[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-nl-elektrokeuring-afgekeurd":3,"blog-alternates-blog-post-nl-elektrokeuring-afgekeurd-inspection-failed-what-now":597,"blog-next-steps-blog-post-nl-elektrokeuring-afgekeurd-inspection-failed-what-now":2583},{"id":4,"title":5,"articleId":6,"body":7,"category":572,"date":573,"description":574,"extension":575,"image":24,"lastUpdated":576,"locale":577,"meta":578,"navigation":579,"ogImage":580,"path":581,"publishDate":573,"readTime":582,"refreshInterval":583,"seo":584,"seoTitle":585,"slug":586,"stem":587,"tags":588,"__hash__":596},"blog\u002Fblog\u002Finspection-failed-what-now.nl.md","Elektrische keuring afgekeurd – wat nu? Stap voor stap naar de nieuwe controle","inspection-failed-what-now",{"type":8,"value":9,"toc":543},"minimark",[10,18,25,28,34,39,42,47,50,54,110,114,117,121,124,128,131,135,138,265,269,273,276,289,293,296,300,307,321,325,332,336,339,343,346,349,367,370,374,377,380,384,387,398,402,405,409,412,427,431,434,438,461,464,468,475,501,504,507,512,532],[11,12,13,17],"p",{},[14,15,16],"strong",{},"Na een negatieve keuring verhelp je elke inbreuk uit het verslag, breng je eendraadschema en situatieplan in lijn met de uitvoering en laat je de installatie opnieuw controleren."," De termijn hangt af van het controletype: bij een nieuwe installatie mag het betrokken deel pas na herstel en een nieuwe controle in gebruik. Na een periodiek controlebezoek komt hetzelfde organisme binnen een jaar terug. Na een verkoopkeuring heeft de koper 18 maanden vanaf de verkoopakte en kiest hij het organisme vrij.",[11,19,20],{},[21,22],"img",{"alt":23,"src":24},"Elektriciens bereiden materiaal voor een herstelling voor.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-inspection-failed-what-now-editorial.webp",[11,26,27],{},"Een negatief verslag zegt op zich niet of er alleen documenten ontbreken of dat er een veiligheidsrisico is. De afzonderlijke vaststellingen zijn bepalend. Deze gids toont je hoe je ze leest, prioriteert, laat corrigeren en netjes aantoont.",[11,29,30,33],{},[14,31,32],{},"Redactie en controle: PlanElec-team, 5 oktober 2026",", getoetst aan AREI Boek 1, versie 06, van toepassing sinds 1 april 2026.",[35,36,38],"h2",{"id":37},"wat-staat-er-in-het-negatieve-verslag","Wat staat er in het negatieve verslag?",[11,40,41],{},"Het verslag van het erkend organisme vermeldt de vastgestelde inbreuken op Boek 1, kringen met een onvoldoende isolatieniveau en de conclusie. Bij het controlebezoek van een woninginstallatie maakt het bovendien onderscheid tussen inbreuken, opmerkingen en toepasselijke afwijkingen voor bestaande installaties (onderafdeling 6.5.7.2, b.5). Een opmerking is geen inbreuk – kijk dus goed onder welke rubriek een vaststelling staat.",[43,44,46],"h3",{"id":45},"codes-en-prioriteiten-correct-lezen","Codes en prioriteiten correct lezen",[11,48,49],{},"Interne codes en prioriteitsklassen verschillen per organisme en verslagmodel. Uit „C1”, „C2” of „C3” volgt dus geen algemene Belgische termijn; de legende van jouw verslag is bepalend. Is een vaststelling onduidelijk, vraag het organisme dan schriftelijk om regelverwijzing, betrokken kring en verwacht bewijs. Een vermelding van onmiddellijk gevaar krijgt voorrang, ongeacht de code: schakel het betrokken deel niet op eigen houtje opnieuw in.",[35,51,53],{"id":52},"termijnen-per-controletype","Termijnen per controletype",[55,56,57,73],"table",{},[58,59,60],"thead",{},[61,62,63,67,70],"tr",{},[64,65,66],"th",{},"Controletype",[64,68,69],{},"Wat nu geldt",[64,71,72],{},"Vindplaats Boek 1",[74,75,76,88,99],"tbody",{},[61,77,78,82,85],{},[79,80,81],"td",{},"Gelijkvormigheidscontrole van een nieuwe installatie of belangrijke wijziging",[79,83,84],{},"Betrokken deel mag niet in gebruik genomen worden; na herstel een nieuwe gelijkvormigheidscontrole",[79,86,87],{},"9.1.3.1",[61,89,90,93,96],{},[79,91,92],{},"Periodiek controlebezoek",[79,94,95],{},"Inbreuken onverwijld verhelpen; nieuw bezoek door hetzelfde organisme binnen een jaar",[79,97,98],{},"9.1.3.2, 6.5.7.2 b.6, b.7",[61,100,101,104,107],{},[79,102,103],{},"Verkoopkeuring van een oude woninginstallatie",[79,105,106],{},"Koper laat ten laatste 18 maanden na de verkoopakte opnieuw controleren; vrije keuze van het organisme",[79,108,109],{},"8.4.2.2 a",[43,111,113],{"id":112},"bij-een-periodieke-keuring","Bij een periodieke keuring",[11,115,116],{},"Het verslag vermeldt in de conclusie de datum waarvoor het aanvullende bezoek door hetzelfde organisme moet plaatsvinden (6.5.7.2, b.6). Zijn er bij dat tweede bezoek nog steeds inbreuken, dan stuurt het organisme een kopie van het verslag naar de Algemene Directie Energie (b.7). Tot dan voer je de werken onverwijld uit en neem je alle passende maatregelen zodat de inbreuken geen gevaar vormen zolang de installatie in gebruik blijft.",[43,118,120],{"id":119},"bij-een-nieuwe-installatie","Bij een nieuwe installatie",[11,122,123],{},"Bij een nieuwe installatie of een belangrijke wijziging blijft het betrokken deel buiten gebruik tot de inbreuken verholpen en opnieuw gecontroleerd zijn (9.1.3.1). De netaansluiting stem je daarnaast af met de bevoegde netbeheerder; die stelt het vermogen van een nieuwe installatie pas ter beschikking als er een positief verslag is (6.4.6.2).",[43,125,127],{"id":126},"bij-verkoop-van-vastgoed","Bij verkoop van vastgoed",[11,129,130],{},"Na een negatieve verkoopkeuring meldt de koper zijn identiteit en de datum van de verkoopakte schriftelijk aan het oorspronkelijke organisme. Ten laatste 18 maanden na die datum laat hij nagaan of de inbreuken verholpen zijn. Het organisme kiest hij vrij; een ander organisme verwittigt het eerste (8.4.2.2 a). Bepalend is de datum van de authentieke akte, niet die van een onderhandse koopovereenkomst.",[35,132,134],{"id":133},"tien-controledomeinen-die-je-in-het-verslag-terugvindt","Tien controledomeinen die je in het verslag terugvindt",[11,136,137],{},"Deze domeinen duiken geregeld op in verslagen. Ze zijn geen statistische rangschikking, maar wel een goede kaart voor je vaststellingen.",[55,139,140,153],{},[58,141,142],{},[61,143,144,147,150],{},[64,145,146],{},"Nr.",[64,148,149],{},"Controledomein",[64,151,152],{},"Vindplaats",[74,154,155,166,177,188,199,210,221,232,243,254],{},[61,156,157,160,163],{},[79,158,159],{},"1",[79,161,162],{},"Differentieel ontbreekt of past niet: 300 mA aan de oorsprong, ten hoogste 30 mA voor de voorgeschreven kringen, minstens type A",[79,164,165],{},"4.2.4.3 b, 5.3.5.3 a",[61,167,168,171,174],{},[79,169,170],{},"2",[79,172,173],{},"Eendraadschema of situatieplan ontbreekt of komt niet overeen met de installatie",[79,175,176],{},"3.1.2, 9.1.2",[61,178,179,182,185],{},[79,180,181],{},"3",[79,183,184],{},"Aardingswaarde en opbouw van de differentiëlen passen niet bij elkaar (onder 100 Ω; boven 30 Ω strengere opbouw)",[79,186,187],{},"4.2.3.2, 4.2.4.3 b",[61,189,190,193,196],{},[79,191,192],{},"4",[79,194,195],{},"Kringen in het bord niet duidelijk aangeduid",[79,197,198],{},"3.1.3",[61,200,201,204,207],{},[79,202,203],{},"5",[79,205,206],{},"Leidingen onvoldoende mechanisch beschermd voor plaatsingswijze en belasting",[79,208,209],{},"5.2.1.5, 5.2.2",[61,211,212,215,218],{},[79,213,214],{},"6",[79,216,217],{},"Volumes en beschermingseisen in de badkamer niet nageleefd",[79,219,220],{},"hoofdstuk 7.1",[61,222,223,226,229],{},[79,224,225],{},"7",[79,227,228],{},"Hoofdschakelaar ontbreekt of is te klein (woning minstens 40 A)",[79,230,231],{},"5.3.5.1 b",[61,233,234,237,240],{},[79,235,236],{},"8",[79,238,239],{},"Beveiliging en doorsnede niet op elkaar afgestemd",[79,241,242],{},"4.4.1.4, tabel 4.11",[61,244,245,248,251],{},[79,246,247],{},"9",[79,249,250],{},"Overspanningsbeveiliging niet vakkundig beoordeeld",[79,252,253],{},"4.5.1",[61,255,256,259,262],{},[79,257,258],{},"10",[79,260,261],{},"Gewestelijke rookmelderplicht wordt verward met AREI-verplichtingen – beide rechtsdomeinen apart nagaan",[79,263,264],{},"gewestelijk woonrecht, niet AREI",[35,266,268],{"id":267},"stap-voor-stap-na-de-negatieve-keuring","Stap voor stap na de negatieve keuring",[43,270,272],{"id":271},"stap-1-lees-het-verslag-regel-per-regel","Stap 1: lees het verslag regel per regel",[11,274,275],{},"Overloop elke vaststelling afzonderlijk en noteer:",[277,278,279,283,286],"ul",{},[280,281,282],"li",{},"Onder welke rubriek staat ze: inbreuk, opmerking of afwijking?",[280,284,285],{},"Waar zit het probleem precies: ruimte, bord, kring?",[280,287,288],{},"Wat wordt precies aangekaart en welke regel is betrokken?",[43,290,292],{"id":291},"stap-2-bepaal-prioriteiten","Stap 2: bepaal prioriteiten",[11,294,295],{},"Eerst komen alle vaststellingen die het verslag aanduidt als onmiddellijk gevaar, reden voor uitschakeling of hindernis voor ingebruikname. Daarna plan je de overige inbreuken volgens hun samenhang: eerst oorzaak en beveiligingsconcept, dan uitvoering, meting en documentatie.",[43,297,299],{"id":298},"stap-3-schakel-een-elektricien-in","Stap 3: schakel een elektricien in",[11,301,302,303,306],{},"Je kunt het verslag ordenen, documenten verzamelen en de plannen vergelijken met de zichtbare installatie. Werken in het bord, aan beveiligingen, aan de aarding of aan vaste leidingen horen bij een ",[14,304,305],{},"elektricien",", bijvoorbeeld:",[277,308,309,312,315,318],{},[280,310,311],{},"differentieelschakelaar bijplaatsen of vervangen",[280,313,314],{},"aarding verbeteren of de opbouw van de differentiëlen afstemmen op de aardingswaarde",[280,316,317],{},"leidingen mechanisch beschermen of opnieuw plaatsen",[280,319,320],{},"hoofdschakelaar plaatsen",[43,322,324],{"id":323},"stap-4-breng-de-plannen-in-lijn-met-de-uitvoering","Stap 4: breng de plannen in lijn met de uitvoering",[11,326,327,328,331],{},"Eendraadschema en situatieplan tonen ",[14,329,330],{},"de toestand na de correctie",". Neem geen vermoedelijke doorsneden of beveiligingswaarden over; onbekende kenmerken verduidelijk je vóór de export of markeer je uitdrukkelijk als open.",[43,333,335],{"id":334},"stap-5-plan-de-nieuwe-controle","Stap 5: plan de nieuwe controle",[11,337,338],{},"Wie controleert, hangt af van het controletype: na een periodiek bezoek komt hetzelfde organisme, na een verkoopkeuring kiest de koper vrij. Verduidelijk aan de hand van het verslag de omvang voor je boekt.",[35,340,342],{"id":341},"een-vaststelling-vertalen-in-een-controleerbare-maatregel","Een vaststelling vertalen in een controleerbare