[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-fr-cout-plan-electrique":3,"blog-alternates-blog-post-fr-cout-plan-electrique-electrical-plan-costs":550,"blog-next-steps-blog-post-fr-cout-plan-electrique-electrical-plan-costs":2393},{"id":4,"title":5,"articleId":6,"body":7,"category":517,"date":518,"description":519,"extension":520,"image":25,"lastUpdated":521,"locale":522,"meta":523,"navigation":524,"ogImage":525,"path":526,"publishDate":527,"readTime":528,"refreshInterval":529,"seo":530,"seoTitle":527,"slug":531,"stem":532,"tags":533,"__hash__":549},"blog\u002Fblog\u002Felectrical-plan-costs.fr.md","Combien coûte un plan électrique ? Facteurs de coût 2026","electrical-plan-costs",{"type":8,"value":9,"toc":490},"minimark",[10,15,19,26,34,38,55,58,136,139,143,146,240,244,247,253,256,261,264,269,272,276,279,283,290,294,301,305,366,369,373,376,388,392,417,421,424,427,431,435,438,442,445,449,452,456,463,467,470,474,477,481,484],[11,12,14],"h2",{"id":13},"réponse-courte-le-prix-suit-létendue-de-la-mission","Réponse courte : le prix suit l’étendue de la mission",[16,17,18],"p",{},"Il n’existe pas de tarif forfaitaire officiel belge pour un schéma unifilaire et un plan de position. Le prix découle de la mission concrète : dispose-t-on d’un relevé fiable ou faut-il suivre l’installation sur place ? Ne dessine-t-on que les deux plans, ou la mission comprend-elle aussi calculs, corrections, vérification technique et contrôle officiel ? Une fourchette trouvée en ligne, sans échantillon, date, région ni statut TVA, ne répond pas à ces questions.",[16,20,21],{},[22,23],"img",{"alt":24,"src":25},"Étude électrique et documents de projet sur une table.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-electrical-plan-costs-editorial.webp",[16,27,28,29,33],{},"Comparez donc ",[30,31,32],"strong",{},"le même résultat pour la même étendue de prestations",", et non un prix de logiciel avec une facture d’électricien. Pendant l’accès anticipé, PlanElec coûte 0 EUR ; après le lancement des formules, l’usage unique coûte 12 EUR par bien et Pro 24 EUR par mois (le prix reste le même tant que l’abonnement court sans interruption), hors TVA. Votre propre temps, les mesures, le matériel, les travaux sur l’installation, l’accompagnement technique et le contrôle par un organisme agréé se chiffrent séparément.",[11,35,37],{"id":36},"quels-documents-sont-officiellement-exigés","Quels documents sont officiellement exigés ?",[16,39,40,41,48,49,54],{},"Le SPF Économie indique que, pour un contrôle domestique, le demandeur présente au minimum le schéma unifilaire, le plan de position et, s’il est disponible, le code EAN. Le schéma reprend notamment les canalisations et leur mode de pose, les différentiels, les protections contre les surintensités, interrupteurs, boîtes, prises, points lumineux, appareils fixes et sources (RGIE Livre 1 V06, sous-section 3.1.2.2, a). Le plan de position situe ces éléments (sous-section 3.1.2.3, a). Avec les rapports de contrôle, ils composent le dossier de l’installation (section 9.1.2). Les sources primaires sont la ",[42,43,47],"a",{"href":44,"rel":45},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[46],"nofollow","page officielle sur le contrôle domestique"," et le ",[42,50,53],{"href":51,"rel":52},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[46],"RGIE Livre 1 version 06",".",[16,56,57],{},"Les documents nécessaires dépendent de l’occasion :",[59,60,61,77],"table",{},[62,63,64],"thead",{},[65,66,67,71,74],"tr",{},[68,69,70],"th",{},"Occasion",[68,72,73],{},"Documents",[68,75,76],{},"Référence",[78,79,80,92,103,114,125],"tbody",{},[65,81,82,86,89],{},[83,84,85],"td",{},"Installation neuve",[83,87,88],{},"schéma unifilaire, plan de position, contrôle de conformité avant mise en usage",[83,90,91],{},"3.1.2.1, a ; chap. 6.4",[65,93,94,97,100],{},[83,95,96],{},"Modification ou extension importante",[83,98,99],{},"plans mis à jour ; contrôle des parties modifiées et ajoutées",[83,101,102],{},"3.1.2.1, a ; 6.4.7.3",[65,104,105,108,111],{},[83,106,107],{},"Modification non importante",[83,109,110],{},"description succincte datée et signée ; le plan de position montre l’état actuel",[83,112,113],{},"3.1.2.1, a",[65,115,116,119,122],{},[83,117,118],{},"Vente d’une unité d’habitation avec installation ancienne",[83,120,121],{},"visite de contrôle ; mise à disposition du dossier existant",[83,123,124],{},"section 8.4.2",[65,126,127,130,133],{},[83,128,129],{},"Augmentation de la puissance de raccordement, installation ancienne",[83,131,132],{},"visite de contrôle avant l’augmentation",[83,134,135],{},"section 8.4.1",[16,137,138],{},"Si le schéma unifilaire et le plan de position manquent lors de la visite de contrôle à la vente, l’organisme agréé établit une brève description et un croquis sommaire. Ceux-ci ne remplacent pas les plans, et l’absence est notée comme infraction dans le rapport (sous-section 8.4.2.2, d). Si vous vendez, prévoyez donc les plans à temps.",[11,140,142],{"id":141},"définir-létendue-avant-le-prix","Définir l’étendue avant le prix",[16,144,145],{},"Une offre devient comparable lorsque chaque poste est décrit. Cette liste évite qu’un devis de dessin bon marché s’alourdisse ensuite de travaux nécessaires.",[59,147,148,158],{},[62,149,150],{},[65,151,152,155],{},[68,153,154],{},"Élément",[68,156,157],{},"Ce qui est explicitement convenu",[78,159,160,168,176,184,192,200,208,216,224,232],{},[65,161,162,165],{},[83,163,164],{},"Relevé",[83,166,167],{},"Pièces, récepteurs, boîtes, cheminements et tableaux sont-ils relevés sur place, ou fournissez-vous des données vérifiées ?",[65,169,170,173],{},[83,171,172],{},"Identification des circuits",[83,174,175],{},"Les affectations sont-elles connues, ou faut-il les établir en coupant, mesurant et ouvrant des points adaptés ?",[65,177,178,181],{},[83,179,180],{},"Schéma unifilaire",[83,182,183],{},"Toutes les protections, données de conducteurs, modes de pose, sources et appareils fixes y figurent-ils ?",[65,185,186,189],{},[83,187,188],{},"Plan de position",[83,190,191],{},"Existe-t-il un fond de plan utilisable, et les repères vers les circuits sont-ils univoques ?",[65,193,194,197],{},[83,195,196],{},"Calculs",[83,198,199],{},"Dimensionnement, courts-circuits, sélectivité ou chute de tension font-ils partie de la mission ?",[65,201,202,205],{},[83,203,204],{},"Vérification technique",[83,206,207],{},"Un professionnel vérifie-t-il l’état réel et la plausibilité technique, ou se contente-t-on de dessiner ?",[65,209,210,213],{},[83,211,212],{},"Corrections",[83,214,215],{},"Des travaux au tableau, aux canalisations ou au matériel sont-ils compris ?",[65,217,218,221],{},[83,219,220],{},"Rendez-vous de contrôle",[83,222,223],{},"Les frais de l’organisme agréé sont-ils compris ou facturés à part ?",[65,225,226,229],{},[83,227,228],{},"Reprises",[83,230,231],{},"Combien de cycles de correction techniquement justifiés sont inclus ?",[65,233,234,237],{},[83,235,236],{},"TVA et déplacement",[83,238,239],{},"Le montant comprend-il TVA, déplacement et éventuels rendez-vous supplémentaires ?",[11,241,243],{"id":242},"un-modèle-de-calcul-modifiable-plutôt-que-des-prix-de-marché-inventés","Un modèle de calcul modifiable plutôt que des prix de marché inventés",[16,245,246],{},"N’introduisez que des valeurs issues de votre offre ou de votre propre estimation de temps :",[16,248,249],{},[250,251,252],"code",{},"Scénario total = relevé + dessin + vérification technique + corrections + contrôle + déplacement + temps propre",[16,254,255],{},"Votre travail personnel se valorise avec une valeur de comparaison personnelle :",[16,257,258],{},[250,259,260],{},"temps propre valorisé = heures documentées × valeur de comparaison horaire personnelle",[16,262,263],{},"Cette valeur n’est pas un tarif de marché belge. Elle montre qu’un week-end de travail n’est pas gratuit sur le plan économique. À l’inverse, un forfait externe n’est pas cher s’il inclut relevé, mesures, responsabilité technique et reprises.",[265,266,268],"h3",{"id":267},"scénario-a-les-données-sont-complètes","Scénario A : les données sont complètes",[16,270,271],{},"Le tableau est proprement étiqueté, l’affectation des circuits vérifiée, un plan à l’échelle existe et les caractéristiques des protections sont lisibles. Le travail consiste alors surtout à reprendre les données, contrôler leur plausibilité et dessiner. PlanElec fournit pour cela le modèle de projet commun – plan, topologie et tableau – ainsi que la sortie PDF ; un électricien vérifie les données de façon ciblée.",[265,273,275],{"id":274},"scénario-b-installation-ancienne-sans-documents-fiables","Scénario B : installation ancienne sans documents fiables",[16,277,278],{},"Si les sections, modes de pose ou affectations sont inconnus, le dessin est la dernière étape. D’abord, une personne qualifiée relève l’installation en sécurité ; ouvrir les enveloppes, mesurer et intervenir relèvent de professionnels. Ici, le relevé coûte souvent plus que l’établissement des plans, et c’est précisément ce poste qui doit apparaître clairement dans l’offre.",[265,280,282],{"id":281},"scénario-c-rénovation-avec-décisions-détude-ouvertes","Scénario C : rénovation avec décisions d’étude ouvertes",[16,284,285,286,54],{},"Pour de nouveaux circuits, du PV, une batterie domestique, une borne de recharge, une pompe à chaleur ou des modifications au tableau, l’étude technique est arrêtée d’abord ; le schéma documente cette décision. Demandez une offre qui sépare étude, données du fabricant, conditions du gestionnaire de réseau, exécution et contrôle. Vous verrez ensuite quel poste a changé. Quelle rénovation impose de nouveaux plans est expliqué dans ",[42,287,289],{"href":288},"\u002Ffr\u002Fblog\u002Frenovation-rgie-plans-electriques","Rénovation et RGIE",[265,291,293],{"id":292},"scénario-d-vente-avec-échéance","Scénario D : vente avec échéance",[16,295,296,297,54],{},"L’urgence seule ne justifie pas de supplément express. Demandez une offre écrite avec date de livraison, prérequis et processus de correction. Convenez de qui commande la visite de contrôle et des rapports existants qui appartiennent au dossier. Un plan dessiné à la hâte qui ne montre pas l’état réel ne règle pas le problème de documentation. Plus de détails dans ",[42,298,300],{"href":299},"\u002Ffr\u002Fblog\u002Fdossier-electrique-vente-immobiliere","Dossier électrique lors de la vente immobilière",[11,302,304],{"id":303},"combien-coûte-planelec","Combien coûte PlanElec ?",[59,306,307,320],{},[62,308,309],{},[65,310,311,314,317],{},[68,312,313],{},"Formule",[68,315,316],{},"Prix",[68,318,319],{},"Contenu",[78,321,322,333,344,355],{},[65,323,324,327,330],{},[83,325,326],{},"Accès anticipé",[83,328,329],{},"0 EUR jusqu’au lancement des formules",[83,331,332],{},"toutes