cas échéant, et l'entreprise qui distribue l'électricité. Les questions pratiques à poser lors de la prise de rendez-vous figurent plus loin dans cet article.",[11,2948,2950],{"id":2949},"combien-de-temps-un-contrôle-électrique-est-il-valable","Combien de temps un contrôle électrique est-il valable ?",[16,2952,2953],{},"Un rapport positif confirme la conformité au moment du contrôle ; la visite de contrôle suivante doit avoir lieu au plus tard dans le délai de la section 6.5.2. Pour une installation domestique, c'est tous les 25 ans, et le rapport du contrôle de conformité indique lui-même la date limite (sous-section 6.4.6.4 b.6).",[41,2955,2956,2969],{},[44,2957,2958],{},[47,2959,2960,2963,2966],{},[50,2961,2962],{},"Type d'installation",[50,2964,2965],{},"Visite de contrôle au moins",[50,2967,2968],{},"Référence",[60,2970,2971,2981,2991,3001],{},[47,2972,2973,2976,2979],{},[65,2974,2975],{},"Installation domestique",[65,2977,2978],{},"tous les 25 ans",[65,2980,288],{},[47,2982,2983,2986,2989],{},[65,2984,2985],{},"Autres installations, par exemple non domestiques",[65,2987,2988],{},"tous les 5 ans",[65,2990,288],{},[47,2992,2993,2996,2999],{},[65,2994,2995],{},"Installation déplaçable, mobile ou temporaire",[65,2997,2998],{},"chaque année",[65,3000,288],{},[47,3002,3003,3006,3008],{},[65,3004,3005],{},"Installation en zone à risque d'explosion",[65,3007,2998],{},[65,3009,288],{},[16,3011,3012],{},"Le Livre 1 ne prévoit pas de « prolongation » d'un contrôle. À l'approche de la date de votre dernier rapport, vous faites effectuer une nouvelle visite de contrôle ; le délai périodique recommence ensuite. Après la visite de contrôle d'une ancienne installation aussi, les sections 6.5.1 et 6.5.2 s'appliquent à toute visite ultérieure (section 8.4.1 et sous-section 8.4.2.3).",[322,3014,3016],{"id":3015},"quand-faut-il-un-nouveau-contrôle-plus-tôt","Quand faut-il un nouveau contrôle plus tôt ?",[327,3018,3019,3024,3029,3035,3040],{},[330,3020,3021,3023],{},[32,3022,2886],{}," : contrôle de conformité de cette partie avant la mise en usage (sous-section 6.4.7.3).",[330,3025,3026,3028],{},[32,3027,2905],{}," : si l'installation date d'avant le 1er octobre 1981 et que cette partie n'a pas encore fait l'objet d'une visite de contrôle (sous-section 8.4.2.1).",[330,3030,3031,3034],{},[32,3032,3033],{},"Renforcement du raccordement"," d'une ancienne installation domestique (section 8.4.1).",[330,3036,3037,3039],{},[32,3038,2837],{}," : un recontrôle après correction des infractions (voir plus loin : mettre l'installation en ordre et recontrôle).",[330,3041,3042,3045],{},[32,3043,3044],{},"Installation contrôlée selon l'ancien RGIE"," : la première visite de contrôle selon la section 6.5.2 a lieu dans le délai fixé par le dernier rapport établi selon l'ancien RGIE (section 8.1.2).",[16,3047,3048],{},"Si vous vendez un logement dont l'installation a déjà fait l'objet d'un contrôle de conformité ou d'une visite de contrôle, elle n'entre pas dans le champ d'application de la section 8.4.2. Vous transmettez toutefois le dossier avec schémas, plans et rapports au nouveau propriétaire (section 9.1.2), et le délai du dernier rapport reste d'application.",[11,3050,3052],{"id":3051},"les-documents-à-présenter","Les documents à présenter",[16,3054,3055,3056,3060],{},"La ",[151,3057,3059],{"href":369,"rel":3058},[155],"page du SPF Economie sur le contrôle des installations domestiques"," cite au minimum le schéma unifilaire, le plan de position et, s'il est disponible, le code EAN du raccordement.",[327,3062,3063,3069,3075],{},[330,3064,3065,3068],{},[32,3066,3067],{},"Schéma unifilaire"," (eendraadschema \u002F Eindrahtschema) : tous les tableaux, circuits, protections et canalisations avec leurs caractéristiques (sous-section 3.1.2.2).",[330,3070,3071,3074],{},[32,3072,3073],{},"Plan de position"," : l'emplacement des tableaux, boîtes, prises, points lumineux, interrupteurs, appareils fixes et sources (sous-section 