[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-fr-batterie-domestique-rgie":3,"blog-alternates-blog-post-fr-batterie-domestique-rgie-home-battery-arei":539,"blog-next-steps-blog-post-fr-batterie-domestique-rgie-home-battery-arei":2256},{"id":4,"title":5,"articleId":6,"body":7,"category":514,"date":515,"description":516,"extension":517,"image":24,"lastUpdated":518,"locale":519,"meta":520,"navigation":521,"ogImage":522,"path":523,"publishDate":515,"readTime":524,"refreshInterval":525,"seo":526,"seoTitle":527,"slug":528,"stem":529,"tags":530,"__hash__":538},"blog\u002Fblog\u002Fhome-battery-arei.fr.md","Batterie domestique et RGIE : Intégrer correctement un stockage batterie dans l'installation électrique","home-battery-arei",{"type":8,"value":9,"toc":483},"minimark",[10,18,25,30,33,36,40,45,48,52,55,59,62,66,69,73,76,80,83,105,109,112,130,134,137,151,155,162,166,169,183,186,190,193,197,200,237,241,244,247,253,258,261,265,268,283,309,312,316,319,322,326,329,332,336,359,362,366,369,372,375,379,382,386,413,417,444,447,452,472],[11,12,13,17],"p",{},[14,15,16],"strong",{},"Pour une batterie domestique, le RGIE ne prévoit pas de chapitre propre : ce sont les prescriptions générales du Livre 1 qui s'appliquent – protection contre les chocs électriques, protection contre les surintensités, sectionnement et protection contre les surtensions."," Le projet concret découle du couplage AC ou DC, de l'onduleur, du fonctionnement parallèle au réseau, du secours, des données du fabricant et de la procédure du gestionnaire de réseau. Ce guide vous donne un parcours documenté, du concept de protection au schéma unifilaire jusqu'à la déclaration.",[11,19,20],{},[21,22],"img",{"alt":23,"src":24},"Deux installateurs positionnent une batterie domestique fermée.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-home-battery-arei-editorial.webp",[26,27,29],"h2",{"id":28},"pourquoi-une-batterie-domestique","Pourquoi une batterie domestique ?",[11,31,32],{},"Une batterie stocke un excédent puis le restitue. La réduction réelle du prélèvement ou de la facture dépend des profils mesurés, de la capacité utile, du rendement, de la commande, du tarif, du vieillissement et du mode d'exploitation. Une économie ou une durée d'amortissement fixe ne s'établit qu'avec des séries temporelles et un modèle tarifaire daté.",[11,34,35],{},"Sur le plan réglementaire, la situation est claire : le chapitre 7.103 vise les batteries d'accumulateurs industrielles et exclut expressément les batteries et dispositifs de charge des installations domestiques (section 7.103.1). Pour la batterie domestique, ce sont donc les parties générales du Livre 1 qui s'appliquent. Lorsque la batterie est couplée à une installation PV, le chapitre 7.112 (installations photovoltaïques domestiques à basse tension ≤ 10 kVA) vise la partie PV ; la batterie elle-même n'en relève pas.",[26,37,39],{"id":38},"exigences-rgie-pour-les-batteries-domestiques","Exigences RGIE pour les batteries domestiques",[41,42,44],"h3",{"id":43},"raccordement-ac-protection-et-conducteurs","Raccordement AC, protection et conducteurs",[11,46,47],{},"L'onduleur batterie ou hybride est une source dans la conception. Circuit, protection contre les surintensités, section, type de différentiel et pouvoir de coupure découlent des caractéristiques assignées, du schéma de terre, du mode de pose, de la notice et du RGIE. « Toujours 20 A sur 2,5 mm² » ou « triphasé signifie toujours type B » sont des raccourcis qui ne résistent pas à l'analyse. Une surveillance de courant de défaut intégrée ne compte que dans la mesure où les documents du modèle exact et les règles l'autorisent.",[41,49,51],{"id":50},"point-de-sectionnement","Point de sectionnement",[11,53,54],{},"Le projet exige un concept de sectionnement traçable. Les pôles à couper, les fonctions intégrées admises et les sectionneurs supplémentaires dépendent de la topologie, des preuves du fabricant et des prescriptions applicables. Le schéma montre tous les dispositifs réels et leur affectation ; leur aptitude se démontre par les données de l'appareil.",[41,56,58],{"id":57},"protection-contre-les-surtensions-spd","Protection contre les surtensions (SPD)",[11,60,61],{},"Le RGIE 4.5.1 pose le principe : les personnes et les biens sont protégés, selon les règles de l'art, contre les effets nuisibles des surtensions, notamment d'origine atmosphérique ou dues aux manœuvres. Il ne prescrit pas de type de parafoudre précis. Un parafoudre côté AC est une bonne pratique pour une batterie, côté DC également – surtout en cas de câblage extérieur. Type et emplacement découlent de l'analyse de risque et des données du fabricant.",[41,63,65],{"id":64},"emplacement-et-ventilation-des-batteries-lithium","Emplacement et ventilation des batteries lithium",[11,67,68],{},"Emplacement, température, distances, ventilation et conditions d'incendie et d'évacuation suivent la technologie concrète, la notice et l'analyse de risques du projet. Il n'existe pas de limite universelle de 35 °C, et tous les produits n'utilisent pas la même chimie. Conservez type de produit, limites de fonctionnement et instructions de montage dans le dossier.",[26,70,72],{"id":71},"intégration-dans-le-schéma-unifilaire","Intégration dans le schéma unifilaire",[11,74,75],{},"Le schéma unifilaire représente la batterie domestique avec ses deux côtés :",[41,77,79],{"id":78},"côté-dc","Côté DC",[11,81,82],{},"Le côté courant continu montre le trajet du pack batterie via le système de gestion de batterie (BMS) jusqu'à l'onduleur :",[84,85,86,102],"ul",{},[87,88,89,92,93,92,96,92,99],"li",{},[14,90,91],{},"Batterie"," → ",[14,94,95],{},"BMS",[14,97,98],{},"Interrupteur-sectionneur DC",[14,100,101],{},"Onduleur hybride",[87,103,104],{},"Pour les systèmes couplés AC : batterie → onduleur batterie dédié → raccordement AC",[41,106,108],{"id":107},"côté-ac","Côté AC",[11,110,111],{},"Le côté courant alternatif montre l'intégration dans l'installation domestique :",[84,113,114,127],{},[87,115,116,92,118,92,121,92,124],{},[14,117,101],{},[14,119,120],{},"Sectionneur AC",[14,122,123],{},"Disjoncteur",[14,125,126],{},"Tableau de répartition",[87,128,129],{},"L'emplacement du départ dans le tableau – en amont ou en aval de quel différentiel – se déduit du concept de protection, du schéma de terre et des données du fabricant. Il n'existe pas de position standard « juste après l'interrupteur principal ».",[41,131,133],{"id":132},"représentation-dans-le-schéma","Représentation dans le schéma",[11,135,136],{},"Dans le schéma unifilaire, la batterie domestique apparaît comme un départ propre, comme l'installation PV. On y trouve :",[84,138,139,142,145,148],{},[87,140,141],{},"symbole de batterie (selon IEC 60617 ou défini clairement dans la légende) ;",[87,143,144],{},"symbole d'onduleur ;",[87,146,147],{},"sectionneur ;",[87,149,150],{},"disjoncteur et différentiel associés.",[26,152,154],{"id":153},"fonction-de-secours-backup","Fonction de secours \u002F backup",[11,156,157,158,161],{},"De nombreuses batteries domestiques offrent une ",[14,159,160],{},"fonction de secours"," (backup) : en cas de coupure du réseau, la batterie continue d'alimenter des circuits sélectionnés.",[41,163,165],{"id":164},"commutation-et-fonctionnement-en-îlot","Commutation et fonctionnement en îlot",[11,167,168],{},"Une fonction de secours exige un concept documenté de commutation et d'îlotage. Selon le système, la fonction est interne à l'onduleur ou réalisée par un appareillage externe ; une appellation commerciale ne prouve ni séparation sûre du réseau ni fonctionnement en îlot admissible :",[84,170,171,177],{},[87,172,173,176],{},[14,174,175],{},"Commutation automatique (ATS) :"," un dispositif interne ou externe documenté passe en îlot dans les conditions approuvées.",[87,178,179,182],{},[14,180,181],{},"Commutation manuelle :"," un commutateur permet la séparation manuelle du réseau et le fonctionnement en îlot.",[11,184,185],{},"Représentez la fonction de commutation et la limite de la partie secourue sur le schéma unifilaire. Les conducteurs effectivement coupés découlent du schéma de terre, du traitement du neutre, des preuves du fabricant et des conditions du gestionnaire. L'objectif est toujours d'empêcher toute réinjection dangereuse vers le réseau coupé ; « toujours omnipolaire » n'est pas une règle autonome sans cette topologie.",[41,187,189],{"id":188},"avertissements","Avertissements",[11,191,192],{},"Les marquages rendent compréhensibles les états d'injection et d'îlotage réellement possibles. Position et texte se déduisent du concept réel de l'installation. Pour la partie PV d'une installation couplée, la section 7.112.2 prévoit des panneaux d'avertissement avec « Ne pas déconnecter en charge » et « Installation électrique toujours sous tension » ; il n'en découle pas un autocollant batterie standard à deux emplacements imposés.",[26,194,196],{"id":195},"déclaration-au-gestionnaire-de-réseau","Déclaration au gestionnaire de réseau",[11,198,199],{},"Déclaration et raccordement sont régionaux et dépendent du mode de fonctionnement. Avant commande et mise en service, vérifiez la procédure actuelle du gestionnaire de l'adresse, en particulier pour un équipement parallèle au réseau ou techniquement capable de l'être :",[84,201,202,208,214,225,231],{},[87,203,204,207],{},[14,205,206],{},"Avec installation PV existante :"," déclaration de modification – l'installation est enregistrée comme PV + batterie",[87,209,210,213],{},[14,211,212],{},"Données techniques :"," capacité (kWh), puissance de l'onduleur (kW), couplage AC ou DC",[87,215,216,219,220],{},[14,217,218],{},"Homologation :"," C10\u002F11 ed. 2.4 et l'homologation C10\u002F26 concernent les unités parallèles au réseau ou techniquement capables de l'être. Vérifiez modèle, variante et firmware avec la ",[221,222,224],"a",{"href":223},"\u002Ffr\u002Ftools\u002Fverification-batterie-domestique-synergrid","vérification Synergrid C10\u002F26 pour batteries domestiques",[87,226,227,230],{},[14,228,229],{},"Documents :"," mettez schéma unifilaire et plan de position à jour selon l'exécution ; le gestionnaire compétent confirme les pièces à transmettre",[87,232,233,236],{},[14,234,235],{},"Contrôle électrique :"," la nature et la portée de la modification déterminent, avec le Livre 1, si un nouveau contrôle est requis et lequel",[26,238,240],{"id":239},"séparer-choix-du-matériel-et-économie","Séparer choix du matériel et économie",[11,242,243],{},"Comparez des fiches datées et l'entrée Synergrid exacte, pas un classement de marques qui vieillit vite. Relevez au minimum puissances AC nominale et apparente, phases admises, plage de tension batterie, capacité utile, protections, variante de firmware, comportements parallèle et secours, ainsi que les conditions d'extension.",[11,245,246],{},"Pour un calcul économique, il faut des données propres au projet :",[11,248,249],{},[250,251,252],"code",{},"effet annuel = prélèvement évité + services valorisés − pertes supplémentaires − coûts courants",[11,254,255],{},[250,256,257],{},"durée du scénario = investissement \u002F effet net annuel estimé prudemment",[11,259,260],{},"Ce sont des scénarios, pas des prévisions. Calculez sur plusieurs années avec des profils mesurés, la capacité utile plutôt que nominale, les pertes de charge et décharge, les limites de puissance, la dégradation, la garantie et une trajectoire tarifaire transparente. Primes et tarifs réseau sont régionaux et évoluent ; vérifiez-les juste avant la décision.",[26,262,264],{"id":263},"documenter-les-chemins-dénergie","Documenter les chemins d'énergie",[11,266,267],{},"Un schéma utile sépare AC et DC, mais aussi les états de fonctionnement. Pour chaque chemin : source, conversion, protection, sectionnement et destination. En couplage DC, PV et batterie partagent l'onduleur hybride mais gardent chacun leurs limites électriques et conditions du fabricant. En couplage AC, un onduleur batterie séparé injecte côté AC. La puissance de toutes les sources reste visible dans l'étude du raccordement.",[11,269,270,271,274,275,278,279,282],{},"Marquez chaque donnée comme ",[14,272,273],{},"connue",", ",[14,276,277],{},"issue du fabricant"," ou ",[14,280,281],{},"à vérifier",". Les plus importantes :",[84,284,285,288,291,294,297,300,303,306],{},[87,286,287],{},"puissance et courant maximal par mode ;",[87,289,290],{},"nombre de phases et répartition prévue ;",[87,292,293],{},"type de câble, conducteurs, section et mode de pose par segment ;",[87,295,296],{},"protections contre les surintensités, courants de défaut et surtensions avec leurs caractéristiques ;",[87,298,299],{},"sectionneurs côté AC et DC ;",[87,301,302],{},"compteurs, transformateurs de mesure ou contacts de commande pour la limitation de puissance ;",[87,304,305],{},"firmware ou variante couverts par l'homologation ;",[87,307,308],{},"repérage des chemins parallèles au réseau et en îlot.",[11,310,311],{},"Cette structure sert aussi la maintenance : un remplacement d'onduleur peut changer protections, puissance de raccordement, homologation et déclaration sans changer la capacité de la batterie.",[26,313,315],{"id":314},"le-secours-est-un-projet-distinct","Le secours est un projet distinct",[11,317,318],{},"La mention commerciale « backup » ne signifie pas alimentation automatique de tout le logement en cas de coupure. Commutation, séparation sûre du réseau, traitement du neutre, conditions de terre en îlot, charges retenues, courants de démarrage et comportement batterie vide s'étudient explicitement. Les termes backup, EPS ou whole-home backup ne sont pas des catégories réglementaires interchangeables.",[11,320,321],{},"Établissez une liste des charges secourues : éclairage, communication, froid ou chauffage ont des priorités et des puissances de démarrage différentes. Indiquez sur le plan de position les circuits alimentés en mode secours, et déterminez si un tableau secondaire dédié ou une commutation sélective est prévu. Le professionnel responsable s'assure qu'aucune réinjection dangereuse vers un réseau coupé n'est possible.",[26,323,325],{"id":324},"dossier-de-contrôle-et-déclaration","Dossier de contrôle et déclaration",[11,327,328],{},"Le dossier contient plus qu'une impression : schéma unifilaire et plan de position actualisés, fiches techniques, instructions de montage et de protection, preuve Synergrid pour la variante concrète, réglages de l'interface réseau, rapport de contrôle et confirmation de la déclaration régionale. Notez qui a exécuté l'installation et quels paramètres ont été confirmés à la mise en service.",[11,330,331],{},"En Flandre, Fluvius relie explicitement stockage, contrôle RGIE et conditions techniques Synergrid. La Wallonie et Bruxelles ont leurs propres opérateurs et procédures : vous ne reprenez donc pas un seuil ou un ordre de dépôt flamand sans vérification. C'est l'instance compétente pour l'adresse de raccordement, au moment de la déclaration, qui fait foi.",[26,333,335],{"id":334},"erreurs-de-documentation-fréquentes","Erreurs de documentation fréquentes",[84,337,338,341,344,347,350,353,356],{},[87,339,340],{},"Batterie et onduleur regroupés sous un seul symbole sans caractéristiques électriques.",[87,342,343],{},"Variantes AC et DC d'un même nom commercial confondues.",[87,345,346],{},"Secours représenté sans la séparation du réseau.",[87,348,349],{},"Homologation C10\u002F26 vérifiée par marque plutôt que par modèle et variante.",[87,351,352],{},"Exemple de différentiel ou de disjoncteur d'un fabricant appliqué à un autre schéma de terre.",[87,354,355],{},"Ancien schéma conservé au dossier après un remplacement d'onduleur.",[87,357,358],{},"Calcul économique basé sur la capacité nominale, sans pertes ni vieillissement.",[11,360,361],{},"Un point ouvert clairement signalé vaut toujours mieux qu'une donnée apparemment complète mais inventée.",[26,363,365],{"id":364},"figer-les-paramètres-de-mise-en-service","Figer les paramètres de mise en service",[11,367,368],{},"Ajoutez au dossier une fiche datée avec modèle, variante, firmware, modes réseau et secours admis, limites de puissance réellement réglées, protections effectivement posées et réglages confirmés. Reliez chaque valeur à la plaque signalétique, à la notice ou au procès-verbal concerné. Lors d'une mise à jour logicielle, d'une extension ou d'un remplacement, comparez d'abord avec cette base avant de conclure que homologation, protection et déclaration restent inchangées.",[11,370,371],{},"Pendant la mise en service, consignez les valeurs confirmées plutôt que les valeurs prévues. Comparez les références installées au dossier, vérifiez les étiquettes et remettez au propriétaire les instructions utiles à l'arrêt normal et d'urgence. Une réserve écrite sur une donnée non vérifiée vaut mieux qu'une case remplie par supposition. Le dossier devient ainsi une base de maintenance et pas seulement une pièce remise au premier contrôle.",[11,373,374],{},"Toute extension ultérieure reprend ce même chemin : référence exacte, effet électrique, mise à jour des plans, vérification des conditions du fabricant et décision sur un nouveau contrôle ou une nouvelle déclaration.",[26,376,378],{"id":377},"batterie-domestique-et-planelec","Batterie domestique et PlanElec",[11,380,381],{},"PlanElec relie plan, topologie électrique, tableau et exports dans un seul projet ; pour le PV, chaînes, onduleur et protection de source sont structurés. Le modèle de données peut déjà prendre en compte plusieurs sources dans le chemin de courant. Les batteries domestiques ne forment toutefois pas encore un flux de travail publié complet, avec palette, propriétés, rendu et export propres. Pour la batterie, cela signifie : concept de protection et de sectionnement, zone secourue et déclaration se documentent à partir des pièces du fabricant, et un symbole de batterie sur le plan n'est pas encore une étude de batterie vérifiée. Les rôles sont clairs : l'autocontrôle RGIE vous montre les constats dans les règles prises en charge, le contrôle officiel revient à l'organisme agréé.",[26,383,385],{"id":384},"sources-primaires-actuelles","Sources primaires actuelles",[84,387,388,397,405],{},[87,389,390,396],{},[221,391,395],{"href":392,"rel":393},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[394],"nofollow","SPF Économie : RGIE Livre 1 version 06",", y compris les modifications DC applicables depuis le 1er avril 2026 ; sections 4.5.1, 7.103.1 et 7.112.2.",[87,398,399,404],{},[221,400,403],{"href":401,"rel":402},"https:\u002F\u002Fwww.synergrid.be\u002Ffr\u002Fhomologation\u002Felectricite\u002Funites-de-production-decentralisee",[394],"Synergrid : homologation des unités décentralisées",", C10\u002F11 ed.2.4 et C10\u002F26 pour onduleurs batterie et hybrides parallèles au réseau ou techniquement capables de l'être.",[87,406,407,412],{},[221,408,411],{"href":409,"rel":410},"https:\u002F\u002Fwww.fluvius.be\u002Fnl\u002Fgroene-energie\u002Fthuisbatterij\u002Fopslagsysteem-aanmelden",[394],"Fluvius : déclaration d'un stockage",", source régionale flamande ; pour la Wallonie et Bruxelles, vérifiez séparément l'instance compétente.",[26,414,416],{"id":415},"contrôle-de-projet-avant-exécution","Contrôle de projet avant exécution",[418,419,420,423,426,429,432,435,438,441],"ol",{},[87,421,422],{},"Décrire séparément fonctionnement parallèle au réseau, zéro injection et secours.",[87,424,425],{},"Documenter modèle exact de l'onduleur, firmware et statut Synergrid.",[87,427,428],{},"Dessiner couplage AC et DC avec tous les chemins d'énergie.",[87,430,431],{},"Déduire protection et sectionnement des données du fabricant et du RGIE.",[87,433,434],{},"Ne pas reprendre données de câble et conditions d'implantation d'un exemple.",[87,436,437],{},"Vérifier les effets sur le PV existant, le comptage et le raccordement.",[87,439,440],{},"Coordonner contrôle et déclaration avec le gestionnaire de réseau compétent.",[87,442,443],{},"Après exécution, archiver schéma, plan de position, réglages et rapport de contrôle dans le dossier.",[445,446],"hr",{},[11,448,449],{},[14,450,451],{},"Articles connexes :",[84,453,454,460,466],{},[87,455,456],{},[221,457,459],{"href":458},"\u002Ffr\u002Fblog\u002Freglementations-rgie-2026","Réglementation RGIE 2026 : qu'est-ce qui a changé ?",[87,461,462],{},[221,463,465],{"href":464},"\u002Ffr\u002Fblog\u002Fcircuit-dedie-obligatoire-appareils","Circuit dédié : quels appareils en ont besoin ?",[87,467,468],{},[221,469,471],{"href":470},"\u002Ffr\u002Fblog\u002Fsection-cable-disjoncteur","Section de câble et disjoncteur : la bonne combinaison",[11,473,474,477,478],{},[14,475,476],{},"Saisissez vos données d'installation de façon structurée dans PlanElec – protection, exécution et déclaration se coordonnent avec le professionnel et le gestionnaire de réseau."," ",[221,479,482],{"href":480,"rel":481},"https:\u002F\u002Fplanelec.be",[394],"Commencer maintenant →",{"title":484,"searchDepth":485,"depth":485,"links":486},"",2,[487,488,495,500,504,505,506,507,508,509,510,511,512,513],{"id":28,"depth":485,"text":29},{"id":38,"depth":485,"text":39,"children":489},[490,492,493,494],{"id":43,"depth":491,"text":44},3,{"id":50,"depth":491,"text":51},{"id":57,"depth":491,"text":58},{"id":64,"depth":491,"text":65},{"id":71,"depth":485,"text":72,"children":496},[497,498,499],{"id":78,"depth":491,"text":79},{"id":107,"depth":491,"text":108},{"id":132,"depth":491,"text":133},{"id":153,"depth":485,"text":154,"children":501},[502,503],{"id":164,"depth":491,"text":165},{"id":188,"depth":491,"text":189},{"id":195,"depth":485,"text":196},{"id":239,"depth":485,"text":240},{"id":263,"depth":485,"text":264},{"id":314,"depth":485,"text":315},{"id":324,"depth":485,"text":325},{"id":334,"depth":485,"text":335},{"id":364,"depth":485,"text":365},{"id":377,"depth":485,"text":378},{"id":384,"depth":485,"text":385},{"id":415,"depth":485,"text":416},"guide","2026-06-02","Comment installer une batterie domestique selon