les fonctions, aucune facture",[65,334,335,338,341],{},[83,336,337],{},"Free",[83,339,340],{},"0 EUR, en permanence",[83,342,343],{},"planification complète sans limite de projets ni de circuits ; exports avec zones masquées sur les données exploitables",[65,345,346,349,352],{},[83,347,348],{},"Usage unique",[83,350,351],{},"12 EUR par bien, une fois",[83,353,354],{},"tous les documents sans zones masquées pour une seule adresse de bien confirmée",[65,356,357,360,363],{},[83,358,359],{},"Pro",[83,361,362],{},"24 EUR par mois ou 240 EUR par an; le prix reste le même tant que l’abonnement court",[83,364,365],{},"tous les projets et documents sans zones masquées, trois places d’édition, 5 EUR par mois ou 50 EUR par an par place supplémentaire",[16,367,368],{},"Tous les prix s’entendent hors TVA de 21 % ; l’usage unique coûte donc 14,52 EUR TVAC. À deux biens par mois, deux usages uniques coûtent autant que Pro (24 EUR) ; dès trois biens par mois, Pro revient moins cher. Nous annoncerons la date de lancement des formules suffisamment à l’avance. Si vous vous inscrivez avant le lancement, vous utilisez PlanElec gratuitement pendant le premier mois civil complet à partir du lancement. Inscription, connexion et invitations ne coûtent jamais rien ; un coût ne naît que d’une souscription explicite.",[11,370,372],{"id":371},"ce-que-planelec-apporte-aujourdhui","Ce que PlanElec apporte aujourd’hui",[16,374,375],{},"PlanElec réunit fond de plan, topologie électrique et étude du tableau dans un seul projet. Le schéma unifilaire et le plan de position sortent en PDF, tout comme un dossier d’installation composé, avec page de garde et table des documents. L’autocontrôle RGIE évalue les règles prises en charge qui peuvent être tranchées à partir de vos données et signale les données manquantes. La liste de matériel détaillée, neutre vis-à-vis des fabricants, est disponible en fonction pilote ; elle ne vaut pas validation de commande.",[16,377,378,379,383,384,54],{},"Les rôles sont donc clairs : PlanElec produit les plans à partir de votre modèle de projet et garde les documents cohérents. Le relevé sur place, l’étude technique et l’exécution restent chez l’électricien, et le rapport de contrôle est rédigé par l’organisme agréé. Que cela soit rentable pour vous dépend du degré de complétude de vos données. Tout ce que PlanElec permet figure dans ",[42,380,382],{"href":381},"\u002Ffr\u002Fblog\u002Fque-peut-on-faire-avec-planelec","Que peut-on faire avec PlanElec"," ; la comparaison avec Excel et le papier se trouve dans ",[42,385,387],{"href":386},"\u002Ffr\u002Fblog\u002Fplanelec-vs-excel-papier","PlanElec face à Excel et au papier : la comparaison",[11,389,391],{"id":390},"obtenir-des-offres-comparables","Obtenir des offres comparables",[393,394,395,399,402,405,408,411,414],"ol",{},[396,397,398],"li",{},"Décrivez bâtiment, raccordement, nombre de tableaux et circuits connus.",[396,400,401],{},"Mentionnez les sources et charges particulières : PV, batterie, borne de recharge ou pompe à chaleur.",[396,403,404],{},"Transmettez les plans et rapports de contrôle existants, sans deviner les données inconnues.",[396,406,407],{},"Demandez des postes séparés pour relevé, dessin, vérification technique, exécution et contrôle.",[396,409,410],{},"Interrogez sur la TVA, le déplacement, le format de livraison et les cycles de correction.",[396,412,413],{},"Comparez non seulement le total, mais aussi la responsabilité et la couverture.",[396,415,416],{},"Après des modifications, documentez l’état réel et conservez les documents dans le dossier de l’installation.",[11,418,420],{"id":419},"prévoir-la-remise-et-la-révision-comme-prestation-distincte","Prévoir la remise et la révision comme prestation distincte",[16,422,423],{},"Une bonne offre ne mentionne pas seulement « plan en PDF », mais l’état de travail remis. Convenez des documents existants vérifiés, des données que vous avez fournies et des inconnues qui restent ouvertes. Fixez le nombre de cycles de correction inclus, qui signale les modifications après chantier et quelle version de fichier vaut ensuite comme état exécuté.",[16,425,426],{},"Pour la réception, une courte liste aide : les repères de circuit concordent-ils entre tableau, schéma unifilaire et plan de position ? Le matériel ajouté et retiré est-il reporté ? Les hypothèses sont-elles marquées comme telles ? Fiches techniques et mesures sont-elles chez le responsable ? Seule cette remise rend comparables dessin, vérification technique et maintenance ultérieure. Une offre basse sans révision convenue devient vite plus chère lors de la modification suivante.",[11,428,430],{"id":429},"questions-fréquentes","Questions fréquentes",[265,432,434],{"id":433},"quelles-données-rassembler-avant-la-demande","Quelles données rassembler avant la demande ?",[16,436,437],{},"Commencez par tout ce qui est visible sans intervention : adresse et type de raccordement, nombre et emplacement des tableaux, caractéristiques lisibles des différentiels et disjoncteurs, noms des circuits, plan du logement, anciens schémas et rapports de contrôle. Notez séparément récepteurs fixes et sources. Marquez explicitement les valeurs inconnues comme inconnues. Une section inventée donne l’air complet à un dessin et le rend techniquement sans valeur. Les photos aident à préparer ; elles ne remplacent pas la constatation sûre de données de canalisation cachées.",[265,439,441],{"id":440},"quelles-prestations-ne-disparaissent-pas-dans-un-prix-du-plan","Quelles prestations ne disparaissent pas dans un « prix du plan » ?",[16,443,444],{},"Modifications de l’installation, recherche de pannes, rapports de mesure, dimensionnement selon les conditions du fabricant et levée d’une remarque de contrôle sont des prestations distinctes. Les procédures auprès du gestionnaire de réseau pour les unités de production ou de stockage ne suivent pas automatiquement non plus. Si ces étapes sont nécessaires, elles apparaissent comme poste distinct avec résultat, responsable et délai. Cela protège les deux parties : vous voyez ce qui est livré, et l’installateur n’endosse pas de responsabilité pour des parties non commandées.",[265,446,448],{"id":447},"comment-traiter-les-modifications-après-le-premier-export","Comment traiter les modifications après le premier export ?",[16,450,451],{},"Conservez une version de départ traçable, reportez les modifications confirmées dans le projet et le plan de position et faites vérifier les modifications techniques. Notez non seulement « cuisine modifiée », mais quel circuit, quelle protection, quelle canalisation et quels points sont concernés. La correction suivante reste ainsi une mise à jour limitée plutôt qu’un nouveau relevé.",[265,453,455],{"id":454},"puis-je-dessiner-le-schéma-moi-même","Puis-je dessiner le schéma moi-même ?",[16,457,458,459,54],{},"Le RGIE désigne qui établit le schéma unifilaire : le responsable de l’exécution des travaux (sous-section 3.1.2.1, a). L’essentiel est que les documents montrent correctement l’état réel et soient disponibles lors du contrôle. Dessiner soi-même n’est pas installer soi-même : le relevé de parties sous tension et l’exécution restent réservés aux professionnels. Une comparaison des deux voies figure dans le ",[42,460,462],{"href":461},"\u002Ffr\u002Fblog\u002Fcomparatif-cout-soi-meme-vs-electricien","comparatif coût soi-même ou électricien",[265,464,466],{"id":465},"un-pdf-planelec-signifie-t-il-que-linstallation-est-conforme","Un PDF PlanElec signifie-t-il que l’installation est conforme ?",[16,468,469],{},"Non. Le PDF documente les données de votre projet, et l’autocontrôle vérifie de manière indicative les règles prises en charge. La conformité de l’installation contrôlée est établie par l’organisme agréé dans la procédure prévue.",[265,471,473],{"id":472},"quel-est-le-principal-facteur-de-coût","Quel est le principal facteur de coût ?",[16,475,476],{},"Ce n’est pas la surface habitable, mais l’incertitude sur l’état réel et l’étendue convenue. Des données connues et vérifiées réduisent l’effort de relevé ; des canalisations inconnues, plusieurs tableaux ou des modifications techniques l’augmentent.",[11,478,480],{"id":479},"conclusion","Conclusion",[16,482,483],{},"Un prix sérieux pour un plan électrique est une offre propre au projet. Séparez relevé, dessin, vérification technique, travaux et contrôle, valorisez aussi votre propre temps et comparez des prestations équivalentes. PlanElec structure la documentation et ne coûte rien pendant l’accès anticipé ; étude technique, exécution et contrôle restent des postes distincts.",[16,485,486],{},[42,487,489],{"href":488},"\u002F","Créer un projet dans l’accès anticipé gratuit →",{"title":491,"searchDepth":492,"depth":492,"links":493},"",2,[494,495,496,497,504,505,506,507,508,516],{"id":13,"depth":492,"text":14},{"id":36,"depth":492,"text":37},{"id":141,"depth":492,"text":142},{"id":242,"depth":492,"text":243,"children":498},[499,501,502,503],{"id":267,"depth":500,"text":268},3,{"id":274,"depth":500,"text":275},{"id":281,"depth":500,"text":282},{"id":292,"depth":500,"text":293},{"id":303,"depth":492,"text":304},{"id":371,"depth":492,"text":372},{"id":390,"depth":492,"text":391},{"id":419,"depth":492,"text":420},{"id":429,"depth":492,"text":430,"children":509},[510,511,512,513,514,515],{"id":433,"depth":500,"text":434},{"id":440,"depth":500,"text":441},{"id":447,"depth":500,"text":448},{"id":454,"depth":500,"text":455},{"id":465,"depth":500,"text":466},{"id":472,"depth":500,"text":473},{"id":479,"depth":492,"text":480},"guide","2026-02-19","Ce qui détermine le prix d'un plan électrique belge, comment comparer les offres avec un modèle de calcul modifiable et ce que coûte PlanElec en accès anticipé et après le lancement des formules.","md","2026-10-19","fr",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-electrical-plan-costs-editorial.jpg","\u002Fblog\u002Felectrical-plan-costs.fr",null,"11 min",12,{"title":5,"description":519},"cout-plan-electrique","blog\u002Felectrical-plan-costs.fr",[534,535,536,537,538,539,540,541,542,543,544,545,546,547,548],"AREI","RGIE","schéma unifilaire","eendraadschema","plan de position","Situationsplan","coût","prix","plan électrique","contrôle électrique","électricien","vente immobilière","Belgique","Eindrahtschema","single-line diagram","bKpF-mEcIMQ3O0XI30MGkqy2q1lsBtw6oXPfRLLud3c",[551,1055,1553,1895],{"id":552,"title":553,"articleId":6,"body":554,"category":517,"date":518,"description":1037,"extension":520,"image":25,"lastUpdated":521,"locale":1038,"meta":1039,"navigation":524,"ogImage":525,"path":1040,"publishDate":527,"readTime":528,"refreshInterval":529,"seo":1041,"seoTitle":527,"slug":1042,"stem":1043,"tags":1044,"__hash__":1054},"blog\u002Fblog\u002Felectrical-plan-costs.de.md","Was