3.1.2.3).",[330,3076,3077,3080],{},[32,3078,3079],{},"Documents du fabricant"," pour le matériel particulier. Pour une installation photovoltaïque, le dossier comprend le mode d'emploi, les consignes de sécurité et les caractéristiques techniques des composants (section 9.1.2).",[16,3082,3083,3084,157],{},"Lors du contrôle de conformité, le rapport atteste expressément que l'installation a été réalisée conformément aux schémas unifilaires et aux plans de position (sous-section 6.4.6.4, b.4). Un plan qui montre un état dépassé se remarque donc autant qu'un plan manquant. Ce qu’est exactement un plan de position, vous le lisez dans ",[151,3085,3087],{"href":3086},"\u002Ffr\u002Fblog\u002Fplan-de-situation","Qu’est-ce qu’un plan de position",[11,3089,3091],{"id":3090},"les-exigences-que-lagent-visiteur-contrôle-dans-une-habitation","Les exigences que l'agent-visiteur contrôle dans une habitation",[16,3093,3094],{},"Le tableau regroupe des exigences du Livre 1 qui sont régulièrement au centre du contrôle d'une installation domestique. Il ne remplace pas le texte intégral, mais il vous indique où regarder avant le rendez-vous.",[41,3096,3097,3106],{},[44,3098,3099],{},[47,3100,3101,3104],{},[50,3102,3103],{},"Exigence",[50,3105,2968],{},[60,3107,3108,3115,3122,3130,3138,3146,3153,3160,3167],{},[47,3109,3110,3113],{},[65,3111,3112],{},"Différentiel de 300 mA au maximum en tête de l'installation",[65,3114,427],{},[47,3116,3117,3120],{},[65,3118,3119],{},"Différentiel à haute ou très haute sensibilité (30 mA au maximum) pour les prises, l'éclairage, la salle de bains\u002Fdouche et le lave-linge, le sèche-linge et le lave-vaisselle ; au maximum huit circuits terminaux par appareil",[65,3121,427],{},[47,3123,3124,3127],{},[65,3125,3126],{},"Résistance de dispersion de la terre inférieure à 100 Ω ; au-delà de 30 Ω, au moins deux différentiels à haute sensibilité de seize prises au maximum chacun et 100 mA au maximum pour les autres circuits",[65,3128,3129],{},"4.2.3.2 et 4.2.4.3 b",[47,3131,3132,3135],{},[65,3133,3134],{},"Protection adaptée à la section, p. ex. 1,5 mm² : disjoncteur 16 A ou fusible 10 A ; 2,5 mm² : 20 A ou 16 A",[65,3136,3137],{},"4.4.1.4, tableau 4.11",[47,3139,3140,3143],{},[65,3141,3142],{},"Circuits de prises d'au moins 2,5 mm² ; au maximum huit socles de prise simples ou multiples par circuit terminal",[65,3144,3145],{},"5.2.1.2 et 5.3.5.2 b",[47,3147,3148,3151],{},[65,3149,3150],{},"Au moins deux circuits d'éclairage distincts si le logement comprend plus de deux locaux",[65,3152,466],{},[47,3154,3155,3158],{},[65,3156,3157],{},"Circuit propre pour lave-linge, lave-vaisselle, sèche-linge, cuisinière, taque de cuisson, four et tout appareil à poste fixe à partir de 2600 W",[65,3159,474],{},[47,3161,3162,3165],{},[65,3163,3164],{},"Interrupteur-sectionneur général d'au moins 40 A dans les installations domestiques",[65,3166,482],{},[47,3168,3169,3172],{},[65,3170,3171],{},"Résistance d'isolement d'au moins 500 kΩ par circuit sous une tension d'essai de 500 V en courant continu",[65,3173,3174],{},"6.4.5.1, tableau 6.1",[16,3176,3177],{},"Les 30 Ω ne sont pas un critère « tout ou rien » : au-delà, le Livre 1 impose une répartition plus stricte des différentiels, et la terre doit de toute façon rester sous 100 Ω. Le courant admissible d'une canalisation dépend en outre du mode de pose, de l'isolation et de la température ambiante (4.4.1.4). Faites donc confirmer dimensionnement et concept de protection par votre électricien.",[322,3179,3181],{"id":3180},"les-écueils-fréquents","Les écueils fréquents",[16,3183,3184],{},"Ces points ressortent souvent en pratique ; il n'existe pas de classement fiable :",[327,3186,3187,3190,3193,3196,3199,3202],{},[330,3188,3189],{},"schéma unifilaire absent ou montrant un état dépassé",[330,3191,3192],{},"différentiels à haute sensibilité trop peu nombreux ou mal répartis",[330,3194,3195],{},"résistance de terre sans la configuration de protection correspondante",[330,3197,3198],{},"canalisations