le RGIE ? Ce guide détaille circuit, point de sectionnement, schéma unifilaire, secours et déclaration au gestionnaire de réseau.","md","2026-10-05","fr",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-home-battery-arei-editorial.jpg","\u002Fblog\u002Fhome-battery-arei.fr","11 min",12,{"title":5,"description":516},"Batterie domestique et RGIE : bien intégrer le stockage","batterie-domestique-rgie","blog\u002Fhome-battery-arei.fr",[531,532,533,534,535,536,537],"batterie-domestique","stockage-energie","rgie","photovoltaique","pv","schema-unifilaire","secours","tqRB-uXxvMe7EvRWQVxL2sUeLczqKvEg_ZSgDM-UrZo",[540,1026,1510,1842],{"id":541,"title":542,"articleId":6,"body":543,"category":514,"date":515,"description":1010,"extension":517,"image":24,"lastUpdated":518,"locale":1011,"meta":1012,"navigation":521,"ogImage":522,"path":1013,"publishDate":515,"readTime":524,"refreshInterval":525,"seo":1014,"seoTitle":1015,"slug":1016,"stem":1017,"tags":1018,"__hash__":1025},"blog\u002Fblog\u002Fhome-battery-arei.de.md","Heimspeicher und AREI: Batteriespeicher korrekt in die Elektroinstallation integrieren",{"type":8,"value":544,"toc":983},[545,551,556,560,563,566,570,574,577,581,584,588,591,595,598,602,605,609,612,629,633,636,654,658,661,675,679,686,690,693,707,710,714,717,721,724,760,764,767,770,775,780,783,787,790,804,830,833,837,840,843,847,850,853,857,880,883,887,890,894,917,921,947,949,954,974],[11,546,547,550],{},[14,548,549],{},"Für einen hauswirtschaftlichen Batteriespeicher gibt es im AREI kein eigenes Kapitel – es gelten die allgemeinen Vorschriften von Buch 1 zu Schutz gegen elektrischen Schlag, Überstromschutz, Trennung und Überspannung."," Den konkreten Aufbau bestimmen AC- oder DC-Kopplung, Wechselrichter, Netzparallelbetrieb, Ersatzstrom, Herstellerangaben und das Anschlussverfahren des Netzbetreibers. Dieser Guide gibt dir einen dokumentierbaren Prüfpfad vom Schutzkonzept über das Eindrahtschema bis zur Anmeldung.",[11,552,553],{},[21,554],{"alt":555,"src":24},"Zwei Fachkräfte positionieren einen geschlossenen Heimspeicher.",[26,557,559],{"id":558},"warum-ein-heimspeicher","Warum ein Heimspeicher?",[11,561,562],{},"Ein Batteriespeicher nimmt überschüssige Energie auf und stellt sie später bereit. Wie viel Netzbezug oder Kosten er tatsächlich einspart, hängt von Lastprofil, PV-Erzeugung, nutzbarer Kapazität, Wirkungsgrad, Steuerung, Tarif, Alterung und Betriebsweise ab. Eine feste Einsparung oder Amortisationszeit belegst du nur mit gemessenen Zeitreihen und einem datierten Tarifmodell.",[11,564,565],{},"Normativ ist die Lage klar: Kapitel 7.103 regelt industrielle Akkumulatorenbatterien und schließt Batterien und Ladeeinrichtungen in hauswirtschaftlichen Anlagen ausdrücklich aus (Abschnitt 7.103.1). Für den Heimspeicher gelten deshalb die allgemeinen Teile von Buch 1. Ist der Speicher mit einer PV-Anlage gekoppelt, gilt für den PV-Teil Kapitel 7.112 (hauswirtschaftliche Niederspannungs-Photovoltaikanlagen ≤ 10 kVA); der Batterieteil selbst fällt nicht darunter.",[26,567,569],{"id":568},"arei-anforderungen-für-batteriespeicher","AREI-Anforderungen für Batteriespeicher",[41,571,573],{"id":572},"ac-anschluss-schutz-und-leitung","AC-Anschluss, Schutz und Leitung",[11,575,576],{},"Der Batteriewechselrichter oder Hybridwechselrichter ist im Installationskonzept eine Quelle. Stromkreis, Überstromschutz, Leiterquerschnitt, Differenzialschalter-Typ und Schaltvermögen legst du aus Bemessungsdaten, Netzform, Verlegebedingungen, Herstelleranleitung und den anwendbaren AREI-Regeln fest. Pauschale Kombinationen wie „immer 20 A mit 2,5 mm²“ oder „dreiphasig immer Typ B“ halten keiner Prüfung stand. Eine integrierte Fehlerstromüberwachung berücksichtigst du genau so weit, wie Herstellerunterlagen und Regelwerk es für das konkrete Gerät erlauben.",[41,578,580],{"id":579},"trennstelle-freischaltstelle","Trennstelle (Freischaltstelle)",[11,582,583],{},"Die Anlage braucht ein nachvollziehbares Trenn- und Schaltkonzept. Welche Pole getrennt werden, welche Einrichtung im Gerät integriert sein darf und wo zusätzliche Trennstellen liegen, ergibt sich aus Systemtopologie, Herstellerdokumentation und anwendbaren Vorschriften. Im Schema sind alle vorhandenen Trennstellen und ihre Zuordnung erkennbar; ihre Eignung belegst du mit den Gerätedaten.",[41,585,587],{"id":586},"überspannungsschutz-spd","Überspannungsschutz (SPD)",[11,589,590],{},"AREI 4.5.1 legt den Grundsatz fest: Personen und Güter werden nach den Regeln des Fachs vor den schädlichen Folgen von Überspannungen geschützt, etwa durch atmosphärische Phänomene oder Schaltvorgänge. Einen bestimmten SPD-Typ schreibt der Abschnitt nicht vor. Ein Überspannungsschutz am AC-Anschluss ist für Speicher eine gute Praxis, auf der DC-Seite ebenfalls – besonders bei Außenverkabelung. Typ und Einbauort folgen aus der Risikobetrachtung und den Herstellerangaben.",[41,592,594],{"id":593},"aufstellort-und-belüftung-bei-lithium-akkus","Aufstellort und Belüftung bei Lithium-Akkus",[11,596,597],{},"Aufstellort, Temperaturbereich, Abstände, Belüftung, Brand- und Fluchtwegbedingungen richten sich nach der konkreten Batterietechnologie, der Herstelleranleitung und einer projektspezifischen Risikobeurteilung. Eine allgemeine 35-°C-Grenze gibt es nicht, und nicht alle Heimspeicher nutzen dieselbe Zellchemie. Halte im Dossier deshalb Produkttyp, Betriebsgrenzen und Montageanleitung fest.",[26,599,601],{"id":600},"integration-im-eindrahtschema","Integration im Eindrahtschema",[11,603,604],{},"Das Eindrahtschema stellt den Batteriespeicher mit beiden Seiten dar:",[41,606,608],{"id":607},"dc-seite","DC-Seite",[11,610,611],{},"Die Gleichstromseite zeigt den Weg vom Batteriepaket über das Batteriemanagementsystem (BMS) zum Wechselrichter:",[84,613,614,626],{},[87,615,616,92,618,92,620,92,623],{},[14,617,91],{},[14,619,95],{},[14,621,622],{},"DC-Trennschalter",[14,624,625],{},"Hybridwechselrichter",[87,627,628],{},"Bei AC-gekoppelten Systemen: Batterie → eigener Batteriewechselrichter → AC-Anschluss",[41,630,632],{"id":631},"ac-seite","AC-Seite",[11,634,635],{},"Die Wechselstromseite zeigt die Einbindung ins Hausnetz:",[84,637,638,651],{},[87,639,640,92,642,92,645,92,648],{},[14,641,625],{},[14,643,644],{},"AC-Trennschalter",[14,646,647],{},"Leitungsschutzschalter",[14,649,650],{},"Verteiler",[87,652,653],{},"Wo der Abgang im Verteiler sitzt – vor oder hinter welchem Differenzialschalter –, legst du aus Schutzkonzept, Netzform und Herstellerangaben fest. Eine Standardposition „direkt nach dem Hauptschalter“ gibt es nicht.",[41,655,657],{"id":656},"darstellung-im-schema","Darstellung im Schema",[11,659,660],{},"Im Eindrahtschema erscheint der Batteriespeicher als eigener Abzweig, ähnlich wie die PV-Anlage. Dazu gehören:",[84,662,663,666,669,672],{},[87,664,665],{},"Batteriesymbol (nach IEC 60617 bzw. eindeutig in der Legende definiert)",[87,667,668],{},"Wechselrichtersymbol",[87,670,671],{},"Trennschalter",[87,673,674],{},"zugehöriger Leitungsschutzschalter und Differenzialschalter",[26,676,678],{"id":677},"notstrom-und-backup-funktion","Notstrom- und Backup-Funktion",[11,680,681,682,685],{},"Viele Heimspeicher bieten eine ",[14,683,684],{},"Notstromfunktion"," (Backup): Fällt das Netz aus, versorgt die Batterie ausgewählte Stromkreise weiter.",[41,687,689],{"id":688},"umschaltung-und-inselbetrieb","Umschaltung und Inselbetrieb",[11,691,692],{},"Für eine Backup-Funktion brauchst du ein nachgewiesenes Umschalt- und Inselbetriebskonzept. Je nach System übernimmt das der Wechselrichter intern oder ein externes Schaltgerät; der Produktname allein belegt weder sichere Netztrennung noch zulässigen Inselbetrieb:",[84,694,695,701],{},[87,696,697,700],{},[14,698,699],{},"Automatische Umschaltung (ATS):"," Eine dokumentierte interne oder externe Einrichtung schaltet unter den freigegebenen Betriebsbedingungen auf Inselbetrieb um.",[87,702,703,706],{},[14,704,705],{},"Manuelle Umschaltung:"," Ein Umschalter trennt manuell vom Netz und ermöglicht den Inselbetrieb.",[11,708,709],{},"Zeichne Schaltfunktion und Grenze des Ersatzstrombereichs ins Eindrahtschema. Welche Leiter tatsächlich geschaltet werden, ergibt sich aus Netzform, Neutralleiter- und Erdungskonzept, Herstellerunterlagen und Netzbetreiberbedingungen. Ziel ist immer: keine gefährliche Rückspeisung in das abgeschaltete Netz. „Immer allpolig“ ist ohne diese Topologie keine belastbare Einzelregel.",[41,711,713],{"id":712},"warnschilder","Warnschilder",[11,715,716],{},"Kennzeichnungen machen die tatsächlich möglichen Einspeise- und Inselzustände verständlich. Position und Wortlaut leitest du aus dem realen Anlagenkonzept und den anwendbaren Vorschriften ab. Für den PV-Teil einer gekoppelten Anlage nennt Abschnitt 7.112.2 Warnschilder mit den Hinweisen „Nicht unter Last ausschalten“ und „Elektrische Anlage steht immer unter Spannung“; ein pauschaler Batterieaufkleber an zwei fest vorgegebenen Stellen folgt daraus nicht.",[26,718,720],{"id":719},"anmeldung-beim-netzbetreiber","Anmeldung beim Netzbetreiber",[11,722,723],{},"Melde- und Anschlussverfahren sind regional und hängen von der Betriebsart ab. Prüfe vor Bestellung und Inbetriebnahme die aktuellen Bedingungen des zuständigen Netzbetreibers für netzparallel arbeitende oder technisch dazu fähige Systeme:",[84,725,726,732,738,748,754],{},[87,727,728,731],{},[14,729,730],{},"Bei bestehender PV-Anlage:"," Änderungsmeldung – die Anlage wird als PV + Batterie registriert",[87,733,734,737],{},[14,735,736],{},"Technische Daten:"," Kapazität (kWh), Wechselrichterleistung (kW), AC- oder DC-Kopplung",[87,739,740,743,744],{},[14,741,742],{},"Homologation:"," C10\u002F11 ed. 2.4 und die C10\u002F26-Typzulassung betreffen netzparallel betriebene beziehungsweise technisch dazu fähige Erzeugungseinheiten. Prüfe Modell, Variante und Firmware mit dem ",[221,745,747],{"href":746},"\u002Fde\u002Ftools\u002Fheimspeicher-synergrid-check","Synergrid-C10\u002F26-Check für Heimspeicher",[87,749,750,753],{},[14,751,752],{},"Dokumente:"," Schema und Positionsplan bringst du auf den ausgeführten Stand; welche Unterlagen einzureichen sind, bestätigt der zuständige Netzbetreiber",[87,755,756,759],{},[14,757,758],{},"Elektrische Kontrolle:"," Art und Umfang der Änderung bestimmen zusammen mit Buch 1, ob und welcher neue Kontrollschritt nötig ist",[26,761,763],{"id":762},"geräteauswahl-und-wirtschaftlichkeit-sauber-trennen","Geräteauswahl und Wirtschaftlichkeit sauber trennen",[11,765,766],{},"Vergleiche Geräte über datierte Herstellerdaten und den konkreten Eintrag in der Synergrid-Liste, nicht über eine schnell veraltende Markenrangliste. Erfasse mindestens AC-Nenn- und Scheinleistung, zugelassene Phasen, Batteriespannungsbereich, nutzbare Kapazität, Schutzfunktionen, Firmwarevariante, Netzparallel- und Ersatzstromverhalten sowie die Bedingungen für Erweiterungen.",[11,768,769],{},"Für eine Wirtschaftlichkeitsrechnung brauchst du projektspezifische Eingaben:",[11,771,772],{},[250,773,774],{},"jährlicher