kostet ein Elektroplan? Kostenfaktoren 2026",{"type":8,"value":555,"toc":1013},[556,560,563,568,575,579,592,595,667,670,674,677,770,774,777,782,785,790,793,797,800,804,807,811,818,822,829,833,892,895,899,902,914,918,941,945,948,951,955,959,962,966,969,973,976,980,987,991,994,998,1001,1005,1008],[11,557,559],{"id":558},"kurzantwort-der-preis-folgt-dem-leistungsumfang","Kurzantwort: Der Preis folgt dem Leistungsumfang",[16,561,562],{},"Einen amtlichen belgischen Pauschaltarif für Eindrahtschema und Positionsplan gibt es nicht. Der Preis ergibt sich aus dem konkreten Auftrag: Liegt eine verlässliche Bestandsaufnahme vor oder muss die Anlage vor Ort verfolgt werden? Werden nur die beiden Pläne gezeichnet, oder gehören Berechnungen, Korrekturarbeiten, fachliche Prüfung und die offizielle Kontrolle dazu? Eine Online-Preisspanne ohne Stichprobe, Datum, Region und Mehrwertsteuerstatus beantwortet diese Fragen nicht.",[16,564,565],{},[22,566],{"alt":567,"src":25},"Elektroplanung und Projektunterlagen an einem Tisch.",[16,569,570,571,574],{},"Vergleiche deshalb ",[30,572,573],{},"gleiches Ergebnis zu gleichem Leistungsumfang",", nicht Softwarepreis gegen Elektrikerrechnung. PlanElec kostet im Early Access 0 EUR; nach dem Tarifstart gibt es die Einzelnutzung für 12 EUR je Objekt oder Pro für 24 EUR im Monat (der Preis bleibt, solange das Abo ohne Unterbrechung läuft), jeweils zuzüglich MwSt. Eigene Arbeitszeit, Messungen, Material, Arbeiten an der Anlage, fachliche Begleitung und die Kontrolle durch eine zugelassene Stelle rechnest du getrennt.",[11,576,578],{"id":577},"welche-unterlagen-sind-offiziell-verlangt","Welche Unterlagen sind offiziell verlangt?",[16,580,581,582,587,588,54],{},"Der FÖD Wirtschaft erklärt für hauswirtschaftliche Anlagen, dass bei einer Kontrolle mindestens das Eindrahtschema, der Positionsplan und, falls verfügbar, der EAN-Code vorgelegt werden. Das Eindrahtschema beschreibt unter anderem Leitungen, Verlegeart, Differenzialschalter, Überstromschutz, Schalter, Dosen, Steckdosen, Lichtpunkte, feste Geräte und Quellen (AREI\u002FRGIE Buch 1 V06, Unterabschnitt 3.1.2.2 Buchstabe a). Der Positionsplan zeigt, wo diese Elemente liegen (Unterabschnitt 3.1.2.3 Buchstabe a). Beide gehören zusammen mit den Kontrollberichten zur Anlagenakte (Abschnitt 9.1.2). Primärquellen sind die ",[42,583,586],{"href":584,"rel":585},"https:\u002F\u002Feconomie.fgov.be\u002Fde\u002Fthemen\u002Fenergie\u002Fsicherheit-und-kontrolle\u002Fkontrolle-von-elektrischen",[46],"amtliche deutschsprachige Übersicht zur Kontrolle"," und das ",[42,589,591],{"href":51,"rel":590},[46],"AREI\u002FRGIE Buch 1, Version 06",[16,593,594],{},"Welche Unterlagen du brauchst, hängt vom Anlass ab:",[59,596,597,610],{},[62,598,599],{},[65,600,601,604,607],{},[68,602,603],{},"Anlass",[68,605,606],{},"Unterlagen",[68,608,609],{},"Fundstelle",[78,611,612,623,634,645,656],{},[65,613,614,617,620],{},[83,615,616],{},"Neue Anlage",[83,618,619],{},"Eindrahtschema, Positionsplan, Konformitätsprüfung vor Ingebrauchnahme",[83,621,622],{},"3.1.2.1 a, Kap. 6.4",[65,624,625,628,631],{},[83,626,627],{},"Wesentliche Änderung oder Erweiterung",[83,629,630],{},"aktualisierte Pläne; Prüfung der geänderten und hinzugefügten Teile",[83,632,633],{},"3.1.2.1 a, 6.4.7.3",[65,635,636,639,642],{},[83,637,638],{},"Unwesentliche Änderung",[83,640,641],{},"datierte, unterschriebene Kurzbeschreibung; Positionsplan zeigt den aktuellen Zustand",[83,643,644],{},"3.1.2.1 a",[65,646,647,650,653],{},[83,648,649],{},"Verkauf einer Wohneinheit mit Altanlage",[83,651,652],{},"Kontrollbesuch; vorhandene Akte bereitstellen",[83,654,655],{},"Abschnitt 8.4.2",[65,657,658,661,664],{},[83,659,660],{},"Anhebung der Anschlussleistung einer Altanlage",[83,662,663],{},"Kontrollbesuch vor der Anhebung",[83,665,666],{},"Abschnitt 8.4.1",[16,668,669],{},"Fehlen beim Kontrollbesuch zum Verkauf Eindrahtschema und Positionsplan, erstellt die zugelassene Stelle eine kurze Beschreibung und eine grobe Skizze. Diese ersetzen die Pläne nicht, und das Fehlen wird im Bericht als Verstoß vermerkt (Unterabschnitt 8.4.2.2 Buchstabe d). Wer verkauft, plant die Pläne deshalb rechtzeitig ein.",[11,671,673],{"id":672},"den-leistungsumfang-vor-dem-preis-festlegen","Den Leistungsumfang vor dem Preis festlegen",[16,675,676],{},"Ein Angebot wird vergleichbar, wenn jede Position beschrieben ist. Mit dieser Liste verhinderst du, dass ein günstiges Zeichenangebot später um notwendige Arbeit wächst.",[59,678,679,689],{},[62,680,681],{},[65,682,683,686],{},[68,684,685],{},"Baustein",[68,687,688],{},"Was ausdrücklich geklärt wird",[78,690,691,699,707,714,722,730,738,746,754,762],{},[65,692,693,696],{},[83,694,695],{},"Bestandsaufnahme",[83,697,698],{},"Werden Räume, Verbraucher, Dosen, Leitungswege und Verteiler vor Ort aufgenommen, oder lieferst du verifizierte Daten?",[65,700,701,704],{},[83,702,703],{},"Stromkreisverfolgung",[83,705,706],{},"Sind die Zuordnungen bekannt, oder müssen sie durch Schalten, Messen und Öffnen geeigneter Stellen ermittelt werden?",[65,708,709,711],{},[83,710,547],{},[83,712,713],{},"Sind alle Schutzgeräte, Leiterdaten, Verlegearten, Quellen und festen Geräte enthalten?",[65,715,716,719],{},[83,717,718],{},"Positionsplan",[83,720,721],{},"Gibt es einen brauchbaren Grundriss, und sind die Referenzen zu den Stromkreisen eindeutig?",[65,723,724,727],{},[83,725,726],{},"Berechnungen",[83,728,729],{},"Gehören Dimensionierung, Kurzschluss-, Selektivitäts- oder Spannungsfallnachweise zum Auftrag?",[65,731,732,735],{},[83,733,734],{},"Fachprüfung",[83,736,737],{},"Prüft eine Elektrofachkraft Ist-Zustand und technische Plausibilität, oder wird nur gezeichnet?",[65,739,740,743],{},[83,741,742],{},"Korrekturarbeiten",[83,744,745],{},"Sind Arbeiten am Verteiler, an Leitungen oder Betriebsmitteln enthalten?",[65,747,748,751],{},[83,749,750],{},"Kontrolltermin",[83,752,753],{},"Ist die Gebühr der zugelassenen Stelle enthalten oder separat?",[65,755,756,759],{},[83,757,758],{},"Nachbearbeitung",[83,760,761],{},"Wie viele fachlich begründete Korrekturrunden sind eingeschlossen?",[65,763,764,767],{},[83,765,766],{},"Steuern und Anfahrt",[83,768,769],{},"Ist der Betrag inklusive Mehrwertsteuer, Fahrt und eventueller Zusatztermine?",[11,771,773],{"id":772},"ein-editierbares-rechenmodell-statt-erfundener-marktpreise","Ein editierbares Rechenmodell statt erfundener Marktpreise",[16,775,776],{},"Trag nur Werte ein, die aus deinem Angebot oder deiner eigenen Zeitbewertung stammen:",[16,778,779],{},[250,780,781],{},"Gesamtszenario = Aufnahme + Zeichnung + Fachprüfung + Korrekturarbeiten + Kontrolle + Fahrt + eigene Zeit",[16,783,784],{},"Eigenleistung bewertest du mit einem persönlichen Vergleichswert:",[16,786,787],{},[250,788,789],{},"bewertete Eigenzeit = dokumentierte Stunden × eigener Vergleichswert pro Stunde",[16,791,792],{},"Der Vergleichswert ist kein belgischer Markttarif. Er zeigt, dass ein Wochenende Arbeit wirtschaftlich nicht automatisch kostenlos ist. Umgekehrt ist eine externe Pauschale nicht teuer, wenn Bestandsaufnahme, Messung, technische Verantwortung und Nachbearbeitung darin enthalten sind.",[265,794,796],{"id":795},"szenario-a-daten-sind-vollständig-vorhanden","Szenario A: Daten sind vollständig vorhanden",[16,798,799],{},"Der Verteiler ist sauber beschriftet, die Stromkreiszuordnung geprüft, ein maßstäblicher Grundriss liegt vor und die Kenndaten der Schutzgeräte sind lesbar. Dann besteht der Aufwand vor allem aus Datenübernahme, Plausibilitätskontrolle und Zeichnung. PlanElec liefert dafür das gemeinsame Projektmodell aus Grundriss, Topologie und Verteiler sowie die PDF-Ausgabe; ein Elektriker prüft gezielt die Angaben.",[265,801,803],{"id":802},"szenario-b-alte-anlage-ohne-verlässliche-unterlagen","Szenario B: Alte Anlage ohne verlässliche Unterlagen",[16,805,806],{},"Sind Leiterquerschnitte, Verlegearten oder Zuordnungen unbekannt, ist das Zeichnen der letzte Schritt. Vorher nimmt eine befähigte Person die Installation sicher auf; Gehäuse öffnen, Messungen und Eingriffe gehören in Fachhände. Hier kostet die Bestandsaufnahme oft mehr als die Planerstellung, und genau diese Position gehört deutlich ins Angebot.",[265,808,810],{"id":809},"szenario-c-renovierung-mit-offenen-planungsentscheidungen","Szenario C: Renovierung mit offenen Planungsentscheidungen",[16,812,813,814,54],{},"Bei neuen Stromkreisen, PV, Batteriespeicher, Wallbox, Wärmepumpe oder Änderungen am Verteiler steht zuerst die technische Auslegung fest; das Schema dokumentiert diese Entscheidung. Hol ein Angebot ein, das Planung, Herstellerangaben, Bedingungen des Netzbetreibers, Ausführung und Kontrolle trennt. So erkennst du später, welche Position sich geändert hat. Welche Renovierung neue Pläne auslöst, erklärt ",[42,815,817],{"href":816},"\u002Fde\u002Fblog\u002Frenovierung-arei-elektroplaene","Renovierung und AREI",[265,819,821],{"id":820},"szenario-d-verkauf-mit-termin","Szenario D: Verkauf mit Termin",[16,823,824,825,54],{},"Zeitdruck allein begründet keinen Expressaufschlag. Frag nach einem schriftlichen Angebot mit Liefertermin, Voraussetzungen und Korrekturprozess. Kläre, wer den Kontrollbesuch beauftragt und welche vorhandenen Berichte zur Akte gehören. Ein schnell gezeichneter Plan, der den Ist-Zustand nicht zeigt, löst das Dokumentationsproblem nicht. Mehr dazu im ",[42,826,828],{"href":827},"\u002Fde\u002Fblog\u002Felektrodossier-immobilienverkauf","Elektrodossier beim Immobilienverkauf",[11,830,832],{"id":831},"was-kostet-planelec","Was kostet PlanElec?",[59,834,835,848],{},[62,836,837],{},[65,838,839,842,845],{},[68,840,841],{},"Tarif",[68,843,844],{},"Preis",[68,846,847],{},"Umfang",[78,849,850,861,871,882],{},[65,851,852,855,858],{},[83,853,854],{},"Early Access",[83,856,857],{},"0 EUR bis zum Tarifstart",[83,859,860],{},"voller Funktionsumfang, keine Rechnung",[65,862,863,865,868],{},[83,864,337],{},[83,866,867],{},"0 EUR, dauerhaft",[83,869,870],{},"vollständige Planung ohne Projekt- und Stromkreisgrenze; Exporte mit Sperrflächen über den verwertbaren Angaben",[65,872,873,876,879],{},[83,874,875],{},"Einzelnutzung",[83,877,878],{},"12 EUR je Objekt, einmalig",[83,880,881],{},"alle Dokumente ohne Sperrflächen für genau eine bestätigte Objektadresse",[65,883,884,886,889],{},[83,885,359],{},[83,887,888],{},"24 EUR im Monat oder 240 EUR im Jahr; der Preis bleibt, solange das Abo läuft",[83,890,891],{},"alle Projekte und Dokumente ohne Sperrflächen, drei Bearbeitungsplätze, jeder weitere 5 EUR im Monat bzw. 50 EUR im Jahr",[16,893,894],{},"Alle Preise verstehen sich zuzüglich 21 % MwSt.; die Einzelnutzung kostet damit 14,52 EUR brutto. Bei zwei Objekten im Monat kosten zwei Einzelnutzungen so viel wie Pro (24 EUR); ab drei Objekten im Monat ist Pro günstiger. Den Starttermin der