insuffisamment fixées ou protégées mécaniquement",[330,3200,3201],{},"boîtes de dérivation sans couvercle ou inaccessibles",[330,3203,3204],{},"un seul circuit d'éclairage dans un logement de plus de deux locaux",[11,3206,3208],{"id":3207},"que-se-passe-t-il-pendant-le-contrôle","Que se passe-t-il pendant le contrôle ?",[16,3210,3211],{},"Le contrôle de conformité s'effectue hors tension et comprend quatre volets (section 6.4.1) :",[529,3213,3214,3220,3226,3232],{},[330,3215,3216,3219],{},[32,3217,3218],{},"Contrôles administratifs"," : documents, données de l'installation, comparaison du schéma unifilaire et du plan avec l'exécution.",[330,3221,3222,3225],{},[32,3223,3224],{},"Contrôles visuels"," : matériel, canalisations, protections, marquage et accessibilité.",[330,3227,3228,3231],{},[32,3229,3230],{},"Contrôles par essais"," : par exemple le fonctionnement des protections et la continuité des conducteurs de protection et des liaisons équipotentielles.",[330,3233,3234,3237],{},[32,3235,3236],{},"Contrôles par mesures"," : résistance d'isolement (6.4.5.1) et résistance de dispersion de la prise de terre (6.4.5.2).",[16,3239,3240],{},"Le rapport mentionne la résistance de terre et le niveau d'isolement et atteste que différentiels et valeur de terre, ainsi que protections contre les surintensités et canalisations, sont coordonnés (6.4.6.4, b.4). Si l'installation est conforme, l'agent-visiteur vise les schémas et plans et indique la date à laquelle la prochaine visite de contrôle doit avoir lieu au plus tard (b.6).",[16,3242,3243,3244,157],{},"Selon la version 06, l'agent-visiteur scelle aussi le différentiel de tête d'une installation conforme. À partir du 1er novembre 2026, cette obligation disparaît avec le Livre 1 version 07 ; tous les détails dans notre article ",[151,3245,3247],{"href":3246},"\u002Ffr\u002Fblog\u002Fplombage-differentiel-supprime-2026","Le plombage du différentiel est supprimé",[11,3249,3251],{"id":3250},"comparer-documents-et-installation-avant-le-rendez-vous","Comparer documents et installation avant le rendez-vous",[16,3253,3254],{},"Confrontez systématiquement les deux plans à l'installation réalisée :",[529,3256,3257,3260,3263,3266,3269],{},[330,3258,3259],{},"Les repères de circuit concordent-ils dans le tableau, sur le schéma unifilaire et sur le plan de position ?",[330,3261,3262],{},"Calibres, nombre de pôles, type de câble et section sont-ils correctement notés ?",[330,3264,3265],{},"Les nouvelles prises, points lumineux, appareils fixes et sources figurent-ils sur le plan ?",[330,3267,3268],{},"Les boîtes de connexion et de dérivation sont-elles repérables et accessibles ?",[330,3270,3271],{},"Les documents du fabricant pour le photovoltaïque, la borne de recharge, la batterie ou tout autre matériel particulier sont-ils prêts ?",[16,3273,3274],{},"Un beau dessin montrant un ancien état ne vous aide pas, et une installation techniquement irréprochable a tout de même besoin des plans prescrits. Repérez les points ouverts et réglez-les avec votre électricien avant le rendez-vous.",[11,3276,3278],{"id":3277},"préparer-le-contrôle-visuel-et-les-mesures","Préparer le contrôle visuel et les mesures",[16,3280,3281],{},"Les valeurs mesurées sont relevées le jour même sur votre installation. Ne reprenez pas de valeurs d'un ancien rapport et n'inscrivez pas de valeurs estimées sur les plans. Assurez un accès sûr au tableau, à la borne de sectionnement de terre et à toutes les pièces ; les étiquettes doivent être lisibles et les protections complètes. Signalez à l'avance les particularités : photovoltaïque, batterie, fonction de secours, point de recharge ou parties anciennes de l'installation. Ouvrir et mesurer sous tension relève de l'électricien, pas de votre préparation.",[11,3283,3285],{"id":3284},"questions-à-poser-lors-de-la-prise-de-rendez-vous","Questions à poser lors de la prise de rendez-vous",[16,3287,3288],{},"Indiquez à l'organisme l'usage domestique ou non domestique, le type de