maatregel",[11,344,345],{},"Het verslag beschrijft een resultaat, niet automatisch de oorzaak. „Isolatieweerstand onvoldoende” kan wijzen op een beschadigde geleider, vocht of een aangesloten toestel. Ter vergelijking: bij de meting moet elke kring minstens 500 kΩ halen bij een proefspanning van 500 V (6.4.5.1). „Plan komt niet overeen” gaat van een ontbrekend stopcontact tot een verkeerde volgorde van beveiligingen. Laat dus eerst oorzaak en omvang bepalen voor een onderdeel wordt vervangen.",[11,347,348],{},"Voor elke vaststelling helpen vijf vragen:",[350,351,352,355,358,361,364],"ol",{},[280,353,354],{},"Welk installatiedeel werd werkelijk gecontroleerd?",[280,356,357],{},"Welke regel of beveiligingsfunctie is betrokken?",[280,359,360],{},"Welke diagnose of meting bevestigt de oorzaak?",[280,362,363],{},"Welke correctie neemt de oorzaak weg, niet alleen het symptoom?",[280,365,366],{},"Welk bewijs toont het organisme de afgewerkte correctie?",[11,368,369],{},"Meerdere inbreuken hangen vaak samen. Een gewijzigde verdeling beïnvloedt eendraadschema, labels, beveiligingen en meetwaarden. Een nieuwe aardingsmaatregel is afgerond voordat plannen worden afgewerkt en opnieuw wordt gemeten. Plan daarom één consistente eindtoestand in plaats van een reeks tegenstrijdige tussenstanden.",[35,371,373],{"id":372},"documentatiegebrek-en-uitvoeringsgebrek-scheiden","Documentatiegebrek en uitvoeringsgebrek scheiden",[11,375,376],{},"Een ontbrekend plan los je niet op door een ongecontroleerd plan te tekenen. Breng eerst de installatie in kaart – openen en meten doet de vakman. Daarna koppel je elk symbool aan de werkelijke kring en ga je na of bordlabels, eendraadschema en situatieplan dezelfde referentie gebruiken.",[11,378,379],{},"Omgekeerd herstelt een mooiere tekening geen uitvoeringsgebrek. Is een beveiliging ongeschikt, de aarding onvoldoende of een leiding mechanisch bedreigd, dan wordt de installatie gecorrigeerd en zo nodig opnieuw gemeten; daarna volgt het plan de uitgevoerde toestand. Zo vindt het organisme bij de nieuwe controle actuele documenten én een gecorrigeerde installatie.",[35,381,383],{"id":382},"bijzonder-geval-verkoop","Bijzonder geval: verkoop",[11,385,386],{},"Bewaar als koper verslag, verkoopakte en installatiedossier samen. De 18 maanden lopen vanaf de dag van de verkoopakte. De termijn is geen uitstel voor zichtbare gevaren: onveilige installatiedelen laat je meteen door een vakman beoordelen en zo nodig buiten gebruik stellen.",[11,388,389,390,397],{},"Wordt het gebouw afgebroken of de installatie volledig vernieuwd, dan geldt een aparte weg: verkoper en koper leggen dat vast in de akte, de koper verwittigt de Algemene Directie Energie en voor de nieuwe installatie geldt de gelijkvormigheidscontrole van hoofdstuk 6.4 (8.4.2.2 a en b). De ",[391,392,396],"a",{"href":393,"rel":394},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Flivre-1-du-reglement-general",[395],"nofollow","FOD-FAQ voor notarissen en vastgoedsector"," beantwoordt verdere verkoopvragen.",[35,399,401],{"id":400},"kosten-realistisch-plannen","Kosten realistisch plannen",[11,403,404],{},"Tarieven en herstelkosten hangen af van controletype, organisme, verplaatsing, aantal borden, meetwerk en het werkelijke gebrek. Het actuele tarief vraag je rechtstreeks aan het organisme. Een goede herstelofferte vermeldt diagnose, materiaal, werkuren, metingen, aanpassing van de plannen en de nieuwe controle afzonderlijk – zo zie je of een verborgen leidingherstelling of een aanpassing van het bord is meegerekend.",[35,406,408],{"id":407},"een-sterk-dossier-voor-de-nieuwe-controle","Een sterk dossier voor de nieuwe controle",[11,410,411],{},"Houd een tabel bij met één rij per vaststelling: tekst uit het verslag, betrokken kring, maatregel, verantwoordelijke, einddatum en bewijs. Foto's vullen het dossier aan; metingen vervangen ze niet. Werk de plannen bij na de werkelijke uitvoering en controleer daarna labels en referenties nog een keer.",[11,413,414,415,420,421,426],{},"Het ",[391,416,419],{"href":417,"rel":418},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations\u002Ftypes-de-controle-des",[395],"FOD-overzicht van de controletypes"," licht gevolgen en termijnen toe; de ",[391,422,425],{"href":423,"rel":424},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Forganismes-de-controle-agrees",[395],"lijst van erkende organismen"," is eveneens officieel.",[35,428,430],{"id":429},"wijzigingen-tot-de-nieuwe-controle-onder-controle-houden","Wijzigingen tot de nieuwe controle onder controle houden",[11,432,433],{},"Leg na het herstel een gedocumenteerde stand vast: gedateerde plannen, bordlabels, meetdocumenten en foto's van werken die later verborgen zitten. Elke verdere wijziging vóór de afspraak toets je aan die stand en verwerk je in de documenten. Anders maakt één extra leiding precies de overeenstemming ongedaan die elektricien en ontwerper net hebben bereikt. Vraag alle bewoners om tot de keuring geen voorlopige aansluitingen of eigen aanpassingen uit te voeren. Moet er toch iets veranderen, dan krijgt de verantwoordelijke vakman het verslag, de actuele plannen en een duidelijke beschrijving van de wijziging.",[35,435,437],{"id":436},"laatste-check-vóór-de-nieuwe-afspraak","Laatste check vóór de nieuwe afspraak",[277,439,440,443,446,449,452,455,458],{},[280,441,442],{},"Elke vaststelling is gekoppeld aan een afgeronde maatregel.",[280,444,445],{},"Correcties die een meting vereisen, zijn vakkundig gemeten en gedocumenteerd.",[280,447,448],{},"Kringaanduidingen kloppen in het bord en op beide plannen.",[280,450,451],{},"Nieuwe of verwijderde toestellen staan bijgewerkt op het situatieplan.",[280,453,454],{},"Nominale waarden en leidinggegevens op het eendraadschema komen overeen met de uitvoering.",[280,456,457],{},"Organisme en controletype zijn bevestigd.",[280,459,460],{},"Verslag, plannen, EAN-code en fabrikantdocumenten liggen klaar.",[11,462,463],{},"Zo gaat elke afgewerkte herstelling met een duidelijk bewijs naar de nieuwe controle. Plan tijd in voor vragen en eventueel een tweede diagnose: een vaststelling is pas afgehandeld als oorzaak, uitvoering en bewijs op elkaar aansluiten.",[35,465,467],{"id":466},"hoe-planelec-helpt","Hoe PlanElec helpt",[11,469,470,471,474],{},"PlanElec maakt ondersteunde ontwerpfouten ",[14,472,473],{},"vóór de nieuwe controle"," zichtbaar en houdt je documenten consistent:",[277,476,477,483,489,495],{},[280,478,479,482],{},[14,480,481],{},"AREI\u002FRGIE-zelfcontrole"," meldt bevindingen over differentieelbescherming en beveiliging in de ondersteunde regels",[280,484,485,488],{},[14,486,487],{},"Eendraadschema"," geeft de ingevoerde topologie gestructureerd weer",[280,490,491,494],{},[14,492,493],{},"Situatieplan"," gebruikt de Belgische symbolenbibliotheek",[280,496,497,500],{},[14,498,499],{},"Kringreferenties"," zijn identiek in schema en plan",[11,502,503],{},"De rollen blijven duidelijk: PlanElec toont je of ontwerp en documenten in de ondersteunde regels kloppen; metingen en het oordeel over de installatie levert het erkend organisme.",[505,506],"hr",{},[11,508,509],{},[14,510,511],{},"Verwante artikels:",[277,513,514,520,526],{},[280,515,516],{},[391,517,519],{"href":518},"\u002Fblog\u002F10-meest-voorkomende-arei-overtredingen","10 belangrijke AREI-controlepunten",[280,521,522],{},[391,523,525],{"href":524},"\u002Fblog\u002F30ma-aardlek-per-stopcontact","30 mA-differentieel per stopcontact?",[280,527,528],{},[391,529,531],{"href":530},"\u002Fblog\u002Fkabeldoorsnede-automaat","Kabeldoorsnede per automaat",[11,533,534,537,538],{},[14,535,536],{},"Breng je documenten in lijn met de uitvoering en ga met een geordend dossier naar de nieuwe controle."," ",[391,539,542],{"href":540,"rel":541},"https:\u002F\u002Fplanelec.be",[395],"Nu starten →",{"title":544,"searchDepth":545,"depth":545,"links":546},"",2,[547,551,556,557,564,565,566,567,568,569,570,571],{"id":37,"depth":545,"text":38,"children":548},[549],{"id":45,"depth":550,"text":46},3,{"id":52,"depth":545,"text":53,"children":552},[553,554,555],{"id":112,"depth":550,"text":113},{"id":119,"depth":550,"text":120},{"id":126,"depth":550,"text":127},{"id":133,"depth":545,"text":134},{"id":267,"depth":545,"text":268,"children":558},[559,560,561,562,563],{"id":271,"depth":550,"text":272},{"id":291,"depth":550,"text":292},{"id":298,"depth":550,"text":299},{"id":323,"depth":550,"text":324},{"id":334,"depth":550,"text":335},{"id":341,"depth":545,"text":342},{"id":372,"depth":545,"text":373},{"id":382,"depth":545,"text":383},{"id":400,"depth":545,"text":401},{"id":407,"depth":545,"text":408},{"id":429,"depth":545,"text":430},{"id":436,"depth":545,"text":437},{"id":466,"depth":545,"text":467},"guide","2026-06-16","Is je elektrische keuring negatief? Zo lees je het verslag, bepaal je de geldende AREI-termijn, plan je veilige correcties en bereid je de nieuwe controle voor.","md","2026-10-05","nl",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-inspection-failed-what-now-editorial.jpg","\u002Fblog\u002Finspection-failed-what-now.nl","8 min",12,{"title":5,"description":574},"Elektrische keuring afgekeurd – wat nu?","elektrokeuring-afgekeurd","blog\u002Finspection-failed-what-now.nl",[589,590,591,592,593,594,595],"keuring","elektrokeuring","afgekeurd","inbreuken","herkeuring","arei","belgie","NYSS5vvioJTBvjhXE318WiTQoIA1YFLy9jTRqJV-Qe8",[598,1133,1669,2207],{"id":599,"title":600,"articleId":6,"body":601,"category":572,"date":573,"description":1118,"extension":575,"image":24,"lastUpdated":576,"locale":1119,"meta":1120,"navigation":579,"ogImage":580,"path":1121,"publishDate":573,"readTime":582,"refreshInterval":583,"seo":1122,"seoTitle":1123,"slug":1124,"stem":1125,"tags":1126,"__hash__":1132},"blog\u002Fblog\u002Finspection-failed-what-now.de.md","Elektrokontrolle durchgefallen – was nun? Schritt für Schritt zur erneuten Kontrolle",{"type":8,"value":602,"toc":1092},[603,609,614,617,623,627,630,634,637,641,688,692,695,699,702,706,709,713,716,825,829,833,836,847,851,854,858,865,879,883,890,894,897,901,904,907,924,927,931,934,937,941,944,952,956,959,963,966,979,983,986,990,1013,1016,1020,1027,1053,1056,1058,1063,1083],[11,604,605,608],{},[14,606,607],{},"Nach einer negativen Elektrokontrolle behebst du jeden Verstoß aus dem Bericht, bringst Eindrahtschema und Positionsplan auf den ausgeführten Stand und lässt die Anlage erneut kontrollieren."," Die Frist hängt von der Kontrollart ab: Bei einer neuen Anlage darf der betroffene