Effekt = vermiedener Bezug + bewertete Netzdienste − zusätzliche Verluste − laufende Kosten",[11,776,777],{},[250,778,779],{},"Szenariodauer = Investition \u002F vorsichtig geschätzter jährlicher Nettoeffekt",[11,781,782],{},"Beide Formeln beschreiben Szenarien, keine Prognose. Rechne über mehrere Jahre mit gemessenen Last- und Erzeugungsprofilen, nutzbarer statt nomineller Kapazität, Lade- und Entladeverlusten, Leistungsgrenzen, Degradation, Garantiebedingungen und einem transparenten Tarifpfad. Prämien und Netzentgelte sind regional und zeitabhängig; prüfe sie unmittelbar vor der Entscheidung bei der zuständigen Stelle.",[26,784,786],{"id":785},"dokumentation-nach-energiepfaden-aufbauen","Dokumentation nach Energiepfaden aufbauen",[11,788,789],{},"Ein brauchbares Schema trennt nicht nur AC und DC, sondern auch die möglichen Betriebszustände. Zeichne für jeden Pfad Quelle, Umwandlung, Schutz, Trennung und Ziel. Bei einem DC-gekoppelten System liegen PV-Generator und Batterie auf der DC-Seite eines Hybridwechselrichters, haben aber jeweils eigene elektrische Grenzen und Herstellerbedingungen. Bei AC-Kopplung speist ein separater Batteriewechselrichter auf die AC-Seite ein. Für die Bewertung des Anschlusses bleiben die Leistungen aller Quellen sichtbar.",[11,791,792,793,274,796,799,800,803],{},"Kennzeichne außerdem, welche Angaben ",[14,794,795],{},"bekannt",[14,797,798],{},"aus Herstellerunterlagen übernommen"," oder ",[14,801,802],{},"noch zu prüfen"," sind. Besonders wichtig sind:",[84,805,806,809,812,815,818,821,824,827],{},[87,807,808],{},"Bemessungsleistung und maximaler Strom je Betriebsart;",[87,810,811],{},"Phasenanzahl und vorgesehene Phasenverteilung;",[87,813,814],{},"Kabeltyp, Leiterzahl, Querschnitt und Verlegeart je Segment;",[87,816,817],{},"Überstrom-, Fehlerstrom- und Überspannungsschutz mit Kenndaten;",[87,819,820],{},"Trennstellen auf AC- und DC-Seite;",[87,822,823],{},"Zähler, Messwandler oder Steuerkontakte für die Leistungsbegrenzung;",[87,825,826],{},"Firmware- oder Variantenbezug der Homologation;",[87,828,829],{},"Kennzeichnung netzparalleler und inselbildender Pfade.",[11,831,832],{},"Diese Struktur zahlt sich bei der Wartung aus. Ein Wechselrichtertausch kann Schutz, Anschlussleistung, Homologation und Meldung verändern, obwohl die Batteriekapazität gleich bleibt.",[26,834,836],{"id":835},"ersatzstrom-ist-ein-eigenes-planungsprojekt","Ersatzstrom ist ein eigenes Planungsprojekt",[11,838,839],{},"Eine Batterie mit „Backup“-Werbung versorgt bei Netzausfall nicht automatisch das ganze Gebäude. Zu klären sind Umschalteinrichtung, sichere Netztrennung, Neutralleiterführung, Erdungsbedingungen im Inselbetrieb, zulässige Lasten, Anlaufströme und das Verhalten bei leerer Batterie. Herstellerbegriffe wie Backup, EPS oder Full Home Backup sind keine austauschbaren rechtlichen Kategorien.",[11,841,842],{},"Erstelle deshalb eine Lastliste für den Ersatzstrombereich. Beleuchtung, Kommunikation, Kühlung oder Heizung haben unterschiedliche Prioritäten und Anlaufleistungen. Markiere im Positionsplan, welche Stromkreise im Ersatzbetrieb versorgt werden, und kläre, ob ein separater Unterverteiler oder eine selektive Umschaltung vorgesehen ist. Die verantwortliche Fachkraft stellt außerdem sicher, dass keine gefährliche Rückspeisung in ein abgeschaltetes Netz möglich ist.",[26,844,846],{"id":845},"kontroll-und-anmeldepaket-vorbereiten","Kontroll- und Anmeldepaket vorbereiten",[11,848,849],{},"Ins Dossier gehört mehr als ein Ausdruck: das aktualisierte Eindrahtschema und der Positionsplan, Datenblätter, Montage- und Schutzanweisungen, der Synergrid-Nachweis für die konkrete Variante, die Einstellungen der Netzschnittstelle, der Kontrollbericht und die Bestätigung der regionalen Meldung. Halte fest, wer die Anlage ausgeführt und welche Parameter bei der Inbetriebnahme bestätigt hat.",[11,851,852],{},"In Flandern nennt Fluvius für Speicher unter anderem AREI-Kontrolle, technische Synergrid-Bedingungen und die Meldung. Andere Regionen haben eigene Verfahren und Formulare. Eine flämische Leistungsgrenze oder Einreichungsreihenfolge überträgst du deshalb nicht ungeprüft nach Wallonien oder Brüssel. Maßgeblich ist die zuständige Stelle am Anschlussort zum Zeitpunkt der Anmeldung.",[26,854,856],{"id":855},"häufige-dokumentationsfehler","Häufige Dokumentationsfehler",[84,858,859,862,865,868,871,874,877],{},[87,860,861],{},"Batterie und Wechselrichter werden als ein Symbol ohne elektrische Kenndaten zusammengezogen.",[87,863,864],{},"AC- und DC-gekoppelte Varianten desselben Produktnamens werden verwechselt.",[87,866,867],{},"Ersatzstrom wird gezeigt, die Netztrennung aber nicht.",[87,869,870],{},"Die C10\u002F26-Zulassung wird nur nach Markenname statt nach Modell und Variante geprüft.",[87,872,873],{},"Ein Herstellerbeispiel für Differenzialschalter oder Sicherung wird auf eine andere Netzform übertragen.",[87,875,876],{},"Nach einem Wechselrichtertausch bleibt das alte Schema im Dossier.",[87,878,879],{},"Die Wirtschaftlichkeitsrechnung nutzt die nominelle Kapazität und ignoriert Verluste und Alterung.",[11,881,882],{},"Ein klar markierter offener Punkt ist immer besser als eine scheinbar vollständige, aber erfundene Angabe.",[26,884,886],{"id":885},"batteriespeicher-und-planelec","Batteriespeicher und PlanElec",[11,888,889],{},"PlanElec verbindet Grundriss, elektrische Topologie, Schaltschrank und Dokumentexporte in einem Projekt; für PV sind Strings, Wechselrichter und Quellenschutz strukturiert abgebildet. Das Datenmodell kann mehrere Quellen bereits im Strompfad berücksichtigen. Batteriespeicher sind aber noch kein vollständig veröffentlichter Workflow mit eigener Palette, Eigenschaften, Darstellung und Export. Für den Speicher heißt das: Schutz- und Trennkonzept, Ersatzstrombereich und Anmeldung dokumentierst du anhand der Herstellerunterlagen, und ein Batteriesymbol im Plan ist noch keine geprüfte Batterieplanung. Die Rollen sind klar: Die AREI\u002FRGIE-Selbstprüfung zeigt dir Befunde in den unterstützten Regeln, die Abnahme macht die zugelassene Kontrollstelle.",[26,891,893],{"id":892},"primärquellen-und-nachweise","Primärquellen und Nachweise",[84,895,896,903,910],{},[87,897,898,902],{},[221,899,901],{"href":392,"rel":900},[394],"FÖD Wirtschaft: AREI\u002FRGIE Bücher, Buch 1 Version 06"," – aktueller amtlicher Regelstand, einschließlich der Änderungen für DC-Systeme ab 1. April 2026; Abschnitte 4.5.1, 7.103.1 und 7.112.2.",[87,904,905,909],{},[221,906,908],{"href":401,"rel":907},[394],"Synergrid: homologierte dezentrale Erzeugungseinheiten"," – C10\u002F11 ed.2.4 und C10\u002F26 für netzparallel betriebene oder technisch dazu fähige Einheiten, einschließlich Batterie- und Hybridwechselrichtern.",[87,911,912,916],{},[221,913,915],{"href":409,"rel":914},[394],"Fluvius: Speicher anmelden"," – regionale Anforderungen für Flandern; für Wallonien oder Brüssel prüfst du die zuständige Stelle separat.",[26,918,920],{"id":919},"projektcheck-vor-der-ausführung","Projektcheck vor der Ausführung",[418,922,923,926,929,932,935,938,941,944],{},[87,924,925],{},"Netzparallelbetrieb, Nulleinspeisung und Ersatzstrom als getrennte Betriebsarten beschreiben.",[87,927,928],{},"Exaktes Wechselrichtermodell, Firmware und Synergrid-Status dokumentieren.",[87,930,931],{},"AC- und DC-Kopplung mit allen Energiepfaden zeichnen.",[87,933,934],{},"Schutz- und Trennkonzept aus Herstellerdaten und AREI ableiten.",[87,936,937],{},"Kabeldaten und Aufstellbedingungen nicht aus Beispielen übernehmen.",[87,939,940],{},"Auswirkungen auf bestehende PV, Zähler und Anschluss prüfen.",[87,942,943],{},"Kontroll- und Anmeldeunterlagen mit dem zuständigen Netzbetreiber abstimmen.",[87,945,946],{},"Nach der Ausführung Schema, Positionsplan, Einstellungen und Prüfbericht im Dossier sichern.",[445,948],{},[11,950,951],{},[14,952,953],{},"Verwandte Artikel:",[84,955,956,962,968],{},[87,957,958],{},[221,959,961],{"href":960},"\u002Fde\u002Fblog\u002Farei-vorschriften-2026","AREI-Vorschriften 2026: Was hat sich geändert?",[87,963,964],{},[221,965,967],{"href":966},"\u002Fde\u002Fblog\u002Feigener-stromkreis-pflicht-geraete","Eigener Stromkreis: Welche Geräte brauchen ihn?",[87,969,970],{},[221,971,973],{"href":972},"\u002Fde\u002Fblog\u002Fkabelquerschnitt-sicherungsautomat","Kabelquerschnitt und Sicherungsautomat: die richtige Kombination",[11,975,976,477,979],{},[14,977,978],{},"Erfasse deine Anlagendaten strukturiert in PlanElec – Schutzkonzept, Ausführung und Anmeldung stimmst du mit Fachkraft und Netzbetreiber ab.",[221,980,982],{"href":480,"rel":981},[394],"Jetzt starten →",{"title":484,"searchDepth":485,"depth":485,"links":984},[985,986,992,997,1001,1002,1003,1004,1005,1006,1007,1008,1009],{"id":558,"depth":485,"text":559},{"id":568,"depth":485,"text":569,"children":987},[988,989,990,991],{"id":572,"depth":491,"text":573},{"id":579,"depth":491,"text":580},{"id":586,"depth":491,"text":587},{"id":593,"depth":491,"text":594},{"id":600,"depth":485,"text":601,"children":993},[994,995,996],{"id":607,"depth":491,"text":608},{"id":631,"depth":491,"text":632},{"id":656,"depth":491,"text":657},{"id":677,"depth":485,"text":678,"children":998},[999,1000],{"id":688,"depth":491,"text":689},{"id":712,"depth":491,"text":713},{"id":719,"depth":485,"text":720},{"id":762,"depth":485,"text":763},{"id":785,"depth":485,"text":786},{"id":835,"depth":485,"text":836},{"id":845,"depth":485,"text":846},{"id":855,"depth":485,"text":856},{"id":885,"depth":485,"text":886},{"id":892,"depth":485,"text":893},{"id":919,"depth":485,"text":920},"Wie installierst du einen Batteriespeicher nach AREI? Der Guide zeigt die Anforderungen an Stromkreis, Trennstelle, Eindrahtschema, Ersatzstrom und Anmeldung beim Netzbetreiber.","de",{},"\u002Fblog\u002Fhome-battery-arei.de",{"title":542,"description":1010},"Heimspeicher und AREI: Batteriespeicher richtig einbinden","heimspeicher-arei","blog\u002Fhome-battery-arei.de",[1019,1020,1021,1022,535,1023,1024],"batteriespeicher","heimspeicher","arei","photovoltaik","eindrahtschema","notstrom","inp90rStdSpxKhs6hTb-Ap-9YcH15OxDfjEyST22Q98",{"id":1027,"title":1028,"articleId":6,"body":1029,"category":514,"date":515,"description":1496,"extension":517,"image":24,"lastUpdated":518,"locale":1497,"meta":1498,"navigation":521,"ogImage":522,"path":1499,"publishDate":515,"readTime":524,"refreshInterval":525,"seo":1500,"seoTitle":1501,"slug":6,"stem":1502,"tags":1503,"__hash__":1509},"blog\u002Fblog\u002Fhome-battery-arei.en.md","Home Battery and AREI: Correctly Integrating Battery Storage into Your Electrical Installation",{"type":8,"value":1030,"toc":1469},[1031,1037,1042,1046,1049,1052,1056,1060,1063,1067,1070,1074,1077,1081,1084,1088,1091,1095,1098,1116,1120,1123,1141,1145,1148,1162,1166,1173,1177,1180,1194,1197,1201,1204,1208,1211,1246,1250,1253,1256,1261,1266,1269,1273,1276,1290,1316,1319,1323,1326,1329,1333,1336,1339,1343,1366,1369,1373,1376,1380,1403,1407,1433,1435,1440,1460],[11,1032,1033,1036],{},[14,1034,1035],{},"The