contrôle, le nombre de tableaux et les sources particulières. Demandez si les documents sont attendus sous forme numérique ou papier, si toutes les pièces doivent être accessibles et comment une rénovation en cours est traitée. Faites confirmer directement le tarif, le mode de paiement et les conditions de report ; les tarifs d'un autre organisme ne s'appliquent pas automatiquement.",[16,3290,3291],{},"Pour un contrôle lors d'une vente, communiquez l'année de construction et les rapports antérieurs. Pour une extension importante, décrivez l'ancien et le nouveau. Pour le photovoltaïque, une batterie ou une borne, précisez le mode de fonctionnement et les documents du fabricant. L'organisme planifie ainsi correctement le type de contrôle et la durée.",[11,3293,3295],{"id":3294},"combien-coûte-un-contrôle-électrique-ou-un-recontrôle","Combien coûte un contrôle électrique ou un recontrôle ?",[16,3297,3298],{},"Le Livre 1 ne fixe aucun tarif : le prix d'un contrôle ou d'un recontrôle se convient avec l'organisme agréé. Le règlement indique en revanche ce qui détermine l'étendue du contrôle – et donc le travail sur place :",[41,3300,3301,3313],{},[44,3302,3303],{},[47,3304,3305,3308,3311],{},[50,3306,3307],{},"Facteur",[50,3309,3310],{},"Pourquoi il compte",[50,3312,2968],{},[60,3314,3315,3325,3335,3345,3355,3365,3375],{},[47,3316,3317,3320,3323],{},[65,3318,3319],{},"Type de contrôle",[65,3321,3322],{},"Contrôle de conformité, visite de contrôle périodique et contrôle lors de la vente ont chacun leur contenu et leur rapport",[65,3324,642],{},[47,3326,3327,3330,3333],{},[65,3328,3329],{},"Domestique ou non domestique",[65,3331,3332],{},"Contenu du rapport et périodicité différents",[65,3334,653],{},[47,3336,3337,3340,3343],{},[65,3338,3339],{},"Taille de l'installation",[65,3341,3342],{},"Le rapport de visite de contrôle mentionne le nombre de tableaux et de circuits terminaux",[65,3344,664],{},[47,3346,3347,3350,3353],{},[65,3348,3349],{},"Installation photovoltaïque domestique (≤ 10 kVA)",[65,3351,3352],{},"Essais supplémentaires : séparation en l'absence de tension réseau et fonctionnement du différentiel",[65,3354,675],{},[47,3356,3357,3360,3363],{},[65,3358,3359],{},"Plans manquants lors d'un contrôle à la vente",[65,3361,3362],{},"L'agent-visiteur établit une description et un croquis sommaires ; l'absence est mentionnée comme infraction",[65,3364,686],{},[47,3366,3367,3370,3373],{},[65,3368,3369],{},"Modification ou extension",[65,3371,3372],{},"Le contrôle se limite à la partie ajoutée ou modifiée",[65,3374,194],{},[47,3376,3377,3380,3383],{},[65,3378,3379],{},"Recontrôle",[65,3381,3382],{},"La vérification porte sur la disparition des infractions constatées",[65,3384,707],{},[16,3386,3387],{},"Demandez donc un prix pour votre type de contrôle et votre installation concrète, et faites confirmer si un recontrôle est facturé séparément. Le tarif d'un autre organisme ou d'un ancien rapport ne s'applique pas automatiquement. Si le schéma unifilaire et le plan de position sont prêts, l'agent-visiteur n'a pas à établir de croquis sommaire lors d'un contrôle à la vente – et vous évitez d'emblée une infraction.",[11,3389,3391],{"id":3390},"le-jour-du-contrôle","Le jour du contrôle",[16,3393,3394],{},"Prévoyez une personne de contact qui connaît l'installation. Ne retirez pas à l'avance les capots fixés, sauf demande de l'organisme ; un accès sûr compte davantage qu'une ouverture improvisée. Veillez à ce que des animaux, des objets entreposés ou des pièces fermées ne bloquent pas l'accès.",[16,3396,3397],{},"Notez vos questions, mais ne modifiez rien à l'installation pendant le contrôle. À la réception du rapport, vérifiez nom et adresse, type de contrôle, étendue de l'installation et documents cités. Formulez toute objection technique par écrit, en vous référant à la constatation précise. Si une pièce ou une partie de l'installation n'était pas accessible, lisez dans le rapport comment cette limite influence la conclusion et