Tarife kündigen wir rechtzeitig vorher an. Wer sich vor dem Start registriert, nutzt PlanElec ab dem Start den ersten vollen Kalendermonat kostenlos. Registrierung, Login und Einladungen lösen nie Kosten aus; Kosten entstehen nur durch eine ausdrückliche Buchung.",[11,896,898],{"id":897},"was-planelec-heute-beiträgt","Was PlanElec heute beiträgt",[16,900,901],{},"PlanElec führt Grundriss, elektrische Topologie und Schaltschrankplanung in einem Projekt zusammen. Eindrahtschema und Positionsplan gehen zentral als PDF hinaus, ebenso ein auswählbares Installationsdossier mit Deckblatt und Dokumentverzeichnis. Der AREI\u002FRGIE-Selbstcheck bewertet die unterstützten, aus deinen Daten entscheidbaren Regeln und zeigt Datenlücken. Die detaillierte herstellerneutrale Materialliste steht als Pilotfunktion bereit; sie ist keine Bestellfreigabe.",[16,903,904,905,909,910,54],{},"Damit sind die Rollen klar: PlanElec erzeugt die Pläne aus deinem Projektmodell und hält die Dokumente konsistent. Bestandsaufnahme vor Ort, technische Auslegung und Ausführung bleiben beim Elektriker, und den Kontrollbericht schreibt die zugelassene Stelle. Ob sich das für dich rechnet, hängt davon ab, wie vollständig deine Projektdaten schon sind. Alles, was PlanElec kann, findest du in ",[42,906,908],{"href":907},"\u002Fde\u002Fblog\u002Fwas-kann-man-mit-planelec-machen","Was man mit PlanElec machen kann","; wie es sich zu Excel und Papier verhält, steht in ",[42,911,913],{"href":912},"\u002Fde\u002Fblog\u002Fplanelec-vs-excel-papier","PlanElec im Vergleich zu Excel und Papier",[11,915,917],{"id":916},"so-holst-du-vergleichbare-angebote-ein","So holst du vergleichbare Angebote ein",[393,919,920,923,926,929,932,935,938],{},[396,921,922],{},"Beschreibe Gebäude, Anschluss, Anzahl der Verteiler und bekannte Stromkreise.",[396,924,925],{},"Nenne besondere Quellen und Lasten wie PV, Batterie, Wallbox oder Wärmepumpe.",[396,927,928],{},"Leg vorhandene Pläne und Kontrollberichte vor, ohne unbekannte Daten zu erraten.",[396,930,931],{},"Fordere getrennte Positionen für Aufnahme, Zeichnung, technische Prüfung, Ausführung und Kontrolle.",[396,933,934],{},"Frag nach Mehrwertsteuer, Anfahrt, Lieferformat und Korrekturrunden.",[396,936,937],{},"Vergleiche nicht nur die Summe, sondern auch Verantwortung und Abdeckung.",[396,939,940],{},"Dokumentiere nach Änderungen den tatsächlichen Stand und bewahre die Unterlagen in der Anlagenakte auf.",[11,942,944],{"id":943},"übergabe-und-revision-als-eigene-leistung-festlegen","Übergabe und Revision als eigene Leistung festlegen",[16,946,947],{},"Ein gutes Angebot nennt nicht nur „Plan als PDF“, sondern den übergebenen Bearbeitungsstand. Vereinbare, welche Bestandsunterlagen geprüft wurden, welche Angaben du geliefert hast und welche Unbekannten offen bleiben. Halte fest, wie viele Korrekturrunden enthalten sind, wer Änderungen nach der Baustelle meldet und welche Dateiversion danach als ausgeführter Stand gilt.",[16,949,950],{},"Für die Abnahme hilft eine kurze Prüfliste: Stimmen die Stromkreiskennungen zwischen Verteiler, Eindrahtschema und Positionsplan überein? Sind neue und entfernte Betriebsmittel nachgeführt? Sind Annahmen als Annahmen gekennzeichnet? Liegen Datenblätter und Messnachweise bei der verantwortlichen Stelle? Erst diese Übergabe macht Zeichenleistung, Fachprüfung und spätere Pflege vergleichbar. Eine niedrige Angebotssumme ohne geklärte Revision wird bei der nächsten Änderung schnell teurer.",[11,952,954],{"id":953},"häufige-fragen","Häufige Fragen",[265,956,958],{"id":957},"welche-daten-sammle-ich-vor-der-anfrage","Welche Daten sammle ich vor der Anfrage?",[16,960,961],{},"Beginne mit allem, was ohne Eingriff sichtbar ist: Adresse und Anschlussart, Anzahl und Standort der Verteiler, lesbare Kenndaten von Differenzialschaltern und Leitungsschutzschaltern, Stromkreisbezeichnungen, Grundriss, frühere Schemata und Kontrollberichte. Halte feste Verbraucher und Quellen getrennt fest. Markiere unbekannte Werte ausdrücklich als unbekannt. Ein erfundener Leiterquerschnitt lässt eine Zeichnung vollständig aussehen und macht sie fachlich wertlos. Fotos helfen bei der Vorbereitung; die sichere Feststellung verdeckter Leitungsdaten ersetzen sie nicht.",[265,963,965],{"id":964},"welche-leistungen-verschwinden-nicht-in-einem-planpreis","Welche Leistungen verschwinden nicht in einem „Planpreis“?",[16,967,968],{},"Änderungen an der Installation, Fehlersuche, Messprotokolle, Dimensionierung nach Herstellerbedingungen und das Beheben eines Kontrollbefunds sind eigene Leistungen. Auch die Verfahren beim Netzbetreiber für Erzeugungsanlagen oder Speicher laufen nicht automatisch mit. Werden diese Schritte gebraucht, erscheinen sie als eigene Position mit Ergebnis, Verantwortlichem und Termin. Das schützt beide Seiten: Du siehst, was geliefert wird, und der Fachbetrieb übernimmt keine Verantwortung für nicht beauftragte Teile.",[265,970,972],{"id":971},"wie-behandle-ich-änderungen-nach-dem-ersten-export","Wie behandle ich Änderungen nach dem ersten Export?",[16,974,975],{},"Bewahre eine nachvollziehbare Ausgangsfassung auf, trag bestätigte Änderungen in Projekt und Positionsplan ein und lass technische Änderungen prüfen. Notiere nicht nur „Küche geändert“, sondern welchen Stromkreis, welches Schutzorgan, welche Leitung und welche Punkte die Änderung betrifft. So bleibt die nächste Korrekturrunde eine begrenzte Aktualisierung statt einer neuen Bestandsaufnahme.",[265,977,979],{"id":978},"darf-ich-das-schema-selbst-zeichnen","Darf ich das Schema selbst zeichnen?",[16,981,982,983,54],{},"Das AREI legt fest, wer das Eindrahtschema erstellt: der Verantwortliche für die Ausführung der Arbeit (Unterabschnitt 3.1.2.1 Buchstabe a). Entscheidend ist, dass die Unterlagen den tatsächlichen Zustand korrekt zeigen und im Kontrollverfahren vorliegen. Selbst zeichnen heißt nicht selbst installieren: Bestandsaufnahme an spannungsführenden Teilen und Ausführung bleiben Fachleuten vorbehalten. Eine Gegenüberstellung beider Wege findest du im ",[42,984,986],{"href":985},"\u002Fde\u002Fblog\u002Fkostenvergleich-selbst-vs-elektriker","Kostenvergleich: selbst zeichnen oder Elektriker",[265,988,990],{"id":989},"bedeutet-ein-pdf-aus-planelec-dass-die-anlage-konform-ist","Bedeutet ein PDF aus PlanElec, dass die Anlage konform ist?",[16,992,993],{},"Nein. Das PDF dokumentiert deine Projektdaten, und der Selbstcheck prüft die unterstützten Regeln orientierend. Ob die kontrollierte Anlage den Vorschriften entspricht, stellt die zugelassene Stelle im vorgesehenen Verfahren fest.",[265,995,997],{"id":996},"was-ist-der-wichtigste-kostentreiber","Was ist der wichtigste Kostentreiber?",[16,999,1000],{},"Nicht die Wohnfläche, sondern die Unsicherheit im Ist-Zustand und der vereinbarte Leistungsumfang. Bekannte, verifizierte Daten senken den Aufnahmeaufwand; unbekannte Leitungen, mehrere Verteiler oder technische Änderungen erhöhen ihn.",[11,1002,1004],{"id":1003},"fazit","Fazit",[16,1006,1007],{},"Ein seriöser Preis für einen Elektroplan ist ein projektspezifisches Angebot. Trenne Aufnahme, Zeichnung, Fachprüfung, Arbeiten und Kontrolle, bewerte auch deine eigene Zeit und vergleiche gleiche Leistungen. PlanElec strukturiert die Dokumentation und kostet im Early Access nichts; Fachplanung, Ausführung und Kontrolle bleiben eigene Positionen.",[16,1009,1010],{},[42,1011,1012],{"href":488},"Projekt im kostenlosen Early Access anlegen →",{"title":491,"searchDepth":492,"depth":492,"links":1014},[1015,1016,1017,1018,1024,1025,1026,1027,1028,1036],{"id":558,"depth":492,"text":559},{"id":577,"depth":492,"text":578},{"id":672,"depth":492,"text":673},{"id":772,"depth":492,"text":773,"children":1019},[1020,1021,1022,1023],{"id":795,"depth":500,"text":796},{"id":802,"depth":500,"text":803},{"id":809,"depth":500,"text":810},{"id":820,"depth":500,"text":821},{"id":831,"depth":492,"text":832},{"id":897,"depth":492,"text":898},{"id":916,"depth":492,"text":917},{"id":943,"depth":492,"text":944},{"id":953,"depth":492,"text":954,"children":1029},[1030,1031,1032,1033,1034,1035],{"id":957,"depth":500,"text":958},{"id":964,"depth":500,"text":965},{"id":971,"depth":500,"text":972},{"id":978,"depth":500,"text":979},{"id":989,"depth":500,"text":990},{"id":996,"depth":500,"text":997},{"id":1003,"depth":492,"text":1004},"Was den Preis eines belgischen Elektroplans bestimmt, wie du Angebote mit einem editierbaren Rechenmodell vergleichst und was PlanElec im Early Access und nach dem Tarifstart kostet.","de",{},"\u002Fblog\u002Felectrical-plan-costs.de",{"title":553,"description":1037},"elektroplan-kosten","blog\u002Felectrical-plan-costs.de",[534,535,547,1045,718,1046,844,1047,1048,1049,1050,1051,1052,536,1053],"Eendraadschema","Kosten","Elektroplan","Stromabnahme","Keuring","Elektriker","Immobilienverkauf","Belgien","plan de situation","gxw3S8MCRUJI2DvPRcGWNGCzrqfxKXjgKIPCZL3pbo4",{"id":1056,"title":1057,"articleId":6,"body":1058,"category":517,"date":518,"description":1536,"extension":520,"image":25,"lastUpdated":521,"locale":1537,"meta":1538,"navigation":524,"ogImage":525,"path":1539,"publishDate":527,"readTime":528,"refreshInterval":529,"seo":1540,"seoTitle":527,"slug":6,"stem":1541,"tags":1542,"__hash__":1552},"blog\u002Fblog\u002Felectrical-plan-costs.en.md","How Much Does an Electrical Plan Cost? Cost Factors 2026",{"type":8,"value":1059,"toc":1512},[1060,1064,1067,1072,1079,1083,1096,1099,1167,1170,1174,1177,1271,1275,1278,1283,1286,1291,1294,1298,1301,1305,1308,1312,1319,1323,1330,1334,1393,1396,1400,1403,1415,1419,1442,1446,1449,1452,1456,1460,1463,1467,1470,1474,1477,1481,1488,1492,1495,1499,1502,1504,1507],[11,1061,1063],{"id":1062},"short-answer-the-price-follows-the-scope-of-work","Short answer: the price follows the scope of work",[16,1065,1066],{},"Belgium has no official flat rate for a single-line diagram and situation plan. The price comes from the specific job: is there a reliable survey, or does the installation have to be traced on site? Are only the two plans drawn, or do calculations, corrective work, a technical review and the official inspection belong to the job? A price range found online without a named sample, date, region and VAT status does not answer those questions.",[16,1068,1069],{},[22,1070],{"alt":1071,"src":25},"Electrical planning and project documents at a table.",[16,1073,1074,1075,1078],{},"So compare ",[30,1076,1077],{},"the same result for the same scope",", not a software price against an electrician’s invoice. PlanElec costs EUR 0 during early access; after the paid plans start, single property costs EUR 12 per property and Pro EUR 24 per month (the price stays for as long as the subscription runs without a break), excluding VAT. Your own time, measurements, materials, work on the installation, technical support and