Teil erst nach Behebung und erneuter Prüfung in Gebrauch gehen. Nach einem periodischen Kontrollbesuch kommt dieselbe Kontrollstelle innerhalb eines Jahres wieder. Nach einer Verkaufskontrolle hat der Käufer 18 Monate ab der Kaufurkunde und wählt die Kontrollstelle frei.",[11,610,611],{},[21,612],{"alt":613,"src":24},"Elektrofachkräfte bereiten Material für eine Nachbesserung vor.",[11,615,616],{},"Ein negativer Bericht sagt für sich allein nicht, ob nur Unterlagen fehlen oder ein Sicherheitsrisiko besteht. Maßgeblich sind die einzelnen Feststellungen. Dieser Leitfaden zeigt dir, wie du sie liest, priorisierst, korrigieren lässt und sauber nachweist.",[11,618,619,622],{},[14,620,621],{},"Redaktion und Prüfung: PlanElec-Team, 5. Oktober 2026",", gegen AREI\u002FRGIE Buch 1, Version 06, anwendbar seit 1. April 2026.",[35,624,626],{"id":625},"was-steht-im-negativen-bericht","Was steht im negativen Bericht?",[11,628,629],{},"Der Bericht der zugelassenen Kontrollstelle nennt die festgestellten Verstöße gegen Buch 1, Stromkreise mit unzureichendem Isolationspegel und die Schlussfolgerung. Beim Kontrollbesuch einer Hausinstallation unterscheidet er zusätzlich zwischen Verstößen, Bemerkungen und anwendbaren Abweichungen für Bestandsanlagen (Unterabschnitt 6.5.7.2, b.5). Eine Bemerkung ist kein Verstoß – lies deshalb genau, unter welcher Rubrik eine Feststellung steht.",[43,631,633],{"id":632},"kürzel-und-prioritäten-richtig-lesen","Kürzel und Prioritäten richtig lesen",[11,635,636],{},"Interne Kürzel und Prioritätsklassen unterscheiden sich zwischen Kontrollstellen und Berichtsvorlagen. Aus „C1“, „C2“ oder „C3“ folgt deshalb keine allgemeingültige belgische Frist; maßgeblich ist die Legende deines Berichts. Ist eine Feststellung unklar, bitte die Kontrollstelle schriftlich um Fundstelle, betroffenen Stromkreis und erwartete Nachweisform. Hinweise auf unmittelbare Gefahr haben unabhängig vom Kürzel Vorrang: Schalte den betroffenen Teil nicht eigenmächtig wieder ein.",[35,638,640],{"id":639},"fristen-je-nach-kontrollart","Fristen je nach Kontrollart",[55,642,643,656],{},[58,644,645],{},[61,646,647,650,653],{},[64,648,649],{},"Kontrollart",[64,651,652],{},"Was jetzt gilt",[64,654,655],{},"Fundstelle Buch 1",[74,657,658,668,678],{},[61,659,660,663,666],{},[79,661,662],{},"Konformitätsprüfung einer neuen Anlage oder wesentlichen Änderung",[79,664,665],{},"Betroffener Teil darf nicht in Gebrauch genommen werden; nach Behebung erneute Konformitätsprüfung",[79,667,87],{},[61,669,670,673,676],{},[79,671,672],{},"Periodischer Kontrollbesuch",[79,674,675],{},"Verstöße unverzüglich beheben; erneuter Besuch durch dieselbe Kontrollstelle innerhalb eines Jahres",[79,677,98],{},[61,679,680,683,686],{},[79,681,682],{},"Verkaufskontrolle einer alten Wohnanlage",[79,684,685],{},"Käufer lässt nach spätestens 18 Monaten ab der Kaufurkunde erneut kontrollieren; freie Wahl der Kontrollstelle",[79,687,109],{},[43,689,691],{"id":690},"bei-periodischer-kontrolle","Bei periodischer Kontrolle",[11,693,694],{},"Der Bericht nennt in der Schlussformel das Datum, bis zu dem der zusätzliche Besuch derselben Kontrollstelle stattfinden muss (6.5.7.2, b.6). Bestehen bei diesem zweiten Besuch weiterhin Verstöße, schickt die Kontrollstelle eine Kopie des Berichts an die Generaldirektion Energie (b.7). Bis dahin müssen die Arbeiten unverzüglich erfolgen, und alle angemessenen Maßnahmen sind zu treffen, damit von den Verstößen keine Gefahr ausgeht, solange die Anlage in Betrieb bleibt.",[43,696,698],{"id":697},"bei-neuinstallation","Bei Neuinstallation",[11,700,701],{},"Bei einer neuen Anlage oder einer wesentlichen Änderung bleibt der betroffene Teil außer Betrieb, bis die Verstöße behoben und erneut geprüft sind (9.1.3.1). Den Netzanschluss stimmst du zusätzlich mit dem zuständigen Netzbetreiber ab; er stellt die Leistung einer neuen Anlage erst bereit, wenn ein positiver Bericht vorliegt (6.4.6.2).",[43,703,705],{"id":704},"bei-immobilienverkauf","Bei Immobilienverkauf",[11,707,708],{},"Nach einer negativen Verkaufskontrolle teilt der Käufer der ursprünglichen Kontrollstelle schriftlich seine Identität und das Datum der Kaufurkunde mit. Spätestens 18 Monate nach diesem Datum lässt er prüfen, ob die Verstöße behoben sind. Die Kontrollstelle darf er frei wählen; eine andere Stelle informiert die erste (8.4.2.2 a). Maßgeblich ist das Datum der authentischen Urkunde, nicht das eines privaten Kaufversprechens.",[35,710,712],{"id":711},"zehn-prüfbereiche-die-du-im-bericht-wiederfindest","Zehn Prüfbereiche, die du im Bericht wiederfindest",[11,714,715],{},"Diese Bereiche tauchen in Berichten regelmäßig auf. Sie sind keine statistische Rangliste, aber eine gute Landkarte für deine Feststellungen.",[55,717,718,730],{},[58,719,720],{},[61,721,722,724,727],{},[64,723,146],{},[64,725,726],{},"Prüfbereich",[64,728,729],{},"Fundstelle",[74,731,732,741,750,759,768,777,787,796,806,815],{},[61,733,734,736,739],{},[79,735,159],{},[79,737,738],{},"Differenzialschalter fehlt oder passt nicht: 300 mA am Speisepunkt, höchstens 30 mA für die vorgeschriebenen Kreise, mindestens Typ A",[79,740,165],{},[61,742,743,745,748],{},[79,744,170],{},[79,746,747],{},"Eindrahtschema oder Positionsplan fehlt oder stimmt nicht mit der Anlage überein",[79,749,176],{},[61,751,752,754,757],{},[79,753,181],{},[79,755,756],{},"Erdungswert und FI-Anordnung passen nicht zusammen (unter 100 Ω; über 30 Ω strengere Anordnung)",[79,758,187],{},[61,760,761,763,766],{},[79,762,192],{},[79,764,765],{},"Stromkreise im Verteiler nicht eindeutig gekennzeichnet",[79,767,198],{},[61,769,770,772,775],{},[79,771,203],{},[79,773,774],{},"Leitungen für Verlegeart und Beanspruchung nicht ausreichend mechanisch geschützt",[79,776,209],{},[61,778,779,781,784],{},[79,780,214],{},[79,782,783],{},"Bereiche und Schutzanforderungen im Bad nicht eingehalten",[79,785,786],{},"Kapitel 7.1",[61,788,789,791,794],{},[79,790,225],{},[79,792,793],{},"Haupt-Lasttrennschalter fehlt oder ist zu klein (Hausinstallation mindestens 40 A)",[79,795,231],{},[61,797,798,800,803],{},[79,799,236],{},[79,801,802],{},"Schutzorgan und Querschnitt nicht koordiniert",[79,804,805],{},"4.4.1.4, Tabelle 4.11",[61,807,808,810,813],{},[79,809,247],{},[79,811,812],{},"Überspannungsschutz nicht fachlich bewertet",[79,814,253],{},[61,816,817,819,822],{},[79,818,258],{},[79,820,821],{},"Regionale Rauchmelderpflicht wird mit AREI-Pflichten vermischt – beide Rechtsbereiche getrennt prüfen",[79,823,824],{},"regionales Wohnrecht, nicht AREI",[35,826,828],{"id":827},"schritt-für-schritt-nach-der-negativen-kontrolle","Schritt für Schritt nach der negativen Kontrolle",[43,830,832],{"id":831},"schritt-1-bericht-zeile-für-zeile-lesen","Schritt 1: Bericht Zeile für Zeile lesen",[11,834,835],{},"Gehe jede Feststellung einzeln durch und notiere:",[277,837,838,841,844],{},[280,839,840],{},"Unter welcher Rubrik steht sie: Verstoß, Bemerkung oder Abweichung?",[280,842,843],{},"Wo genau liegt das Problem: Raum, Verteiler, Stromkreis?",[280,845,846],{},"Was genau wird beanstandet, und welche Regel ist betroffen?",[43,848,850],{"id":849},"schritt-2-prioritäten-setzen","Schritt 2: Prioritäten setzen",[11,852,853],{},"Zuerst kommen alle Feststellungen, die der Bericht als unmittelbare Gefahr, Abschaltgrund oder Hindernis für die Ingebrauchnahme kennzeichnet. Danach planst du die übrigen Verstöße nach Abhängigkeit: erst Ursache und Schutzkonzept, dann Ausführung, Messung und Dokumentation.",[43,855,857],{"id":856},"schritt-3-elektrofachkraft-beauftragen","Schritt 3: Elektrofachkraft beauftragen",[11,859,860,861,864],{},"Du kannst den Bericht ordnen, Unterlagen sammeln und die Pläne mit der sichtbaren Anlage vergleichen. Arbeiten im Verteiler, an Schutzgeräten, an der Erdung oder an festen Leitungen gehören in die Hände einer ",[14,862,863],{},"Elektrofachkraft",", zum Beispiel:",[277,866,867,870,873,876],{},[280,868,869],{},"Differenzialschalter nachrüsten oder tauschen",[280,871,872],{},"Erdung verbessern oder die FI-Anordnung an den Erdungswert anpassen",[280,874,875],{},"Leitungen mechanisch schützen oder neu verlegen",[280,877,878],{},"Haupt-Lasttrennschalter einbauen",[43,880,882],{"id":881},"schritt-4-pläne-auf-den-ausgeführten-stand-bringen","Schritt 4: Pläne auf den ausgeführten Stand bringen",[11,884,885,886,889],{},"Eindrahtschema und Positionsplan zeigen ",[14,887,888],{},"den Zustand nach der Korrektur",". Übernimm keine vermuteten Querschnitte oder Schutzwerte; unbekannte Merkmale klärst du vor dem Export oder kennzeichnest sie ausdrücklich als offen.",[43,891,893],{"id":892},"schritt-5-erneute-kontrolle-vereinbaren","Schritt 5: Erneute Kontrolle vereinbaren",[11,895,896],{},"Wer kontrolliert, hängt von der Kontrollart ab: Nach einem periodischen Besuch kommt dieselbe Kontrollstelle, nach einer Verkaufskontrolle wählt der Käufer frei. Kläre anhand des Berichts den Umfang, bevor du buchst.",[35,898,900],{"id":899},"feststellung-in-eine-prüfbare-maßnahme-übersetzen","Feststellung in eine prüfbare Maßnahme übersetzen",[11,902,903],{},"Der Bericht beschreibt ein Ergebnis, nicht automatisch die Ursache. „Isolationswiderstand unzureichend“ kann einen beschädigten Leiter, Feuchtigkeit oder ein angeschlossenes Gerät betreffen. Zur Einordnung: Bei der Messung muss jeder Stromkreis mindestens 500 kΩ bei 500 V Prüfspannung erreichen (6.4.5.1). „Plan stimmt nicht überein“ reicht von einer fehlenden Steckdose bis zu einer falschen Schutzgerätefolge. Lass deshalb zuerst Ursache und Umfang bestimmen, bevor ein einzelnes Bauteil getauscht wird.",[11,905,906],{},"Für jede Feststellung helfen fünf Fragen:",[350,908,909,912,915,918,921],{},[280,910,911],{},"Welcher Anlagenteil wurde tatsächlich kontrolliert?",[280,913,914],{},"Welche Regel oder Schutzfunktion ist betroffen?",[280,916,917],{},"Welche Diagnose oder Messung bestätigt die Ursache?",[280,919,920],{},"Welche Korrektur beseitigt die Ursache, nicht nur das Symptom?",[280,922,923],{},"Welcher Nachweis zeigt der Kontrollstelle die fertige Korrektur?",[11,925,926],{},"Mehrere Verstöße hängen oft zusammen. Eine geänderte Verteilung beeinflusst Eindrahtschema, Beschriftung, Schutzgeräte und Messwerte. Eine neue Erdungsmaßnahme ist abgeschlossen, bevor Pläne finalisiert und erneut gemessen wird. Plane deshalb einen einzigen, konsistenten Endstand statt einer Folge widersprüchlicher Zwischenstände.",[35,928,930],{"id":929},"dokumentationsmangel-und-ausführungsmangel-trennen","Dokumentationsmangel