demandez si une visite complémentaire est nécessaire.",[11,3399,3401],{"id":3400},"après-le-rapport","Après le rapport",[16,3403,3404,3407],{},[32,3405,3406],{},"Rapport positif :"," il confirme l'évaluation à la date et dans le périmètre du contrôle. Conservez-le avec le schéma unifilaire et le plan dans le dossier de l'installation électrique, que vous détenez en double exemplaire et transmettez au nouveau propriétaire en cas de vente (section 9.1.2). Toute modification ultérieure y est consignée.",[16,3409,3410,3413],{},[32,3411,3412],{},"Rapport négatif :"," chaque infraction se traite séparément. Les conséquences dépendent du type de contrôle :",[41,3415,3416,3427],{},[44,3417,3418],{},[47,3419,3420,3422,3425],{},[50,3421,3319],{},[50,3423,3424],{},"Conséquence d'un rapport négatif",[50,3426,2968],{},[60,3428,3429,3438,3448],{},[47,3430,3431,3433,3436],{},[65,3432,2777],{},[65,3434,3435],{},"La partie concernée ne peut pas être mise en usage avant correction des infractions et nouveau contrôle",[65,3437,762],{},[47,3439,3440,3442,3445],{},[65,3441,2807],{},[65,3443,3444],{},"Corriger les infractions sans délai ; nouvelle visite par le même organisme dans un délai d'un an",[65,3446,3447],{},"9.1.3.2, 6.5.7.2 b.6 et b.7",[47,3449,3450,3453,3456],{},[65,3451,3452],{},"Contrôle à la vente d'une ancienne installation",[65,3454,3455],{},"L'acheteur fait contrôler la mise en ordre dans les 18 mois suivant l'acte de vente ; il choisit librement l'organisme",[65,3457,215],{},[16,3459,3055,3460,3464,3465,157],{},[151,3461,3463],{"href":788,"rel":3462},[155],"vue d'ensemble des types de contrôle du SPF Economie"," détaille les procédures. Pour la marche à suivre après un résultat négatif, lisez notre guide ",[151,3466,3468],{"href":3467},"\u002Ffr\u002Fblog\u002Fcontrole-electrique-refuse","Contrôle électrique refusé – que faire ?",[11,3470,3472],{"id":3471},"mettre-linstallation-en-ordre-et-recontrôle","Mettre l'installation en ordre et recontrôle",[16,3474,3475],{},"Mettre votre installation électrique en ordre signifie faire corriger chaque infraction du rapport et faire vérifier la correction par un organisme agréé. Après une visite de contrôle, les travaux sont exécutés sans retard et, tant que l'installation reste en service, vous prenez les mesures pour que les infractions ne constituent pas un danger pour les personnes et les biens (sous-section 9.1.3.2). Après un contrôle de conformité, la partie concernée ne peut être mise en usage qu'après correction et nouveau contrôle (sous-section 9.1.3.1).",[529,3477,3478,3484,3490,3496],{},[330,3479,3480,3483],{},[32,3481,3482],{},"Lisez chaque infraction avec sa référence."," Le rapport énumère les infractions (sous-sections 6.4.6.4 b.5 et 6.5.7.2 b.5) ; traitez-les une par une.",[330,3485,3486,3489],{},[32,3487,3488],{},"Faites exécuter et confirmer la correction"," par votre électricien, infraction par infraction et avec le circuit concerné.",[330,3491,3492,3495],{},[32,3493,3494],{},"Mettez les documents à jour."," Si la correction modifie des circuits, des protections ou des points, adaptez le schéma unifilaire et le plan de position et consignez la modification dans le dossier (section 9.1.2). Lors d'un contrôle à la vente, l'absence de plans est elle-même une infraction (sous-section 8.4.2.2 d).",[330,3497,3498,3501],{},[32,3499,3500],{},"Demandez le recontrôle au bon organisme."," Après une visite de contrôle périodique, le même organisme agréé effectue la visite complémentaire avant la date indiquée dans le rapport (sous-section 6.5.7.2 b.6). Après un contrôle à la vente, l'acheteur communique son identité et la date de l'acte à l'organisme du premier rapport et fait vérifier par l'organisme de son choix que les infractions ont disparu au terme du délai de 18 mois (sous-section 8.4.2.2 a).",[16,3503,3504,3505,157],{},"Ne rien faire n'est pas sans suite : si des infractions subsistent lors de la seconde visite après un contrôle périodique, l'organisme agréé envoie