the inspection by an approved body are costed separately.",[11,1080,1082],{"id":1081},"which-documents-are-officially-required","Which documents are officially required?",[16,1084,1085,1086,1090,1091,1095],{},"The Belgian FPS Economy states that a domestic inspection requires at least the single-line diagram, the situation plan and, when available, the connection’s EAN code. The single-line diagram records cables, installation method, RCDs, overcurrent protection, switches, boxes, socket outlets, lighting points, fixed appliances and sources (AREI\u002FRGIE Book 1 V06, Subsection 3.1.2.2 a). The situation plan shows where those items are (Subsection 3.1.2.3 a). Together with the inspection reports, they form the installation file (Section 9.1.2). The primary sources are the ",[42,1087,1089],{"href":44,"rel":1088},[46],"official federal domestic-inspection guidance"," and ",[42,1092,1094],{"href":51,"rel":1093},[46],"AREI\u002FRGIE Book 1 version 06","; this English article summarises the official national-language material.",[16,1097,1098],{},"Which documents you need depends on the occasion:",[59,1100,1101,1112],{},[62,1102,1103],{},[65,1104,1105,1107,1109],{},[68,1106,70],{},[68,1108,73],{},[68,1110,1111],{},"Reference",[78,1113,1114,1125,1135,1145,1156],{},[65,1115,1116,1119,1122],{},[83,1117,1118],{},"New installation",[83,1120,1121],{},"single-line diagram, situation plan, conformity inspection before use",[83,1123,1124],{},"3.1.2.1 a, Chapter 6.4",[65,1126,1127,1130,1133],{},[83,1128,1129],{},"Substantial alteration or extension",[83,1131,1132],{},"updated plans; inspection of the modified and added parts",[83,1134,633],{},[65,1136,1137,1140,1143],{},[83,1138,1139],{},"Non-substantial alteration",[83,1141,1142],{},"dated, signed short description; situation plan shows the current state",[83,1144,644],{},[65,1146,1147,1150,1153],{},[83,1148,1149],{},"Sale of a dwelling with an old installation",[83,1151,1152],{},"inspection visit; existing file made available",[83,1154,1155],{},"Section 8.4.2",[65,1157,1158,1161,1164],{},[83,1159,1160],{},"Supply capacity increase for an old installation",[83,1162,1163],{},"inspection visit before the increase",[83,1165,1166],{},"Section 8.4.1",[16,1168,1169],{},"If the single-line diagram and situation plan are missing at the inspection visit on sale, the approved body draws up a brief description and a rough sketch. These do not replace the plans, and the absence is recorded as an infringement in the report (Subsection 8.4.2.2 d). If you are selling, plan the drawings in good time.",[11,1171,1173],{"id":1172},"define-the-scope-before-the-price","Define the scope before the price",[16,1175,1176],{},"A quotation becomes comparable once every item is described. This list stops a cheap drawing quote from growing later with necessary work.",[59,1178,1179,1189],{},[62,1180,1181],{},[65,1182,1183,1186],{},[68,1184,1185],{},"Component",[68,1187,1188],{},"What is explicitly agreed",[78,1190,1191,1199,1207,1215,1223,1231,1239,1247,1255,1263],{},[65,1192,1193,1196],{},[83,1194,1195],{},"Survey",[83,1197,1198],{},"Are rooms, loads, boxes, cable routes and boards surveyed on site, or do you supply verified data?",[65,1200,1201,1204],{},[83,1202,1203],{},"Circuit tracing",[83,1205,1206],{},"Are the assignments known, or must they be established by switching, measuring and opening suitable points?",[65,1208,1209,1212],{},[83,1210,1211],{},"Single-line diagram",[83,1213,1214],{},"Are all protective devices, conductor data, installation methods, sources and fixed appliances included?",[65,1216,1217,1220],{},[83,1218,1219],{},"Situation plan",[83,1221,1222],{},"Is there a usable floor plan, and are the references to the circuits unambiguous?",[65,1224,1225,1228],{},[83,1226,1227],{},"Calculations",[83,1229,1230],{},"Are sizing, short-circuit, selectivity or voltage-drop calculations part of the job?",[65,1232,1233,1236],{},[83,1234,1235],{},"Technical review",[83,1237,1238],{},"Does a qualified electrician check the as-built state and technical plausibility, or is it drawing only?",[65,1240,1241,1244],{},[83,1242,1243],{},"Corrective work",[83,1245,1246],{},"Is work on the board, cables or equipment included?",[65,1248,1249,1252],{},[83,1250,1251],{},"Inspection appointment",[83,1253,1254],{},"Is the approved body’s fee included or separate?",[65,1256,1257,1260],{},[83,1258,1259],{},"Revisions",[83,1261,1262],{},"How many technically justified correction rounds are included?",[65,1264,1265,1268],{},[83,1266,1267],{},"VAT and travel",[83,1269,1270],{},"Does the amount include VAT, travel and any extra appointments?",[11,1272,1274],{"id":1273},"an-editable-calculation-model-instead-of-invented-market-prices","An editable calculation model instead of invented market prices",[16,1276,1277],{},"Enter only values that come from your quotation or your own time estimate:",[16,1279,1280],{},[250,1281,1282],{},"Total scenario = survey + drawing + technical review + corrective work + inspection + travel + own time",[16,1284,1285],{},"Value your own work with a personal comparison rate:",[16,1287,1288],{},[250,1289,1290],{},"valued own time = documented hours × personal comparison rate per hour",[16,1292,1293],{},"That rate is not a Belgian market tariff. It shows that a weekend of work is not economically free. Conversely, an external flat fee is not expensive if survey, measurement, technical responsibility and revisions are included.",[265,1295,1297],{"id":1296},"scenario-a-complete-data-is-available","Scenario A: complete data is available",[16,1299,1300],{},"The board is clearly labelled, circuit assignments are checked, a scaled floor plan exists and the protective-device data is legible. The work then consists mainly of taking over data, checking plausibility and drawing. PlanElec provides the shared project model of floor plan, topology and board plus the PDF output; an electrician checks the data in a targeted way.",[265,1302,1304],{"id":1303},"scenario-b-old-installation-without-reliable-records","Scenario B: old installation without reliable records",[16,1306,1307],{},"If cross-sections, installation methods or assignments are unknown, drawing is the last step. First a competent person surveys the installation safely; opening enclosures, measuring and intervening belong in professional hands. Here the survey often costs more than producing the plans, and that is exactly the item that must appear clearly in the quotation.",[265,1309,1311],{"id":1310},"scenario-c-renovation-with-open-design-decisions","Scenario C: renovation with open design decisions",[16,1313,1314,1315,54],{},"For new circuits, PV, a home battery, an EV charger, a heat pump or board changes, the technical design is settled first; the diagram documents that decision. Ask for a quotation that separates design, manufacturer data, grid operator conditions, execution and inspection. You will then see later which item changed. Which renovation triggers new plans is explained in ",[42,1316,1318],{"href":1317},"\u002Fen\u002Fblog\u002Frenovation-electrical-plans","Renovation and AREI",[265,1320,1322],{"id":1321},"scenario-d-sale-with-a-deadline","Scenario D: sale with a deadline",[16,1324,1325,1326,54],{},"Time pressure alone does not justify an express surcharge. Ask for a written quotation with delivery date, prerequisites and correction process. Agree who books the inspection visit and which existing reports belong in the file. A hastily drawn plan that does not show the as-built state does not solve the documentation problem. More in ",[42,1327,1329],{"href":1328},"\u002Fen\u002Fblog\u002Fproperty-sale-electrical-dossier","Electrical dossier for property sales",[11,1331,1333],{"id":1332},"what-does-planelec-cost","What does PlanElec cost?",[59,1335,1336,1349],{},[62,1337,1338],{},[65,1339,1340,1343,1346],{},[68,1341,1342],{},"Plan",[68,1344,1345],{},"Price",[68,1347,1348],{},"Scope",[78,1350,1351,1362,1372,1383],{},[65,1352,1353,1356,1359],{},[83,1354,1355],{},"Early access",[83,1357,1358],{},"EUR 0 until the paid plans start",[83,1360,1361],{},"full feature set, no invoice",[65,1363,1364,1366,1369],{},[83,1365,337],{},[83,1367,1368],{},"EUR 0, permanently",[83,1370,1371],{},"complete planning with no project or circuit limit; exports with masked areas over the usable figures",[65,1373,1374,1377,1380],{},[83,1375,1376],{},"Single property",[83,1378,1379],{},"EUR 12 per property, one-off",[83,1381,1382],{},"all documents without masked areas for exactly one confirmed property address",[65,1384,1385,1387,1390],{},[83,1386,359],{},[83,1388,1389],{},"EUR 24 per month or EUR 240 per year; the price stays for as long as the subscription runs",[83,1391,1392],{},"all projects and documents without masked areas, three editing seats, each extra seat EUR 5 per month or EUR 50 per year",[16,1394,1395],{},"All prices exclude 21 % VAT; single property therefore costs EUR 14.52 including VAT. At two properties a month, two single-property purchases cost as much as Pro (EUR 24); from three properties a month, Pro is cheaper. We will announce the start date of the paid plans well in advance. If you register before the start, you use PlanElec free of charge for the first full calendar month after the start. Registration, login and invitations never cost anything; costs only arise from an explicit booking.",[11,1397,1399],{"id":1398},"what-planelec-contributes-today","What PlanElec contributes today",[16,1401,1402],{},"PlanElec brings floor plan, electrical topology and board planning together in one project. The single-line diagram and situation plan are exported as PDFs, as is a compiled installation dossier with cover sheet and document index. The AREI\u002FRGIE self-check evaluates the supported rules that can be decided from your data and shows data gaps. The detailed, manufacturer-neutral material list is available as a pilot feature; it is not an order release.",[16,1404,1405,1406,1410,1411,54],{},"The roles are therefore clear: PlanElec produces the plans from your project model and keeps the documents consistent. The on-site survey, technical design and installation stay with the electrician, and the approved body writes the inspection report. Whether that pays off for you depends on how complete your project data already is. Everything PlanElec can do is covered in ",[42,1407,1409],{"href":1408},"\u002Fen\u002Fblog\u002Fwhat-can-you-do-with-planelec","What you can do with PlanElec","; how it compares with Excel and paper is explained in ",[42,1412,1414],{"href":1413},"\u002Fen\u002Fblog\u002Fplanelec-vs-excel-paper","PlanElec compared with Excel and paper",[11,1416,1418],{"id":1417},"how-to-obtain-comparable-quotations","How to obtain comparable quotations",[393,1420,1421,1424,1427,1430,1433,1436,1439],{},[396,1422,1423],{},"Describe