AREI has no dedicated chapter for household home batteries – the general provisions of Book 1 apply: protection against electric shock, overcurrent protection, isolation and overvoltage protection."," The actual design follows from AC or DC coupling, the inverter, grid-parallel operation, backup, manufacturer data and the grid operator's connection procedure. This guide gives you a documented review path from protection concept through the single-line diagram to registration.",[11,1038,1039],{},[21,1040],{"alt":1041,"src":24},"Two technicians position a closed home battery.",[26,1043,1045],{"id":1044},"why-a-home-battery","Why a Home Battery?",[11,1047,1048],{},"A battery stores surplus energy and delivers it later. How much grid import or cost it actually saves depends on measured load and PV profiles, usable capacity, efficiency, control strategy, tariff, ageing and operating mode. Fixed savings or a payback period can only be supported with time-series data and a dated tariff model.",[11,1050,1051],{},"The regulatory picture is clear: Chapter 7.103 covers industrial accumulator batteries and explicitly excludes batteries and chargers used in household installations (Section 7.103.1). For a home battery, the general parts of Book 1 therefore apply. Where the battery is coupled with a PV installation, Chapter 7.112 (household low-voltage photovoltaic installations ≤ 10 kVA) applies to the PV part; the battery itself does not fall under it.",[26,1053,1055],{"id":1054},"arei-requirements-for-home-batteries","AREI Requirements for Home Batteries",[41,1057,1059],{"id":1058},"ac-connection-protection-and-conductor","AC connection, protection and conductor",[11,1061,1062],{},"The battery or hybrid inverter is a source in the installation design. Circuit arrangement, overcurrent protection, conductor section, RCD type and switching rating follow from equipment ratings, earthing system, installation conditions, manufacturer instructions and applicable AREI rules. Generic combinations such as “always 20 A on 2.5 mm²” or “three-phase always needs Type B” do not survive a review. Integrated residual-current monitoring counts only as far as the exact device documentation and the rules allow.",[41,1064,1066],{"id":1065},"isolation-point","Isolation point",[11,1068,1069],{},"The project needs a traceable isolation and switching concept. Which poles are switched, what may be integrated and where an additional isolator is required depend on topology, manufacturer evidence and the applicable provisions. The diagram shows every actual isolator and its assignment; you prove its suitability with the device data.",[41,1071,1073],{"id":1072},"surge-protection-spd","Surge Protection (SPD)",[11,1075,1076],{},"AREI 4.5.1 sets the principle: persons and property are protected, according to good practice, against the harmful effects of overvoltages, for example from atmospheric phenomena or switching. It does not mandate a specific SPD type. A surge protection device at the AC connection is good practice for battery systems, and on the DC side as well – especially with outdoor cabling. Type and location follow from the risk assessment and manufacturer data.",[41,1078,1080],{"id":1079},"location-and-ventilation-for-lithium-batteries","Location and ventilation for lithium batteries",[11,1082,1083],{},"Location, temperature limits, clearances, ventilation and fire or escape-route conditions follow the actual battery technology, manufacturer instructions and the project risk assessment. There is no universal 35°C threshold, and not all products share one cell chemistry. Retain the product type, operating limits and installation manual in the dossier.",[26,1085,1087],{"id":1086},"integration-in-the-single-line-diagram","Integration in the Single-Line Diagram",[11,1089,1090],{},"The single-line diagram shows the home battery with both of its sides:",[41,1092,1094],{"id":1093},"dc-side","DC Side",[11,1096,1097],{},"The direct current side shows the path from the battery pack through the battery management system (BMS) to the inverter:",[84,1099,1100,1113],{},[87,1101,1102,92,1105,92,1107,92,1110],{},[14,1103,1104],{},"Battery",[14,1106,95],{},[14,1108,1109],{},"DC disconnect switch",[14,1111,1112],{},"Hybrid inverter",[87,1114,1115],{},"For AC-coupled systems: battery → dedicated battery inverter → AC connection",[41,1117,1119],{"id":1118},"ac-side","AC Side",[11,1121,1122],{},"The alternating current side shows the integration into the household installation:",[84,1124,1125,1138],{},[87,1126,1127,92,1129,92,1132,92,1135],{},[14,1128,1112],{},[14,1130,1131],{},"AC disconnect switch",[14,1133,1134],{},"MCB",[14,1136,1137],{},"Distribution board",[87,1139,1140],{},"Where the way sits in the board – upstream or downstream of which RCD – follows from the protection concept, earthing system and manufacturer data. There is no standard position “directly after the main switch”.",[41,1142,1144],{"id":1143},"representation-in-the-diagram","Representation in the Diagram",[11,1146,1147],{},"In the single-line diagram, the home battery appears as its own branch, similar to the PV installation. It includes:",[84,1149,1150,1153,1156,1159],{},[87,1151,1152],{},"battery symbol (per IEC 60617 or clearly defined in the legend);",[87,1154,1155],{},"inverter symbol;",[87,1157,1158],{},"disconnect switch;",[87,1160,1161],{},"associated MCB and RCD.",[26,1163,1165],{"id":1164},"backup-emergency-power-function","Backup \u002F Emergency Power Function",[11,1167,1168,1169,1172],{},"Many home batteries offer a ",[14,1170,1171],{},"backup function",": when the grid fails, the battery keeps supplying selected circuits.",[41,1174,1176],{"id":1175},"transfer-and-island-operation","Transfer and island operation",[11,1178,1179],{},"A backup function requires a documented transfer and islanding concept. Depending on the system, the inverter handles it internally or external switching equipment does; a marketing label alone proves neither safe grid separation nor permissible island operation:",[84,1181,1182,1188],{},[87,1183,1184,1187],{},[14,1185,1186],{},"Automatic Transfer Switch (ATS):"," a documented internal or external arrangement changes to island mode under its approved conditions.",[87,1189,1190,1193],{},[14,1191,1192],{},"Manual Transfer Switch:"," a changeover switch allows manual disconnection from the grid and operation in island mode.",[11,1195,1196],{},"Show the switching function and the boundary of the backed-up section on the single-line diagram. Which conductors are actually switched follows from the earthing system, neutral treatment, manufacturer evidence and grid-operator conditions. The goal is always the same: no dangerous backfeed into the isolated grid. “Always all-pole” is not a reliable standalone rule without that topology.",[41,1198,1200],{"id":1199},"warning-signs","Warning signs",[11,1202,1203],{},"Markings make the actually possible feed-in and island states understandable. Position and wording follow from the real installation concept. For the PV part of a coupled installation, Section 7.112.2 requires warning signs stating “Do not disconnect under load” and “Electrical installation always live”; that does not translate into a standard battery sticker at two fixed locations.",[26,1205,1207],{"id":1206},"registration-with-the-grid-operator","Registration with the Grid Operator",[11,1209,1210],{},"Registration and connection procedures are regional and depend on the operating mode. Before ordering and commissioning, check the current process of the operator responsible for the address, particularly for equipment operating in parallel with the grid or technically capable of doing so:",[84,1212,1213,1219,1225,1234,1240],{},[87,1214,1215,1218],{},[14,1216,1217],{},"With an existing PV installation:"," modification notification – the installation is registered as PV + battery",[87,1220,1221,1224],{},[14,1222,1223],{},"Technical data:"," capacity (kWh), inverter power (kW), AC or DC coupling",[87,1226,1227,1229,1230],{},[14,1228,742],{}," C10\u002F11 ed. 2.4 and C10\u002F26 type approval apply to grid-parallel or technically capable generation units. Check model, variant and firmware with the ",[221,1231,1233],{"href":1232},"\u002Fen\u002Ftools\u002Fhome-battery-synergrid-check","Synergrid C10\u002F26 check for home batteries",[87,1235,1236,1239],{},[14,1237,1238],{},"Documents:"," bring the single-line diagram and situation plan up to the installed state; the competent operator confirms the submission package",[87,1241,1242,1245],{},[14,1243,1244],{},"Electrical inspection:"," the nature and scope of the alteration, together with Book 1, determine whether and which new inspection step is required",[26,1247,1249],{"id":1248},"separate-equipment-selection-from-economics","Separate equipment selection from economics",[11,1251,1252],{},"Compare dated manufacturer data and the exact Synergrid listing, not a brand ranking that quickly ages. Record at least AC active and apparent power, permitted phases, battery-voltage range, usable capacity, protection functions, firmware variant, parallel and backup behaviour, and expansion conditions.",[11,1254,1255],{},"An economic calculation needs project-specific inputs:",[11,1257,1258],{},[250,1259,1260],{},"annual effect = avoided import + valued services − extra losses − running costs",[11,1262,1263],{},[250,1264,1265],{},"scenario duration = investment \u002F cautiously estimated annual net effect",[11,1267,1268],{},"Both are scenarios, not forecasts. Calculate over several years with measured load and generation profiles, usable rather than nominal capacity, charge and discharge losses, power limits, degradation, warranty terms and a transparent tariff path. Regional incentives and network charges change over time; check them immediately before the decision.",[26,1270,1272],{"id":1271},"build-the-documentation-around-energy-paths","Build the documentation around energy paths",[11,1274,1275],{},"A useful diagram separates AC and DC as well as operating states. For every path, show source, conversion, protection, isolation and destination. In a DC-coupled system, the PV generator and battery share a hybrid inverter but each keeps its own electrical limits and manufacturer conditions. With AC coupling, a separate battery inverter feeds the AC side. The power of every source stays visible in the connection assessment.",[11,1277,1278,1279,274,1282,1285,1286,1289],{},"Mark each item as ",[14,1280,1281],{},"known",[14,1283,1284],{},"taken from manufacturer evidence"," or ",[14,1287,1288],{},"still to verify",". The most important are:",[84,1291,1292,1295,1298,1301,1304,1307,1310,1313],{},[87,1293,1294],{},"rated power and maximum current per mode;",[87,1296,1297],{},"number of phases and intended phase allocation;",[87,1299,1300],{},"cable type, conductors, cross-section and installation method per segment;",[87,1302,1303],{},"overcurrent, residual-current and surge protection