une copie du rapport à la Direction générale de l'Energie (sous-section 6.5.7.2 b.7 d). La marche à suivre complète après un résultat négatif figure dans ",[151,3506,3468],{"href":3467},[11,3508,3510],{"id":3509},"consigner-le-périmètre-contrôlé","Consigner le périmètre contrôlé",[16,3512,3513],{},"Notez quels tableaux, locaux, sources et modes de fonctionnement faisaient réellement partie du contrôle et comparez-les avec la désignation du rapport. Un rapport positif pour une partie clairement délimitée ne dit rien des parties ajoutées plus tard ou non visitées. Conservez la version des plans présentée au contrôle, inchangée, avec le rapport, et créez une nouvelle version datée pour les travaux ultérieurs. Vous pourrez ainsi toujours montrer quel état d'exécution a été évalué. Si vous modifiez ensuite des canalisations fixes, des protections ou des fonctions photovoltaïques, de stockage ou de recharge, vérifiez si un nouveau contrôle de conformité est nécessaire.",[11,3515,3517],{"id":3516},"comment-planelec-vous-aide","Comment PlanElec vous aide",[16,3519,3520,3521,3523],{},"La documentation est souvent la partie la plus lourde de la préparation. ",[32,3522,850],{}," réunit plan du bâtiment, circuits et tableau dans un seul projet et en tire vos documents :",[327,3525,3526,3531,3536,3542,3548],{},[330,3527,3528,3530],{},[32,3529,3067],{}," issu de la topologie électrique saisie, en PDF",[330,3532,3533,3535],{},[32,3534,3073],{}," basé sur votre plan, avec la bibliothèque de symboles belges, en PDF",[330,3537,3538,3541],{},[32,3539,3540],{},"Autocontrôle RGIE"," qui fait apparaître les erreurs de conception dans les règles prises en charge avant le contrôle",[330,3543,3544,3547],{},[32,3545,3546],{},"Dossier d'installation"," avec page de garde, table des documents et pagination continue",[330,3549,3550,3553],{},[32,3551,3552],{},"Quatre langues"," : néerlandais, français, allemand et anglais",[16,3555,3556,3557,157],{},"Les rôles sont clairement répartis : l'autocontrôle vous montre les constats tirés des données du projet, votre électricien confirme dimensionnement et exécution, et le contrôle avec mesures est réalisé par l'organisme agréé. La liste des organismes agréés est publiée par le ",[151,3558,2857],{"href":153,"rel":3559},[155],[16,3561,3562],{},[151,3563,3564],{"href":892},"Commencez gratuitement votre documentation électrique →",{"title":895,"searchDepth":896,"depth":896,"links":3566},[3567,3568,3569,3570,3573,3574,3577,3578,3579,3580,3581,3582,3583,3584,3585,3586],{"id":2730,"depth":896,"text":2731},{"id":2751,"depth":896,"text":2752},{"id":2849,"depth":896,"text":2850},{"id":2949,"depth":896,"text":2950,"children":3571},[3572],{"id":3015,"depth":904,"text":3016},{"id":3051,"depth":896,"text":3052},{"id":3090,"depth":896,"text":3091,"children":3575},[3576],{"id":3180,"depth":904,"text":3181},{"id":3207,"depth":896,"text":3208},{"id":3250,"depth":896,"text":3251},{"id":3277,"depth":896,"text":3278},{"id":3284,"depth":896,"text":3285},{"id":3294,"depth":896,"text":3295},{"id":3390,"depth":896,"text":3391},{"id":3400,"depth":896,"text":3401},{"id":3471,"depth":896,"text":3472},{"id":3509,"depth":896,"text":3510},{"id":3516,"depth":896,"text":3517},"Demander un contrôle électrique à un organisme agréé : durée de validité, cas où un recontrôle s'impose, ce qui détermine le coût et ce que l'agent-visiteur vérifie – avec les références RGIE.","fr",{},"\u002Fblog\u002Felectrical-inspection.fr",{"title":2725,"description":3587},"Contrôle électrique : demande, recontrôle et validité","controle-electrique","blog\u002Felectrical-inspection.fr",[937,938,2715,939,949,941,3596,951,3597,3598,3599,3600,3601,948,2716],"plan de position","conformité","différentiel","mise à la