und Ausführungsmangel trennen",[11,932,933],{},"Ein fehlender Plan wird nicht dadurch behoben, dass jemand einen ungeprüften Plan zeichnet. Erfasse zuerst die Anlage – Öffnen und Messen übernimmt die Fachkraft. Dann ordnest du jedem Symbol den tatsächlichen Stromkreis zu und prüfst, ob Verteilerbeschriftung, Eindrahtschema und Positionsplan dieselbe Referenz verwenden.",[11,935,936],{},"Umgekehrt behebt eine schönere Zeichnung keinen Ausführungsmangel. Ist ein Schutzgerät ungeeignet, die Erdung unzureichend oder eine Leitung mechanisch gefährdet, wird die Anlage korrigiert und gegebenenfalls neu gemessen; danach folgt der Plan dem ausgeführten Zustand. Diese Reihenfolge sorgt dafür, dass die Kontrollstelle bei der erneuten Kontrolle aktuelle Unterlagen und eine korrigierte Anlage vorfindet.",[35,938,940],{"id":939},"sonderfall-verkauf","Sonderfall Verkauf",[11,942,943],{},"Bewahre als Käufer Bericht, Kaufurkunde und Anlagenakte gemeinsam auf. Die 18 Monate laufen ab dem Tag der Kaufurkunde. Die Frist ist kein Aufschub für erkennbare Gefahren: Unsichere Anlagenteile lässt du sofort von einer Fachkraft bewerten und gegebenenfalls außer Betrieb nehmen.",[11,945,946,947,951],{},"Wird das Gebäude abgerissen oder die Anlage vollständig erneuert, gilt ein eigener Weg: Verkäufer und Käufer halten das in der Urkunde fest, der Käufer informiert die Generaldirektion Energie, und für die neue Anlage gilt die Konformitätsprüfung nach Kapitel 6.4 (8.4.2.2 a und b). Die ",[391,948,950],{"href":393,"rel":949},[395],"FÖD-FAQ für Notare und Immobiliensektor"," beantwortet weitere Verkaufsfragen.",[35,953,955],{"id":954},"kosten-realistisch-planen","Kosten realistisch planen",[11,957,958],{},"Tarife und Reparaturkosten hängen von Kontrollart, Kontrollstelle, Anfahrt, Zahl der Verteiler, Messaufwand und tatsächlichem Mangel ab. Den aktuellen Tarif erfragst du direkt bei der Kontrollstelle. Ein gutes Reparaturangebot weist Diagnose, Material, Arbeitszeit, Messungen, Plananpassung und erneute Kontrolle getrennt aus – so erkennst du, ob eine verdeckte Leitungsreparatur oder ein Verteilerumbau eingerechnet ist.",[35,960,962],{"id":961},"belastbare-akte-für-die-erneute-kontrolle","Belastbare Akte für die erneute Kontrolle",[11,964,965],{},"Führe eine Tabelle mit einer Zeile pro Feststellung: Berichtstext, betroffener Stromkreis, Maßnahme, verantwortliche Person, Abschlussdatum und Nachweis. Fotos ergänzen die Akte; Messungen ersetzen sie nicht. Aktualisiere die Pläne nach der tatsächlichen Ausführung und prüfe danach Beschriftungen und Referenzen noch einmal.",[11,967,968,969,973,974,978],{},"Die ",[391,970,972],{"href":417,"rel":971},[395],"FÖD-Übersicht der Kontrollarten"," erläutert Folgen und Fristen, die ",[391,975,977],{"href":423,"rel":976},[395],"Liste der zugelassenen Kontrollstellen"," ist ebenfalls amtlich.",[35,980,982],{"id":981},"änderungen-bis-zur-erneuten-kontrolle-beherrschen","Änderungen bis zur erneuten Kontrolle beherrschen",[11,984,985],{},"Friere nach der Mängelbeseitigung einen dokumentierten Stand ein: datierte Pläne, Verteilerbeschriftung, Messunterlagen und Fotos der später verdeckten Arbeiten. Jede weitere Änderung vor dem Termin prüfst du gegen diesen Stand und trägst sie nach. Sonst zerstört eine kleine zusätzliche Leitung genau die Übereinstimmung, die Elektriker und Planer gerade hergestellt haben. Bitte alle Bewohner, bis zur Kontrolle auf provisorische Anschlüsse und eigene Umbauten zu verzichten. Muss doch etwas geändert werden, bekommt die verantwortliche Fachkraft Bericht, aktuelle Pläne und eine eindeutige Beschreibung der Änderung.",[35,987,989],{"id":988},"letzter-check-vor-dem-neuen-termin","Letzter Check vor dem neuen Termin",[277,991,992,995,998,1001,1004,1007,1010],{},[280,993,994],{},"Jede Feststellung ist einer abgeschlossenen Maßnahme zugeordnet.",[280,996,997],{},"Messpflichtige Korrekturen sind fachgerecht gemessen und dokumentiert.",[280,999,1000],{},"Stromkreiskennzeichen stimmen im Verteiler und in beiden Plänen überein.",[280,1002,1003],{},"Neue oder entfernte Geräte sind im Positionsplan nachgetragen.",[280,1005,1006],{},"Nennwerte und Leitungsangaben im Eindrahtschema entsprechen der Ausführung.",[280,1008,1009],{},"Kontrollstelle und Kontrollart sind bestätigt.",[280,1011,1012],{},"Bericht, Pläne, EAN-Nummer und Herstellerunterlagen liegen bereit.",[11,1014,1015],{},"So geht jede erledigte Reparatur mit einem klaren Nachweis in die erneute Kontrolle. Plane Zeit für Rückfragen und gegebenenfalls eine zweite Diagnose ein: Eine Feststellung ist erst erledigt, wenn Ursache, Ausführung und Nachweis zusammenpassen.",[35,1017,1019],{"id":1018},"wie-planelec-hilft","Wie PlanElec hilft",[11,1021,1022,1023,1026],{},"PlanElec macht unterstützte Planungsfehler ",[14,1024,1025],{},"vor der erneuten Kontrolle"," sichtbar und hält deine Unterlagen konsistent:",[277,1028,1029,1035,1041,1047],{},[280,1030,1031,1034],{},[14,1032,1033],{},"AREI\u002FRGIE-Selbstprüfung"," meldet Befunde zu FI-Schutz und Absicherung in den unterstützten Regeln",[280,1036,1037,1040],{},[14,1038,1039],{},"Eindrahtschema"," bildet die erfasste Topologie strukturiert ab",[280,1042,1043,1046],{},[14,1044,1045],{},"Positionsplan"," nutzt die belgische Symbolbibliothek",[280,1048,1049,1052],{},[14,1050,1051],{},"Stromkreisreferenzen"," sind in Schema und Plan identisch",[11,1054,1055],{},"Die Rollen bleiben klar: PlanElec zeigt dir, ob Planung und Unterlagen in den unterstützten Regeln stimmig sind; Messungen und das Urteil über die Anlage liefert die zugelassene Kontrollstelle.",[505,1057],{},[11,1059,1060],{},[14,1061,1062],{},"Verwandte Artikel:",[277,1064,1065,1071,1077],{},[280,1066,1067],{},[391,1068,1070],{"href":1069},"\u002Fde\u002Fblog\u002F10-haeufigste-arei-verstoesse","10 wichtige AREI-Kontrollpunkte",[280,1072,1073],{},[391,1074,1076],{"href":1075},"\u002Fde\u002Fblog\u002F30ma-fi-pro-steckdose","30-mA-FI für jede Steckdose? Die AREI-Regel",[280,1078,1079],{},[391,1080,1082],{"href":1081},"\u002Fde\u002Fblog\u002Fkabelquerschnitt-sicherungsautomat","Kabelquerschnitt für Sicherungsautomat",[11,1084,1085,537,1088],{},[14,1086,1087],{},"Bring deine Unterlagen auf den ausgeführten Stand und geh mit einer geordneten Akte in die erneute Kontrolle.",[391,1089,1091],{"href":540,"rel":1090},[395],"Jetzt starten →",{"title":544,"searchDepth":545,"depth":545,"links":1093},[1094,1097,1102,1103,1110,1111,1112,1113,1114,1115,1116,1117],{"id":625,"depth":545,"text":626,"children":1095},[1096],{"id":632,"depth":550,"text":633},{"id":639,"depth":545,"text":640,"children":1098},[1099,1100,1101],{"id":690,"depth":550,"text":691},{"id":697,"depth":550,"text":698},{"id":704,"depth":550,"text":705},{"id":711,"depth":545,"text":712},{"id":827,"depth":545,"text":828,"children":1104},[1105,1106,1107,1108,1109],{"id":831,"depth":550,"text":832},{"id":849,"depth":550,"text":850},{"id":856,"depth":550,"text":857},{"id":881,"depth":550,"text":882},{"id":892,"depth":550,"text":893},{"id":899,"depth":545,"text":900},{"id":929,"depth":545,"text":930},{"id":939,"depth":545,"text":940},{"id":954,"depth":545,"text":955},{"id":961,"depth":545,"text":962},{"id":981,"depth":545,"text":982},{"id":988,"depth":545,"text":989},{"id":1018,"depth":545,"text":1019},"Deine Elektrokontrolle ist negativ? So liest du den Bericht, bestimmst die geltende Frist nach AREI, planst sichere Korrekturen und bereitest die erneute Kontrolle vor.","de",{},"\u002Fblog\u002Finspection-failed-what-now.de",{"title":600,"description":1118},"Elektrokontrolle durchgefallen – was nun?","stromabnahme-durchgefallen","blog\u002Finspection-failed-what-now.de",[589,1127,1128,1129,1130,594,1131],"elektrokontrolle","durchgefallen","mängel","nachkontrolle","belgien","ayzUvOhEELjCVdqP-SCaTVCH0mnnhEF5TFZG8lojvQA",{"id":1134,"title":1135,"articleId":6,"body":1136,"category":572,"date":573,"description":1654,"extension":575,"image":24,"lastUpdated":576,"locale":1655,"meta":1656,"navigation":579,"ogImage":580,"path":1657,"publishDate":573,"readTime":582,"refreshInterval":583,"seo":1658,"seoTitle":1659,"slug":6,"stem":1660,"tags":1661,"__hash__":1668},"blog\u002Fblog\u002Finspection-failed-what-now.en.md","Electrical Inspection Failed – What Now? Step by Step to the Re-Inspection",{"type":8,"value":1137,"toc":1628},[1138,1144,1149,1152,1158,1162,1165,1169,1172,1176,1223,1227,1230,1234,1237,1241,1244,1248,1251,1361,1365,1369,1372,1383,1387,1390,1394,1401,1415,1419,1426,1430,1433,1437,1440,1443,1460,1463,1467,1470,1473,1477,1480,1488,1492,1495,1499,1502,1515,1519,1522,1526,1549,1552,1556,1563,1589,1592,1594,1599,1619],[11,1139,1140,1143],{},[14,1141,1142],{},"After a negative inspection, you have every infringement in the report corrected, bring the single-line diagram and situation plan in line with the installation as built, and have the installation inspected again."," The deadline depends on the type of inspection: for a new installation, the affected part may only be put into use after correction and a new inspection. After a periodic control visit, the same inspection body returns within one year. After a sale inspection, the buyer has 18 months from the deed of sale and chooses the inspection body freely.",[11,1145,1146],{},[21,1147],{"alt":1148,"src":24},"Electricians prepare materials for remedial work.",[11,1150,1151],{},"A negative report on its own does not tell you whether only documents are missing or whether there is a safety risk. The individual findings decide. This guide shows you how to read them, prioritise them, have them corrected and prove the result.",[11,1153,1154,1157],{},[14,1155,1156],{},"Editing and review: PlanElec team, 5 October 2026",", checked against AREI\u002FRGIE Book 1, version 06, applicable since 1 April 2026.",[35,1159,1161],{"id":1160},"what-is-in-the-negative-report","What is in the negative report?",[11,1163,1164],{},"The approved inspection body's report lists the infringements of Book 1, any circuits with an insufficient insulation level, and the conclusion. For a control visit to a domestic installation, it also separates infringements, remarks and applicable derogations for existing installations (subsection 6.5.7.2, b.5). A remark is not an infringement – so check carefully which heading a finding is listed under.",[43,1166,1168],{"id":1167},"reading-codes-and-priorities-correctly","Reading codes and priorities correctly",[11,1170,1171],{},"Internal codes and priority classes differ between