the building, supply, number of boards and known circuits.",[396,1425,1426],{},"Mention special sources and loads such as PV, battery, EV charger or heat pump.",[396,1428,1429],{},"Share existing plans and inspection reports without guessing unknown data.",[396,1431,1432],{},"Ask for separate items for survey, drawing, technical review, execution and inspection.",[396,1434,1435],{},"Ask about VAT, travel, delivery format and correction rounds.",[396,1437,1438],{},"Compare not only the total but also responsibility and coverage.",[396,1440,1441],{},"After changes, document the as-built state and keep the documents in the installation file.",[11,1443,1445],{"id":1444},"agree-handover-and-revision-as-a-separate-service","Agree handover and revision as a separate service",[16,1447,1448],{},"A good quotation states not only “plan as PDF” but the handed-over working state. Agree which existing documents were checked, which data you supplied and which unknowns remain open. Record how many correction rounds are included, who reports changes after the site work and which file version then counts as the as-built state.",[16,1450,1451],{},"A short checklist helps at handover: do the circuit references match between board, single-line diagram and situation plan? Have new and removed devices been updated? Are assumptions marked as assumptions? Are datasheets and measurement records with the responsible party? Only this handover makes drawing, technical review and later maintenance comparable. A low quotation without agreed revisions quickly becomes more expensive at the next change.",[11,1453,1455],{"id":1454},"frequently-asked-questions","Frequently asked questions",[265,1457,1459],{"id":1458},"which-data-should-i-gather-before-asking-for-a-quotation","Which data should I gather before asking for a quotation?",[16,1461,1462],{},"Start with everything visible without intervention: address and supply type, number and location of boards, legible ratings of RCDs and circuit breakers, circuit names, floor plan, earlier diagrams and inspection reports. Record fixed loads and sources separately. Mark unknown values explicitly as unknown. An invented cross-section makes a drawing look complete and technically worthless. Photos help with preparation; they do not replace safely establishing concealed cable data.",[265,1464,1466],{"id":1465},"which-services-must-not-disappear-into-a-plan-price","Which services must not disappear into a “plan price”?",[16,1468,1469],{},"Changes to the installation, fault finding, measurement reports, sizing according to manufacturer conditions and resolving an inspection finding are separate services. Grid operator procedures for generation or storage do not run automatically either. If these steps are needed, they appear as separate items with result, responsible party and deadline. That protects both sides: you see what is delivered, and the contractor takes no responsibility for parts that were not ordered.",[265,1471,1473],{"id":1472},"how-do-i-handle-changes-after-the-first-export","How do I handle changes after the first export?",[16,1475,1476],{},"Keep a traceable baseline version, enter confirmed changes in the project and situation plan and have technical changes checked. Record not just “kitchen changed” but which circuit, protective device, cable and points the change affects. The next correction round then stays a limited update rather than a new survey.",[265,1478,1480],{"id":1479},"may-i-draw-the-diagram-myself","May I draw the diagram myself?",[16,1482,1483,1484,54],{},"The AREI states who draws up the single-line diagram: the person responsible for carrying out the work (Subsection 3.1.2.1 a). What matters is that the documents show the actual state correctly and are available during the inspection. Drawing yourself is not installing yourself: surveying live parts and installation work stay with professionals. A side-by-side comparison of both routes is in the ",[42,1485,1487],{"href":1486},"\u002Fen\u002Fblog\u002Fcost-comparison-diy-vs-electrician","cost comparison: DIY or electrician",[265,1489,1491],{"id":1490},"does-a-planelec-pdf-mean-the-installation-is-compliant","Does a PlanElec PDF mean the installation is compliant?",[16,1493,1494],{},"No. The PDF documents your project data, and the self-check tests the supported rules on an indicative basis. Whether the inspected installation meets the regulations is established by the approved body in the prescribed procedure.",[265,1496,1498],{"id":1497},"what-is-the-main-cost-driver","What is the main cost driver?",[16,1500,1501],{},"Not floor area, but uncertainty about the as-built state and the agreed scope. Known, verified data reduces survey effort; unknown cables, several boards or technical changes increase it.",[11,1503,480],{"id":479},[16,1505,1506],{},"A sound price for an electrical plan is a project-specific quotation. Separate survey, drawing, technical review, work and inspection, value your own time too and compare equivalent services. PlanElec structures the documentation and costs nothing during early access; technical design, installation and inspection remain separate items.",[16,1508,1509],{},[42,1510,1511],{"href":488},"Create a project in the free early access →",{"title":491,"searchDepth":492,"depth":492,"links":1513},[1514,1515,1516,1517,1523,1524,1525,1526,1527,1535],{"id":1062,"depth":492,"text":1063},{"id":1081,"depth":492,"text":1082},{"id":1172,"depth":492,"text":1173},{"id":1273,"depth":492,"text":1274,"children":1518},[1519,1520,1521,1522],{"id":1296,"depth":500,"text":1297},{"id":1303,"depth":500,"text":1304},{"id":1310,"depth":500,"text":1311},{"id":1321,"depth":500,"text":1322},{"id":1332,"depth":492,"text":1333},{"id":1398,"depth":492,"text":1399},{"id":1417,"depth":492,"text":1418},{"id":1444,"depth":492,"text":1445},{"id":1454,"depth":492,"text":1455,"children":1528},[1529,1530,1531,1532,1533,1534],{"id":1458,"depth":500,"text":1459},{"id":1465,"depth":500,"text":1466},{"id":1472,"depth":500,"text":1473},{"id":1479,"depth":500,"text":1480},{"id":1490,"depth":500,"text":1491},{"id":1497,"depth":500,"text":1498},{"id":479,"depth":492,"text":480},"What drives the price of a Belgian electrical plan, how to compare quotations with an editable calculation model and what PlanElec costs during early access and after the paid plans start.","en",{},"\u002Fblog\u002Felectrical-plan-costs.en",{"title":1057,"description":1536},"blog\u002Felectrical-plan-costs.en",[534,535,548,537,547,536,1543,539,1053,1544,1545,1546,1547,1548,1549,1550,1551],"situation plan","cost","price","electrical plan","inspection","keuring","electrician","property sale","Belgium","VP2FqWknK99ClUZvhCQ6Cr8dwRpzFfcJSXVHFZsv70g",{"id":4,"title":5,"articleId":6,"body":1554,"category":517,"date":518,"description":519,"extension":520,"image":25,"lastUpdated":521,"locale":522,"meta":1892,"navigation":524,"ogImage":525,"path":526,"publishDate":527,"readTime":528,"refreshInterval":529,"seo":1893,"seoTitle":527,"slug":531,"stem":532,"tags":1894,"__hash__":549},{"type":8,"value":1555,"toc":1868},[1556,1558,1560,1564,1568,1570,1578,1580,1634,1636,1638,1640,1712,1714,1716,1720,1722,1726,1728,1730,1732,1734,1736,1738,1742,1744,1748,1750,1796,1798,1800,1802,1808,1810,1826,1828,1830,1832,1834,1836,1838,1840,1842,1844,1846,1848,1852,1854,1856,1858,1860,1862,1864],[11,1557,14],{"id":13},[16,1559,18],{},[16,1561,1562],{},[22,1563],{"alt":24,"src":25},[16,1565,28,1566,33],{},[30,1567,32],{},[11,1569,37],{"id":36},[16,1571,40,1572,48,1575,54],{},[42,1573,47],{"href":44,"rel":1574},[46],[42,1576,53],{"href":51,"rel":1577},[46],[16,1579,57],{},[59,1581,1582,1592],{},[62,1583,1584],{},[65,1585,1586,1588,1590],{},[68,1587,70],{},[68,1589,73],{},[68,1591,76],{},[78,1593,1594,1602,1610,1618,1626],{},[65,1595,1596,1598,1600],{},[83,1597,85],{},[83,1599,88],{},[83,1601,91],{},[65,1603,1604,1606,1608],{},[83,1605,96],{},[83,1607,99],{},[83,1609,102],{},[65,1611,1612,1614,1616],{},[83,1613,107],{},[83,1615,110],{},[83,1617,113],{},[65,1619,1620,1622,1624],{},[83,1621,118],{},[83,1623,121],{},[83,1625,124],{},[65,1627,1628,1630,1632],{},[83,1629,129],{},[83,1631,132],{},[83,1633,135],{},[16,1635,138],{},[11,1637,142],{"id":141},[16,1639,145],{},[59,1641,1642,1650],{},[62,1643,1644],{},[65,1645,1646,1648],{},[68,1647,154],{},[68,1649,157],{},[78,1651,1652,1658,1664,1670,1676,1682,1688,1694,1700,1706],{},[65,1653,1654,1656],{},[83,1655,164],{},[83,1657,167],{},[65,1659,1660,1662],{},[83,1661,172],{},[83,1663,175],{},[65,1665,1666,1668],{},[83,1667,180],{},[83,1669,183],{},[65,1671,1672,1674],{},[83,1673,188],{},[83,1675,191],{},[65,1677,1678,1680],{},[83,1679,196],{},[83,1681,199],{},[65,1683,1684,1686],{},[83,1685,204],{},[83,1687,207],{},[65,1689,1690,1692],{},[83,1691,212],{},[83,1693,215],{},[65,1695,1696,1698],{},[83,1697,220],{},[83,1699,223],{},[65,1701,1702,1704],{},[83,1703,228],{},[83,1705,231],{},[65,1707,1708,1710],{},[83,1709,236],{},[83,1711,239],{},[11,1713,243],{"id":242},[16,1715,246],{},[16,1717,1718],{},[250,1719,252],{},[16,1721,255],{},[16,1723,1724],{},[250,1725,260],{},[16,1727,263],{},[265,1729,268],{"id":267},[16,1731,271],{},[265,1733,275],{"id":274},[16,1735,278],{},[265,1737,282],{"id":281},[16,1739,285,1740,54],{},[42,1741,289],{"href":288},[265,1743,293],{"id":292},[16,1745,296,1746,54],{},[42,1747,300],{"href":299},[11,1749,304],{"id":303},[59,1751,1752,1762],{},[62,1753,1754],{},[65,1755,1756,1758,1760],{},[68,1757,313],{},[68,1759,316],{},[68,1761,319],{},[78,1763,1764,1772,1780,1788],{},[65,1765,1766,1768,1770],{},[83,1767,326],{},[83,1769,329],{},[83,1771,332],{},[65,1773,1774,1776,1778],{},[83,1775,337],{},[83,1777,340],{},[83,1779,343],{},[65,1781,1782,1784,1786],{},[83,1783,348],{},[83,1785,351],{},[83,1787,354],{},[65,1789,1790,1792,1794],{},[83,1791,359],{},[83,1793,362],{},[83,1795,365],{},[16,1797,368],{},[11,1799,372],{"id":371},[16,1801,375],{},[16,1803,378,1804,383,1806,54],{},[42,1805,382],{"href":381},[42,1807,387],{"href":386},[11,1809,391],{"id":390},[393,1811,1812,1814,1816,1818,1820,1822,1824],{},[396,1813,398],{},[396,1815,401],{},[396,1817,404],{},[396,1819,407],{},[396,1821,410],{},[396,1823,413],{},[396,1825,416],{},[11,1827,420],{"id":419},[16,1829,423],{},[16,1831,426],{},[11,1833,430],{"id":429},[265,1835,434],{"id":433},[16,1837,437],{},[265,1839,441],{"id":440},[16,1841,444],{},[265,1843,448],{"id":447},[16,1845,451],{},[265,1847,455],{"id":454},[16,1849,458,1850,54],{},[42,1851,462],{"href":461},[265,1853,466],{"id":465},[16,1855,469],{},[265,1857,473],{"id":472},[16,1859,476],{},[11,1861,480],{"id":479},[16,1863,483],{},[16,1865,1866],{},[42,1867,489],{"href":488},{"title":491,"searchDepth":492,"depth":492,"links":1869},[1870,1871,1872,1873,1879,1880,1881,1882,1883,1891],{"id":13,"depth":492,"text":14},{"id":36,"depth":492,"text":37},{"id":141,"depth":492,"text":142},{"id":242,"depth":492,"text":243,"children":1874},[1875,1876,1877,1878],{"id":267,"depth":500,"text":268},{"id":274,"depth":500,"text":275},{"id":281,"depth":500,"text":282},{"id":292,"depth":500,"text":293},{"id":303,"depth":492,"text":304},{"id":371,"depth":492,"text":372},{"id":390,"depth":492,"text":391},{"id":419,"depth":492,"text":420},{"id":429,"depth":492,"text":430,"children":1884},[1885,1886,1887,1888,1889,1890],{"id":433,"depth":500,"text":434},{"id":440,"depth":500,"text":441},{"id":447,"depth":500,"text":448},{"id":454,"depth":500,"text":455},{"id":465,"depth":500,"text":466},{"id":472,"depth":500,"text":473},{"id":479,"depth":492,"text":480},{},{"title":5,"description":519},[534,535,536,537,538,539,540,541,542,543,544,545,546,547,548],{"id":1896,"title":1897,"articleId":6,"body":1898,"category":517,"date":518,"description":2377,"extension":520,"image":25,"lastUpdated":521,"locale":2378,"meta":2379,"navigation":524,"ogImage":525,"path":2380,"publishDate":527,"readTime":528,"refreshInterval":529,"seo":2381,"seoTitle":527,"slug":2382,"stem":2383,"tags":2384,"__hash__":2392},"blog\u002Fblog\u002Felectrical-plan-costs.nl.md","Wat