terre","électricien","Belgique","bsouItjCOk4d0gzO_vXYLjnM5Tih44mQ_2DSRlgI5Tc",{"id":4,"title":5,"articleId":6,"body":3604,"category":919,"date":920,"description":921,"extension":922,"image":25,"lastUpdated":923,"locale":924,"meta":4250,"navigation":926,"ogImage":927,"path":928,"publishDate":929,"readTime":930,"refreshInterval":931,"seo":4251,"seoTitle":933,"slug":934,"stem":935,"tags":4252,"__hash__":952},{"type":8,"value":3605,"toc":4228},[3606,3608,3610,3614,3616,3620,3622,3692,3694,3696,3701,3771,3775,3777,3779,3825,3827,3829,3851,3853,3855,3860,3874,3878,3880,3882,3948,3950,3952,3954,3968,3970,3972,3990,3992,3996,3998,4000,4012,4014,4016,4018,4020,4022,4024,4026,4028,4098,4100,4102,4104,4106,4108,4112,4116,4154,4161,4163,4165,4183,4187,4189,4191,4193,4197,4219,4224],[11,3607,14],{"id":13},[16,3609,18],{},[16,3611,3612],{},[22,3613],{"alt":24,"src":25},[16,3615,28],{},[16,3617,3618,35],{},[32,3619,34],{},[11,3621,39],{"id":38},[41,3623,3624,3634],{},[44,3625,3626],{},[47,3627,3628,3630,3632],{},[50,3629,52],{},[50,3631,55],{},[50,3633,58],{},[60,3635,3636,3644,3652,3660,3668,3676,3684],{},[47,3637,3638,3640,3642],{},[65,3639,67],{},[65,3641,70],{},[65,3643,73],{},[47,3645,3646,3648,3650],{},[65,3647,78],{},[65,3649,81],{},[65,3651,84],{},[47,3653,3654,3656,3658],{},[65,3655,89],{},[65,3657,92],{},[65,3659,95],{},[47,3661,3662,3664,3666],{},[65,3663,100],{},[65,3665,103],{},[65,3667,106],{},[47,3669,3670,3672,3674],{},[65,3671,111],{},[65,3673,114],{},[65,3675,117],{},[47,3677,3678,3680,3682],{},[65,3679,122],{},[65,3681,125],{},[65,3683,128],{},[47,3685,3686,3688,3690],{},[65,3687,133],{},[65,3689,136],{},[65,3691,139],{},[16,3693,142],{},[11,3695,146],{"id":145},[16,3697,149,3698,157],{},[151,3699,156],{"href":153,"rel":3700},[155],[41,3702,3703,3713],{},[44,3704,3705],{},[47,3706,3707,3709,3711],{},[50,3708,166],{},[50,3710,169],{},[50,3712,58],{},[60,3714,3715,3723,3731,3739,3747,3755,3763],{},[47,3716,3717,3719,3721],{},[65,3718,67],{},[65,3720,180],{},[65,3722,183],{},[47,3724,3725,3727,3729],{},[65,3726,188],{},[65,3728,191],{},[65,3730,194],{},[47,3732,3733,3735,3737],{},[65,3734,100],{},[65,3736,201],{},[65,3738,204],{},[47,3740,3741,3743,3745],{},[65,3742,209],{},[65,3744,212],{},[65,3746,215],{},[47,3748,3749,3751,3753],{},[65,3750,220],{},[65,3752,223],{},[65,3754,226],{},[47,3756,3757,3759,3761],{},[65,3758,231],{},[65,3760,234],{},[65,3762,237],{},[47,3764,3765,3767,3769],{},[65,3766,242],{},[65,3768,245],{},[65,3770,215],{},[16,3772,3773,253],{},[32,3774,252],{},[11,3776,257],{"id":256},[16,3778,260],{},[41,3780,3781,3791],{},[44,3782,3783],{},[47,3784,3785,3787,3789],{},[50,3786,269],{},[50,3788,272],{},[50,3790,275],{},[60,3792,3793,3801,3809,3817],{},[47,3794,3795,3797,3799],{},[65,3796,282],{},[65,3798,285],{},[65,3800,288],{},[47,3802,3803,3805,3807],{},[65,3804,293],{},[65,3806,296],{},[65,3808,288],{},[47,3810,3811,3813,3815],{},[65,3812,303],{},[65,3814,306],{},[65,3816,288],{},[47,3818,3819,3821,3823],{},[65,3820,313],{},[65,3822,306],{},[65,3824,288],{},[16,3826,320],{},[322,3828,325],{"id":324},[327,3830,3831,3835,3839,3843,3847],{},[330,3832,3833,334],{},[32,3834,188],{},[330,3836,3837,339],{},[32,3838,209],{},[330,3840,3841,345],{},[32,3842,344],{},[330,3844,3845,350],{},[32,3846,133],{},[330,3848,3849,356],{},[32,3850,355],{},[16,3852,359],{},[11,3854,363],{"id":362},[16,3856,366,3857,372],{},[151,3858,371],{"href":369,"rel":3859},[155],[327,3861,3862,3866,3870],{},[330,3863,3864,380],{},[32,3865,379],{},[330,3867,3868,386],{},[32,3869,385],{},[330,3871,3872,392],{},[32,3873,391],{},[16,3875,395,3876,157],{},[151,3877,399],{"href":398},[11,3879,403],{"id":402},[16,3881,406],{},[41,3883,3884,3892],{},[44,3885,3886],{},[47,3887,3888,3890],{},[50,3889,415],{},[50,3891,275],{},[60,3893,3894,3900,3906,3912,3918,3924,3930,3936,3942],{},[47,3895,3896,3898],{},[65,3897,424],{},[65,3899,427],{},[47,3901,3902,3904],{},[65,3903,432],{},[65,3905,427],{},[47,3907,3908,3910],{},[65,3909,439],{},[65,3911,442],{},[47,3913,3914,3916],{},[65,3915,447],{},[65,3917,450],{},[47,3919,3920,3922],{},[65,3921,455],{},[65,3923,458],{},[47,3925,3926,3928],{},[65,3927,463],{},[65,3929,466],{},[47,3931,3932,3934],{},[65,3933,471],{},[65,3935,474],{},[47,3937,3938