inspection bodies and report templates. \"C1\", \"C2\" or \"C3\" therefore do not set a universal Belgian deadline; the legend of your report is what counts. If a finding is unclear, ask the inspection body in writing for the rule reference, the affected circuit and the evidence it expects. Any mention of immediate danger takes priority, whatever the code: do not switch the affected part back on yourself.",[35,1173,1175],{"id":1174},"deadlines-by-type-of-inspection","Deadlines by type of inspection",[55,1177,1178,1191],{},[58,1179,1180],{},[61,1181,1182,1185,1188],{},[64,1183,1184],{},"Type of inspection",[64,1186,1187],{},"What applies now",[64,1189,1190],{},"Book 1 reference",[74,1192,1193,1203,1213],{},[61,1194,1195,1198,1201],{},[79,1196,1197],{},"Conformity inspection of a new installation or significant modification",[79,1199,1200],{},"The affected part may not be put into use; new conformity inspection after correction",[79,1202,87],{},[61,1204,1205,1208,1211],{},[79,1206,1207],{},"Periodic control visit",[79,1209,1210],{},"Correct without delay; new visit by the same body within one year",[79,1212,98],{},[61,1214,1215,1218,1221],{},[79,1216,1217],{},"Sale inspection of an old domestic installation",[79,1219,1220],{},"The buyer has it inspected again no later than 18 months after the deed of sale; free choice of body",[79,1222,109],{},[43,1224,1226],{"id":1225},"after-a-periodic-inspection","After a periodic inspection",[11,1228,1229],{},"The conclusion of the report states the date by which the additional visit by the same body must take place (6.5.7.2, b.6). If infringements remain at that second visit, the body sends a copy of the report to the Directorate-General for Energy (b.7). Until then, the work is carried out without delay and all appropriate measures are taken so that the infringements pose no danger while the installation stays in service.",[43,1231,1233],{"id":1232},"for-a-new-installation","For a new installation",[11,1235,1236],{},"For a new installation or a significant modification, the affected part stays out of service until the infringements are corrected and inspected again (9.1.3.1). Coordinate the grid connection with the responsible grid operator as well; it only makes the power of a new installation available once a positive report exists (6.4.6.2).",[43,1238,1240],{"id":1239},"when-selling-a-property","When selling a property",[11,1242,1243],{},"After a negative sale inspection, the buyer notifies the original inspection body in writing of their identity and the date of the deed of sale. No later than 18 months after that date, the buyer has the corrections inspected. The buyer chooses the body freely; a different body informs the first one (8.4.2.2 a). The relevant date is that of the notarial deed, not of a private purchase agreement.",[35,1245,1247],{"id":1246},"ten-inspection-areas-you-will-find-in-the-report","Ten inspection areas you will find in the report",[11,1249,1250],{},"These areas come up regularly in reports. They are not a statistical ranking, but a useful map for your findings.",[55,1252,1253,1266],{},[58,1254,1255],{},[61,1256,1257,1260,1263],{},[64,1258,1259],{},"No.",[64,1261,1262],{},"Inspection area",[64,1264,1265],{},"Reference",[74,1267,1268,1277,1286,1295,1304,1313,1323,1332,1342,1351],{},[61,1269,1270,1272,1275],{},[79,1271,159],{},[79,1273,1274],{},"RCD missing or unsuitable: 300 mA at the origin, at most 30 mA for the prescribed circuits, at least type A",[79,1276,165],{},[61,1278,1279,1281,1284],{},[79,1280,170],{},[79,1282,1283],{},"Single-line diagram or situation plan missing or not matching the installation",[79,1285,176],{},[61,1287,1288,1290,1293],{},[79,1289,181],{},[79,1291,1292],{},"Earth value and RCD layout do not fit together (below 100 Ω; above 30 Ω a stricter layout)",[79,1294,187],{},[61,1296,1297,1299,1302],{},[79,1298,192],{},[79,1300,1301],{},"Circuits in the board not clearly labelled",[79,1303,198],{},[61,1305,1306,1308,1311],{},[79,1307,203],{},[79,1309,1310],{},"Cables not adequately protected mechanically for the installation method and stresses",[79,1312,209],{},[61,1314,1315,1317,1320],{},[79,1316,214],{},[79,1318,1319],{},"Bathroom zones and protection requirements not respected",[79,1321,1322],{},"chapter 7.1",[61,1324,1325,1327,1330],{},[79,1326,225],{},[79,1328,1329],{},"Main switch-disconnector missing or too small (at least 40 A in a home)",[79,1331,231],{},[61,1333,1334,1336,1339],{},[79,1335,236],{},[79,1337,1338],{},"Protective device and cross-section not coordinated",[79,1340,1341],{},"4.4.1.4, table 4.11",[61,1343,1344,1346,1349],{},[79,1345,247],{},[79,1347,1348],{},"Surge protection not professionally assessed",[79,1350,253],{},[61,1352,1353,1355,1358],{},[79,1354,258],{},[79,1356,1357],{},"Regional smoke detector duty mixed up with AREI duties – check both legal areas separately",[79,1359,1360],{},"regional housing law, not AREI",[35,1362,1364],{"id":1363},"step-by-step-after-the-negative-inspection","Step by step after the negative inspection",[43,1366,1368],{"id":1367},"step-1-read-the-report-line-by-line","Step 1: read the report line by line",[11,1370,1371],{},"Go through each finding and note:",[277,1373,1374,1377,1380],{},[280,1375,1376],{},"Which heading is it under: infringement, remark or derogation?",[280,1378,1379],{},"Where exactly is the problem: room, board, circuit?",[280,1381,1382],{},"What exactly is being flagged, and which rule is involved?",[43,1384,1386],{"id":1385},"step-2-set-priorities","Step 2: set priorities",[11,1388,1389],{},"First come all findings that the report marks as immediate danger, a reason for disconnection or an obstacle to putting into use. Then plan the remaining infringements by dependency: cause and protection concept first, then workmanship, measurement and documentation.",[43,1391,1393],{"id":1392},"step-3-bring-in-an-electrician","Step 3: bring in an electrician",[11,1395,1396,1397,1400],{},"You can organise the report, gather documents and compare the plans with the visible installation. Work in the board, on protective devices, on the earthing or on fixed wiring belongs with a ",[14,1398,1399],{},"qualified electrician",", for example:",[277,1402,1403,1406,1409,1412],{},[280,1404,1405],{},"adding or replacing an RCD",[280,1407,1408],{},"improving the earth electrode or adapting the RCD layout to the earth value",[280,1410,1411],{},"protecting cables mechanically or re-routing them",[280,1413,1414],{},"installing the main switch-disconnector",[43,1416,1418],{"id":1417},"step-4-bring-the-plans-in-line-with-the-installation","Step 4: bring the plans in line with the installation",[11,1420,1421,1422,1425],{},"The single-line diagram and situation plan show ",[14,1423,1424],{},"the state after correction",". Do not copy assumed cross-sections or ratings; clarify unknown characteristics before exporting, or mark them explicitly as open.",[43,1427,1429],{"id":1428},"step-5-book-the-re-inspection","Step 5: book the re-inspection",[11,1431,1432],{},"Who inspects depends on the type of inspection: after a periodic visit it is the same body; after a sale inspection the buyer chooses freely. Use the report to clarify the scope before you book.",[35,1434,1436],{"id":1435},"turning-a-finding-into-a-verifiable-measure","Turning a finding into a verifiable measure",[11,1438,1439],{},"The report describes a result, not necessarily the cause. \"Insufficient insulation resistance\" can point to a damaged conductor, moisture or a connected appliance. For reference: each circuit must reach at least 500 kΩ at a 500 V test voltage (6.4.5.1). \"Plan does not match\" ranges from a missing socket to a wrong sequence of protective devices. So have the cause and extent established first, before a component is replaced.",[11,1441,1442],{},"For each finding, five questions help:",[350,1444,1445,1448,1451,1454,1457],{},[280,1446,1447],{},"Which part of the installation was actually inspected?",[280,1449,1450],{},"Which rule or protective function is involved?",[280,1452,1453],{},"Which diagnosis or measurement confirms the cause?",[280,1455,1456],{},"Which correction removes the cause, not just the symptom?",[280,1458,1459],{},"Which evidence shows the inspection body the completed correction?",[11,1461,1462],{},"Several infringements are often linked. A changed distribution affects the single-line diagram, labelling, protective devices and measured values. New earthing work is finished before plans are finalised and measurements repeated. So plan one consistent final state rather than a series of contradictory interim states.",[35,1464,1466],{"id":1465},"separating-documentation-defects-from-workmanship-defects","Separating documentation defects from workmanship defects",[11,1468,1469],{},"A missing plan is not fixed by drawing an unverified plan. Survey the installation first – opening and measuring is the electrician's job. Then link each symbol to the real circuit and check that board labels, single-line diagram and situation plan use the same reference.",[11,1471,1472],{},"Conversely, a nicer drawing does not fix a workmanship defect. If a protective device is unsuitable, the earthing insufficient or a cable mechanically at risk, the installation is corrected and, where needed, measured again; the plan then follows the state as built. That way the inspection body finds up-to-date documents and a corrected installation at the re-inspection.",[35,1474,1476],{"id":1475},"special-case-a-sale","Special case: a sale",[11,1478,1479],{},"As the buyer, keep the report, the deed of sale and the installation file together. The 18 months run from the day of the deed. The deadline is no postponement for visible hazards: have unsafe parts assessed by an electrician immediately and, if needed, taken out of service.",[11,1481,1482,1483,1487],{},"If the building is demolished or the installation completely renewed, a separate route applies: seller and buyer record it in the deed, the buyer informs the Directorate-General for Energy, and the new installation follows the conformity inspection of chapter 6.4 (8.4.2.2 a and b). The ",[391,1484,1486],{"href":393,"rel":1485},[395],"FPS Economy FAQ for notaries and the property sector"," answers further sale questions.",[35,1489,1491],{"id":1490},"planning-costs-realistically","Planning costs realistically",[11,1493,1494],{},"Fees and repair costs depend on the type of inspection, the body, travel, the number of boards, measurement