kost een elektriciteitsplan? Kostenfactoren 2026",{"type":8,"value":1899,"toc":2353},[1900,1904,1907,1912,1919,1923,1936,1939,2009,2012,2016,2019,2112,2116,2119,2124,2127,2132,2135,2139,2142,2146,2149,2153,2160,2164,2171,2175,2232,2235,2239,2242,2254,2258,2281,2285,2288,2291,2295,2299,2302,2306,2309,2313,2316,2320,2327,2331,2334,2338,2341,2345,2348],[11,1901,1903],{"id":1902},"kort-antwoord-de-prijs-volgt-de-omvang-van-de-opdracht","Kort antwoord: de prijs volgt de omvang van de opdracht",[16,1905,1906],{},"Een officieel Belgisch forfait voor eendraadschema en situatieplan bestaat niet. De prijs volgt uit de concrete opdracht: is er een betrouwbare opname, of moet de installatie ter plaatse worden nagegaan? Worden alleen de twee plannen getekend, of horen berekeningen, herstellingen, een technische controle en de officiële keuring erbij? Een prijsvork online zonder steekproef, datum, regio en btw-status beantwoordt die vragen niet.",[16,1908,1909],{},[22,1910],{"alt":1911,"src":25},"Elektrische planning en projectdocumenten op een tafel.",[16,1913,1914,1915,1918],{},"Vergelijk daarom ",[30,1916,1917],{},"hetzelfde resultaat met dezelfde omvang",", niet een softwareprijs met een factuur van de elektricien. PlanElec kost in Early Access 0 EUR; na de start van de tarieven is er eenmalig gebruik voor 12 EUR per pand of Pro voor 24 EUR per maand (de prijs blijft zolang het abonnement zonder onderbreking loopt), telkens exclusief btw. Je eigen tijd, metingen, materiaal, werken aan de installatie, technische begeleiding en de keuring door een erkend organisme reken je apart.",[11,1920,1922],{"id":1921},"welke-documenten-zijn-officieel-vereist","Welke documenten zijn officieel vereist?",[16,1924,1925,1926,1931,1932,54],{},"De FOD Economie vermeldt dat bij een huishoudelijke controle minstens het eendraadschema, het situatieplan en, indien beschikbaar, de EAN-code worden voorgelegd. Het eendraadschema toont onder meer leidingen en plaatsingswijze, differentieelschakelaars, overstroombeveiliging, schakelaars, dozen, contactdozen, lichtpunten, vaste toestellen en bronnen (AREI\u002FRGIE Boek 1 V06, onderafdeling 3.1.2.2 a). Het situatieplan toont waar die elementen zich bevinden (onderafdeling 3.1.2.3 a). Samen met de controleverslagen horen ze in het dossier van de installatie (afdeling 9.1.2). Primaire bronnen zijn de ",[42,1927,1930],{"href":1928,"rel":1929},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fthemas\u002Fenergie\u002Fbronnen-en-dragers-van-energie\u002Felektriciteit\u002Fveiligheid-en-controle-van\u002Fcontrole-van-huishoudelijke",[46],"officiële pagina over huishoudelijke controles"," en ",[42,1933,1935],{"href":51,"rel":1934},[46],"AREI Boek 1 versie 06",[16,1937,1938],{},"Welke documenten je nodig hebt, hangt af van de aanleiding:",[59,1940,1941,1954],{},[62,1942,1943],{},[65,1944,1945,1948,1951],{},[68,1946,1947],{},"Aanleiding",[68,1949,1950],{},"Documenten",[68,1952,1953],{},"Bron",[78,1955,1956,1967,1977,1987,1998],{},[65,1957,1958,1961,1964],{},[83,1959,1960],{},"Nieuwe installatie",[83,1962,1963],{},"eendraadschema, situatieplan, gelijkvormigheidscontrole vóór ingebruikname",[83,1965,1966],{},"3.1.2.1 a, hfst. 6.4",[65,1968,1969,1972,1975],{},[83,1970,1971],{},"Belangrijke wijziging of uitbreiding",[83,1973,1974],{},"bijgewerkte plannen; controle van gewijzigde en toegevoegde delen",[83,1976,633],{},[65,1978,1979,1982,1985],{},[83,1980,1981],{},"Niet-belangrijke wijziging",[83,1983,1984],{},"gedateerde, ondertekende bondige beschrijving; situatieplan toont de toestand",[83,1986,644],{},[65,1988,1989,1992,1995],{},[83,1990,1991],{},"Verkoop van een woning met oude installatie",[83,1993,1994],{},"controlebezoek; bestaand dossier ter beschikking stellen",[83,1996,1997],{},"afdeling 8.4.2",[65,1999,2000,2003,2006],{},[83,2001,2002],{},"Verhoging van het aansluitvermogen, oude installatie",[83,2004,2005],{},"controlebezoek vóór de verhoging",[83,2007,2008],{},"afdeling 8.4.1",[16,2010,2011],{},"Ontbreken eendraadschema en situatieplan bij het controlebezoek voor een verkoop, dan maakt het erkend organisme een korte beschrijving en een ruwe schets. Die vervangen de plannen niet, en het ontbreken wordt in het verslag als inbreuk genoteerd (onderafdeling 8.4.2.2 d). Wie verkoopt, plant de plannen dus tijdig in.",[11,2013,2015],{"id":2014},"leg-de-omvang-vast-vóór-de-prijs","Leg de omvang vast vóór de prijs",[16,2017,2018],{},"Een offerte wordt vergelijkbaar wanneer elke post beschreven is. Met deze lijst voorkom je dat een goedkope tekenofferte later groeit met noodzakelijk werk.",[59,2020,2021,2031],{},[62,2022,2023],{},[65,2024,2025,2028],{},[68,2026,2027],{},"Onderdeel",[68,2029,2030],{},"Wat uitdrukkelijk wordt afgesproken",[78,2032,2033,2041,2049,2056,2064,2072,2080,2088,2096,2104],{},[65,2034,2035,2038],{},[83,2036,2037],{},"Opname",[83,2039,2040],{},"Worden ruimten, verbruikers, dozen, leidingtrajecten en borden ter plaatse opgenomen, of lever jij geverifieerde gegevens?",[65,2042,2043,2046],{},[83,2044,2045],{},"Kringen nagaan",[83,2047,2048],{},"Zijn de toewijzingen gekend, of moeten ze via schakelen, meten en openen van geschikte punten worden bepaald?",[65,2050,2051,2053],{},[83,2052,1045],{},[83,2054,2055],{},"Staan alle beveiligingen, geleidergegevens, plaatsingswijzen, bronnen en vaste toestellen erop?",[65,2057,2058,2061],{},[83,2059,2060],{},"Situatieplan",[83,2062,2063],{},"Is er een bruikbaar grondplan en zijn de verwijzingen naar de kringen eenduidig?",[65,2065,2066,2069],{},[83,2067,2068],{},"Berekeningen",[83,2070,2071],{},"Horen dimensionering, kortsluit-, selectiviteits- of spanningsvalberekeningen bij de opdracht?",[65,2073,2074,2077],{},[83,2075,2076],{},"Technische controle",[83,2078,2079],{},"Controleert een vakman de werkelijke toestand en de technische plausibiliteit, of wordt alleen getekend?",[65,2081,2082,2085],{},[83,2083,2084],{},"Herstellingen",[83,2086,2087],{},"Zijn werken aan bord, leidingen of materieel inbegrepen?",[65,2089,2090,2093],{},[83,2091,2092],{},"Keuringsafspraak",[83,2094,2095],{},"Is de vergoeding van het erkend organisme inbegrepen of apart?",[65,2097,2098,2101],{},[83,2099,2100],{},"Nabewerking",[83,2102,2103],{},"Hoeveel technisch onderbouwde correctierondes zijn inbegrepen?",[65,2105,2106,2109],{},[83,2107,2108],{},"Btw en verplaatsing",[83,2110,2111],{},"Is het bedrag inclusief btw, verplaatsing en eventuele extra afspraken?",[11,2113,2115],{"id":2114},"een-aanpasbaar-rekenmodel-in-plaats-van-verzonnen-marktprijzen","Een aanpasbaar rekenmodel in plaats van verzonnen marktprijzen",[16,2117,2118],{},"Vul alleen waarden in die uit je offerte of je eigen tijdsinschatting komen:",[16,2120,2121],{},[250,2122,2123],{},"Totaalscenario = opname + tekenwerk + technische controle + herstellingen + keuring + verplaatsing + eigen tijd",[16,2125,2126],{},"Eigen werk waardeer je met een persoonlijke vergelijkingswaarde:",[16,2128,2129],{},[250,2130,2131],{},"gewaardeerde eigen tijd = gedocumenteerde uren × eigen vergelijkingswaarde per uur",[16,2133,2134],{},"Die vergelijkingswaarde is geen Belgisch markttarief. Ze toont dat een weekend werk economisch niet automatisch gratis is. Omgekeerd is een extern forfait niet duur wanneer opname, meting, technische verantwoordelijkheid en nabewerking erin zitten.",[265,2136,2138],{"id":2137},"scenario-a-alle-gegevens-zijn-beschikbaar","Scenario A: alle gegevens zijn beschikbaar",[16,2140,2141],{},"Het bord is netjes gelabeld, de kringtoewijzing gecontroleerd, er is een grondplan op schaal en de kenmerken van de beveiligingen zijn leesbaar. Dan bestaat het werk vooral uit gegevens overnemen, plausibiliteit controleren en tekenen. PlanElec levert daarvoor het gedeelde projectmodel van grondplan, topologie en bord en de pdf-uitvoer; een elektricien controleert gericht de gegevens.",[265,2143,2145],{"id":2144},"scenario-b-oude-installatie-zonder-betrouwbare-documenten","Scenario B: oude installatie zonder betrouwbare documenten",[16,2147,2148],{},"Zijn doorsneden, plaatsingswijzen of toewijzingen onbekend, dan is tekenen de laatste stap. Eerst neemt een bekwame persoon de installatie veilig op; behuizingen openen, metingen en ingrepen horen in vakkundige handen. Hier kost de opname vaak meer dan het opstellen van de plannen, en precies die post hoort duidelijk in de offerte.",[265,2150,2152],{"id":2151},"scenario-c-renovatie-met-open-ontwerpbeslissingen","Scenario C: renovatie met open ontwerpbeslissingen",[16,2154,2155,2156,54],{},"Bij nieuwe kringen, PV, thuisbatterij, laadpaal, warmtepomp of wijzigingen aan het bord ligt eerst het technische ontwerp vast; het schema documenteert die beslissing. Vraag een offerte die ontwerp, fabrikantgegevens, voorwaarden van de netbeheerder, uitvoering en keuring scheidt. Zo zie je later welke post veranderde. Welke renovatie nieuwe plannen vraagt, lees je in ",[42,2157,2159],{"href":2158},"\u002Fblog\u002Frenovatie-arei-elektrische-plannen","Renovatie en AREI",[265,2161,2163],{"id":2162},"scenario-d-verkoop-met-deadline","Scenario D: verkoop met deadline",[16,2165,2166,2167,54],{},"Tijdsdruk alleen rechtvaardigt geen spoedtoeslag. Vraag een schriftelijke offerte met leverdatum, voorwaarden en correctieproces. Spreek af wie het controlebezoek aanvraagt en welke bestaande verslagen in het dossier horen. Een snel getekend plan dat de werkelijke toestand niet toont, lost het documentatieprobleem niet op. Meer daarover in ",[42,2168,2170],{"href":2169},"\u002Fblog\u002Felektrisch-dossier-woningverkoop","Elektrisch