with their characteristics;",[87,1305,1306],{},"isolation points on the AC and DC side;",[87,1308,1309],{},"meters, current transformers or control contacts for power limitation;",[87,1311,1312],{},"firmware or variant covered by the homologation;",[87,1314,1315],{},"identification of grid-parallel and island paths.",[11,1317,1318],{},"This structure pays off in maintenance. An inverter replacement may alter protection, connection power, homologation and notification even when battery capacity stays unchanged.",[26,1320,1322],{"id":1321},"backup-is-a-separate-design-project","Backup is a separate design project",[11,1324,1325],{},"A product advertised as “backup” does not automatically supply the whole dwelling during an outage. Transfer arrangement, safe grid separation, neutral treatment, island earthing, selected loads, starting currents and behaviour at low state of charge are designed explicitly. Terms such as backup, EPS and whole-home backup are not interchangeable legal categories.",[11,1327,1328],{},"Create a load list for the backed-up section: lighting, communication, refrigeration or heating have different priorities and starting loads. Identify the backed-up circuits on the situation plan and determine whether a separate board or selective transfer is used. The responsible professional ensures that no dangerous backfeed into an isolated distribution grid is possible.",[26,1330,1332],{"id":1331},"prepare-the-inspection-and-registration-package","Prepare the inspection and registration package",[11,1334,1335],{},"The dossier holds more than a printout: updated single-line diagram and situation plan, product data, installation and protection instructions, Synergrid evidence for the exact variant, grid-interface settings, inspection report and regional registration confirmation. Record who carried out the installation and which parameters were confirmed at commissioning.",[11,1337,1338],{},"In Flanders, Fluvius explicitly links storage registration with AREI inspection and Synergrid technical conditions. Wallonia and Brussels have their own competent operators and procedures, so you do not copy Flemish thresholds or sequencing without checking the connection location. The competent body for the connection address at the time of registration is decisive.",[26,1340,1342],{"id":1341},"common-documentation-failures","Common documentation failures",[84,1344,1345,1348,1351,1354,1357,1360,1363],{},[87,1346,1347],{},"Battery and inverter merged into one symbol without electrical ratings.",[87,1349,1350],{},"AC- and DC-coupled variants with a similar product name mixed up.",[87,1352,1353],{},"Backup shown without the grid separation.",[87,1355,1356],{},"C10\u002F26 checked by brand instead of model and variant.",[87,1358,1359],{},"A manufacturer example of breaker or RCD selection applied to a different earthing system.",[87,1361,1362],{},"The old diagram kept in the dossier after an inverter replacement.",[87,1364,1365],{},"An economic calculation based on nominal capacity, ignoring losses and ageing.",[11,1367,1368],{},"A clearly marked open point always beats a plausible but invented value.",[26,1370,1372],{"id":1371},"home-batteries-and-planelec","Home batteries and PlanElec",[11,1374,1375],{},"PlanElec connects floor plan, electrical topology, distribution board and document exports in one project; for PV, strings, inverter and source protection are fully structured. Its data model can already account for several sources in the current path. Home batteries, however, are not yet a fully released workflow with their own palette, properties, rendering and export. For the battery, that means: you document the protection and isolation concept, backed-up section and registration from the manufacturer documents, and a battery symbol on the plan is not yet a verified battery design. The roles are clear: the AREI\u002FRGIE self-check shows you findings within the supported rules, and the official inspection is carried out by the approved inspection body.",[26,1377,1379],{"id":1378},"current-primary-sources","Current primary sources",[84,1381,1382,1389,1396],{},[87,1383,1384,1388],{},[221,1385,1387],{"href":392,"rel":1386},[394],"FPS Economy: AREI\u002FRGIE books, Book 1 version 06",", including the DC-system changes applicable from 1 April 2026; Sections 4.5.1, 7.103.1 and 7.112.2.",[87,1390,1391,1395],{},[221,1392,1394],{"href":401,"rel":1393},[394],"Synergrid: homologation of decentralised generation units",", covering C10\u002F11 ed.2.4 and C10\u002F26 for grid-parallel or technically capable battery and hybrid inverters.",[87,1397,1398,1402],{},[221,1399,1401],{"href":409,"rel":1400},[394],"Fluvius: storage-system registration",", a regional primary source for Flanders; for Wallonia or Brussels, check the competent body separately.",[26,1404,1406],{"id":1405},"pre-installation-review-list","Pre-installation review list",[418,1408,1409,1412,1415,1418,1421,1424,1427,1430],{},[87,1410,1411],{},"Describe grid-parallel, zero-export and backup modes separately.",[87,1413,1414],{},"Record the exact inverter model, firmware and current Synergrid status.",[87,1416,1417],{},"Draw AC and DC coupling with every energy path, rather than only a battery icon.",[87,1419,1420],{},"Derive protection and isolation from manufacturer evidence and the applicable AREI provisions.",[87,1422,1423],{},"Keep cable and location data project-specific; do not copy them from an example.",[87,1425,1426],{},"Check effects on existing PV, metering, connection capacity and phase balance.",[87,1428,1429],{},"Confirm inspection and notification documents with the operator responsible for the address.",[87,1431,1432],{},"After commissioning, retain settings, signed diagrams, inspection report and registration confirmation.",[445,1434],{},[11,1436,1437],{},[14,1438,1439],{},"Related articles:",[84,1441,1442,1448,1454],{},[87,1443,1444],{},[221,1445,1447],{"href":1446},"\u002Fen\u002Fblog\u002Farei-regulations-2026","AREI Regulations 2026: What Has Changed?",[87,1449,1450],{},[221,1451,1453],{"href":1452},"\u002Fen\u002Fblog\u002Fdedicated-circuits-appliances","Dedicated Circuits: Which Appliances Need Their Own Circuit?",[87,1455,1456],{},[221,1457,1459],{"href":1458},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","Cable Cross-Section and Breaker: The Right Combination",[11,1461,1462,477,1465],{},[14,1463,1464],{},"Capture your installation data in a structured way in PlanElec – protection, installation and registration you coordinate with the professional and the grid operator.",[221,1466,1468],{"href":480,"rel":1467},[394],"Get started →",{"title":484,"searchDepth":485,"depth":485,"links":1470},[1471,1472,1478,1483,1487,1488,1489,1490,1491,1492,1493,1494,1495],{"id":1044,"depth":485,"text":1045},{"id":1054,"depth":485,"text":1055,"children":1473},[1474,1475,1476,1477],{"id":1058,"depth":491,"text":1059},{"id":1065,"depth":491,"text":1066},{"id":1072,"depth":491,"text":1073},{"id":1079,"depth":491,"text":1080},{"id":1086,"depth":485,"text":1087,"children":1479},[1480,1481,1482],{"id":1093,"depth":491,"text":1094},{"id":1118,"depth":491,"text":1119},{"id":1143,"depth":491,"text":1144},{"id":1164,"depth":485,"text":1165,"children":1484},[1485,1486],{"id":1175,"depth":491,"text":1176},{"id":1199,"depth":491,"text":1200},{"id":1206,"depth":485,"text":1207},{"id":1248,"depth":485,"text":1249},{"id":1271,"depth":485,"text":1272},{"id":1321,"depth":485,"text":1322},{"id":1331,"depth":485,"text":1332},{"id":1341,"depth":485,"text":1342},{"id":1371,"depth":485,"text":1372},{"id":1378,"depth":485,"text":1379},{"id":1405,"depth":485,"text":1406},"How do you install a home battery under the AREI? This guide covers circuit, isolation point, single-line diagram, backup operation and grid operator registration.","en",{},"\u002Fblog\u002Fhome-battery-arei.en",{"title":1028,"description":1496},"Home Battery and AREI: Integrating Battery Storage","blog\u002Fhome-battery-arei.en",[1504,1505,1021,1506,535,1507,1508],"home-battery","energy-storage","photovoltaic","single-line-diagram","backup-power","bpQ8T979CiF6o1zT56nSonPFKB9fRrNOYYSsvgykIzw",{"id":4,"title":5,"articleId":6,"body":1511,"category":514,"date":515,"description":516,"extension":517,"image":24,"lastUpdated":518,"locale":519,"meta":1839,"navigation":521,"ogImage":522,"path":523,"publishDate":515,"readTime":524,"refreshInterval":525,"seo":1840,"seoTitle":527,"slug":528,"stem":529,"tags":1841,"__hash__":538},{"type":8,"value":1512,"toc":1811},[1513,1517,1521,1523,1525,1527,1529,1531,1533,1535,1537,1539,1541,1543,1545,1547,1549,1551,1553,1567,1569,1571,1585,1587,1589,1599,1601,1605,1607,1609,1619,1621,1623,1625,1627,1629,1653,1655,1657,1659,1663,1667,1669,1671,1673,1681,1699,1701,1703,1705,1707,1709,1711,1713,1715,1731,1733,1735,1737,1739,1741,1743,1745,1747,1764,1766,1784,1786,1790,1804],[11,1514,1515,17],{},[14,1516,16],{},[11,1518,1519],{},[21,1520],{"alt":23,"src":24},[26,1522,29],{"id":28},[11,1524,32],{},[11,1526,35],{},[26,1528,39],{"id":38},[41,1530,44],{"id":43},[11,1532,47],{},[41,1534,51],{"id":50},[11,1536,54],{},[41,1538,58],{"id":57},[11,1540,61],{},[41,1542,65],{"id":64},[11,1544,68],{},[26,1546,72],{"id":71},[11,1548,75],{},[41,1550,79],{"id":78},[11,1552,82],{},[84,1554,1555,1565],{},[87,1556,1557,92,1559,92,1561,92,1563],{},[14,1558,91],{},[14,1560,95],{},[14,1562,98],{},[14,1564,101],{},[87,1566,104],{},[41,1568,108],{"id":107},[11,1570,111],{},[84,1572,1573,1583],{},[87,1574,1575,92,1577,92,1579,92,1581],{},[14,1576,101],{},[14,1578,120],{},[14,1580,123],{},[14,1582,126],{},[87,1584,129],{},[41,1586,133],{"id":132},[11,1588,136],{},[84,1590,1591,1593,1595,1597],{},[87,1592,141],{},[87,1594,144],{},[87,1596,147],{},[87,1598,150],{},[26,1600,154],{"id":153},[11,1602,157,1603,161],{},[14,1604,160],{},[41,1606,165],{"id":164},[11,1608,168],{},[84,1610,1611,1615],{},[87,1612,1613,176],{},[14,1614,175],{},[87,1616,1617,182],{},[14,1618,181],{},[11,1620,185],{},[41,1622,189],{"id":188},[11,1624,192],{},[26,1626,196],{"id":195},[11,1628,199],{},[84,1630,1631,1635,1639,1645,1649],{},[87,1632,1633,207],{},[14,1634,206],{},[87,1636,1637,213],{},[14,1638,212],{},[87,1640,1641,219,1643],{},[14,1642,218],{},[221,1644,224],{"href":223},[87,1646,1647,230],{},[14,1648,229],{},[87,1650,1651,236],{},[14,1652,235],{},[26,1654,240],{"id":239},[11,1656,243],{},[11,1658,246],{},[11,1660,1661],{},[250,1662,252],{},[11,1664,1665],{},[250,1666,257],{},[11,1668,260],{},[26,1670,264],{"id":263},[11,1672,267],{},[11,1674,270,1675,274,1677,278,1679,282],{},[14,1676,273],{},[14,1678,277],{},[14,1680,281],{},[84,1682,1683,1685,1687,1689,1691,1693,1695,1697],{},[87,1684,287],{},[87,1686,290],{},[87,1688,293],{},[87,1690,296],{},[87,1692,299],{},[87,1694,302],{},[87,1696,305],{},[87,1698,308],{},[11,1700,311],{},[26,1702,315],{"id":314},[11,1704,318],{},[11,1706,321],{},[26,1708,325],{"id":324},[11,1710,328],{},[11,1712,331],{},[26,1714,335],{"id":334},[84,1716,1717,1719,1721