effort and the actual defect. Ask the inspection body directly for its current fee. A good repair quote lists diagnosis, materials, labour, measurements, plan updates and the re-inspection separately – so you can see whether a concealed cable repair or a board rebuild is included.",[35,1496,1498],{"id":1497},"a-solid-file-for-the-re-inspection","A solid file for the re-inspection",[11,1500,1501],{},"Keep a table with one row per finding: report text, affected circuit, measure, responsible person, completion date and evidence. Photos supplement the file; they do not replace measurements. Update the plans after the actual work and then check labels and references once more.",[11,1503,1504,1505,1509,1510,1514],{},"The ",[391,1506,1508],{"href":417,"rel":1507},[395],"FPS Economy overview of inspection types"," explains consequences and deadlines; the ",[391,1511,1513],{"href":423,"rel":1512},[395],"list of approved inspection bodies"," is official too.",[35,1516,1518],{"id":1517},"keeping-changes-under-control-until-the-re-inspection","Keeping changes under control until the re-inspection",[11,1520,1521],{},"After the corrections, freeze a documented state: dated plans, board labels, measurement records and photos of work that will later be concealed. Check every further change before the appointment against that state and record it. Otherwise one small additional cable breaks exactly the consistency that electrician and designer have just established. Ask all occupants to avoid temporary connections and their own alterations until the inspection. If a change is unavoidable, the responsible electrician receives the report, the current plans and a clear description of the change.",[35,1523,1525],{"id":1524},"final-check-before-the-new-appointment","Final check before the new appointment",[277,1527,1528,1531,1534,1537,1540,1543,1546],{},[280,1529,1530],{},"Every finding is linked to a completed measure.",[280,1532,1533],{},"Corrections that require a measurement have been measured and documented properly.",[280,1535,1536],{},"Circuit labels match in the board and on both plans.",[280,1538,1539],{},"New or removed appliances are updated on the situation plan.",[280,1541,1542],{},"Ratings and cable data on the single-line diagram match the installation.",[280,1544,1545],{},"Inspection body and type of inspection are confirmed.",[280,1547,1548],{},"Report, plans, EAN code and manufacturer documents are ready.",[11,1550,1551],{},"Every completed repair then goes into the re-inspection with clear evidence. Allow time for questions and, if needed, a second diagnosis: a finding is only closed when cause, workmanship and evidence line up.",[35,1553,1555],{"id":1554},"how-planelec-helps","How PlanElec helps",[11,1557,1558,1559,1562],{},"PlanElec surfaces supported design errors ",[14,1560,1561],{},"before the re-inspection"," and keeps your documents consistent:",[277,1564,1565,1571,1577,1583],{},[280,1566,1567,1570],{},[14,1568,1569],{},"AREI\u002FRGIE self-check"," reports findings on RCD protection and circuit protection in the supported rules",[280,1572,1573,1576],{},[14,1574,1575],{},"Single-line diagram"," shows the topology you entered in a structured way",[280,1578,1579,1582],{},[14,1580,1581],{},"Situation plan"," uses the Belgian symbol library",[280,1584,1585,1588],{},[14,1586,1587],{},"Circuit references"," are identical in diagram and plan",[11,1590,1591],{},"The roles stay clear: PlanElec shows you whether design and documents are consistent in the supported rules; measurements and the verdict on the installation come from the approved inspection body.",[505,1593],{},[11,1595,1596],{},[14,1597,1598],{},"Related articles:",[277,1600,1601,1607,1613],{},[280,1602,1603],{},[391,1604,1606],{"href":1605},"\u002Fen\u002Fblog\u002Ftop-10-arei-violations","10 important AREI inspection points",[280,1608,1609],{},[391,1610,1612],{"href":1611},"\u002Fen\u002Fblog\u002F30ma-rcd-per-socket","A 30 mA RCD for Every Socket?",[280,1614,1615],{},[391,1616,1618],{"href":1617},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","Cable Cross-Section per Circuit Breaker",[11,1620,1621,537,1624],{},[14,1622,1623],{},"Bring your documents in line with the installation and go into the re-inspection with an organised file.",[391,1625,1627],{"href":540,"rel":1626},[395],"Get started →",{"title":544,"searchDepth":545,"depth":545,"links":1629},[1630,1633,1638,1639,1646,1647,1648,1649,1650,1651,1652,1653],{"id":1160,"depth":545,"text":1161,"children":1631},[1632],{"id":1167,"depth":550,"text":1168},{"id":1174,"depth":545,"text":1175,"children":1634},[1635,1636,1637],{"id":1225,"depth":550,"text":1226},{"id":1232,"depth":550,"text":1233},{"id":1239,"depth":550,"text":1240},{"id":1246,"depth":545,"text":1247},{"id":1363,"depth":545,"text":1364,"children":1640},[1641,1642,1643,1644,1645],{"id":1367,"depth":550,"text":1368},{"id":1385,"depth":550,"text":1386},{"id":1392,"depth":550,"text":1393},{"id":1417,"depth":550,"text":1418},{"id":1428,"depth":550,"text":1429},{"id":1435,"depth":545,"text":1436},{"id":1465,"depth":545,"text":1466},{"id":1475,"depth":545,"text":1476},{"id":1490,"depth":545,"text":1491},{"id":1497,"depth":545,"text":1498},{"id":1517,"depth":545,"text":1518},{"id":1524,"depth":545,"text":1525},{"id":1554,"depth":545,"text":1555},"Your electrical inspection came back negative? Read the report, identify the applicable AREI deadline, plan safe corrections and prepare the re-inspection.","en",{},"\u002Fblog\u002Finspection-failed-what-now.en",{"title":1135,"description":1654},"Electrical Inspection Failed – What Now?","blog\u002Finspection-failed-what-now.en",[1662,1663,1664,1665,1666,594,1667],"inspection","electrical-inspection","failed","deficiencies","re-inspection","belgium","wfk162xgMep971Qg7fNYUKmhxOScRgX_J41f8uP9viU",{"id":1670,"title":1671,"articleId":6,"body":1672,"category":572,"date":573,"description":2190,"extension":575,"image":24,"lastUpdated":576,"locale":2191,"meta":2192,"navigation":579,"ogImage":580,"path":2193,"publishDate":573,"readTime":582,"refreshInterval":583,"seo":2194,"seoTitle":2195,"slug":2196,"stem":2197,"tags":2198,"__hash__":2206},"blog\u002Fblog\u002Finspection-failed-what-now.fr.md","Contrôle électrique refusé – que faire ? Étape par étape jusqu’au nouveau contrôle",{"type":8,"value":1673,"toc":2164},[1674,1680,1685,1688,1694,1698,1701,1705,1708,1712,1759,1763,1766,1770,1773,1777,1780,1784,1787,1897,1901,1905,1908,1919,1923,1926,1930,1937,1951,1955,1962,1966,1969,1973,1976,1979,1996,1999,2003,2006,2009,2013,2016,2024,2028,2031,2035,2038,2051,2055,2058,2062,2085,2088,2092,2099,2125,2128,2130,2135,2155],[11,1675,1676,1679],{},[14,1677,1678],{},"Après un contrôle négatif, vous faites corriger chaque infraction du rapport, mettez le schéma unifilaire et le plan de position à jour selon l'exécution et faites contrôler à nouveau l'installation."," Le délai dépend du type de contrôle : pour une nouvelle installation, la partie concernée ne peut être mise en usage qu'après correction et nouveau contrôle. Après une visite de contrôle périodique, le même organisme revient dans un délai d'un an. Après un contrôle lors d'une vente, l'acheteur dispose de 18 mois à compter de l'acte de vente et choisit librement l'organisme.",[11,1681,1682],{},[21,1683],{"alt":1684,"src":24},"Des électriciens préparent le matériel d’une remise en conformité.",[11,1686,1687],{},"Un rapport négatif ne dit pas à lui seul s'il manque seulement des documents ou s'il existe un risque pour la sécurité. Chaque constat compte. Ce guide vous montre comment les lire, les prioriser, les faire corriger et en apporter la preuve.",[11,1689,1690,1693],{},[14,1691,1692],{},"Rédaction et vérification : équipe PlanElec, 5 octobre 2026",", sur la base du RGIE Livre 1, version 06, applicable depuis le 1er avril 2026.",[35,1695,1697],{"id":1696},"que-contient-le-rapport-négatif","Que contient le rapport négatif ?",[11,1699,1700],{},"Le rapport de l'organisme agréé mentionne les infractions au Livre 1, les circuits présentant un niveau d'isolement insuffisant et la conclusion. Lors d'une visite de contrôle d'une installation domestique, il distingue en outre infractions, remarques et dérogations applicables aux installations existantes (sous-section 6.5.7.2, b.5). Une remarque n'est pas une infraction – vérifiez donc sous quelle rubrique figure chaque constat.",[43,1702,1704],{"id":1703},"lire-correctement-codes-et-priorités","Lire correctement codes et priorités",[11,1706,1707],{},"Les codes internes et les classes de priorité varient selon l'organisme et le modèle de rapport. « C1 », « C2 » ou « C3 » ne fixent donc aucun délai belge universel ; c'est la légende de votre rapport qui fait foi. Si un constat n'est pas clair, demandez par écrit à l'organisme la référence réglementaire, le circuit concerné et la preuve attendue. Une mention de danger immédiat est prioritaire, quel que soit le code : ne remettez pas la partie concernée sous tension de votre propre initiative.",[35,1709,1711],{"id":1710},"les-délais-selon-le-type-de-contrôle","Les délais selon le type de contrôle",[55,1713,1714,1727],{},[58,1715,1716],{},[61,1717,1718,1721,1724],{},[64,1719,1720],{},"Type de contrôle",[64,1722,1723],{},"Ce qui s'applique",[64,1725,1726],{},"Référence Livre 1",[74,1728,1729,1739,1749],{},[61,1730,1731,1734,1737],{},[79,1732,1733],{},"Contrôle de conformité d'une nouvelle installation ou d'une modification importante",[79,1735,1736],{},"La partie concernée ne peut pas être mise en usage ; nouveau contrôle de conformité après correction",[79,1738,87],{},[61,1740,1741,1744,1747],{},[79,1742,1743],{},"Visite de contrôle périodique",[79,1745,1746],{},"Corriger sans délai ; nouvelle visite par le même organisme dans un délai d'un an",[79,1748,98],{},[61,1750,1751,1754,1757],{},[79,1752,1753],{},"Contrôle à la vente d'une ancienne installation domestique",[79,1755,1756],{},"L'acheteur fait contrôler au plus tard 18 mois après l'acte de vente ; libre choix de l'organisme",[79,1758,109],{},[43,1760,1762],{"id":1761},"en-cas-de-visite-périodique","En cas de visite périodique",[11,1764,1765],{},"La conclusion du rapport indique la date avant laquelle la visite complémentaire du même organisme doit avoir lieu (6.5.7.2, b.6). Si des infractions subsistent lors de cette deuxième visite, l'organisme envoie une copie du rapport à la Direction générale de l'Énergie (b.7). D'ici là, les travaux sont exécutés sans délai et toutes