,3940],{},[65,3939,479],{},[65,3941,482],{},[47,3943,3944,3946],{},[65,3945,487],{},[65,3947,490],{},[16,3949,493],{},[322,3951,497],{"id":496},[16,3953,500],{},[327,3955,3956,3958,3960,3962,3964,3966],{},[330,3957,505],{},[330,3959,508],{},[330,3961,511],{},[330,3963,514],{},[330,3965,517],{},[330,3967,520],{},[11,3969,524],{"id":523},[16,3971,527],{},[529,3973,3974,3978,3982,3986],{},[330,3975,3976,536],{},[32,3977,535],{},[330,3979,3980,542],{},[32,3981,541],{},[330,3983,3984,548],{},[32,3985,547],{},[330,3987,3988,554],{},[32,3989,553],{},[16,3991,557],{},[16,3993,560,3994,157],{},[151,3995,564],{"href":563},[11,3997,568],{"id":567},[16,3999,571],{},[529,4001,4002,4004,4006,4008,4010],{},[330,4003,576],{},[330,4005,579],{},[330,4007,582],{},[330,4009,585],{},[330,4011,588],{},[16,4013,591],{},[11,4015,595],{"id":594},[16,4017,598],{},[11,4019,602],{"id":601},[16,4021,605],{},[16,4023,608],{},[11,4025,612],{"id":611},[16,4027,615],{},[41,4029,4030,4040],{},[44,4031,4032],{},[47,4033,4034,4036,4038],{},[50,4035,624],{},[50,4037,627],{},[50,4039,275],{},[60,4041,4042,4050,4058,4066,4074,4082,4090],{},[47,4043,4044,4046,4048],{},[65,4045,636],{},[65,4047,639],{},[65,4049,642],{},[47,4051,4052,4054,4056],{},[65,4053,647],{},[65,4055,650],{},[65,4057,653],{},[47,4059,4060,4062,4064],{},[65,4061,658],{},[65,4063,661],{},[65,4065,664],{},[47,4067,4068,4070,4072],{},[65,4069,669],{},[65,4071,672],{},[65,4073,675],{},[47,4075,4076,4078,4080],{},[65,4077,680],{},[65,4079,683],{},[65,4081,686],{},[47,4083,4084,4086,4088],{},[65,4085,691],{},[65,4087,694],{},[65,4089,194],{},[47,4091,4092,4094,4096],{},[65,4093,701],{},[65,4095,704],{},[65,4097,707],{},[16,4099,710],{},[11,4101,714],{"id":713},[16,4103,717],{},[16,4105,720],{},[11,4107,724],{"id":723},[16,4109,4110,730],{},[32,4111,729],{},[16,4113,4114,736],{},[32,4115,735],{},[41,4117,4118,4128],{},[44,4119,4120],{},[47,4121,4122,4124,4126],{},[50,4123,745],{},[50,4125,748],{},[50,4127,275],{},[60,4129,4130,4138,4146],{},[47,4131,4132,4134,4136],{},[65,4133,70],{},[65,4135,759],{},[65,4137,762],{},[47,4139,4140,4142,4144],{},[65,4141,100],{},[65,4143,769],{},[65,4145,772],{},[47,4147,4148,4150,4152],{},[65,4149,777],{},[65,4151,780],{},[65,4153,215],{},[16,4155,785,4156,791,4159,157],{},[151,4157,790],{"href":788,"rel":4158},[155],[151,4160,795],{"href":794},[11,4162,799],{"id":798},[16,4164,802],{},[529,4166,4167,4171,4175,4179],{},[330,4168,4169,810],{},[32,4170,809],{},[330,4172,4173,816],{},[32,4174,815],{},[330,4176,4177,822],{},[32,4178,821],{},[330,4180,4181,828],{},[32,4182,827],{},[16,4184,831,4185,157],{},[151,4186,795],{"href":794},[11,4188,837],{"id":836},[16,4190,840],{},[11,4192,844],{"id":843},[16,4194,847,4195,851],{},[32,4196,850],{},[327,4198,4199,4203,4207,4211,4215],{},[330,4200,4201,858],{},[32,4202,379],{},[330,4204,4205,863],{},[32,4206,385],{},[330,4208,4209,869],{},[32,4210,868],{},[330,4212,4213,875],{},[32,4214,874],{},[330,4216,4217,881],{},[32,4218,880],{},[16,4220,884,4221,157],{},[151,4222,156],{"href":153,"rel":4223},[155],[16,4225,4226],{},[151,4227,893],{"href":892},{"title":895,"searchDepth":896,"depth":896,"links":4229},[4230,4231,4232,4233,4236,4237,4240,4241,4242,4243,4244,4245,4246,4247,4248,4249],{"id":13,"depth":896,"text":14},{"id":38,"depth":896,"text":39},{"id":145,"depth":896,"text":146},{"id":256,"depth":896,"text":257,"children":4234},[4235],{"id":324,"depth":904,"text":325},{"id":362,"depth":896,"text":363},{"id":402,"depth":896,"text":403,"children":4238},[4239],{"id":496,"depth":904,"text":497},{"id":523,"depth":896,"text":524},{"id":567,"depth":896,"text":568},{"id":594,"depth":896,"text":595},{"id":601,"depth":896,"text":602},{"id":611,"depth":896,"text":612},{"id":713,"depth":896,"text":714},{"id":723,"depth":896,"text":724},{"id":798,"depth":896,"text":799},{"id":836,"depth":896,"text":837},{"id":843,"depth":896,"text":844},{},{"title":5,"description":921},[937,938,939,940,941,942,943,944,945,946,947,948,949,950,951],[]]