,1723,1725,1727,1729],{},[87,1718,340],{},[87,1720,343],{},[87,1722,346],{},[87,1724,349],{},[87,1726,352],{},[87,1728,355],{},[87,1730,358],{},[11,1732,361],{},[26,1734,365],{"id":364},[11,1736,368],{},[11,1738,371],{},[11,1740,374],{},[26,1742,378],{"id":377},[11,1744,381],{},[26,1746,385],{"id":384},[84,1748,1749,1754,1759],{},[87,1750,1751,396],{},[221,1752,395],{"href":392,"rel":1753},[394],[87,1755,1756,404],{},[221,1757,403],{"href":401,"rel":1758},[394],[87,1760,1761,412],{},[221,1762,411],{"href":409,"rel":1763},[394],[26,1765,416],{"id":415},[418,1767,1768,1770,1772,1774,1776,1778,1780,1782],{},[87,1769,422],{},[87,1771,425],{},[87,1773,428],{},[87,1775,431],{},[87,1777,434],{},[87,1779,437],{},[87,1781,440],{},[87,1783,443],{},[445,1785],{},[11,1787,1788],{},[14,1789,451],{},[84,1791,1792,1796,1800],{},[87,1793,1794],{},[221,1795,459],{"href":458},[87,1797,1798],{},[221,1799,465],{"href":464},[87,1801,1802],{},[221,1803,471],{"href":470},[11,1805,1806,477,1808],{},[14,1807,476],{},[221,1809,482],{"href":480,"rel":1810},[394],{"title":484,"searchDepth":485,"depth":485,"links":1812},[1813,1814,1820,1825,1829,1830,1831,1832,1833,1834,1835,1836,1837,1838],{"id":28,"depth":485,"text":29},{"id":38,"depth":485,"text":39,"children":1815},[1816,1817,1818,1819],{"id":43,"depth":491,"text":44},{"id":50,"depth":491,"text":51},{"id":57,"depth":491,"text":58},{"id":64,"depth":491,"text":65},{"id":71,"depth":485,"text":72,"children":1821},[1822,1823,1824],{"id":78,"depth":491,"text":79},{"id":107,"depth":491,"text":108},{"id":132,"depth":491,"text":133},{"id":153,"depth":485,"text":154,"children":1826},[1827,1828],{"id":164,"depth":491,"text":165},{"id":188,"depth":491,"text":189},{"id":195,"depth":485,"text":196},{"id":239,"depth":485,"text":240},{"id":263,"depth":485,"text":264},{"id":314,"depth":485,"text":315},{"id":324,"depth":485,"text":325},{"id":334,"depth":485,"text":335},{"id":364,"depth":485,"text":365},{"id":377,"depth":485,"text":378},{"id":384,"depth":485,"text":385},{"id":415,"depth":485,"text":416},{},{"title":5,"description":516},[531,532,533,534,535,536,537],{"id":1843,"title":1844,"articleId":6,"body":1845,"category":514,"date":515,"description":2241,"extension":517,"image":24,"lastUpdated":518,"locale":2242,"meta":2243,"navigation":521,"ogImage":522,"path":2244,"publishDate":515,"readTime":524,"refreshInterval":525,"seo":2245,"seoTitle":2246,"slug":2247,"stem":2248,"tags":2249,"__hash__":2255},"blog\u002Fblog\u002Fhome-battery-arei.nl.md","Thuisbatterij en AREI: Batterijopslag correct integreren in de elektroinstallatie",{"type":8,"value":1846,"toc":2226},[1847,1853,1858,1862,1865,1868,1872,1875,1878,1881,1884,1888,1891,1905,1934,1937,1941,1944,1947,1950,1954,1962,1965,1968,1972,1975,1978,1983,1988,1991,1995,2019,2023,2026,2030,2056,2059,2063,2066,2069,2072,2075,2078,2082,2085,2169,2172,2176,2179,2182,2186,2189,2192,2197,2217],[11,1848,1849,1852],{},[14,1850,1851],{},"Voor een huishoudelijke thuisbatterij heeft het AREI geen eigen hoofdstuk – de algemene voorschriften van Boek 1 over bescherming tegen elektrische schokken, overstroom, scheiding en overspanning zijn van toepassing."," Het concrete ontwerp volgt uit AC- of DC-koppeling, omvormer, netparallel bedrijf, backup, fabrikantgegevens en de aansluitprocedure van de netbeheerder. Deze gids geeft je een documenteerbaar controlepad van beveiligingsconcept over eendraadschema tot aanmelding.",[11,1854,1855],{},[21,1856],{"alt":1857,"src":24},"Twee installateurs plaatsen een gesloten thuisbatterij.",[26,1859,1861],{"id":1860},"functie-en-reglementaire-context","Functie en reglementaire context",[11,1863,1864],{},"Een batterij slaat overschot op en levert het later. Hoeveel netafname of kosten je werkelijk bespaart, hangt af van gemeten verbruik en PV, bruikbare capaciteit, rendement, sturing, tarief, veroudering en bedrijfswijze. Een vaste besparing of terugverdientijd onderbouw je alleen met tijdreeksen en een gedateerd tariefmodel.",[11,1866,1867],{},"Reglementair is het beeld duidelijk: hoofdstuk 7.103 regelt industriële accumulatorenbatterijen en sluit batterijen en laadtoestellen in huishoudelijke installaties uitdrukkelijk uit (afdeling 7.103.1). Voor de thuisbatterij gelden dus de algemene delen van Boek 1: bescherming tegen elektrische schokken, overstroom, keuze van materieel, scheiding en documentatie. Bij gekoppelde PV geldt hoofdstuk 7.112 voor het huishoudelijke PV-deel tot 10 kVA; het batterijdeel zelf valt daar niet onder.",[26,1869,1871],{"id":1870},"ac-aansluiting-beveiliging-en-leiding","AC-aansluiting, beveiliging en leiding",[11,1873,1874],{},"De batterij- of hybride omvormer is in het ontwerp een bron. Stroomkring, overstroombeveiliging, doorsnede, type differentieelschakelaar en schakelvermogen volgen uit toestelgegevens, aardingssysteem, plaatsingsvoorwaarden, fabrikant en AREI. “Altijd 20 A op 2,5 mm²” of “driefasig altijd type B” zijn vuistregels die geen controle doorstaan. Ingebouwde foutstroombewaking telt alleen zover de documenten van het exacte model en de regels dat toestaan.",[11,1876,1877],{},"Waar de aftakking in het bord komt – vóór of achter welke differentieelschakelaar – leg je vast op basis van beveiligingsconcept, aardingssysteem en fabrikantgegevens. Een standaardpositie bestaat niet.",[11,1879,1880],{},"Het project vraagt een traceerbaar scheidingsconcept. Welke polen, geïntegreerde functies en extra scheiders nodig zijn, hangt af van topologie, fabrikantbewijs en voorschriften. Teken de echte scheiders in het schema; hun geschiktheid bewijs je met de toestelgegevens. Voor overspanningsbeveiliging legt AREI 4.5.1 het beginsel vast dat personen en goederen tegen de schadelijke gevolgen van overspanningen worden beschermd, onder meer door atmosferische verschijnselen of schakelingen. Een bepaald type schrijft die afdeling niet voor; toesteltype, plaats en voorbeveiliging kies je per project.",[11,1882,1883],{},"Plaats, temperatuur, afstanden, ventilatie en brandvoorwaarden volgen uit technologie, handleiding en de risicoanalyse van het project. Eén grens van 35 °C of dezelfde celchemie voor alle producten bestaat niet. Bewaar producttype, bedrijfsgrenzen en montage-instructies in het dossier.",[26,1885,1887],{"id":1886},"ac-en-dc-koppeling-tekenen","AC- en DC-koppeling tekenen",[11,1889,1890],{},"Scheid AC, DC en bedrijfsstanden. Toon per pad bron, omzetting, beveiliging, scheiding en bestemming. Bij DC-koppeling delen PV en batterij een hybride omvormer, maar houden ze eigen elektrische grenzen en fabrikantvoorwaarden. Bij AC-koppeling voedt een aparte batterijomvormer de AC-zijde. Het vermogen van alle bronnen blijft zichtbaar in de beoordeling van aansluiting en verdeelbord.",[11,1892,1893,1894,274,1897,1900,1901,1904],{},"Markeer elke waarde als ",[14,1895,1896],{},"bekend",[14,1898,1899],{},"uit fabrikantbewijs"," of ",[14,1902,1903],{},"te controleren",". Noteer minstens:",[84,1906,1907,1910,1913,1916,1919,1922,1925,1928,1931],{},[87,1908,1909],{},"actief en schijnbaar vermogen en maximale stroom per modus;",[87,1911,1912],{},"faseaantal en voorgenomen faseverdeling;",[87,1914,1915],{},"batterijspanningsgebied en bruikbare capaciteit;",[87,1917,1918],{},"kabeltype, geleiders, doorsnede en plaatsingswijze per segment;",[87,1920,1921],{},"overstroom-, foutstroom- en overspanningsbeveiliging met kenmerken;",[87,1923,1924],{},"AC- en DC-scheidingspunten;",[87,1926,1927],{},"meter, sturing of begrenzer voor vermogensbeheer;",[87,1929,1930],{},"firmware of variant waarop de Synergrid-vermelding betrekking heeft;",[87,1932,1933],{},"onderscheid tussen netparallel en eilandbedrijf.",[11,1935,1936],{},"Een omvormerwissel kan beveiliging, aansluitvermogen, homologatie en melding wijzigen terwijl de batterijcapaciteit gelijk blijft. Werk het dossier daarom bij op componentniveau, niet alleen op merknaam.",[26,1938,1940],{"id":1939},"backup-is-een-afzonderlijk-ontwerp","Backup is een afzonderlijk ontwerp",[11,1942,1943],{},"Een product dat “backup” vermeldt, voedt bij netuitval niet automatisch de volledige woning. Omschakeling, veilige netscheiding, behandeling van de nulgeleider, aarding in eilandbedrijf, gekozen lasten, aanloopstromen en gedrag bij lege batterij ontwerp je uitdrukkelijk. Commerciële termen zoals EPS, backup en whole-home backup zijn geen onderling verwisselbare reglementaire categorieën.",[11,1945,1946],{},"Maak een lastlijst voor het noodgedeelte. Verlichting, communicatie, koeling en verwarming hebben andere prioriteiten en startstromen. Duid op het situatieplan aan welke kringen tijdens noodbedrijf gevoed worden, en bepaal of een afzonderlijk onderbord of selectieve omschakeling nodig is. Een bevoegde vakpersoon zorgt ervoor dat geen gevaarlijke terugvoeding naar een afgeschakeld distributienet kan ontstaan.",[11,1948,1949],{},"Voor het PV-deel van een gekoppelde installatie noemt afdeling 7.112.2 waarschuwingsborden met “Niet onderbreken bij belasting” en “Elektrische installatie altijd onder spanning”. Een vaste batterijsticker op twee voorgeschreven plaatsen volgt daar niet uit; positie en tekst van waarschuwingen leid je af uit het echte installatieconcept.",[26,1951,1953],{"id":1952},"synergrid-keuring-en-regionale-melding","Synergrid, keuring en regionale melding",[11,1955,1956,1957,1961],{},"Synergrid stelt dat elektriciteitsproductie-eenheden die parallel met het Belgische distributienet werken of daartoe technisch in staat zijn, aan C10\u002F11 ed.2.4 moeten voldoen. Batterij- en hybride omvormers vallen onder de C10\u002F26-typehomologatie. Controleer exact model, variant en firmware in de actuele lijst, bijvoorbeeld met de ",[221,1958,1960],{"href":1959},"\u002Ftools\u002Fthuisbatterij-synergrid-check","Synergrid C10\u002F26-check voor thuisbatterijen","; een bekende merknaam volstaat niet.",[11,1963,1964],{},"Fluvius vermeldt in Vlaanderen dat opslagsystemen gemeld worden en koppelt de aansluiting onder meer aan AREI-keuring en technische Synergrid-bepalingen. Wallonië en Brussel hebben eigen bevoegde operatoren en procedures. Een Vlaamse vermogensgrens, formulier of volgorde neem je dus niet ongecontroleerd over voor een ander aansluitadres. Controleer dit vóór bestelling en opnieuw vóór indiening.",[11,1966,1967],{},"Het dossier omvat bijgewerkte schema's, technische fiches, installatie- en beschermingsinstructies, Synergrid-bewijs, instellingen van de netinterface, controleverslag en bevestiging van de regionale melding. Noteer wie uitvoerde en welke parameters bij ingebruikname werden bevestigd.",[26,1969,1971],{"id":1970},"materiaalkeuze-en-economie-scheiden","Materiaalkeuze en economie scheiden",[11,1973,1974],{},"Vergelijk gedateerde fabrikantgegevens en de exacte homologatie, geen snel verouderende merkenlijst. Noteer AC-vermogen, fasen, spanningsgebied, bruikbare capaciteit, beveiligingsfuncties, firmware, parallel- en backupgedrag en uitbreidingsvoorwaarden.",[11,1976,1977],{},"Een bewerkbaar economisch scenario