dossier bij woningverkoop",[11,2172,2174],{"id":2173},"wat-kost-planelec","Wat kost PlanElec?",[59,2176,2177,2189],{},[62,2178,2179],{},[65,2180,2181,2183,2186],{},[68,2182,313],{},[68,2184,2185],{},"Prijs",[68,2187,2188],{},"Omvang",[78,2190,2191,2201,2211,2222],{},[65,2192,2193,2195,2198],{},[83,2194,854],{},[83,2196,2197],{},"0 EUR tot de start van de tarieven",[83,2199,2200],{},"volledige functionaliteit, geen factuur",[65,2202,2203,2205,2208],{},[83,2204,337],{},[83,2206,2207],{},"0 EUR, blijvend",[83,2209,2210],{},"volledig ontwerp zonder project- of kringlimiet; exports met afdekvlakken over de bruikbare gegevens",[65,2212,2213,2216,2219],{},[83,2214,2215],{},"Eenmalig gebruik",[83,2217,2218],{},"12 EUR per pand, eenmalig",[83,2220,2221],{},"alle documenten zonder afdekvlakken voor precies één bevestigd adres",[65,2223,2224,2226,2229],{},[83,2225,359],{},[83,2227,2228],{},"24 EUR per maand of 240 EUR per jaar; de prijs blijft zolang het abonnement loopt",[83,2230,2231],{},"alle projecten en documenten zonder afdekvlakken, drie bewerkingsplaatsen, elke extra plaats 5 EUR per maand of 50 EUR per jaar",[16,2233,2234],{},"Alle prijzen zijn exclusief 21 % btw; eenmalig gebruik kost dus 14,52 EUR inclusief btw. Bij twee panden per maand kosten twee keer eenmalig gebruik evenveel als Pro (24 EUR); vanaf drie panden per maand is Pro voordeliger. De startdatum van de tarieven kondigen we tijdig vooraf aan. Wie zich vóór de start registreert, gebruikt PlanElec vanaf de start de eerste volle kalendermaand gratis. Registratie, inloggen en uitnodigingen kosten nooit iets; kosten ontstaan alleen door een uitdrukkelijke boeking.",[11,2236,2238],{"id":2237},"wat-planelec-vandaag-bijdraagt","Wat PlanElec vandaag bijdraagt",[16,2240,2241],{},"PlanElec brengt grondplan, elektrische topologie en bordplanning samen in één project. Eendraadschema en situatieplan gaan centraal als pdf de deur uit, net als een samengesteld installatiedossier met voorblad en documentenlijst. De AREI\u002FRGIE-zelfcontrole beoordeelt de ondersteunde regels die uit je gegevens beslisbaar zijn en toont ontbrekende gegevens. De gedetailleerde, merkneutrale materiaallijst is beschikbaar als pilotfunctie; ze is geen bestelvrijgave.",[16,2243,2244,2245,2249,2250,54],{},"De rollen zijn daarmee duidelijk: PlanElec maakt de plannen uit je projectmodel en houdt de documenten consistent. Opname ter plaatse, technisch ontwerp en uitvoering blijven bij de elektricien, en het controleverslag schrijft het erkend organisme. Of dat voor jou loont, hangt af van hoe volledig je projectgegevens al zijn. Alles wat PlanElec kan, vind je in ",[42,2246,2248],{"href":2247},"\u002Fblog\u002Fwat-kan-je-met-planelec","Wat je met PlanElec kunt doen","; hoe het zich verhoudt tot Excel en papier, lees je in ",[42,2251,2253],{"href":2252},"\u002Fblog\u002Fplanelec-vs-excel-papier","PlanElec of Excel en papier: de vergelijking",[11,2255,2257],{"id":2256},"zo-vraag-je-vergelijkbare-offertes-aan","Zo vraag je vergelijkbare offertes aan",[393,2259,2260,2263,2266,2269,2272,2275,2278],{},[396,2261,2262],{},"Beschrijf gebouw, aansluiting, aantal borden en gekende kringen.",[396,2264,2265],{},"Vermeld bijzondere bronnen en lasten zoals PV, batterij, laadpaal of warmtepomp.",[396,2267,2268],{},"Bezorg bestaande plannen en keuringsverslagen, zonder onbekende gegevens te raden.",[396,2270,2271],{},"Vraag aparte posten voor opname, tekenwerk, technische controle, uitvoering en keuring.",[396,2273,2274],{},"Vraag naar btw, verplaatsing, leverformaat en correctierondes.",[396,2276,2277],{},"Vergelijk niet alleen het totaal, maar ook verantwoordelijkheid en dekking.",[396,2279,2280],{},"Documenteer na wijzigingen de werkelijke toestand en bewaar de documenten in het installatiedossier.",[11,2282,2284],{"id":2283},"oplevering-en-revisie-als-aparte-prestatie","Oplevering en revisie als aparte prestatie",[16,2286,2287],{},"Een goede offerte vermeldt niet alleen “plan als pdf”, maar de opgeleverde stand van het werk. Spreek af welke bestaande documenten gecontroleerd werden, welke gegevens jij leverde en welke onbekenden open blijven. Leg vast hoeveel correctierondes inbegrepen zijn, wie wijzigingen na de werf meldt en welke bestandsversie daarna als uitgevoerde toestand geldt.",[16,2289,2290],{},"Voor de oplevering helpt een korte controlelijst: kloppen de kringcodes tussen bord, eendraadschema en situatieplan? Zijn nieuw en verwijderd materieel verwerkt? Zijn aannames als aannames gemarkeerd? Liggen datasheets en meetgegevens bij de verantwoordelijke? Pas die oplevering maakt tekenwerk, technische controle en later onderhoud vergelijkbaar. Een lage offerte zonder afgesproken revisie wordt bij de volgende wijziging snel duurder.",[11,2292,2294],{"id":2293},"veelgestelde-vragen","Veelgestelde vragen",[265,2296,2298],{"id":2297},"welke-gegevens-verzamel-ik-vóór-de-aanvraag","Welke gegevens verzamel ik vóór de aanvraag?",[16,2300,2301],{},"Begin met alles wat zonder ingreep zichtbaar is: adres en aansluitingstype, aantal en ligging van de borden, leesbare kenmerken van differentieelschakelaars en automaten, kringnamen, grondplan, vroegere schema's en keuringsverslagen. Noteer vaste verbruikers en bronnen apart. Markeer onbekende waarden uitdrukkelijk als onbekend. Een verzonnen doorsnede laat een tekening volledig lijken en maakt ze technisch waardeloos. Foto's helpen bij de voorbereiding; de veilige vaststelling van verborgen leidinggegevens vervangen ze niet.",[265,2303,2305],{"id":2304},"welke-prestaties-verdwijnen-niet-in-een-planprijs","Welke prestaties verdwijnen niet in een “planprijs”?",[16,2307,2308],{},"Wijzigingen aan de installatie, foutopsporing, meetrapporten, dimensionering volgens fabrikantvoorwaarden en het oplossen van een keuringsopmerking zijn aparte prestaties. Ook de procedures bij de netbeheerder voor productie-installaties of opslag lopen niet automatisch mee. Zijn die stappen nodig, dan verschijnen ze als aparte post met resultaat, verantwoordelijke en termijn. Dat beschermt beide partijen: jij ziet wat geleverd wordt, en de installateur neemt geen verantwoordelijkheid voor niet-bestelde delen.",[265,2310,2312],{"id":2311},"hoe-behandel-ik-wijzigingen-na-de-eerste-export","Hoe behandel ik wijzigingen na de eerste export?",[16,2314,2315],{},"Bewaar een traceerbare beginversie, voer bevestigde wijzigingen in project en situatieplan in en laat technische wijzigingen controleren. Noteer niet alleen “keuken gewijzigd”, maar welke kring, welke beveiliging, welke leiding en welke punten de wijziging raakt. Zo blijft de volgende correctieronde een beperkte update in plaats van een nieuwe opname.",[265,2317,2319],{"id":2318},"mag-ik-het-schema-zelf-tekenen","Mag ik het schema zelf tekenen?",[16,2321,2322,2323,54],{},"Het AREI bepaalt wie het eendraadschema opstelt: de verantwoordelijke van de uitvoering van het werk (onderafdeling 3.1.2.1 a). Beslissend is dat de documenten de werkelijke toestand correct tonen en in de controleprocedure beschikbaar zijn. Zelf tekenen is niet zelf installeren: opname aan spanningvoerende delen en uitvoering blijven voorbehouden aan vakmensen. Een vergelijking van beide wegen vind je in de ",[42,2324,2326],{"href":2325},"\u002Fblog\u002Fkostenvergelijking-zelf-vs-elektricien","kostenvergelijking zelf tekenen of elektricien",[265,2328,2330],{"id":2329},"betekent-een-pdf-uit-planelec-dat-de-installatie-conform-is","Betekent een pdf uit PlanElec dat de installatie conform is?",[16,2332,2333],{},"Nee. De pdf documenteert je projectgegevens, en de zelfcontrole toetst de ondersteunde regels oriënterend. Of de gekeurde installatie aan de voorschriften voldoet, stelt het erkend organisme vast in de voorziene procedure.",[265,2335,2337],{"id":2336},"wat-is-de-belangrijkste-kostendrijver","Wat is de belangrijkste kostendrijver?",[16,2339,2340],{},"Niet de woonoppervlakte, maar de onzekerheid over de werkelijke toestand en de afgesproken omvang. Gekende, geverifieerde gegevens verlagen de opname-inspanning; onbekende leidingen, meerdere borden of technische wijzigingen verhogen ze.",[11,2342,2344],{"id":2343},"besluit","Besluit",[16,2346,2347],{},"Een correcte prijs voor een elektriciteitsplan is een projectspecifieke offerte. Scheid opname, tekenwerk, technische controle, werken en keuring, waardeer ook je eigen tijd en vergelijk gelijke prestaties. PlanElec structureert de documentatie en kost in Early Access niets; technisch ontwerp, uitvoering en keuring blijven aparte posten.",[16,2349,2350],{},[42,2351,2352],{"href":488},"Start je project in de gratis Early Access →",{"title":491,"searchDepth":492,"depth":492,"links":2354},[2355,2356,2357,2358,2364,2365,2366,2367,2368,2376],{"id":1902,"depth":492,"text":1903},{"id":1921,"depth":492,"text":1922},{"id":2014,"depth":492,"text":2015},{"id":2114,"depth":492,"text":2115,"children":2359},[2360,2361,2362,2363],{"id":2137,"depth":500,"text":2138},{"id":2144,"depth":500,"text":2145},{"id":2151,"depth":500,"text":2152},{"id":2162,"depth":500,"text":2163},{"id":2173,"depth":492,"text":2174},{"id":2237,"depth":492,"text":2238},{"id":2256,"depth":492,"text":2257},{"id":2283,"depth":492,"text":2284},{"id":2293,"depth":492,"text":2294,"children":2369},[2370,2371,2372,2373,2374,2375],{"id":2297,"depth":500,"text":2298},{"id":2304,"depth":500,"text":2305},{"id":2311,"depth":500,"text":2312},{"id":2318,"depth":500,"text":2319},{"id":2329,"depth":500,"text":2330},{"id":2336,"depth":500,"text":2337},{"id":2343,"depth":492,"text":2344},"Wat de prijs van een Belgisch elektriciteitsplan bepaalt, hoe je offertes vergelijkt met een aanpasbaar rekenmodel en wat PlanElec kost in Early Access en na de start van de tarieven.","nl",{},"\u002Fblog\u002Felectrical-plan-costs.nl",{"title":1897,"description":2377},"kosten-elektriciteitsplan","blog\u002Felectrical-plan-costs.nl",[534,535,537,2385,2386,2387,2388,1548,2389,2390,2391,547,536,1053,539],"situatieschema","kosten","prijs","elektriciteitsplan","elektricien","immobilieverkoop","België","K87tqsCZr_26CvZFsHM4_catQIhW5G1UKwVPEP1HJc0",[2394,2399,2404],{"articleId":2395,"locale":522,"slug":2396,"title":2397,"date":2398,"publishDate":527},"single-line-diagram","schema-unifilaire","Schéma unifilaire en Belgique : guide RGIE étape par étape","2026-01-05",{"articleId":2400,"locale":522,"slug":2401,"title":2402,"date":2403,"publishDate":2403},"bill-of-materials-electrical","liste-de-materiel-installation-electrique","Liste de matériel d’une installation électrique : quels postes doit-elle contenir ?","2026-08-31",{"articleId":2405,"locale":522,"slug":2406,"title":2407,"date":2408,"publishDate":2408},"new-build-single-line-checklist","schema-unifilaire-construction-neuve-checklist","Schéma unifilaire en construction neuve : checklist RGIE jusqu’au contrôle","2026-08-29"]