les mesures adéquates sont prises pour que les infractions ne présentent pas de danger tant que l'installation reste en service.",[43,1767,1769],{"id":1768},"en-cas-de-nouvelle-installation","En cas de nouvelle installation",[11,1771,1772],{},"Pour une nouvelle installation ou une modification importante, la partie concernée reste hors service jusqu'à la correction des infractions et à un nouveau contrôle (9.1.3.1). Le raccordement se règle en outre avec le gestionnaire de réseau compétent ; il ne met la puissance d'une nouvelle installation à disposition qu'au vu d'un rapport positif (6.4.6.2).",[43,1774,1776],{"id":1775},"en-cas-de-vente","En cas de vente",[11,1778,1779],{},"Après un contrôle négatif lors de la vente, l'acheteur communique par écrit son identité et la date de l'acte de vente à l'organisme initial. Au plus tard 18 mois après cette date, il fait vérifier la correction des infractions. Il choisit librement l'organisme ; un autre organisme en informe le premier (8.4.2.2 a). C'est la date de l'acte authentique qui compte, pas celle d'un compromis sous seing privé.",[35,1781,1783],{"id":1782},"dix-domaines-de-contrôle-que-vous-retrouvez-dans-le-rapport","Dix domaines de contrôle que vous retrouvez dans le rapport",[11,1785,1786],{},"Ces domaines reviennent régulièrement dans les rapports. Ils ne forment pas un classement statistique, mais une bonne carte de lecture de vos constats.",[55,1788,1789,1802],{},[58,1790,1791],{},[61,1792,1793,1796,1799],{},[64,1794,1795],{},"N°",[64,1797,1798],{},"Domaine de contrôle",[64,1800,1801],{},"Référence",[74,1803,1804,1813,1822,1831,1840,1849,1859,1868,1878,1887],{},[61,1805,1806,1808,1811],{},[79,1807,159],{},[79,1809,1810],{},"Différentiel absent ou inadapté : 300 mA en tête, 30 mA au maximum pour les circuits prescrits, au moins type A",[79,1812,165],{},[61,1814,1815,1817,1820],{},[79,1816,170],{},[79,1818,1819],{},"Schéma unifilaire ou plan de position absent ou non conforme à l'installation",[79,1821,176],{},[61,1823,1824,1826,1829],{},[79,1825,181],{},[79,1827,1828],{},"Valeur de terre et répartition des différentiels incompatibles (sous 100 Ω ; au-delà de 30 Ω, répartition plus stricte)",[79,1830,187],{},[61,1832,1833,1835,1838],{},[79,1834,192],{},[79,1836,1837],{},"Circuits mal repérés dans le tableau",[79,1839,198],{},[61,1841,1842,1844,1847],{},[79,1843,203],{},[79,1845,1846],{},"Canalisations insuffisamment protégées mécaniquement pour le mode de pose et les contraintes",[79,1848,209],{},[61,1850,1851,1853,1856],{},[79,1852,214],{},[79,1854,1855],{},"Volumes et exigences de protection de la salle de bains non respectés",[79,1857,1858],{},"chapitre 7.1",[61,1860,1861,1863,1866],{},[79,1862,225],{},[79,1864,1865],{},"Interrupteur-sectionneur général absent ou sous-dimensionné (au moins 40 A en domestique)",[79,1867,231],{},[61,1869,1870,1872,1875],{},[79,1871,236],{},[79,1873,1874],{},"Protection et section non coordonnées",[79,1876,1877],{},"4.4.1.4, tableau 4.11",[61,1879,1880,1882,1885],{},[79,1881,247],{},[79,1883,1884],{},"Protection contre les surtensions non évaluée par un professionnel",[79,1886,253],{},[61,1888,1889,1891,1894],{},[79,1890,258],{},[79,1892,1893],{},"Obligation régionale de détecteurs de fumée confondue avec les obligations du RGIE – examiner les deux séparément",[79,1895,1896],{},"droit régional du logement, pas RGIE",[35,1898,1900],{"id":1899},"étape-par-étape-après-le-contrôle-négatif","Étape par étape après le contrôle négatif",[43,1902,1904],{"id":1903},"étape-1-lire-le-rapport-ligne-par-ligne","Étape 1 : lire le rapport ligne par ligne",[11,1906,1907],{},"Passez chaque constat en revue et notez :",[277,1909,1910,1913,1916],{},[280,1911,1912],{},"Sous quelle rubrique figure-t-il : infraction, remarque ou dérogation ?",[280,1914,1915],{},"Où se situe exactement le problème : local, tableau, circuit ?",[280,1917,1918],{},"Qu'est-ce qui est reproché, et quelle règle est concernée ?",[43,1920,1922],{"id":1921},"étape-2-fixer-les-priorités","Étape 2 : fixer les priorités",[11,1924,1925],{},"Viennent d'abord tous les constats que le rapport qualifie de danger immédiat, de motif de mise hors tension ou d'obstacle à la mise en usage. Planifiez ensuite les autres infractions selon leurs dépendances : d'abord la cause et le concept de protection, puis l'exécution, la mesure et la documentation.",[43,1927,1929],{"id":1928},"étape-3-faire-appel-à-un-électricien","Étape 3 : faire appel à un électricien",[11,1931,1932,1933,1936],{},"Vous pouvez classer le rapport, rassembler les documents et comparer les plans avec l'installation visible. Les travaux dans le tableau, sur les protections, sur la mise à la terre ou sur les canalisations fixes relèvent d'un ",[14,1934,1935],{},"électricien",", par exemple :",[277,1938,1939,1942,1945,1948],{},[280,1940,1941],{},"ajouter ou remplacer un différentiel",[280,1943,1944],{},"améliorer la prise de terre ou adapter la répartition des différentiels à la valeur de terre",[280,1946,1947],{},"protéger mécaniquement ou reposer des canalisations",[280,1949,1950],{},"installer l'interrupteur-sectionneur général",[43,1952,1954],{"id":1953},"étape-4-mettre-les-plans-à-jour-selon-lexécution","Étape 4 : mettre les plans à jour selon l'exécution",[11,1956,1957,1958,1961],{},"Le schéma unifilaire et le plan de position montrent ",[14,1959,1960],{},"l'état après correction",". Ne reprenez ni sections ni calibres supposés ; clarifiez les caractéristiques inconnues avant l'export ou signalez-les expressément comme ouvertes.",[43,1963,1965],{"id":1964},"étape-5-planifier-le-nouveau-contrôle","Étape 5 : planifier le nouveau contrôle",[11,1967,1968],{},"Qui contrôle dépend du type de contrôle : après une visite périodique, c'est le même organisme ; après un contrôle lors d'une vente, l'acheteur choisit librement. Clarifiez le périmètre à l'aide du rapport avant de réserver.",[35,1970,1972],{"id":1971},"traduire-un-constat-en-mesure-vérifiable","Traduire un constat en mesure vérifiable",[11,1974,1975],{},"Le rapport décrit un résultat, pas forcément sa cause. « Résistance d'isolement insuffisante » peut viser un conducteur endommagé, de l'humidité ou un appareil raccordé. Pour situer : chaque circuit doit atteindre au moins 500 kΩ sous une tension d'essai de 500 V (6.4.5.1). « Plan non conforme » va de la prise manquante à une mauvaise succession de protections. Faites donc d'abord établir la cause et l'étendue avant de remplacer une pièce.",[11,1977,1978],{},"Pour chaque constat, cinq questions aident :",[350,1980,1981,1984,1987,1990,1993],{},[280,1982,1983],{},"Quelle partie de l'installation a réellement été contrôlée ?",[280,1985,1986],{},"Quelle règle ou fonction de protection est concernée ?",[280,1988,1989],{},"Quel diagnostic ou quelle mesure confirme la cause ?",[280,1991,1992],{},"Quelle correction élimine la cause, et pas seulement le symptôme ?",[280,1994,1995],{},"Quelle preuve montrera la correction terminée à l'organisme ?",[11,1997,1998],{},"Plusieurs infractions sont souvent liées. Une nouvelle répartition influence le schéma unifilaire, le repérage, les protections et les valeurs mesurées. Une nouvelle mesure de mise à la terre est terminée avant de finaliser les plans et de mesurer à nouveau. Visez donc un seul état final cohérent plutôt qu'une suite d'états intermédiaires contradictoires.",[35,2000,2002],{"id":2001},"distinguer-défaut-de-documentation-et-défaut-dexécution","Distinguer défaut de documentation et défaut d'exécution",[11,2004,2005],{},"Un plan manquant ne se règle pas en dessinant un plan non vérifié. Relevez d'abord l'installation – ouvrir et mesurer est l'affaire de l'électricien. Associez ensuite chaque symbole au circuit réel et vérifiez que le repérage du tableau, le schéma unifilaire et le plan de position utilisent la même référence.",[11,2007,2008],{},"À l'inverse, un plus beau dessin ne corrige pas un défaut d'exécution. Si une protection est inadaptée, la terre insuffisante ou une canalisation menacée mécaniquement, l'installation est corrigée puis, si nécessaire, mesurée à nouveau ; le plan suit ensuite l'état réalisé. L'organisme trouve ainsi, lors du nouveau contrôle, des documents à jour et une installation corrigée.",[35,2010,2012],{"id":2011},"cas-particulier-la-vente","Cas particulier : la vente",[11,2014,2015],{},"En tant qu'acheteur, conservez ensemble le rapport, l'acte de vente et le dossier de l'installation. Les 18 mois courent à partir du jour de l'acte. Ce délai ne couvre pas les dangers visibles : faites évaluer immédiatement les parties dangereuses par un électricien et, si nécessaire, mettez-les hors service.",[11,2017,2018,2019,2023],{},"En cas de démolition du bâtiment ou de renouvellement complet de l'installation, une voie distincte s'applique : vendeur et acheteur le mentionnent dans l'acte, l'acheteur informe la Direction générale de l'Énergie et la nouvelle installation suit le contrôle de conformité du chapitre 6.4 (8.4.2.2 a et b). La ",[391,2020,2022],{"href":393,"rel":2021},[395],"FAQ du SPF Economie pour les notaires et le secteur immobilier"," répond aux autres questions liées à la vente.",[35,2025,2027],{"id":2026},"prévoir-les-coûts-de-façon-réaliste","Prévoir les coûts de façon réaliste",[11,2029,2030],{},"Tarifs et coûts de réparation dépendent du type de contrôle, de l'organisme, du déplacement, du nombre de tableaux, des mesures et du défaut réel. Demandez le tarif actuel directement à l'organisme. Un bon devis de réparation distingue diagnostic, matériel, main-d'œuvre, mesures, mise à jour des plans et nouveau contrôle – vous voyez ainsi si une réparation de canalisation encastrée ou une transformation du tableau est comprise.",[35,2032,2034],{"id":2033},"un-dossier-solide-pour-le-nouveau-contrôle","Un dossier solide pour le nouveau contrôle",[11,2036,2037],{},"Tenez un tableau avec une ligne par constat : texte du rapport, circuit concerné, mesure, responsable, date d'achèvement et preuve. Les photos complètent le dossier ; elles ne remplacent pas les mesures. Mettez les plans à jour après l'exécution réelle, puis vérifiez encore une fois repérages et références.",[11,2039,2040,2041,2045,2046,2050],{},"La ",[391,2042,2044],{"href":417,"rel":2043},[395],"vue d'ensemble des types de contrôle du SPF Economie"," détaille conséquences et délais ; la ",[391,2047,2049],{"href":423,"rel":2048},[395],"liste des organismes agréés"," est elle aussi officielle.",[35,2052,2054],{"id":2053},"maîtriser-les-modifications-jusquau-nouveau-contrôle","Maîtriser