is:",[11,1979,1980],{},[250,1981,1982],{},"jaareffect = vermeden afname + gewaardeerde diensten − extra verliezen − lopende kosten",[11,1984,1985],{},[250,1986,1987],{},"scenarioduur = investering \u002F voorzichtig geraamd netto jaareffect",[11,1989,1990],{},"Dit zijn scenario's, geen voorspellingen. Gebruik gemeten profielen, bruikbare in plaats van nominale capaciteit, laad- en ontlaadverlies, vermogenslimieten, degradatie, garantie en een transparant tariefpad. Premies en netkosten zijn regionaal en tijdsgevoelig; controleer ze vlak vóór je beslissing.",[26,1992,1994],{"id":1993},"actuele-primaire-bronnen","Actuele primaire bronnen",[84,1996,1997,2004,2012],{},[87,1998,1999,2003],{},[221,2000,2002],{"href":392,"rel":2001},[394],"FOD Economie: AREI Boek 1 versie 06",", inclusief de DC-wijzigingen die sinds 1 april 2026 gelden; afdelingen 4.5.1, 7.103.1 en 7.112.2.",[87,2005,2006,2011],{},[221,2007,2010],{"href":2008,"rel":2009},"https:\u002F\u002Fwww.synergrid.be\u002Fnl\u002Fhomologatie\u002Felektriciteit\u002Fdecentrale-productie-eenheden",[394],"Synergrid: homologatie decentrale productie",", C10\u002F11 ed.2.4 en C10\u002F26 voor netparallelle of technisch capabele batterij- en hybride omvormers.",[87,2013,2014,2018],{},[221,2015,2017],{"href":409,"rel":2016},[394],"Fluvius: opslagsysteem aanmelden",", primaire regionale bron voor Vlaanderen.",[26,2020,2022],{"id":2021},"thuisbatterij-en-planelec","Thuisbatterij en PlanElec",[11,2024,2025],{},"PlanElec verbindt grondplan, elektrische topologie, verdeelbord en exports in één project; voor PV zijn strings, omvormer en bronbeveiliging gestructureerd uitgewerkt. Het datamodel kan meerdere bronnen al in het stroompad meenemen. Thuisbatterijen zijn wel nog geen volledig gepubliceerde workflow met eigen palet, eigenschappen, weergave en export. Voor de batterij betekent dat: beveiligings- en scheidingsconcept, backupzone en melding documenteer je op basis van de fabrikantstukken, en een batterijsymbool op het plan is nog geen gecontroleerd batterijontwerp. De rollen zijn duidelijk: de AREI\u002FRGIE-zelfcontrole toont je bevindingen binnen de ondersteunde regels, de keuring doet het erkende organisme.",[26,2027,2029],{"id":2028},"projectcheck-vóór-uitvoering","Projectcheck vóór uitvoering",[418,2031,2032,2035,2038,2041,2044,2047,2050,2053],{},[87,2033,2034],{},"Beschrijf netparallel bedrijf, nul-injectie en backup afzonderlijk.",[87,2036,2037],{},"Noteer exact omvormermodel, firmware en actuele Synergrid-status.",[87,2039,2040],{},"Teken AC- en DC-koppeling met alle energiepaden.",[87,2042,2043],{},"Leid beveiliging en scheiding af uit fabrikantbewijs en AREI.",[87,2045,2046],{},"Kopieer kabel- en plaatsgegevens niet uit een voorbeeld.",[87,2048,2049],{},"Controleer de gevolgen voor bestaande PV, meter, aansluiting en faseverdeling.",[87,2051,2052],{},"Stem keuring en melding af met de operator van het adres.",[87,2054,2055],{},"Bewaar na ingebruikname instellingen, schema's, verslag en meldingsbevestiging.",[11,2057,2058],{},"Veelgemaakte documentatiefouten zijn AC- en DC-varianten verwarren, C10\u002F26 alleen op merk controleren, de omschakeling uit een backupschema weglaten en na een omvormerwissel het oude schema bewaren. Ook een fabrikantvoorbeeld van automaat of differentieelschakelaar neem je niet als universele regel over. Een duidelijk gemarkeerd open punt is altijd beter dan een aannemelijke maar verzonnen waarde.",[26,2060,2062],{"id":2061},"van-ontwerp-naar-ingebruikname","Van ontwerp naar ingebruikname",[11,2064,2065],{},"Maak vóór de werken een ontwerpversie met expliciete aannames. Geef elk toestel een stabiele referentie die terugkomt in eendraadschema, situatieplan, instellingenlijst en handleidingen. Noteer welke bescherming de installateur nog moet berekenen of bevestigen. Zo beoordeel je een latere productwijziging gericht: veranderde alleen de behuizing, of ook stroom, foutstroombewaking, scheidingsfunctie en homologatie?",[11,2067,2068],{},"Controleer bij levering typeplaat, firmware en compatibiliteitslijst. Een offerte met een productfamilie bewijst niet dat de geleverde variant dezelfde eigenschappen heeft. Leg afwijkingen vast vóór aansluiting. Werk na uitvoering de ontwerpwaarden bij naar de werkelijk geïnstalleerde waarden en bewaar een gedateerde export. De eigenaar weet daarna welke delen bij noodbedrijf gevoed blijven, hoe een normale uitschakeling verloopt en welke handelingen alleen een vakpersoon mag uitvoeren.",[11,2070,2071],{},"Bij latere uitbreiding telt niet alleen extra kWh. Meer batterijmodules beïnvloeden laad- of ontlaadstromen, beveiliging, kabelbelasting, warmteontwikkeling en garantievoorwaarden. Een software-update kan instellingen of homologatievoorwaarden raken. Behandel uitbreiding en firmwarewijziging daarom als gecontroleerde wijziging met fabrikantbewijs, niet als administratieve notitie.",[11,2073,2074],{},"Maak bij oplevering één gedateerde instellingenfiche. Noteer exact model, variant en firmware, toegelaten netparallelle en eilandmodi, werkelijk ingestelde vermogensgrenzen, gebruikte beveiligingstoestellen en de versie van schema's en handleidingen. Koppel elke waarde aan typeplaat, fabrikantdocument of meetverslag in plaats van aan een productfamilie uit de offerte.",[11,2076,2077],{},"Vergelijk bij een latere software-update, uitbreiding of vervanging eerst met die basis. Controleer gericht of foutstroombewaking, scheidingsfunctie, behandeling van de nulgeleider, homologatie en regionale melding ongewijzigd blijven. Zo beschouw je een wijziging niet ten onrechte als louter administratief, en geeft de verantwoordelijke vakpersoon precies aan welke nieuwe beoordeling, meting of documentversie nodig is.",[26,2079,2081],{"id":2080},"voorbeeld-van-een-gegevensblad-per-energiepad","Voorbeeld van een gegevensblad per energiepad",[11,2083,2084],{},"Gebruik voor elk segment dezelfde velden:",[2086,2087,2088,2101],"table",{},[2089,2090,2091],"thead",{},[2092,2093,2094,2098],"tr",{},[2095,2096,2097],"th",{},"Veld",[2095,2099,2100],{},"Voorbeeld van de status, niet van de waarde",[2102,2103,2104,2113,2121,2129,2137,2145,2153,2161],"tbody",{},[2092,2105,2106,2110],{},[2107,2108,2109],"td",{},"Van \u002F naar",[2107,2111,2112],{},"bekende componentreferenties",[2092,2114,2115,2118],{},[2107,2116,2117],{},"Bedrijfsmodus",[2107,2119,2120],{},"netparallel, laden, ontladen of eiland",[2092,2122,2123,2126],{},[2107,2124,2125],{},"Spanning en stroom",[2107,2127,2128],{},"uit typeplaat of nog te meten\u002Fberekenen",[2092,2130,2131,2134],{},[2107,2132,2133],{},"Geleider",[2107,2135,2136],{},"type, aantal, doorsnede en plaatsingswijze",[2092,2138,2139,2142],{},[2107,2140,2141],{},"Beveiliging",[2107,2143,2144],{},"toestelreferentie en ingestelde kenmerken",[2092,2146,2147,2150],{},[2107,2148,2149],{},"Scheiding",[2107,2151,2152],{},"fysiek toestel en bedieningsplaats",[2092,2154,2155,2158],{},[2107,2156,2157],{},"Bron",[2107,2159,2160],{},"fabrikantfiche, berekening of controlebevinding",[2092,2162,2163,2166],{},[2107,2164,2165],{},"Status",[2107,2167,2168],{},"bevestigd, aannemelijk of ontbrekend",[11,2170,2171],{},"Die laatste status voorkomt dat een leeg veld stilletjes als nul gelezen wordt. Ze richt ook de vakcontrole: alleen ontbrekende of tegenstrijdige informatie vraagt nader onderzoek.",[26,2173,2175],{"id":2174},"wat-een-zelfcontrole-ziet-en-wat-ter-plaatse-blijft","Wat een zelfcontrole ziet – en wat ter plaatse blijft",[11,2177,2178],{},"Een projectmodel kent de ingevoerde gegevens. Een beschadigde kabel, losse verbinding, verkeerde klem, ontoereikende ventilatie, feitelijke aardingswaarde of niet-geregistreerde firmware zie je ter plaatse. Of fabrikantinstellingen correct zijn toegepast, bevestigt de inbedrijfstelling. Gebruik softwaremeldingen daarom als voorbereidende lijst en combineer ze met vakinspectie, metingen en officiële controle waar vereist.",[11,2180,2181],{},"Een groene uitkomst voor een ondersteunde regel zegt niets over regels die niet uit de beschikbare gegevens beslisbaar zijn. Ontbrekende informatie blijft zichtbaar als ontbrekend. Vooral bij meerdere bronnen is een duidelijke waarschuwing dat beoordeling nog niet mogelijk is waardevoller dan een onvolledige positieve conclusie.",[26,2183,2185],{"id":2184},"beslissen-zonder-rendementsclaim","Beslissen zonder rendementsclaim",[11,2187,2188],{},"Maak minstens drie economische scenario's: voorzichtig, midden en gunstig. Varieer eigen verbruik, tarief, verlies, degradatie en vervangingskosten afzonderlijk. Gebruik geen historische premie alsof ze vandaag geldt en behandel een toekomstig energietarief als aanname. Vergelijk daarnaast niet-financiële doelen zoals beperkte noodvoeding of vermogensbeheer, met hun technische randvoorwaarden.",[11,2190,2191],{},"Een batterij kan bij een bepaald profiel zinvol zijn zonder dat er een universele terugverdientijd bestaat. Omgekeerd bewijst een aantrekkelijke simulatie niet dat aansluiting, beveiliging en gebruik toegelaten zijn. Houd de economische beslissing en de elektrische conformiteitsbeoordeling als twee aparte sporen in hetzelfde dossier.",[11,2193,2194],{},[14,2195,2196],{},"Gerelateerde artikelen:",[84,2198,2199,2205,2211],{},[87,2200,2201],{},[221,2202,2204],{"href":2203},"\u002Fblog\u002Farei-reglementen-2026","AREI-reglementen 2026: wat is er veranderd?",[87,2206,2207],{},[221,2208,2210],{"href":2209},"\u002Fblog\u002Feigen-stroomkring-verplicht-toestellen","Eigen stroomkring: welke toestellen hebben er een nodig?",[87,2212,2213],{},[221,2214,2216],{"href":2215},"\u002Fblog\u002Fkabeldoorsnede-automaat","Kabeldoorsnede en automaat: de juiste combinatie",[11,2218,2219,477,2222],{},[14,2220,2221],{},"Leg je projectgegevens gestructureerd vast in PlanElec – beveiliging, uitvoering en melding stem je af met vakpersoon en netbeheerder.",[221,2223,2225],{"href":480,"rel":2224},[394],"Nu starten →",{"title":484,"searchDepth":485,"depth":485,"links":2227},[2228,2229,2230,2231,2232,2233,2234,2235,2236,2237,2238,2239,2240],{"id":1860,"depth":485,"text":1861},{"id":1870,"depth":485,"text":1871},{"id":1886,"depth":485,"text":1887},{"id":1939,"depth":485,"text":1940},{"id":1952,"depth":485,"text":1953},{"id":1970,"depth":485,"text":1971},{"id":1993,"depth":485,"text":1994},{"id":2021,"depth":485,"text":2022},{"id":2028,"depth":485,"text":2029},{"id":2061,"depth":485,"text":2062},{"id":2080,"depth":485,"text":2081},{"id":2174,"depth":485,"text":2175},{"id":2184,"depth":485,"text":2185},"Zo documenteer je een Belgische thuisbatterij: energiepaden, beveiliging, Synergrid-homologatie, keuring en regionale melding – zonder rendementsbelofte.","nl",{},"\u002Fblog\u002Fhome-battery-arei.nl",{"title":1844,"description":2241},"Thuisbatterij en AREI: batterijopslag correct integreren","thuisbatterij-arei","blog\u002Fhome-battery-arei.nl",[2250,2251,1021,2252,535,2253,2254],"batterijopslag","thuisbatterij","zonnepanelen","eendraadschema","noodstroom","O65eoIGwKnJ5Nw0fZrSb1JEUmKEsWuKYVwMfdqQIHHU",[]]