les modifications jusqu'au nouveau contrôle",[11,2056,2057],{},"Après les corrections, figez un état documenté : plans datés, repérage du tableau, relevés de mesure et photos des travaux qui seront ensuite cachés. Toute modification supplémentaire avant le rendez-vous est confrontée à cet état et reportée dans les documents. Sinon, une petite canalisation ajoutée détruit précisément la concordance que l'électricien et le concepteur viennent d'établir. Demandez à tous les occupants d'éviter raccordements provisoires et transformations personnelles jusqu'au contrôle. Si un changement reste indispensable, l'électricien responsable reçoit le rapport, les plans à jour et une description claire de la modification.",[35,2059,2061],{"id":2060},"dernière-vérification-avant-le-nouveau-rendez-vous","Dernière vérification avant le nouveau rendez-vous",[277,2063,2064,2067,2070,2073,2076,2079,2082],{},[280,2065,2066],{},"Chaque constat est associé à une mesure terminée.",[280,2068,2069],{},"Les corrections nécessitant une mesure ont été mesurées et documentées dans les règles de l'art.",[280,2071,2072],{},"Les repères de circuit concordent dans le tableau et sur les deux plans.",[280,2074,2075],{},"Les appareils ajoutés ou retirés figurent à jour sur le plan de position.",[280,2077,2078],{},"Calibres et données de canalisation du schéma unifilaire correspondent à l'exécution.",[280,2080,2081],{},"L'organisme et le type de contrôle sont confirmés.",[280,2083,2084],{},"Rapport, plans, code EAN et documents des fabricants sont prêts.",[11,2086,2087],{},"Chaque réparation terminée arrive ainsi au nouveau contrôle avec une preuve claire. Prévoyez du temps pour les questions et, le cas échéant, un second diagnostic : un constat n'est réglé que lorsque cause, exécution et preuve concordent.",[35,2089,2091],{"id":2090},"comment-planelec-vous-aide","Comment PlanElec vous aide",[11,2093,2094,2095,2098],{},"PlanElec fait apparaître les erreurs de conception prises en charge ",[14,2096,2097],{},"avant le nouveau contrôle"," et garde vos documents cohérents :",[277,2100,2101,2107,2113,2119],{},[280,2102,2103,2106],{},[14,2104,2105],{},"L'autocontrôle RGIE"," signale des constats sur la protection différentielle et les protections dans les règles prises en charge",[280,2108,2109,2112],{},[14,2110,2111],{},"Le schéma unifilaire"," représente de manière structurée la topologie saisie",[280,2114,2115,2118],{},[14,2116,2117],{},"Le plan de position"," utilise la bibliothèque de symboles belges",[280,2120,2121,2124],{},[14,2122,2123],{},"Les références de circuit"," sont identiques dans le schéma et le plan",[11,2126,2127],{},"Les rôles restent clairs : PlanElec vous montre si la conception et les documents sont cohérents dans les règles prises en charge ; les mesures et le jugement sur l'installation reviennent à l'organisme agréé.",[505,2129],{},[11,2131,2132],{},[14,2133,2134],{},"Articles connexes :",[277,2136,2137,2143,2149],{},[280,2138,2139],{},[391,2140,2142],{"href":2141},"\u002Ffr\u002Fblog\u002F10-infractions-rgie-frequentes","10 points de contrôle RGIE importants",[280,2144,2145],{},[391,2146,2148],{"href":2147},"\u002Ffr\u002Fblog\u002F30ma-ddr-par-prise","Un différentiel 30 mA par prise ?",[280,2150,2151],{},[391,2152,2154],{"href":2153},"\u002Ffr\u002Fblog\u002Fsection-cable-disjoncteur","Section de câble et disjoncteur",[11,2156,2157,537,2160],{},[14,2158,2159],{},"Mettez vos documents à jour selon l'exécution et abordez le nouveau contrôle avec un dossier ordonné.",[391,2161,2163],{"href":540,"rel":2162},[395],"Commencer →",{"title":544,"searchDepth":545,"depth":545,"links":2165},[2166,2169,2174,2175,2182,2183,2184,2185,2186,2187,2188,2189],{"id":1696,"depth":545,"text":1697,"children":2167},[2168],{"id":1703,"depth":550,"text":1704},{"id":1710,"depth":545,"text":1711,"children":2170},[2171,2172,2173],{"id":1761,"depth":550,"text":1762},{"id":1768,"depth":550,"text":1769},{"id":1775,"depth":550,"text":1776},{"id":1782,"depth":545,"text":1783},{"id":1899,"depth":545,"text":1900,"children":2176},[2177,2178,2179,2180,2181],{"id":1903,"depth":550,"text":1904},{"id":1921,"depth":550,"text":1922},{"id":1928,"depth":550,"text":1929},{"id":1953,"depth":550,"text":1954},{"id":1964,"depth":550,"text":1965},{"id":1971,"depth":545,"text":1972},{"id":2001,"depth":545,"text":2002},{"id":2011,"depth":545,"text":2012},{"id":2026,"depth":545,"text":2027},{"id":2033,"depth":545,"text":2034},{"id":2053,"depth":545,"text":2054},{"id":2060,"depth":545,"text":2061},{"id":2090,"depth":545,"text":2091},"Votre contrôle électrique est négatif ? Lisez le rapport, identifiez le délai RGIE applicable, planifiez des corrections sûres et préparez le nouveau contrôle.","fr",{},"\u002Fblog\u002Finspection-failed-what-now.fr",{"title":1671,"description":2190},"Contrôle électrique refusé – que faire maintenant ?","controle-electrique-refuse","blog\u002Finspection-failed-what-now.fr",[2199,2200,2201,2202,2203,2204,2205],"controle","controle-electrique","refuse","infractions","recontrole","rgie","belgique","8qJWsNL2E-w5RcGUUKXZp6zGtyR2-4peLsQ54qmdj3o",{"id":4,"title":5,"articleId":6,"body":2208,"category":572,"date":573,"description":574,"extension":575,"image":24,"lastUpdated":576,"locale":577,"meta":2580,"navigation":579,"ogImage":580,"path":581,"publishDate":573,"readTime":582,"refreshInterval":583,"seo":2581,"seoTitle":585,"slug":586,"stem":587,"tags":2582,"__hash__":596},{"type":8,"value":2209,"toc":2554},[2210,2214,2218,2220,2224,2226,2228,2230,2232,2234,2272,2274,2276,2278,2280,2282,2284,2286,2288,2382,2384,2386,2388,2396,2398,2400,2402,2406,2416,2418,2422,2424,2426,2428,2430,2432,2444,2446,2448,2450,2452,2454,2456,2461,2463,2465,2467,2469,2477,2479,2481,2483,2499,2501,2503,2507,2525,2527,2529,2533,2547],[11,2211,2212,17],{},[14,2213,16],{},[11,2215,2216],{},[21,2217],{"alt":23,"src":24},[11,2219,27],{},[11,2221,2222,33],{},[14,2223,32],{},[35,2225,38],{"id":37},[11,2227,41],{},[43,2229,46],{"id":45},[11,2231,49],{},[35,2233,53],{"id":52},[55,2235,2236,2246],{},[58,2237,2238],{},[61,2239,2240,2242,2244],{},[64,2241,66],{},[64,2243,69],{},[64,2245,72],{},[74,2247,2248,2256,2264],{},[61,2249,2250,2252,2254],{},[79,2251,81],{},[79,2253,84],{},[79,2255,87],{},[61,2257,2258,2260,2262],{},[79,2259,92],{},[79,2261,95],{},[79,2263,98],{},[61,2265,2266,2268,2270],{},[79,2267,103],{},[79,2269,106],{},[79,2271,109],{},[43,2273,113],{"id":112},[11,2275,116],{},[43,2277,120],{"id":119},[11,2279,123],{},[43,2281,127],{"id":126},[11,2283,130],{},[35,2285,134],{"id":133},[11,2287,137],{},[55,2289,2290,2300],{},[58,2291,2292],{},[61,2293,2294,2296,2298],{},[64,2295,146],{},[64,2297,149],{},[64,2299,152],{},[74,2301,2302,2310,2318,2326,2334,2342,2350,2358,2366,2374],{},[61,2303,2304,2306,2308],{},[79,2305,159],{},[79,2307,162],{},[79,2309,165],{},[61,2311,2312,2314,2316],{},[79,2313,170],{},[79,2315,173],{},[79,2317,176],{},[61,2319,2320,2322,2324],{},[79,2321,181],{},[79,2323,184],{},[79,2325,187],{},[61,2327,2328,2330,2332],{},[79,2329,192],{},[79,2331,195],{},[79,2333,198],{},[61,2335,2336,2338,2340],{},[79,2337,203],{},[79,2339,206],{},[79,2341,209],{},[61,2343,2344,2346,2348],{},[79,2345,214],{},[79,2347,217],{},[79,2349,220],{},[61,2351,2352,2354,2356],{},[79,2353,225],{},[79,2355,228],{},[79,2357,231],{},[61,2359,2360,2362,2364],{},[79,2361,236],{},[79,2363,239],{},[79,2365,242],{},[61,2367,2368,2370,2372],{},[79,2369,247],{},[79,2371,250],{},[79,2373,253],{},[61,2375,2376,2378,2380],{},[79,2377,258],{},[79,2379,261],{},[79,2381,264],{},[35,2383,268],{"id":267},[43,2385,272],{"id":271},[11,2387,275],{},[277,2389,2390,2392,2394],{},[280,2391,282],{},[280,2393,285],{},[280,2395,288],{},[43,2397,292],{"id":291},[11,2399,295],{},[43,2401,299],{"id":298},[11,2403,302,2404,306],{},[14,2405,305],{},[277,2407,2408,2410,2412,2414],{},[280,2409,311],{},[280,2411,314],{},[280,2413,317],{},[280,2415,320],{},[43,2417,324],{"id":323},[11,2419,327,2420,331],{},[14,2421,330],{},[43,2423,335],{"id":334},[11,2425,338],{},[35,2427,342],{"id":341},[11,2429,345],{},[11,2431,348],{},[350,2433,2434,2436,2438,2440,2442],{},[280,2435,354],{},[280,2437,357],{},[280,2439,360],{},[280,2441,363],{},[280,2443,366],{},[11,2445,369],{},[35,2447,373],{"id":372},[11,2449,376],{},[11,2451,379],{},[35,2453,383],{"id":382},[11,2455,386],{},[11,2457,389,2458,397],{},[391,2459,396],{"href":393,"rel":2460},[395],[35,2462,401],{"id":400},[11,2464,404],{},[35,2466,408],{"id":407},[11,2468,411],{},[11,2470,414,2471,420,2474,426],{},[391,2472,419],{"href":417,"rel":2473},[395],[391,2475,425],{"href":423,"rel":2476},[395],[35,2478,430],{"id":429},[11,2480,433],{},[35,2482,437],{"id":436},[277,2484,2485,2487,2489,2491,2493,2495,2497],{},[280,2486,442],{},[280,2488,445],{},[280,2490,448],{},[280,2492,451],{},[280,2494,454],{},[280,2496,457],{},[280,2498,460],{},[11,2500,463],{},[35,2502,467],{"id":466},[11,2504,470,2505,474],{},[14,2506,473],{},[277,2508,2509,2513,2517,2521],{},[280,2510,2511,482],{},[14,2512,481],{},[280,2514,2515,488],{},[14,2516,487],{},[280,2518,2519,494],{},[14,2520,493],{},[280,2522,2523,500],{},[14,2524,499],{},[11,2526,503],{},[505,2528],{},[11,2530,2531],{},[14,2532,511],{},[277,2534,2535,2539,2543],{},[280,2536,2537],{},[391,2538,519],{"href":518},[280,2540,2541],{},[391,2542,525],{"href":524},[280,2544,2545],{},[391,2546,531],{"href":530},[11,2548,2549,537,2551],{},[14,2550,536],{},[391,2552,542],{"href":540,"rel":2553},[395],{"title":544,"searchDepth":545,"depth":545,"links":2555},[2556,2559,2564,2565,2572,2573,2574,2575,2576,2577,2578,2579],{"id":37,"depth":545,"text":38,"children":2557},[2558],{"id":45,"depth":550,"text":46},{"id":52,"depth":545,"text":53,"children":2560},[2561,2562,2563],{"id":112,"depth":550,"text":113},{"id":119,"depth":550,"text":120},{"id":126,"depth":550,"text":127},{"id":133,"depth":545,"text":134},{"id":267,"depth":545,"text":268,"children":2566},[2567,2568,2569,2570,2571],{"id":271,"depth":550,"text":272},{"id":291,"depth":550,"text":292},{"id":298,"depth":550,"text":299},{"id":323,"depth":550,"text":324},{"id":334,"depth":550,"text":335},{"id":341,"depth":545,"text":342},{"id":372,"depth":545,"text":373},{"id":382,"depth":545,"text":383},{"id":400,"depth":545,"text":401},{"id":407,"depth":545,"text":408},{"id":429,"depth":545,"text":430},{"id":436,"depth":545,"text":437},{"id":466,"depth":545,"text":467},{},{"title":5,"description":574},[589,590,591,592,593,594,595],[]]